forays group overview · finance,accounting & control ... wire line project hyderabad city....
TRANSCRIPT
FORAYS OVERVIEW2013
INTRODUCTION
FORAYS IS AN ENGINEERING & CONSTRUCTION COMPANY FORMED BYA GROUP OF PROFFESIONALS HAVING RICH EXPERIENCE SPANNING MORETHAN THREE DECADES OF ASSOCIATION WITH LEADING MULTINATIONALBACKGROUND AND SPECIALIZED IN THE FIELD OF BUISINESS,INTERNATIONAL PROCUREMENT SERVICES, EPC PROJECTS ANDINSTRUMENTATION, ELECTRICAL AND TELECOMMUNICATIONCONSTRUCTION IN NATIONAL & INTERNATIONAL ARENA
PAGE 2
FORAYS PROFILEFORAYS IS FORMED AS AN ENGINEERING AND CONSTRUCTIONCOMPANY IN ORDER TO CATER THE GROWING NEEDS OF THEINSTRUMENTATION , ELECTRICAL CONSTRUCTION AND TELECOMINDUSTRY.
GLOBAL NETWORK SERVICES, SPECIALIZED IN FIBRE OPTIC SPLICING,OFC TESTING, SOFTWARE INSTALLATION, INTEGRATION ANDCOMMISSIONING OF UBR, WIMAX, EDP, LMDS & OME SYSTEMS, BASEDAT HYDERABAD, INDIA, IS ALSO AN INTEGRAL PART OF FORAYS.
PAGE 3
WORLDWIDE NETWORK
FORAYS QATAR W.L.LDoha, Qatar
FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd. Hyderabad - India
HEADQUARTERS
FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd
MUMBAI-INDIA
SUBSIDIARIES & BRANCH OFFICES
PAGE 4
FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd.
FORAYS INDIA WILL FOCUS ON THE LARGEINDIAN SUBCONTINENT MARKET WHEREMAJOR INVESTMENT IS BEING MADE INPOWER, INFRASTRUCTURE AND OIL & GASSECTORS .
TO DEVELOP, TRAIN AND RETAIN THE VASTPOOL OF PROFESSIONAL HUMAN RESOURCESAVAILABLE IN THE LOCAL MARKET.
TO AUGMENT SKILLED MANPOWER TO THERESPECTIVE PROJECTS ACROSS THEGLOBE.
PAGE 5
FORAYS QATAR W.L.L
FORAYS QATAR WILL BE THE NERVECENTRE OF MIDDLE EAST OPERATIONS.
FORAYS QATAR WILL NOT ONLY CATERTHE NEEDS OF MIDDLE EAST MARKETBUT ALSO ACT AS A BASE CENTRE FORTRAINING & TALENT DEVELOPMENT INORDER TO SUPPLEMENT OTHER REGIONS.
PAGE 6
MISSION
TO DEVELOP FORAYS AS A WORLD SCALE INSTRUMENTATION,ELECTRICAL & TELECOM ENGINEERING CONSTRUCTIONCOMPANY MEETING HIGHEST INTERNATIONAL INDUSTRYSTANDARD COMMITTED ITSELF TO SUPPLY INSTRUMENTS ,EQUIPMENT, ERECTION MATERIALS, INSTALLATION, TESTING /CALIBRATION & COMMISSIONING OF PROJECTS INCLUDINGMAINTENANCE, MODERNISATION / REVAMPING OF PLANTS INTHE FIELD OF OIL & GAS, PETROCHEMICALS, FERTILIZERS,CHEMICALS, POWER, ETC. MEETING ALL TECHNO-ECONOMICREQUIREMENTS DEFINED WITH CLIENTS, IN COMPLIANCEWITH THE CODES AND REGULATIONS IN FORCE IN THECOUNTRIES FOR WHICH PRODUCTS OR SERVICES AREMEANT.
PAGE 7
VISION
TO DEVELOP A CONDUCIVE WORKINGENVIRONMENT.
TO DEVELOP A SLEW OF MEASURES FORIMPROVEMENT OF OPERATIONAL EFFICIENCY.
