form -1 scheme of mining & pre-feasibility...

12
FORM -1 SCHEME OF MINING & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF MULTI COLOURED GRANITE (Extent: 1.39.0Ha) -B2 Project IN S.F.No: 160/2B, 160/5A, 160/5C and 449/1B Village: Naganur Taluk: Kulithalai District: Karur State: Tamilnadu SUBMITTED TO State Level Environment Impact Assessment Authority (SEIAA), Government of Tamilnadu Chennai SUBMITTED BY M/s. G.V. Granites, No. 19G, Main Road, Thogamalai, Kulithalai Taluk, Karur District

Upload: vancong

Post on 17-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

FORM -1

SCHEME OF MINING &

PRE-FEASIBILITY REPORT

TO OBTAIN ENVIRONMENTAL CLEARANCE

FOR QUARRYING OF MULTI COLOURED GRANITE

(Extent: 1.39.0Ha) -B2 Project

IN

S.F.No: 160/2B, 160/5A, 160/5C and 449/1B

Village: Naganur

Taluk: Kulithalai

District: Karur

State: Tamilnadu

SUBMITTED TO

State Level Environment Impact Assessment Authority (SEIAA),

Government of Tamilnadu

Chennai

SUBMITTED BY

M/s. G.V. Granites,

No. 19G, Main Road,

Thogamalai, Kulithalai Taluk,

Karur District

INDEX FILE Sl.

No DESCRIPTION

PAGE

NOS

1 To Obtain Environmental clearance 3

2 Environmental clearance Format 5-9

3 Declaration letter 11

4 Demand Draft 13

5 Form-I 15-53

6 Approved Mining Plan Along With

Approval Letter 55-157

7 Pre-Feasibility Report 159-215

8 VAO signed for quarry site 199

9 Baselines Studies 217- 241

10 Affidavit Document 243-249

11 Copy of Explosive License 251-253

12 Consolidated Above Document In

PDF Format (DVD)

257

To consider the proposal for the grant of Environmental Clearance for Multi Coloured Granite quarrying

in at 1.39.0Ha in S.F.No: 160/2B, 160/5A, 160/5C and 449/1B of Naganur Village in Kulithalai Taluk,,

Karur District by M/s. G.V. Granites

The salient features of the proposal are as follows:

S.No: Details of the proposal : Data furnished Page No:

1.

Name of the owner/Firm

:

M/s. G.V. Granites,

No. 19G, Main Road,

Thogamalai, Kulithalai Taluk,

Karur District

Mobile No: 9443133605

3,19,55,11

9,159

2.

Type of quarrying

(Savudu/Rough stone/

Sand/Granite)

:

It is a Multi Coloured Granite quarry Project in

Naganur Village.

3,17,55,11

9,159

3. S.F.No of the quarry site with

area break up :

S.F.No: 160/2B, 160/5A, 160/5C and 449/1B 3,17,55,11

9,159

4. Village in which situated

: Naganur Village 3,17,55,11

9,159

5. Taluk in which situated

: Kulithalai Taluk 3,17,55,11

9,159

6. District in which situated

: Karur District 3,17,55,11

9,159

7. Extent of quarry (in ha)

1.39.0Ha 3,17,55,11

9,159

8.

Period of quarrying proposed

:

The Second Scheme of quarrying is prepared to

submission for a period of Five years (2014 – 15 to

2018 -19).

73,119,161

9.

Production (Quantity in m3)

:

The proposed quantity of reserves is (25%) is about

26492m3 of Multi Coloured Granite for a proposal of

four years

17,97,163

10. Latitude and Longitude of all

corners of the quarry site :

10°43’56.90’’N to 10°44’05.82’’N

78°24’10.87’’ E to 78°24’15.36’’ E

17,83,163

11. Topo sheet No : 58 J/06 17,83,163

12.

Precise area communication

approved by the District

Collector with date

: G.O. (3D) No. 84, Industries (MMB.2) Department

Dated: 10.08.2004

119

13.

Mining plan approved by the

Assistant Director of the District

with date

: Letter. No: 12083/MM2/2003 Dated: 23.07.2004 55

14.

