for agency use only submit one hard copy and one...
TRANSCRIPT
SUBMIT ONE HARD COPY AND ONE ELECTRONIC COPY
WYOMING POLLUTANT DISCHARGE ELIMINATION SYSTEM
APPLICATION FOR PERMIT TO SURFACE DISCHARGE PRODUCED WATER FROM COAL BED METHANE NEW DISCHARGES, RENEWALS, OR MAJOR
MODIFICATIONS
Revised: 6-12-2013
PLEASE PRINT OR TYPE (Submission of illegible materials will result in return of the application to the applicant) 1. Check the box corresponding to the type of application being applied for:
New CBM permit
CBM permit renewal Permit number: WY0055638 Expiration Date: 11/30/2015
CBM permit major modification Permit number: Expiration Date:
2. Identify the river basin in which the discharge will occur:
Belle Fourche Cheyenne Powder Little Powder Tongue
Other (identify) _________________________________________
3. Select permit option(s): if more than one option is selected, the applicant must describe which option applies to which outfall.
Option 1A – Discharge is contained within an off-channel pit (class 4C) capable of containing all effluent plus up to a 50-year / 24-hour storm event. For existing permits only, Option 1A also applies to discharges that are contained within a head water reservoir situated within a class 4 channel and capable of containing all effluent plus up to a 50-year/24-hour storm event.
Option 1B – Discharge is contained within a natural closed basin or playa lake (class 3A). Option 1B also applies to discharges that are contained within a headwater reservoir situated within a class 3 channel and capable of containing all effluent plus up to a 50-year/24-hour storm event. Option 1B headwater reservoirs shall not be located within alluvial deposits or the floodplain of any perennial, intermittent or ephemeral stream. Option 1B headwater reservoirs less than 50 acre feet in capacity shall not be located within 500 feet of such features; reservoirs greater than 50 acre feet in capacity shall not be located within ¼ mile (1320 feet) of such features.
Option 2 – This option includes any on-channel discharge (including discharge into an on-channel reservoir) that does not meet the impoundment requirements specified in options 1A or 1B above. Outfalls 001 – 006 will discharge into four (4) on-channel reservoirs; the lowermost reservoirs will contain CBNG produced water during ‘dry’ operating conditions.
4. General Facility Location: Township(s): 47N Range(s): 76W
Immediate Receiving Stream(s): Tributaries to Beaver Creek, which is tributary to the Powder River. Please see Tables 1A and 1B for details. HUC 10 - 1009020205
5. Name of the facility producing the discharge (this is the facility name that will appear on the WYPDES permit):
Pumpkin Creek POD II North
For Agency Use Only
Application Number WY00_______________
Date Received:
__________________
(mo/day/yr)
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 1 of 17
6. Company, Contact Name, mailing address, e-mail address, and telephone number of the individual or company which owns the facility producing the discharge, and the person (consultant) responsible for permit submission.
Company Contact Name Jenni Hitt
Consultant Contact Name Charlene Ewart
Company Name Vanguard Operating, LLC
Company Name InterTech Environmental & Engineering, LLC
Mailing Address 1414 E. Lincoln Street
Mailing Address 3821 Beech Street
City, State, and Zip Code Gillette, WY 82716
City, State, and Zip Code Laramie, WY 82070
Telephone Number (307) 685-4322
Telephone Number (307) 755-3481
E-Mail Address [email protected]
E-Mail Address [email protected]
7.a. If applying for outfalls under Option 2, are any of the proposed Option 2 outfalls DIRECT DISCHARGES*that would
require the use of assimilative capacity credits for salt and sodium in the Powder River?
YES NO
If “yes”, please complete Table 5.
*DIRECT DISCHARGE means those discharges that are not or are only partially contained within reservoirs. Discharges to reservoirs that only overtop and spill during storm events are not subject to assimilative capacity requirements. Direct discharges that can meet Powder River ambient concentrations for TDS and sodium are also not subject to assimilative capacity requirements.
7.b. If applying for outfalls under Option 2, is it possible that INTENTIONAL RESERVOIR RELEASES* will be requested for any of the reservoirs receiving CBM discharges under this permit?
YES NO. Outfalls 001 – 006 will discharge into four (4) on-channel reservoirs; the lowermost reservoirs will contain CBNG produced water during ‘dry’ operating conditions. Vanguard is authorized to release produced water from upstream on-channel reservoirs to the lowermost on-channel reservoirs identified in question 10c. Discharge from the lowermost on-channel reservoirs is allowed with prior written authorization granted by the WYPDES program for a reservoir release, in association with use of assimilative capacity credits for the Powder River Basin.
*INTENTIONAL RESERVOIR RELEASE means purposeful and intentional reservoir releases (opening a valve or pumping out a reservoir) to provide freeboard within a reservoir. Discharges that occur solely in response to storm events are not considered intentional reservoir releases, and do not require assimilative capacity credits. Intentional reservoir releases are authorized on a case-by-case basis and require WDEQ approval above and beyond a WYPDES surface discharge permit (authorization application form available on WDEQ website).
8. If submitting a major modification or permit renewal, please describe all requested permit modifications (i.e. add 2 outfalls, add 23 wells, move outfall 001 500 feet…):
Update reservoir information, as shown on Tables 1A/1B/3/4.
Update the MW1 and MW3 groundwater monitoring wells, as shown on Tables 1A/1B.
Update STR1 stream monitoring point, as shown on Tables 1A/1B.
Update R1, R2 and R4 reservoir monitoring stations, as shown on Tables 1A/1B.
