Florida Department of
TRANSPORTATION - DISTRICT ONEFlorida Department of
TRANSPORTATION - DISTRICT ONE
SOUTHWESTAREA OFFICE(FORT MYERS)
DISTRICT ONEHEADQUARTERS
(BARTOW)
POLK COUNTY
ADOPTED FIVE YEAR WORK PROGRAMFISCALFISCAL YEARS YEARS 2017-20212017-2021
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYPOLK
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
July 1, 2016 Through June 30, 2021
ADOPTED WORK PROGRAM REPORT
Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 28/18/2016Run Date: SnapShot Date: 7/20/2016
Zachary BurchGovernment Affairs &Communications ManagerSouthwest Area Office10041 Daniels ParkwayFort Myers, Fl. 33913(239) 225‐1950
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYPOLK
July 1, 2016 Through June 30, 2021
CURRENTLY REPORTED ACTIVE FUND CODES
ADOPTED WORK PROGRAM REPORT
ACCM Advance Construction (CM)
ACSA Advance Construction (SA)
ACSU Advance Construction (SU)
BNDS Bond – State
BRTZ BRT (AC/Repair)
CIGP County Incentive Grant Program
CM Congestion Mitigation – ACQ
DDR District Dedicated Revenue
DI State-Statewide Inter/Intrastate Highway
DIH State In-house Product Support
DITS Statewide ITS - State 100%
DPTO State PTO
DS State Primary Highways and PTO
DU State Primary/Federal Reimbursement
DWS Weigh Stations - State 100%
FAA Federal Aviation Administration
FTA Federal Transit Administration
FTAT FHWA Transfer to FTA (non-bud)
HSP Highway Safety Program
LF Local Funds
LFP Local Fund for Participating
PKYI Tpk Improvement
PKYR Tpk Maintenance Reserve
PL Metro Plan (85% FA; 15% other)
RHH Rail-Highway Xings – Hazard
SA STP, Any Area
SL STP, Areas < 200k
SU STP, Urban Areas > 200k
TRIP Trans Regional Incentive Prog
ACBZ
ACNP Advanced Construction NHPP
ACTA
ACTU Advanced Construction TALU
NHPP National Highway Preformance Program
NHRE National Highway Resurfacing
TALT Transportation Alternatives Any Area
TALU Transportation Alternatives (Population > 200K)
TRWR Transportational Regional Incentive Program
SIWR State Transportation Trust Funds
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 38/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
HIGHWAYS
FPN: 4387581 Project/Location: AIRPORT RD RR XING AT ENTRANCE TO
AIRPORT #625424K
Project Length: 0.001
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU RHH $177,013
$177,013Project Total:
FPN: 4382661 Project/Location: ARIANA ST SIDEWALK FROM S. WABASH AVE TO
LOTUS AVE
Project Length: 0.740
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.380 End Mile Post: 1.120
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $201,000
CST SU $1,584,158
$201,000 $1,584,158Project Total:
FPN: 4136441 Project/Location: AUBURNDALE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.820
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 10.690 End Mile Post: 11.510
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $37,997 $28,443 $29,297 $30,176 $31,081
$37,997 $28,443 $29,297 $30,176 $31,081Project Total:
FPN: 4313521 Project/Location: BARTOW NORTHERN CONNECTOR PHASE II
FROM US 17 TO SR 60
Project Length: 2.000
Desc: NEW ROAD CONSTRUCTION
Comments:
Begin Mile Post: 2.062 End Mile Post: 4.062
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST CIGP $467,864
CST LFP $10,171,346
CST TRIP $554,101
CST TRWR $2,092,968
$13,286,279Project Total:
FPN: 4136451 Project/Location: BARTOW TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.002
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 16.896 End Mile Post: 17.898
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $59,600 $52,721 $54,303 $55,932 $57,610
$59,600 $52,721 $54,303 $55,932 $57,610Project Total:
FPN: 4345081 Project/Location: BOMBER ROAD AT SPRUCE ROAD AND GERBER
DAIRY ROAD
Project Length: 1.857
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.750 End Mile Post: 2.607
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SA $4,717
ENV ACSA $20,000
CST ACSA $10,250
CST HSP $1,150,025
$1,184,992Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 48/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4351071 Project/Location: BRUNNELL PARKWAY FROM MEMORIAL BLVD
TO TENTH STREET
Project Length: 0.556
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.844 End Mile Post: 1.400
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $151,090
$151,090Project Total:
FPN: 1976204 Project/Location: CITY OF LAKELAND LEASE OF FIBER OPTIC
NETWORK
Project Length: 0.000
Desc: TRAFFIC CONTROL DEVICES/SYSTEM
Comments: YEARLY MAINTENANCE FEE FOR ATMS FIBER CABLE
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS SL $20,278 $20,278 $20,278 $20,278 $20,278
$20,278 $20,278 $20,278 $20,278 $20,278Project Total:
FPN: 4317721 Project/Location: COW CAMP ROAD BRIDGE NO. 160400 OVER
ROSALIE/ZIPPRER CANAL
Project Length: 0.001
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE BRTZ $58,433
ENV ACBZ $20,000
CST ACBZ $1,715,032
$1,793,465Project Total:
FPN: 4332721 Project/Location: CR 544 AT SR 17
Project Length: 0.446
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.446
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSU $1,789
CST SU $28,288
$30,077Project Total:
FPN: 4349421 Project/Location: CREWS LAKE RD FROM LAKELAND HIGHLANDS
RD TO E. OF BEAL LANE
Project Length: 1.946
Desc: TRAFFIC OPS IMPROVEMENT
Comments:
Begin Mile Post: 0.007 End Mile Post: 1.953
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SA $3,651
CST ACSA $8,200
CST HSP $1,322,230
$1,334,081Project Total:
FPN: 4350941 Project/Location: DAVENPORT COMPLETE STREET PHASE I AND
PHASE II
Project Length: 0.001
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $225,000
CST TALT $436,163
CST TALU $248,600
$225,000 $684,763Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 58/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4136461 Project/Location: DAVENPORT TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.094
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 3.768 End Mile Post: 3.862
