for personal use only 2012 - australian securities exchange · 2012. 11. 29. · november 2011...
TRANSCRIPT
![Page 1: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/1.jpg)
Corporate Presentation 2012 F
or p
erso
nal u
se o
nly
![Page 2: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/2.jpg)
Disclaimer This presentation contains forward looking statements that are subject to risk factors associated with the USA Oil and Gas business. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a range of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, geotechnical factors, drilling and production results, gas commercialisation, reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. The oil resources estimates for the Alaska Region were compiled by Scott J Wilson, of Ryder Scott Company LP who is qualified in accordance with ASX listing rule 5.11 and who has consented to the form and content in which this statement appears. The oil resource estimates for the Wyoming Region were compiled by James L. Baird of Ryder Scott Company LP who is qualified in accordance with ASX listing rule 5.11 and who has consented to the form and content in which this statement appears. The oil resource estimates for the Gulf Coast Region were compiled by Robert L. Walker of Haas Petroleum Engineering Services, Inc. who is qualified in accordance with ASX listing rule 5.11 and who has consented to the form and content in which this statement appears. The valuations for the Alaska Region and Wyoming Region were compiled by Wood Mackenzie. Wood Mackenzie does not warrant or represent that the Information is appropriate or sufficient and has not taken into account the purposes for which the Information is used and you acknowledge and agree that if you use or rely upon the Information for any purpose then you shall do so entirely at your own risk. The information in this report, where indicated, in relation to coal resources is based on information compiled by Troy Turner, who is a member of the Australian Institute of Mining and Metallurgy and who is employed by Xenith Consulting Pty Ltd. Mr Turner has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a competent person as defined in the 2004 Edition of the “Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves”. Mr Turner consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. All $ are presented in US$, unless otherwise specified.
For
per
sona
l use
onl
y
![Page 3: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/3.jpg)
Peter Bond Managing Director and CEO
For
per
sona
l use
onl
y
![Page 4: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/4.jpg)
Scott Broussard President Oil & Gas
For
per
sona
l use
onl
y
![Page 5: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/5.jpg)
Safety First
>600 days no lost time accidents!
Oil & Gas
For
per
sona
l use
onl
y
![Page 6: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/6.jpg)
Overview Production, development, exploitation and acquisition of crude oil properties
Properties Gulf Coast (Texas and Louisiana) Alaska (North Slope) Wyoming (Powder River Basin)
Proved Reserves 13.5 MMBoe Proved Reserve Mix 97% Oil / 3% Gas Proved PV-10 $516.6 Million Fields/Wells 18 (16 Producing) / 157 Daily Production (gross) ~4,200 BOPD Acreage 62,520
Oil & Gas
For
per
sona
l use
onl
y
![Page 7: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/7.jpg)
Assets
Linc Energy’s reserves represent a well-balanced portfolio of attractive near-term cash flow opportunities as well as significant longer-term upside potential.
Gulf Coast Total Proved: 12.7 MMBoe PV-10: $504.5 million
Alaska - Umiat Total 2P: 154.6 MMBoe 2P PV-10: $1,496 million
Wyoming Total Proved: 0.8 MMBoe PV-10: $12.1 million
Percent Oil: 97% Gross Production: ~4,000 BOPD
Percent Oil: 100% OOIP: ~1,000 MMBbls Percent Oil: 100%
Gross Production: ~200 BOPD Est. Recoverable Oil: 75 MMBbls
Oil & Gas
For
per
sona
l use
onl
y
![Page 8: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/8.jpg)
Gulf Coast Region – Texas and Louisiana
Summary Statistics
Total Proved Reserves: 12.7 MMBoe Percent Oil: 97% PV-10: $504.5 million Fields: 14 (13 producing) Production (BOPD): 4,000 gross
Working Interest: ~100%
Average NRI: 74% Acreage: 13,390 acres Producing Wells: 127
Oil & Gas
For
per
sona
l use
onl
y
![Page 9: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/9.jpg)
Salt Dome Geology
• Production from stacked reservoirs primarily in Miocene and Frio sands at depths to 2286 metres (7,500 feet)
• Minimal drilling below 2286 metres (7,500 feet) (geopressure)
• Deeper drilling potential (Yegua, Hackberry, and Wilcox) • Significant 3-D seismic coverage (reprocessing for subsalt)
Oil & Gas
For
per
sona
l use
onl
y
![Page 10: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/10.jpg)
Reserve Summary
12.7 MMBoe
Gulf Coast Region – Breakdown by Field
1P Reserves by Category 1P PV-10 by Category
$504.5 MM
PDP 30%
PDNP 34%
PUD 36% PDP
40%
PDNP 31%
PUD 29%
1P Reserves Gross DailyNet
AcresTotal
(MMBOE) % Oil % PDPPV-10
($ in millions)Production
(BOPD)% Working
Interest% Revenue
Interest
Barbers Hill 1,144 7.1 100% 16% $266 1,419 100% 78%Black Bayou 2,435 0.2 100% 37% 13 423 100% 62%Hoskins Mound 2,500 0.8 73% 22% 30 661 100% 72%Atkinson Island 385 0.9 87% 72% 43 336 100% 72%Cedar Point 1,040 0.6 96% 64% 24 436 100% 61%High Island 901 1.5 100% 23% 70 256 100% 75%Port Neches 3,810 0.5 99% 47% 27 181 100% 83%Other 1,175 1.0 99% NA 33 323 NA NATotal 13,390 12.7 97% 30% $505 4,035 98% 74%
Oil & Gas
For
per
sona
l use
onl
y
![Page 11: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/11.jpg)
Significant Production Growth Production History October 2011 – October 2012
Since April 2012, Linc Energy has achieved significant increases in production as a result of rounding out its team of technical experts.
