PRE FEASIBILITY REPORT
FOR OBTAINING ENVIRONMENTAL CLEARANCE
For the Proposed Synthetic Organic Chemicals
Manufacturing Unit of
SKANTTR LIFESCIENCE LLP.
Survey no.: 340 & 345, Village-Amipura, Kensville-Nalsarovar
Road, District-Bavla, Ahmedabad-382220.
Mr. Rakesh G. Radadiya: 9825032197
E-mail: [email protected]
Prepared By:
T. R. ASSOCIATES
C-605/A, Ganesh Meridian, Opp. Kargil Petrol Pump,
S. G. Highway, Ahmedabad.
Mo. No.: 98253 71099
Email ID: [email protected]; [email protected]
February 2017
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-1-
1. Introduction
Skanttr Lifescience LLP is a proposed new project to be located at Survey no.: 340 & 345
Village-Amipura, Kensville-Nalsarovar Road, District-Bavla, Ahmedabad-382220 for
manufacturing of synthetic organic chemicals API (Active Pharmaceutical Ingredients) with
total production capacity of 87.9 MT/Month.
Proposed Production Details
Sr. No.
Name of Product Quantity (MT/Month)
1. Atenolol 9.6 2. Glimepiride 10.0 3. Atorvastatin Calcium 6.0 4. Abacavir Sulfate 2.1 5. Pantoprazole Sodium 16.0 6. Olanzapine 3.2 7. Rosuvastatin Calcium 1.5 8. Montelukast sodium 5 9. Carbidopa 1.5 10. Amlodipine Besylate 6.8 11. Hydroxychloroquine 4.0 12. Labetalol hydrochloride 3.0 13. Methylcobalamin 0.1 14. Lafutidine 2.2 15. Aripiprazole 3.0 16. Levosulpride 2.1 17. Fexofenadine Hydrochloride 2.2 18. Folic acid 3.0 19. Ipratropium Bromide 2.2 20. Ursodeoxycholic acid 1.4 21. Albuterol 1.5 22. Saxagliptin 1.0 23. Research & Development products 0.5
Sr. No.
Product Byproduct Capacity
(MT/Month) End Use
1 Lafutidine Sodium bromide 0.60 Sale
The proposed products fall under Category 5(f) as stated in Environment Impact Assessment
Notification Published on 14th September, 2006. Further, the location of the proposed project is
outside the notified industrial estate. Hence, the project proponent has to obtain the EC from
the Ministry of Environment, Forests & Climate Change, New Delhi. The pharmaceutical
industry is based primarily upon the scientific research and development (R&D) of medicines
that prevent or treat disease and disorder. Modern scientific and technology advances are
accelerating the discovery and development of innovative pharmaceuticals with improved
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-2-
therapeutic activity and reduced side effects. Industrial chemicals are used in researching and
developing active drug substances and manufacturing bulk substances and finished
pharmaceutical products. M/s. T. R. Associates has been appointed to carry out EIA/EMP
studies for Environmental Clearance.
The total land area of company is 14285 m2 out of which 4767 m2 (33.3 % of total land) area will
be used for greenbelt development. The estimated cost of the proposed project is 6.65 Crores.
Total budget allocation towards Environmental Management Facilities will be Rs. 50 Lacs. Total
110 persons will be employed including skilled persons, unskilled persons and office staff.
2. Project Proponent and their back ground
Company is promoted by its partners namely Dr. Jaysukhbhai N. Radadiya is working as a
general surgeon for 18 years, experience in Pharma, Mr. Kashyap G. Radadiya having 8
months experience in API manufacturing.
3. Brief description of nature of the project
It is a small scale project for production of synthetic organic chemicals API pharmaceutical
which will be sold in domestic market as well exported.
a. Need for the project and its importance to the country and or region:
Looking to the product profile, it is required to take Environmental Clearance. In India, good
quality raw materials are available at cheap rates, enabling the manufacturing at low cost. This
increases the profit margin as compared to other players in the world. To meet the current and
future market demand, the project proponent intends to start a new unit. Looking to the market
demand, the proposed project is feasible at stated location.
b. Imports v/s Indigenous production:
Indian market is open and big that is why every kind of import is booming. Indian industrialist
must understand the fact that its no more a regional shift, it is a global shift. Indian technology
should be upgraded an updated at par with international standards.
