foga aps dk north sea · 2020. 3. 24. · 57°29.4427n ‐005°23.1247e 57°29.2332n...

4
FOGA ApS FISHERMENS INFORMATION OF OILAND GAS ACTIVITIES Trafikhavnskaj 19 DK6700 Esbjerg Tel.: +45 75 45 11 44 EMail: [email protected] Web page: www.foga.dk NORTH SEA ACTIVITIES Week 13 March 24, 2020 FOGA ApS has on basis of information received from offshoreoperators at the North Sea prepared the following newsletter describing present activities: Info 14.0 Side 1 Info 2.1 Info 4.0 Info 2.0 Info 14.0 Info 9.0 Info 14.0 Info 1.0 Info 3.0 Info 5.0 Info 6.0 Info 7.0 Signatures: Warning Safety zone Pipeline with 200 meter protective zone Buoy Existing installation Mobile rig 1 MAERSK RESOLUTE: Port of Esbjerg. 2 NOBLE SAM TURNER to be moved from DAN FB to Nigg, UK approx. 25/3. 4 CROSSWAY EAGLE in position at TYRA W. 5 MAERSK GUARDIAN in position at TYRA E. 12 COLGA: Port of ESBJERG Info 10.0 Info 14.0 Info 15.0 © Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 201706)". Do not copy without permission from FOGA ApS 4 CROSSWAY EAGLE in position at TYRA W. 5 MAERSK GUARDIAN in position at TYRA E. 12 COLGA: Port of ESBJERG. A lost anchor and 6 schakles of chain is located on pos. 56°00.28N 007°57.7E Vessels: The vessel KOMMANDOR is expected at the SVEND Field approx. 1/4 10/4. The vessels ASSISTER, BUGSIER 10 & MULTRATUG 29 are expected to carry out the rigmove of the rig NOBLE SAM TURNER from the DAN Field The vessel BOKA ATLANTIS is working at the TYRA Fields. The vessel ENERGY DUCHESS is working the DUC fields. The vessel FS ABERGELDIE is working at the DUC Fields. The vessel VESTLAND CYGNUS is working at the TYRA Fields. The vessel DEFENDER is working at the TYRA Fields. The vessel MAERSK TRACKER conducting maintenance at the DUC Fields. The vessel ENERGY DUCHESS (PSV) are expected to the DUC area. The vessels CS RESPONDER, NAUTILUS & FLINTSTONE at the HAVFRUE cable. The vessels ENHIORNINGEN, ARKONA, VENUS II, CECILIE, VEGA II & VERA II are acting as guard vessels at the HAVFRUE cable. The vessel ILE D'AIX and ILE DE BATZ Cable lay HAVHINGSTEN. The CTV KEM 1 at the HORNS REV 3 and the vessel MPI ENTERPRISE might operate in the Horns Rev 3 area. Side 1

Upload: others

Post on 31-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

    Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

    E‐Mail:      [email protected] page:       www.foga.dk

    NORTH SEAACTIVITIES

    Week 13March 24, 2020

    FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

    Info 14.0

    Side 1

    Info 2.1

    Info 4.0

    Info 2.0

    Info 14.0Info 9.0

    Info 14.0

    Info 1.0

    Info 3.0

    Info 5.0

    Info 6.0

    Info 7.0Signatures:WarningSafety zone

    Pipeline with 200 meter protective zone

    Buoy

    Existing installation

    Mobile rig1 MAERSK RESOLUTE: Port of Esbjerg. 2 NOBLE SAM TURNER to be moved from DAN FB to Nigg, UK approx. 25/3. 4 CROSSWAY EAGLE in position at TYRA W.5 MAERSK GUARDIAN in position at TYRA E. 12 COLGA: Port of ESBJERG

    Info 10.0

    Info 14.0Info 15.0

    © Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 2017‐06)". Do not copy without permission from  FOGA ApS

