New York City Department of Environmental Protection 59-17 Junction Boulevard Flushing, New York 11373 Vincent Sapienza Commissioner Elisa Velazquez Assistant Commissioner Agency Chief Contracting Officer For Furnishing all Labor and Material Necessary and Required for: Contract: CAT-213F Description: CHEMICAL ADDITION FACILITY AT THE PLEASANTVILLE ALUM PLANT ADDENDUM 3 April 4, 2018

Upload: others

Post on 26-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: For Furnishing all Labor and Material Necessary and

New York City Department of Environmental Protection

59-17 Junction Boulevard Flushing, New York 11373

Vincent Sapienza Commissioner

Elisa Velazquez Assistant Commissioner Agency Chief Contracting Officer

For Furnishing all Labor and Material Necessary and Required for:

Contract: CAT-213F

Description: CHEMICAL ADDITION FACILITY AT THE PLEASANTVILLE ALUM PLANT

ADDENDUM 3

April 4, 2018

Page 2: For Furnishing all Labor and Material Necessary and

i Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF ENGINEERING DESIGN AND CONSTRUCTION TO ALL BIDDERS FURNISHING ALL LABOR AND MATERIALS NECESSARY AND REQUIRED FOR:

Contract CAT-213F-G, E

Chemical Addition Facility at Pleasantville Alum Plant

This Addendum is issued for the purpose of amending the requirements of the Contract Documents and is hereby made a part of said Contract Documents to the same extent as though it were originally included therein. The pages of this Addendum are numbered sequentially. All Bidders should check this Addendum carefully to verify that all pages are included. Should any pages be missing, notify the Department of Environmental Protection in writing as soon as possible. Please be advised, the correct bid date is set for April 12, 2018 at 11:30AM

ADDENDUM TABLE OF CONTENTS UItem UPage No.

Addendum Table of Contents ................................................................................................................ i Signature Page ...................................................................................................................................... ii Addendum No. 3 ....................................................................................................................................1 Specifications .........................................................................................................................................1 Contract Drawings .................................................................................................................................1 List of Attachments ................................................................................................................................2 Attachments ................................................................................................................. following page 2 FOR INFORMATION ONLY: Response to Bidders Questions ............................................................................... at end of Addendum

Page 3: For Furnishing all Labor and Material Necessary and

ii Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

This signature page must be signed, dated, and detached from the book and submitted by the bidder with his/her bid as an acknowledgement of receipt of, having read, and inclusion of same in his/her bid. Vincent Sapienza, PE Commissioner __________________________________ NAME OF BIDDER By _______________________________ Date: _____________________________

Contracts CAT-213F-G, E Chemical Addition Facility at Pleasantville Alum Plant Addendum to Contract Documents, No. 3

Page 4: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF ENGINEERING DESIGN AND CONSTRUCTION

Contract CAT-213F-G, E

CHEMICAL ADDITION FACILITY AT PLEASANTVILLE ALUM PLANT is amended as follows:

SPECIFICATIONS

DETAILED SPECIFICATIONS – STRUCTURES AND EQUIPMENT CONTRACT 1. Page 2010, Detailed Specification 16133G – Underground Ducts – Ducts in Concrete, add the

following as Article 2.04.B and renumber the following item accordingly:

“B. A warning ribbon shall be installed approximately 12 inches below finished grade over all underground duct banks carrying cables of 208 volts and higher.”

2. Page 2010, Detailed Specification 16133G – Underground Ducts – Ducts in Concrete, add the following as Article 2.05.A and renumber the following item accordingly:

“A. All ducts entering buildings and structures shall be sealed. All empty spare ducts shall be sealed and plugged.”

CONTRACT DRAWINGS CONTRACT DRAWINGS – STRUCTURES AND EQUIPMENT CONTRACT 1. See Drawing 213F-S-02 for drawing changes.

2. See Drawing 213F-I-04 for drawing changes.

3. See Drawing 213F-H-02 for drawing changes. CONTRACT DRAWINGS – ELECTRICAL CONTRACT 1. See Drawing 213F-E-07 for drawing changes.

2. See Drawing 213F-E-08 for drawing changes.

3. See Drawing 213F-E-09 for drawing changes.

Page 5: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

LIST OF DWG ATTACHMENTS Dwg Attachment No. 1 – Dwg 213F-S-02 (Sheet 31 of 60) Dwg Attachment No. 2 – Dwg 213F-I-04 (Sheet 50 of 60) Dwg Attachment No. 3 – Dwg 213F-H-02 (Sheet 54 of 60) Dwg Attachment No. 4 – Dwg 213F-E-07 (Sheet 7 of 9) Dwg Attachment No. 5 – Dwg 213F-E-08 (Sheet 8 of 9) Dwg Attachment No. 6 – Dwg 213F-E-09 (Sheet 9 of 9)

*****

Page 6: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

Drawing Attachment 1

Drawing 213F-S-02

Page 7: For Furnishing all Labor and Material Necessary and

N

28'-

8"