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $4,590 $3,386 $3,488 $3,592 $3,700
$4,590 $3,386 $3,488 $3,592 $3,700Project Total:
FPN: 4361451 Project/Location: DRAINAGE IMPROVEMENT SR 600 FROM E. ECHO
ST TO W CUMMING ST
Project Length: 0.260
Desc: DRAINAGE IMPROVEMENTS
Comments:
Begin Mile Post: 0.556 End Mile Post: 0.816
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $2,726
CST DIH $5,135
CST DS $1,591,356
$1,599,217Project Total:
FPN: 4136471 Project/Location: DUNDEE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.065
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 28.850 End Mile Post: 29.915
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $10,019 $10,836 $11,161 $11,495 $11,840
$10,019 $10,836 $11,161 $11,495 $11,840Project Total:
FPN: 4387571 Project/Location: E PARK AVE FROM N SCENIC HWY TO CYPRESS
GARDENS LANE #625479X
Project Length: 0.039
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.314 End Mile Post: 0.353
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU RHH $264,519
$264,519Project Total:
FPN: 4136481 Project/Location: EAGLE LAKE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.440
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 25.390 End Mile Post: 25.830
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $13,770 $10,159 $10,463 $10,777 $11,100
$13,770 $10,159 $10,463 $10,777 $11,100Project Total:
FPN: 4345021 Project/Location: EWELL ROAD AT LUNN RD
Project Length: 5.000
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE HSP $142,876
PE SA $5,504
CST HSP $2,050,283
CST SA $10,270
$148,380 $2,060,553Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 68/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4301855 Project/Location: FGT I-4 @ SR 33 INTERCHANGE
MODIFICATION
Project Length: 0.650
Desc: INTERCHANGE - ADD LANES
Comments:
Begin Mile Post: 12.032 End Mile Post: 12.682
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $5,000
RRU DS $240,000 $1,200,000
ROW DIH $26,225
ROW DS $582,424
CST DIH $5,415
$245,000 $608,649 $1,205,415Project Total:
FPN: 4136491 Project/Location: FROSTPROOF TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.443
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 4.750 End Mile Post: 6.193
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $10,617 $8,296 $8,545 $8,801 $9,065
$10,617 $8,296 $8,545 $8,801 $9,065Project Total:
FPN: 4332682 Project/Location: FT FRASER TRAIL EXTENSION FM SR540/WINTER
LK RD TO COMBEE RD- LAKELAND
Project Length: 0.946
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 7.829 End Mile Post: 8.775
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $1,250,000
$1,250,000Project Total:
FPN: 4136501 Project/Location: FT MEADE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.700
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 7.000 End Mile Post: 7.700
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $10,179 $9,312 $9,591 $9,879 $10,175
$10,179 $9,312 $9,591 $9,879 $10,175Project Total:
FPN: 4136511 Project/Location: HAINES CITY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.270
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 21.500 End Mile Post: 22.770
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $40,176 $43,450 $44,754 $46,096 $47,479
$40,176 $43,450 $44,754 $46,096 $47,479Project Total:
FPN: 4301853 Project/Location: I-4 @ SR 33 INTERCHANGE
MODIFICATION
Project Length: 0.650
Desc: INTERCHANGE - ADD LANES
Comments:
Begin Mile Post: 12.032 End Mile Post: 12.682
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV SA $1,300,000
RRU DS $200,000 $950,000
ROW DIH $108,049
ROW SA $2,424,346
$200,000 $4,782,395Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 78/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 2012178 Project/Location: I-4 AT CSX RAILROAD
Project Length: 0.004
Desc: BRIDGE-REPLACE AND ADD LANES
Comments:
Begin Mile Post: 4.887 End Mile Post: 4.891
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACNP $86,918
ENV SIWR $50,000
RRU DI $6,000,000
RRU SIWR $1,000,000
CST DI $9,581,454
CST DIH $129,395
$86,918 $1,050,000 $15,710,849Project Total:
FPN: 4388711 Project/Location: I-4 AT SR 539
Project Length: 0.780
Desc: LANDSCAPING
Comments:
Begin Mile Post: 4.620 End Mile Post: 5.400
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $10,560
CST DS $1,056,000
$10,000 $1,066,560Project Total:
FPN: 2012153 Project/Location: I-4 AT SR 557
Project Length: 1.610
Desc: INTERCHANGE IMPROVEMENT
Comments:
Begin Mile Post: 21.767 End Mile Post: 22.878
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $26,053
ENV SA $8,000,000
RRU ACNP $4,500,000
CST ACNP $53,944,313
CST DIH $485,248
$26,053 $8,000,000 $58,929,561Project Total:
FPN: 4389941 Project/Location: I-4 AT SR 559
Project Length: 0.730
Desc: LANDSCAPING
Comments:
Begin Mile Post: 18.060 End Mile Post: 18.790
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $10,250
CST DS $820,000
$840,250Project Total:
FPN: 4136521 Project/Location: LAKE ALFRED TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.010
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 15.590 End Mile Post: 15.600
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $15,672 $12,392 $12,764 $13,146 $13,541
$15,672 $12,392 $12,764 $13,146 $13,541Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 88/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4351091 Project/Location: LAKE HOWARD DR FROM AVE D SW TO 15TH ST
SW
Project Length: 0.001
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE LF $155,000
CST SA $1,000
CST TALT $66,198
CST TALU $361,327
$155,000 $428,525Project Total:
FPN: 4136531 Project/Location: LAKE WALES TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.017
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 18.968 End Mile Post: 19.985
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $35,066 $38,032 $39,173 $40,348 $41,559
$35,066 $38,032 $39,173 $40,348 $41,559Project Total:
FPN: 4371071 Project/Location: LAKELAND TMC OPS FUND CITY