Update the Downstream (DPR), Tributary (TRIB1) and Upstream (UPR) Water Quality Monitoring Stations to more field accessible locations, as shown on Tables 1A/1B.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 2 of 17
9. Name(s) and mailing address(es) of owner(s) of the surface rights on whose land the discharge occurs (in cases where the land is owned by the state or federal government but surface rights are leased to a private individual, provide lessee’s name and address):
Landowner #1 Name Hey, Mary L Trust (The)
Landowner # 2 Name Mankin, Ruth F Revocable Trust
Landowner # 3 Name Bureau of Land Management
Mailing Address 1919 Grove Street
Mailing Address PO Box 1239
Mailing Address PO Box 1828
City, State, and Zip Code Boulder, CO 80302
City, State, and Zip Code Gillette, WY 82717-1239
City, State, and Zip Code Cheyenne, WY 82001
BLM Lessee Name Iberlin Ranch Ltd. Partnership Mailing Address 975 Iberlin Road
City, State, and Zip Code Gillette, WY 82718
10a. Please provide the maximum anticipated discharge rate, in million gallons per day (MGD), from this facility:
The maximum anticipated discharge rate from this facility is 0.1617 MGD. 10b. Does this facility rely on containment in reservoirs (of any type) as part of the water management strategy?
YES NO
10c. If NO is checked above, please proceed to item #11. If YES is checked above, the permittee is required to conduct an internal evaluation of the ability of the reservoir(s) at this facility to contain discharges. Based on the results of this evaluation, please describe the ability of the reservoir(s) at this facility to contain effluent and surface run-off from precipitation events. If there are multiple reservoirs at this facility which have different reservoir containment capabilities, please describe separately, identifying reservoirs using reservoir name. For example, “Reservoir A will contain all effluent and will only overtop during a storm event of any magnitude; Reservoir B will contain all effluent plus surface run-off from up to the 50 year/24 hour storm event, etc…”:
Based on the results of an internal water balance evaluation, Vanguard anticipates containment of CBNG produced water from outfalls 001 – 006 within four (4) on-channel reservoirs; the lowermost reservoirs will contain effluent during ‘dry’ operating conditions and will only overtop naturally during a storm event of any magnitude. Vanguard is authorized to release produced water from upstream on-channel reservoirs to the lowermost on-channel reservoirs. Discharge from the lowermost on-channel reservoirs is allowed, during ‘dry’ operating conditions, with prior written authorization granted by the WYPDES program for a reservoir release, in association with use of assimilative capacity credits for the Powder River Basin.
The upstream on-channel reservoirs that are allowed to discharge are as follows: Mary L. Hey, P14-2-47-76 and P23-1-47-76.
The lowermost on-channel reservoir is as follows: Mankin.
Please note that Vanguard will monitor flow rates and alter discharges as necessary to meet the requirements of this permit.
Please see Table 3: Reservoir Information for additional details.
The internal evaluation does NOT need to be submitted to the WYPDES Program as part of this application. By completing item 10b and signing this application, the permittee certifies that the reservoirs at this facility are capable of meeting the containment abilities which have been provided. The WYPDES Program will use the information provided above to determine the appropriate reservoir containment requirements that will be established in the permit. If reservoir containment requirements established in the permit are not met, this may constitute a violation of the permit, which is subject to full enforcement by the WYPDES Program. 11. Attach a description and a clear, legible, detailed topographic map of the discharging facility. Include the following:
a. A legend b. Well locations c. Ponds – Not pertinent to the water management strategy of this facility. d. Reservoirs
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 3 of 17
e. Stock tanks – Not pertinent to the water management strategy of this facility. f. Discharge points (outfalls) g. Immediate receiving streams h. Water quality monitoring stations – Referred to as downstream (DPR), upstream (UPR) and tributary (TRIB1)
water quality monitoring stations. i. Irrigation monitoring points – Referred to as monitoring well (MW), stream (STR) and reservoir (R) monitoring
points. j. Location of nearest downstream irrigator k. Section, Township, and Range information l. If proposing to use class 4C off-channel pits (option 1A), include footprint outline of the proposed pits. To denote
setback distance, include a distance marker from closest side of pit to the nearest water feature, floodplain, or stream alluvium. Identify latitude and longitude in decimal degrees (using a minimum of 6 decimal places) for each end point of the setback distance marker. – Off-channel pits are not being used at this facility.
m. If proposing discharge to a headwater reservoir or to a playa lake (option 1B), include footprint outline of the proposed impoundment(s). See page 1 of the application form for option 1B impoundment siting requirements. To denote setback distance from alluvial floodplain areas, include a distance marker from closest side of the impoundment to the nearest floodplain, or stream alluvium. Identify latitude and longitude in decimal degrees (using a minimum of 6 decimal places) for each end point of the setback distance marker. – Headwater reservoirs and playa lakes are not being used at this facility.
Please see the attached permit renewal map for the remaining items listed above.
(If any of the above are not applicable please indicate in the description and include a brief explanation as to why the item is not applicable.)
12. Describe the control measures that will be implemented to prevent significant damage to or erosion of the receiving water
channel at the point of discharge.
Produced water is discharged slowly through a vertical, large diameter riser pipe and allowed to flow down the side of the corrugated pipe to dissipate energy. The discharge water passes over cement aprons and/or rip-rap placed at a gentle slope prior to entering the receiving water/reservoir.
13. Describe the control measures that will be implemented to achieve water quality standards and effluent limits. If proposing
to utilize a treatment process, provide a description of the treatment process.