PAGE 8
VISION TO RENEW, REJUVENATE AND ADD HUMAN
RESOURCE MANAGEMENT & DEVELOPMENTSYSTEM SO AS TO ENSURE A VIBRANT MOTIVATEDWORKFORCE ON A LONG TERM BASIS IN ORDERTO PROVIDE CONTINUOUS QUALITY SERVICE TOTHE ESTEEMED CLIENTS.
TO OPERATE AND RUN THE ORGANISATIONULTIMATELY WITH THE STRENGTH OF ITS OWNPROCEDURES & SYSTEMS.
PAGE 9
FIELD OF BUSINESS
OIL & GAS PETROCHEMICALS REFINERIES CEMENT AND STEEL TELECOMMUNICATION FERTILIZERS / CHEMICALS POWER / NUCLEAR POWER / SOLAR POWER AND
DESALINATION PHARMACEUTICALS AND FOOD PROCESSING LIQUIFIED NATURAL GAS (LNG)
PAGE 10
FIELD ENGINEERING PROCUREMENT INSPECTION INSTALLATION TESTING / CALIBRATION COMMISSIONING ASSISTANCE REVAMPING / RETROFITTING SHUT DOWN / MAINTENANCE
PAGE 11
FIELD OF SERVICES
PAGE 12ORGANIZATION CHART
CHAIRMAN & MANAGING DIRECTOR[CMD]
Mr. Mathew M Mankanthanam
EXECUTIVE DIRECTOR[EXDR]
Mr. Suresh P Thomas
FINANCE,ACCOUNTING & CONTROL[FACO]
Mr Nevin Alex
HUMAN RESOURCE MGT.[HRMA]
Ms Swati Sharma
COMPANY SECRETARY[COSE]
Mr. V.G.Venkataraman
BUSINESS DEVEOPMENT & PROPOSAL[BUDPRO]
A.I. Mr. Mathew M Mankanthanam
QUALITY & HSE MGT.[QHSE]
Mr. Shilin VenugopalGENERAL MANAGER-Projects[PROJCONST]Mr. N.R.Niburaj
CONSTRUCTION MANAGER[CONST]
QA/QCEngineer
Planning Engineer
Field Engineer
Testing Engineer
SafetyEngineer
Site Admin& Accounts
PROCUREMENTMr. Jackson Kuriakose
MANPOWER
CAPABILITY TO EXECUTE PROJECTS UP TO 1.5 MILLION MHRS / YEAR.
PAGE 13
Manpower
Construction Managers & Engineers 26
Supervisors & Technicians 60
Admn., Accounts & Logistics 16
Direct Labour 400
Direct Labour through Sub-contractors 300_________________________________
Total Direct & Indirect Manpower 802Direct labour through sub-contractors 300
Direct labour 400
Const. Mgrs. & Engrs.26
Supervisors & technicians 60 Admn.. &
Logistics 16
PAGE 14
S. No Project Name Scope of work Client W.O. No. Year
Work order Value in
Million INR
1 PBR Project Instrumentation & Calibration Reliance Industries Ltd, P.O. Batha, Surat
HSP/31069000 & HSP/31069024 2012 21.03
2CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar.
Instrumentation AMC & Field Inst. Modification
Reliance Inds. Ltd., Meghpar/Padana,
Jamnagar
WO No. JS4/104520 2012 13.5
3 1X50 MW Solar Thermal Power Plant, Rajasthan
Supply & Installation of Electrical & Instrumentation Works
Lauren Engineers & Constructors (I) P. Ltd
LCC0362/WO/0116 2012 16.88
4 2 x 35 MW CPP & Rolling Mill, TUML Plant, Nagpur
Installation of Instrumentation Works
Topworth Urja & Metals Limited.
TUML/FSCOL/WO/IE/2012-13/152 2012 7.08
5AVU & STR LPG units for IOCL Paradeep Refinery, Orissa.
Installation of Instrumentation Works
ESSAR Projects (India) Limited.
EPIL/HO/LOI/IOCL/2012/018 2012 55.38
6 1.8MTPA Syn gas based DRI, Angul, Orissa
Supply & Installation of Electrical & Instrumentation Works
Jindal Steel & Power Ltd
JSPL/LOI/2011-12/143 2012 44.60
7 Sulphur Recovery Unit-H2 Plant of Adani Wilmar, Mundra, Kutch.
Supply & Installation of Electrical & Instrumentation Works
Linde Engineering India Pvt. Ltd.
