FMANZ gratefully acknowledges the support of our Gold Sponsors. NZ Electricity Market - Where to Next?. Mike Roan Wholesale Markets Manager Meridian Energy. 13 September 2012. - PowerPoint PPT PresentationTRANSCRIPT
FMANZ gratefully acknowledges the support of our Gold Sponsors
NZ Electricity Market - Where to Next?
Mike RoanWholesale Markets ManagerMeridian Energy
13 September 2012
3
The information provided in this presentation is provided for education and informational purposes only. The information is not intended to be and does not constitute financial advice. It is general in nature and is not specific to you, your business or anyone else. You should not make any decision based on this information (financial or otherwise) without undertaking independent due diligence or seeking your own independent financial or other professional advice.
4
Recap – Other Seminars
• At previous seminars we combined messages:
– prices have risen by ~5 per cent since 2000
– prices will continue to rise (and can be volatile)
– we can control the way we use electricity in order to manage cost
– we can also contract out of exposure to price volatility
Take Out: Controlling electricity consumption while contracting out of price volatility will become increasingly valuable to you
5
This Time
• This time:
– what is going on in the electricity sector that might be of interest
– how may this impact you and decisions you make?
6
• MED electricity price forecasts remain the same – prices are likely to rise
0
20
40
60
80
100
120
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
$/M
Wh
Reference
Projection
Wholesale Electricity Price ($/MWh, including Carbon, Real 2010)
Source: MED Energy Outlook - www.med.govt.nz/sectors-industries/energy/energy-modelling/modelling/new-zealands-energy-outlook
NZ Wholesale Electricity Price Forecast
7
• However, there are some cross winds to be aware of:
– the global economy is weak
– NZ electric demand is weak
– reasonable levels of supply (absent hydro shortage)
Cross Winds
8
• Since 2007, NZ electric demand has been reasonably static
• The drivers of flat demand are well documented
– low inflows in 2008 (where consumers were asked to conserve), the global financial crisis, NZAS transformer failure, the Christchurch earthquake and improved energy intensity by consumers
Source: Meridian
Cross Winds – NZ Electric Demand
Static Demand
9
Cross Winds – NZ Electric Demand
• Looking forward, much of the above uncertainty continues to exist
– ongoing global economic instability and more local impacts are expected to remain
– NZAS & Norske Skog announcements are indicators of difficulty that is possibly widespread
• This graph includes ~2,000GWh of new supply being added over the next three years
Forecast demand growth
10
• Offsetting all of the above is hydro fuel availability (inflow volatility)
• NZ electricity prices largely a function of hydro storage (unlike other countries)
0
200
400
600
800
1000
1200
1400
1600
19
57
-19
58
19
44
-19
45
19
82
-19
83
19
95
-19
96
20
09
-20
10
20
10
-20
11
19
89
-19
90
19
56
-19
57
19
84
-19
85
19
65
-19
66
19
34
-19
35
19
45
-19
46
19
85
-19
86
19
37
-19
38
19
64
-19
65
19
71
-19
72
20
04
-20
05
19
72
-19
73
20
02
-20
03
19
59
-19
60
19
87
-19
88
20
00
-20
01
19
61
-19
62
19
99
-20
00
19
46
-19
47
19
75
-19
76
20
11
-20
12
De
c -
mid
-Ma
y
Wa
ita
ki+
Wa
iau
av
era
ge
in
flo
w (
cu
me
cs
)
1970-71
2007-08
2006-07
1991-92
2011-12
2005-06
2000-01
Source: Meridian
Offsets - Issues to be Aware of
11
SI Prices
0
100
200
300
400
500
600$/MWh
SI Daily Prices 2012
SI Daily Prices 2011
SI Daily Prices 2008
• NZ wholesale electricity prices reflect hydro storage capacity
Source: Meridian
Recent Events – NZEM
12
• Some of our competitors will have big decisions to make
– Genesis has said it will shut two Huntly units – one in 2012 and one in 2014
– Contact is considering repowering its Otahuhu station
• And there are some very specific challenges to overcome
– Transpower is completing a number of large transmission upgrades in the near term
– Genesis is relining the Tekapo canal
– NZAS request to renegotiate contractual terms (approx 12% of NZ demand)
Source: Meridian
Offsets - Issues to be Aware of
Major Projects and Timelines
Reinforce Auckland consumption- November 2012
1000MW HVDC Upgrade- February 2013
Lower SI Renewable Upgrade- Stage 1: November 2012
- Stage 2: March 2014
Tekapo Canal Relining- Jan through April 2013
Taupo Grid Strengthening- Late 2014
Lower NI Upgrading- 5+ years away
14
• My role is to manage these issues for Meridian
• More importantly, what do they mean for you?
What Does it Mean for You?