No active water treatment is necessary to meet the water quality standards and effluent limits. However, passive treatment methods such as aeration and settling may be implemented to reduce concentrations of trace metals.
14. Outfall locations must be established as part of a preliminary field reconnaissance survey using GPS or conventional survey
equipment and documented in Table 1. Please document the type of equipment used, the expected accuracy of your measurements, and a brief rationale for locating the outfalls at the requested sites below.
The outfall locations were determined by field personnel using a handheld GPS unit with an accuracy of generally 60 feet or better. The outfalls are located on ephemeral stream channels in locations where the discharge water will benefit livestock and wildlife. Outfalls 001 – 006 are shown in their as-built locations.
15. Complete the attached Table 1. Provide all the information requested in the table for each proposed discharge point or
monitoring point. If proposing changes (a major modification) to an existing facility, clearly indicate the desired changes on the table. Additional tables may be attached. Use the format provided. Option 2 permits, except those located in the Belle Fourche or Cheyenne River Basins, must include water quality monitoring station locations. Option 1B headwater reservoir discharges (reservoirs other than playa lakes capable of 50 year, 24 hour stormwater runoff containment) must include flow monitoring station locations. Option 1A and 1B permits must include containment unit monitoring station locations. Information related to reservoirs is only required if the facility’s water management plan includes reservoir containment.
Please see attached Tables 1A and 1B: Outfall Information. 16. Complete the attached Table 2. Provide all the information requested in the table for each well associated with this proposed
discharge authorization. If proposing changes (a major modification) to an existing facility, clearly indicate the desired changes on the table. Additional tables may be attached. Use the format provided.
Please see attached Table 2: Well Information.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 4 of 17
17. Complete the attached Table 3. Provide all the information requested in the table for each reservoir proposed for containment of CBM produced water. Specified locations refer to the approximate center of the reservoir. If proposing changes (a major modification) to an existing facility, clearly indicate the desired changes on the table. Additional tables may be attached. Use the format provided. Information related to reservoirs is only required if the facility’s water management plan includes reservoir containment.
Please see attached Table 3: Reservoir Information. 18. Complete the attached Table 4. Provide all information requested in the table related to reservoir bonding requirements for
each reservoir proposed for the containment of CBM produced water. If proposing any changes (a major modification) to an existing facility, clearly indicate the desired changes on the table. Additional tables may be attached. Use the format provided. Information related to reservoirs is only required if the facility’s water management plan includes reservoir containment.
Please see attached Table 4: Bonding Information. 19. Provide the results of water analyses for a sample collected from a location representative of the quality of the water being
proposed for discharge for all of the chemical parameters listed in the table below. The sample must be collected from well(s) or outfall(s) within a twenty mile radius of the proposed facility’s location, and from the same coal formation(s) and the same approximate depth(s) as proposed in this application. If filing an application for a permit renewal or modification, the representative sample must be collected from the facility being proposed for renewal or modification. Explain why this sample is representative of the produced water to be discharged.
Please refer to the following sample identification table and corresponding lab analysis for representative water quality. An initial laboratory analysis for DP_WY0055638_003 is included and is representative of CBNG production from the Big George coal seam from outfall 003 of this permit.
Sample ID Sample
Date QTR/ QTR
SEC TWP (N)
RNG (W)
Coal Seam(s)
DP_WY0055638_003 1/19/2011 SENE 23 47 76 Big George
Samples from co-mingled coal seams are acceptable as long as the sample(s) meet the following criteria:
A. all of the coal seams being proposed for development are represented in the co-mingled sample, with no contribution from coal seams not being proposed for development at the new facility.
B. the ratio of each coal seam’s contribution is approximately the same in the sample and the proposed development, C. documentation is provided to verify the criteria listed in A. and B.
The analyses must be conducted in accordance with approved EPA test procedures (40 CFR Part 136). Include a signed copy of your lab report that includes the following:
a. detection limits b. results of each of the chemical parameters at the chemical state given below c. quarter/quarter, section, township and range of the sample collection location d. Time and date of sample collection e. Time and date of analysis for each parameter f. Analyst’s initials for each parameter g. Detection limit for each parameter as achieved by the laboratory h. WYPDES permit number and outfall number, where the sample was collected. i. Origin of produced water (coal seam and legal location of sample collection location)
If more than one coal seam is being proposed for development, the permittee must submit a lab analysis and complete information characterizing water quality from each coal seam being proposed for development. If the permittee is proposing to include discharges from a coal seam not previously developed at this facility, the permittee must submit a lab analysis and complete information characterizing water quality from the new coal seam being proposed for development. A mixing analysis may be required if the representative water quality analysis from the new coal seam indicates that the inclusion of the new effluent source may result in degradation of existing effluent quality. Analyses must be provided in the units listed below.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 5 of 17
Parameter* (See notes following the table on chemical states)
Required Detection Limits and Required Units
Alkalinity, Total 1 mg/l as CaCO3
Aluminum, Dissolved 50 g/l
Arsenic, Total Recoverable 1 g/l
Barium, Total Recoverable 100 g/l
Bicarbonate 10 mg/l
Cadmium, Dissolved 5 g/l
Calcium, Dissolved 50 g/l, report as mg/l
Chlorides 5 mg/l
Copper, Dissolved 10 g/l
Dissolved Solids, Total 5 mg/l
Fluoride, Dissolved 100 µg/l
Hardness, Total 10 mg/l as CaCO3
Iron, Dissolved 50 g/l
Lead, Dissolved 2 g/l
Magnesium, Dissolved 100 g/l, report as mg/l
Manganese, Dissolved 50 g/l
Mercury, Dissolved 1 g/l
pH to 0.1 pH unit
Radium 226, Total Recoverable 0.2 pCi/l
Radium 228, Total Recoverable** 0.2 pCi/l
Selenium, Total Recoverable 5 g/l
Sodium Adsorption Ratio Calculated as unadjusted ratio
Sodium, Dissolved 100 g/l, report as mg/l
Specific Conductance 5 micromhos/cm
Sulfates 10 mg/l
Zinc, Dissolved 50 g/l *Discharges into drainages other than the Powder River geologic basin may require analysis of additional parameters,
please contact the WDEQ for a separate list.
