1. Changes in the natural environment of a river 2. Loss of floodplain surface in upper Rhine 3. “Ecological obstacles” 4. River restoration ready for the future? 5. Restoring habitat connectivity

TRANSCRIPT

Page 1: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

FLOOD PREVENTION AND

RIVER RESTORATION

ROOM FOR THE RIVER

Bart Fokkens

Chairman European Centre for River Restoration

21-11-2011

CHANGES IN THE NATURAL ENVIRONMENT OF A RIVER

21-11-2011 2 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOSS OF FLOODPLAIN SURFACE IN UPPER RHINE

0

20

40

60

80

100

1800 1820 1840 1860 1880 1900 1920 1940 1960 1980 2000

loss due to dike construction works

(HonsellTulla)

loss due to erosion (Basel-Breisach)

loss due to construction works until

Iffezheim

remained floodplain

21-11-2011 3 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ldquoECOLOGICAL OBSTACLESrdquo

21-11-2011 4 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RR READY FOR THE FUTURE

bull Design rivers for the future with respect for the past

bull Multidisciplinary adaptive approach acceptance of non-stationary

bull Public involvement social processes and interactions important with increased scale

bull Multi-criteria analysis cost benefit analysis and economic evaluation

bull Adequate (long-term) multi-level monitoring

21-11-2011 5 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

EU AND ldquoIWRBrdquo bull Prevent deterioration and achieve a good ecological status

bull Work with the river and not against it

bull From sector amp technical to integral amp natural

bull From river basin to local scale

bull Participatory planning

bull Socio-economic analyses 09122009

Basin Branch Floodplain Ecotope

21-11-2011 6 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 2: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

CHANGES IN THE NATURAL ENVIRONMENT OF A RIVER

21-11-2011 2 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOSS OF FLOODPLAIN SURFACE IN UPPER RHINE

0

20

40

60

80

100

1800 1820 1840 1860 1880 1900 1920 1940 1960 1980 2000

loss due to dike construction works

(HonsellTulla)

loss due to erosion (Basel-Breisach)

loss due to construction works until

Iffezheim

remained floodplain

21-11-2011 3 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ldquoECOLOGICAL OBSTACLESrdquo

21-11-2011 4 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RR READY FOR THE FUTURE

bull Design rivers for the future with respect for the past

bull Multidisciplinary adaptive approach acceptance of non-stationary

bull Public involvement social processes and interactions important with increased scale

bull Multi-criteria analysis cost benefit analysis and economic evaluation

bull Adequate (long-term) multi-level monitoring

21-11-2011 5 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

EU AND ldquoIWRBrdquo bull Prevent deterioration and achieve a good ecological status

bull Work with the river and not against it

bull From sector amp technical to integral amp natural

bull From river basin to local scale

bull Participatory planning

bull Socio-economic analyses 09122009

Basin Branch Floodplain Ecotope

21-11-2011 6 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 3: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

LOSS OF FLOODPLAIN SURFACE IN UPPER RHINE

0

20

40

60

80

100

1800 1820 1840 1860 1880 1900 1920 1940 1960 1980 2000

loss due to dike construction works

(HonsellTulla)

loss due to erosion (Basel-Breisach)

loss due to construction works until

Iffezheim

remained floodplain

21-11-2011 3 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ldquoECOLOGICAL OBSTACLESrdquo

21-11-2011 4 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RR READY FOR THE FUTURE

bull Design rivers for the future with respect for the past

bull Multidisciplinary adaptive approach acceptance of non-stationary

bull Public involvement social processes and interactions important with increased scale

bull Multi-criteria analysis cost benefit analysis and economic evaluation

bull Adequate (long-term) multi-level monitoring

21-11-2011 5 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

EU AND ldquoIWRBrdquo bull Prevent deterioration and achieve a good ecological status

bull Work with the river and not against it

bull From sector amp technical to integral amp natural

bull From river basin to local scale

bull Participatory planning

bull Socio-economic analyses 09122009

Basin Branch Floodplain Ecotope

21-11-2011 6 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 4: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

ldquoECOLOGICAL OBSTACLESrdquo

21-11-2011 4 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RR READY FOR THE FUTURE

bull Design rivers for the future with respect for the past

bull Multidisciplinary adaptive approach acceptance of non-stationary

bull Public involvement social processes and interactions important with increased scale

bull Multi-criteria analysis cost benefit analysis and economic evaluation

bull Adequate (long-term) multi-level monitoring

21-11-2011 5 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

EU AND ldquoIWRBrdquo bull Prevent deterioration and achieve a good ecological status

bull Work with the river and not against it

bull From sector amp technical to integral amp natural

bull From river basin to local scale

bull Participatory planning

bull Socio-economic analyses 09122009

Basin Branch Floodplain Ecotope

21-11-2011 6 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 5: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