Water Requirement:

1. Drinking & Domestic

purpose (in KLD)

2. Dust suppression & Green

Belt (in KLD)

;

Purpose Quantity KLD

Source

Drinking 0.3KLD Water vendors

Domestic purpose 0.3KLD From Existing bore hole

nearby quarry area

Dust suppression and Afforestation

0.4KLD From Existing bore hole nearby quarry area

33,167

15. Depth of quarrying

: The applicant proposed Multi-Coloured Granite up to a

depth of 13m (1m top soil+12m Granite) for a period.

17,97,163

16.

Project cost (including EMP

cost) :

The total project cost including EMP cost (A+B+C) is

about Rs. 49, 05,000/- (Rupees forty nine lakhs five

thousand only)

167,215

17. EMP cost

: The total EMP cost is about Rs. 2, 55,000/- (Rupees

two lakhs fifty five thousand only)

167,215

Checklist for Mining of Minor Mineral 1.39.0Ha mine lease area

S.No Details of the proposal : Data furnished Page No

1. Name of the owner/Firm : M/s. G.V. Granites, 3,19,55,1

19,159

2.

Correspondence Address with Pin

Code :

No. 19G, Main Road,

Thogamalai, Kulithalai Taluk,

Karur District

3. Email Address : [email protected] 19,171

4. Mobile Number : 9443133605 19,171

5. Type of quarrying

(Earth/ Rough stone/Sand/Granite) :

It is a Multi Coloured Granite quarry Project in Naganur

Village.

17,55,119

,159

6. S.F. No of the Quarry site

: S.F.No: 160/2B, 160/5A, 160/5C and 449/1B 17,55,119

,159

7.

Village in which situated, Town

Panchayat/ Panchayat Union in

which the village is situated

:

Village Panchayat : Naganur

Panchayat Union : Kulithalai

17,55,119

,159

8. Taluk in which situated

: Kulithalai Taluk 17,55,119

,159

9. District in which situated

: Karur District 17,55,119

,159

10. Extent of quarry (in Ha)

: 1.39.0Ha 17,55,119

,159

11.

New or existing quarry

:

It is New proposal Multi Coloured Granite Quarry Project

(the area has been quarrying operation is earlier) in Naganur

Village.

17,55,119

,163

12.

If in case of existing Rough Stone/

Blue Metal/ Granite Quarry, the

length, width and depth to which

quarrying has already been done

(below the ground level/ above the

ground level)

:

It is New proposal Multi Coloured Granite Quarry Project

(the area has been quarrying operation is earlier) in Naganur

Village.

L (m) W(m) D(m) Max

61 43 10

85,149

13.

If quarrying had been done below

the ground level/above the Ground

level, the height of quarrying

: If the quarrying had been done maximum 10m 85,149

14.

Name of the owner who had earlier

undertaken the quarrying & a copy

of mining lease issued with date

:

It is New proposal Multi Coloured Granite Quarry Project

(the area has been quarrying operation is earlier) in Naganur

Village.

17,55,119

,163

15.

Proof of land ownership.

If owned patta copy.

If not own patta land agreement/

lease copy entered with the owner

(to be enclosed)

:

It is a Patta vide Patta Nos.1188 125

16. Period of quarrying

: The Second Scheme of quarrying is prepared to submission

for a period of Five years (2014 – 15 to 2018 -19).

73,119,16

1

17.

Production (quantity in m3)

:

The proposed quantity of reserves is (25%) is about 26492m3

(or) 4681 Lorry Loads of Multi Coloured Granite for a

proposal of four years

The applicant proposed up to a depth of 13m (1m top

soil+12m Granite) for a period.

Description

ROM (m3)

Reserves

25%

(m3)

Granite

waste 75%

(m3)

Top soil

in (m3)

Geological reserves

257789 64447 193342 12890

Mineable

Reserves 188280 47070 141210 12890

Year wise reserves

114450 26492 79475 8484

17,89,91,

97,163

18.

Method of Mining

:

The quarrying operation will be carried out by Open cast

semi mechanized mining method with 5.0m vertical bench

with a bench width of 5.0m is being proposed.