FRP STAIRS, SEESPEC 06610, TYP

TYP

EQPT PAD

0331600

213F-S-05

A____213F-S-05

A____

12"

2'-

0"

12"

10' - 0"12' - 0"8' - 0" 20' - 0"

EQPT PAD

0331600

213F-S-05

B____

213F-S-05

B____

17"

8'-

6"

8'-

5"

5'-

71/2

"

CONC PLATFORMSUPPORT, TOC 363.29BELOW GRTG, TYP

TOC 363.37

EQPT PAD

0331600

213F-S-05

C____

SLO

PE

SLOPE

SLO

PE

SLOPE

HPT 360.50 , TYP

LPT 360.33 , TYP

SLO

PE

SLO

PE

SLOPE

SLOPE

6'-

3"

10' - 0"

1" EXP JT MATL& SEALANT

4' - 11"3' - 0"

4'-

11"

12"

HPT 360.50 , TYP

8" 52' - 0"30'-

8"

TYP

12"

EQPT PAD

0331600

213F-S-05

D____

213F-S-05

E____

5'-

1"

12"

4'-

2"

4'-

11"

TYP

2' - 0"

4' - 6"

12"12"

TYP

4' - 0" 12"

TYP

6" MIN

TYP

6" MIN

6' - 5"

4'-

5"

213F-S-03

G____

213F-S-03

G____

213F-S-03

F____

6"

6"

x EL 359.50x EL 360.50

____213F-S-02

2 TYP

213F-S-03

H____

2"

12"

8"

9' - 6"4' - 6"

TWO CONDUIT DUCT BANKS SHALL PENETRATETHE CONC WALL AT THIS LOCATION, COORDINATEW/ ELEC AND DTL 1/213F-S-02

12"6' - 10"

4'-

5"

14"

14"

#4 CLOSED TIES@10" OC

4-#5 BARS

NOTES:1. COORDINATE REBAR LOCATIONS WITH FRP

ATTACHMENTS TO AVOID INTERFERENCE.2. SEE STANDARD DETAIL 0331800.3. TOP OF CONCRETE 363.50 (14"x14" COLUMN).4. TOP OF CONCRETE 363.29 (12"x12" COLUMN).

5. REBAR SIMILAR FOR 12"x12" COLUMN.

EL 362.21

EL 362.92

#4@12" EF DEFLECTION/EXP FITTING

PVC RGSCONDUIT

PVC WELD, TYP

PVC WS FLANGE, TYP

#5@12"

EL 364.17

1"Øx1'-1" LONG PVC PIPE SLEEVEW/ END CAP, FILLED W/ GREASE

3/4"Ø SMOOTH CARBONSTEEL COATED DWL, TYP

WATERSTOP, TYP

NOTES:1. BOX OUT WALL OPENING WITH WATERSTOP

INSTALLED AROUND PERIMETER OF OPENING.2. COORDINATE REBAR LOCATIONS WITH CONDUITS

TO AVOID INTERFERENCE.3. SECTIONS B-B AND C-C REPRESENT TWO

SEPARATE CONDUIT DUCT BANKS PENETRATINGTHE WEST WALL.

#4@12" EF

12"

JT SEALANT, BACKER ROD ANDWATERSTOP AROUND PERIMETER OFBANK, SEE STD DTL 0325100, SIM

B-B/C-C

B-B/C-C12"

MIN

6 1/2"

MIN

6 1/2"

MIN

61/2

"

MIN

61/2

"

CONT #4 BAR, TYP

#3@12" C/C

#4/O GROUND CABLE

3/4"Øx2'-0" LONG SMOOTH CARBONSTEEL EPOXY COATED DWLSCENTERED ON EXP JT, TYP OF 3

3" PVC, SCHEDULE 40CONDUIT

MIN

61/2

"

MIN

61/2

"

CONT #4 BAR, TYP

#3@12" C/C

#4/O GROUND CABLE

3/4"Øx2'-0" LONG SMOOTH CARBONSTEEL EPOXY COATED DWLSCENTERED ON EXP JT, TYP OF 4

MIN

6 1/2"

MIN

7"

MIN

6 1/2"2" PVC , SCHEDULE 40CONDUIT

61/2

"6

1/2

"

CONT #4 BAR, TYP

#3@12" C/C

#4/O GROUND CABLE

6 1/2" 7" 7" 6 1/2"

27"

13"

3" PVC, SCHEDULE 40CONDUIT

2" PVC , SCHEDULE 40CONDUIT

DESIGNED BY:

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

PROJECTENGINEER:

DRAWN BY:

CHECKED BY:

0 1/2" 1"

APPROVED FOR THE CITY OF NEW YORK

ACCOUNTABLE MANAGER

PORTFOLIO MANAGER

P.E.

P.E.

THE CITY OF NEW YORK

BUREAU OF ENGINEERING DESIGN & CONSTRUCTION

DEPARTMENT OFENVIRONMENTAL PROTECTION

CAPITAL PROJECT CAT-329CHEMICAL ADDITION FACILITY AT PLEASANTVILLE ALUM PLANT

CONTRACT NO. CAT-213F-G

P.E.