1,500
2,000
2,500
3,000
3,500
4,000
4,500
10/7 11/7 12/7 1/7 2/7 3/7 4/7 5/7 6/7 7/7 8/7 9/7 10/7
Gross Daily Production History (BOPD) – Gulf Coast
Recompletion New Drill
Q1 FY2012 Q2 FY2012 Q3 FY2012 Q4 FY2012 Q1 FY2013
Oil & Gas
For
per
sona
l use
onl
y
![Page 12: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/12.jpg)
Near Term Drilling and Recompletions
Rig Wells Number Drilled
Pioneer #2 3 300 500Pioneer #15 2 300 400Pioneer #35 2 400 600
Total 7 1,000 1,500
Workover Rig RecompletionsNumber Completed
WO Rig #1 4 700 800WO Rig #2 3 525 600WO Rig #3 3 275 300
Total 10 1,500 1,700
Production EstimatesCurrent Production 3,500 4,000New Drilling Production 1,000 1,500New Recompletion Production 1,500 1,700
Total BOPD by 12/31/12 6,000 7,200
Estimated ProductionRange
Estimated ProductionRange
Range
Oil & Gas
For
per
sona
l use
onl
y
![Page 13: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/13.jpg)
• Capital program (FYE 30/06/13): Three to four drilling rigs
• 30-40 new wells Three workover/completion rigs
• 15-20 recompletions Total CAPEX: $60-70M funded by cashflow
• Extensive subsurface mapping • 3D Seismic interpretation • Seismic reprocessing
Gulf Coast Region
Linc Energy’s stable Gulf Coast operations provide for increasing cash flow generation through high-return new drilling and recompletion projects.
Exploitation Program Oil & Gas
For
per
sona
l use
onl
y
![Page 14: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/14.jpg)
Higgins Tank Battery Before… Oil
& Gas
For
per
sona
l use
onl
y
![Page 15: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/15.jpg)
Higgins Tank Battery After… Oil
& Gas
For
per
sona
l use
onl
y
![Page 16: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/16.jpg)
SWB Pump Controls Before… Oil
& Gas
For
per
sona
l use
onl
y
![Page 17: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/17.jpg)
SWB Pump Controls After… Oil
& Gas
For
per
sona
l use
onl
y
![Page 18: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/18.jpg)
Wilburn Battery Before… Oil
& Gas
For
per
sona
l use
onl
y
![Page 19: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/19.jpg)
Wilburn Battery After… Oil
& Gas
For
per
sona
l use
onl
y
![Page 20: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/20.jpg)
Wilburn SWD System Before… Oil
& Gas
For
per
sona
l use
onl
y
![Page 21: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/21.jpg)
Wilburn SWD System After… Oil
& Gas
For
per
sona
l use
onl
y
![Page 22: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/22.jpg)
Wilburn B Separators Before… Oil
& Gas
For
per
sona
l use
onl
y
![Page 23: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/23.jpg)
Wilburn B Separators After… Oil
& Gas
For
per
sona
l use
onl
y
![Page 24: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/24.jpg)
Pumping Unit Before… Oil
& Gas
For
per
sona
l use
onl
y
![Page 25: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/25.jpg)
Pumping Unit After… Oil
& Gas
For
per
sona
l use
onl
y
![Page 26: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/26.jpg)
Summary Statistics Project Overview
North Slope (Umiat) • OOIP: ~1,000 MMbbls • 2P reserves of 155 MMbbls / $1,496 MM PV-
10 • Formerly part of the National Strategic
Petroleum Reserve • Located within the National Petroleum
Reserve of Alaska • Potential peak production of ~50,000 gross
BOPD • Potential upside from deeper oil and gas
reserves – Identified deeper potential through
reprocessed 3D seismic – Drilling deep well in winter 2012/2013 to
look for/test deeper reservoirs • Appraised asset value of $100-$200 million
Total 2P Reserves: 155 MMBoe Percent Oil: 100% PV-10: $1,496 million Working Interest: 84.5% Acreage: 19,348
Alaska – North Slope (Umiat) Oil & Gas
For
per
sona
l use