002 0MA4670 Sup.000 / 4680 2012 2.65
8Amonia, Urea & OSBL UNIT OF MATIX FERTILIZER, Durgapur,W.B
Installation of Electrical & Instrumentation Works
ESSAR Projects (India) Limited.
1081/HY3/1500021816/
EPIL/DRG/MTX/LOI/137
2012 76.68
92X5000MT AMMONIA STORAGE SYSTEM, W.B
Supply & Installation of Electrical & Instrumentation Works
UDHE INDIA PRIVATE LIMITED
UIPL/MATIX/0156/P/U002, U003 2011 6.18
10 Sulphur Recovery Unit-HPCL Refinery, Mahul, Mumbai.
Supply & Installation of Electrical & Instrumentation Works
Linde Engineering India Pvt. Ltd.
&AG-W-SY-1006.017, &AG-W-SY-1006.016
2011 35.31
11Johnson Matthey Chemical-123, Kanpur- U.P
Supply & Installation of Electrical & Instrumentation Works
Johnson Matthey Chemical India Pvt
Ltd.4500083580 / 81 2011 22.46
PAGE 15MAJOR PROJECT(1-11)
S.No. Project Name Scope of work Client W.O. No. YearWork Order Value
in Millions INR
1240 MW Thin Film Solar Power Plant, Kutch, Gujarat
Supply & Installation of Electrical Works
ADANI INFRA (INDIA) LIMITED.
4500057108 / 5700042501 2011 45.9
13 Essar Oil Refinery Expansion, Jamnagar.
Instrumentation works for ETP & Desalination
Unit.Train-1
ESSAR Projects (India) Limited.
1500002706 / 1500002754 2011 28.07
14CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar.
Instrumentation AMC & Field Inst. Modification
Reliance Petroleum Ltd 99677 2011 13.9
15 BUTENE-1- Reliance Industries, Hazira, Surat.
Installation of Instrumentation Works
Reliance Industries Ltd, Hazira. HSP/31024099 2010 8.58
16 REPLICA PLANT, Kanpur – U.P.
Supply & Installation of Electrical &
Instrumentation Works
Johnson Matthey Chemical India PvtLtd. 4500073503 / 16 2010 13.07
17CFU, PP, Coker & Alkylation-Reliance Refinery, Jamnagar
Instrumentation AMC & Field Inst. Modification Reliance Petroleum Ltd JS4 / 574192 2010 12.90
18 KCIL-FORMALDHYDE UNIT
Supply & Installation of Electrical &
Instrumentation Works
Kanoria Chemical India Ltd. ( Consultant-Uhde
India Pvt. Ltd.)KCIL:DLH:2010:109 2010 14.50
19 POLY ISCOYNATE UNIT
Supply & Installation of Electrical &
Instrumentation Works
Aker Powergas Pvt. Ltd(End-user-BUYER) 2096/2041/TP023 2010 13.7
20 30 MW Power Plant Supply and Erection of Instrumentation Works
Shree Virangana Steels Ltd
SVSL/NGP/WP-CPP/INST-CONT/09-
10/51 & 562009 3.59
MAJOR PROJECT(12-20)PAGE-16
21HPU System in Coker-Reliance Refinery, Jamnagar
Instrumentation Erection Works Reliance Industries Ltd ES4/53525950 2009 0.12
22Sulphur Unit 672 & 431-RIL Refinery, Jamnagar
Instrumentation Erection Works Reliance Industries Ltd 1JJG/ES4/368185
9 2009 4.20
23LNUU 471 Compressor-Reliance Refinery, Jamnagar
Instrumentation Erection Works Reliance Industries Ltd 1JJG/ES4/368812
4 2009 0.76
24 DHDS 2-Reliance Refinery, Jamnagar
Instrumentation Erection Works Reliance Petroleum Ltd 2JRH/ES4/535213
46 2009 5.22
25 FCC-RIL Refinery, Jamnagar Steam Tracing Reliance Petroleum Ltd 2J/ES4/53521528 2009 1.70
26CFU, PP, Coker & Alkalation-RIL Refinery, Jamnagar
Instrumentation AMC & Field Inst. Modification Reliance Petroleum Ltd ES4/573801 2009 12.20
27 Crude 2-Reliance Refinery, Jamnagar Steam Tracing Reliance Petroleum Ltd 2JRD/ES4/535236
56 2009 0.69
28 Wire Line Project Hyderabad City Splicing Reliance Infocom
Engineering Pvt.Ltd A.P. COMBINED 2009 11.92
29 WIN Project Kurnool District Splicing Reliance InfocomEngineering COMBINED 2008 6.01
30 Civil Work in Hyderabad City Civil Work & Splicing Reliance Infocom
Engineering RA8/15725920 2008 0.60
31 WIN Project East Godavari District Splicing Reliance Infocom
Engineering COMBINED 2008 3.88
S.N Project Name Scope of work Client W.O. No. Year Work Order value in Million INR
PAGE 17MAJOR PROJECT(21-31)
QUALITY ASSURANCE THE KEY GOAL OF FORAYS’S QUALITY POLICY IS CLIENT’S
SATISFACTION.