DATE FEBRUARY 2018

HAZEN NO

CONTRACT NO

09490-213F

DRAWINGNUMBER

SHEET OF 60

IT IS A VIOLATION OF SECTION 7209.2 OF THE NEW YORK STATEEDUCATION LAW FOR ANY PERSON, UNLESS ACTING UNDER THEDIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER INANY WAY PLANS, SPECIFICATIONS, PLATS OR REPORTS TO WHICHTHE SEAL OF A PROFESSIONAL ENGINEER HAS BEEN APPLIED. IF ANITEM BEARING THE SEAL OF A PROFESSIONAL ENGINEER IS ALTERED,THE ALTERING ENGINEER SHALL AFFIX TO THE ITEM HIS SEAL ANDTHE NOTATION "ALTERED BY" FOLLOWED BY HIS SIGNATURE, THEDATE, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.

WARNING

JAH

MATTHEW JESUP

WENDY SPERDUTO

0

C:\

Users

\rchung\D

ocum

ents

\213F-S

TRU_rc

hung@

haze

nandsaw

yer.

com

.rvt

4/4

/2018

1:5

3:3

8PM

BULK CHEMICAL STORAGE - BOTTOM PLAN AT EL360.50

DMK

KWG

DRK213F-S-02

31

STRUCTURAL

3/8" = 1'-0"

BOTTOM PLAN1/4" = 1'-0"

1 1 3 7'0 2

DETAIL1" = 1'-0" 213F-S-02

2

DETAIL1" = 1'-0"

1

1/213F-S-02

SECTION B-B

1/213F-S-02

SECTION C-C

?

SECTION A-A

REV ISSUED FOR DATE BY

ISSUED FOR BIDS FEB 2018 REP

1 ADDENDUM 3 APR 2018 REP

213F-C-06/E-04/E-07

1/213F-S-02/C-06/E-04/E-07

1/213F-S-02/C-06/E-04/E-07NOTES:

1. CONCRETE DUCTBANK AND ENCASED CONDUITS AND ALL ASSOCIATEDACCESSORIES SHALL BE FURNISHED AND INSTALLED UNDER THE 213F-GCONTRACT IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND DETAILEDSPECIFICATION 16133G. WIRE AND CABLES SHALL BE FURNISHED AND

INSTALLED UNDER THE 213F-E CONTRACT IN ACCORDANCE WITH THECONTRACT DRAWINGS AND DETAILED SPECIFICATION 16121E.

1

1

1

1

1

1

1

Page 8: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

Drawing Attachment 2

Drawing 213F-I-04

Page 9: For Furnishing all Labor and Material Necessary and

AA

AA

HH

JAH

INSTRUMENTATION213F-I-04

50

P&ID - MOTIVE WATER SYSTEMIF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

REV ISSUED FOR DATE BY

09490-213F

-CONTRACT NO.

HAZEN NO.

DATE FEBRUARY 2018

DRAWINGNUMBER

SHEET OF

THE CITY OF NEW YORK

ENVIRONMENTAL PROTECTIONBUREAU OF ENGINEERING DESIGN & CONSTRUCTION

DEPARTMENT OF

P.E. 60PORTFOLIO MANAGER

APPROVED FOR THE CITY OF NEW YORK

ACCOUNTABLE MANAGER

P.E.

P.E.

0 ISSUED FOR BIDS FEB 2018 REP

1 ADDENDUM 3 APR 2018 REP

Page 10: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

Drawing Attachment 3

Drawing 213F-H-02

Page 11: For Furnishing all Labor and Material Necessary and

DMK

JC

SB

JAH

HVAC213F-H-02

HVAC SCHEDULES54

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

REV ISSUED FOR DATE BY

09490-213F

-CONTRACT NO.

HAZEN NO.

DATE FEBRUARY 2018

DRAWINGNUMBER

SHEET OF

THE CITY OF NEW YORK

ENVIRONMENTAL PROTECTIONBUREAU OF ENGINEERING DESIGN & CONSTRUCTION

DEPARTMENT OF

P.E. 60PORTFOLIO MANAGER

APPROVED FOR THE CITY OF NEW YORK

ACCOUNTABLE MANAGER

P.E.

P.E.

0 ISSUED FOR BIDS FEB 2018 REP

1 ADDENDUM 3 APR 2018 REP

Page 12: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

Drawing Attachment 4

Drawing 213F-E-07

Page 13: For Furnishing all Labor and Material Necessary and

RC

RC

HH

JAH

ELECTRICAL213F-E-07

DETAILSIF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

REV ISSUED FOR DATE BY

09490-213F

-CONTRACT NO.

HAZEN NO.

DATE FEBRUARY 2018

DRAWINGNUMBER

SHEET OF

THE CITY OF NEW YORK

ENVIRONMENTAL PROTECTIONBUREAU OF ENGINEERING DESIGN & CONSTRUCTION

DEPARTMENT OF

P.E. 9PORTFOLIO MANAGER

APPROVED FOR THE CITY OF NEW YORK

ACCOUNTABLE MANAGER

P.E.

