57
Al Oerter Recreation Center September 30, 2015 Flushing Creek and Flushing Bay CSO Long Term Control Plan

Upload: ngonguyet

Post on 06-Mar-2018

227 views

Category:

Documents


4 download

TRANSCRIPT

Al Oerter Recreation Center

September 30, 2015

Flushing Creek and Flushing Bay

CSO Long Term Control Plan

2

Welcome & Introductions

Eric Landau

Associate Commissioner

DEP

3

Agenda

Topic Speaker

1 Welcome & Introductions Eric Landau

2 Flushing Creek LTCP

• Summary of Previous Public Meetings Eric Landau

• LTCP Proposed Final Recommendations Keith Beckmann

3 Flushing Bay LTCP

• Background Eric Landau

• Waterbody / Watershed Characteristics Keith Beckmann

• Water Quality Improvement Projects

o Green Infrastructure Angela Licata

o Grey Infrastructure Keith Beckmann

4 Next Steps Eric Landau

5 Discussion and Q&A Session All

4

What is a Combined Sewer Overflow?

NYC’s sewer system is approximately 60% combined, which means it

is used to convey both sanitary and storm flows.

When the sewer system is at full capacity, a diluted mixture of rain water and

sewage may be released into local waterways. This is called a combined sewer

overflow (CSO).

65% to 90% of combined sanitary & storm flow is captured at treatment plants.

Down

Spout

Catch Basin

Combined

Sewer Outfall

Sewer

Regulator

Dry Weather

Conditions

City Sewer Main

Building Sewer

Connection

Down

Spout

Catch Basin

Stormy Weather Conditions

Combined

Sewer Outfall

Sewer

Regulator

City Sewer Main

Building Sewer

Connection

5

What is a LTCP and CSO Consent Order?

Long Term Control Plan (LTCP)

identifies appropriate CSO controls to achieve applicable

water quality standards

consistent with the Federal CSO Policy and Clean Water Act

CSO Consent Order

an agreement that settles past legal disputes without

prolonged litigation

requires DEP to develop LTCPs and mitigate CSOs

6

Flushing Creek (FC) LTCP

Proposed Final Recommendations

7

Summary of Previous

Flushing Creek Public Meetings

Eric Landau

Associate Commissioner

DEP

8

Flushing Creek LTCP Process & Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

AnalysisModeling

Alternatives Development & Evaluation

LTCP DEC Review

Kickoff

Meeting6/11/2014

Alternatives

Review Meeting10/23/2014

Final Plan

Review Meeting

TODAY

Submitted

LTCP 12/30/2014*

Community Board 3

Environmental

Committee Meeting

10/30/2014

*Supplemental Documentation was submitted to DEC on 5/22/2015 and 8/7/2015 in response to DEC review comments.

9

FC Public Meeting #1 – Summary

Presented on:

Waterbody/Watershed Characteristics

Current Uses

Preliminary Water Quality Sampling Results

Grey Infrastructure Projects• CSO Retention Facility

• Upgrades to increase flow conveyance to Tallman

Island WWTP

Green Infrastructure Projects• JHS 185Q, Edward Bleecker Jr. High

• Flushing Town Hall

• TI-011 and TI-022 Area-Wide Contracts with DDC

Date: June 11, 2014

Location: P.S. 020 John Bowne, Queens

Attendees: 20

New Interceptor Route

Being Restored to Upland / Wetland

CSO Retention Facility

10

FC Public Meeting #2 – Summary

Date: October 23, 2014

Location: Al Oerter Recreational Center

Attendees: 15

Presented on:

Brief Recap of Meeting #1

Water Quality Attainment• Current Classification (Secondary Contact)

= High Level Attainment (See following slides)

• Potential Future Classification (Primary Contact)

= Non-Attainment (See following slides)

Modeling• 100% CSO Control in Flushing Creek results in

minimal WQ improvement for Primary Contact

Attainment

Comparison of Key Alternatives

11

Flushing Creek LTCP Proposed

Final Recommendations

Keith Beckmann, P.E.