23,95,163

19. Top soil/ Overburden in case of

Rough Stone/ Blue Metal :

There is a thickness of top soil is about 1m, the generation of

top soil is about 8484m3 during this scheme period.

97,103,16

3

20.

Quantity of rejects in m3 in case of

Granite Mining. :

Total Granite waste @75% is about 141210m3 for entire life

period.

Total Granite waste @75% is about 79475m3

for a proposal

of four years. There is no quantity of rejects.

17,91,97,

163

21.

Length, Width, Depth & Proposed

Quarry in meters. :

Ultimate pit dimensions

Block Length

(m)

Width

(m)

Depth (m)

XX` 115 90 21

93,97

22.

Land use pattern for a radius of 1Km

around the quarry site such as

Agriculture, Habitation etc., :

Description Percentage %

Trees - 20%

Road – 05%

Agricultural land – 50%

Existing quarry – 10%

Habitation – 15%

143

23.

Details of other quarries for a radius

of 1Km, around the quarry site. :

The village Topo sketch map showing the quarry proposed

site.

There is ten operating quarry located within the radius of

500m

143

24. Aerial distance from periphery of the

site to the nearest habitation : The Nearest habitation Mettupatty is 1km on Northern side. 49,109,20

3

25.

Aerial distance to the interstate

borders, in case of Rough Stone/

Blue Metal/ Granite quarry to be

obtained from IRS, Anna University.

:

There is no interstate boundary within the radius of 15km. 49,167,20

1

26.

In case of Rough Stone/ Blue Metal/

Granite quarry no objection

certificate from the concerned

district Forest Officer/ Wild Life

Sanctuaries/ National Parks/ HACA/

Western Ghats region if the quarry

site is within 15 Kms of these areas.

:

There are no wild life sanctuaries, National parks, HACA,

Western Ghats region within the radius of 15km.

49,167,20

1

27.

Aerial distance to the nearest eco-

sensitive areas, CRZ, Forests,

Monuments etc., within 15Kms of

these areas.

:

There is no CRZ, Monuments and sensitive areas within the

radius of 15km.

The forest is situated within 4km away from south western

side

49,167,20

1

28. Latitude and Longitude of all corners

of the quarry site. : 10°43’56.90’’N to 10°44’05.82’’N

78°24’10.87’’ E to 78°24’15.36’’ E

17,83,163

29. Topo Sheet No : 58 J/06 17,83,163

30.

Copy of explosives license and a

consent letter/ agreement of

competent recognized person who

has agreed to handle explosive for

the blasting, in case of Rough Stone/

Blue Metal/ Granite quarry.

:

A copy of consent letter and license copy enclosed. 251

31.

Brief details of APC measures

proposed to be proposed to be

implemented. :

The granite stones are quarried as undamaged dimensional

stones without involving deep hole drilling and heavy

blasting, fragmentation and generation of lumps, fines or

dust is negligible. Water will be sprinkled for the suppression

air borne dust from mine approach roads waste dumps on

regular intervals using water tankers.

113

32.

Mine Closure Plan to be furnished in

Mining plan.

:

In the Multi Coloured Granite quarry operations the

maximum depth about 21m (1m topsoil + 20m Multi

coloured Granite) for the entire lease period this is based on

the market potential at present scenario.

After completion of quarry operation the quarried out land

will be land will be fenced and maintained with barbed wire

to prevent inherent entry of the Public and cattle. Garland

drains will be constructed around the quarry to prevent the

surface run off rain water.

115

33.

Scheme of Mining plan prepared by

:

G. Eswar Reddy, M.Sc., B.L., Ph.D.,

RQP/HYD/302/2013/A

117,125,

Environmental clearance report

prepared by

Dr. P.Thangaraju, M.Sc., Ph.D.,

RQP/MAS/206/2007/A

34. Precise area communication

approved by the District Collector :

The Mining lease was granted in G.O. (3D) No. 84,

Industries (MMB.2) Department Dated: 10.08.2004

119

35.

Mining plan approved by the

Deputy/ Assistant Director of the

District.

:

The Mining Plan was Approved by the Commissioner of

Geology and Mining, Chennai vide Letter. No:

12083/MM2/2003 Dated: 23.07.2004

55

36.

