Floor Screeding. Lesson no 1. Learning outcomes by the end of this lesson you should be able to. Identify the bonded floor screed Describe the monolithic floor screed Recognise a Floating screed. Types of floor screed systems. Bonded. (Monolithic.) Un Bonded Floating screed. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Floor Screeding

Floor Screeding

Lesson no 1

Page 2: Floor Screeding
Page 3: Floor Screeding

Learning outcomesby the end of this lesson you should be able to

Identify the bonded floor screed

Describe the monolithic floor screed

Recognise a Floating screed

Page 4: Floor Screeding

Types of floor screed systems

Bonded. (Monolithic.) Un Bonded Floating screed

Page 5: Floor Screeding

Bonded ( monolithic) floor screed

Bonded systems tend to be the most common methods it fits better with the nature of construction and the set and leave approach of concrete.

In this method a screed is applied to a previously laid concrete base

Bonded thickness is from 25mm to 40mm

Page 6: Floor Screeding

Bonded floor screed

Page 7: Floor Screeding

Un Bonded floor screed An unbonded floor is

where no bond to the concrete base is possible owing to its condition. Minimum thickness is 50mm.

A number of different forms of floor construction are included in this type, and are often grouped on their own, e.g. laying a screed on a damp-proof sheet membrane.

Page 8: Floor Screeding

Un Bonded floor screed

Page 9: Floor Screeding

Floating floor screed Floating screed • An Floating screed floor is

where no bond to the concrete base is possible owing to its condition. Minimum thickness is 50mm.

• A number of different forms of floor construction are included in this type, and are often grouped on their own, e.g. laying a creed on a damp-proof sheet membrane, and laying a floor on a layer of insulation

Page 10: Floor Screeding

Floating floor screed

Page 11: Floor Screeding

Task

1. How much mixed material is needed to complete a floor screed 5.000 m long by 4.000 m wide

and 0.050 m thick?

Answer

1 m3

Page 12: Floor Screeding

Task

Tools and equipment for floor screeding will generally include:

1. sweeping brush, trowel, float, mixer, shovel2. splash brush, small tool, gauger, trowel, float3. spirit level, trowel, buckets, mixer, float4. levelling equipment, trowel, float, shovel

buckets, mixer Answer 4

Page 13: Floor Screeding

Answer

Page 14: Floor Screeding

Types of materials used

Mixing is one of the most important jobs of the whole operation

The quality of the sand is important and must be sharp,gritty and clean

The mix ratio is 3 parts sand and 1 part cement

Page 15: Floor Screeding
Page 16: Floor Screeding

Types of materials used

Some floors are laid using granite chipping

On large work , a pump mixer can be used.this will increase productivity and ensure an even mix

Page 17: Floor Screeding
Page 18: Floor Screeding

Preparation of floors

Remove all loose particles and high points on the floor

Brush all the area to remove dust For certain floor surfaces , a mix of

cement slurry and P.V.A can be brushed into the surface

Smooth surface should be scrabbled to form a key

Page 19: Floor Screeding

Question

Plastic sheeting below the structural floor is the:

1. damp proof membrane2. vapour barrier3. moisture trap4. aid to curing the floorAnswer 1. damp proof membrane

Page 20: Floor Screeding

Question

The type of cement used in floor screeds is:

1. Masonry Portland2. Extra Portland3. Rapid Portland4. Ordinary PortlandAnswer Ordinary Portland

Page 21: Floor Screeding

Finishes

• Floors are generally finished with either a floated or trowelled surface.

• A wood fl oat produces a sand-faced texture.

• Trowelling gives a smooth finish which closes in the surface of a wood fl oat finish.

• Power floats, tampers and rollers can be used to assist the floor layer.

Page 22: Floor Screeding

Finishes

Float finish These are laid mainly to receive mastic asphalt, asphalt

tiles, bitumen, concrete tiles and other heavy finishes. Trowel finish These are laid mainly to receive carpet, hardboard, vinyl

and cork tiles.

Page 23: Floor Screeding

Task make a copy of this chart

CAUSE EFFECT

Poor preparation of sub-base. Cracking and lack of bond.