P.E.

0 ISSUED FOR BIDS FEB 2018 REP 7

· PP1-001· COMM-001· COMM-002

LEFT TO RIGHT

· COMM-001· COMM-002

LEFT TO RIGHT

· PP1-001

1/2"=1'-0"

SECTION A-A1/2"=1'-0"

SECTION B-B1/2"=1'-0"

SECTION C-C

TYPICAL POWER AND CONTROL WIRINGWITH LOCAL DISCONNECT SWITCH

NTS

DETAIL

FIRE RATED FLOORS USE TYPE CFS AND/OR

SYSTEM CONDUIT

BY THE ENGINEER.

O-Z/GEDNEY OR EQUAL APPROVED

CFSI SMOKE AND FIRE STOP

FITTINGS MANUFACTURED BY

FLOOR SEAL OR SEALING BUSHING . FOR

TYPICAL THRU FLOOR CONDUIT

OVER SIZED SLEEVE

TOP OF FINISHED CONCRETE

OR EXISTING CONSTRUCTION

FLOOR SLAB-INTERIOR NEW

NTS

DETAIL

TYPICAL THRU WALL CONDUIT BANK

EQUAL APPROVED BY THE ENGINEER

FOR FIRE OR NON FIRE RATED WALLS

MANUFACTURED BY CROUSE-HINDS OR

USE TW SERIES "THRU-WALL BARRIER"

SUITABLE FOR TYPE OF APPLICATION

INTERIOR OR EXTERIOR

NEW OR EXISTING CONSTRUCTION

BLOCK OR CONCRETE WALL

FILL IN VOIDS ALL ROUND

WITH FIRE BARRIER CAULK

OR PUDDY AS REQ'D

SYSTEM CONDUITS

NTS

DETAIL

COMPRESSIBLE LINK TYPESEAL, TWO REQUIRED FORWALL THICKNESS GREATERTHAN 10"

FOR CONDUIT DIA 4" AND LESS,THE WALL PENETRATION FOREXISTING WALLS MAY BE COREDRILLED AND SEALED WITHCOMPRESSIBLE LINK TYPE SEAL.

NONSHRINK GROUT

WALL PIPE WITH INTEGRALWATERSTOP (PExPE)

CONDUIT, 6" DIAMAX

STAINLESS STEEL BOLTS

NEW CONCRETE WALL

EXISTING CONCRETE WALL

6"

TYPICAL CONDUIT THRU CONCRETE WALL

NTS

DETAIL

1 ADDENDUM 3 APR 2018 REP

Page 14: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

Drawing Attachment 5

Drawing 213F-E-08

Page 15: For Furnishing all Labor and Material Necessary and

RC

RC

HH

JAH

ELECTRICAL213F-E-08

8

CABLE AND CONDUITSCHEDULE SHEET 1 OF 2

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

REV ISSUED FOR DATE BY

09490-213F

-CONTRACT NO.

HAZEN NO.

DATE FEBRUARY 2018

DRAWINGNUMBER

SHEET OF

THE CITY OF NEW YORK

ENVIRONMENTAL PROTECTIONBUREAU OF ENGINEERING DESIGN & CONSTRUCTION

DEPARTMENT OF

P.E. 9PORTFOLIO MANAGER

APPROVED FOR THE CITY OF NEW YORK

ACCOUNTABLE MANAGER

P.E.

P.E.

0 ISSUED FOR BIDS FEB 2018 REP

CONDUITSIZE

CONDUITFILL

FROM TO COMMENTS

PP1-001 3" 3#4/0+ 1#6 GND EXISTING PANEL MDP PANEL PP1

PP1-002

PP1-003

PP1-004

PP1-005

PP1-006

PP1-007

PP1-008

PP1-009

PP1-010

PP1-011

PP1-012

PP1-013

PP1-014

PP1-015

LP1-001

LP1-002

LP1-003

LP1-004

LP1-005

LP1-006

LP1-007

LP1-008LP1-009

LP1-010

LP1-011

LP1-012

2" LCS-220/MW-STARTER 12" P-220

PANEL PP1 DSW-AHU-1

DSW-AHU-1 AHU-1

PANEL PP1 LCS-320

LCS-320 MP-320

4#6 + 1#6 GND PANEL PP1 PANEL LP1

3#8 + 1#8GND PANEL PP1 DSW-EDH-1

1" PANEL LP1 PANEL HCP-11" PANEL LP1 PANEL MCP-11" VF-2111" VF-2121" MBV-2111" MBV-3011" MBV-3021" MBV-3031" MBV-3111"

1"

1"

TYPE

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

LP1-013

LP1-014

LP1-015

LP1-016

LP1-017

1"

1"

P-240

1"

DSW-EWH-1

1"

EWH-1

1"

