KOCHI KOTTANAD BANGALORE MANGALORE PIPELINE PROJECT INSPECTION TEST PLAN FOR FLOOR FINISHING CLIENT: GAIL( INDIA) LIMITED CONSULTANT : MECON LIMITED CONTRACTOR: JAIHIND PROJECT LTD DOCUMENT NO: JPL/KKBMPL/CIVIL/09/ITP S.No ACTIVITY FREQUENCY OF INSPECTION REMARKS JPL MECON GAIL 1 Approval of procedure W RM RM 2 Incoming material checking W RM RM 3 Bed Level Checking W RM RM 4 W RM RM 5 W RM RM 6 Floor finish checking. W RM RM 7 W RM RM 8 W RM RM 9 Curing for 7 days W RM RM 10 Grinding and polishing W RM RM 11 W RM RM 12 Setting of joints W RM RM 13 W RM RM 14 Health & Safety W RM RM LEGEND: A - Approval H - Hold Point W - Witness Point R - Review Documents RM - Random Inspection FOR JPL FOR MECON/GAIL Signature Name Date Checking of Sub-base , Base Course as per drawing Checking of necessary slope provided Checking of junction of floor with wall plaster,cladding. Checking of Cement Plaster Skirting Workmanship conforming to IS Codes. Removing of all marks from tile surface by washing as per specification.

Upload: sachein-anand

Post on 04-Dec-2015

221 views

Category:

Documents


7 download

DESCRIPTION

Floor Finishing

TRANSCRIPT

Page 1: Floor Finishing

KOCHI KOTTANAD BANGALORE MANGALORE PIPELINE PROJECTINSPECTION TEST PLAN FOR

FLOOR FINISHINGCLIENT: GAIL( INDIA) LIMITEDCONSULTANT : MECON LIMITEDCONTRACTOR: JAIHIND PROJECT LTDDOCUMENT NO: JPL/KKBMPL/CIVIL/09/ITP

S.No ACTIVITYFREQUENCY OF INSPECTION

REMARKSJPL MECON GAIL

1 Approval of procedure W RM RM

2 Incoming material checking W RM RM

3 Bed Level Checking W RM RM

4 W RM RM

5 W RM RM

6 Floor finish checking. W RM RM

7 W RM RM

8 W RM RM

9 Curing for 7 days W RM RM

10 Grinding and polishing W RM RM

11 W RM RM

12 Setting of joints W RM RM

13 W RM RM

14 Health & Safety W RM RM

LEGEND:

A - Approval H - Hold Point W - Witness Point R - Review Documents RM - Random Inspection

FOR JPL FOR MECON/GAILSignature

Name

Date

Checking of Sub-base , Base Course as per drawing

Checking of necessary slope provided

Checking of junction of floor with wall plaster,cladding.

Checking of Cement Plaster Skirting

Workmanship conforming to IS Codes.

Removing of all marks from tile surface by washing as per specification.