    4 CROSSWAY EAGLE in position at TYRA W.5 MAERSK GUARDIAN in position at TYRA E. 12 COLGA: Port of ESBJERG. A lost anchor and 6 schakles of chain is located on pos. 56°00.28N 007°57.7EVessels:The vessel KOMMANDOR is expected at the SVEND Field approx. 1/4 ‐ 10/4.The vessels ASSISTER, BUGSIER 10 & MULTRATUG 29 are expected to carry out the rigmove of the rig NOBLE SAM TURNER from the DAN FieldThe vessel BOKA ATLANTIS is working at the TYRA Fields.The vessel ENERGY DUCHESS is working the DUC fields.The vessel FS ABERGELDIE is working at the DUC Fields. The vessel VESTLAND CYGNUS is working at the TYRA Fields. The vessel DEFENDER is working at the TYRA Fields.The vessel MAERSK TRACKER conducting maintenance at the DUC Fields.The vessel ENERGY DUCHESS (PSV) are expected to the DUC area.The vessels CS RESPONDER, NAUTILUS & FLINTSTONE at the HAVFRUE cable.The vessels ENHIORNINGEN, ARKONA, VENUS II, CECILIE, VEGA II & VERA II are acting as guard vessels at the HAVFRUE cable. The vessel ILE D'AIX and ILE DE BATZ Cable lay HAVHINGSTEN.The CTV KEM 1 at the HORNS REV 3 and the vessel MPI ENTERPRISE might operate in the Horns Rev 3 area.

    Side 1

  • Rigs in the Port of Esbjerg

    Info 1.0

    Rigs: COLGA

    Vessels:Th l KOMMANDOR i t d t th SVEND Fi ld f h i l it f 1/4 10/4 th

    FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

    Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

    E‐Mail:      [email protected] page:       www.foga.dk

    NORTH SEAACTIVITIES

    FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

    Update of informationWeek 13March 24 ‐ 30, 2020Next FOGA Info to be distributedMarch 31, 2020

    COLGA

    Total E&P Danmark A/S

    MAERSK TRACKER

    MAERSK RESOLUTE

    VESTLAND CYGNUSENERGY DUCHESS KOMMANDOR

    The vessel KOMMANDOR is expected at the SVEND Field for a geophysical site survey from approx. 1/4 ‐ 10/4, weather permitting. The vessel will be towing a single approx. 1.2km long seismic cable behind the vessel, at dept of approx. 3m.The vessels ASSISTER, BUGSIER 10 & MULTRATUG 29 are expected to carry out the rigmove of the rig NOBLE SAM TURNER from the DAN Field to Nigg, UK, approx. 25/3‐2020.The vessel BOKA ATLANTIS is working at the TYRA Fields. The vessel (PSV) FS ABERGELDIE is working at the DUC Fields for cargo runs to HALFDAN A and NOBLE SAM TURNER. The vessel VESTLAND CYGNUS is working at the TYRA Fields for close down of satellite platforms and cleaning of pipelines. The vessel DEFENDER is working at the TYRA Fields.The vessel MAERSK TRACKER conducting maintenance at the DUC Fields.The vessel ENERGY DUCHESS is working the DUC fields. 

    TYRA FUTURE:Both new pipelines between TYRA W & TYRA E has been deployed and trenched into the seabed. More information on this project can be found on page 4.

    Rigmoves: The rig NOBLE SAM TURNER to be moved from DAN FB to Nigg, UK approx. 25/3. The accommodation rig CROSSWAY EAGLE in position at TYRA W.The accommodation rig MAERSK GUARDIAN in position at TYRA E. 

    NOBLE SAM TURNER

    CROSSWAY EAGLEMAERSKGUARDIAN

    DEFENDERFS ABERGELDIEBOKA ATLANTIS

    MULTRATUG 29

    ASSISTER BUGSIER 10

    Info 2.0

    Info 2.1

    SIRI‐field:  56o 28.96' N  004o 54.67' ECECILIE‐A field: 56o 24.13' N  004o 45.58' ENINI A‐field:  56o 38.45' N  005o 19.27' ENINI B‐field: 56o 40.49' N  005o 24.74' ESTINE field ‐ Subsea installations:STINE SCB‐1:  56o 30.96' N  005o 02.46' ESTINE SCB‐2:  56o 30.95' N  005o 03.56' E

    The safety zones are 500 mfrom the positions.