DSW-SF-1

SF-1

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

HCP1-001

HCP1-002

HEAT TRACE SYSTEM 7

P-260 STARTER

ESD-1

HCP1-003

HCP1-004

HCP1-005

HCP1-006HCP1-007

HCP1-008

HCP1-009

1" MCP-11" EF-1 STARTER1" AHU-1

1" MD-1

1" MD-2

PVC RGS

PVC RGSPVC RGS

PVC RGS

PVC RGS

PP1-016

PP1-017

PP1-018PP1-019

PP1-020

DSW-EDH-1 EDH-1

PANEL PP1 DSW-EUH-1

DSW-EUH-1 EUH-1

PANEL PP1 DSW-EUH-2

DSW-EUH-2 EUH-2

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PP1-021

PP1-022

PP1-023

PP1-024

PP1-025

2#12 + 1#12 GND PANEL PP1 HEAT TRACE SYSTEM 1PANEL PP1

PANEL PP1

PANEL PP1

PANEL PP1

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PP1-026 PANEL PP1PVC RGS

HCP1-010 1" HUMIDISTATPVC RGS

SEE NOTE 1

PANEL LP1

PANEL LP1

PANEL LP1

PANEL LP1

PANEL LP1

PANEL LP1

PANEL LP1

PANEL LP1

PANEL LP1

DSW-EWH-1PANEL LP1

DSW-SF-1PANEL LP1

PURPOSE

EXISTING PANEL MDP

LCS-220/MW-STARTER 1PVC RGS

2" LCS-221/MW-STARTER22" P-221

EXISTING PANEL MDP

LCS-221/MW-STARTER2

PANEL PP1 LCS-321

LCS-321 MP-321PANEL PP1 LCS-322

LCS-322 MP-322

HEAT TRACE SYSTEM 2

HEAT TRACE SYSTEM 3HEAT TRACE SYSTEM 4

HEAT TRACE SYSTEM 5

HEAT TRACE SYSTEM 6

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

3#8 + 1#8GND

3#8 + 1#8GND

3#8 + 1#8GND

3#8 + 1#8GND

3#8 + 1#8GND

3#1/0 + 1#6 GND

3#4/0 + 1#6 GND

3#4/0 + 1#6 GND

3#4 + 1#6 GND

3#4 + 1#6 GND

3#4 + 1#6 GND

3#4 + 1#6 GND

3#4 + 1#6 GND

3#4 + 1#6 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

3#12 + 1#12 GND

3#12 + 1#12 GND

3#12 + 1#12 GND

3#12 + 1#12 GND

2#12 + 1#12 GND

3#12 + 1#12 GND

3#12 + 1#12 GND

3#12 + 1#12 GND

3#10 + 1/10 GND

3#10 + 1#10 GND

2#12 + 1#12 GND

3#12 + 1#12 GND

3#12 + 1#12 GND

6#14

2#14 + 1#14 GND

4 #14

2 #14 + 1 #14 GND

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

CONDUITNO.

PANEL HCP1

PANEL HCP1PANEL HCP1

PANEL HCP1

CONDUITSIZE

CONDUITFILL

FROM TO COMMENTSTYPE

PURPOSE

MCP1-001

MCP1-002

MCP1-003

MCP1-004

MCP1-005

MCP1-006

MCP1-007

MCP1-008

MCP1-009

1" PANEL LP1 LCS-240

1"

1"

1"

1"

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

PANEL MCP-1

PANEL MCP-1

AIT-200

AIT-201

AIT-225

AIT-226

MCC-001 2" 3#8 + 1#8 GND EXISTING PANEL MCC P-241PVC RGS POWER

CONDUITNO.

AIT-400

AIT-201

AIT-225

P-280PANEL LP1

P-260PANEL LP1

ESD-2

ESD-3

MODBUS CABLE

6 #14MODBUS CABLE

4 #14

3#1/0 + 1#6 GND

3#1/0 + 1#6 GND

3#1/0 + 1#6 GND

MCP1-011

MCP1-012

MCP1-013

MCP1-014

MCP1-015

MCP1-016

MCP1-017

MCP1-018

MCP1-019

1" LAS-3001"

1"

1"

1"

1"

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

PANEL MCP-1

PANEL MCP-1

LAS-201

LAS-301

FIT-320

FIT-321

FIT-322

LAS-321

LAS-322

FIT-220

MCP1-010 1" PANEL MCP-1 LAS-200PVC RGS 2#12 + 1#12 GND

PANEL MCP-1 FIT-211

PANEL MCP-1 FIT-212

MCP1-022

MCP1-023

MCP1-024

MCP1-025

1"

1"PVC RGS

PVC RGS

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

LAS-323

LAS-324

AIT-227

AIT-228

MCP1-020 1" PVC RGS 2#12 + 1#12 GND

MCP1-021 1" PVC RGS 2#12 + 1#12 GND

HCP1-011

HCP1-012

1"

1"PVC RGS

PVC RGS

HCP1-013

HCP1-014

HCP1-015

HCP1-016HCP1-017

HCP1-018

HCP1-019

1"

