FOGA ApS FISHERMENS INFORMATION OF OILAND GAS ACTIVITIES Trafikhavnskaj 19 DK6700 Esbjerg Tel.: +45 75 45 11 44 EMail: [email protected] Web page: www.foga.dk NORTH SEA ACTIVITIES Week 46 November 14, 2017 FOGA ApS has on basis of information received from offshoreoperators at the North Sea prepared the following newsletter describing present activities: 1 af 3 Info 2.1 Info 4.0 Info 2.0 Info 6.0 Info 6.0 Info 1.1 Info 3.0 Info 5.0 Info 6.0 Info 7.0 Signatures: Warning Prohibited area Pipeline with 200 meter protective zone Buoy Existing installation Mobile rig 2 NOBLE SAM TURNER has arrived at the DAN Field. 4 CROSSWAY EAGLE in position at TYRA West. 5 MAERSK GUARDIAN in position at TYRA East. 6 MAERSK RESILIENT is in position at GORM A The rig is expected to be moved to Info 6.0 Info 6.0 © Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 201706)". Do not copy without permission from FOGA ApS 4 CROSSWAY EAGLE in position at TYRA West. 5 MAERSK GUARDIAN in position at TYRA East. 6 MAERSK RESILIENT is in position at GORM A. The rig is expected to be moved to GORM F approx. 29/112017. 8 MÆRSK GIANT: ESBJERG HAVN. 10 PARAGON C20051: ESBJERG HAVN. 11 PARAGON HZ1: ESBJERG HAVN. 12 ATLANTIC LABRADOR: ESBJERG HAVN. Within the 500 zone at TYRA E a pipeline at the seabed has been exposed. Fishing vessels are to keep clear of the position. Vessels: The vessel GARGANO is expected at the DUC Fields from approx. 24/112017 for a job of 10 days duration. The vessel SKANDI OLYMPIA is conducting ROV operations at the DUC fields. The vessels INNOVATION & EAGLE FJORD is working at the Horn Rev III. 1 af 3

Upload: lymien

Post on 26-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Week 46November 14, 2017

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

1 af 3

Info 2.1

Info 4.0

Info 2.0

Info 6.0Info 6.0

Info 1.1

Info 3.0

Info 5.0

Info 6.0

Info 7.0Signatures:Warning

Prohibited area

Pipeline with 200 meter protective zone

Buoy

Existing installation

Mobile rig

2 NOBLE SAM TURNER has arrived at the DAN Field.  4 CROSSWAY EAGLE  in position at TYRA West.5 MAERSK GUARDIAN in position at TYRA East. 6 MAERSK RESILIENT is in position at GORM A The rig is expected to be moved to

Info 6.0Info 6.0

© Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 2017‐06)". Do not copy without permission from  FOGA ApS

4 CROSSWAY EAGLE  in position at TYRA West.5 MAERSK GUARDIAN in position at TYRA East. 6 MAERSK RESILIENT is in position at GORM A. The rig is expected to be moved to GORM F approx. 29/11‐2017. 8 MÆRSK GIANT: ESBJERG HAVN.10 PARAGON C20051: ESBJERG HAVN.11 PARAGON HZ1: ESBJERG HAVN.12 ATLANTIC LABRADOR: ESBJERG HAVN.

Within the 500 zone at TYRA E a pipeline at the seabed has been exposed. Fishing vessels are to keep clear of the position.

Vessels:

The vessel GARGANO is expected at the DUC Fields from approx. 24/11‐2017 for a job of 10 days duration.The vessel SKANDI OLYMPIA is conducting ROV operations at the DUC fields. The vessels INNOVATION & EAGLE FJORD is working at the Horn Rev III. 

1 af 3

Rigs in the Port of Esbjerg

Info 1.0

Rigs:MÆRSK GIANT, PARAGON C20051, PARAGON HZ1, ATLANTIC LABRADOR

Within the 500 zone at TYRA E a pipeline at the seabed has been exposed. Fishing vessels are to keep clear of the position.

Vessels:

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

Update of informationWeek  46November 14 ‐ 20, 2017Next FOGA Info to be distributed November 21, 2017

MAERSK GIANT

PARAGON HZ1 PARAGON C20051 ATLANTIC LABRADOR

Info 2.0

The vessel M/V GARGANO is expected at the DUC Fields from approx. 24/11‐2017 for a job of 10 days duration.

The vessel SKANDI OLYMPIA is conducting ROV operations at the DUC Fields. 

Rigmoves: 

NOBLE SAM TURNER is in position at the DAN Field. The accommodation rig CROSSWAY EAGLE is in position at TYRA W A.The accommodation rig MAERSK GUARDIAN is in position at TYRA East A. MAERSK RESILIENT is in position at GORM A. The rig is expected to be moved to GORM F approx. November 29, 2017.   

SIRI‐field:  56o 28.96' N  004o 54.67' E

CECILIE‐A field: 56o 24 13' N 004o 45 58' ESIRI tanker loading facility.