    Vessels: 

    Hejre Project: 

    In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐ 003°57,534' E. 

    Illustration of hose when idle.

    SIRI tanker loading facility.

    HEJRE Field

    Info 3.0 FINO 3 ‐ Research PlatformThe research platform FINO 3 was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position: 55° 11,7' N 007° 09,5' E. A 500 meter safety zone has been established around the platform. 

    Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochschule Kiel Gmbh" www.fino3.de for more information.

    DAN TYSK windfarmThe DAN TYSK  windfarm has been etablised at the shown site.  

    SANDBANK windfarm The SANDBANK windfarm has been etablised.  

    HEJRE Field

    FINO 3

    Side 2

  • Info 4.0

    SYD ARNE field

    The storage tank and top site of  SOUTH ARNE field is installed at position 56o 04,72' N  004o 13,82' E, connected with a new bridge to the platform South Arne WHP E (Well Head Panel) at position 56o 04,693' N  004o 13,85' E.

    The satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N  004o 13,154' E, where a safety zone of 500 meter is established acc. to Offshore safety order.  SOUTH ARNE's tanker loading  facility,  where tankers are  loaded at  8 ‐ 10 day  intervals  is located at WGS‐84 pos. 56o 05,55' N  004o 15,37' E. 

    FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

    Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

    E‐Mail:      [email protected] page:       www.foga.dk

    NORTH SEAACTIVITIES

    Update of informationWeek 13March 24 ‐ 30, 2020Next FOGA Info to be distributedMarch 31, 2020

    FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

     

    Syd ArneSAL system56 05,549 N04 15,368 E

    o

    o

    Syd ArneWHPN platform56 05,744 N04 13,154 E

    o

    o

    Info 6.0Crew Transfer Vessel (CTV) KEM 1 will be in the Horns Rev 3 area and the vessel MPI ENTERPRISE might operate in the Horns Rev 3 area.

    All 49 WTG's are installed.

    Horns Rev 3 Marine Coordination Centre has been established by Vattenfall and is in operation 24/7. HR3 MCC can be contacted by VHF can 16 and 10 or by duty‐phone no.: +45 27 87 50 50. HR3 MCC is monitoring traffic in the area and at the construction site.

    SYD ARNE Field

    SYD ARNE tanker loading facility

    Syd ArneWHPE platform56 04,694 N04 13,852 E

    o

    o

    Syd ArneGBS platform56 04,702 N04 13,731 E

    o

    o

     

    List of dropped objects Horns Rev 3 Offshore Windfarm

    Number Date Position Lost asset 1 2018-01-03 55°43,8N 007°41,6E Anchor stone incl. 60m

    chain 2 31-10-2019 55.41.36 N

    007.35.12 E Acoustic Logger

    3 17-05-2019 55°43,19N 007°39,22E

    12,5m of BBC hose recovered

    37,5m of BBC hose remaining

    4 19-05-2019 55°43,19N 007°39,22E

    Remains of a CPS on seabed

    5 17-05-2019 55°43,19N Cable recovery near

    CTV KEM 1 MPI ENTERPRISE

    Info 7.0

    Info 8.0

    Info 9.0

    Danish navigational warning no. DK‐214‐16

    At the below mentioned position a wreck of a submarine has been discovered containing dangerous ammunition.Due to safety reasons, Danish Maritime Authority prohibit all unauthorized fishing, anchoring and diving on and within 100 m radius of the wreck in pos. 55 30,62 N ‐ 007 56,84 E. Please note that the size of the prohibited area has been changed. Violation of the prohibition is punishable by fine or prison.