1"

1"

1"1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGSPVC RGS

PVC RGS

PVC RGS

PANEL HCP1

1 #16 TWSP PANEL HCP1PANEL HCP1

PANEL HCP1

PANEL HCP1

PANEL HCP1PANEL HCP1

PANEL HCP1AHU-1

2 #14

HEAT SOURCE WATER FLOW SWITCH

HEAT TRACING CONTROLLER

SPACE THERMOSTAT

HEAT SOURCE SUPPLY TEMP SENSOR

HEAT SOURCE RETURN TEMP SENSOR

GLYCOL FLOW SWITCH

GLYCOL SOURCE TEMP SENSOR

GLYCOL SOURCE TEMP SENSOR

4 #14 + 1 #14 GND

1 #16 TWSP

1 #16 TSWP

1 #16 TSWP

4 #14 + 1 #14 GND

GLYCOL PRESSURE SENSOR2 #14 + 1 #16 TWSP

2 #14 + 1 #16 TWSP

HCP1-020 1" PVC RGS LAS-321

HCP1-021 1" PVC RGS LAS-322

HCP1-022 1" PVC RGS LAS-323

HCP1-023 1" PVC RGS LAS-324

2 #14

2 #14

2 #14

2 #14

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

POWER

HCP1-024 1" PVC RGS ESD-1

HCP1-025 1" PVC RGS ESD-2

HCP1-026 1" PVC RGS ESD-3

2 #14

2 #14

2 #14

PANEL AHU-1

PANEL ESD-1

PANEL ESD-2

2#14 + 1#14 GND

2#14 + 1#14 GND

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL MCP-1

PANEL HCP1

PANEL HCP1

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

1"

1"1"

1"

PVC RGS

PVC RGSPVC RGS

PVC RGS

PANEL HCP1

PANEL HCP1PANEL HCP1

SIGNAL

SIGNAL

SIGNAL

SIGNAL

PANEL HCP1

PANEL HCP1

PANEL HCP1

LP1-018

LP1-019

LP1-020

LP1-021

1"

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

DSW-SF-1PANEL LP12#12 + 1#12 GNDPANEL LP1

PANEL LP1

POWER

POWER

POWER

POWER

2#12 + 1#12 GND

2#12 + 1#12 GND

2#12 + 1#12 GND

LAS-321

LAS-322

LAS-323

LAS-324

1" PANEL MCP-1 LCS-220PVC RGS 2#12 + 1#12 GND POWER

LP1-022

LP1-023

1"

1"PVC RGS

PVC RGS

LAS-300

LAS-301

POWER

POWER2#12 + 1#12 GND

2#12 + 1#12 GND

LSH-300

LIT-301

1"

1"PVC RGS

PVC RGS

PANEL HCP1

PANEL HCP1

LP1-024

LP1-025

1"

1"PVC RGS

PVC RGS

LAS-200

LAS-201 POWER2#12 + 1#12 GND

2#12 + 1#12 GND

LSH-200

LIT-201

POWER

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

1 ADDENDUM 3 APR 2018 REP

Page 16: For Furnishing all Labor and Material Necessary and

Addendum No. 3 Contracts CAT-213F-G, E 4/2/18

Drawing Attachment 6

Drawing 213F-E-09

Page 17: For Furnishing all Labor and Material Necessary and

RC

RC

HH

JAH

ELECTRICAL213F-E-09

9

CABLE AND CONDUITSCHEDULE SHEET 2 OF 2

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

REV ISSUED FOR DATE BY

09490-213F

-CONTRACT NO.

HAZEN NO.

DATE FEBRUARY 2018

DRAWINGNUMBER

SHEET OF

THE CITY OF NEW YORK

ENVIRONMENTAL PROTECTIONBUREAU OF ENGINEERING DESIGN & CONSTRUCTION

DEPARTMENT OF

P.E. 9PORTFOLIO MANAGER

APPROVED FOR THE CITY OF NEW YORK

ACCOUNTABLE MANAGER

P.E.

P.E.

0 ISSUED FOR BIDS FEB 2018 REP

CONDUITSIZE

CONDUITFILL

FROM TO COMMENTS

--

-

-

-

-

-

-

-

-

1" 6 #14 LSL-201 LAS-201

-

-

1.5" 14 #14 LCS-220 MCP-1

-

1.5"

-

1.5"

-

1.5"

-

1" PSH-220

-

1" PSH-221

-

1" FE-220

-

TYPE

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

COMM-072

COMM-073

COMM-074

COMM-075

COMM-076

COMM-077

COMM-078

COMM-079

COMM-080

COMM-081

COMM-082

COMM-083

COMM-084

COMM-085

COMM-086

COMM-087

COMM-088

COMM-089

COMM-090

COMM-091

COMM-092

COMM-093

COMM-094

COMM-095

COMM-096

COMM-097

1"1" FIT-2201" FE-2111" FE-2121"

1"

2" HCP-11" FSH-321 LAS-3211"

1"

2"

2"

2"

2"1"

1" ALUM PLANT RTU

1" CCTV CAMERA1" LCS-2401" LCS-241

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

14 #14

2 #14

2 #14

1 #16 TWSP

FIT-220

MCP-1

FIT-211

FIT-212

1 #16 TWSP

1 #16 TWSP

34 #14 + 1 CAT6

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

AIT-201

COMM-098COMM-099

COMM-100

4 #14

4 #14

4 #14

CAT614 #14

14 #14

1.5" LCS-320

1.5" LCS-3211.5" LCS-3221" AE-201

PVC RGS

PVC RGS

PVC RGS

PVC RGS

8 #14 + 2 #16 TWSP

8 #14 + 2 #16 TWSP

MANF CABLE.

