    Proposal

    Regarding

    Former Dalfort/Legend Facilities

    December 08, 2014

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    2/22

    Table of Contents

    SECTION I: PROPOSAL

    Team 3

    Key Terms 4

    Exterior 5

    Interior 9

    SECTION II: IMPACTS

    Environmental 12

    Social 13

    Jobs 14

    Financial 15

    Funding 16

    SECTION III: EXECUTIONBudget 17

    Timetable 18

    Lease 19

    Summary 22

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    3/22

    Team

    Developer

    Nonprofit organization created to relieve the burdens

    of government

    500,000 sq. ft. of aviation hangar and office under

    management in four states

    Completed aviation projects in four states

    Renovated facilities at Bridgeport Sikorsky Airport and

    Owatonna Municipal Airport

    In operation since August 2007

    www.flyingcrown.org

    Jason Hutton

    Stephen Birch

    Architectural

    Design

    Construction

    Old Parkland Renovation (for Crow Holdings)

    Interurban Building Lofts Historic Conversion

    Adaptive Reuse of Fidelity Union Life Building

    Gables Republic Tower lobby

    Republic Tower elevation

    Cathedral Guadalupe

    Santa Fe 4 A Loft Hotel Conversion

    Majestic Lofts

    Mosaic Loft Historic Conversion

    Dallas Power & Light Lofts Historic Conversion

    www.gff.com

    www.andresconstruction.com

    Award-winning 100 person firm in practice for 31

    years. Architectural Top 250 Firms nationwide and

    Top 100 Green Design firms. Recent projects

    include:

    City of Dallas: Perot Museum of Nature and ScienceArts District Parking Garage

    Fair Park Renovations 1987-2012

    Dealey Plaza

    Crow Holdings at Old Parkland

    Melrose Hotel Renovation and Expansion

    Park Lane

    Park Seventeen

    Jeff Good

    Wade Andres

    Page 3

    http://www.gff.com/http://www.andresconstruction.com/http://www.andresconstruction.com/http://www.gff.com/
  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    4/22

    Key Terms

    Proposal

    Introduction: Flying Crown Land Group is pleased to present to the Aviation Department this

    revised proposal to develop the former Dalfort/Legend facilities

    Compromise: Compromise among aviation, historic preservation and neighborhood groups

    Strategy: Renovate existing aviation facilities and parking garage

    Construct new office building and aviation structures

    Retail and restaurants along Lemmon Avenue

    Development: Renovation: Operations and Maintenance Building (OMB)

    Annex, North and South

    Parking Garage

    Construction: Office Building/Underground Parking Garage

    Hangars (2)/Fuel FarmRetail/Restaurants

    Budget: $92,424,000

    Mixed-Use: Aviation: FBO, aviation offices, new hangars (including 145 facility); fuel farm

    Commercial: Class A office space

    Retail: High quality owner/chef restaurants and retail spaces

    Civic: Ballroom and meeting spaces for public and private events

    Governmental: CBP/Secure facility for dignitaries (Secret Service input)

    Community: Natural, park-like setting; designated space on Ground Level

    Design: Restore mid-century modern design to OMB and carryover design to other buildings

    Retain highest artistic design elements of original architects

    Environmental: Green buildings; LEED certifiable

    Page 4

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    5/22

    Exterior

    Page 5

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    6/22

    Exterior

    Outdoors: Courtyard (park) feel

    Efficient outdoor lighting

    Parking lots (natural materials, crushed stone)

    Extensive new trees and plantings

    Fountain (front entrance)

    Benches (exterior seating areas)

    Sustainable gardens (on roof tops)

    Outdoor restaurant seating areas (covered and

    uncovered) on ground and balcony levels

    Site Work: Demolition (Partial South and North Annexes, and

    other structures on South perimeter)

    Underground parking garage (new office building)

    Second entrance to underground parking and FBO

    Redesign parallel access road along Lemmon

    Design and construct new main entrance

    Install new median break at main entrance

    Retail Spaces: Converted ground floor of Parking garage

    New construction on South side of Parking garage

    Ground floor of office building

    Ground floor of OMB

    Square Footage: Retail: 38,100

    Office: 100,000

    Existing Aviation: 440,300

    New hangars: 42,000 (18,000 x 2) + (Office: 6,000)

    Automotive: 20,000

    Parking: New underground parking garage - office building (123)

    New parking lot - new office building (160)

    Reconfigured existing parking garage (745)

    New underground parking OMB (110)

    Reconfigured front parking lot and new retail parking

    (along Lemmon) (274)

    Total spaces (1,412)

    Page 6

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    7/22

    Exterior

    Floors: FiveQuality: Class A

    Size: 100,000 sq. ft.