**This parameter is only required for those discharges located within one stream mile of a class 2 water.
20. For new facilities, provide the expected (estimated) flow volume from each well in gallons per day, and provide the rationale behind the flow volume estimate. For existing facilities, provide actual flow data from all wells within the last six months.
Flow: 0.0576 MGD
Rational: The average maximum total facility flow from July to December 2014. Please see the Flow Data Table for details.
21. For applications for new facilities, are any of the required chemical constituents in the laboratory analysis present in
concentrations above Wyoming Water Quality Standards?
YES NO. Not applicable, this is an existing facility.
If the answer to question # 21 is yes, answer 21.a. – 21.b below. If no, proceed to question 23.
a. Which constituents? b. Has this constituent been addressed in the response to question 13?
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 6 of 17
22. For applications for existing facilities, has the facility ever exceeded permit limits or water quality standards? If the facility has never discharged or has not yet been constructed, please indicate below.
YES NO
If the answer to question 22 is yes, answer 22.a. – 22.c. If no, proceed to question 23.
a. Which constituents? Dissolved iron b. Has the exceedance been addressed? Yes c. Describe how the exceedance was addressed. Please see the attached Exceedance Summary Table for details.
23. Does any irrigation occur downstream of the discharge? Please note that irrigation may include conventional (artificial) irrigation involving the use of diversion structures; as well as natural irrigation, which occurs passively from overbank flooding or sub-irrigation.
YES NO
WDEQ has implemented a program within the Beaver Creek drainage for irrigation protection to include monitoring and reporting of downstream locations, which includes monitoring well, stream, soil, crop and reservoir points. These standard locations are included within this renewal application.
If yes, at a minimum, the WYPDES Program requires submission of the following information:
1. Location(s) of irrigation diversions (if any) and/or naturally-irrigated acreage; 2. Type(s) of Crops grown under irrigation; 3. Description of Irrigation Practices 4. A topographic map showing irrigated acreage, any structures, ownership of irrigated acreage.
In addition to the minimum information described above, the WYPDES Program may require additional information should the permittee request site-specific effluent limits protective of irrigation uses. Contact the WYPDES Program for more information regarding requirements for site-specific SAR, TDS, and EC limits.
24. Provide name(s) and address(es) for all downstream irrigators between the outfalls and the mainstem.
Irrigator #1 Name Iberlin Ranch Ltd. Partnership Mailing Address 975 Iberlin Road
City, State, and Zip Code Gillette, WY 82718
25. Provide a listing of all active permits or construction approvals received or applied for by the applicant for the site described in
this permit application in accordance with Chapter 2, Section 5.T. of the Wyoming Water Quality Rules and Regulations.
Please see Table 2 for a complete list of WOGCC API numbers associated with this facility. Please see Table 3 for a complete list of SEO permit numbers associated with this facility.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 7 of 17
Desired Changes
Discharge Point
(Outfalls) #
ImmediateReceiving
Stream
Mainstem(closest
perennialwater)
Distance to Closest 2AB Channel & Mainstem
(Miles)
Qtr/Qtr SecTwn(N)
Rng(W)
NAD 83Latitude
NAD 83Longitude
CountyReservoir
Name and Type
UpdateFrom
001 Lapin CreekPowder River
25.2 NESW 15 47 76 44.045436 -105.981938 CampbellMary L. HeyP11-1-47-76
(Option 2)
UpdateTo
001 Lapin CreekPowder River
25.2 NESW 15 47 76 44.045436 -105.981938 CampbellMary L. Hey
Mankin(Option 2)
UpdateFrom
002Tributary to
Beaver CreekPowder River
24.3 NWNE 14 47 76 44.051750 -105.956720 CampbellP14-2-47-76P11-1-47-76
(Option 2)
UpdateTo
002Tributary to
Beaver CreekPowder River
24.3 NWNE 14 47 76 44.051750 -105.956720 CampbellP14-2-47-76
Mankin(Option 2)
UpdateFrom
003Tributary to
Beaver CreekPowder River
25.4 SENE 23 47 76 44.033668 -105.955398 CampbellP11-1-47-76
(Option 2)Update
To003
Tributary to Beaver Creek
Powder River
25.4 SENE 23 47 76 44.033668 -105.955398 CampbellMankin
(Option 2)
UpdateFrom
004Tributary to
Beaver CreekPowder River
25.6 NESW 23 47 76 44.030679 -105.962938 CampbellP23-1-47-76P11-1-47-76
(Option 2)
UpdateTo
004Tributary to
Beaver CreekPowder River
25.6 NESW 23 47 76 44.030679 -105.962938 CampbellP23-1-47-76
Mankin(Option 2)
UpdateFrom
005Tributary to
Beaver CreekPowder River
25.6 SWSW 23 47 76 44.029150 -105.967031 CampbellP11-1-47-76
(Option 2)Update
To005
Tributary to Beaver Creek
Powder River
25.6 SWSW 23 47 76 44.029150 -105.967031 CampbellMankin
(Option 2)UpdateFrom
006Tributary to
Beaver CreekPowder River
26.5 SWNW 26 47 76 44.020606 -105.969088 CampbellP11-1-47-76
(Option 2)Update
To006
Tributary to Beaver Creek
Powder River
26.5 SWNW 26 47 76 44.020606 -105.969088 CampbellMankin
(Option 2)
Desired Changes
Station Name
Qtr/Qtr SecTwn(N)
Rng(W)
NAD 83Latitude
NAD 83Longitude
Update From