COMM-101

COMM-102

PURPOSECONDUIT

SIZECONDUIT

FILLFROM TO COMMENTS

COMM-003

COMM-004

COMM-005

COMM-006

COMM-007

COMM-008

COMM-009

COMM-010

COMM-011

LSH-300 LAS-300 -1" 2 #14 -

1" LAS-300 MCP-1 -

1" LSL-301 LAS-301 -

1" LSH-301 -

1" 1 #16 TWSP LIT-201 -

1" 2 #14 LAS-200 -

1" 2 #14 LSH-200 LAS-200 -

1" LE-201 LIT-201 -

1" LSH-201 LAS-201 -

1" -

1"LE-301 LIT-301

-

1"1 #16 TWSP LIT-301 LAS-301

-

1"LAS-301 LCS-320

-

1"LAS-301 LCS-321

-

1"LAS-301 LCS-322

-

1"PSL-320

-

1"PSL-321

-

1"PSL-322

-

TYPE

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

COMM-012

COMM-013

COMM-014

COMM-015

COMM-016

COMM-017

COMM-018

COMM-019

COMM-020

COMM-021

COMM-022

COMM-023

COMM-024

COMM-025

COMM-026

COMM-027

COMM-028

COMM-029

COMM-030

COMM-031

COMM-032

COMM-033

COMM-034

COMM-035

COMM-036

COMM-037

1"1"PSH-320

1"PSH-321

1"PSH-322

1"FE-320 FIT-320

1"FE-321 FIT-321

1"FE-322 FIT-322

1"FIT-320 MCP-1

1"FIT-321

2"

FIT-322

2"

4 #14 + 1 #16 TWSP LAS-201

2"

VF-211

2"

VF-212

1.5"LAS-301

1.5"MBV-211

1.5"MBV-301

1.5"MBV-302

1.5"MBV-303

2"

MBV-311

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

2 #14

2 #14

2 #14 LAS-301

LAS-201

MCP-1

MANF CABLE.

MANF CABLE.

2 #14

2 #14

2 #14

2 #14

2 #14

2 #14

2 #14

2 #14

2 #14

2 #14

LCS-320

LCS-321

LCS-322

LCS-320

LCS-321

LCS-322

MANF CABLE.

MANF CABLE.

MANF CABLE.

1 #16 TWSP

1 #16 TWSP

1 #16 TWSP

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

MCP-1

AIT-201

MCP-1

COMM-038

COMM-039

COMM-040

COMM-041

COMM-042

COMM-043

COMM-044

COMM-045

COMM-046

COMM-047

COMM-048COMM-049

COMM-050

COMM-051

COMM-052

COMM-053

COMM-054

COMM-055

COMM-056

COMM-057

COMM-058

COMM-059

COMM-060

COMM-061

COMM-062

COMM-063

COMM-062

8 #14 + 3 #16 TWSP

8 #14 + 3 #16 TWSP

4 #14 + 1 #16 TWSP14 #14

2"

LCS-320

2"

LCS-321

1"LCS-322

1"AE-201

1"AIT-201

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

16 #14 + 2 #16 TWSP

1 #16 TWSP

1"

1"

1"

1"

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

16 #14 + 2 #16 TWSP

MANF CABLE.

AIT-200

MCP-1

AE-223

AIT-2001 #16 TWSP

MANF CABLE.

AIT-200

MCP-1

AE-224

AIT-2001 #16 TWSP

MANF CABLE.

AIT-225

MCP-1

AE-225

AIT-2251 #16 TWSP

MANF CABLE.

AIT-226

MCP-1

AE-226

AIT-2261 #16 TWSP

MANF CABLE.

AIT-227MCP-1

AE-227

AIT-2271 #16 TWSP

MANF CABLE.

AIT-228MCP-1

AE-228

AIT-2281 #16 TWSP

MANF CABLE.

AIT-200MCP-1

AE-229

AIT-2001 #16 TWSP

MANF CABLE.

AIT-200

MCP-1

AE-230

AIT-2001 #16 TWSP

MANF CABLE.

AIT-201

MCP-1

AE-231

AIT-2011 #16 TWSP

MANF CABLE.

AIT-201

MCP-1

AE-232

AIT-2011 #16 TWSP

MANF CABLE.