NOBLE SAM TURNER

CROSSWAY EAGLE

MAERSKGUARDIAN

MAERSKRESILIENT

SKANDI OLYMPIA GARGANO

Info 2.1

CECILIE‐A field: 56o 24.13  N  004o 45.58  E

NINI A‐field:  56o 38.45' N  005o 19.27' E

NINI B‐field: 56o 40.49' N  005o 24.74' E

STINE field ‐ Subsea installations:STINE SCB‐1:  56o 30.96' N  005o 02.46' E

STINE SCB‐2:  56o 30.95' N  005o 03.56' E

The safety zones are 500 mfrom the positions.

Vessels: 

Hejre Project: 

In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐ 003°57,534' E. The safety zone has been established according to the Energy Ministry Order No 657 of 30 December 1985. 

Illustration of hose when idle.

HEJREField

Info 3.0 FINO 3 ‐ Research PlatformThe research platform FINO 3 was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position: 55° 11,7' N 007° 09,5' E.A 500 meter safety zone has been established around the platform. 

Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochschule Kiel Gmbh" www.fino3.de for more information.

DAN TYSK windfarmThe DAN TYSK  windfarm has been etablised at the shown site. The buoys which marked the site have been withdrawn. 

SANDBANK windfarm The SANDBANK windfarm has been etablised. The site are marked with buoys. 

FINO 3

2 af 3

Info 4.0

SYD ARNE field

The storage tank and top site of  SOUTH ARNE field is installed at position 56o 04,72' N  004o 13,82' E, connected with a new bridge to the platform South Arne WHP E (Well Head Panel) at position 56o 04,693' N  004o 13,85' E.

The satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N  004o 13,154' E, where a safety zone of 500 meter is established acc. to DEA regulation No. 657.  SOUTH ARNE's tanker loading  facility,  where tankers are  loaded at  8 ‐ 10 day  intervals  is located at WGS‐84 pos. 56o

 

Syd ArneSAL system56 05,549 N04 15,368 E

o

o

Syd ArneWHPN platform56 05,744 N04 13,154 E

o

o

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek  46November 14 ‐ 20,  2017Next FOGA Info to be distributed November 21, 2017

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

SYD ARNE Field

Info 5.0

Info 6.0

56 05,549 N04 15,368 E

o

o

04 13,154 Eo

Syd ArneWHPE platform56 04,694 N04 13,852 E

o

o

Syd ArneGBS platform56 04,702 N04 13,731 E

o

o

The oil company Wintershall has established a new platform called RAVN; at the position: 55°52,912' N ‐ 004°14,078' E. 

A prohibited area with a radius of 500 m from the position has been established. Within the area unauthorized navigation, anchoring, diving and fishing is prohibited.  

RAVN Platform

Info 7.0

The company Vattenfall has  commenced the installation of the wind turbine foundations at the Horns Rev III wind farm. A buoyed prohibited area has been established at the site for the coming wind farm HORNS REV III. Within the area unauthorized navigation, anchoring, diving and fishing is prohibited. The Heavy Lift Vessel/Jack‐Up vessel INNOVATION has started the installation of the foundations at the Horns Rev III site. Until now 20 out of 49 monopiles have been installed and it is expected that further 4 monopiles will be installed during week 46: H03, G06, G05, F04, weather permitting. During the installation work the supply vessel EAGLE FJORD will be at the site too. The EAGLE FJORD deploys and operates bubble curtains as noise mitigation during the piling of the monopiles.  At the position 55°43,933 N ‐ 007°34,007 E a wave rider buoy has been deployed. The foundations are loaded in the Port of Esbjerg. 

Horns Rev 3 Marine Coordination Centre has been established by Vattenfall and is in operation 24/7. HR3 MCC can be contacted by VHF can 16 and 10 or by duty‐phone no.: +45 27 87 50 50. HR3 MCC is monitoring traffic in the area and at the construction site.

A string of 39 m CPT rods, 4 cm in diameter has been lost and is now laying at the seabed at approx. position 56°01,29 N ‐ 008°02,00 E. Fishing vessels are to keep clear of the position. 

Danish navigational warning no. DK‐214‐16

At the below mentioned position a wreck of a submarine has been discovered containing dangerous ammunition.Due to safety reasons, Danish Maritime Authority prohibit all unauthorized fishing, anchoring and diving on and within 100 m radius f th k i 55 30 62 N 007 56 84 E Pl t th t th i f th hibit d h b h d Vi l ti f th

INNOVATION

EAGLE FJORD

Monopile

Info 8.0

of the wreck in pos. 55 30,62 N ‐ 007 56,84 E. Please note that the size of the prohibited area has been changed. Violation of the prohibition is punishable by fine or prison.

This newsletter and infochart has been prepared on request from the cooperation Oil Gas Denmark and is distributed via E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.

Orsted operates 3 pipelines in the Danish North Sea sector: 

20” Oil pipeline from GORM to Filsø24” Gas pipeline from SYD ARNE to Blåbjerg. (via subsea Y‐connection with a spilt from HARALD)30” Gas pipeline from TYRA E‐E to Kærgård