• there are some cross currents for electricity prices– they are still likely to increase
• some of the specific risks in the near term may result in some volatility– the next 6 months include major transmission upgrade works
– contracts provide relief from volatility – both specific risk and hydrology
• contract duration should match your business risk profile
• continue hunting down waste regardless
15
Managing Electricity in Your Business
The Essentials
16
First things first – Site Type?
• Two types of site in the electricity world
17
Small* Commercial/Residential sites e.g. your house, small-mid size retail
Large* Commercial / Industriale.g. manufacturing, hotels, supermarkets
Meters read periodically (frequency depends) Consumption recorded every half hour
“Anytime” is just one price Price varies (time of day + month)
Network charges may be ‘bundled’ into rate Network charges are separated
Non-Half Hourly Time of Use
* Threshold varies by Network
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
What charges are included in a bill?
There are two major cost components:
Energy (Wholesale purchase + Retailer)
Network (Network company e.g. Vector)
19
• Variable Pricing– Energy component subject to change (30 days notice)– Network charges change when those companies change their rates– No price certainty. This is the default or ‘Do Nothing’ option
• Fixed Energy Plan– The Energy component of your rate is fixed – typically for 2-3 yrs– As above, Network charges change– Gives you significant (but not quite complete) price certainty
• Select a specific tariff for your needs– Options are determined by metering configuration– Metering changes can enable savings– Options differ by network– Examples include
• Day/Night/Weekend tariffs• ‘Controlled’ rates• Seasonality in some networks
Your Pricing Options – Non Half Hourly
Main Message: Talk to an expert
20
• Fixed Price (with Variable Volume)– Meridian calls this “Easiplan” – it is the most common contract– Provides price certainty and insulates you from spot market fluctuations– Pricing is ‘shaped’ so that different rates apply at different times
• Spot Pricing– This is 100% exposure to the wholesale market (incl. Admin fee) – Expect significant variability in the price you pay each month
• Proportional Pricing– Mixture of Fixed Price and Spot – Select % you want fixed
e.g. 80% fixed price, 20% on spot market
• More complex options – Spot supply with Contracts for Differences (CFDs or Hedges)
Your Pricing Options – Time of Use
Main Message: Talk to an expert
21
Two primary ways to manage your budget
1. Enter into a Supply Agreement– Define what you are looking for in a supplier and ask Retailers to respond– Use competition to get the best outcome for you– Choose a supplier that will add value (we of course think there is only one)
2. Take Control of your electricity consumption– Request data from your retailer or use their on-line tools (Business On Line)– Eliminate waste! Consider undertaking an energy audit– Take advantage of pricing
differentialse.g. night vs. day rates
– Meridian customers, talk to one of ourAccount Managers.
Managing Your Electricity Budget
We are here to help
22
– How much do you spend on electricity per annum and how material is it to you?
– What is your business’s appetite for price risk?
– How well do you understand the electricity market – do you need help?
– Do suppliers values align with yours?e.g. sustainability
– Are you aware of what Retailers offer beyond of price? (On Line, Electronic Invoicing, payment terms,reporting, account management)
– If you are considering participating in asupply group, are the group’s requirementsaligned with yours?
Supply Agreements: Key Questions for You
In the success game – Value always beats Price
23
Take Outs
• controlling consumption will become increasingly valuable
• wholesale price volatility reflects the place we live
– this volatility is not a new feature
• if you enter into contracts, define what success looks like before you begin
– use trusted partners to get there and ask for advice on how to structure along the way
Getting on the Energy Management Cycle
Improve your energy wasteline
29 August 2012
Energy Management Cycle Westpac followed all elements of this cycle
Get commitment
Control, monitor & report
Understand
Plan & organiseImplement
• Monthly Reporting• e-Smart
• Annual Implementation plan
• 6 weekly meetings
• Quarterly M&T Report & Meeting
• Manage through Action Plan
Energy Management is about reducing waste
Reduce energy use and costs AND not adversely impact the operation of the
site.
Performance improvements need to be measured in KPI’s.
• Westpac A/C
Focus on making good business decisions – any green benefits are the icing on the cake.
You Need to Measure to ManageEnergy management needs commitment Customers should expect a return on investment.
Westpac recovers more than $2 for every $1 they have spent on EM.
Energy needs to be actively managed Benchmarking and targets identify issues, drive improvementRegular reporting is required - add intelligence to informationAction plan implementing cost effective solutionsDon’t be scared to spend money on Advice!
Understand Your Site/Portfolio
How Much Energy do I use?
How much is it costing me?
How does this site compare?What is a common unit of measure? kWh? FTE’s? Output?
What is the trend?
How does it compare to similar sites?
How can I as an FM make energy savings?