    Budget: $22,584,615 (approx. $200/s.f.)

    Design: Inspired by Lever House (in NYC); design tied to OMB

    Exterior: Open foyer space for outside dining and other garden areas

    Balcony: Additional outside seating

    Lead Tenant: FlexJet

    Retail: Local bank branch and two restaurants; additional

    retail along Lemmon

    Restaurant: Two (5,000 sq. ft. each) and One (3,600 sq. ft.)

    Parking: Underground (123 spaces) and new surface lot (160

    spaces); street parking off Lemmon

    Efficiency: Central plant and solar powered

    Green: LEED Certifiable

    Office Retail

    Page 7

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    8/22

    Exterior

    Ground Level: Reconfigure 50% of ground level for retail (front

    along Lemmon)

    New Retail: New construction (South end) for retai l orrestaurant

    Enclosure: Redesign entire building with decorative louvers

    (increase curb appeal)Design: Exterior design ties to OMBBudget: $4,821,000Ramp: Remove existing ramp; construct new speed

    ramp on North side

    Sq. Ft.: Retail (converted and new) of 24,500Exterior: Outside dining and gardens

    Restaurant: Space for restaurant (South end)

    Balcony: On second level (South end)

    Parking: 458 existing spaces (garage)

    New Parking: Additional new street parking off Lemmon (90 spaces)

    Tenants: Sewell Automotive Group

    Marketing: Demand-driven leasing strategy

    Demand: Expecta tion of close to 100% pre-leased before

    construction commenced

    Green: LEED Platinum Certifiable

    Parking Garage

    Page 8

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    9/22

    Interior

    Lower Level

    Theme: Connection (setting new standards for private FBO

    facility experience)

    Size: FBO/Offices: 38,000 sq. ft.

    Parking: 26,000 sq. ft.

    Hangars: 140,000 sq. ft.

    Hangar Capacity: Accommodate 72 mid-sized private jets

    Use: Operational aviation (FBO, private offices and

    hangars)

    Exclusive clients, highest public officials and

    dignitaries

    Public Access: Restricted area (no public access)

    Design: Luxury FBO (non-public) and private offices

    Exclusive, private, high security area

    FBO entrance (private/secured)

    Hangars (upgraded with unique features)

    Convenient, private parking (adjacent to hangars)

    Fitness center and locker rooms (private use only)

    US Secret Service input (on security matters)

    Marketing: Highest demand (invitation only)

    Pre-sold in advance of construction

    Tenants: Undetermined (National FBO Chain)

    New corporate clients

    Relocated clients (within Love Field)

    US Customs and Border Protection

    OfficeCustoms BPHangarParking

    Private FBO

    Page 9

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    10/22

    Ground Level

    Theme: Community (entire level dedicated to aviation and

    non-aviation community activities)

    Size: Commercial: 37,000 sq. ft.

    Ballroom: 20,000 sq. ft.

    Atrium: 13,000 sq. ft.

    Use: Various community activities and events

    Ballroom (public and private events); kitchen facilities

    Fitness Center

    Commercial demonstration kitchen (aviation use)

    Conference rooms, aviation library and training center

    Public Access: Full, unrestricted

    Design: Atrium (two-story Atrium through center of building)

    Ballroom

    Marketing: Strong demand expected

    Pre-leased before construction completed

    Tenants: Undetermined FBOCessna Aircraft

    Bell Helicopter

    Air Culinaire

    Augusta Westland

    Leading Edge

    Public Space

    Showroom

    Interior

    Page 10

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    11/22

    Upper Level

    Theme: Collaboration (incubator for community groups and non-profits)

    Provide infrastructure, support and office space in central place

    Similar to The Meadows Foundation (Wilson Historic District)

    Size: Offices: 31,000 sq. ft.

    Dining Club: 15,000 sq. ft.