Water requirement :

a) Drinking & domestic

purposes in KLD.

b) Dust suppression (in KLD)

c) Green belt (in KLD)

:

Drinking Water - 0.3 KLD

& Domestic purpose

Dust Suppression - 0.3 KLD

Green belt - 0.4 KLD

Total -1.0 KLD

33,167

37.

Source of water

:

Purpose Sources

Drinking &

Domestic

Purpose

Packaged drinking water is available from

the nearby approved water vendors

Dust suppression From Existing Borehole on nearby quarry

Green belt

development

From Existing Borehole on nearby quarry

33,167

38. Ground water table

: The Ground water is about 35mt depth from ground level. 29,109,16

5

39.

Project Cost (excluding EMP Cost)

:

The Project cost:

A. Fixed Asset cost = Rs. 5, 50,000/-

B. Operational cost = Rs. 41, 00,000/-

C. EMP cost = Rs. 2, 55,000/-

Total cost = Rs. 49, 05,000/-

The total project cost including EMP cost (A+B+C) is about

Rs. 49, 05,000/- (Rupees forty nine lakhs five thousand

only)

167,215

40. EMP Cost

: The total EMP cost is about Rs. 2, 55,000/- (Rupees two

lakhs fifty five thousand only)

167,215

41. Disclosure RQP

:

Dr. P.Thangaraju, M.Sc., Ph.D.,

RQP/MAS/206/2007/A

117,125,

42.

Soft copy of the Form–1,

Pre –feasibility report and Mining

plan in CD.

:

There is enclosed Soft copy for form –1, Pre – feasibility

report and mining plan in CD.

257

43.

Key map showing the approach

roads to the site to be attested by the

Deputy/ Assistant Director of

Geology and Mining of the

concerned District.

:

The Route map showing with approach roads to the site is

enclosed Plate No: IC

141

44.

Village map with S.F. Nos& salient

features such as vegetation,

habitations etc., for a radius of 500m

around the quarry site.

:

Village map with S.F.No and Salient features such as

vegetation, habitation etc., for 500mt radius is enclosed as

Plate no. VIII & Annexure - III

143

45.

If lakes, Ponds, river, nallah, odai

etc. are situated near the quarry site

permission from the concerned PWD

authorities for mining

There is no Rivers/Stream, and Reservoir within the 500m

distance to the lease applied area.

One lake is situated 700m away from south eastern side

49,167,20

1

46.

Section map for mining to be

attested by the Deputy/ Assistant

Director of Geology and Mining of

the concerned District.

:

The Geological Plan and section in 1:1000 & 1:500 scale is

enclosed: IV.

149

47. Photograph of the proposed Mining

site with S.F.No and attested by at :

The Photo of the quarry site is enclosed. 199

least VAO.

48. Form –I To be signed by applicant : I am hereby signed 53

49. Pre- Feasibility Report to be signed

by applicant. :

Pre-feasibility report has been signed by the applicant

215

50.

First and last page and the page at

which quantity of mining has been

worked out to be signed by the

Deputy/Assistant Director of

Geology and Mining of the

concerned District.

:

First page and last page and the quantity proposed in the plan

have been signed by the Commissioner of Geology and

Mining.

73,97

51.

Affidavit from the applicant that

child labor is not being employed in

the mining activity. :

It is been ensured that the labor will not be employed less

than 18 years, No child labor will engaged or entertained for

any kind of quarrying operations. All the labor engaged for

quarrying operations will be insured during the quarry lease

period.

243

52.

Affidavit from the applicant

regarding planting of trees around

the quarry site in fulfillment of the

Green belt commitment furnished.

:

Affidavit from the applicant regarding the proposal for

planting trees around the quarry and fulfillment of greenbelt

commitment is enclosed

243

53.

Details (POD) Regarding

communicating the proposal to the

members of the committee.