Minimise the energy costs
Review the operational requirements of the current
tenant
Compare against your building plant operating hours
Invest in cost-effective improvements
Use life-cycle costing
Start a structured programme with regular reviews
Reduce energy costs to your site(s)Energy Supply Cost
Key information How much has it cost me last year? and What will it cost me next year?
Tender for the supply of energygain best priceAlways avoid default rates.
Our experience: two out of three tenders lead to a change in supplier based usually on priceMyth of Security of Supply
Network and line costs Network costs are NOT fixed and NOT only Daily chargeNetwork Optimisation:Review nominated capacity charges (HV)
Ensure that you are in the best network load group Check every couple of years!
Examples:Food: In Christchurch changed load group on 3 sites with annual savings over $160,000 p.a.School: Increase capacity & change load group, savings $10,000 p.a.
Power factor - penalty charges introduced by Vector 2012
Reduce energy costs to your site(s) – Part 2
Impact
Having gained the best possible delivered energy price for your site or sites:
Any investment decisions can be made based on a solid foundation.
Reduce energy costs to your site(s) – Part 3
Where does energy normally get consumed in an office building?
73/20 RULE
Review site operating requirements and current control settings
Establish current building system operating requirementsWhat is plant controlling?
time clock, security system, BMS
What is the time on the controlling system? When is plant set to turn on and off?Review regularly as site operations change. Do not be surprised is time of the time clock or other controls are wrong! “Lazy running” - Daylight savings often see plant running an hour longer than required every day
Programme for 5 years
• Reset public Holidays annually• Change for daylight savings 2x p.a.
GOOD INVESTMEN
T?
Controller Maintenance in Action
Westpac established a set operating schedule for a branch and installed many smart relays to lock this in.Westpac monitors operating times using smart meter energy profile informationAfter Hours baseloadWeekend load/profilePublic Holiday load/profile
Exceptionally high baseload (expected 1-2kWh); Result of Plant Load (A/C on 24/7). Check controls on Plant Load – Time clock settings, functioning of time clock, temp set points.
Smart meter energy profile information
Waste A/C - 108 hours/weekApprox $5,000 p.a.
Smart meter energy profile information
16/3 – 20/3 (Friday; Saturday; Sunday; Monday; Tuesday; Wednesday; Thursday)
16/3 – 20/3 (Friday; Saturday; Sunday; Monday; Tuesday; Wednesday; Thursday)
Saving Energy is about Reducing Waste
Actively manage control systems
Building walk through - outside normal operating
hours!
Identify controllable loads
Identify control options that are cost effective
Sensor; time switch; Use existing control system or
install new control systems?
Use Life Cycle costing to establish benefit
Life cycle costing (LCC) looks at the maintained
life of a system over a period of time to provide a
more accurate view of the financial benefits of each
option. LCC factors in the:
•Purchase cost; and
•Energy cost; and
•Maintenance costs of the system.
There are very few energy related opportunities
that can be justified on energy reduction alone.
Cost Benefit from change from 7 day time clock
Purchase price 10 Year Annual Costs/Savings Total
Smart Relay (2 channel) 500-$ 0 500-$ Install & Programme 600-$ -200 800-$ Energy Savings Public Holidays 9000 9,000$ Plant Maintenance Saving 2160 2,160$ Adjust for Daylight saving 0 -$ Energy Savings Daylight Saving 18750 18,750$ Plant Maintenance Saving 3750 3,750$ Total 1,100-$ 33460 32,360$
Simple Payback 3 MonthsNPV 10% $22,874.93
Purchase price 10 Year Annual Costs/Savings Total
365 day time clock (2 channel) 500-$ 0 500-$ Install & Programme 500-$ -1000 1,500-$ Energy Savings Public Holidays 9000 9,000$ Plant Maintenance Saving 2160 2,160$ Adjust for Daylight saving -1000 1,000-$ Energy Savings Daylight Saving 18750 18,750$ Plant Maintenance Saving 3750 3,750$
1,000-$ 31660 30,660$
Simple Payback 3 MonthsNPV 10% $21,706.51
What is not working well in terms of Energy Management
A large number of sophisticated control systems are failing to deliver the benefits for the end users REASON: No-one is actively managing these systems.This is a LOSE-LOSE: High OPEX costs increases costs to tenants and reduces value of building.Unless these systems are managed in a continuous and proactive manner there is no financial benefit derived from having them installed.
A $100,000 BMS is (often) just an expensive time clock
SOLUTIONUse a third party to manage control systems!Removes risk of knowledge being lost when an employee moves on. These “management costs” should form part of the OPEX for the building and be passed through to Tenant(s) in all lease agreements. Financial Benefits will exceed Management costs, reducing OPEXCreates a WIN-WIN
Key areas to focus for low cost benefitsEnsure the technology you already have is actively managedUse metering information.