WIDE
Project Length: 0.001
Desc: OTHER ITS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DS $318,000 $159,000 $159,000 $159,000 $159,000
$318,000 $159,000 $159,000 $159,000 $159,000Project Total:
FPN: 4136541 Project/Location: LAKELAND TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 4.770
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 23.830 End Mile Post: 28.600
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DITS $504,743 $555,002 $576,426 $593,719 $616,595
$504,743 $555,002 $576,426 $593,719 $616,595Project Total:
FPN: 4382671 Project/Location: MAIN STREET PATHWAYS FROM INTERLACHEN
PKWY TO LONGFELLOW BLVD
Project Length: 0.490
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.430 End Mile Post: 0.920
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $81,000
CST SU $524,241
CST TALU $331,870
$81,000 $856,111Project Total:
FPN: 4136551 Project/Location: MULBERRY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 2.500
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 18.450 End Mile Post: 20.950
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $26,463 $22,136 $22,800 $23,484 $24,189
$26,463 $22,136 $22,800 $23,484 $24,189Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 98/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4332581 Project/Location: NEW JERSEY TRAIL FROM CRYSTAL LAKE
DRIVE TO EDGEWOOD DRIVE
Project Length: 0.000
Desc: BIKE PATH/TRAIL
Comments: 10FT ASPHALT TRAIL ON WEST SIDE OF NEW JERSEY ROAD
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST ACTU $1,000
LAR SU $19,316
$20,316Project Total:
FPN: 4332601 Project/Location: NEW YORK CYCLE TRACK (LIME STREET) FROM
SIKES BLVD TO NEW YORK AVENUE
Project Length: 0.000
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE LF $115,307
PE TALU $1,000
CST SA $1,000
CST TALU $529,762
$116,307 $530,762Project Total:
FPN: 4344891 Project/Location: OLD DIXIE HIGHWAY/ SADDLE CREEK
ROAD
Project Length: 0.500
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.500
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALT $1,751
CST ACSA $10,250
CST HSP $1,072,075
$1,084,076Project Total:
FPN: 4353911 Project/Location: OLD DIXIE TRAIL FROM AUBURNDALE TO
HAINES CITY
Project Length: 0.001
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE SU $1,048,752
$1,048,752Project Total:
FPN: 4126751 Project/Location: POLK COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 12.175
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 2.300 End Mile Post: 14.475
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $21,523
OPS DITS $545,704 $476,838 $500,692 $515,712 $531,184
$567,227 $476,838 $500,692 $515,712 $531,184Project Total:
FPN: 4385451 Project/Location: POLK COUNTY US 27 ASCT
Project Length: 3.149
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 22.402 End Mile Post: 25.551
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DITS $125,000
DSB DIH $144,170
DSB DITS $1,397,000
$1,666,170Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 108/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4125301 Project/Location: POLK TPO IDENTIFIED OPERATIONAL
IMPROVEMENTS - FUNDING
Project Length: 0.000
Desc: TRAFFIC OPS IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $220
ROW SU $220
CST SU $971,103 $6,576,776 $3,126,138 $6,749,014 $7,281,362
$971,103 $6,576,776 $3,126,138 $6,749,454 $7,281,362Project Total:
FPN: 4351041 Project/Location: ROSE STREET SIDEWALKS AT VARIOUS
LOCATIONS
Project Length: 0.533
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.144 End Mile Post: 0.677
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALT $500
CST TALT $19,049
CST TALU $251,069
$270,618Project Total:
FPN: 4382651 Project/Location: SOUTH LAKE SILVER DR FROM 5TH STREET NW
TO SR 549(1ST STREET) N
Project Length: 0.330
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.330
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $126,000
CST SU $978,138
$126,000 $978,138Project Total:
FPN: 4381581 Project/Location: SR 17 FROM GRIFFIN FERTILIZER TO S. OF
LIVINGSTON LAKE ROAD
Project Length: 0.148
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.258 End Mile Post: 0.406
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
RRU DDR $350,000
CST DIH $21,120
CST DS $492,412
$10,000 $350,000 $513,532Project Total:
FPN: 4380141 Project/Location: SR 25 (US 27) FROM ERNIE CALDWELL BLVD TO
DUNSON ROAD
Project Length: 1.604
Desc: RESURFACING
Comments:
Begin Mile Post: 23.150 End Mile Post: 24.754
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $100,000
ENV DS $20,000 $50,000
CST DDR $1,702,454
CST DIH $264,000
CST DS $4,381,812
$120,000 $6,398,266Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 118/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4301852 Project/Location: SR 33 FROM OLD COMBEE RD TO N OF TOMKOW
RD
Project Length: 3.721
Desc: PRELIMINARY ENGINEERING
Comments:
Begin Mile Post: 4.993 End Mile Post: 8.714
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $1,229,296
$1,229,296Project Total:
FPN: 4301854 Project/Location: SR 33 FROM OLD COMBEE RD TO UNIVERSITY
BLVD
Project Length: 2.887
Desc: ADD LANES & REHABILITATE PVMNT
Comments:
Begin Mile Post: 4.993 End Mile Post: 7.880
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DDR $370,000
$370,000Project Total:
FPN: 4382641 Project/Location: SR 35/700 (US 98) AT SR 659 (COMBEE
ROAD)
Project Length: 0.200
Desc: PUBLIC TRANSPORTATION SHELTER
Comments:
Begin Mile Post: 8.693 End Mile Post: 8.893
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST FTAT $59,061
CST SU $59,061
$118,122Project Total:
FPN: 1975624 Project/Location: SR 35/700 (US98) FROM EDGEWOOD DRIVE TO E
MAIN STREET
Project Length: 3.033
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 9.189 End Mile Post: 12.222
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $7,499
ROW CM $1,386,556 $1,945,260
ROW SA $81,037 $4,079,592 $4,359,163
$7,499 $1,467,593 $6,024,852 $4,359,163Project Total:
FPN: 4345071 Project/Location: SR 37 AT LAKE HARRIS DRIVE
Project Length: 0.285
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 23.436 End Mile Post: 23.721
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SA $5,174
CST ACSA $10,250
CST DDR $31,131
CST HSP $1,631,368
$1,677,923Project Total:
FPN: 4380251 Project/Location: SR 37 AT RR CROSSING 908391
Project Length: 0.001
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 1.934 End Mile Post: 1.935
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $50,000
ENV DS $10,000 $25,000
RRU DDR $150,000
CST DDR $407,440
CST DIH $53,374
$60,000 $635,814Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 128/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4349371 Project/Location: SR 37 FROM CR 630 TO CR 640 (PINECREST
RD)
Project Length: 7.601
Desc: RESURFACING
Comments:
Begin Mile Post: 7.386 End Mile Post: 14.987
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $36,604
ENV DS $100,000
CST DIH $92,995
CST DS $8,443,574
$8,673,173Project Total:
FPN: 4381591 Project/Location: SR 37 FROM MP 1.860 TO MP 2.008
Project Length: 0.148
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 1.860 End Mile Post: 2.008
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
RRU DDR $150,000
CST DIH $15,840
CST DS $492,412
$10,000 $150,000 $508,252Project Total:
FPN: 4366011 Project/Location: SR 37 FROM SR 60 TO N OF VIRGINIA
ST
Project Length: 0.796
Desc: RESURFACING
Comments:
Begin Mile Post: 18.209 End Mile Post: 19.005
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $79,116
ENV DDR $50,000
CST ACSA $283,763
CST DDR $51,250
CST SA $1,892,077
$2,356,206Project Total:
FPN: 4106662 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP
RD
Project Length: 2.305
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 0.380 End Mile Post: 2.685
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $34,185
ENV DDR $40,000 $200,000
RRU DDR $2,366,869
RRU LF $3,290,951
ROW ACSU $155,879
ROW SU $820,056
CST DDR $14,962,577
CST DIH $316,800
CST LF $62,339
INC DDR $960,000
$1,010,120 $40,000 $21,199,536 $960,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 138/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4106664 Project/Location: SR 542 FROM 1ST STREET TO BUCKEYE LOOP
ROAD
Project Length: 2.476
Desc: LANDSCAPING
Comments:
Begin Mile Post: 0.000 End Mile Post: 2.476
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $251,635
CST DIH $35,517
$287,152Project Total:
FPN: 4106663 Project/Location: SR 542 FROM BUCKEYE LOOP ROAD TO US
27
Project Length: 3.648
Desc: WIDEN/RESURFACE EXIST LANES
Comments:
Begin Mile Post: 2.779 End Mile Post: 6.427
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $14,807
ENV DS $50,000 $200,000
RRU DDR $3,025,000
RRU LF $500,000
ROW DDR $432,370 $4,704,127
ROW DIH $601,135
ROW DS $2,966,666
CST DDR $42,757,174
CST DIH $555,000
$4,014,978 $4,704,127 $50,000 $47,037,174Project Total:
FPN: 4365691 Project/Location: SR 546 (US 92) FROM WABASH AVENUE TO N.
INGRAHAM AVENUE
Project Length: 3.311
Desc: RIGID PAVEMENT REHABILITATION
Comments:
Begin Mile Post: 1.738 End Mile Post: 5.049
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $4,958
ENV ACSA $50,000
ENV SA $100,000
CST NHRE $3,677,682
CST SA $4,405,852
$54,958 $8,183,534Project Total:
FPN: 4380641 Project/Location: SR 546 FROM W. OF INGRAHAM TO E. OF EAST
GARY RD
Project Length: 1.209
Desc: RIGID PAVEMENT REHABILITATION
Comments:
Begin Mile Post: 4.494 End Mile Post: 5.703
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DDR $2,372,161
CST DIH $269,240
$10,000 $2,641,401Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 148/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4350711 Project/Location: SR 555 (US 17) FROM AVENUE G SW TO AVENUE A
SW
Project Length: 1.066
Desc: RESURFACING
Comments:
Begin Mile Post: 28.500 End Mile Post: 29.069
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $6,268
ENV DDR $100,000
CST DDR $2,030,635
CST DIH $17,177
$2,154,080Project Total:
FPN: 4350851 Project/Location: SR 563 (SIKES BLVD) FROM LIME ST TO SR 539
(MLK JR BLVD)
Project Length: 0.417
Desc: RIGID PAVEMENT REHABILITATION
Comments:
Begin Mile Post: 0.006 End Mile Post: 0.423
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DDR $913,086
CST DIH $103,635
$10,000 $1,016,721Project Total:
FPN: 4380091 Project/Location: SR 572 FROM N OF ROOMS TO GO ENTRANCE TO
DRANE FIELD RD
Project Length: 2.054
Desc: RESURFACING
Comments:
Begin Mile Post: 0.685 End Mile Post: 2.739
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $100,000
CST DIH $293,775
CST SA $3,869,906
$100,000 $4,163,681Project Total:
FPN: 4345091 Project/Location: SR 60 AT BAILEY RD
Project Length: 0.303
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 2.848 End Mile Post: 3.151
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SA $2,817
CST ACSA $53,502
CST DDR $24,628
CST HSP $957,426
$1,038,373Project Total:
FPN: 4338562 Project/Location: SR 60 FROM CR 630 TO GRAPE HAMMOCK
RD
Project Length: 5.523
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 18.340 End Mile Post: 23.863
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACNP $7,350,000
$7,350,000Project Total:
FPN: 4338563 Project/Location: SR 60 FROM GRAPE HAMMOCK ROAD TO
OSCEOLA COUNTY LINE
Project Length: 1.760
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 23.863 End Mile Post: 25.623
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACNP $3,350,000
$3,350,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 158/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4356061 Project/Location: SR 60 FROM HILLSBOROUGH C/L TO DIESEL
RD
Project Length: 5.298
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.298
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $38,257
ENV DDR $70,000
RRU DS $245,000
CST DDR $2,396,314
CST DIH $102,500
CST NHRE $7,777,800
$10,629,871Project Total:
FPN: 4380241 Project/Location: SR 60 FROM MYRTLE AVE TO DUDE RANCH
ROAD
Project Length: 2.000