The working environment in India has changed tremendously. Earlier the trade fairs were
hardly participated by foreign chemical manufacturing companies where as now it is flooded
with global suppliers.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-3-
c. Export Possibility:
There is good possibility for export. But currently we are focused on local sale market for
distribution.
d. Employment Generation (Direct and Indirect) due to the project:
This project will provide direct employment to 110 people whereas it will provide employment
to many others indirectly.
4. Project Description
a. Type of project including interlinked and interdependent projects:
The scientific research & development in API mfg is focused increasing the yield and reducing
the toxicity of waste and consumption of solvents, using alternative manufacturing method etc.
in this context the API manufacturing is viewed as an environmentally hazardous activity.
According MoEF&CC, GOI mandated prior Environmental clearance for synthetic organic
chemicals manufacturing units vide s.o. 1533 dated 14-09-2006. Active pharmaceutical
ingredients are frequently used for cure the disease as well. So it is an individual Industry
having no direct dependency on others.
b. Location
Proposed project is to be located at Survey no.: Survey no.: 340 & 345, Village-Amipura,
Kensville-Nalsarovar Road, District-Bavla, Ahmedabad-382220.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-4-
Google Image of Proposed Location
Nodes GPS Coordinates Nodes GPS Coordinates
1 22°47'9.48"N 72°17'58.43"E
4 22°47'5.59"N 72°17'53.06"E
2 22°47'10.45"N 72°17'52.78"E
5 22°47'5.89"N 72°17'56.28"E
3 22°47'9.37"N 72°17'52.80"E
6 22°47'9.43"N 72°17'56.53"E
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-5-
Salient features in the surroundings area of the proposed site within 10 km radius are as follows:
Sr. No.
Important Features Description
1 Location Survey no.: 340 & 345, Village-Amipura, Kensville-Nalsarovar Road, District-Bavla, Ahmedabad-382220.
2 GPS Coordinates 22°47'7.74"N 72°17'54.55"E
3 Mean Sea Level 18 m
4 Nearest power station Uttar Gujarat Vij Company Ltd., Ahmedabad
5 Proponent Name Mr. Rakesh G. Radadiya (Partner) Contact No. 9825032197
6 Corporate office address Survey no.: 340 & 345, Village-Amipura, Kensville-Nalsarovar Road, District-Bavla, Ahmedabad-382220.
7 Temperature range 90 C to 450 C
8 Annual Rain fall 500-1000 mm
9 Nearest Road NH 8A @ 3.4 km, E
10 Nearest Railway station Bavla Railway Station @ 8.5 km, ENE
11 Nearest city Bavla @ 7.1 km, ENE
12 Nearest village Amipura @ 1.2 km, SSW
13 National Highway NH 8A @ 3.4 km, E
14 Nearest River/water body Rodh river @ 6.1 km WNW Amipura Pond @ 0.95 km SSW Canal from Vasna Barrage @ 1 km WSW
15 Seismic Zone Zone-III (medium risk zone)
16 National Parks / Sanctuary None within 10 Km radius.
c. Project description with process details
Please refer Annexure-3 of Form-1 document.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-6-
5. Resource optimization/ recycling and reuse envisaged in the project, if any, should be
briefly outlined.
Latest Process technology will be adopted as available in market with optimum resources
requirement with highest yield and less waste and pollution generation. In addition to this, all
the feasible cleaner production technologies will be adopted.
6. Availability of water its source, Energy/ power requirement and source should be
given.
Energy/power requirement will be 550 KVA which will be procured through Uttar Gujarat Vij
Company Limited.
The total water requirement will be 50 KL/day which will be fulfilled by own bore well. Water
balance diagram is given as Annexure-6 of Form-1 document;
7. Quantity of wastes to be generated (liquid and solid) and scheme for their
Management/disposal.
For Solid waste disposal refer Annexure-4 of Form-1 document.
