for more information, please contact · executive managing director lic#00902154 +1 925-627-2480...

5
Brooks Pedder, SIOR Executive Managing Director Lic#00902154 +1 925-627-2480 [email protected] Tony Binswanger, SIOR Executive Director Lic#01861701 +1 925-627-2482 [email protected] John McManus, MCR, CCIM Executive Managing Director Lic#01129064 +1 510-891-5817 [email protected] WWW.CONTRACOSTALOGISTICS.COM FOR MORE INFORMATION, PLEASE CONTACT: BUILDING 2 SOUTHEAST NORTHEAST

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FOR MORE INFORMATION, PLEASE CONTACT · Executive Managing Director Lic#00902154 +1 925-627-2480 brooks.pedder@cushwake.com View Site Specific COVID-19 Prevention Plan Tony Binswanger,

Brooks Pedder, SIOR Executive Managing Director Lic#00902154 +1 925-627-2480 [email protected]

Tony Binswanger, SIOR Executive Director Lic#01861701 +1 925-627-2482 [email protected]

John McManus, MCR, CCIM Executive Managing Director Lic#01129064 +1 510-891-5817 [email protected]

WWW.CONTRACOSTALOGISTICS.COM

FOR MORE INFORMATION, PLEASE CONTACT:

BUILDING 2

SOUTHEAST

NORTHEAST

Page 2: FOR MORE INFORMATION, PLEASE CONTACT · Executive Managing Director Lic#00902154 +1 925-627-2480 brooks.pedder@cushwake.com View Site Specific COVID-19 Prevention Plan Tony Binswanger,

Wilbur Avenue and Bridgehead Road. Oakley, CA 94561

WILBUR AVE.

WILBUR AVE.

MAIN ST.MAIN ST.

BNSF RAIL

I-5 LODI: ±30 MI.

I-5 LODI: ±30 MI.

CONCORD: ±17 MI

WALNUT CREEK: ±24 MI

PORT OF OAKLAND: ±39 MICONCORD: ±17 MI

WALNUT CREEK: ±24 MI

PORT OF OAKLAND: ±39 MI I-580: ±26 MI I-580: ±26 MI

N

PROJECT DETAILSSite Size: ±143 acres

City/County: Oakley/Contra Costa

Zoning: Limited Industrial

Total Proposed Development: ±2.2M SF

Timing: ±443,591 SF at 4100 Wilbur Ave. Available now

HIGHLIGHTS• Only state-of-the-art logistics center in East or

Central Contra Costa County

• Superior and captive local labor supply

• Affordable comparable drayage costs (View labor report and drayage report)

• Flexible tenant suites, divisible to ±75,000 SF

• BNSF rail service on site

• Immediate access to HWY 160/4. Highway on-ramp is at project entrance (Wilbur Exit)

• Improvements in place. Not a cold shell. (See specifications)

VIEW DRAYAGE REPORT

VIEW LABOR REPORT

BUILDING 5 ±642,960 SF

BUILDING 4 ±547,080 SF

BUILDING 1 ±150,500 SF

BUILDING 3 ±205,344 SF

BUILDING 2 ±443,591 SF

WWW.CONTRACOSTALOGISTICS.COM

Page 3: FOR MORE INFORMATION, PLEASE CONTACT · Executive Managing Director Lic#00902154 +1 925-627-2480 brooks.pedder@cushwake.com View Site Specific COVID-19 Prevention Plan Tony Binswanger,

Wilbur Avenue and Bridgehead Road. Oakley, CA 94561

PRIVATE SITE IMPROVEMENT PLANSOVERALL DIMENSION PLAN

621

BUILDING TWO

CITY OF OAKLEY CALIFORNIA

DATE:

DESIGNED UNDER THE DIRECTION OF:

CHECKED: JV

DRAWN: LTTN

DESIGN: HAP

JASON D. VOGANR.C.E. No. 59299

DATE

DATE:

DATE:

NOVEMBER 27, 2019

NOVEMBER 27, 2019

NOVEMBER 27, 2019

NOT FOR CONSTRUCTION

OAKLEY LOGISTICS CENTERSUBD. 9513

LOT 2BUILDING 2±439,920 sf

LOT 1BUILDING 1±150,000 sf

LOT 3BUILDING 3±205,344 sf

LOT 4BUILDING 4±547,080 sf

LOT 5BUILDING 5±642,960 sf

Bui

ldin

g 3

±2

05,

344

SF

Building 2 ±443,591 SF

Building 4 ±547,080 SF

Building 5 ±642,960 SF

Bui

ldin

g 1

±1

50,5

00

SF

+

N

Public Road

Private Road

Park Entry

Road Intersections

BNSF Rail

BUILDING 2 SPECIFICATIONS Bldg. Address: 4100 Wilbur Ave. Oakley, CA

Bldg. Area: ±443,591 SF divisible to ±75,000 SF

Bldg. Dimensions: ±470’ x ±936’

Office Area: Build to Suit

Auto Parking: ±235 stalls

Trailer Parking: ±128 stalls

Dock-High Loading: ±44 dock doors (22 per side), 50 future docks

Drive-In Loading: ±4 drive-in doors (2 per side)