THE COMPANY’S QUALITY ASSURANCE SYSTEM IS DEDICATEDTO SATISFYING EVERY CLIENT ’ S TECHNICAL ANDECONOMICAL REQUIREMENTS.
THIS COVERS ALL PHASES OF PROJECT MANAGEMENT &CONFORMS TO ISO.
THE EFFECTIVENESS OF QA SYSTEM IS CONSTANTLYMONITORED BY TOP MANAGEMENT THROUGH THE QUALITYCOMMITTEE, THE QA MANUAL & PROCEDURES ESTABLISHEDBY QA / QC MANAGER.
WE AT FORAYS ARE COMMITED TO TOTAL QUALITYMANGEMENT & CONTINUOUS QUALITY IMPROVEMENT.
PAGE 18
QUALITY CONTROL
FORAYS SHALL HAVE A DEDICATED AND WELL EXPERIENCED TEAM OF QUALITY CONTROL PERSONNEL.
FORAYS SHALL PROVIDE THE CHECKS, TESTING DOCUMENTS,CONTROL AND MEASURES AGAINST ESTABLISHED REQUIREMENTS.
THE QUALITY WORKMANSHIP IS BASED ON SPECIFICATION OF THE CONTRACT AND OTHER CONTRACT DOCUMENTS.
LOCAL REGULATION & CODES OF STANDARDS REFERRED TO, IN THE CONTRACT DOCUMENTS.
QUALITY CONTROL PROCEDURES AND TEST PLAN (DULY APPROVED BY CLIENTS).
PAGE 19
SAFETY
SAFETY IS ONE OF THE MOST IMPORTANT SUBJECTSWHERE TOP MOST ATTENTION IS GIVEN DURING ENTIREEXECUTION OF PROJECT.
FORAYS ’ S SAFETY DEPARTMENT, SHALL IDENTIFY,THROUGH “ZERO ACCIDENT POLICY”.
HOW TO PREVENT ACCIDENTS?
-ELEMINATE UNSAFE ACT.-ELEMINATE UNSAFE CONDITION.-DISCOVER THE CAUSES.
SAFETY ACHIEVED BY ADHERING TO STRICT SAFETYMANAGEMENT AND PROCEDURES.
PAGE 20
Forays Services & Constructions Pvt. Ltd.Registered Office:
1301, 13th Floor, The Ambience Court, Plot No-2,Sector-19 D, Vashi, Navi Mumbai- 400 705.
Tel: +91- 022- 2783 2809 / 2820 / 2821 Fax: +91- 22-2783 2815E-mail: [email protected]
Website: www.forays.co.in
PAGE 21
Branch Office:
1st Floor, 3-5-996, Street No. 5,Narayanaguda, Opp. Honda Showroom,
Hyderabad-500029, A.P., IndiaTel: +91-40-23223134, 30221632
E-mail: [email protected]: Mr. Suresh Thomas
Subsidiary:
Forays Qatar W.L.L.,P.O.Box No. 13738, Doha, Qatar
Tel: +9741-4604801(M): +974-5558576Fax: +9741-4604802
E-Mail: [email protected]: Mr. Abraham Mathew