Florida Department of

TRANSPORTATION - DISTRICT ONEFlorida Department of

TRANSPORTATION - DISTRICT ONE

SOUTHWESTAREA OFFICE(FORT MYERS)

DISTRICT ONEHEADQUARTERS

(BARTOW)

POLK COUNTY

ADOPTED FIVE YEAR WORK PROGRAMFISCALFISCAL YEARS YEARS 2017-20212017-2021

Page 2: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

COUNTYPOLK

MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.

July 1, 2016 Through June 30, 2021

ADOPTED WORK PROGRAM REPORT

Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 28/18/2016Run Date: SnapShot Date: 7/20/2016

Zachary BurchGovernment Affairs &Communications ManagerSouthwest Area Office10041 Daniels ParkwayFort Myers, Fl. 33913(239) 225‐1950

Page 3: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1

COUNTYPOLK

July 1, 2016 Through June 30, 2021

CURRENTLY REPORTED ACTIVE FUND CODES

ADOPTED WORK PROGRAM REPORT

ACCM Advance Construction (CM)

ACSA Advance Construction (SA)

ACSU Advance Construction (SU)

BNDS Bond – State

BRTZ BRT (AC/Repair)

CIGP County Incentive Grant Program

CM Congestion Mitigation – ACQ

DDR District Dedicated Revenue

DI State-Statewide Inter/Intrastate Highway

DIH State In-house Product Support

DITS Statewide ITS - State 100%

DPTO State PTO

DS State Primary Highways and PTO

DU State Primary/Federal Reimbursement

DWS Weigh Stations - State 100%

FAA Federal Aviation Administration

FTA Federal Transit Administration

FTAT FHWA Transfer to FTA (non-bud)

HSP Highway Safety Program

LF Local Funds

LFP Local Fund for Participating

PKYI Tpk Improvement

PKYR Tpk Maintenance Reserve

PL Metro Plan (85% FA; 15% other)

RHH Rail-Highway Xings – Hazard

SA STP, Any Area

SL STP, Areas < 200k

SU STP, Urban Areas > 200k

TRIP Trans Regional Incentive Prog

ACBZ

ACNP Advanced Construction NHPP

ACTA

ACTU Advanced Construction TALU

NHPP National Highway Preformance Program

NHRE National Highway Resurfacing

TALT Transportation Alternatives Any Area

TALU Transportation Alternatives (Population > 200K)

TRWR Transportational Regional Incentive Program

SIWR State Transportation Trust Funds

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 38/18/2016Run Date: SnapShot Date: 7/20/2016

Page 4: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

HIGHWAYS

FPN: 4387581 Project/Location: AIRPORT RD RR XING AT ENTRANCE TO

AIRPORT #625424K

Project Length: 0.001

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

RRU RHH $177,013

$177,013Project Total:

FPN: 4382661 Project/Location: ARIANA ST SIDEWALK FROM S. WABASH AVE TO

LOTUS AVE

Project Length: 0.740

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.380 End Mile Post: 1.120

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $201,000

CST SU $1,584,158

$201,000 $1,584,158Project Total:

FPN: 4136441 Project/Location: AUBURNDALE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.820

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 10.690 End Mile Post: 11.510

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $37,997 $28,443 $29,297 $30,176 $31,081

$37,997 $28,443 $29,297 $30,176 $31,081Project Total:

FPN: 4313521 Project/Location: BARTOW NORTHERN CONNECTOR PHASE II

FROM US 17 TO SR 60

Project Length: 2.000

Desc: NEW ROAD CONSTRUCTION

Comments:

Begin Mile Post: 2.062 End Mile Post: 4.062

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST CIGP $467,864

CST LFP $10,171,346

CST TRIP $554,101

CST TRWR $2,092,968

$13,286,279Project Total:

FPN: 4136451 Project/Location: BARTOW TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.002

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 16.896 End Mile Post: 17.898

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $59,600 $52,721 $54,303 $55,932 $57,610

$59,600 $52,721 $54,303 $55,932 $57,610Project Total:

FPN: 4345081 Project/Location: BOMBER ROAD AT SPRUCE ROAD AND GERBER

DAIRY ROAD

Project Length: 1.857

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 0.750 End Mile Post: 2.607

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SA $4,717

ENV ACSA $20,000

CST ACSA $10,250

CST HSP $1,150,025

$1,184,992Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 48/18/2016Run Date: SnapShot Date: 7/20/2016

Page 5: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4351071 Project/Location: BRUNNELL PARKWAY FROM MEMORIAL BLVD

TO TENTH STREET

Project Length: 0.556

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.844 End Mile Post: 1.400

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST SU $151,090

$151,090Project Total:

FPN: 1976204 Project/Location: CITY OF LAKELAND LEASE OF FIBER OPTIC

NETWORK

Project Length: 0.000

Desc: TRAFFIC CONTROL DEVICES/SYSTEM

Comments: YEARLY MAINTENANCE FEE FOR ATMS FIBER CABLE

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS SL $20,278 $20,278 $20,278 $20,278 $20,278

$20,278 $20,278 $20,278 $20,278 $20,278Project Total:

FPN: 4317721 Project/Location: COW CAMP ROAD BRIDGE NO. 160400 OVER

ROSALIE/ZIPPRER CANAL

Project Length: 0.001

Desc: BRIDGE REPLACEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE BRTZ $58,433

ENV ACBZ $20,000

CST ACBZ $1,715,032

$1,793,465Project Total:

FPN: 4332721 Project/Location: CR 544 AT SR 17

Project Length: 0.446

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.446

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE ACSU $1,789

CST SU $28,288

$30,077Project Total:

FPN: 4349421 Project/Location: CREWS LAKE RD FROM LAKELAND HIGHLANDS

RD TO E. OF BEAL LANE

Project Length: 1.946

Desc: TRAFFIC OPS IMPROVEMENT

Comments:

Begin Mile Post: 0.007 End Mile Post: 1.953

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SA $3,651

CST ACSA $8,200

CST HSP $1,322,230

$1,334,081Project Total:

FPN: 4350941 Project/Location: DAVENPORT COMPLETE STREET PHASE I AND

PHASE II

Project Length: 0.001

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE TALU $225,000

CST TALT $436,163

CST TALU $248,600

$225,000 $684,763Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 58/18/2016Run Date: SnapShot Date: 7/20/2016

Page 6: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4136461 Project/Location: DAVENPORT TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.094

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 3.768 End Mile Post: 3.862

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $4,590 $3,386 $3,488 $3,592 $3,700

$4,590 $3,386 $3,488 $3,592 $3,700Project Total:

FPN: 4361451 Project/Location: DRAINAGE IMPROVEMENT SR 600 FROM E. ECHO

ST TO W CUMMING ST

Project Length: 0.260

Desc: DRAINAGE IMPROVEMENTS

Comments:

Begin Mile Post: 0.556 End Mile Post: 0.816

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $2,726

CST DIH $5,135

CST DS $1,591,356

$1,599,217Project Total:

FPN: 4136471 Project/Location: DUNDEE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.065

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 28.850 End Mile Post: 29.915

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $10,019 $10,836 $11,161 $11,495 $11,840

$10,019 $10,836 $11,161 $11,495 $11,840Project Total:

FPN: 4387571 Project/Location: E PARK AVE FROM N SCENIC HWY TO CYPRESS

GARDENS LANE #625479X

Project Length: 0.039

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.314 End Mile Post: 0.353

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

RRU RHH $264,519

$264,519Project Total:

FPN: 4136481 Project/Location: EAGLE LAKE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.440

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 25.390 End Mile Post: 25.830

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $13,770 $10,159 $10,463 $10,777 $11,100

$13,770 $10,159 $10,463 $10,777 $11,100Project Total:

FPN: 4345021 Project/Location: EWELL ROAD AT LUNN RD

Project Length: 5.000

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 5.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE HSP $142,876

PE SA $5,504

CST HSP $2,050,283

CST SA $10,270

$148,380 $2,060,553Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 68/18/2016Run Date: SnapShot Date: 7/20/2016

Page 7: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4301855 Project/Location: FGT I-4 @ SR 33 INTERCHANGE

MODIFICATION

Project Length: 0.650

Desc: INTERCHANGE - ADD LANES

Comments:

Begin Mile Post: 12.032 End Mile Post: 12.682

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $5,000

RRU DS $240,000 $1,200,000

ROW DIH $26,225

ROW DS $582,424

CST DIH $5,415

$245,000 $608,649 $1,205,415Project Total:

FPN: 4136491 Project/Location: FROSTPROOF TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.443

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 4.750 End Mile Post: 6.193

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $10,617 $8,296 $8,545 $8,801 $9,065

$10,617 $8,296 $8,545 $8,801 $9,065Project Total:

FPN: 4332682 Project/Location: FT FRASER TRAIL EXTENSION FM SR540/WINTER

LK RD TO COMBEE RD- LAKELAND

Project Length: 0.946

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 7.829 End Mile Post: 8.775

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $1,250,000

$1,250,000Project Total:

FPN: 4136501 Project/Location: FT MEADE TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.700

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 7.000 End Mile Post: 7.700

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $10,179 $9,312 $9,591 $9,879 $10,175

$10,179 $9,312 $9,591 $9,879 $10,175Project Total:

FPN: 4136511 Project/Location: HAINES CITY TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.270

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 21.500 End Mile Post: 22.770

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $40,176 $43,450 $44,754 $46,096 $47,479

$40,176 $43,450 $44,754 $46,096 $47,479Project Total:

FPN: 4301853 Project/Location: I-4 @ SR 33 INTERCHANGE

MODIFICATION

Project Length: 0.650

Desc: INTERCHANGE - ADD LANES

Comments:

Begin Mile Post: 12.032 End Mile Post: 12.682

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

ENV SA $1,300,000

RRU DS $200,000 $950,000

ROW DIH $108,049

ROW SA $2,424,346

$200,000 $4,782,395Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 78/18/2016Run Date: SnapShot Date: 7/20/2016

Page 8: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 2012178 Project/Location: I-4 AT CSX RAILROAD

Project Length: 0.004

Desc: BRIDGE-REPLACE AND ADD LANES

Comments:

Begin Mile Post: 4.887 End Mile Post: 4.891

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE ACNP $86,918

ENV SIWR $50,000

RRU DI $6,000,000

RRU SIWR $1,000,000

CST DI $9,581,454

CST DIH $129,395

$86,918 $1,050,000 $15,710,849Project Total:

FPN: 4388711 Project/Location: I-4 AT SR 539

Project Length: 0.780

Desc: LANDSCAPING

Comments:

Begin Mile Post: 4.620 End Mile Post: 5.400

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $10,000

CST DIH $10,560

CST DS $1,056,000

$10,000 $1,066,560Project Total:

FPN: 2012153 Project/Location: I-4 AT SR 557

Project Length: 1.610

Desc: INTERCHANGE IMPROVEMENT

Comments:

Begin Mile Post: 21.767 End Mile Post: 22.878

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $26,053

ENV SA $8,000,000

RRU ACNP $4,500,000

CST ACNP $53,944,313

CST DIH $485,248

$26,053 $8,000,000 $58,929,561Project Total:

FPN: 4389941 Project/Location: I-4 AT SR 559

Project Length: 0.730

Desc: LANDSCAPING

Comments:

Begin Mile Post: 18.060 End Mile Post: 18.790

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $10,000

CST DIH $10,250

CST DS $820,000

$840,250Project Total:

FPN: 4136521 Project/Location: LAKE ALFRED TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 0.010

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 15.590 End Mile Post: 15.600

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $15,672 $12,392 $12,764 $13,146 $13,541

$15,672 $12,392 $12,764 $13,146 $13,541Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 88/18/2016Run Date: SnapShot Date: 7/20/2016

Page 9: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4351091 Project/Location: LAKE HOWARD DR FROM AVE D SW TO 15TH ST

SW

Project Length: 0.001

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE LF $155,000

CST SA $1,000

CST TALT $66,198

CST TALU $361,327

$155,000 $428,525Project Total:

FPN: 4136531 Project/Location: LAKE WALES TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 1.017

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 18.968 End Mile Post: 19.985

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $35,066 $38,032 $39,173 $40,348 $41,559

$35,066 $38,032 $39,173 $40,348 $41,559Project Total:

FPN: 4371071 Project/Location: LAKELAND TMC OPS FUND CITY

WIDE

Project Length: 0.001

Desc: OTHER ITS

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DS $318,000 $159,000 $159,000 $159,000 $159,000

$318,000 $159,000 $159,000 $159,000 $159,000Project Total:

FPN: 4136541 Project/Location: LAKELAND TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 4.770

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 23.830 End Mile Post: 28.600

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DITS $504,743 $555,002 $576,426 $593,719 $616,595

$504,743 $555,002 $576,426 $593,719 $616,595Project Total:

FPN: 4382671 Project/Location: MAIN STREET PATHWAYS FROM INTERLACHEN

PKWY TO LONGFELLOW BLVD

Project Length: 0.490

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.430 End Mile Post: 0.920

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $81,000

CST SU $524,241

CST TALU $331,870

$81,000 $856,111Project Total:

FPN: 4136551 Project/Location: MULBERRY TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 2.500

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 18.450 End Mile Post: 20.950

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $26,463 $22,136 $22,800 $23,484 $24,189

$26,463 $22,136 $22,800 $23,484 $24,189Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 98/18/2016Run Date: SnapShot Date: 7/20/2016

Page 10: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4332581 Project/Location: NEW JERSEY TRAIL FROM CRYSTAL LAKE

DRIVE TO EDGEWOOD DRIVE

Project Length: 0.000

Desc: BIKE PATH/TRAIL

Comments: 10FT ASPHALT TRAIL ON WEST SIDE OF NEW JERSEY ROAD

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST ACTU $1,000

LAR SU $19,316

$20,316Project Total:

FPN: 4332601 Project/Location: NEW YORK CYCLE TRACK (LIME STREET) FROM

SIKES BLVD TO NEW YORK AVENUE

Project Length: 0.000

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE LF $115,307

PE TALU $1,000

CST SA $1,000

CST TALU $529,762

$116,307 $530,762Project Total:

FPN: 4344891 Project/Location: OLD DIXIE HIGHWAY/ SADDLE CREEK

ROAD

Project Length: 0.500

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.500

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE TALT $1,751

CST ACSA $10,250

CST HSP $1,072,075

$1,084,076Project Total:

FPN: 4353911 Project/Location: OLD DIXIE TRAIL FROM AUBURNDALE TO

HAINES CITY

Project Length: 0.001

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE SU $1,048,752

$1,048,752Project Total:

FPN: 4126751 Project/Location: POLK COUNTY TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 12.175

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 2.300 End Mile Post: 14.475

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $21,523

OPS DITS $545,704 $476,838 $500,692 $515,712 $531,184

$567,227 $476,838 $500,692 $515,712 $531,184Project Total:

FPN: 4385451 Project/Location: POLK COUNTY US 27 ASCT

Project Length: 3.149

Desc: ATMS - ARTERIAL TRAFFIC MGMT

Comments:

Begin Mile Post: 22.402 End Mile Post: 25.551

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DITS $125,000

DSB DIH $144,170

DSB DITS $1,397,000

$1,666,170Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 108/18/2016Run Date: SnapShot Date: 7/20/2016

Page 11: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4125301 Project/Location: POLK TPO IDENTIFIED OPERATIONAL

IMPROVEMENTS - FUNDING

Project Length: 0.000

Desc: TRAFFIC OPS IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $220

ROW SU $220

CST SU $971,103 $6,576,776 $3,126,138 $6,749,014 $7,281,362

$971,103 $6,576,776 $3,126,138 $6,749,454 $7,281,362Project Total:

FPN: 4351041 Project/Location: ROSE STREET SIDEWALKS AT VARIOUS

LOCATIONS

Project Length: 0.533

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.144 End Mile Post: 0.677

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE TALT $500

CST TALT $19,049

CST TALU $251,069

$270,618Project Total:

FPN: 4382651 Project/Location: SOUTH LAKE SILVER DR FROM 5TH STREET NW

TO SR 549(1ST STREET) N

Project Length: 0.330

Desc: SIDEWALK

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.330

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $126,000

CST SU $978,138

$126,000 $978,138Project Total:

FPN: 4381581 Project/Location: SR 17 FROM GRIFFIN FERTILIZER TO S. OF

LIVINGSTON LAKE ROAD

Project Length: 0.148

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.258 End Mile Post: 0.406

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $10,000

RRU DDR $350,000

CST DIH $21,120

CST DS $492,412

$10,000 $350,000 $513,532Project Total:

FPN: 4380141 Project/Location: SR 25 (US 27) FROM ERNIE CALDWELL BLVD TO

DUNSON ROAD

Project Length: 1.604

Desc: RESURFACING

Comments:

Begin Mile Post: 23.150 End Mile Post: 24.754

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $100,000

ENV DS $20,000 $50,000

CST DDR $1,702,454

CST DIH $264,000

CST DS $4,381,812

$120,000 $6,398,266Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 118/18/2016Run Date: SnapShot Date: 7/20/2016

Page 12: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4301852 Project/Location: SR 33 FROM OLD COMBEE RD TO N OF TOMKOW

RD

Project Length: 3.721

Desc: PRELIMINARY ENGINEERING

Comments:

Begin Mile Post: 4.993 End Mile Post: 8.714

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $1,229,296

$1,229,296Project Total:

FPN: 4301854 Project/Location: SR 33 FROM OLD COMBEE RD TO UNIVERSITY

BLVD

Project Length: 2.887

Desc: ADD LANES & REHABILITATE PVMNT

Comments:

Begin Mile Post: 4.993 End Mile Post: 7.880

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

ENV DDR $370,000

$370,000Project Total:

FPN: 4382641 Project/Location: SR 35/700 (US 98) AT SR 659 (COMBEE

ROAD)

Project Length: 0.200

Desc: PUBLIC TRANSPORTATION SHELTER

Comments:

Begin Mile Post: 8.693 End Mile Post: 8.893

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST FTAT $59,061

CST SU $59,061

$118,122Project Total:

FPN: 1975624 Project/Location: SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E

MAIN STREET

Project Length: 3.033

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 9.189 End Mile Post: 12.222

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $7,499

ROW CM $1,386,556 $1,945,260

ROW SA $81,037 $4,079,592 $4,359,163

$7,499 $1,467,593 $6,024,852 $4,359,163Project Total:

FPN: 4345071 Project/Location: SR 37 AT LAKE HARRIS DRIVE

Project Length: 0.285

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 23.436 End Mile Post: 23.721

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SA $5,174

CST ACSA $10,250

CST DDR $31,131

CST HSP $1,631,368

$1,677,923Project Total:

FPN: 4380251 Project/Location: SR 37 AT RR CROSSING 908391

Project Length: 0.001

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 1.934 End Mile Post: 1.935

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $50,000

ENV DS $10,000 $25,000

RRU DDR $150,000

CST DDR $407,440

CST DIH $53,374

$60,000 $635,814Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 128/18/2016Run Date: SnapShot Date: 7/20/2016

Page 13: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4349371 Project/Location: SR 37 FROM CR 630 TO CR 640 (PINECREST

RD)

Project Length: 7.601

Desc: RESURFACING

Comments:

Begin Mile Post: 7.386 End Mile Post: 14.987

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $36,604

ENV DS $100,000

CST DIH $92,995

CST DS $8,443,574

$8,673,173Project Total:

FPN: 4381591 Project/Location: SR 37 FROM MP 1.860 TO MP 2.008

Project Length: 0.148

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 1.860 End Mile Post: 2.008

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $10,000

RRU DDR $150,000

CST DIH $15,840

CST DS $492,412

$10,000 $150,000 $508,252Project Total:

FPN: 4366011 Project/Location: SR 37 FROM SR 60 TO N OF VIRGINIA

ST

Project Length: 0.796

Desc: RESURFACING

Comments:

Begin Mile Post: 18.209 End Mile Post: 19.005

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $79,116

ENV DDR $50,000

CST ACSA $283,763

CST DDR $51,250

CST SA $1,892,077

$2,356,206Project Total:

FPN: 4106662 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP

RD

Project Length: 2.305

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 0.380 End Mile Post: 2.685

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $34,185

ENV DDR $40,000 $200,000

RRU DDR $2,366,869

RRU LF $3,290,951

ROW ACSU $155,879

ROW SU $820,056

CST DDR $14,962,577

CST DIH $316,800

CST LF $62,339

INC DDR $960,000

$1,010,120 $40,000 $21,199,536 $960,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 138/18/2016Run Date: SnapShot Date: 7/20/2016

Page 14: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4106664 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP

ROAD

Project Length: 2.476

Desc: LANDSCAPING

Comments:

Begin Mile Post: 0.000 End Mile Post: 2.476

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST DDR $251,635

CST DIH $35,517

$287,152Project Total:

FPN: 4106663 Project/Location: SR 542 FROM BUCKEYE LOOP ROAD TO US

27

Project Length: 3.648

Desc: WIDEN/RESURFACE EXIST LANES

Comments:

Begin Mile Post: 2.779 End Mile Post: 6.427

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $14,807

ENV DS $50,000 $200,000

RRU DDR $3,025,000

RRU LF $500,000

ROW DDR $432,370 $4,704,127

ROW DIH $601,135

ROW DS $2,966,666

CST DDR $42,757,174

CST DIH $555,000

$4,014,978 $4,704,127 $50,000 $47,037,174Project Total:

FPN: 4365691 Project/Location: SR 546 (US 92) FROM WABASH AVENUE TO N.

INGRAHAM AVENUE

Project Length: 3.311

Desc: RIGID PAVEMENT REHABILITATION

Comments:

Begin Mile Post: 1.738 End Mile Post: 5.049

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $4,958

ENV ACSA $50,000

ENV SA $100,000

CST NHRE $3,677,682

CST SA $4,405,852

$54,958 $8,183,534Project Total:

FPN: 4380641 Project/Location: SR 546 FROM W. OF INGRAHAM TO E. OF EAST

GARY RD

Project Length: 1.209

Desc: RIGID PAVEMENT REHABILITATION

Comments:

Begin Mile Post: 4.494 End Mile Post: 5.703

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $10,000

CST DDR $2,372,161

CST DIH $269,240

$10,000 $2,641,401Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 148/18/2016Run Date: SnapShot Date: 7/20/2016

Page 15: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4350711 Project/Location: SR 555 (US 17) FROM AVENUE G SW TO AVENUE A

SW

Project Length: 1.066

Desc: RESURFACING

Comments:

Begin Mile Post: 28.500 End Mile Post: 29.069

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $6,268

ENV DDR $100,000

CST DDR $2,030,635

CST DIH $17,177

$2,154,080Project Total:

FPN: 4350851 Project/Location: SR 563 (SIKES BLVD) FROM LIME ST TO SR 539

(MLK JR BLVD)

Project Length: 0.417

Desc: RIGID PAVEMENT REHABILITATION

Comments:

Begin Mile Post: 0.006 End Mile Post: 0.423

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $10,000

CST DDR $913,086

CST DIH $103,635

$10,000 $1,016,721Project Total:

FPN: 4380091 Project/Location: SR 572 FROM N OF ROOMS TO GO ENTRANCE TO

DRANE FIELD RD

Project Length: 2.054

Desc: RESURFACING

Comments:

Begin Mile Post: 0.685 End Mile Post: 2.739

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $100,000

CST DIH $293,775

CST SA $3,869,906

$100,000 $4,163,681Project Total:

FPN: 4345091 Project/Location: SR 60 AT BAILEY RD

Project Length: 0.303

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 2.848 End Mile Post: 3.151

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SA $2,817

CST ACSA $53,502

CST DDR $24,628

CST HSP $957,426

$1,038,373Project Total:

FPN: 4338562 Project/Location: SR 60 FROM CR 630 TO GRAPE HAMMOCK

RD

Project Length: 5.523

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 18.340 End Mile Post: 23.863

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE ACNP $7,350,000

$7,350,000Project Total:

FPN: 4338563 Project/Location: SR 60 FROM GRAPE HAMMOCK ROAD TO

OSCEOLA COUNTY LINE

Project Length: 1.760

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 23.863 End Mile Post: 25.623

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE ACNP $3,350,000

$3,350,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 158/18/2016Run Date: SnapShot Date: 7/20/2016

Page 16: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4356061 Project/Location: SR 60 FROM HILLSBOROUGH C/L TO DIESEL

RD

Project Length: 5.298

Desc: RESURFACING

Comments:

Begin Mile Post: 0.000 End Mile Post: 5.298

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $38,257

ENV DDR $70,000

RRU DS $245,000

CST DDR $2,396,314

CST DIH $102,500

CST NHRE $7,777,800

$10,629,871Project Total:

FPN: 4380241 Project/Location: SR 60 FROM MYRTLE AVE TO DUDE RANCH

ROAD

Project Length: 2.000

Desc: RESURFACING

Comments:

Begin Mile Post: 2.903 End Mile Post: 4.903

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $100,000

ENV DS $15,000 $25,000

CST DIH $252,064

CST SA $3,843,326

$115,000 $4,120,390Project Total:

FPN: 4349381 Project/Location: SR 600 (US 92) FROM W OF THOMPSON RD TO E

OF FISH HATCHERY RD

Project Length: 0.164

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 3.859 End Mile Post: 4.023

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $18,361

ENV DS $10,000

RRU DS $75,000

$103,361Project Total:

FPN: 4387591 Project/Location: SR 655/LAKE SHIPP DR FROM US 17/SR 555 TO

EAGLE LAKE RD #623042H

Project Length: 0.103

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.103

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

RRU RHH $8,865

$8,865Project Total:

FPN: 4192432 Project/Location: SR25 (US 27) FROM HIGHLANDS COUNTY LINE TO

CR 630A

Project Length: 8.612

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 0.000 End Mile Post: 8.612

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $63,953

ENV ACNP $350,000

$63,953 $350,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 168/18/2016Run Date: SnapShot Date: 7/20/2016