:

1. Signature of the applicant

For M/s. G.V. Granites

P. Velusamy

(Managing Partner)

2. Signature of the Recognized qualified person

Dr. P.Thangaraju, M.Sc., Ph.D.,

RQP/MAS/206/2007/A

NAGANUR MULTI COLOURED GRANITE QUARRY LEASE

APPLIED AREA (1.39.0Ha)

The proponent M/s. G.V. Granites has applied for Environmental clearance for the proposed quarry

Multi Coloured Granite for over an extent of 1.39.0Ha in S.F.No: 160/2B, 160/5A, 160/5C and

449/1B of Naganur Village in Kulithalai Taluk, Karur District.

Salient features of the proposal are as follows:

S.

No

Details of the proposal :

Data furnished Page No

1. Name of the Owner +

Firm

: M/s. G.V. Granites,

No. 19G, Main Road,

Thogamalai, Kulithalai Taluk,

Karur District

Mobile No: 9443133605

3,19,55,

119,159

2. Location of the quarry-

S.F.No.

: S.F.No: 160/2B, 160/5A, 160/5C and 449/1B of Naganur

Village in Kulithalai Taluk, Karur District

3,17,55,

119,159

3. Purpose of Application : It is a Multi Coloured Granite quarry Project in Naganur

Village.

17,55,119,159

4. Extent of quarry in Ha- : 1.39.0Ha 17,55,119,159

5. Land use planning

a) Mining

b) Storage of Topsoil

over burden

c) Infrastructure Road

d) Utilized Area

Total

:

Description

Present

Area

(Ha.)

Additional

area required

during the

scheme period

(Ha)

Net Area

considered

for

calculation

(Ha)

Area under quarry 0.20.8 0.71.7 0.92.8

Dumps Nil 0.16.7 0.16.7

Infrastructure Nil 0.01.0 0.01.0

Roads 0.01.0 Nil 0.01.0

Green Belt Nil 0.09.0 0.15.0

Unutilized area 1.17.2 0.18.8 0.12.5

Grand Total 1.39.0 1.17.2 1.39.0

23,115,2

05

6. Production (quantity in

m3)

: The proposed quantity of reserves is (25%) is about 26492m3

(or) 4681 Lorry Loads of Multi Coloured Granite for a

proposal of four years

The applicant proposed up to a depth of 13m (1m top

soil+12m Granite) for a period.

Description

ROM (m3)

Reserves

25%

(m3)

Granite

waste 75%

(m3)

Top soil

in (m3)

Geological

reserves 257789 64447 193342 12890

Mineable

Reserves 188280 47070 141210 12890

Year wise

reserves 114450 26492 79475 8484

17,89,91

,97,163

7. Top soil & overburden

(quantity in m3)

: There is a thickness of top soil is about 1m, the generation of

top soil is about 8484m3 during this scheme period.

97,103,1

63

8. Method of Mining : The quarrying operation will be carried out by Open cast semi

mechanized mining method with 5.0m vertical bench with a

bench width of 5.0m is being proposed.

23,95,16

3

9. Life of Mine as per

approved mining plan

: The Second Scheme of quarrying is prepared to submission

for a period of Five years (2014 – 15 to 2018 -19).

73,119,1

61

10. Height / width of the

bench

: Height 5.0m & Width 5.0m 23,95,16

3

11. Source of water / quantity

required :

Quantity

required

(in litres)

Source

33,167

a. Drinking & Domestic

Purpose

0.3 KLD Packaged drinking water is available from the approved water

vender

b. Dust Suppression 0.3KLD From Existing bore hole on nearby quarry

C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry

12. Waste water

Sewage water

Mode of disposal

:

:

There is no waste water. 39,207

The septic tank is constructed on permanent structure with in

the quarry lease area.

To local Panchyat Authority

13. APC Measures : 1.Mist Spray using water tankers,

2. Enclosed covered system. (Tarpaulin) for transportation.

39

14. Ariel distance of nearest

habitation

: S.

