FLOW, SPACE, ANDACTIVITY RELATIONSHIPS
![Page 2: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/2.jpg)
FLOWlot sizesunit load sizesmaterial handling equipment and
strategieslayout arrangementbuilding configuration.
![Page 3: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/3.jpg)
SPACE
lot sizesstorage systemproduction equipment
typesizelayout arrangementbuilding configuration
housekeeping and organization policies
material handling equipment
officecafeteriarestroom design
![Page 4: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/4.jpg)
ACTIVITY RELATIONSHIPS
material or personnel flowenvironmental considerationsorganizational structurecontinuous improvement methodology
(teamwork activities)control issuesprocess requirements
![Page 5: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/5.jpg)
DEPARTMENTAL PLANNINGPlanning department
production, support, administrative, service areas
Production planning departmentscollections of workstations to be grouped
together during the facilities layout process. As a general rule, planning departments may
be determined by combining workstations that perform "like" functions (similar products or processes)
![Page 6: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/6.jpg)
VOLUME-VARIETY IMPACT
Variety
Volume
![Page 7: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/7.jpg)
Sporadic متقطع
![Page 8: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/8.jpg)
MANUFACTURING CELLS
Product family or group technology departments aggregate medium volume-variety parts into families based on similar manufacturing operations or design attributes.
The machines that are required to manufacture the part family are grouped together to form a "cell."
Manufacturing cells group machines, employees, materials, tooling, and material handling and storage equipment to produce families of parts.
![Page 9: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/9.jpg)
Classification
Production Flow AnalysisClustering MethodologiesMathematical ModelsHeuristicsGenetic Algorithms, Simulated AnnealingOthers
![Page 10: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/10.jpg)
DCA (Direct Clustering Algorithm)Part-machine matrix
Chan&Milner – 1982Algorithm
Step.1 Order the rows and columns
Step.2 Sort the columns
Step.3 Sort the rowsStep.4 Form cells
Machine#
Part# 1 2 3 4 5
1 1 1
2 1
3 1 1 1
4 1 1
5 1
6 1 1
![Page 11: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/11.jpg)
Step.1 Ordering machine-part matrix
Machine#
Part# 1 2 3 4 5
1 1 1
2 1
3 1 1 1
4 1 1
5 1
6 1 1
Part# 5 4 3 2 1
#of 1s
3 1 1 1 3
6 1 1 2
4 1 1 2
1 1 1 2
5 1 1
2 1 1
# of 1s 2 2 2 2 3
![Page 12: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/12.jpg)
Step.2 Column-sorted machine-part matrix
Column-sorted
M-P matrix
Part# 5 4 2 3 1
# of 1s
3 1 1 1 3
6 1 1 2
4 1 1 2
1 1 1 2
5 1 1
2 1 1
# of 1s 2 2 2 2 3
Previous Matrix
Part# 5 4 3 2 1
#of 1s
3 1 1 1 3
6 1 1 2
4 1 1 2
1 1 1 2
5 1 1
2 1 1
# of 1s 2 2 2 2 3
![Page 13: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/13.jpg)
Step.3 Row-sorted machine-part matrix
Column-sorted
M-P matrix
Part# 5 4 2 3 1
# of 1s
3 1 1 1 3
6 1 1 2
4 1 1 2
1 1 1 2
5 1 1
2 1 1
# of 1s 2 2 2 2 3
Row-sorted
M-P matrix Part# 5 4 2 3 1 #1
3 1 1 1 3
6 1 1 2
5 1 1
4 1 1 2
1 1 1 2
2 1 1
# of 1s 2 2 2 2 3
![Page 14: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/14.jpg)
ACTIVITY RELATIONSHIPS
Organizational relationships (org. chart)Flow relationships (no. of moves per hour)Control relationships Environmental relationshipsProcess relationships
![Page 15: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/15.jpg)
FLOW
SubjectResourcesCommunications
![Page 16: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/16.jpg)
Within a manufacturing facility
MATERIAL
FLOW
SYSTEM
Subject Materials, parts and supplies used in
production (within facility)
Resources Production control & qual.cot.dep. Manuf., Assembly, and Storage Dp. Material handling equipment Warehouse
Communication Prod.Schedules, work order rel. Bar codes, route sheets, assmb. charts Warehouse records
![Page 17: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/17.jpg)
Product planning department
![Page 18: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/18.jpg)
Fixed materials location planning dept.
![Page 19: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/19.jpg)
Product family planning departments
![Page 20: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/20.jpg)
Process planning departmetns
![Page 21: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/21.jpg)
Flow of products from a manufacturing facility
Physical
Distribution
Systems
SubjectFinished goods produced by a firm
ResourcesThe customerSales and accounting dpts.WarehousesMater.Handling and transp. equipmentThe distributors of the finished product
CommunicationSales orders, packing lists, shipping
reports, shipping releases Invoices, bills of lading
![Page 22: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/22.jpg)
MATERIAL MANAGEMENT
+MATERIAL FLOW
+PHYSICAL
DISTRIBUTION
LOGISTICS
SYSTEM
![Page 23: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/23.jpg)
FLOW PATTERNS
Flow within workstationsSimultaneousSymmetricalNaturalRhythmicalHabitual
![Page 24: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/24.jpg)
Flow within product departments
![Page 25: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/25.jpg)
Flow within process departments
![Page 26: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/26.jpg)
General Flow Patterns
![Page 27: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/27.jpg)
Flow within a facility
![Page 28: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/28.jpg)
Flow within a facility
![Page 29: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/29.jpg)
FLOW PLANNING
Effective flowwithin a facilitywithin a departmentwithin a workstation
Progressive movement of materials, information or people
![Page 30: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/30.jpg)
FLOW PLANNING
Principles of effective flowMaximize directed flow pathsMinimize flowMinimize the cost of flow
![Page 31: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/31.jpg)
FLOW PLANNING Work simplification approaches:
Eliminating flow by planning for the delivery of materials, information, or people directly to the point of ultimate use and eliminate intermediate steps.