onl
y
![Page 27: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/27.jpg)
Alaska – North Slope (Umiat) Oil & Gas
For
per
sona
l use
onl
y
![Page 28: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/28.jpg)
Alaska – North Slope (Umiat) Oil & Gas
For
per
sona
l use
onl
y
![Page 29: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/29.jpg)
Key Milestones: • Pre-pack 100 mile snow road • Establish campsite and in-field ice
pads • Mobilise drill rig • Drill disposal well • Drill, core and test 2 vertical and 1
horizontal well • Install Ambient Air Monitoring
station • Environmental Impact Statement
underway (EID submitted) • Determine capital strategy for full
development
Key Milestones: • Drill and test deep resource targets • Perform extended flow test for 1
vertical and 1 horizontal delineation well
• Finalise engineering design • Submit air permit application
Phase I Phase II Phase III
Reconfirm Reserve and Resource Value
Increased Reserve Value: Transition to Proved Reserves
Estimated Full Production: 50,000 BOPD
Key Milestones: • Commence procurement and
fabrication • Full EIS review • North Slope Borough master plan
approval • Construction of roads and pipelines • Issuance of air permit • Facility construction • Commence development drilling
(Q2 2017) • TAPS tie-in facilities
Expected Timing: • First production 2017
Umiat Development Plan Oil & Gas
For
per
sona
l use
onl
y
![Page 30: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/30.jpg)
Project Overview
• Potential for 75 MMBbls of oil using CO2 EOR strategy from Big Muddy and South Glenrock fields
• Recently established supply contract with ExxonMobil for 25 BCF of CO2 during the initial one year term of the agreement
• Field Overview – Big Muddy Field (Discovered in 1917)
• OOIP of 255.0 MMBbls • Production of 53.8 MMBbls of oil to
date – South Glenrock (Discovered in 1950)
• OOIP of 170.3 MMBbls • Production of 17.1 MMBbls of oil to
date – South Cole Creek Field (Discovered in 1948)
• OOIP of 41.3 MMBbls • Production of 17.1 MMBbls of oil to
date
Salt Creek
Salt Creek – Field Analogy
• Producing > 13,000 BOPD GROSS
Wyoming (Powder River Basin) EOR Project
Oil & Gas
For
per
sona
l use
onl
y
![Page 31: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/31.jpg)
Adam Bond President Clean Energy
For
per
sona
l use
onl
y
![Page 32: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/32.jpg)
Safety First - Chinchilla
1428 days no lost time accidents!
Clean Energy
For
per
sona
l use
onl
y
![Page 33: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/33.jpg)
The Past 12 Months • Significant effort to refocus towards commercialisation • Review of business model for global UCG deployment • Ongoing optimisation of technology at Chinchilla.
Clean Energy
For
per
sona
l use
onl
y
![Page 34: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/34.jpg)
G5 Repositioning Clean Energy
For
per
sona
l use
onl
y
![Page 35: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/35.jpg)
Production wellheads and surface facilities
Clean Energy Clean Energy
For
per
sona
l use
onl
y
![Page 36: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/36.jpg)
Wyoming – Gasifier 6 (G6)
Current focus on identification and development of commercial UCG opportunities in Wyoming across the Powder River Basin.
Clean Energy
October 2010 Rig mobilisation
October 2011 Submitted first tranche of UCG
Licence
April 2012 Submitted
second tranche of
UCG Licence
End 2012 Technical
completion of Licence
Application anticipated
Q1 2013 Licence
awarded (anticipated)
For
per
sona
l use
onl
y
![Page 37: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/37.jpg)
Poland
A number of gas supply off-take proposals currently under review for UCG from the PWD lease.