Truck Court: ±130’, ±185’ overall

Column Spacing: ±50’ deep x ±52’ wide with 60’ speed bays

Bldg. Configuration: Cross Dock

Clear Height: ±36’

Construction: Concrete-tilt with clerestory windows

Power: 4000 amps @ 277/480, connects to main panel

Sprinklers: ESFR

Lighting: LED with motion sensors already installed

Est. Completion Date: Q3 2020

Existing Shell Upgrades:

• 9’x 10’ manual vertical lift sectional overhead doors with insulated core, R-9, equipped with perimeter weather stripping, step plates, door lights, 50,000 cycle spring, locks

• 45,000 lb mechanical pit levelers with 7’x 8’ platform, 16” lip, operating range toe guards, nightlocks, brush weather seals, and two (2) 10”x 4” projection steel faced laminated rubber bumpers

• Dock Seals with 10” projection, 10’ tall side pads, 10’- 4” wide head cap with adjustable drop curtain and 22 oz. vinyl case covers with wear pleats

• Wheel chocks with 20’ chains• LED with motion sensors. 30 foot candles measured 30” above finished floor

Building # Building SF1 ±150,500 SF

2 ±443,591 SF

3 ±205,344 SF

4 ±547,080 SF

5 ±642,960 SF

Building 5 ±642,960 SF

Building 4 ±547,080 SF

Bui

ldin

g 1

±1

50,5

00

SF

Bui

ldin

g 3

±2

05,

344

SF

Building 2 ±443,591 SF

WWW.CONTRACOSTALOGISTICS.COM

Page 4: FOR MORE INFORMATION, PLEASE CONTACT · Executive Managing Director Lic#00902154 +1 925-627-2480 brooks.pedder@cushwake.com View Site Specific COVID-19 Prevention Plan Tony Binswanger,

BENICIA BRIDGE

CARQUINEZ BRIDGE

ANTIOCH BRIDGE

RICHMOND BRIDGEBAY BRIDGEPORT OF

OAKLANDPORT OF OAKLAND

SAN FRANCISCOSAN FRANCISCO

WALNUT CREEKWALNUT CREEKCONCORDCONCORD

ANTIOCHANTIOCH

BENICIABENICIA

NAPA NAPA

I-5 I-5

SAN JOSE SAN JOSE

WILBUR AVE.

WILBUR AVE.MAIN ST.

MAIN ST.

BNSF RAIL

© 2019 Cushman and Wakefield. All rights reserved. The information contained in this communication

is strictly confidential. This information has been obtained from sources believed to be reliable

but has not been verified. No warranty or representation, express or implied, is made as to the

condition of the property (or properties) referenced herein or as to the accuracy or completeness

of the information contained herein, and same is submitted subject to errors, omissions, change

of price, rental or other conditions, withdrawal without notice, and to any special listing

conditions imposed by the property owner(s). Any projections, opinions or estimates are

subject to uncertainty and do not signify current or future property performance.

NORTHPOINT DEVELOPMENT Well-capitalized and highly experienced landlord/developer with deep in-house engineering expertise. Founded in 2012, NorthPoint has developed ±70 million SF in more than 21 states for tenants such as Chewy, Home Depot, Amazon, GE, Lowes, UPS, Adidas, Hostess, Ford and General Motors.

Brooks Pedder, SIOR Executive Managing Director Lic#00902154 +1 925-627-2480 [email protected]

Tony Binswanger, SIOR Executive Director Lic#01861701 +1 925-627-2482l [email protected]

John McManus, MCR, CCIM Executive Managing Director Lic#01129064 +1 510-891-5817 [email protected]

DRIVING DISTANCES

I-680/Hwy 4: ±17 miles

Walnut Creek @ Hwy 24: ±25 miles

I-680/Hwy 24: ±26 miles

I-580 Livermore: ±26 miles

I-5 Lodi: ±27 miles

Benicia Bridge: ±27 miles

Port of Oakland: ±40 miles

Napa: ±52 miles

Wilbur Avenue and Bridgehead Road. Oakley, CA 94561

N

WWW.CONTRACOSTALOGISTICS.COM

Page 5: FOR MORE INFORMATION, PLEASE CONTACT · Executive Managing Director Lic#00902154 +1 925-627-2480 brooks.pedder@cushwake.com View Site Specific COVID-19 Prevention Plan Tony Binswanger,

4100 WILBUR AVE. BUILDING 2 SITE PLAN

PRIVATE SITE IMPROVEMENT PLANSOVERALL DIMENSION PLAN

621

BUILDING TWO

CITY OF OAKLEY CALIFORNIA

DATE:

DESIGNED UNDER THE DIRECTION OF:

CHECKED: JV

DRAWN: LTTN

DESIGN: HAP

JASON D. VOGANR.C.E. No. 59299

DATE

DATE:

DATE:

NOVEMBER 27, 2019

NOVEMBER 27, 2019

NOVEMBER 27, 2019

NOT FOR CONSTRUCTION

OAKLEY LOGISTICS CENTERSUBD. 9513

N