LTCP Program Manager

DEP

Angela Licata

Deputy Commissioner

DEP

12

Flushing Creek Drainage Area

Flushing Creek is located in north-

central Queens and discharges into

Flushing Bay

Over 500 acres of the watershed

tributary drain to fresh water Meadow

and Willow Lakes

Flushing Creek is classified by New

York State DEC for secondary contact

recreation

Class I – Boating and Fishing

DEP wet-weather discharges include:

3 CSO Outfalls

5 Stormwater Outfalls

Drainage

Area

Acres 11,016

Served by combined sewers 57%

13

Flushing Creek Sampling Locations

14

Flushing Creek Fecal Coliform Results

131

433

3310

21761894

910

130100

327

119 112

77

1

10

100

1000

10000

0 1 2 3 4 5 6 7

Ge

om

etr

ic M

ean

Fe

ca

l C

olifo

rm (

#/1

00 m

l)

Wet Weather

Dry Weather

2000 #/100 ml

November 2013 to May 2014

200 #/100 ml

Potential Future

Primary Contact

Standard

Sampling Locations

~18 Dry and ~60 Wet

samples per location

OW1 OW2 OW3 OW4 OW5 OW6

Secondary Contact

Standard

15

Flushing Creek Enterococci Results

51

99

863

494 497

221

32

20

61

2320

14

1

10

100

1000

0 1 2 3 4 5 6 7

Ge

om

etr

ic M

ean

En

tero

co

cc

i (#

/10

0 m

l)

Wet Weather

Dry Weather

30 #/100 ml

Sampling Locations

November 2013 to May 2014

OW1 OW2 OW3 OW4 OW5 OW6

~18 Dry and ~60 Wet

samples per location

Potential Future

Primary Contact

Standard

16

Flushing Creek CSO Mitigation Options

System

OptimizationFixed Weir

Parallel

Interceptor /

Sewer

Inflatable Dams

Bending Weirs

Control Gates

Pump Station

Expansion

CSO

Relocation

Gravity Flow

Tipping to Other

Watersheds

Pumping Station

Modification

Flow Tipping with

Conduit/Tunnel and Pumping

Water Quality

/ Ecological

Enhancement

Floatables Control DredgingWetlands

RestorationFlushing Tunnel

Treatment

Satellite:

Centralized:

Outfall

DisinfectionTank Disinfection

High Rate

Clarification (HRC)

WWTP Expansion

Storage In-System Shaft Tank Tunnel

INCREASING COMPLEXITY

INC

RE

AS

ING

CO

ST

Flushing Creek Preferred Alternative

= Disinfection of Outfalls TI-011 and TI-010

17

Green Infrastructure in New York City

Green Infrastructure (GI) collects

stormwater runoff from impervious

surfaces, such as streets and roofs,

reducing flow to sewers

2012 Consent Order requires GI

investments over 20 years

$1.5 billion budgeted for GI Citywide to

manage 1” of stormwater runoff from

10% of impervious combined sewered

areas by 2030

DEP will meet this goal through:

• Area-Wide Contracts

• Public Property Retrofits

• Grant Program for Private Property Owners

• Stringent Detention Rule for New Development

Permeable Pavers

Green Roofs

Bioswales

(right of way green infrastructure)

18

GI Opportunities for Private Property Owners

Green Infrastructure Grant Program: DEP provides funding for the design and construction costs of green

infrastructure on private property in combined sewer areas of the City.

Green Roof Tax Abatement:The City provides a one-year property tax abatement for private

properties that install green roofs. The abatement value is $5.23 per

square foot (up to the lesser of $200,000 or the building’s tax liability)

and is available through March 15, 2018.

2012 Stormwater Rule:In 2012, DEP amended the allowable flow rate of stormwater to the

City’s combined sewer system for new and existing development. Site

Connection Proposals may include green infrastructure technologies

to meet the new allowable rate.

19

Planned Green Infrastructure in Flushing Creek

Area-Wide GI Contracts:

• TI-022 – Geotechnical investigations

are complete

• TI-011 – Geotechnical investigations

are underway

• TI-010 – Design will begin this

fall/winter

PS 185Q:

• Construction began September 2015

• Rain garden and synthetic turf field

for “Schoolyards to Playgrounds”

project with TPL/SCA/DOE

Flushing Town Hall:

• In construction

• Rain garden and swales with the

Department of Cultural Affairs

.

20

Flushing Creek Preferred Alternative

Recreational Season Disinfection (May 1st – Oct. 31st)

*TI-010 – Disinfect at Influent Screens and DC5

*TI-011 – Disinfect at Regulator 9

TI-010 TI-011

Benefits

• Provides disinfection of

tank bypass flows

• Minimizes footprint as

disinfection equipment

can be installed at

existing site

• Utilizes gravity, no

effluent pumping

• Maximizes use of

existing infrastructure

• Cost effective; no

retention tank needed

Challenges

• May require control

structure at end of

outfall

• Potential residual

chlorine issues

• Potential impacts due

to street work

• May require control

structure at end of

outfall

• Potential residual

chlorine issues

• May require site

acquisition

Construction $2 Million $5 Million

O&M Cost $350,000 per Year $300,000 per Year

*Note: Provisions for floatables control to be

evaluated and included in the design for both TI-010

and TI-011.