MW1 NENW 3 47 76 44.081430 -105.947850
Update To
MW1 NENE 3 47 76 44.081430 -105.974850
Groundwater Monitoring Well Irrigated Field
Table 1A - Outfall Information Changes: WY0055638 - Pumpkin Creek POD II North
Station DescriptionNotes regarding water quality
monitoring station types
Irrigated FieldGroundwater Monitoring Well
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 9 of 17
Table 1A - Outfall Information Changes: WY0055638 - Pumpkin Creek POD II North
Desired Changes
Station Name
Qtr/Qtr SecTwn(N)
Rng(W)
NAD 83Latitude
NAD 83Longitude
Update From
MW3 NESW 2 47 76 44.076510 -105.964150
Update To
MW3 NWSW 2 47 76 44.076820 -105.966390
Update From
STR1 NESW 2 47 76 44.077580 -105.964380
Update To
STR1 SWNW 2 47 76 44.077250 -105.966310
Update From
R1 NESW 15 47 76 44.044881 -105.982055
Update To
R1 NESW 15 47 76 44.044979 -105.981643
Update From
R2 NWNE 14 47 76 44.054500 -105.958760
Update To
R2 NWNE 14 47 76 44.054519 -105.958755
Update From
R3 NENW 11 47 76 44.069437 -105.962005
UpdateTo
R3 NENW 11 47 76 44.069437 -105.962005
Update From
R4 NESW 23 47 76 44.032100 -105.963900
UpdateTo
R4 NESW 23 47 76 44.032129 -105.963897
UpdateFrom
DPR SWNE 20 48 77 44.119427 -106.137481
UpdateTo
DPR SWNE 20 48 77 44.121949 -106.140138
UpdateFrom
TRIB1 NESE 20 48 77 44.118179 -106.135699
UpdateTo
TRIB1 NESE 20 48 77 44.117668 -106.132576
UpdateFrom
UPR SWSW 20 48 77 44.113121 -106.146704
UpdateTo
UPR SWSW 20 48 77 44.114396 -106.148259
Reservoir Quality Monitoring Station Mary L. Hey
Reservoir Quality Monitoring Station P14-2-47-76
Reservoir Quality Monitoring Station P23-1-47-76
-
Groundwater Monitoring Well Irrigated Field
Stream Monitoring Point -
Station DescriptionNotes regarding water quality
monitoring station types
Upstream Mainstem Water Quality Monitoring Station; Powder River
Associated outfalls: All
Associated outfalls: All
Associated outfalls: AllDownstream Mainstem Water Quality
Monitoring Station; Powder River
Tributary Water Quality Monitoring Station;Beaver Creek
Reservoir Quality Monitoring Station P23-1-47-76
Tributary Water Quality Monitoring Station;Beaver Creek
Associated outfalls: All
Reservoir Quality Monitoring Station P14-2-47-76
Reservoir Quality Monitoring Station Mankin
Reservoir Quality Monitoring Station
Upstream Mainstem Water Quality Monitoring Station; Powder River
Associated outfalls: All
Please note that not all station types may be applicable for a particular facility. Additional spaces may be added if necessary. Use the format provided. Please denote reservoir type(s) - on channel, off-channel, playa, headwater Option 1B - in the appropriate column. Please note that reservoir information is not required if reservoir containment is not part of the facility's water management plan - for instance, information about existing "incidental" downstream reservoirs is not required. Please use North American Datum 1983 (NAD83) when reporting latitudes and longitudes.
Downstream Mainstem Water Quality Monitoring Station; Powder River
Associated outfalls: All
Reservoir Quality Monitoring Station Mary L. Hey
Groundwater Monitoring Well Irrigated Field
P11-1-47-76
Stream Monitoring Point
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 10 of 17
Discharge Point
(Outfalls) #
ImmediateReceiving
Stream
Mainstem(closest
perennialwater)
Distance to Closest 2AB Channel &
Mainstem (Miles)
Qtr/Qtr SecTwn(N)
Rng(W)
NAD 83Latitude
NAD 83Longitude
CountyReservoir
Name and Type
001 Lapin CreekPowder River
25.2 NESW 15 47 76 44.045436 -105.981938 CampbellMary L. Hey
Mankin(Option 2)
002Tributary to Beaver
CreekPowder River
24.3 NWNE 14 47 76 44.051750 -105.956720 CampbellP14-2-47-76
Mankin(Option 2)
003Tributary to Beaver
CreekPowder River
25.4 SENE 23 47 76 44.033668 -105.955398 CampbellMankin
(Option 2)
004Tributary to Beaver
CreekPowder River
25.6 NESW 23 47 76 44.030679 -105.962938 CampbellP23-1-47-76
Mankin(Option 2)
005Tributary to Beaver
CreekPowder River
25.6 SWSW 23 47 76 44.029150 -105.967031 CampbellMankin
(Option 2)
006Tributary to Beaver
CreekPowder River
26.5 SWNW 26 47 76 44.020606 -105.969088 CampbellMankin
(Option 2)
Station Name
Qtr/Qtr SecTwn(N)
Rng(W)
NAD 83Latitude
NAD 83Longitude
MW1 NENE 3 47 76 44.081430 -105.974850
MW3 NWSW 2 47 76 44.076820 -105.966390
STR1 SWNW 2 47 76 44.077250 -105.966310
R1 NESW 15 47 76 44.044979 -105.981643
R2 NWNE 14 47 76 44.054519 -105.958755
R3 NENW 11 47 76 44.069437 -105.962005
R4 NESW 23 47 76 44.032129 -105.963897
DPR SWNE 20 48 77 44.121949 -106.140138
TRIB1 NESE 20 48 77 44.117668 -106.132576
UPR SWSW 20 48 77 44.114396 -106.148259
Reservoir Quality Monitoring Station P23-1-47-76
Tributary Water Quality Monitoring Station;Beaver Creek
Associated outfalls: All
Reservoir Quality Monitoring Station P14-2-47-76
Reservoir Quality Monitoring Station Mankin
Please note that not all station types may be applicable for a particular facility. Additional spaces may be added if necessary. Use the format provided. Please denote reservoir type(s) - on channel, off-channel, playa, headwater Option 1B - in the appropriate column. Please note that reservoir information is not required if reservoir containment is not part of the facility's water management plan - for instance, information about existing "incidental" downstream reservoirs is not required.