    Atrium: 11,000 sq. ft.

    Deck: 5,000 sq. ft.

    Public Access: Full public access

    Use: Centralized office space designated for non-profit organizations

    Private Dining Club

    Design: Two-Story Atrium (sky light)

    Restore observation deck

    Marketing: Strong Interest

    Advance commitments expected

    Tenants: ClubCorp

    Community groups and non-profits (aviation and non-aviation)

    Interior

    Public Space

    Offices

    Walkway

    Atrium

    Page 11

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    12/22

    Environmental

    Concern

    Metal Dust Soil/Groundwater Mold/Fungus

    Cause

    Assessment

    Action

    Building Materials

    Elevated levels of metal dust

    Spread through building

    Plating Room

    Paint Booth and

    Sand Blasting Rooms

    Farmer Interior Sampling

    Report (6/10/09)EFI Global Memo No. 2

    (7/16/12)

    Clean up: Qualified

    abatement contractor

    Contamination by COCs in

    excess of regulatory guidelines

    Plating room,

    Hazardous materials (storage)

    USTs,

    Waste water sand traps and

    Water separators

    Limited Phase II ESA/Farmer

    Report Re Subgrade Soil &

    Water (5/29/09)

    Remove UST

    Remove oil water separator

    Remove sand traps

    Plug/Abandon monitoring wells

    Mold/fungus in Legends

    office space

    Roof leaks

    Pipe leaks

    Other moisture

    Limited Fungal Growth

    and Bio aerosol

    Assessment (7/3/09)

    Remove contaminated

    ceiling tile

    Repair sources of

    moisture (roof/pipe leaks)

    Lead paint

    Asbestos

    PCB

    Materials used in 1950s

    construction

    Phase I ESA (11/17/08)

    Asbestos Assessment (not

    available)

    Removal: Qualified

    abatement contractor

    Takeaways

    Environmental issues are typical of aviation facilities

    Expected remediation is limited, contained and manageable

    Cost of remediation has been properly accounted for

    No off-site environmental concerns have been identified

    Environmental considerations are not likely to be a significant community concern

    Page 12

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    13/22

    Social

    Comparison

    Takeaways

    ConcernsBenefits

    Employment (Job Creation)

    Aviation Development/Growth

    Community Development

    Removal of eye sore

    Historical Preservation

    Furtherance of policy (Good Neighbor Plan

    Initiative)

    Residential neighborhood - Impact to adjacent residential

    neighborhoods from increased air traffic, noise or congestion

    Potential increased traffic on Lemmon (partially caused by loss

    of parallel access road)

    o Proposal benefits different groups within the community

    o No adverse impact or disproportionate disadvantage to a particular group

    o No significant negatives identified that cannot be managed or mitigated

    o Mitigation factors: retail/restaurants improve quality of life for residents and office is good neighbor

    (quiet at night)

    Support

    Focus

    For Against

    Business neighbors

    Residential neighbors

    District Council Member

    Southwest Airlines

    Love Field Pilot/Aviation groups

    None identified

    To assess impact on the Community

    Page 13

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    14/22

    Jobs

    OMB

    TotalNewExisting

    Total

    Number of Jobs Payroll Number of Jobs Payroll Number of Jobs Payroll

    Tenant:

    Building:

    Tenant:

    Building:

    Retail:

    Restaurant:

    Labor:

    133 $5,200,000 106 $9,905,000

    327 5,108,105

    239 $15,105,000

    327 5,108,105

    368 31,708,200

    10 500,000

    368 31,708,200

    10 500,000

    64 2,698,306

    150 4,497,750

    64 2,698,306

    150 4,497,750

    84 4,200,000 84 4,200,000

    133 $6,500,000 1,109 $58,617,361 1,242 $63,817,361Annually:

    Office

    Building

    Retail

    Construction

    Page 14

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    15/22

    Financial

    ProposalOriginal

    Factors

    Takeaways

    Result

    Revenues:

    Ground Lease (Approx.):

    Other:

    Capital Commitment/Residual Value:

    Demolition:

    Less: $5m Rent Rebate

    Capital Outlay (by City):

    Financial Commitment (by City):

    Environmental/Clean-Up:

    Mitigated Costs:

    (Maintenance/Preservation)