TI-010

TI-011

21

Flushing Creek Projected Attainment

Current Classification

Class I – Secondary Contact (Fecal GM ≤ 2000 #/100mL)

o 100% Annual Attainment

Potential Future Classification)

Class SC – Primary Contact (Fecal GM ≤ 200 #/100mL and Entero GM ≤ 30 #/100mL)

o Fecal: 67% to 75% Annual Attainment

o Entero: 45% to 62% Annual Attainment

Projected Attainment with

Implementation of LTCP Recommended Plan

22

Projected Fecal Annual Attainment

7780

77 78

67 67

75 75

39

43

48

53

0

20

40

60

80

100

OW3 OW4 OW5 OW6

An

nu

al A

ttain

me

nt

%

100% CSO Control

LTCP Recommended Plan

Baseline

Compliance = Attainment ≥ 95%

for GM ≤ 200 #/100 mL

Sampling Locations

TI-022

CSO Outfall

TI-011

CSO OutfallTI-010

CSO Outfall

FecalPotential Future Class SC

23

Projected Entero Attainment

61

6967 67

45

5559

62

32

4144

50

0

20

40

60

80

100

OW3 OW4 OW5 OW6

Recre

ati

on

al A

ttain

men

t %

100% CSO Control

LTCP Recommended Plan

Baseline

Compliance = Attainment ≥ 95%

for GM ≤ 30 #/100 mL

Sampling Locations

TI-022

CSO Outfall

TI-011

CSO OutfallTI-010

CSO Outfall

EnteroPotential Future Class SC

24

Projected Dissolved Oxygen Annual Attainment

83

87 87

91

7880 81

90

7880

81

90

0

20

40

60

80

100

OW3 OW4 OW5 OW6

An

nu

al A

ttain

me

nt

%

100% CSO Control

LTCP Recommended Plan

Baseline

Compliance = Attainment ≥ 95%

for DO daily average

≥ 4.8 mg/L mL

Sampling Locations

TI-022

CSO Outfall

TI-011

CSO OutfallTI-010

CSO Outfall

Chronic (Daily) DOPotential Future Class SC

25

Projected Dissolved Oxygen Annual Attainment

97 98 99 100

9295

9799

92

95 97

99

0

20

40

60

80

100

OW3 OW4 OW5 OW6

An

nu

al A

ttain

me

nt

%

100% CSO Control

LTCP Recommended Plan

Baseline

Compliance = Attainment ≥ 95%

for DO never

< 3.0 mg/L mL

Sampling Locations

TI-022

CSO Outfall

TI-011

CSO OutfallTI-010

CSO Outfall

Acute (Hourly) DOPotential Future Class SC

26

Flushing Creek: CSO Volume Reductions

Volume Reduction: 53% annual CSO volume reduction through completed /

planned Green and Grey infrastructure implementation

1,952

713

490

399

89

84

0

500

1000

1500

2000

2500

3000

Pre-WWFP LTCP Baseline

CS

O D

isc

ha

rge

(M

G/y

r)

TI-022

TI-011

TI-010

53%CSO Volume

Reduction(585 MGY of

remaining CSO is

also seasonally

disinfected)

BEFORE

(2,531 MG/yr)

AFTER

(1,196 MG/yr)

(with WWFP Green and Grey Infrastructure)

27

Flushing Creek: Fecal Load Reductions

Bacteria Reduction: Additional 51% Annual Fecal Reductions

as a result of seasonal disinfection at outfalls TI-010

and TI-011 during May 1st to Oct 31st

781

332

2030

952

182.5

182.5

0

500

1000

1500

2000

2500

3000

3500

LTCP Baseline Post-LTCP Recommended Plan

To

tal O

rga

nis

ms

(x

10

13)

TI-022

TI-011

TI-010

51%Additional

Annual

Fecal Load

Reduction

BEFORE

(2,994 x1013)

AFTER

(1,467 x1013)

(with WWFP Green and Grey Infrastructure) (with Preferred Alternative)