Minimizing multiple flows by planning for the flow between two consecutive points of use to take place in as few movements as possible, preferably one.
Combining flows and operations wherever possible by planning for the movement of materials, information, or people to be combined with a processing step.
![Page 32: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/32.jpg)
FLOW PLANNING: Perspective
Minimize manual handling by minimizing: walking, manual travel distances, and motions.
Eliminate manual handling by mechanizing or automating flow to allow workers to spend full time on their assigned tasks
![Page 33: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/33.jpg)
BACKTRACKING PENALTY
![Page 34: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/34.jpg)
MEASURING FLOW
QuantitativePieces per hourMoves per dayKilos per week
QualitativeNecessity for closeness
Large volumes of material, information, people: Quantitative
Little actual movement but significant communication and organizational interrelations: Qualitative
![Page 35: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/35.jpg)
QUANTITATIVE FLOW MEASUREMENTAmount moved between departments
![Page 36: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/36.jpg)
QUANTITATIVE FLOW MEASUREMENT
![Page 37: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/37.jpg)
EXAMPLE 3.4A firm produces three components. Components 1 and 2 have
the same size and weight and are equivalent with respect to movement. Component 3 is almost twice as large and moving two units of either component 1 or 2 is equivalent to moving 1 unit of component 3. The departments included in the facility are A, B, C, D, and E. The quantities to be produced and the component routings are as follows:
Component Prod.Qnty/day Routing
1 30 A-C-B-D-E
2 12 A-B-D-E
3 7 A-C-D-B-E
![Page 38: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/38.jpg)
Ex.4.2 (Cont.) EXCEL
![Page 39: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/39.jpg)
QUALITATIVE FLOW MEASUREMENTCloseness relationships values1. List all departments on the
relationship chart.2. Conduct interviews or
surveys 3. Define the criteria for
assigning closeness relationships
4. Establish the relationship value and the reason for the value for all pairs ofdepartments.
5. Allow everyone having input to the development of the relationship chart tohave an opportunity to evaluate and discuss changes in the chart.
Value Closeness
A Absolutely necessary
E Especially important
I Important
O Ordinary
U Unimportant
X Undesirable
![Page 40: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/40.jpg)
Qualitative Flow Measurement:Relationship Chart
![Page 41: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/41.jpg)
Qualitative Flow Measurement
Proximity requirementsNon-distance related solutions
![Page 42: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/42.jpg)
SPACE REQUIREMENTS
True space requirementsA facility: the fixed assets required to
accomplish a specific objective.A workstation
![Page 43: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/43.jpg)
Space RequirementsWorkstation
Equipment spaceEquipment: Available from machinery data sheets
Machine travel: Floor area requirements
Machine maintenancePlant services
The materials areasReceiving and storing materials.In-process materials.Storing and shipping materials.Storing and shipping waste and scrap.Tools, fixtures, jigs, dies, and maintenance
materials.
![Page 44: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/44.jpg)
Space requirements
WorkstationThe personnel area
The operator.Material handling.Operator ingress and
egress.
![Page 45: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/45.jpg)
Department SpecificationAisle Allowance Estimates
Expressed as a percentage of the net area required for equipment, material, and personnel.
If the largest load is Percentage is
Less than 6 sqft 5-10
Between 6 and 12 sqft 10-20
Between 12 and 18 sqft 20-30
Greater than 18 sqft 30-40
![Page 46: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/46.jpg)
Example 4.3Work station
Quantity Area sqft
Equip. Mater. Persl. TotalTurret
Lathe5 240 100 100 440
Screw mach.
6 280 240 120 640
Chucker 2 60 100 40 200
1280
Aisle Allowance 13% 167
Total Area Required 1447
![Page 47: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/47.jpg)
Recommended Aisle WidthsType of flow Aisle Width (feet)
Tractors 12(x0,3=3,6m)
3-ton Forklift 11
Narrow aisle truck 9
Manual platform truck 5
Personnel 3
Personnel with doors opening into the aisle from one side
6
Personnel with doors opening into the aisle from two sides
8
![Page 48: FLOW, SPACE, AND ACTIVITY RELATIONSHIPS. FLOW lot sizes unit load sizes material handling equipment and strategies layout arrangement building configuration](https://reader035.vdocuments.net/reader035/viewer/2022062407/56649d815503460f94a66453/html5/thumbnails/48.jpg)
Visual Management
Visual Control: To make line failures visible to anyone
Kanban: Flow arrangement, “signals” or “instruction cards”
Andon: Line stop alarm light