Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production Games Design Final Major Project Schedule Review date: 06.02.13 Monday Tuesday Wednesday Thursday Friday Saturday Sunday w/b 04.02.13 Task 1 - FMP Launch Meeting w/b 11.02.13 Half-Term w/b 18.02.13 Book meeting slot with project manager. Task 2 - Viability started Begin research into fps games and find out why they’re so popular w/b 25.02.13 Complete task 2 and start task 3 Complete task 3 and start blogging work for task 2 and 3 w/b 04.03.13 Task 4: Pitch must take place by this week. Task 4 to be completed and blogged by this point Begin Pre-Production w/b 11.03.13 Task 5: Pre- production must take place by this week. w/b 18.03.13 Must finish pre- production by this point Begin Production 25.03.13 Easter 01.04.13 Easter w/b 08.04.13 Continue with production w/b 15.04.13 w/b 22.04.13 Be at lest halfway through production by this point

Upload: davidsharples11

Post on 04-Jul-2015

36 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fmp initial schedule_240513

Salford City CollegeEccles Sixth Form Centre

BTec Level 3Extended Diploma in Creative Media ProductionGames Design

Final Major ProjectSchedule

Review date: 06.02.13Monday Tuesday Wednesday Thursday Friday Saturday Sunday

w/b 04.02.13 Task 1 - FMP Launch Meeting

w/b 11.02.13 Half-Termw/b 18.02.13 Book meeting

slot with project manager.

Task 2 - Viability started

Begin research into fps games and find out why they’re so popular

w/b 25.02.13 Complete task 2 and start task 3

Complete task 3 and start blogging work for task 2 and 3

w/b 04.03.13 Task 4: Pitch must take place by this week.

Task 4 to be completed and blogged by this point

Begin Pre-Production

w/b 11.03.13 Task 5: Pre-production must take place by this week.

w/b 18.03.13 Must finish pre-production by this point

Begin Production

25.03.13 Easter01.04.13 Easterw/b 08.04.13 Continue with

productionw/b 15.04.13w/b 22.04.13 Be at lest halfway

through production by this point

Page 2: Fmp initial schedule_240513

w/b 29.04.13w/b 06.05.13w/b 13.05.13 Finish production by

at least this pointTask 7: Get a focus group to test the product and report any bugs they might find

w/b 20.05.13 Task 8: Evaluation should take place no later than the beginning of this week.

DEADLINE