form rfd rev.5.xls

14
REQUEST FOR NEW PRODUCT DEVELOPMENT No : Customer Name : ( Local / Export ) Sales Volume Projection : Pcs/Annum - Other Remarks Description of Product : Size : Existing Stock Information * : (Filled by PPC) Item Quantity Covered by Solution to Stock PO SO (Filled by Sales) Finish Good WIP (P/Sheet-Component-etc) Alu/Tin Plate Lacquers Customer Specification Components Material Coating Quantity of Specification Inside Outside Printing Colour 1. 2. 3. 4. 5. Product to be Filled : Customer Process : Samples …………. Pcs * Pictures Customer Drawings and Specifications Customer Process * REQUESTED BY NAME SIGNATURE DATE SALES STAFF Expected Production Date : Forward : (please tick) To be Filled if the product to be developed is from old customer (progress) and wants to change the existing product with the new one Use another paper if needed

Upload: anon145533844

Post on 17-Jul-2016

248 views

Category:

Documents


1 download

TRANSCRIPT

REQUEST FOR NEW PRODUCT DEVELOPMENTNo :

Customer Name : ( Local / Export )

Sales Volume Projection : Pcs/Annum - Other Remarks

Description of Product :

Size :

Existing Stock Information * :

(Filled by PPC)

Item QuantityCovered by Solution to Stock

PO SO (Filled by Sales)

Finish Good

WIP (P/Sheet-Component-etc)

Alu/Tin Plate

Lacquers

Customer Specification

ComponentsMaterial Coating Quantity of

Specification Inside Outside Printing Colour

1.

2.

3.

4.

5.

Product to be Filled :

Customer Process :

Samples …………. Pcs *

Pictures

Customer Drawings and Specifications

Customer Process *

REQUESTED BY NAME SIGNATURE DATE

SALES STAFF

Expected Production Date :

Forward : (please tick) To be Filled if the product to be developed is from old customer (progress) and wants to change the existing product with the new one

Use another paper if needed

SALES MANAGER

Masa Kadaluarsa : - Revisi ke : 5 Nomor Dokumen : SLS-FM-04-02-05

Plan Manufacturing Proses RFD No :

Customer :

Product :

A. Availability of Machine and Capacity

Machine/Line available ……………………………

Investment Required (Please List Below) : ( in USD )

B. Availability of Tooling

Tooling available

Investment Required (Please List Below) : ( in USD )

Test Pack Requirement : Yes / No Estimate Time of Development :(Including Tools, Machine and Materials)

- Sample : - Produksi :

Check & Approved by NAME SIGNATURE DATE

Pro Dev Supervisor

R & D Manager *

Note : * Filled if this project need some investment

Approval could be done via email

Masa Kadaluarsa : - Revisi ke : 5 Nomor Dokumen : SLS-FM-04-02-05

RFD No :

Customer :Product :

Product Cost Calculationin USD per 1000 pcs

COST ITEMCOMPONENT ITEM

TOTAL

Metal Cost

Protective & Decorative

Other Material

Packaging

Labour

Factory Overhead

Sub Total Mfg. Cost

Sales Cost

General & Adm Cost

Others

TOTAL COST GENERAL

Price Proposed

Contribution Margin (%)

Gross Profit Margin (%)

Net Profit Margin (%)

Price Proposed

Investment Calculation (if any)

Total Price Proposed

Total Investment Need

IRR

NPV

Payback (months)

Check & Approved by NAME SIGNATURE DATE

Cost Accountant

Finance Controller

Masa Kadaluarsa : - Revisi ke : 5 Nomor Dokumen : SLS-FM-04-02-05

RFD No. :

Customer :

Product :

NAME SIGNATURE DATE

Note : * Approval could be done via email

1. Preparation

Item Controlled Date Of Remarks

Product Drawing Spec. Issued

Tooling Drawing Spec. Issued

Tooling PreparationStart

Finish

2. Summary Product Test

a. Printing Test : A. Cross Cut :

B. Mechanical Scratch :

C. Aceton Rub Test :

D. :

E. :

b. Dimension and Visual Test

ComponentResult to Product

RemarksDrawing Specification

c. Performance/Function/Assembly Test

d. Condition of Run Production Test

e. Result of Incubation Test Related To The Product

Samples/Proof Print Development Request

Requested bySales Manager

Approved byGM Sales & Marketing *

Approved byGM Operation Division *

NAME SIGNATURE DATE

Masa Kadaluarsa : - Revisi ke : 5 Nomor Dokumen : SLS-FM-04-02-05

RFD No. :

Customer :

Product :

REQUEST FOR PRE PRESS SERVICE (RPS)RPS No.:

New Design : Y / N, Dec No :

Issued Date : By:

Description:

Customer :

Dia.:

Finished Can Height :

Blanks Size :

Content Of Can :

Need Pasteurisasi : Y / N

Need Proof Print before price approval : Y / N

Color Reference :

Attachment :

Remark :

NOTES :

1

Issued & Check byProd Dev Supervisor

Approved byR & D Manager

TARGET PENYELESAIAN ARTWORK = 1 MINGGU, PAPER PRINT = 1 MINGGU, PROOFPRINT = 2 MINGGU DARI TANGGAL RRS

2

3

4

5 *F/C = FULL COLOR , B/W = BLACK & WHITE

Masa Kadaluarsa : - Revisi ke : 5 Nomor Dokumen : SLS-FM-04-02-05

RFD No. :

Customer :

Product :

Customer Test Pack Request

Contact Person at Customer :

Address :

Phone / Fax No. :

Quantity Samples Required :

NAME SIGNATURE DATE

Note : * Approval could be done via email

Test Pack Record

Date of Customer Test :

Quantity of Product Tested :

Item Test Result of Test Remarks

Dimentional Test

Visual Test

Assembly Test

Functional Test

Incubation Test

Conclusion of Customer Test : Good Fail

Additional Comment

1. Test pack has been done with standard product content/ingridients and production process as stated on attached

customer process data.

2. Test pack samples should be kept by customer and PT. Ancol Terang MPI as a test pack evidence.

PENENTUAN MATERIAL ET/TFS/ALU & COATING MENGACU KEPADA PRINTING LAYOUT DAN TECHNICAL SPECIFICATION

JUMLAH PEMBUATAN PAPER PRINT ADALAH 3 LEMBAR, JIKA SALES MEMBUTUHKAN LEBIH AGAR DICANTUMKAN PADA REMARK

JUMLAH PEMBUATAN PROOFPRINT DAPAT DILIHAT PADA DAFTAR SPESIFIKASI PROOFPRINT & COLOUR TOLERANCES

Requested bySales Manager

Approved byR & D Manager *

3. If there is any changes on standard product content/ingridients or product process, then customer should inform

PT. Ancol Terang MPI for evaluation purpose and test pack if required.

NAME SIGNATURE DATE

Masa Kadaluarsa : - Revisi ke : 5 Nomor Dokumen : SLS-FM-04-02-05

Issued byATP Staff

Approved byCustomer

Approved by ATP R&D Manager

ORDER TYPE

1a F/C Paper Print

1b B/W Paper Print

2 CTP Group Besar

3 Proofprint

4 Finished Good Sample

5a Soft copy File Aktif

5b Soft copy File tidak Aktif

EMAIL

CD

6 Others

REQUEST DATE

CONFIRM BY PRE PRESS