    Orsted operates 3 pipelines in the Danish North Sea sector:

    20” Oil pipeline from GORM to Filsø24” Gas pipeline from SYD ARNE to Blåbjerg. (via subsea Y‐connection with a split from HARALD)30” Gas pipeline from TYRA E‐E to Kærgård

    5 ,007°39,22E

    yE03, approx. 58m of

    cable recovered.

    On behalf of ENERGINET, 4 x 4 yellow buoys have been deployed at the Thor site in order to monitor the wildlife. All in all 16 buoys to be deployed within the Thor site. Every position consists of 4 yellow buoys with a distance of 250 m between each other. The yellow buoys are special marks with yellow light and a yellow X as topsign.

    No. Name LAT N LONG E

    1 Thor_T1 56 16.999 7 45.1162 Thor_T2 56 17.049 7 33.3173 Thor_T3 56 20.343 7 40.8984 Thor_T4 56 24.734 7 44.734

    Side 3

  • Info 10.0

    TYRA FUTURE:

    FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

    Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

    E‐Mail:      [email protected] page:       www.foga.dk

    NORTH SEAACTIVITIES

    Update of informationWeek 13March 24 ‐ 30, 2020Next FOGA Info to be distributed March 31, 2020

    FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

    The charts below shows the new pipelines between the TYRA Fields.

    Total E&P Danmark A/S

    Info 14.0

    The works along the Havfrue cable in Danish and Norwegian waters are carried out by the vessel CS RESPONDER.The vessels ARKONA, ENHIORNINGEN, VENUS II, CECILIE, VEGA II and VERA II are acting as guard vessels. ARKONA on station at Asset 44,43,42 EUROPIPE, NORDNED E & W.Asset 42: 56° 28,68N – 006° 05,05EAsset 43: 56° 28,67N‐ 006° 05,09EAsset 44: 56° 23,76 N – 006° 16,96EENHIORNINGEN on station at below mentioned positions: Asset 27: 57°39.06N ‐ 006°39.60E. Asset 28: 57°39.06N ‐ 006°39.55E. PLIB Site: 57°37,51N ‐ 006°30,43E.Clump position: 57°37,32N ‐ 006°29,24E.VENUS II on station at below mentioned positions: Asset 29: 57°35.11N ‐ 006°10.37E. Asset 30: 57°35.11N ‐ 006°10.42E. CECILIE on station at below mentioned positions:Asset 31: 57°32.5765N ‐ 005°48.4919E.Asset 32: 57°32.7306N ‐ 005°50.6861E. VEGA II on station at below mentioned positions:57°29.4427N ‐ 005°23.1247E57°29.2332N ‐ 005°22.0999EVERA II on station at below mentioned positions:Exposed cable between 57°27'7666N ‐ 005°09'8359E & 57°27'6213N ‐ 005°08'7890E

    CS RESPONDERNAUTILUS

    Info 15.0

    This newsletter and infochart has been prepared on request from the operators in the North Sea and is distributed via E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.

    VERA II on station at below mentioned positions:Exposed cable between 57°27'7666N ‐ 005°09'8359E & 57°27'6213N ‐ 005°08'7890EAsset 34: 57°25,80 N – 004° 54,10 EAsset 35:  57° 25,15 N 004° 49,52 EAsset 36: 57° 24,92 N – 004° 47,60 E

    From the vessel C/S Ile de Batz the company Alcatel Submarine Networks are laying a subsea cable between Denmark and UK, from Nov 2019 ‐ April 2020 (Havhingsten subsea telecom system). The vessel C/S Ile d'Aix has joined the project (Dec 2019 – April 2020) for cable burial at pipeline crossing locations. 

    C/S Ile de Batzwill return to cable installation and ploughing in Danish waters this week (week 13). Leaving DK waters is planned on first half of April.

    C/S Ile d'Aix is planned to be back for cable burial works in the Danish North Sea during this week (week 13) until first half of April.

    Mariners are requested to keep clear of the cable laying vessels.

    The cable route is shown on the chart.  C/S Ile de Batz 

    C/S Ile d'Aix

    FLINTSTONE

    Side 4