Desc: RESURFACING
Comments:
Begin Mile Post: 2.903 End Mile Post: 4.903
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $100,000
ENV DS $15,000 $25,000
CST DIH $252,064
CST SA $3,843,326
$115,000 $4,120,390Project Total:
FPN: 4349381 Project/Location: SR 600 (US 92) FROM W OF THOMPSON RD TO E
OF FISH HATCHERY RD
Project Length: 0.164
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 3.859 End Mile Post: 4.023
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $18,361
ENV DS $10,000
RRU DS $75,000
$103,361Project Total:
FPN: 4387591 Project/Location: SR 655/LAKE SHIPP DR FROM US 17/SR 555 TO
EAGLE LAKE RD #623042H
Project Length: 0.103
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.103
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU RHH $8,865
$8,865Project Total:
FPN: 4192432 Project/Location: SR25 (US 27) FROM HIGHLANDS COUNTY LINE TO
CR 630A
Project Length: 8.612
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 0.000 End Mile Post: 8.612
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $63,953
ENV ACNP $350,000
$63,953 $350,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 168/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4366731 Project/Location: SR35/700(US 98) FROM N. OF WEST SOCRUM
LOOP RD TO SR 471
Project Length: 7.531
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 9.005 End Mile Post: 16.536
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DDR $712,807
PDE DIH $200,000
PDE SA $1,387,193
$2,300,000Project Total:
FPN: 4366721 Project/Location: SR35/700(US98) FROM WEST DAUGHTERY ROAD
TO NORTH OF WEST SOCRUM RD
Project Length: 3.382
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 5.623 End Mile Post: 9.005
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $150,000
PDE SA $1,500,000
$1,650,000Project Total:
FPN: 2012103 Project/Location: SR400 (I-4) W. OF US 27 (SR 25) E. OF CR
532
Project Length: 4.022
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 28.000 End Mile Post: 32.022
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DDR $2,000,000
PE DIH $28,440
$2,028,440Project Total:
FPN: 4347621 Project/Location: SR546(MEMORIAL BLVD) FROM I-4 TO WABASH
AVE
Project Length: 1.411
Desc: RIGID PAVEMENT RECONSTRUCTION
Comments:
Begin Mile Post: 0.300 End Mile Post: 1.711
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSA $1,095
PE SA $4
CST DIH $146,381
INC DDR $950,000
$1,097,480Project Total:
FPN: 4313511 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)
TO 17TH STREET
Project Length: 0.310
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 22.460 End Mile Post: 22.770
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DDR $950,998
PDE DIH $18,081
$969,079Project Total:
FPN: 4313512 Project/Location: US 17/92 HINSON AVE FROM SR 17 (10TH STREET)
TO 17TH STREET
Project Length: 0.310
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 22.460 End Mile Post: 22.770
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DDR $1,350,000
PE DIH $25,000
$1,375,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 178/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4336571 Project/Location: US 27 (SR 25) AT SR 60 INTERCHANGE
Project Length: 0.105
Desc: LANDSCAPING
Comments:
Begin Mile Post: 0.040 End Mile Post: 0.145
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $15,926
CST DIH $11,100
CST DS $464,943
$15,926 $476,043Project Total:
FPN: 4345061 Project/Location: US 27 AT MAIN ST/CRUMP RD
Project Length: 0.906
Desc: LIGHTING
Comments:
Begin Mile Post: 9.731 End Mile Post: 10.637
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SA $2,668
ENV ACSA $20,000
CST ACSA $10,250
CST DDR $12,581
CST HSP $814,681
$860,180Project Total:
FPN: 4192434 Project/Location: US 27 AT SR 60
Project Length: 5.178
Desc: INTERCHANGE - ADD LANES
Comments:
Begin Mile Post: 13.638 End Mile Post: 18.816
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $53,089
ENV DI $240,000 $75,000 $338,472
ENV SIWR $161,528
RRU DDR $1,575,076
ROW DDR $1,560,033 $3,660,798
ROW DIH $106,213 $247,831
CST DDR $48,300,854
CST DIH $899,280
$53,089 $1,906,246 $3,983,629 $51,275,210Project Total:
FPN: 4192433 Project/Location: US 27 FROM CR 630A TO PRESIDENTS
DRIVE
Project Length: 5.026
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 8.612 End Mile Post: 13.638
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $69,378
ENV ACNP $300,000
ROW DI $2,229,296
ROW DIH $71,643
$69,378 $2,600,939Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 188/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4312061 Project/Location: US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN
AVE
Project Length: 2.663
Desc: RESURFACING
Comments:
Begin Mile Post: 2.469 End Mile Post: 5.132
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $25,000
RRU DS $5,000
CST DIH $173,637
$203,637Project Total:
FPN: 4312081 Project/Location: US 92 (SR 600) FROM REYNOLDS RD TO
SCHALAMAR CREEK ENT
Project Length: 1.250
Desc: BRIDGE REPLACEMENT
Comments: FROM E OF REYNOLDS RD TO SCHALAMAR CREEK ENT
Begin Mile Post: 4.327 End Mile Post: 5.577
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $135,585
RRU LF $985
CST DDR $19,985
CST DIH $298,054
CST LF $197
INC DDR $392,000
$846,806Project Total:
FPN: 4335582 Project/Location: US 92 FROM COUNTY LINE ROAD TO WABASH
AVENUE
Project Length: 4.131
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 0.000 End Mile Post: 4.131
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE CM $522,062
PE SA $3,927,938
ROW CM $1,947,311
ROW DS $794,918
ROW SA $5,741,339
$4,450,000 $8,483,568Project Total:
FPN: 4351081 Project/Location: US 92 FROM GALLOWAY RD TO N CHESTNUT
RD
Project Length: 1.586
Desc: SIDEWALK
Comments:
Begin Mile Post: 2.290 End Mile Post: 3.876
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $345,000
ENV SU $70,000
CST DDR $43,054
CST SU $921,447
$345,000 $70,000 $964,501Project Total:
FPN: 4298131 Project/Location: US 92 -NEW TAMPA HWY AT WABASH
AVE