Clean Energy
November 2011 Acquired 1.2bn
tonnes of coal in Upper Silesian Basin
(PWD lease)
August 2012 Drilling of PWD
lease commenced
6 metre-thick coal seam intercepted at
625m
October 2012 Polish officials
visited Chinchilla
For
per
sona
l use
onl
y
![Page 38: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/38.jpg)
Poland Clean Energy
For
per
sona
l use
onl
y
![Page 39: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/39.jpg)
China • Remains an important target • Dialogue ongoing with a number of Chinese companies • Drivers for UCG into China remain strong • GCL
Clean Energy
For
per
sona
l use
onl
y
![Page 40: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/40.jpg)
South Africa
Exxaro • Completion of concept study in June • Superior commercial opportunity for a
UCG to Power project.
Clean Energy
For
per
sona
l use
onl
y
![Page 41: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/41.jpg)
The Next 12 Months
Clean Energy
For
per
sona
l use
onl
y
![Page 42: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/42.jpg)
USA - Alaska
Clean Energy
For
per
sona
l use
onl
y
![Page 43: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/43.jpg)
USA
Clean Energy
For
per
sona
l use
onl
y
![Page 44: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/44.jpg)
Canada
Clean Energy
For
per
sona
l use
onl
y
![Page 45: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/45.jpg)
South Africa
Clean Energy
For
per
sona
l use
onl
y
![Page 46: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/46.jpg)
Ukraine
Clean Energy
For
per
sona
l use
onl
y
![Page 47: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/47.jpg)
Poland
Clean Energy
For
per
sona
l use
onl
y
![Page 48: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/48.jpg)
Russia
Clean Energy
For
per
sona
l use
onl
y
![Page 49: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/49.jpg)
Pakistan
Clean Energy
For
per
sona
l use
onl
y
![Page 50: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/50.jpg)
Bangladesh
Clean Energy
For
per
sona
l use
onl
y
![Page 51: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/51.jpg)
Mongolia
Clean Energy
For
per
sona
l use
onl
y
![Page 52: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/52.jpg)
China
Clean Energy
For
per
sona
l use
onl
y
![Page 53: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/53.jpg)
Australia
Clean Energy
For
per
sona
l use
onl
y
![Page 54: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/54.jpg)
The Next 12 Months
Clean Energy
For
per
sona
l use
onl
y
![Page 55: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/55.jpg)
Michael Mapp President Coal
For
per
sona
l use
onl
y
![Page 56: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/56.jpg)
Safety First
365 days no lost time accidents!
Coal F
or p
erso
nal u
se o
nly
![Page 57: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/57.jpg)
Assets
• Over 8,000km2 of exploration and mining tenure • 710Mt (258Mt Indicated, 452Mt Inferred) of JORC Resource • (Competent Person Troy Turner , Xenith Consulting Pty Ltd) • 19 Exploration Permits for Coal (EPCs) • 7 Exploration Permit for Coal Applications (EPCAs) • 2 Mining Licence Applications (MLA) • 1 Mining Development Licence (MDL)
Coal F
or p
erso
nal u
se o
nly
![Page 58: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/58.jpg)
Assets 1. Teresa • JORC Resource of 298Mt** (82Mt
Indicated, 216Mt Inferred) • Mining lease application has been
submitted and EIS commenced for a 6Mtpa underground mine
• First coal Q4 2015 target 2. Pentland • JORC resource of 266 Mt** (176Mt
Indicated, 90Mt Inferred) • Expected to produce c. 3.0 to
4.0Mtpa of export grade thermal coal.