Saving 1 kW baseload saves more that 6,000 kWh pa ~ $900
Consider professional help - it will be cost effective!You need to measure to manage.Monitor and report operational savings (energy and other system savings). Use action plans and targets (with regular meetings).The old adage is true - a team works better than an individual
More Information or Assistance
If you want further information on this presentation, or assistance with the energy management on your site, please contact:
Peter McKeown
Smart Metering – what it means for businesses Thursday 13 September, 2012Hamish McEwen, Business Marketing Manager
Meridian Energy
September 2012
A meter is a meter is a meter, unless it’s a smart meter
• Records half-hourly consumption data.
• Regularly transmits consumption data.
• Remotely receives meter configuration data.
• What they are not…– A check meter– A control device
The benefits of awareness
• Knowing what, how, and when, power is being used provides for the opportunity to make changes.– Performance monitoring
– BudgetingWEEK
DAY
Consumption across a week
Consumption during the day
Combining and comparing data
• Benchmarking• Industry trends and behaviours
Single site consumption compared to city average
Day time consumption patterns across industries
Smart meters enable the development of new pricing structures
• Measuring consumption in 30 min intervals allows for pricing at 30 min intervals.
• Electricity pricing in the New Zealand market follows supply and demand triggers, on a daily, weekly and yearly basis.
YEAR
Summer Winter Summer
WEEK
Sunday Saturday
DAY
Time-of-use or not time-of-use
00:00 24:00
Retail
Pubs and taverns
Grocery and supermarkets
Cafes and restaurants
Schools
Market pricing
Sculptured
Access and deployment
• Smart meter deployment is continuing across NZ.• Access to data is becoming available to customers.• Retailers are developing systems that will
incorporate data from different meters providers.• Smart meters can be installed outside of roll-out
programmes… but may incur a cost.
Smart meter takeaways
• Awareness and monitoring can save money
• Pricing plans that better fit industry consumption are coming
• Smart meters can be installed at customer request – if interested talk to one us.
Smart metering
Why?
• To better understand electricity usage across multiple sites
• Identify opportunities to reduce emissions
• Lower consumption costs
• Provide real-time feedback on variances and potential issues
• Eliminate need for meter reading and bill estimates
How?
• National deployment
• Data analysis and reporting
• Corrective actions
• Performance monitoring
National Deployment- Site AnalysisPhotographic review of existing installation
Deployment - Site Analysis
At times, getting the right photo was a childrens game of “hot and cold”…….
Warm…. Warmer…. Really warm….
Deployment - Site Analysis
At times, getting the right photo was a childrens game of “hot and cold”…….
Cold!
National Deployment - Site PreparationThe (simplified) installation process……
– Arc Innovation set up steps– Westpac engagement to allow for installation– Westpac to IT server management– Meter installation
Installation challenges– Contractor failure – IT hardware failure – Insufficient space for installation– Unusual cross-tenancy metering– Embedded networking (under contract)
National Deployment - Data Analysis and Reporting
The smart meter interval data allows you to understand more about your sites
Analysing the data allows you to identify peak/off-peak consumption, developing an energy index, sites with issues, etc…
National Deployment - Data Analysis and Reporting
What the data won’t tell you:
•The root cause of excessive consumption•Whether consumption behaviour is human or controlled
National Deployment - Data Analysis and Reporting
While Meridian are developing a web based portal for reporting and data analytics, Westpac were keen to realise the benefits of smart meter data. The reporting tool is based on a scoring system which rates the performance of each site on performance criteria:•Energy Index (benchmarked and scaled)•Peak average (benchmarked and scaled)•Off peak average (benchmarked and scaled)•Consumption on weekends/public holidays
National DeploymentData Analysis and Reporting
Benchmarking figures:•Energy Index – 161•Peak average – 9 kwh•Off peak average – 3 kwh
These benchmarking figures are derived from the smart meter data. Poor performing sites were removed from this calculation.
Case Study KilbirnieCorrective Action
Post corrective action performance
•The off-peak average load for this site was reported as 6.1kwhr (compared to the Westpac branch portfolio average of 3.04kwhr).•Work commenced at Kilbirnie branch on 26th July, to install the data loggers and carry out an evaluation of the site HVAC control system.
Savings as a result of the works undertaken
Summary KilbirnieAverage weekly energy use per hour prior Smart meters :
11.15 KW Per hour
New average weekly energy use per hour :
5.83KW per hour
Estimated savings $6500.00 PA
Return on investment 2 months.
What’s Next?Meridian to advise on web tool and escalation plan•BAU – ongoing performance monitoring• Westpac to review audit templates and audit protocols for service contractors – reduce cost of “fix”•Westpac to review PPM task list for service contractors• Ongoing re-commissioning is essential• “Smart building controls” – “Smart Buildings” – “Smart Savings”• Focus on asset management & performance•“Green Design”• Sustainability focus•Cost Savings – Bottom Line