Table 1B - Outfall Information as Proposed: WY0055638 - Pumpkin Creek POD II North
Notes regarding water quality monitoring station types
Station Description
Groundwater Monitoring Well Irrigated Field
Upstream Mainstem Water Quality Monitoring Station; Powder River
Associated outfalls: All
Downstream Mainstem Water Quality Monitoring Station; Powder River
Associated outfalls: All
Reservoir Quality Monitoring Station Mary L. Hey
Groundwater Monitoring Well Irrigated Field
Stream Monitoring Point -
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 11 of 17
Change Well Name API Number Coal SeamWell
Depth
Location(QQ, Section,
Township, Range)
Discharges to
Outfall #*
- Mankin 14-11-4776 49-005-59523 Big George 1294 SWSW 11-47-76 AWAO- Mankin 23-11-4776 49-005-59522 Big George 1152 NESW 11-47-76 AWAO- Mankin 34-11-4776 49-005-59521 Big George 1246 SWSE 11-47-76 AWAO- Mankin 43-11-4776 49-005-59524 Big George 1233 NESE 11-47-76 AWAO- Mankin Federal 12-14-4776BG 49-005-54083 Big George 1288 SWNW 14-47-76 AWAO- Mankin Federal 14-14-4776BG 49-005-53696 Big George 1373 SWSW 14-47-76 AWAO- Mankin Federal 21-14-4776BG 49-005-54762 Big George 1319 NENW 14-47-76 AWAO- Mankin Fed 23-14-4776BG 49-005-53695 Big George 1334 NESW 14-47-76 AWAO- Mankin Fed 32-14-4776BG 49-005-53694 Big George 1284 SWNE 14-47-76 AWAO- Mankin Federal 34-14-4776BG 49-005-54760 Big George 1362 SWSE 14-47-76 AWAO- Mankin Fed 41-14-4776BG 49-005-53693 Big George 1300 NENE 14-47-76 AWAO- Mankin Federal 43-14-4776BG 49-005-54761 Big George 1374 NESE 14-47-76 AWAO- Mary Hey Fed 23-15-4776BG 49-005-53691 Big George 1403 NESW 15-47-76 AWAO- Federal 32-22-4776BG 49-005-53690 Big George 1376 SWNE 22-47-76 AWAO- PC Federal 34-22-4776BG 49-005-53689 Big George 1371 SWSE 22-47-76 AWAO- Federal 41-22-4776BG 49-005-53688 Big George 1379 NENE 22-47-76 AWAO- PC Federal 43-22-4776BG 49-005-53730 Big George 1348 NESE 22-47-76 AWAO- PC Federal 14-23-4776BG 49-005-53729 Big George 1341 SWSW 23-47-76 AWAO- Mankin Federal 23-23-4776BG 49-005-53728 Big George 1338 NESW 23-47-76 AWAO- Federal 34-23-4776BG 49-005-54908 Big George 1535 SWSE 23-47-76 AWAO- Mankin Fed 43-23-4776BG 49-005-53727 Big George 1412 NESE 23-47-76 AWAO- Federal 12-26-4776BG 49-005-53195 Big George 1424 SWNW 26-47-76 AWAO- Federal 14-26-4776BG 49-005-53194 Big George 1424 SWSW 26-47-76 AWAO- Federal 21-26-4776BG 49-005-53192 Big George 1392 NENW 26-47-76 AWAO- Federal 23-26-4776BG 49-005-53193 Big George 1442 NESW 26-47-76 AWAO- Federal 32-26-4776BG 49-005-53191 Big George 1411 SWNE 26-47-76 AWAO- Federal 34-26-4776BG 49-005-53190 Big George 1407 SWSE 26-47-76 AWAO- Federal 41-26-4776BG 49-005-53189 Big George 1389 NENE 26-47-76 AWAO- Federal 43-26-4776BG 49-005-53953 Big George 1418 NESE 26-47-76 AWAO- Iberlin Fed 14-27-4776BG 49-005-54082 Big George 1273 SWSW 27-47-76 AWAO- Federal 23-27-4776BG 49-005-54081 Big George 1331 NESW 27-47-76 AWAO- PC Federal 32-27-4776BG 49-005-53168 Big George 1413 SWNE 27-47-76 AWAO- Federal 41-27-4776BG 49-005-53166 Big George 1365 NENE 27-47-76 AWAO- Federal 43-27-4776BG 49-005-53165 Big George 1415 NESE 27-47-76 AWAO- Iberlin Fed 41-35-4776BG 49-005-59492 Big George 1372 NENE 35-47-76 AWAO
Table 2 - Well Information: WY0055638 - Pumpkin Creek POD II North
*AWAO - All wells are permitted to discharge to all outfalls
Total Number of Wells: 35
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 12 of 17
Qtr/Qtr
SecTwn(N)
Rng(W)
NAD 83Latitude
NAD 83Longitude
UpdateFrom
P11-1-47-76 46.88 P13237R Not Available NENW 11 47 76 44.069467 -105.961539
UpdateTo
Mankin 46.88 P13237R Not Available NENW 11 47 76 44.069467 -105.961539
Update Mary L. Hey 2.31 P18931S Not Available NESW 15 47 76 44.044979 -105.981643
- P14-2-47-76 17.0 P18362S Not Available NWNE 14 47 76 44.054519 -105.958755
- P23-1-47-76 5.7 P18363S Not Available NESW 23 47 76 44.032129 -105.963897
Table 3 - Reservoir Information: WY0055638 - Pumpkin Creek POD II North
*Geographic location for on-channel impoundments represents the approximate of Center of Dam - Center of Channel. Location for off-channel impoundments represents the approximate center of the impoundment.