    TOTAL

    $1m $1m

    Sales/Property Taxes (Higher)

    Sub-Lease Rents (Higher)BETTER

    $21m $84m BETTER ($63m)

    $8m $0

    $3m BETTER ($3m)

    $0 $0 SAME

    $0 $0 SAME

    SAME$[3]m $[3]m

    $1m $0 BETTER ($1m)

    BETTER ($67m or more)

    Budget:

    Economic:

    Risk:

    Stable and constant rent revenues

    No capital outlays (initially or in the future) by the City

    No financial guarantee or credit supportBenefits aviation and general funds

    Greater residual value

    Greater upside potential (sales/property taxes and sub-leasing revenue)

    Greater multiplier effect

    Execution: Greater expertise (GFF, DEVCO and Andres)

    Financial: Additional financial specialists (Raymond James/Amegy)

    Stability: Strategic business plan diversifies and decreases risk

    Page 15

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    16/22

    29.0%

    27.1%

    84.1%

    30.0%

    BRANIFF OMB SOURCES OF CAPITAL

    Equity Debt Government Incentives EB-5

    Funding

    Sources

    of

    Capital

    Detail

    Federal Historic Tax Credit available due to National Park Service eligible status of 20%

    Newly enacted State Historic Tax Credits of 10% by legislation implemented this year Love Field Area is in Highly Distressed economic identification zone as per the 2010 US

    Census making it eligible for New Market Tax Credits (NMTC)

    Eligible for Brownfield Development Improvement Funds due to EPA registered cleanup site

    Chapter 380 Guaranty from the City of Dallas

    Property remains FAA grantee site and eligible for HUD Section 108 loan guarantees