Mix too dry. Hard to lay; gives weak finish.

Too much cement. Shrinkage cracks.

Too little cement. Will break down when load applied.

Too much water. Hard to form flat surface; may shrink and be weak.

Poor material mix. Could leave pockets of sand with no cement, or vice versa.

Over-trowelling/trowelling too soon.

Brings water to the surface with cement.

Poor curing. Weakens surface.

Over-trowelling/trowelling too soon.

Brings water to the surface with cement.

Page 24: Floor Screeding

Questions

What is one of the most important jobs in the whole operation

Answer Mixing is one of the most important

jobs of the whole operation What is the mix ratio of a floor screed Answer The mix ratio is 3 parts sand and 1 part

cement

Page 25: Floor Screeding

Curing

It is essential that sufficient moisture is available for the continued hydration, or setting action, between the Portland cement and water for up to seven days after laying.

This is achieved by restricting the moisture loss of evaporation from the mix by covering

the finished topping with: Building paper. Polythene sheets. Damp hessian sacks.

Page 26: Floor Screeding

A floor scrabbling machine

How do we key a smooth floor to receive a screed

Answer With a scrabbling

machine Basic floor Scrabbled floor Scrabbling machine

Page 27: Floor Screeding
Page 28: Floor Screeding

Grinding High Spots

The screed is ground using a power operated grinding machine.

Throughout the process the surface is kept wet.

Any ground material is removed using squeegees or some modern grinders collect the material as they operate

Page 29: Floor Screeding
Page 30: Floor Screeding

Question

How should we prepare the floor to receive a screed

Answer Remove all loose particles and high

points on the floor Brush all the area to remove dust

Page 31: Floor Screeding

Floor screeding

Floor area is calculated by volume i.e length x width x depth. Length = 29m, x width = 30m, x

depth = 0.035mm, = 30.45 m3

Page 32: Floor Screeding

Question

How do we key a smooth floor to receive a screed

Answer With a scrabbling machine

Page 33: Floor Screeding

Monolithic floor screed

Monolithic in construction terminology means 'one body' or 'laid as one'.

That is to say when materials such as a concrete base and its screed are laid within three hours, they are deemed to be laid as one

Monolithic thickness is from 10mm to 15mm

Page 34: Floor Screeding
Page 35: Floor Screeding

Question

Name the three types of floor screed Answer Bonded (Monolithic) Un-bonded Floating screed

Page 36: Floor Screeding

Floor screeding

Monolithic thickness is from 10mm to 15mm

Un-bonded thickness is 50mm

Bonded thickness is from 25mm to 40mm

Separate Minimum thickness is 40mm..

Page 37: Floor Screeding

Task

Now work in groups to answer questions 14-22 on pages 324 –326 of your work book

Page 38: Floor Screeding

Floor Screed

Lesson no 2

Page 39: Floor Screeding

Floor screedingby the end of this lesson you should be able to

Recall why we use a datum line, and how to set out levels

Understand the term Curing Be aware of common faults that might

occur when floor screeding

Page 40: Floor Screeding

Recap on lesson no 1

Name four types of floor screed Answer Monolithic Bonded Un-bonded Floating screed How do we key a smooth floor to receive

a screed Answer With a scrabbling machine

Page 41: Floor Screeding

Recap on lesson no 1

How should we prepare the floor to receive a screed

Answer Remove all loose particles and high

points on the floor Brush all the area to remove dust

Page 42: Floor Screeding

Datum line

A datum line is a level line around the room

This can be drawn by using a sprit level , or a laser level, or a water level.

The height of the screed can be set from the datum line by using a builders square

Page 43: Floor Screeding

Water level

The green pipe is filled with water .

Then with two operatives each take an end of the water level,

By raising the end of the water level up or down they will both reach a point where both reading are the same

At this point a mark will be made on the wall, this is a datum point,from which datum lines can then be drawn

Page 44: Floor Screeding

Water level

Setting datum level to wall areas

Set the liquid container at a suitable height for working

Set adjustable gauge to zero at the level of liquid in container

Page 45: Floor Screeding

Water level Move instrument rod 3

from station point 1 to point 2,3,4 in sequence.