Desired Changes
Reservoir Name
ReservoirStorageVolume
(acre/feet)
SEO Permit #
SEO Reservoir Requirements
Location Geographic Location*
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 13 of 17
Desired Changes
Reservoir Name
Reservoir Bonding Authority
Reservoir Reclamation Volume* less
than 5000 cubic yards?
Reservoir Reclamation
Volume* between 5000
and 10,000 cubic yards
Reservoir Reclamation
Volume* greater than 10,000 cubic
yards
Reservoir constructed/ upgraded**
prior to September 1,
2005
Bond Currently
posted with bonding
authority?
UpdateFrom
P11-1-47-76 BLM X No Yes
UpdateTo
Mankin BLM X No Yes
- Mary L. Hey BLM X No Yes
- P14-2-47-76 BLM X Yes Yes
- P23-1-47-76 BLM X No Yes
** Reservoir constructed/upgraded information relates to the September 2005 memo in which topsoil stockpiling is required for the new construction or the upgrade of an existing reservoir, as defined by embankment enlargement or spillway excavation. The installation of a drainpipe does not require topsoil stockpiling.
A Yes response in this column represents that the reservoir has been constructed prior to September 2005, or a reservoir constructed before September 2005 that needs an upgrade that does not require the stockpiling of topsoil, e.g., drainpipe installation.
A No response in this column represents that the reservoir is not constructed, the reservoir requires upgrades which will require topsoil stockpiling on site, or the reservoir was constructed after September 1, 2005.
Table 4 - Bonding Information: WY0055638 - Pumpkin Creek POD II North
Please check only one "reservoir reclamation volume" box for each reservoir
* Reservoir Reclamation Volume is the volume of the reservoir embankment with topsoil. The reservoir may have been created by an embankment that is either a cross valley/draw fill or an excavation with the embankment on 3 or 4 sides. During reclamation, the embankment is usually placed in the location where earth was borrowed to create the embankment.
Please note that reservoir information is not required if reservoir containment is not part of the facility's water management plan - for instance, information about existing incidental downstream reservoirs is not required.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 14 of 17
Month
July 2014August 2014
September 2014October 2014
November 2014December 2014
*Flows are based on actual discharge from outfalls 001, 002, 003, 004, 005 and 006 during the months of July through December of 2014.
0.06150.05810.0511
0.0618
WY0055638 Pumpkin Creek POD II NorthFlow Data Table
*Average Maximum Total Facility Flow
*Maximum Total Facility Flow
*Total Daily Maximum Facility Flow(MGD)0.05650.05640.0618
0.0576
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 15 of 17
LABORATORY ANALYTICAL REPORT
Site Name: Pumpkin_Creek_POD_II_North
Client Sample ID DP_WY0055638_003
Collection Date: 01/19/11 14:59
Matrix: Aqueous
Client: Bill Barrett Corporation
Lab ID: G11010491-003
Report Date: 02/07/11
Date Received: 01/19/11
Location: Sampled By: Paul McElvery
Samp FRQ/Type: IN_A_S1_M
Project: WYPDES
Tracking Number: 182555
Revised Date: 02/11/11
Analyses Result Units Analysis Date / ByRL MethodQualifier Result Units
Prepared by Gillette, WY Branch
FIELD PARAMETERS
01/19/11 14:59 / ***umhos/cmConductivity, field FIELD2430
01/19/11 14:59 / ***s.u.pH, field FIELD8.32
*** Performed by Sampler
MAJOR IONS, DISSOLVED
02/01/11 10:04 / mlimg/LBicarbonate as HCO3 A2320 B28.81750 5 meq/L
01/24/11 19:13 / japmg/LChloride E300.00.238 1 meq/L
01/24/11 19:13 / japug/LFluoride E300.01730 100
01/24/11 19:13 / japmg/LSulfate E300.00.032 1 meq/L
D 02/01/11 16:28 / eli-bmg/LCalcium E200.71.2525 2 meq/L
02/01/11 16:28 / eli-bmg/LMagnesium E200.72.2327 1 meq/L