28

Flushing Creek: Enterococcus Load Reductions

Bacteria Reduction: Additional 49% Annual Enterococcus Reductions

as a result of seasonal disinfection at outfalls TI-010

and TI-011 during May 1st to Oct 31st

221

102

227

108

27.6

27.6

0

100

200

300

400

500

LTCP Baseline Post-LTCP Recommended Plan

To

tal O

rga

nis

ms

(x

10

13)

TI-022

TI-011

TI-010

49%Additional

Annual

Entero Load

Reduction

BEFORE

(476 x1013)

AFTER

(238 x1013)

(with WWFP Green and Grey Infrastructure) (with Preferred Alternative)

29

Flushing Creek Tentative Implementation Schedule

*This is the projected schedule pending DEC approval of the Flushing Creek LTCP

30

FC LTCP Proposed Final Recommendations

Continue to implement the Green Infrastructure Program

Implement Preferred Alternative

• Seasonal disinfection at outfalls TI-010 and TI-011

Perform a Use Attainability Analysis (UAA) to evaluate factors

(e.g. physical, chemical, biological, economical, etc.) affecting water

quality attainment

Establish a wet-weather advisory during the recreational season(May 1st – Oct 31st)

31

Army Corps of Engineers: Dredging Project

Per ACOE Website:

Plan to dredge portions

of the navigation

channels of Flushing

Bay and Creek

Project advertised

and bids received

in July 2015

Expect to initiate

work later this year

CHANNEL

OPIONAL WORK:

Approximate

locations of areas

to be dredged

BASIC WORK:

Approximate

locations of areas

to be dredged

32

Flushing Bay (FB) LTCP

Kick-Off Meeting

33

Flushing Bay LTCP Process & Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

AnalysisModeling

Alternatives Development & Evaluation

LTCP DEC Review

Kickoff Meeting

TODAY

Alternatives

Review MeetingSpring 2016

Final Plan

Review MeetingTBD

LTCP Due6/30/16

Queens Community

Board 3 Meeting on

Public Outreach

9/17/2015

34

Public Participation

Goal:

Raise awareness, foster understanding, and encourage input on

LTCP development

Activities:

Local public meetings in each watershed and existing forums

Annual citywide public meetings

Meeting with key stakeholders and organizations

Briefings with elected officials and their staff

Communication Tools:

DEP Program Website

DEP Social Media

Advisories & Notifications

35

Flushing Bay

Waterbody / Watershed

Characteristics

Keith Beckmann, P.E.

LTCP Program Manager

DEP

36

FB Classification & Current Water Quality Standard

STATEN ISLAND

BROOKLYN

QUEENS

WESTCHESTER

BRONX

CLASS IB o a t i n g / F i s h i n g

The best usages of Class I waters are

secondary contact recreation and fishing.

These waters are suitable for fish, shellfish and

wildlife propagation and survival.

Dissolved

Oxygen (mg/l)

Bacteria

Fecal Coliform(col/100 ml)

Total Coliform(col/100 ml)

≥ 4.0 ≤ 2,000*(Monthly GM)

≤ 10,000(Monthly GM)

*Note: New rulemaking proposed by DEC for primary contact

criteria for Class I and Class SD of ≤ 200 col/100 ml for

Fecal Coliform.

37

Flushing Bay Ongoing and New Developments

4

1

32

1

2

3

44) Flushing West

Neighborhood

Planning Study

Potential Rezoning

of C4-2, M3-1 and

M1-1 districts

Increase allowable

residential density

1) LaGuardia Airport Central

Building Redevelopment

Construct a new terminal south of the

existing Central Building

Build 4 concourses

Maximize aircraft movement areas

Provide new roadways and parking

with direct access to the new terminal

2) The Eastern Emerald Hotel(Formerly LaGuardia Convention Center)

12-story, 106,000 SF mixed-use building

197 hotel guestrooms

206 residential apartments

Community facility and parking garage

3) Special Willets Hotel, affordable housing

Office and retail space

Public esplanade

Surface parking/recreational area

Willets West & Roosevelt Avenue

Entertainment retail center

Retail stores, movie theaters,

restaurant, entertainment venues

Surface parking

Provide well-defined waterfront access and public

amenity plan

Recalibrate minimum off-street parking requirements

Guide the height and massing of new buildings

38

Flushing Bay Current Uses

Waterfront Public Access

Flushing Bay Esplanade and Marina

Professional Service Center Park

Macneil Park

Boat Access

Public Boat Dock(East end of Flushing Bay Esplanade at 127th Pl)