No Name of the Village

Approximate distance &

Direction from lease

applied area

applied area

Approximate

population

1. Mettupatty 1.0Km – N 1000

2. Akkandimedu 2.5Km-N 750

3. Thogaimalai 1.5Km-SE 1200

4. Naganoor 2.0Km-SW 1050

49,109,2

03

15. Ariel distance from

Reserve forest, Sensitive

areas, Forest, Bird

sanctuaries, Wild life

sanctuaries, National

parks, Monuments

etc., within 15km

: The forest is situated within 4km away from south western

side

Bird Sanctuaries – Ni

Wild life sanctuaries - Nil

National Park – Nil

Monuments – Nil

49,167,2

01

16. Land owner ship

document

Own patta land

Lease

Govt. Poromboke

:

:

:

It is a Patta vide Patta Nos.1188 125

17. Land use classification : It is New proposal Multi Coloured Granite Quarry Project

(the area has been quarrying operation is earlier) in Naganur

Village.

17,55,11

9,163

18. Scheme of Mining plan

prepared by

:

G. Eswar Reddy, M.Sc., B.L., Ph.D.,

RQP/HYD/302/2013/A

117,125,

Environmental clearance

report prepared by

Dr. P.Thangaraju, M.Sc., Ph.D.,

RQP/MAS/206/2007/A

19. Approved by : The Mining Plan was Approved by the Commissioner of

Geology and Mining, Chennai vide Letter. No:

12083/MM2/2003 Dated: 23.07.2004

55

20 Precise area statement

Approved by

: The Mining lease was granted in G.O. (3D) No. 84,

Industries (MMB.2) Department Dated: 10.08.2004

119

21. Nearby quarries : There is ten operating quarry located within the radius of

500m

143

22. Nearby lake / river/ odai /

channel etc.

: There is no Rivers/Stream, and Reservoir within the 500m

distance to the lease applied area.

One lake is situated 700m away from south eastern side

49,167,2

01

23. Latitude / Longitude : 10°43’56.90’’N to 10°44’05.82’’N

78°24’10.87’’ E to 78°24’15.36’’ E

17,83,16

3

24. GI Sheet No. : 58 J/06 17,83,16

3

25. Project Cost(Project cost

+EMP cost)

: The Project cost:

A. Fixed Asset cost = Rs. 5, 50,000/-

B. Operational cost = Rs. 41, 00,000/-

C. EMP cost = Rs. 2, 55,000/-

Total cost = Rs. 49, 05,000/-

The total project cost including EMP cost (A+B+C) is about

Rs. 49, 05,000/- (Rupees forty nine lakhs five thousand only)

167,215

26. EMP Cost (Capital and

recurring)

: The total EMP cost is about Rs. 2, 55,000/- (Rupees two

lakhs fifty five thousand only)

167,215

27. Water table : The Ground water is about 35mt depth from ground level. 29,109,1

65

28. Interstate boundary : There is no interstate boundary within the radius of 15km. 49,167,2

01

29. Western Ghats : There is no Western Ghats within the radius of 15km. 49,167,2

01

From:

M/s. G.V. Granites,

No. 19G, Main Road,

Thogamalai, Kulithalai Taluk,

Karur District

Mobile No: 9443133605

To:

THE CHAIRMAN,

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,

PANAGAL BUILDING, SAIDAPET,

CHENNAI

Sir,

Sub: Submission of Form–1, Pre-feasibility report and Scheme of Mining

(Ref. Approved Mining Plan Letter. No: 12083/MM2/2003 Dated: 23.07.2004)

for obtaining Environmental Clearance for our Naganur Multi Coloured Granite

Quarry Lease applied area- Reg.,

****************

I am here by submitting the processing fee in the form of demand draft for rupees one

lakh, along with Form-I and Pre-feasibility report and Scheme of Mining to your good office for

obtaining clearance from SEIAA, Chennai, for our Naganur Multi Coloured Granite quarry

Lease applied area for over an extent of 1.39.0Ha in S.F.No. 160/2B, 160/5A, 160/5C and

449/1B at Naganur Village of Kulithalai Taluk, Karur District, Tamilnadu.

I have submitted all the relevant documents to your good office to the best of our

knowledge. If any clarifications are required, we are ready to submit the same to your office at

your convenient time. Also we are ready to present the project in front of the committee.

Hence we request your good office to kindly process our application and allow us to

present our project at the earliest.

Thanking you.

Yours sincerely

For M/s. G.V. Granites

P. Velusamy

(Managing Partner)

Place: Karur