RR READY FOR THE FUTURE

bull Design rivers for the future with respect for the past

bull Multidisciplinary adaptive approach acceptance of non-stationary

bull Public involvement social processes and interactions important with increased scale

bull Multi-criteria analysis cost benefit analysis and economic evaluation

bull Adequate (long-term) multi-level monitoring

21-11-2011 5 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

EU AND ldquoIWRBrdquo bull Prevent deterioration and achieve a good ecological status

bull Work with the river and not against it

bull From sector amp technical to integral amp natural

bull From river basin to local scale

bull Participatory planning

bull Socio-economic analyses 09122009

Basin Branch Floodplain Ecotope

21-11-2011 6 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 6: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

EU AND ldquoIWRBrdquo bull Prevent deterioration and achieve a good ecological status

bull Work with the river and not against it

bull From sector amp technical to integral amp natural

bull From river basin to local scale

bull Participatory planning

bull Socio-economic analyses 09122009

Basin Branch Floodplain Ecotope

21-11-2011 6 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 7: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

RESTORING HABITAT CONNECTIVITY

21-11-2011 7 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 8: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

RESTORATION MEASURES

21-11-2011 8 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 9: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

MITIGATION MEASURES

21-11-2011 9 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 10: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

LOST ROOM FOR RHINE AND MEUSE

21-11-2011 10 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 11: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

FLOOD RISK MANAGEMENT RHINE RIVER

21-11-2011 11 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 12: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

NEAR FLOODINGS 2003 2005

21-11-2011 12 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 13: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

DIKE STRENGTHENING

21-11-2011 13 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 14: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

ROOM FOR THE RIVER PRGRAMME

21-11-2011 14 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 15: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

GOALS AND CONDITIONS bull Safety stabilizing critical water levels despite

increase of design discharge of 1000 m3s

bull Increase of spatial quality ndash Socio-economic value

ndash Ecological value

ndash Aesthetic cultural value

ndash Sustainability

bull Implementation in partnership between national and regional authorities

bull Completion deadline 2015

bull Put 2015 plan in perspective of long-term vision (2050+)

bull Strictly limited budget of 22 billion Euros

21-11-2011 15

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 16: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

TOOLBOX OF MEASURES (green = best potential for ecological restoration)

bull Inside existing floodplain

ndash Riverbed deepening

ndash Groin improvement

ndash Creating side-channels

ndash Removing obstacles

ndash Strengthening of dikes (final option if no room available at reasonable costs)

bull Outside existing floodplain

ndash Detention areas

ndash Bypasses lsquogreen riversrsquo

ndash Widening of floodplain by replacement of dikes or depoldering

Selection of measures based on

cost-effectiveness contribution to spatial quality and administrativepolitical feasability

21-11-2011 16 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 17: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

DECISION MAKING PROCESS RHINE RIVER

2003600 individual measures

measures from long-term

survey

regional design workshops with

stakeholders

13 strategies

5 alternatives + extra modules

2007Approval by parliament = PLAN

2005preferred alternative

Quantity Assessment of alternatives Quality

Discussion-

and decision-

support

Analysis

discussion and

negotiation

21-11-2011 18 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 18: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

PROGRAMMATIC APPROACH Alternative measures could be developed by partners until summer 2008 within strict limits of

bull Political and Public support

bull Effectiveness (safety + spatial quality)

bull Within available budget or provide extra

bull Completed in 2015

21-11-2011 19

WWF6 ECRR Seminar Ljubljana 16-18 November 2011

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 19: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

RIVER RESTORATION ldquoROOM FOR THE RIVERSrdquo

bull National programme with various measures by 2015

bull Flood alleviation and ecological restoration

bull Costs 22 Billion Euros

21-11-2011 20 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 20: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

BOTTLENECK NIJMEGEN

21-11-2011 21 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 21: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

21-11-2011 22 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 22: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

ARTIST IMPRESSION

21-11-2011 23 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 23: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

FLOODPLAIN RESTORATION ARNHEM NL

Satellite image 1995

21-11-2011 24 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 24: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

BIESBOSCH AREA

21-11-2011 25 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 25: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

lsquoROOM FOR THE RIVERrsquo NOORDWAARD

From Google

lsquoDepolderingrsquo

21-11-2011 26 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 26: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

BIESCHBOS IN 1850

21-11-2011 27 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 27: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

21-11-2011 28 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011

Page 28: Fokkens B. ECRR, Flood prevention and river restoration, Room for the river

THANK YOU

21-11-2011 29 WWF6 ECRR Seminar

Ljubljana 16-18 November 2011