02/01/11 16:28 / eli-bmg/LPotassium E200.70.3413 1 meq/L
D 02/01/11 16:28 / eli-bmg/LSodium E200.726.3604 2 meq/L
METALS, DISSOLVED
01/24/11 18:58 / eli-bug/LAluminum E200.8ND 50
01/24/11 18:58 / eli-bug/LCadmium E200.8ND 0.1
01/24/11 18:58 / eli-bug/LCopper E200.81 1
02/01/11 16:28 / eli-bug/LIron E200.7ND 30
01/24/11 18:58 / eli-bug/LLead E200.8ND 2
01/21/11 17:45 / eli-bug/LManganese E200.727 10
01/24/11 18:58 / eli-bug/LMercury E200.8ND 0.06
01/24/11 18:58 / eli-bug/LZinc E200.8ND 10
METALS, TOTAL RECOVERABLE
01/22/11 11:05 / eli-bug/LArsenic E200.81.9 0.5
01/22/11 11:05 / eli-bug/LBarium E200.8847 100
01/22/11 11:05 / eli-bug/LSelenium E200.8ND 5
NON-METALS
02/01/11 10:04 / mlimg/LAlkalinity, Total as CaCO3 A2320 B1490 5
02/03/11 12:00 / jlwmg/LHardness as CaCO3 A2340 B170 10
02/03/11 12:00 / jlwunitlessSodium Adsorption Ratio (SAR) Calculation19.9 0.1
D 01/24/11 15:11 / mlimg/LSolids, Total Dissolved TDS @ 180 C A2540 C1560 20
RADIONUCLIDES - TOTAL
02/01/11 11:08 / eli-cpCi/LRadium 226 E903.00.19
02/01/11 11:08 / eli-cpCi/LRadium 226 precision (±) E903.00.14
02/01/11 11:08 / eli-cpCi/LRadium 226 MDC E903.00.13
ReportDefinitions:
RL - Analyte reporting limit. MCL - Maximum contaminant level.
QCL - Quality control limit. ND - Not detected at the reporting limit.
MDC - Minimum detectable concentration D - RL increased due to sample matrix.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 16 of 17
WYPDES Permit WY0055638 - Pumpkin Creek POD II North: Exceedance Summary TableTable Date: 5/11/2015
Permitted StationExceedingConstituent
Sample Date
Sample Result
Date Reported to
WDEQ
Compliance Attained
Y/NInformation Reported to WDEQ
11/11/2010 3060 12/14/2010 NoDoes not reflect historical data for permit. Resample two times in next three months pending flow.
12/29/2010 536
1/19/2011 76
Vanguard Operating, LLC
WY0055638_002 Fe, dissolved2/11/2011 Yes Fully addressed. Two consecutive samples in compliance.
WYPDES Permit WY0055638 Vanguard Operating, LLC
Pumpkin Creek POD II North - Renewal HUC 10 - 1009020205
June 2, 2015 Page 17 of 17
Ç* Ç*
Ç* Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
Ç*
%
%
%
%
K
K
K
K
%
%
C
C
8
8B
_
_
_
_
_
_
ëë
ëë
`a
R4
R3
R2
R1
MW3
MW1
003
002
006
005
004
001
STR1
8 9
5 4 23 1
11
28 25
24
29
23
17
22
16
20
14
21
1315
2627
10 12
Iberlin Ranch Ltd.
MankinP13237R
Mary L. HeyP18931S
P23-1-47-76P18363S
P14-2-47-76P18362S
419000
419000
420000
420000
421000
421000
422000
422000
423000
423000
424000
424000
4874
000
4874
000
4875
000
4875
000
4876
000
4876
000
4877
000
4877
000
4878
000
4878
000
4879
000
4879
000
4880
000
4880
000
4881
000
4881
000
InterTech E&E, [email protected]
M:\Projects\Vanguard\Pumpkin_Creek_POD_II_North\Projects\WY0055638_PR_20150528.mxd
Pumpkin Creek POD II NorthWYPDES
Permit Renewal WY0055638
HUC 10 - 1009020205May 28, 2015
Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*
Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*Ç*
Ç*Ç*
Ç*
__
%K%K%K
__
%K%K%K
%K__
%C 8%C 8B ëë
ë
ë
`aBeaver Creek
Dead Horse Creek
Pumpkin Creek
Culp Draw
Burger Draw
Indian Creek
Red Draw
Curtis Draw
Van Houten Draw
Hynes Draw
Fourmile Creek
North Fork Pumpkin Creek
Hupp Draw
I-90
Schoonover Rd
Napie r Rd
Beaver Creek Rd / Iberlin Rd
SchoonoverBarlo
w
0 0.5 1Miles
Ü1:24,000
Explanation`a Nearest Downstream Irrigator
ë On-Channel Impoundment, Existing
B Stream Monitor Station
%C 8 Monitoring Well
_ Outfall, Constructed
%K RQMS
%K WQMS
Ç* CBNG Well - Fed
Ç* CBNG Well - Fee
Ç* CBNG Well - State
County Road
Highway
Interstate
Railroad
R75W R74W
T49NT48N
Powder River-Dead Horse CreekHUC - 1009020205
DetailBoundary
T47N R76W
%K
%K
%K
28
21
2930
2019
T48N R77W
DPR
UPR
TRIB1
Beaver Creek
Powder River
WQMS
R77W R76W
T48NT47N
R76W R75W
WQMS Inset
R78W R77W
T47NT46N