    Job creation meets both EB-5 and NMTC requirements

    170.1%

    FUNDING BREAKDOWNEquity

    Charitable Donations $ 500,000 1.1%

    Owner Cash Contribution $ 2,000,000 4.3%

    Foundation Support $ 4,619,863 10.0%

    Land Lease Equity $ 6,287,243 13.6%

    Debt

    Section 380 Guarantees $ 2,500,000 5.4%

    Bank Debt Financing $ 5,000,000 10.8%

    Section 108 Guarantees $ 5,000,000 10.8%

    Government Incentives

    Brownfield Development $ 2,500,000 5.4%

    CDBG $ 4,000,000 8.66%

    State Tax Credits $ 4,619,863 10.0%

    Historic Tax Credits $ 9,239,727 20.0%

    New Market Tax Credit $ 18,479,454 40.0%

    EB-5 Funding $ 13,859,590 30.0%

    $ 78,605,741 170.1%

    Project Cost $ 46,198,635

    FCLG Confidential and Proprietary Page 16

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    17/22

    Budget

    OMB Renovations

    SQUARE FOOTAGE (SF) LEVELSTOTAL FIRST SECOND THIRD

    Office 33,847 0 12,510 21,337

    Special Events 64,510 20,040 29,699 14,771

    Hangar & Showrooms 191,213 162,104 29,109 0

    Civic 2,902 0 0 2,902

    Support 1,927 0 0 1,927

    Atrium 62,326 18,163 31,256 12,907

    Restrooms 5,213 1,250 2,904 2,309

    Parking 25,540 25,540 0 0

    Total 387,478 225,847 105,478 56,153

    RENOVATIONS SF PRICE/SF COST TOTAL

    Office 33,847 80 2,707,760

    Special Events 64,510 60 3,870,600

    Hangar & Showrooms 191,213 50 9,560,650

    Civic 2,902 120 348,240

    Support 1,927 120 231,240

    Atrium 62,326 120 7,479,120

    Restrooms 5,213 80 417,040

    Parking 25,540 40 1,021,600

    387,478 25,636,250

    DEMOLITION

    In te ri or - Mez za nine le ve ls 137, 508 2 275 ,016

    Hangars (Level 1) 162,104 3 486,312

    Atrium 62,326 10 623,260

    Parking 25,540 4 102,160

    Existing Building 16,168 20 323,360

    1,810,108

    HISTORIC RESTORATION

    Hangar Door 832 500 416,000

    Precast Skin 543,060 10 5,430,600

    Storefront Glass 19,200 65 1,248,000

    Clearstory Glass 7,152 45 321,840

    Roof 225,847 12 2,710,164

    Tarmac 395,266 4 1,581,064

    11,707,668

    TOTAL OMB 39,154,026

    New Construction

    SF PRICE/SF COST TOTAL

    EXISTING AVIATION

    BLDGS

    North Annex 74,000 30 2,220,000

    South Annex 21,000 30 630,000

    2,850,000

    NEW HANGARS (2) 42,000 125 5,250,000

    5,250,000

    FUEL FARM

    Building 5,272 80 421,760

    Equipment 500,884

    922,644

    OFFICE BUILDINGStandard Class A 100,000 200 20,000,000

    Parking 2,584,615

    22,584,615

    PARKING GARAGE

    Exterior Features 55,720 25 1,393,000

    Ramp 190,000 2 380,000

    Retail 38,100 80 3,048,000

    4,821,000

    SITE WORK

    Surface Parking 130,150 12 1,561,800

    Landscaping 400,000

    Curb Cut 50,000

    Sidewalks 66,263 8 530,104

    2,541,904

    CENTRAL PLANT

    6,300,000

    PROJECT TOTAL 84,424,189

    Page 17

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    18/22

    Timetable

    Construction Schedule

    Pre-Construction Period: Finalize ground lease terms

    Finalize architectural drawings

    Complete environmental clean up

    Projected Capital Expenditures

    Construction Period: Begin renovations on OMB, Annex and site work (Day 1)

    Construction of new hangars projected to commence 9 months after Day 1

    Renovations on Parking Garage, Automotive and Retail projected to commence 15 months after Day 1

    Construction of new office building projected to commence 18 months after Day 1

    First Year Second Year Third Year Total

    Start Date Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12

    OMB Q1 1,603,938 4,558,560 6,880,050 8,061,898 8,061,898 6,880,050 4,558,560 1,603,939 42,208,893

    OMB Annex Q1 1,097,250 1,601,700 151,050 2,850,000

    Sitework Q1 1,664,947 876,957 2,541,904

    New Hangars Q4 1,907,347 3,364,091 901,206 6,172,644

    Parking Garage Q6 1,685,904 2,973,520 796,576 5,456,000

    Office Building Q7 2,716,056 6,977,026 8,198,005 5,805,882 1,220,979 24,917,948

    Quarterly Totals 4,366,135 7,037,217 7,031,100 9,969,245 11,425,989 9,467,160 10,248,136 9,377,541 8,198,005 5,805,882 1,220,979 -

    Annual Totals 28,403,697 40,518,826 15,224,866 84,147,389

    Page 18

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    19/22

    In General

    Aviation

    Parties: City of Dallas (Lessor)

    Reed Enterprises Investment Holdings, L.P. (Lessee)

    Reed Enterprises Management, LLC (General Partner)

    Randall L. Reed (Manager)

    Term: Forty (40) years (to commence fourteen (14)months from Effective Date)

    Effective Date: Date upon which lease is executed

    Property: 635,538 sq. ft. (Total)600,858 sq. ft. (Improved Land)

    34,680 sq. ft. (Unimproved Land)

    Rate: $0.65 per sq. ft. (Improved Land)

    $0.40 per sq. ft. (Unimproved Land)

    Rent: Amount: $404,429 (Annually)

    Computation: (600,858 * 0.65) + (34,680 * 0.40)

    Payable: Begins fourteen (14) months from the Effective Date

    Period: First three years

    RentIncrease:

    Timing: Every three years

    Computation: Greater of (1) percentage increase in CPI over previous 3-yr

    period, (2) Prevailing rate for similar properties at Love Field or (3) 6 %

    Cap: 12% (of previous 3-year period)Period: Years 4 through 30

    Amount: Collection of rent at then prevailing market rate at Love Field

    Period: Years 31 through 40

    Permanent

    Improvements:

    $9 million (within 24 months of Effective Date)

    $4 million (within 10 years of Effective Date)

    Title: Title to Improvements vests to Lessor upon completion of construction

    Parties: Braniff International Property

    Company (Lessee)

    Effective Date: No Change

    Rate: No Change

    Rent Increase: No Change

    Title: No Change

    Term: [40] years (or longer toaccommodate financing) and [24] months

    (longer construction period)