3. Great Northern Leases • Exploration planned in 2013
** Competent Person Troy Turner , Xenith Consulting Pty Ltd
1
2 3
Coal F
or p
erso
nal u
se o
nly
![Page 59: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/59.jpg)
Assets 4. Biloela • Initial drilling program completed in
late 2010 5. Surat • Dalby – JORC resource of 146Mt**
(146Mt Inferred) 6. Drummond Basin • Similar to Blair Athol resource
targeted • Magnetic Survey planned for 2013/14 7. Rathdowney • Drilling planned for 2013/14
** Competent Person Troy Turner , Xenith Consulting Pty Ltd
4
5
6
7
Coal F
or p
erso
nal u
se o
nly
![Page 60: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/60.jpg)
60
1 July 2011 to 30 June 2012 • Established the Division and ratified its
business strategy • Recruited staff into key roles • Receipt of the Mineral Development
Licence (MDL361) for the Pentland mine
Highlights Coal F
or p
erso
nal u
se o
nly
![Page 61: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/61.jpg)
Strategy
Add value to development
assets
• Further define JORC Resources and Reserves • Infrastructure for Teresa and Pentland • EIS for Teresa • Build operations team: key management
Divest
• Cornerstone Investor • IPO, JV or Merger with listed entity
Coal F
or p
erso
nal u
se o
nly
![Page 62: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/62.jpg)
Strategy
Add value to development
assets
• Further define JORC Resources and Reserves • Infrastructure for Teresa and Pentland • EIS for Teresa • Build operations team: key management
Divest
• Cornerstone Investor • IPO, JV or Merger with listed entity
Coal F
or p
erso
nal u
se o
nly
![Page 63: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/63.jpg)
63
1 July 2011 to 30 June 2012 • Transition from Conceptual Study Phase to Prefeasibility Study (PFS)
stage • Publication of Initial Activity Statement (IAS) and Terms of Reference
(TOR) • Commenced base-line studies for EIS • Commencement of the PFS drilling program Since June 30 2012 • PFS Drilling program completed
Teresa Highlights Coal F
or p
erso
nal u
se o
nly
![Page 64: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/64.jpg)
• Potential: up to 6 Mtpa (product tonne) underground operation for 30 years
• JORC resource statement focused on Corvus 2 seam only of 298Mt: 82Mt Indicated, 216Mt Inferred, Xenith Consulting Pty Ltd
• Early production 2015, full production 2018
• Within Bowen Basin near existing coal mines of Kestrel, Crinum, Ensham and Oaky Creek
• Existing infrastructure connections • Mining lease application submitted and
EIS process commenced.
Teresa Overview Coal F
or p
erso
nal u
se o
nly
![Page 65: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/65.jpg)
Teresa - Logistics Coal F
or p
erso
nal u
se o
nly
![Page 66: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/66.jpg)
Teresa - Schedule
PROJECT SCHEDULE 2012 2013 2014 2015 2016 2017 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Pre-feasibility Feasibility EIS Studies Construction EIS Submission EIS Approved Mining Lease Awarded FID First Coal - 2Mtpa Full Production - 6Mtpa
Coal F
or p
erso
nal u
se o
nly
![Page 67: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/67.jpg)
Teresa Development Strategy Coal F
or p
erso
nal u
se o
nly
![Page 68: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/68.jpg)
Going Forward
Add value to development
assets
• JORC Resources and Reserves • Infrastructure for Teresa and Pentland • EIS for Teresa • Build operations team: key management
Divest
• Cornerstone Investor • IPO, JV or Merger with listed entity
Coal F
or p
erso
nal u
se o
nly
![Page 69: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/69.jpg)
Why Coal?
October 2012
Coal F
or p
erso
nal u
se o
nly
![Page 70: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/70.jpg)
Don Schofield President SAPEX
For
per
sona
l use
onl
y
![Page 71: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/71.jpg)
Ownership - 100% Linc Energy Contains all Linc Energy assets in South Australia: 10 - Petroleum Exploration Licences (PELs) 2 - Petroleum Exploration Licence Applications (PELAs) 6 - Exploration Licences for Coal (ELs)
SAPEX SAPEX Limited F
or p
erso
nal u
se o
nly
![Page 72: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/72.jpg)
SAPEX SAPEX Tenements F
or p
erso
nal u
se o
nly
![Page 73: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/73.jpg)
Commercial Development Highest priority: Shale Oil in the Arckaringa Basin
SAPEX F
or p
erso
nal u
se o
nly
![Page 74: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/74.jpg)
Oil Discovery – Maglia-1 SAPEX
Area: - 65,000km2 - 16,000,000ac
For
per
sona
l use
onl
y
![Page 75: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/75.jpg)
SAPEX Maglia-1 Oil Discovery
First discovery of oil in the Arckaringa Basin Oil show proves existence of active petroleum system.