1 – Flushing Bay Esplanade 3 – Professional Service Center Park

1

1

2

3

2

3

4

4

2 – Public Boat Dock

39

Flushing Bay Drainage Area

Annual Wet-Weather Discharge Volume:

~1,300 million gallon(typical year pre-WWFP)

Outfalls BB-006 and BB-008 contribute over 90% of total discharge to Flushing Bay

Sewer System:

Tallman Island and Bowery Bay WWTP

10 CSO Outfalls ( )

4 MS4 Outfalls ( )

Bowery

Bay

WWTP

Tallman

Island

WWTP

LaGuardia

Airport

Drainage

Area Acres5,603 404 596

Served by

Combined

Sewers90% 18% N/A

!( MS4 Outfall

#* CSO Outfalls

LaGuardia Storm Drainage

Tallman Island Drainage Area

Combined

Separate/Direct

Bowery Bay Drainage Area

Combined

Separate/Direct

40

Flushing Bay Drainage Area Land Use

Residential & Commercial 62%

Transportation & Utility 15%

Other 7%

Public Facility 6%

Park and Open Space 5%

Industrial 5%

LEGEND

Residential

Mixed Residential and Commercial

Commercial and Office

Industrial and Manufacturing

Transportation and Utility

Public Facilities and Institutions

Open Space and Outdoor Recreation

Parking Facilities

Vacant Land

Unknown

41

LTCP Sampling:

• Outfall Pipe • 2 CSO Outfalls

(BB-006 & BB-008)

• Flushing Bay• 12 locations

Inner Bay: (OW7 thru OW9)

Outer Bay: (OW10 thru OW15)

Other Sampling Programs:

• Harbor Survey Monitoring• 3 locations

(E15, FB1, E6)

• Sentinel Monitoring• 2 locations

(S65, S66)

• Citizen Sampling• 1 location

(World’s Fair Marina)

Flushing Bay Sampling Locations

Inner Bay

Outer Bay

42

1

10

100

1000

OW7* OW7A OW7B OW7C OW8 OW9 OW10* OW11 OW12 OW13 OW14 OW15*

Feca

l Co

lifo

rm, #

/10

0 m

L

Dry Weather

Wet Weather

612681

939

610469

311

201

85124

161

74

112

2422

2624

1615

6.4 7 5.8 7

5.06.2

Flushing Bay Fecal Coliform Results

Sampling Locations

Ge

om

etr

ic M

ea

n

Potential Future

Primary Contact

WQ GM Criterion

200 #/100 mL

*Includes LTCP and Harbor Survey Data

October 21, 2013 – May 7, 2014

~247 Dry and ~692 Wet

samples per location

Inner Bay Outer Bay

43

1.0

10.0

100.0

1000.0

OW7* OW7A OW7B OW7C OW8 OW9 OW10* OW11 OW12 OW13 OW14 OW15*

En

tero

co

cci, #

/100 m

L

Dry Weather

Wet Weather172

142

241

150116

85

60

31 32 34

25

36

6

9

67

5.5

4.5 43.6

4 4.23.9 3.9

Flushing Bay Enterococci ResultsG

eo

me

tric

Me

an Potential Future Primary

Contact WQ GM Criterion

30 #/100 mL

~247 Dry and ~692 Wet

samples per location

October 21, 2013 – May 7, 2014

Sampling Locations *Includes LTCP and Harbor Survey Data

Inner Bay Outer Bay

44

FB Landside Sampling / Flow Monitoring Program

Duration

=July to Oct 2015

No. of Locations

= 6

2 CSO Outfalls:

= BB-006 and BB-008

CSO Water Quality

Analysis for:

o Fecal Coliform

o Enterococci

45

Flushing Bay

Water Quality Improvement Projects

Green and Grey Infrastructure

Keith Beckmann, P.E.