AIT-400

MCP-1

AE-400

AIT-4001 #16 TWSP

MANF CABLE.

-

COMM-063

COMM-064

COMM-065

COMM-066

COMM-067

COMM-068

COMM-069

COMM-070

COMM-071

-

-

-

-

NOT USED

NOT USED

1"

LSL-301 LAS-301

1"

LSH-301

1"

1 #16 TWSP LIT-201

1"

2 #14 LAS-200

1"

2 #14 LSH-200 LAS-200

LE-201 LIT-201

LSH-201 LAS-201

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

2 #14

2 #14 LAS-301

LAS-201

LAS-201

MANF CABLE.

2 #14

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS1"

1"

1"

1"

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PVC RGS1"

1"

1"

1"

PVC RGS

PVC RGS

PVC RGS

PVC RGS

PURPOSE

COMM-001

COMM-002

2" FIBER + 28 #14 EXISTING PLC PANEL COMM-JBOX1

2"

PVC RGS

PVC RGS 28 #14 + 2 CAT6 SEE NOTE 2EXISTING PLC PANEL COMM-JBOX1

SEE NOTE 2

CONDUITNO.

--

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

--

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

14 #14

14 #14

14 #14

14 #14

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

COMM-103

COMM-JBOX13" MCP-1PVC RGS CAT6, FIBER, 56 #14COMM-104

LCS-221 MCP-1

LCS-220 MW1-STARTER

LCS-221 MW2-STARTER

MW1-STARTER

MW2-STARTER

MANF CABLE.

10 #14

10 #14

MANF CABLE.

MANF CABLE.

FIT-211

FIT-212

MCP-1

MCP-1

CONDUITNO.

MCP-1

MANF CABLE.

MANF CABLE.

MANF CABLE.

MANF CABLE.

FSH-322

FSH-323

FSH-324

LAS-322

LAS-323

LAS-324

LAS-321

LAS-322

LAS-323

LAS-3244 #14

CABLES COMBINED IN COMM-001 AND 002

CABLES COMBINED IN COMM-001 AND 002

-SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

NOT USED

NOT USED

8 #14 + 2 #16 TWSP

4 #14

16 #14 + 2 #16 TWSP

1 ADDENDUM 3 APR 2018 REP

Page 18: For Furnishing all Labor and Material Necessary and

Item COMMENT/QUESTION SPECIFICATION DRAWING RESPONSE

1

Please confirm that the contractor in NOT required to provide the first fill of

the chemical tanks for final testing after initial preliminary testing of

chemical system.

N/A N/A

The Contractor is required to provide the first fill of the chemical tanks for final testing

after initial preliminary testing of the chemical system, in accordance with Spec 01811

Section 1.05.B.2. and Section 1.05.E.2.

2

Drawing 213F-I-04 note 5 states "Wiring and conduit by H contractor".

Please confirm that this work is not to be performed under contracts CAT-

213F-G nor CAT-213F-E.

N/A I-04

Drawing 213F-I-04 has been updated to delete reference to the ‘H Contractor’. The

wiring and conduit in question (between MCP-1 and local alarm stations LAS-321

through 324) shall be provided under the CAT-213F-E contract.

3

Specifications 16133G and 16445 are provided under contract CAT-213F-

G, however the conduit and cable for this work is shown on the conduit

and cable schedule drawings 213F-E-08 and 213F-E-09. Please confirm

the conduit and cable is to be paid under contract CAT-213F-E.

16133G & 16445 E-08 & E-09

The G-Contractor is responsible to provide all materials specified under Detailed

Specification 16133G. The cable and conduit for 16445 is not shown on the cable and

conduit schedule drawings 213F-E-08 and 213F-E-09.

4

Specification 17101 section 1.01.B.8 states, "All field power, signal, control

wiring, fiber optic, copper cables and conduit including field terminations of

the Control System equipment shall be performed by the Contractor under

Division 16 of this Contract." The referenced conduit and cable is shown

on drawings 213F-E-08 and 213F-E-09 to be furnished and installed under

contract CAT-213-F-E. Please clarify which contract this work is to be paid

under.

17101 E-08 & E-09

All field power, signal, control wiring, fiber optic, copper cables and conduit including field

terminations of the Control System equipment shall be performed by the 213F-E

Contractor unless otherwise indicated.

5

Refer to Drawing 213F-H-02. the 3"x2" piping for heat Exhanger HX-1 calls

for "Heat tracing by Electrical Contractor." The heat trace specification is

provided under Contract CAT-213F-G. Please clarify which contract this

work is to be paid under.

N/A H-02 Heat tracing for heat exchanger HX-1 piping by 213F-G Contractor.

CONTRACT CAT-213F,G

Chemical Addition Facility at Ashokan Screen Chamber

LOG OF BIDDER'S QUESTIONS

Note: The written responses to the bidder's questions shown on this spreadsheet are provided for information only and are not to be considered part of the Contract Documents. Where a written response

to a bidder's question conflicts with the Contract Documents, the Contract Documents shall govern.

Page 1 of 1