Raise or lower the rod until liquid is at zero on gauge and then mark this datum point on the wall at each of the points 1 – 2

Join up station points to obtain level datum line

Page 46: Floor Screeding

Water level

Page 47: Floor Screeding

Water level

Page 48: Floor Screeding

Laser level

The laser level will project a level line around the room it is located in

Page 49: Floor Screeding

Laser level

Page 50: Floor Screeding

Laser level

Page 51: Floor Screeding
Page 52: Floor Screeding
Page 53: Floor Screeding

Battens levelled in.

Bays filled in working in chequer board batten.

An initial trowel as work proceeds and turn back when floor has ‘picked-up’ and give

final Trowelling up.

Page 54: Floor Screeding

Dots levelled in.

Screeds ruled off dots in order indicated.

Bay filled in ruling off screeds.

Rubbing up and consolidating with a wood fl oat giving sand faced texture or when

trowel finish is required lightly Trowelling up fl oat finish.

Page 55: Floor Screeding

Task 1

In your own word describe how to seta datum level for setting up a level floor

Make a sketch of a water level

Page 56: Floor Screeding

Tools required for the task You will need the following

tools to carry out the floor screed:

• Flooring trowel. • Large fl oat. • Spirit level. • Gauger. • Large and small straight

edges. • Shovel. • Timber for dots. • Builders square. • Water or laser level.

Page 57: Floor Screeding

Question

What is a datum line Answer A datum line is a level line around the

room

Page 58: Floor Screeding

Curing

It is essential that sufficient moisture is available for the continued hydration ,or setting action

This is achieved by restricting the moisture loss of evaporation from the mix by covering the finish topping with

Building paper Polythene sheets Damp hessian sacks

Page 59: Floor Screeding

Task 2

Describe how to set up a floor with a fall

Page 60: Floor Screeding

Common faultsDusty Floors

This is a common problem. The surface of a floor begins to loose adhesion and does not resist abrasion well, the top layer of laitance (cement paste) turns to dust. This can be caused by :-

a) Insufficient curing of dryer mixes

b) Too much water in the concrete or screed mix

c) Lack of cement in the mix d) Too much fine aggregate

in the mix e) Weak aggregates in the

mix

Page 61: Floor Screeding
Page 62: Floor Screeding

Question

How do we let a floor cure Answer This is achieved by restricting the moisture

loss of evaporation from the mix by covering the finish topping with

Building paper Polythene sheets Damp hessian sacks

Page 63: Floor Screeding

Question

Give me two reasons why a floor screed may become dusty

Answer Insufficient curing of dryer mixes b) Too much water in the concrete or

screed mix c) Lack of cement in the mix d) Too much fine aggregate in the mix e) Weak aggregates in the mix

Page 64: Floor Screeding

Task

Now work in groups to answer questions1 –19 , pages 327 –335 of your work book

Then complete the word search

Page 65: Floor Screeding
Page 66: Floor Screeding

Floor with a fall

Fall are put in floor screeds to drain away water, i. e a shower room

Achieving a fall on a floor screed is not as daunting as it may first seem.

The secret is in the preparation of the dots used to control the levels and thus the falls for the screeded area.

Page 67: Floor Screeding

Achieving a fall

Achieving a fall on a roof screed is not as daunting as it may first seem. The secret is in the preparation of the dots used to control the levels and thus the falls for the screeded area.

Page 68: Floor Screeding

Achieving a fall

On roofs, dots are started from the lowest outlet position and worked back and lined in to an agreed fall. The best way of achieving this is by the use of a fixed length rule or straightedge of known length.

Page 69: Floor Screeding

Achieving a fall

For example, if a fall of 1:100 is required this is the same as 10mm in every metre. If you have a 3m straightedge, then place a packing piece 30mm thick (10mm x 3m length) below one end. You will find when you level the straightedge using a spirit level, this will mean that from one dot to another will rise by 30mm - simple ! This technique can be used for whatever fall you need, just calculate the packing thickness.