    Revised property line:

    788,855 sq. ft. (Improved Land)

    No Change (Unimproved Land)

    Amount: $526,627

    Computation: (788,855* 0.65) + (34,680* 0.40)

    Payable: [24] months

    $[35] million within [36] months

    $[15] million within [5] years

    Subsequent Rent: Subsequent Rent: No change

    Lease

    Original Proposal

    Page 19

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    20/22

    Lease

    Commercial

    Original Proposal

    Property:

    Rate:

    Rent:

    RentIncrease:

    Permanent

    Improvements:

    Title:

    Rate: No Change

    Rent Increase: No Change

    Title: No Change

    $[20] million within [60] months

    Percentage Rent:

    414,600 sq.ft. (Unimproved and Improved Land)

    $0.75 per sq. ft.

    $240,000 annually (parking garage)

    Amount: $521,809 (Annually)

    Computation: ((414,600 less 38,865 for parking garage)

    multiplied by $0.75 rate) plus $240,000

    Payable: Begins fourteen months from the Effective Date

    Period: First three years

    Timing: Every three years

    Computation: Lessor of (1) percentage increase in CPI overprevious 3-year period or (2) Maximum of 2 percent per year

    Excess CPI Amount: Any CPI increase over 2 percent shall be

    payable on a pro rata basis over 5 years

    Period: Years 4 through 40

    Lessor shall receive percentage rental equal to excess of (1)

    10% of gross retail rentals collected by Lessee under subleases

    of the property over (2) amount of base rent otherwise payable

    by Lessee for same periodPeriod: Years 20 through 40

    $8 million (within 24 months of Effective Date)

    Upon completion of construction, Lessee retains ownership

    of permanent improvements through remainder of Term

    (which will be subject to ad valorem property taxes)

    261,283 sq.ft.

    Amount: $406,814

    Computation: ((261,283 less 38,865 for

    parking garage) multiplied by $0.75 rate)

    plus $240,000

    Payable: Begins [24] months

    Percentage Rent: No change

    Page 20

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    21/22

    Other

    Original Proposal

    No Change

    At Maturity: At expiration of the Term, Lessor retains right

    to require Lessee (at Lessees expense) to

    demolish the improvements or leave them in place

    Right of

    First Refusal:

    Lessor remains responsible for environmental clean-up and

    remediation of environmental contaminates, not caused by

    Lessee, after Lessors initial demolition of the structural

    improvements. If, during Lessees construction of new

    improvements on the leased premises, environmental

    contaminates requiring remediation are found on the site for

    which Lessor is responsible, Lessee may remediate the site

    to acceptable levels and Lessor shall reimburse Lessee for

    the cost of such remediation through rent abatements in an

    amount not to exceed one years rent under both leases

    Environmental: Lessor remains responsible for environmental clean-up and

    remediation of environmental contaminates, not caused by

    Lessee, after Lessors initial demolition of the structural

    improvements. If, during Lessees construction of new

    improvements on the leased premises, environmental

    contaminates requiring remediation are found on the site for

    which Lessor is responsible, Lessee may remediate the site to

    acceptable levels and Lessor shall reimburse Lessee for thecost of such remediation through rent abatements in an amount

    not to exceed one years rent under both leases

    Renewal: The Parties agree to enter into negotiations in the thirty sixth

    (36th) year regarding possible ten (10) year extension of the

    Term. If no agreement is reached (by the beginning of the 37th

    year), Lessee has right to terminate the lease upon written

    notice. Lessee has limited right of first refusal for third party

    offers

    No Change

    No Change

    [NA, no demo of historical property]

    Lease

    Page 21

  • 8/10/2019 Flying Crown's Dalfort Legend Presentation Proposal 03 Dec 2014

    22/22

    Summary

    Conclusion

    Next Steps

    Endorsement to proceed

    Finalize lease terms

    Finalize architectural designs

    Schedule environmental clean-up

    Identify any other concerns

    Thank you for the opportunity to present our proposal

    Win-win solution that is superior to the original plan

    Compelling financial deal for the City

    More positive impacts to the community (e.g., creates more jobs, preserve

    historical building, and furthers Good Neighborhood Initiative)

    Less risk (execution, funding and ongoing risk)

    Page 22