For Liquid waste disposal refer Annexure-5 of Form-1 document.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-7-
8. Schematic representations of the feasibility drawing which give information of EIA
purpose.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-8-
9. Site Analysis
a. Connectivity
Nearest Railway station Bavla Railway Station 8.5 km
Nearest National highway NH 8A 3.4 km
Nearest Airport Ahmedabad 45 km
Nearest City Bavla 7.1 km
b. Existing Infrastructure
Power: 550 KVA from Uttar Gujarat Vij Company Limited.
Water: Source of the water will be own bore well.
Basic amenities: Good Road connectivity with state and National highway.
c. Land Form, Land use and Land ownership
Proposed project site has already been procured by proponent which is presently not being
used for any purposes. Landuse imaginary of proposed site is as under:
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-9-
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-10-
Soil classification of Rajkot
The soils found in the district are mostly of Black soil, Goradu soil, Kyari and Rocky soil.
(1) Black Soil
Black soils cover the southern part of Dholka and eastern part of Dhandhuka taluka popularly
known as „Bhal‟ tract, where cotton is grown in the initial stage of monsoon. It is not very
clayey and contains above 20% of clay and about 40 % of sand. Sub-soil invariably contains
horizons of lime nodules. This type of soil is highly suitable for cultivation of rabi wheat, which
is the main crop raised on this soil. If rains are sufficient in the late monsoon, rabi jowar and
grams are sown. Medium Black Soils are found in Viramgam, Sanand and Dholka talukas. This
soil is suitable for growing bajri, jowar and cotton.
(2) Goradu Soils
Goradu soils vary from fertile brown to sandy loam and is found in City, Dascroi and parts of
Sanand, Dholka and Viramgam talukas. This soil is mostly fertile and responds very well to
irrigation and manuring. Practically all kinds of crops can grow on this soil.
(3) Kyari
Kyari soils are found in several parts of City, Dascroi, Sanand, Dholka and Viramgam talukas.
It is the most fertile soil with very good moisture and retentive capacity. Well known varieties
of paddy such as Pankali, kamod, Jirasar, Sukhvel, Sutarsal and Basumati are grown on this
soil.
(4) Rocky soils
Rocky soils are found in Dhandhuka taluka and is known as Kaner tract. It is shallow, light in
texture and fit for early maturing crops like cotton, Bajri, Jowar and Math.
Social Infrastructure available.
Ahmedabad city is near to project site. The social infrastructure of district has good education,
health and other facilties.
(1) Education
There are 2373 primary, 1293 secondary and higher secondary schools in the district along with
major colleges such as
Indian Institute of Management (IIM)
National Institute of Design (NID)
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-11-
Nirma education & Research Foundation (NERF)
National Institute of Fashion Technology (NIFT)
Indian Institute of Packaging
Mundra Institute of Communications, Ahmedabad (MICA)
Center for Environment Planning & Technology (CEPT)
Gujarat National Law University (GNLU)
Applications Center of the Indian Space Research Organisation (ISRO)
Apparel Export Promotion Council (AEPC)
Various Industrial Training Institutes provide training in areas like electronics, instrument and
motor mechanic, wielding, dress making, tailoring and cutting, painting, stenography,
carpentry and Wood working, oil engine and tractor repairing and others.
(2) Health
The district has 43 primary healthcare centres, 9 community healthcare centres, 18 government,
8 municipal and 6 government aided hospitals.
Ahmedabad hosts some of the best private hospitals in the State such as Apollo Hospital,
Sterling Hospital, Krishna Heart Centre and Gujarat Cancer Society which have the
facility and the expertise to provide the best health services
Apollo hospital in Ahmedabad specialises in cardiology, orthopaedics, urology, oncology,
nephrology, gastroenterology and has the largest Dialysis Unit with inhouse Reverse Osmosis
Plant.
Sterling is a multi-superspecialty corporate hospital situated in Ahmedabad. With a networth
of over INR 100 crores (USD 23.8 million), Sterling has state of the art infrastructure to provide
high quality services across a range of specialties.
Krishna Heart Centre, one of the leading medical service providers, is the multi specialty
hospital present in the district.
Climate data from Indian Meteorological Department
The district has extreme climate and wide variation in temperature is observed.