Project Length: 0.200
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 4.031 End Mile Post: 4.231
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DDR $20,000 $30,000
CST DDR $818,466
CST DIH $1,000
$20,000 $849,466Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 198/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4348862 Project/Location: US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO
0064(JOHN SINGLETARY BRIDGE)
Project Length: 0.103
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 1.189 End Mile Post: 1.292
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE CM $1,876,306
PE SA $173,694
$2,050,000Project Total:
FPN: 4353421 Project/Location: US 98 (SR35 & SR700) VIRTUAL WEIGH STATION
STUDY
Project Length: 8.745
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 9.005 End Mile Post: 17.750
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $10,000
PDE DWS $1,000,000
$1,010,000Project Total:
FPN: 4387561 Project/Location: WABASH AVE FROM OLD TAMPA HWY/CR 542 TO
MERSHON ST #624298P
Project Length: 0.028
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.028
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU RHH $57,730
$57,730Project Total:
FPN: 4313531 Project/Location: WESTGATE-CENTRAL TRAIL FROM WEST
BELMAR ST TO OAKHILL STREET
Project Length: 0.790
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.790
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST LF $182,005
CST SU $231,631
CST TALT $1,000
CST TALU $326,537
$741,173Project Total:
FPN: 4371081 Project/Location: WINTER HAVEN TMC OPS CITY
WIDE
Project Length: 0.001
Desc: OTHER ITS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DS $87,000 $43,500 $43,500 $43,500 $43,500
$87,000 $43,500 $43,500 $43,500 $43,500Project Total:
FPN: 4136561 Project/Location: WINTER HAVEN TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 2.880
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 27.760 End Mile Post: 30.640
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $134,891 $145,904 $150,281 $154,790 $159,433
$134,891 $145,904 $150,281 $154,790 $159,433Project Total:
HIGHWAYS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$57,760,381 $37,372,683 $81,065,140 $131,831,328 $102,097,342
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 208/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
TRANSPORTATION PLANNING
FPN: 4383611 Project/Location: POLK COUNTY MPO FY 2020-2021
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $615,543
$615,543Project Total:
FPN: 4348551 Project/Location: POLK COUNTY MPO 2018/2019 UPWP
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $615,543 $615,543
$615,543 $615,543Project Total:
FPN: 4318091 Project/Location: POLK COUNTY MPO FY 2017/2018
UPWP
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $615,543
$615,543Project Total:
FPN: 4393131 Project/Location: POLK COUNTY MPO FY 2016/2017
UPWP
Project Length: 0.000
Desc: TRANSPORTATION PLANNING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $615,543
$615,543Project Total:
TRANSPORTATION PLANNING TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$615,543 $615,543 $615,543 $615,543 $615,543
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 218/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
TURNPIKE
FPN: 4289721 Project/Location: PAINT BRIDGES - POLK
PKWY(160249,160250,160251 ,160252,160253,160254)
Project Length: 7.400
Desc: BRIDGE - PAINTING
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.600
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYR $229,073
CST PKYR $9,459,924
$229,073 $9,459,924Project Total:
FPN: 4311232 Project/Location: PAINT BRIDGES - POLK PARKWAY (160267 &
160268)
Project Length: 0.958
Desc: BRIDGE - PAINTING
Comments:
Begin Mile Post: 13.568 End Mile Post: 14.526
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYI $201,021
CST PKYI $1,541
CST PKYR $2,419,374
$202,562 $2,419,374Project Total:
FPN: 4356081 Project/Location: POLK PARKWAY TRUSS CANTILEVER & POST
SIGN PANEL REPLACEMENTS (MP 8-21)
Project Length: 13.000
Desc: OVERHEAD SIGNING
Comments:
Begin Mile Post: 8.000 End Mile Post: 21.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYR $814
CST PKYR $2,303,642
$2,304,456Project Total:
FPN: 4394191 Project/Location: POLK WESTERN PLAZA SUNPASS
CONVERSION
Project Length: 0.000
Desc: ITS COMMUNICATION SYSTEM
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYI $1,500
CST PKYI $58,527
$60,027Project Total:
FPN: 4365201 Project/Location: RESURFACE POLK PKWY, MP 0-8
Project Length: 8.000
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 8.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYR $1,110,621
CST PKYR $13,132,980
$1,110,621 $13,132,980Project Total:
FPN: 4365203 Project/Location: ROADSIDE IMPROVEMENT FOR POLK PKWY MP
0-8
Project Length: 8.000
Desc: GUARDRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 8.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYI $1,885
CST PKYI $1,552,498
$1,885 $1,552,498Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 228/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4373001 Project/Location: SUNTRAX TEST FACILITY
Project Length: 1.380
Desc: MISCELLANEOUS STRUCTURE
Comments:
Begin Mile Post: 23.000 End Mile Post: 24.380
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYI $15,000
ENV PKYI $6,300,000
ROW PKYI $5,004,119
CST PKYI $35,700,619 $6,280,000
$47,019,738 $6,280,000Project Total:
FPN: 4365202 Project/Location: THERMOPLASTIC OF POLK PKWY
RESURFACING FROM MP 0-8
Project Length: 8.000
Desc: SIGNING/PAVEMENT MARKINGS
Comments:
Begin Mile Post: 0.000 End Mile Post: 8.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST PKYR $354,561
$354,561Project Total:
FPN: 4380182 Project/Location: THERMOPLASTIC WIDEN POLK PKWY MP18-
MM22
Project Length: 3.954
Desc: SIGNING/PAVEMENT MARKINGS
Comments:
Begin Mile Post: 18.024 End Mile Post: 21.978
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST PKYI $145,287
$145,287Project Total:
FPN: 4380181 Project/Location: WIDEN POLK PKWY FROM MP 18 TO MP 22, 2 TO
4 LANES
Project Length: 3.954
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 18.024 End Mile Post: 21.978
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE PKYI $4,001,601
DSB PKYI $1,500 $67,698,169
ROW PKYI $353
$4,003,454 $67,698,169Project Total:
TURNPIKE TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$54,931,816 $100,542,945 $354,561 $145,287
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 238/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FLP: AVIATION
FPN: 4336461 Project/Location: BARTOW MUNICIPAL AIRPORT PERIMETER
SECURITY FENCING
Project Length: 0.000
Desc: AVIATION SECURITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $640,000
CAP LF $160,000
$800,000Project Total:
FPN: 4348191 Project/Location: BARTOW MUNICIPAL APT TW L CONNECTOR
AND REMOVE OLD RW PAVEMENT
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments: DESIGN AND CONSTRUCTION
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $405,000
CAP LF $101,250
$506,250Project Total:
FPN: 4336371 Project/Location: LAKE WALES MUNICIPAL AIRPORT UPGRADE -
EXPAND ELECTRICAL VAULT
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $197,993
CAP LF $49,498
$247,491Project Total:
FPN: 4389211 Project/Location: LAKE WALES MUNICIPAL ARPT CONSTRUCT
RUNWAY REHABILITATION/EXTENSION
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $460,402 $1,000,000 $228,241
CAP FAA $1,087,232
CAP LF $115,101 $250,000 $57,060
$1,662,735 $1,250,000 $285,301Project Total:
FPN: 4313701 Project/Location: LAKELAND LINDER REG APT EXTEND RW 9-27
TW A
Project Length: 0.000
Desc: AVIATION SAFETY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $41,742
CAP DPTO $208,258
CAP FAA $4,500,000
CAP LF $250,000
$5,000,000Project Total:
FPN: 4336381 Project/Location: LAKELAND LINDER REG APT REHAB AND
EXTEND TW D
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $496,000 $704,708
CAP DPTO $400,000 $32,200
CAP LF $100,000 $124,000 $170,408
$500,000 $652,200 $875,116Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 248/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4362011 Project/Location: LAKELAND LINDER REG APT AIRSIDE CENTER
ROOF
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $200,000
CAP DPTO $522,500
CAP LF $522,500 $200,000
$1,045,000 $400,000Project Total:
FPN: 4369771 Project/Location: LAKELAND LINDER REG APT REHAB TW
H
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $63,750
CAP FAA $1,147,500
CAP LF $63,750
$1,275,000Project Total:
FPN: 4370781 Project/Location: LAKELAND LINDER REG APT PAINT HANGER
EXPANSION
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $490,000
CAP LF $490,000
$980,000Project Total:
FPN: 4370791 Project/Location: LAKELAND LINDER REG APT HANGER
PURCHASE
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $440,000
CAP LF $440,000
$880,000Project Total:
FPN: 4388791 Project/Location: LAKELAND LINDER REGIONAL AIRPORT ARPT
FACILITY EXPANSION
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $300,000
CAP LF $300,000
$600,000Project Total:
FPN: 4389751 Project/Location: WINTER HAVEN MUNICIPAL ARPT TAXIWAY E &
F CONSTRUCTION
Project Length: 0.000
Desc: AVIATION PRESERVATION PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $248,000
CAP FAA $4,464,000
CAP LF $248,000
$4,960,000Project Total:
FLP: AVIATION TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$9,442,735 $3,949,691 $3,526,667 $5,000,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 258/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FLP: INTERMODAL
FPN: 4309701 Project/Location: BARTOW MUNICIPAL APT NEW APT ENTRANCE
RD
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments: NEW AIRPORT ENTRANCE ROAD
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $200,000
CAP DPTO $990,000 $400,000
CAP LF $697,500 $600,000
$1,687,500 $1,200,000Project Total:
FPN: 4370591 Project/Location: BARTOW MUNICIPAL APT INSTALL NEW AND
RELOCATE EXISTING RAIL LINES
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments: INSTALL NEW AND RELOCATE EXISTING RAIL LINES
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $600,000
CAP LF $600,000
$1,200,000Project Total:
FPN: 4369901 Project/Location: LAKELAND LINDER REG APT MRO
HANGER
Project Length: 0.000
Desc: AVIATION REVENUE/OPERATIONAL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $372,938
CAP LF $372,938
$745,876Project Total:
FPN: 4388361 Project/Location: LAKELAND LINDER REG ARPT SITE
PREP/UTILITY INSTALL @ INTERMODAL CENTER
Project Length: 0.000
Desc: AVIATION CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $1,100,000 $1,800,000
CAP DPTO $100,000 $200,000 $1,400,000 $232,050
CAP LF $100,000 $1,300,000 $1,400,000 $2,032,050
$200,000 $2,600,000 $2,800,000 $4,064,100Project Total:
FLP: INTERMODAL TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$2,633,376 $1,200,000 $2,600,000 $4,000,000 $4,064,100
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 268/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FLP: RAIL
FPN: 4366501 Project/Location: ITS IMPROVEMENT TO TRAFFIC OPERATIONS IN
THE DOWNTOWN AREA
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $3,354
PE DIH $55,625
PE TRIP $125,000
DSB DIH $51,350
DSB TRIP $2,131,025
$58,979 $2,307,375Project Total:
FPN: 4366561 Project/Location: NEW YORK AVENUE PEDESTRIAN
UNDERPASS
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $15,208
PE TRIP $1,500,000
ENV TRIP $25,000
RRU TRIP $400,000
ROW DIH $54,024
ROW TRIP $151,944
CST DIH $481,500
$2,021,708 $205,968 $400,000Project Total:
FPN: 4365591 Project/Location: SR60 GRADE SEPARATION OVER CSX
RAILROAD
Project Length: 1.196
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 24.849 End Mile Post: 26.045
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $87,345
ENV TRIP $75,000
RRU TRIP $30,000 $470,000
ROW DIH $20,000
ROW TRIP $843,085
CST TRIP $30,639,633
$980,430 $545,000 $30,639,633Project Total:
FLP: RAIL TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$3,061,117 $2,852,375 $30,845,601 $400,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 278/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FLP: TRANSIT
FPN: 4101421 Project/Location: LAKELAND AREA MASS TRANSIT STATE BLOCK
GRAMT OPERATING ASSISTANCE
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $60,990
OPS DPTO $783,999 $804,267 $830,819 $872,359 $940,224
OPS LF $844,989 $804,267 $830,819 $872,359 $940,224
$1,689,978 $1,608,534 $1,661,638 $1,744,718 $1,880,448Project Total:
FPN: 4140631 Project/Location: LAKELAND AREA MASS TRANSIT (LAMTD)-
OPERATING ASSISTANCE - CORRIDOR
Project Length: 0.000
Desc: URBAN CORRIDOR IMPROVEMENTS
Comments: TRANSIT CORRIDOR PROGRAM
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DPTO $709,151 $762,481 $795,083 $818,945 $818,945
OPS LF $709,151 $762,481 $795,083 $818,945 $818,945
$1,418,302 $1,524,962 $1,590,166 $1,637,890 $1,637,890Project Total:
FPN: 4101492 Project/Location: LAMTD FTA SECT 5307 OPERATING ASSIST LKLD
UZA
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments: LAMTD IS THE DESIGNATED RECIPIENT
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS FTA $3,835,489 $1,915,235 $1,915,235 $1,915,235 $1,920,254
OPS LF $3,835,489 $1,915,235 $1,915,235 $1,915,235 $1,920,254
$7,670,978 $3,830,470 $3,830,470 $3,830,470 $3,840,508Project Total:
FPN: 4101501 Project/Location: LAMTD FTA SECTION 5307 CAPITAL ASSISTANCE
WINTER HAVEN UZA
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments: LAMTD IS THE DESIGNATED RECIPIENT
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $2,030,185 $500,743 $500,743 $515,092 $513,607
CAP LF $507,697 $125,186 $125,186 $128,773 $128,402
$2,537,882 $625,929 $625,929 $643,865 $642,009Project Total:
FPN: 4101502 Project/Location: LAMTD FTA SECTION 5307 OPERATING
ASSISTANCE WINTER HAVEN UZA
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments: LAMTD IS THE DESIGNATED RECIPIENT
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS FTA $6,090,557 $1,502,230 $1,502,230 $1,545,276 $1,540,821
OPS LF $6,090,557 $1,502,230 $1,502,230 $1,545,276 $1,540,821
$12,181,114 $3,004,460 $3,004,460 $3,090,552 $3,081,642Project Total:
FPN: 4332821 Project/Location: LAMTD TRANSIT STOP IMPROVEMENTS @
VARIOUS LOCATIONS
Project Length: 8.031
Desc: TRANSIT IMPROVEMENT
Comments:
Begin Mile Post: 8.679 End Mile Post: 16.710
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $109,566
CAP SU $109,566
$219,132Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 288/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FPN: 4350771 Project/Location: LAMTD TRANSIT STOP IMPROVEMENTS @
VARIOUS LOCATIONS FTAT TRANSFER
Project Length: 0.000
Desc: TRANSIT IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $174,028
CAP SU $174,028
$348,056Project Total:
FPN: 4350781 Project/Location: LAMTD TRANSIT STOP IMPROVEMENTS @
VARIOUS LOCATIONS
Project Length: 0.000
Desc: TRANSIT IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $49,661
CAP SU $49,661
$99,322Project Total:
FPN: 4357711 Project/Location: LAMTD/LKND-WH UZA FTA SECTION 5339
CAPITAL ASSISTANCE
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments: WHAT-$210,205
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $1,942,324 $490,708 $490,708 $480,121 $480,787
CAP LF $485,582 $122,678 $122,678 $120,030 $120,197
$2,427,906 $613,386 $613,386 $600,151 $600,984Project Total:
FPN: 4101281 Project/Location: POLK COUNTY FTA SECTION 5311 OPERATING
ASSISTANCE
Project Length: 0.000
Desc: OPERATING/ADMIN. ASSISTANCE
Comments: SECTION 5311 RURAL AND SMALL AREAS
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DU $712,856 $712,856 $712,856 $897,295 $808,929
OPS LF $712,856 $712,856 $712,856 $897,295 $808,929
$1,425,712 $1,425,712 $1,425,712 $1,794,590 $1,617,858Project Total:
FPN: 4101161 Project/Location: POLK COUNTY TPO TRANSIT PLANNING - FTA
SECTION 5305 (D)
Project Length: 0.000
Desc: MODAL SYSTEMS PLANNING
Comments: FTA SECTION 5305(D) METROPOLITAN PLANNING
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN DPTO $14,745 $15,187 $15,187 $15,195 $14,656
PLN DU $117,962 $121,501 $121,501 $121,559 $117,245
PLN LF $14,745 $15,187 $15,187 $15,195 $14,656
$147,452 $151,875 $151,875 $151,949 $146,557Project Total:
FPN: 4101431 Project/Location: WINTER HAVEN AREA TRANSIT (WHAT)
OPERATING STATE TRANSIT BLOCK GRANT
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments: BLOCK GRANT - OPERATING
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DPTO $613,657 $729,838 $753,933 $791,629 $831,210
OPS LF $613,657 $729,838 $753,933 $791,629 $831,210
$1,227,314 $1,459,676 $1,507,866 $1,583,258 $1,662,420Project Total:
FLP: TRANSIT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$31,393,148 $14,245,004 $14,411,502 $15,077,443 $15,110,316
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 298/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYPOLK
FLORIDA RAIL ENTERPRISE
FPN: 4366531 Project/Location: KENTUCKY AVENUE PEDESTRIAN
OVERPASS
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $14,501
PE TRIP $1,000,000
RRU TRIP $400,000 $600,000
ROW DIH $54,024
ROW TRIP $85,539
CST DIH $258,000
CST TRIP $4,522,000
$1,014,501 $139,563 $400,000 $5,380,000Project Total:
FPN: 4365601 Project/Location: RECKER HIGHWAY CONSTRUCT A BRIDGE
SPANNING THE CSX RR TRACK IN POLK CO
Project Length: 0.000
Desc: RAIL CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $2,896
PE DIH $604
PE TRIP $2,700,000
ENV TRIP $25,000
RRU TRIP $500,000
ROW DIH $153,024
ROW TRIP $4,775,050
$3,500 $2,725,000 $4,928,074 $500,000Project Total:
FLORIDA RAIL ENTERPRISE TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$1,018,001 $2,725,000 $139,563 $5,328,074 $5,880,000
COUNTY TOTALSPOLK
Phase Fund Total2016/17 2017/18 2018/19 2019/20 2020/21
$160,856,117 $163,503,241 $133,558,577 $162,397,675 $127,767,301COUNTY Total: $748,082,911
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 308/18/2016Run Date: SnapShot Date: 7/20/2016