For
per
sona
l use
onl
y
![Page 76: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/76.jpg)
SAPEX Arckaringa Basin Stratigraphy F
or p
erso
nal u
se o
nly
![Page 77: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/77.jpg)
Testing Organic Rich Shale SAPEX
Arck-1 core hole
For
per
sona
l use
onl
y
![Page 78: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/78.jpg)
Shale Oil Core SAPEX F
or p
erso
nal u
se o
nly
![Page 79: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/79.jpg)
New Seismic Data Collected 1100 km of Seismic in 2011 program
SAPEX F
or p
erso
nal u
se o
nly
![Page 80: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/80.jpg)
Deep and Thick Shale Zones SAPEX F
or p
erso
nal u
se o
nly
![Page 81: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/81.jpg)
Arckaringa Basin Shale
SAPEX
• Deep areas have most potential
• Approx. 3.5 million acres of “sweet spots”
For
per
sona
l use
onl
y
![Page 82: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/82.jpg)
Shale Property Eagle Ford Bakken Mississippi Lime Arckaringa Basin
Organic-rich Shale
Age Cretaceous Devonian,
Mississippian Mississippian Permian
Lithology Bituminous Shale Sandstone, Carbonate
Limestone, Chert, Dolomite
Marine shale, Siltstones
Depth 7,000–14,000 (ft) 2,100–4,300 (m)
8,500–10,500 (ft) 2,600–3,200 (m)
3,000–6,000 (ft) 900–1800 (m)
2,000–4,300+ (ft) 600–1,300+ (m)
Thickness 150–300 (ft) 45–90 (m)
10–150 (ft) 3–45 (m)
250–600 (ft) 76–180 (m)
230–1000+ (ft) 70–300+ (m)
Porosity 6–14 % 3–8 (%) 4–15 (%) 5–17 (%)
Kerogen Type
Type II Type I / II Type II Type I / II
TOC 2–6% 7–22% 1.5–3% 4.5–10%
Vitrinite Reflectance (Vro)
0.5–1.4% 0.5–1.0% 0.65–1.2% 0.5–1.35%
Tmax ~ 833 oF ~445 oC
~ 800 oF ~425 oC
~840 oF ~450 oC
~825oF ~440 oC
Data Source Wall Street Research Linc Energy
SAPEX F
or p
erso
nal u
se o
nly
![Page 83: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/83.jpg)
SAPEX The Oil Window F
or p
erso
nal u
se o
nly
![Page 84: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/84.jpg)
SAPEX SAPEX Bakken Play – North Dakota
• Largest oilfield in USA except Alaska N Slope
• 6.5 million acres
• 4 billion barrel field
• 6,000 active wells
Production: • 2010 – 140,000 BOPD • 2012 – 500,000 BOPD
For
per
sona
l use
onl
y
![Page 85: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/85.jpg)
SAPEX SAPEX Eagle Ford Shale – Texas
• Fastest developing oilfield in USA
• 12 million acres
• 3 billion barrel field
• 6,000 active wells
Production: • 2010 – 12,000 BOPD • 2012 – 300,000 BOPD F
or p
erso
nal u
se o
nly
![Page 86: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/86.jpg)
SAPEX SAPEX Arckaringa Shale Oil- World Class Potential
• Largest shale oil play in Australia
• 16 million acres – 100% SAPEX
• Prospective resources – potential for billions of barrels of oil
• Supportive government in South Australia
• Ready for large investment to confirm optimum development strategy
320km
For
per
sona
l use
onl
y
![Page 87: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/87.jpg)
Road to Commercial Development
• Bring in experienced JV partner for development – Shale technology is specialised – Shale Projects = Large scale capital investment – Industry is new – North American based – Partner will operate a drilling and seismic work program focussed on
development
• Internationally recognised independent consultants to confirm prospective resources
• Appoint global investment bankers to assist in process
SAPEX F
or p
erso
nal u
se o
nly
![Page 88: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/88.jpg)
Summary
Existing petroleum system Shale oil characteristics are excellent Large acreage position – 100% held Global experts are confirming our discovery
WORLD CLASS OPPORTUNITY FOR LINC ENERGY SHAREHOLDERS
SAPEX F
or p
erso
nal u
se o
nly
![Page 89: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/89.jpg)
Shale oil production – Arckaringa Basin June 2015
Our Vision for the Future
WEST TEXAS Source: Oil & Gas Journal 2012
For
per
sona
l use
onl
y
![Page 90: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/90.jpg)
Peter Bond Managing Director and CEO
For
per
sona
l use
onl
y
![Page 92: For personal use only 2012 - Australian Securities Exchange · 2012. 11. 29. · November 2011 Acquired 1.2bn tonnes of coal in Upper Silesian Basin (PWD lease) August 2012 Drilling](https://reader031.vdocuments.net/reader031/viewer/2022011917/5ff755a94b13c65cd82ef696/html5/thumbnails/92.jpg)
Direct Your Questions
OIL & GAS Scott Broussard
CLEAN ENERGY Adam Bond
COAL Michael Mapp
SAPEX Don Schofield
MD/CEO Peter Bond
For
per
sona
l use
onl
y