(1) Seasons:
The climate of the district is characterised by hot summer and general dryness except during
the southwest monsoon seasons. The year can be divided into four seasons. The period from
March to May is the hot season (summer) followed by southwest monsoon from June to
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-12-
September. October and November constitute the post-monsoon or retreating monsoon season.
The cold season (winter) starts from December and ends in February.
(2) Temperature:
Period of March to May is one of the continuous rise in temperature. May is the hottest month
while January is the coldest month. Temperature range is 9°-45°C.
(3) Winds:
Winds are generally light with some strengthening in force in summer and in the south-west
monsoon season. During South west monsoon winds are generally SW to W. during end of
monsoon NW winds also starts. Wind direction is between NW & NE in morning; between SW
& NW in afternoon in February & March. Rest of summer wind direction is between SW & NW
(4) Rainfall:
The annual rainfall is received during SW monsoon season from June-September, with July
being the highest rainfall month. Average annual rainfall is 500-1000 mm.
10. Planning Brief
a. Planning Concept (type of industries, facilities transportation etc) Town and Country
Planning/Development authority Classification.
Proposed Project site is located near to the NH8A which is well connected to the Ahmedabad
city having all the infrastructural and transportation facilities.
Ahmedabad is an industrial base for sectors such as chemicals, textiles, drugs and
pharmaceuticals and agro and food processing industries. Textile and Chemicals have been the
major sectors of investment and employment in the district, since 1980. Ahmedabad district
accounts for 21.5% of factories and employs 18% of workers in the state. Over 14% of the total
investments in all stock exchanges in India and 60% of the total industrial productivity is
contributed by the district. Several business conglomerates such as Adani Group, Reliance
Industries, Nirma Group of Industries, Arvind Mills, Claris Life Sciences, Cadilla
Pharmaceuticals, Shell, Vadilal Industries Ltd., Rasna, Bosch Rexroth (Germany) ,Stork and
Rollepaal (Netherland) are present in the district. Presence of Ahmedabad Textile Industry’s
Research Association (ATIRA), the largest association for textile research and allied industries
in India, has helped the district in becoming a thriving textile centre. Most of the medium and
large scale industries are concentrated in talukas such as Ahmedabad city, Sanand, Viramgam,
Daskroi and Dholka.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-13-
b. Land use planning (breakup along with green belt etc).
Sr. No. Particular Area (Sq. Mt.)
1 Built Up Area 3485
2 Green belt area 4767
3 Open/ Road area 6033
Total 14285
For plant layout please refer Annexure-2 of Form-1 document.
c. Assessment of Infrastructure Demand (Physical & Social).
Surrounded villages in 10 km area from the project site are having all the necessary physical
and social infrastructure facilities due to agricultural activities, animal husbandry and
industrial development within the area as well nearby Bavla & Ahmedabad city.
d. Amenities/Facilities.
All the basic amenities/facilities such as power connection & power back-up, drinking water,
internal roads, water & wastewater treatment plant etc. will be provided.
e. Proposed Infrastructure
Industrial Area
Industry will provide 3485 m2. built up area for industrial process activity. Which provide all
needed facility including proper ventilation, safe handling system, etc.
Residential Area
Industry will provide labor quarter for their labors and provide all basic facilities to them.
Green Belt.
4767 m2 (33.3 %) area will be proposed for greenbelt development. In addition to this, project
proponent will participate in greenbelt development programs in nearby areas under their
CSR.
Social Infrastructure
The Project proponent Industry will contribute annually 2% of total profit towards CSR
(Corporate Social Responsibility) activity like following in nearby villages;
Education Facilities:- Facilities for village schools like game kits, drawing kits, table-chairs;
school construction (classroom/toilet/school boundary), ceiling fans or books for school library
Health Facilities:-to provide assistance to existing health facilities in Nearest Hospital, for
improvement in health facilities or services.
PRE-FEASIBILITY REPORT FOR SKANTTR LIFESCIENCE LLP
-14-
11. Project Schedule & Cost Estimates
a. Likely date of start of construction and likely date of completion
Start construction work: 1st August, 2017
Completion of construction work: 1st December, 2018
b. Estimated project cost along with analysis in terms of economic viability of the project.
Total project cost is around 6.65 Crores