LTCP Program Manager

DEP

Angela Licata

Deputy Commissioner

DEP

46

Flushing Bay Built and Planned GI Projects

BB-008:• 400 Bioswales

• 1 Stormwater Greenstreets

• 2 Parks

• 1 School

BB-006:• 560 Bioswales

• 17 Stormwater Greenstreets

• 26,000 SF Porous Concrete Pilot

• 10 Parks

• 2 Schools

1. PS 12 James B. Colgate

2. Winfield Plaza

3. Corona Golf Playground

4. PS 13 Clement C. Moore

5. Newtown Playground

6. Horace Harding Park

7. Real Good Park

8. JHS 157 Stephen A Halsey

(Already Constructed)

9. Annadale Playground

10. Hoffman Park

11. PS 102 Bayview

12. Russel Sage Playground

13. The Painter’s Playground

14. Ehrenreich-Austin Playground

15. Forest Park Union Turnpike

16. Forest Park Victory Field

Public Property Retrofits

47

GI at Stephen A. Halsey Junior High School

Before

After

Implemented GI Types:

Permeable Pavers

Synthetic Turf Field

Pervious Concrete

48

Flushing Bay Grey Infrastructure

Grey Infrastructure

Results in CSO Reduction and

Addresses Legacy CSO Odor Issues

Waterbody/Watershed Facility Plan (WWFP) Recommended

Implementation of Three Grey Infrastructure Projects:

1) Divert Low-Lying Sewers / Raise Weir BB-02

2) Regulator Modifications

3) Environmental Dredging of Flushing Bay

49

1) Divert Low-Lying Sewers / Raise Weir BB-02

Divert low-lying sewers in the vicinity of Bowery Bay WWTP

and raise the weir at regulator BB-02

• Estimated Cost

= $5.6 Million

• Construction Completion

= December 2016

• Current Status

= In Construction

50

2) Regulator Modifications

Bowery Bay high level

interceptor regulator

modifications at 5

regulators: BB-R4, BB-R5,

BB-R6, BB-R9, and BB-R10

• Estimated Cost

= $41.4 Million

• Construction Completion

= June 2018

• Current Status

= Design Completed

Regulator modification at

BB-R2 is covered under a

separate project

BB-R2

BB-R4BB-R5

BB-R6

BB-R9

BB-R10

51

3) Environmental Dredging of Flushing Bay

Removal of CSO related sediments

that are exposed at low tides

Dredge Area = 17.5 acres

Dredge Quantity = 91,600 cubic yards

Post-Dredge Depth = 4 feet below mean

lower low water

Removal of deteriorated piles and

abandoned Pier head at Pier 2

• Estimated Cost = $38.8 Million

• Current status = Design Completed

Milestone Date

NTP Construction March 2016

Complete Dredging &

PlantingMarch 2019

Complete Wetlands

MaintenanceMarch 2021

52

Flushing Bay Modeled CSO Volumes

714617

40

36

486

423

0

200

400

600

800

1000

1200

1400

1600

Pre-WWFP LTCP Baseline

CS

O D

isch

arg

e V

olu

me

(MG

Y)

TI-019

TI-018

TI-017

TI-016

TI-015

TI-014

TI-012

BB-008

BB-007

BB-006

(with Grey and Green WWFP Infrastructure Recommendations)

~13% CSO Volume

Reduction

BEFORE

(1297 MG/yr)

AFTER

(1130 MG/yr)54

57

53

Flushing Bay CSO Mitigation Options

System

OptimizationFixed Weir

Parallel

Interceptor /

Sewer

Inflatable Dams

Bending Weirs

Control Gates

Pump Station

Expansion

CSO

Relocation

Gravity Flow

Tipping to Other

Watersheds

Pumping Station

Modification

Flow Tipping with

Conduit/Tunnel and Pumping

Water Quality

/ Ecological

Enhancement

Floatables

ControlDredging

Dissolved Oxygen

ImprovementFlushing Tunnel

Treatment

Satellite:

Centralized:

Outfall

DisinfectionRetention Treatment Basin (RTB)

High Rate

Clarification (HRC)

WWTP Expansion

Storage In-System Shaft Tank Tunnel

INCREASING COMPLEXITY

INC

RE

AS

ING

CO

ST

54

Next Steps

Eric Landau

Associate Commissioner

DEP

55

Public Comments

Public Comments will be accepted for Flushing Bay

and Flushing Creek through October 30, 2015

DEP/DEC to review public comments

DEC to approve Flushing Creek LTCP

Comments can be submitted to:

• New York City DEP at: [email protected]

56

Additional Information & Resources

Visit the informational tables tonight for handouts and

poster boards with detailed information

Go to www.nyc.gov/dep/ltcp to access:

LTCP Public Participation Plan

Presentation, handouts and poster boards from this meeting

Links to Waterbody/Watershed Facility Plans

CSO Order including LTCP Goal Statement

NYC’s Green Infrastructure Plan

Green Infrastructure Pilots 2011 and 2012 Monitoring Results

NYC Waterbody Advisory Program

Upcoming meeting announcements

Other LTCP updates

57

Open Discussion