Page 17: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4366731 Project/Location: SR35/700(US 98) FROM N. OF WEST SOCRUM

LOOP RD TO SR 471

Project Length: 7.531

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 9.005 End Mile Post: 16.536

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DDR $712,807

PDE DIH $200,000

PDE SA $1,387,193

$2,300,000Project Total:

FPN: 4366721 Project/Location: SR35/700(US98) FROM WEST DAUGHTERY ROAD

TO NORTH OF WEST SOCRUM RD

Project Length: 3.382

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 5.623 End Mile Post: 9.005

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DIH $150,000

PDE SA $1,500,000

$1,650,000Project Total:

FPN: 2012103 Project/Location: SR400 (I-4) W. OF US 27 (SR 25) E. OF CR

532

Project Length: 4.022

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 28.000 End Mile Post: 32.022

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DDR $2,000,000

PE DIH $28,440

$2,028,440Project Total:

FPN: 4347621 Project/Location: SR546(MEMORIAL BLVD) FROM I-4 TO WABASH

AVE

Project Length: 1.411

Desc: RIGID PAVEMENT RECONSTRUCTION

Comments:

Begin Mile Post: 0.300 End Mile Post: 1.711

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE ACSA $1,095

PE SA $4

CST DIH $146,381

INC DDR $950,000

$1,097,480Project Total:

FPN: 4313511 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)

TO 17TH STREET

Project Length: 0.310

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 22.460 End Mile Post: 22.770

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DDR $950,998

PDE DIH $18,081

$969,079Project Total:

FPN: 4313512 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)

TO 17TH STREET

Project Length: 0.310

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 22.460 End Mile Post: 22.770

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DDR $1,350,000

PE DIH $25,000

$1,375,000Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 178/18/2016Run Date: SnapShot Date: 7/20/2016

Page 18: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4336571 Project/Location: US 27 (SR 25) AT SR 60 INTERCHANGE

Project Length: 0.105

Desc: LANDSCAPING

Comments:

Begin Mile Post: 0.040 End Mile Post: 0.145

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $15,926

CST DIH $11,100

CST DS $464,943

$15,926 $476,043Project Total:

FPN: 4345061 Project/Location: US 27 AT MAIN ST/CRUMP RD

Project Length: 0.906

Desc: LIGHTING

Comments:

Begin Mile Post: 9.731 End Mile Post: 10.637

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SA $2,668

ENV ACSA $20,000

CST ACSA $10,250

CST DDR $12,581

CST HSP $814,681

$860,180Project Total:

FPN: 4192434 Project/Location: US 27 AT SR 60

Project Length: 5.178

Desc: INTERCHANGE - ADD LANES

Comments:

Begin Mile Post: 13.638 End Mile Post: 18.816

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $53,089

ENV DI $240,000 $75,000 $338,472

ENV SIWR $161,528

RRU DDR $1,575,076

ROW DDR $1,560,033 $3,660,798

ROW DIH $106,213 $247,831

CST DDR $48,300,854

CST DIH $899,280

$53,089 $1,906,246 $3,983,629 $51,275,210Project Total:

FPN: 4192433 Project/Location: US 27 FROM CR 630A TO PRESIDENTS

DRIVE

Project Length: 5.026

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 8.612 End Mile Post: 13.638

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $69,378

ENV ACNP $300,000

ROW DI $2,229,296

ROW DIH $71,643

$69,378 $2,600,939Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 188/18/2016Run Date: SnapShot Date: 7/20/2016

Page 19: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4312061 Project/Location: US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN

AVE

Project Length: 2.663

Desc: RESURFACING

Comments:

Begin Mile Post: 2.469 End Mile Post: 5.132

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $25,000

RRU DS $5,000

CST DIH $173,637

$203,637Project Total:

FPN: 4312081 Project/Location: US 92 (SR 600) FROM REYNOLDS RD TO

SCHALAMAR CREEK ENT

Project Length: 1.250

Desc: BRIDGE REPLACEMENT

Comments: FROM E OF REYNOLDS RD TO SCHALAMAR CREEK ENT

Begin Mile Post: 4.327 End Mile Post: 5.577

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $135,585

RRU LF $985

CST DDR $19,985

CST DIH $298,054

CST LF $197

INC DDR $392,000

$846,806Project Total:

FPN: 4335582 Project/Location: US 92 FROM COUNTY LINE ROAD TO WABASH

AVENUE

Project Length: 4.131

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 0.000 End Mile Post: 4.131

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE CM $522,062

PE SA $3,927,938

ROW CM $1,947,311

ROW DS $794,918

ROW SA $5,741,339

$4,450,000 $8,483,568Project Total:

FPN: 4351081 Project/Location: US 92 FROM GALLOWAY RD TO N CHESTNUT

RD

Project Length: 1.586

Desc: SIDEWALK

Comments:

Begin Mile Post: 2.290 End Mile Post: 3.876

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE SU $345,000

ENV SU $70,000

CST DDR $43,054

CST SU $921,447

$345,000 $70,000 $964,501Project Total:

FPN: 4298131 Project/Location: US 92 -NEW TAMPA HWY AT WABASH

AVE

Project Length: 0.200

Desc: INTERSECTION IMPROVEMENT

Comments:

Begin Mile Post: 4.031 End Mile Post: 4.231

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

ENV DDR $20,000 $30,000

CST DDR $818,466

CST DIH $1,000

$20,000 $849,466Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 198/18/2016Run Date: SnapShot Date: 7/20/2016

Page 20: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4348862 Project/Location: US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO

0064(JOHN SINGLETARY BRIDGE)

Project Length: 0.103

Desc: BRIDGE REPLACEMENT

Comments:

Begin Mile Post: 1.189 End Mile Post: 1.292

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE CM $1,876,306

PE SA $173,694

$2,050,000Project Total:

FPN: 4353421 Project/Location: US 98 (SR35 & SR700) VIRTUAL WEIGH STATION

STUDY

Project Length: 8.745

Desc: PD&E/EMO STUDY

Comments:

Begin Mile Post: 9.005 End Mile Post: 17.750

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DIH $10,000

PDE DWS $1,000,000

$1,010,000Project Total:

FPN: 4387561 Project/Location: WABASH AVE FROM OLD TAMPA HWY/CR 542 TO

MERSHON ST #624298P

Project Length: 0.028

Desc: RAIL SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.028

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

RRU RHH $57,730

$57,730Project Total:

FPN: 4313531 Project/Location: WESTGATE-CENTRAL TRAIL FROM WEST

BELMAR ST TO OAKHILL STREET

Project Length: 0.790

Desc: BIKE PATH/TRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.790

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST LF $182,005

CST SU $231,631

CST TALT $1,000

CST TALU $326,537

$741,173Project Total:

FPN: 4371081 Project/Location: WINTER HAVEN TMC OPS CITY

WIDE

Project Length: 0.001

Desc: OTHER ITS

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.001

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DS $87,000 $43,500 $43,500 $43,500 $43,500

$87,000 $43,500 $43,500 $43,500 $43,500Project Total:

FPN: 4136561 Project/Location: WINTER HAVEN TRAFFIC SIGNALS

REIMBURSEMENT

Project Length: 2.880

Desc: TRAFFIC SIGNALS

Comments:

Begin Mile Post: 27.760 End Mile Post: 30.640

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $134,891 $145,904 $150,281 $154,790 $159,433

$134,891 $145,904 $150,281 $154,790 $159,433Project Total:

HIGHWAYS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$57,760,381 $37,372,683 $81,065,140 $131,831,328 $102,097,342

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 208/18/2016Run Date: SnapShot Date: 7/20/2016

Page 21: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

TRANSPORTATION PLANNING

FPN: 4383611 Project/Location: POLK COUNTY MPO FY 2020-2021

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PLN PL $615,543

$615,543Project Total:

FPN: 4348551 Project/Location: POLK COUNTY MPO 2018/2019 UPWP

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PLN PL $615,543 $615,543

$615,543 $615,543Project Total:

FPN: 4318091 Project/Location: POLK COUNTY MPO FY 2017/2018

UPWP

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PLN PL $615,543

$615,543Project Total:

FPN: 4393131 Project/Location: POLK COUNTY MPO FY 2016/2017

UPWP

Project Length: 0.000

Desc: TRANSPORTATION PLANNING

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PLN PL $615,543

$615,543Project Total:

TRANSPORTATION PLANNING TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$615,543 $615,543 $615,543 $615,543 $615,543

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 218/18/2016Run Date: SnapShot Date: 7/20/2016

Page 22: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

TURNPIKE

FPN: 4289721 Project/Location: PAINT BRIDGES - POLK

PKWY(160249,160250,160251 ,160252,160253,160254)

Project Length: 7.400

Desc: BRIDGE - PAINTING

Comments:

Begin Mile Post: 0.000 End Mile Post: 5.600

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYR $229,073

CST PKYR $9,459,924

$229,073 $9,459,924Project Total:

FPN: 4311232 Project/Location: PAINT BRIDGES - POLK PARKWAY (160267 &

160268)

Project Length: 0.958

Desc: BRIDGE - PAINTING

Comments:

Begin Mile Post: 13.568 End Mile Post: 14.526

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYI $201,021

CST PKYI $1,541

CST PKYR $2,419,374

$202,562 $2,419,374Project Total:

FPN: 4356081 Project/Location: POLK PARKWAY TRUSS CANTILEVER & POST

SIGN PANEL REPLACEMENTS (MP 8-21)

Project Length: 13.000

Desc: OVERHEAD SIGNING

Comments:

Begin Mile Post: 8.000 End Mile Post: 21.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYR $814

CST PKYR $2,303,642

$2,304,456Project Total:

FPN: 4394191 Project/Location: POLK WESTERN PLAZA SUNPASS

CONVERSION

Project Length: 0.000

Desc: ITS COMMUNICATION SYSTEM

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYI $1,500

CST PKYI $58,527

$60,027Project Total:

FPN: 4365201 Project/Location: RESURFACE POLK PKWY, MP 0-8

Project Length: 8.000

Desc: RESURFACING

Comments:

Begin Mile Post: 0.000 End Mile Post: 8.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYR $1,110,621

CST PKYR $13,132,980

$1,110,621 $13,132,980Project Total:

FPN: 4365203 Project/Location: ROADSIDE IMPROVEMENT FOR POLK PKWY MP

0-8

Project Length: 8.000

Desc: GUARDRAIL

Comments:

Begin Mile Post: 0.000 End Mile Post: 8.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYI $1,885

CST PKYI $1,552,498

$1,885 $1,552,498Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 228/18/2016Run Date: SnapShot Date: 7/20/2016

Page 23: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4373001 Project/Location: SUNTRAX TEST FACILITY

Project Length: 1.380

Desc: MISCELLANEOUS STRUCTURE

Comments:

Begin Mile Post: 23.000 End Mile Post: 24.380

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYI $15,000

ENV PKYI $6,300,000

ROW PKYI $5,004,119

CST PKYI $35,700,619 $6,280,000

$47,019,738 $6,280,000Project Total:

FPN: 4365202 Project/Location: THERMOPLASTIC OF POLK PKWY

RESURFACING FROM MP 0-8

Project Length: 8.000

Desc: SIGNING/PAVEMENT MARKINGS

Comments:

Begin Mile Post: 0.000 End Mile Post: 8.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST PKYR $354,561

$354,561Project Total:

FPN: 4380182 Project/Location: THERMOPLASTIC WIDEN POLK PKWY MP18-

MM22

Project Length: 3.954

Desc: SIGNING/PAVEMENT MARKINGS

Comments:

Begin Mile Post: 18.024 End Mile Post: 21.978

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CST PKYI $145,287

$145,287Project Total:

FPN: 4380181 Project/Location: WIDEN POLK PKWY FROM MP 18 TO MP 22, 2 TO

4 LANES

Project Length: 3.954

Desc: ADD LANES & RECONSTRUCT

Comments:

Begin Mile Post: 18.024 End Mile Post: 21.978

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE PKYI $4,001,601

DSB PKYI $1,500 $67,698,169

ROW PKYI $353

$4,003,454 $67,698,169Project Total:

TURNPIKE TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$54,931,816 $100,542,945 $354,561 $145,287

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 238/18/2016Run Date: SnapShot Date: 7/20/2016

Page 24: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FLP: AVIATION

FPN: 4336461 Project/Location: BARTOW MUNICIPAL AIRPORT PERIMETER

SECURITY FENCING

Project Length: 0.000

Desc: AVIATION SECURITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $640,000

CAP LF $160,000

$800,000Project Total:

FPN: 4348191 Project/Location: BARTOW MUNICIPAL APT TW L CONNECTOR

AND REMOVE OLD RW PAVEMENT

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments: DESIGN AND CONSTRUCTION

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DPTO $405,000

CAP LF $101,250

$506,250Project Total:

FPN: 4336371 Project/Location: LAKE WALES MUNICIPAL AIRPORT UPGRADE -

EXPAND ELECTRICAL VAULT

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $197,993

CAP LF $49,498

$247,491Project Total:

FPN: 4389211 Project/Location: LAKE WALES MUNICIPAL ARPT CONSTRUCT

RUNWAY REHABILITATION/EXTENSION

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $460,402 $1,000,000 $228,241

CAP FAA $1,087,232

CAP LF $115,101 $250,000 $57,060

$1,662,735 $1,250,000 $285,301Project Total:

FPN: 4313701 Project/Location: LAKELAND LINDER REG APT EXTEND RW 9-27

TW A

Project Length: 0.000

Desc: AVIATION SAFETY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $41,742

CAP DPTO $208,258

CAP FAA $4,500,000

CAP LF $250,000

$5,000,000Project Total:

FPN: 4336381 Project/Location: LAKELAND LINDER REG APT REHAB AND

EXTEND TW D

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $496,000 $704,708

CAP DPTO $400,000 $32,200

CAP LF $100,000 $124,000 $170,408

$500,000 $652,200 $875,116Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 248/18/2016Run Date: SnapShot Date: 7/20/2016

Page 25: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4362011 Project/Location: LAKELAND LINDER REG APT AIRSIDE CENTER

ROOF

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $200,000

CAP DPTO $522,500

CAP LF $522,500 $200,000

$1,045,000 $400,000Project Total:

FPN: 4369771 Project/Location: LAKELAND LINDER REG APT REHAB TW

H

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DPTO $63,750

CAP FAA $1,147,500

CAP LF $63,750

$1,275,000Project Total:

FPN: 4370781 Project/Location: LAKELAND LINDER REG APT PAINT HANGER

EXPANSION

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $490,000

CAP LF $490,000

$980,000Project Total:

FPN: 4370791 Project/Location: LAKELAND LINDER REG APT HANGER

PURCHASE

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DPTO $440,000

CAP LF $440,000

$880,000Project Total:

FPN: 4388791 Project/Location: LAKELAND LINDER REGIONAL AIRPORT ARPT

FACILITY EXPANSION

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $300,000

CAP LF $300,000

$600,000Project Total:

FPN: 4389751 Project/Location: WINTER HAVEN MUNICIPAL ARPT TAXIWAY E &

F CONSTRUCTION

Project Length: 0.000

Desc: AVIATION PRESERVATION PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $248,000

CAP FAA $4,464,000

CAP LF $248,000

$4,960,000Project Total:

FLP: AVIATION TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$9,442,735 $3,949,691 $3,526,667 $5,000,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 258/18/2016Run Date: SnapShot Date: 7/20/2016

Page 26: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FLP: INTERMODAL

FPN: 4309701 Project/Location: BARTOW MUNICIPAL APT NEW APT ENTRANCE

RD

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments: NEW AIRPORT ENTRANCE ROAD

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $200,000

CAP DPTO $990,000 $400,000

CAP LF $697,500 $600,000

$1,687,500 $1,200,000Project Total:

FPN: 4370591 Project/Location: BARTOW MUNICIPAL APT INSTALL NEW AND

RELOCATE EXISTING RAIL LINES

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments: INSTALL NEW AND RELOCATE EXISTING RAIL LINES

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DPTO $600,000

CAP LF $600,000

$1,200,000Project Total:

FPN: 4369901 Project/Location: LAKELAND LINDER REG APT MRO

HANGER

Project Length: 0.000

Desc: AVIATION REVENUE/OPERATIONAL

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DPTO $372,938

CAP LF $372,938

$745,876Project Total:

FPN: 4388361 Project/Location: LAKELAND LINDER REG ARPT SITE

PREP/UTILITY INSTALL @ INTERMODAL CENTER

Project Length: 0.000

Desc: AVIATION CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP DDR $1,100,000 $1,800,000

CAP DPTO $100,000 $200,000 $1,400,000 $232,050

CAP LF $100,000 $1,300,000 $1,400,000 $2,032,050

$200,000 $2,600,000 $2,800,000 $4,064,100Project Total:

FLP: INTERMODAL TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$2,633,376 $1,200,000 $2,600,000 $4,000,000 $4,064,100

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 268/18/2016Run Date: SnapShot Date: 7/20/2016

Page 27: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FLP: RAIL

FPN: 4366501 Project/Location: ITS IMPROVEMENT TO TRAFFIC OPERATIONS IN

THE DOWNTOWN AREA

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DIH $3,354

PE DIH $55,625

PE TRIP $125,000

DSB DIH $51,350

DSB TRIP $2,131,025

$58,979 $2,307,375Project Total:

FPN: 4366561 Project/Location: NEW YORK AVENUE PEDESTRIAN

UNDERPASS

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DIH $15,208

PE TRIP $1,500,000

ENV TRIP $25,000

RRU TRIP $400,000

ROW DIH $54,024

ROW TRIP $151,944

CST DIH $481,500

$2,021,708 $205,968 $400,000Project Total:

FPN: 4365591 Project/Location: SR60 GRADE SEPARATION OVER CSX

RAILROAD

Project Length: 1.196

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 24.849 End Mile Post: 26.045

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PE DIH $87,345

ENV TRIP $75,000

RRU TRIP $30,000 $470,000

ROW DIH $20,000

ROW TRIP $843,085

CST TRIP $30,639,633

$980,430 $545,000 $30,639,633Project Total:

FLP: RAIL TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$3,061,117 $2,852,375 $30,845,601 $400,000

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 278/18/2016Run Date: SnapShot Date: 7/20/2016

Page 28: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FLP: TRANSIT

FPN: 4101421 Project/Location: LAKELAND AREA MASS TRANSIT STATE BLOCK

GRAMT OPERATING ASSISTANCE

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DDR $60,990

OPS DPTO $783,999 $804,267 $830,819 $872,359 $940,224

OPS LF $844,989 $804,267 $830,819 $872,359 $940,224

$1,689,978 $1,608,534 $1,661,638 $1,744,718 $1,880,448Project Total:

FPN: 4140631 Project/Location: LAKELAND AREA MASS TRANSIT (LAMTD)-

OPERATING ASSISTANCE - CORRIDOR

Project Length: 0.000

Desc: URBAN CORRIDOR IMPROVEMENTS

Comments: TRANSIT CORRIDOR PROGRAM

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DPTO $709,151 $762,481 $795,083 $818,945 $818,945

OPS LF $709,151 $762,481 $795,083 $818,945 $818,945

$1,418,302 $1,524,962 $1,590,166 $1,637,890 $1,637,890Project Total:

FPN: 4101492 Project/Location: LAMTD FTA SECT 5307 OPERATING ASSIST LKLD

UZA

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments: LAMTD IS THE DESIGNATED RECIPIENT

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS FTA $3,835,489 $1,915,235 $1,915,235 $1,915,235 $1,920,254

OPS LF $3,835,489 $1,915,235 $1,915,235 $1,915,235 $1,920,254

$7,670,978 $3,830,470 $3,830,470 $3,830,470 $3,840,508Project Total:

FPN: 4101501 Project/Location: LAMTD FTA SECTION 5307 CAPITAL ASSISTANCE

WINTER HAVEN UZA

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments: LAMTD IS THE DESIGNATED RECIPIENT

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP FTA $2,030,185 $500,743 $500,743 $515,092 $513,607

CAP LF $507,697 $125,186 $125,186 $128,773 $128,402

$2,537,882 $625,929 $625,929 $643,865 $642,009Project Total:

FPN: 4101502 Project/Location: LAMTD FTA SECTION 5307 OPERATING

ASSISTANCE WINTER HAVEN UZA

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments: LAMTD IS THE DESIGNATED RECIPIENT

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS FTA $6,090,557 $1,502,230 $1,502,230 $1,545,276 $1,540,821

OPS LF $6,090,557 $1,502,230 $1,502,230 $1,545,276 $1,540,821

$12,181,114 $3,004,460 $3,004,460 $3,090,552 $3,081,642Project Total:

FPN: 4332821 Project/Location: LAMTD TRANSIT STOP IMPROVEMENTS @

VARIOUS LOCATIONS

Project Length: 8.031

Desc: TRANSIT IMPROVEMENT

Comments:

Begin Mile Post: 8.679 End Mile Post: 16.710

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP FTAT $109,566

CAP SU $109,566

$219,132Project Total:

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 288/18/2016Run Date: SnapShot Date: 7/20/2016

Page 29: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FPN: 4350771 Project/Location: LAMTD TRANSIT STOP IMPROVEMENTS @

VARIOUS LOCATIONS FTAT TRANSFER

Project Length: 0.000

Desc: TRANSIT IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP FTAT $174,028

CAP SU $174,028

$348,056Project Total:

FPN: 4350781 Project/Location: LAMTD TRANSIT STOP IMPROVEMENTS @

VARIOUS LOCATIONS

Project Length: 0.000

Desc: TRANSIT IMPROVEMENT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP FTAT $49,661

CAP SU $49,661

$99,322Project Total:

FPN: 4357711 Project/Location: LAMTD/LKND-WH UZA FTA SECTION 5339

CAPITAL ASSISTANCE

Project Length: 0.000

Desc: CAPITAL FOR FIXED ROUTE

Comments: WHAT-$210,205

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

CAP FTA $1,942,324 $490,708 $490,708 $480,121 $480,787

CAP LF $485,582 $122,678 $122,678 $120,030 $120,197

$2,427,906 $613,386 $613,386 $600,151 $600,984Project Total:

FPN: 4101281 Project/Location: POLK COUNTY FTA SECTION 5311 OPERATING

ASSISTANCE

Project Length: 0.000

Desc: OPERATING/ADMIN. ASSISTANCE

Comments: SECTION 5311 RURAL AND SMALL AREAS

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DU $712,856 $712,856 $712,856 $897,295 $808,929

OPS LF $712,856 $712,856 $712,856 $897,295 $808,929

$1,425,712 $1,425,712 $1,425,712 $1,794,590 $1,617,858Project Total:

FPN: 4101161 Project/Location: POLK COUNTY TPO TRANSIT PLANNING - FTA

SECTION 5305 (D)

Project Length: 0.000

Desc: MODAL SYSTEMS PLANNING

Comments: FTA SECTION 5305(D) METROPOLITAN PLANNING

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PLN DPTO $14,745 $15,187 $15,187 $15,195 $14,656

PLN DU $117,962 $121,501 $121,501 $121,559 $117,245

PLN LF $14,745 $15,187 $15,187 $15,195 $14,656

$147,452 $151,875 $151,875 $151,949 $146,557Project Total:

FPN: 4101431 Project/Location: WINTER HAVEN AREA TRANSIT (WHAT)

OPERATING STATE TRANSIT BLOCK GRANT

Project Length: 0.000

Desc: OPERATING FOR FIXED ROUTE

Comments: BLOCK GRANT - OPERATING

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

OPS DPTO $613,657 $729,838 $753,933 $791,629 $831,210

OPS LF $613,657 $729,838 $753,933 $791,629 $831,210

$1,227,314 $1,459,676 $1,507,866 $1,583,258 $1,662,420Project Total:

FLP: TRANSIT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$31,393,148 $14,245,004 $14,411,502 $15,077,443 $15,110,316

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 298/18/2016Run Date: SnapShot Date: 7/20/2016

Page 30: Florida Department of TRANSPORTATION - DISTRICT ONE · Miscellaneous OPS – Operations PE – Prelim Engineering PDE – Project Dev and Enviro PLN – Planning RES – Research

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT

July 1, 2016 Through June 30, 2021 COUNTYPOLK

FLORIDA RAIL ENTERPRISE

FPN: 4366531 Project/Location: KENTUCKY AVENUE PEDESTRIAN

OVERPASS

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DIH $14,501

PE TRIP $1,000,000

RRU TRIP $400,000 $600,000

ROW DIH $54,024

ROW TRIP $85,539

CST DIH $258,000

CST TRIP $4,522,000

$1,014,501 $139,563 $400,000 $5,380,000Project Total:

FPN: 4365601 Project/Location: RECKER HIGHWAY CONSTRUCT A BRIDGE

SPANNING THE CSX RR TRACK IN POLK CO

Project Length: 0.000

Desc: RAIL CAPACITY PROJECT

Comments:

Begin Mile Post: 0.000 End Mile Post: 0.000

Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21

PDE DIH $2,896

PE DIH $604

PE TRIP $2,700,000

ENV TRIP $25,000

RRU TRIP $500,000

ROW DIH $153,024

ROW TRIP $4,775,050

$3,500 $2,725,000 $4,928,074 $500,000Project Total:

FLORIDA RAIL ENTERPRISE TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21

$1,018,001 $2,725,000 $139,563 $5,328,074 $5,880,000

COUNTY TOTALSPOLK

Phase Fund Total2016/17 2017/18 2018/19 2019/20 2020/21

$160,856,117 $163,503,241 $133,558,577 $162,397,675 $127,767,301COUNTY Total: $748,082,911

ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –

Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES

Page: 308/18/2016Run Date: SnapShot Date: 7/20/2016