Northwest Project Location
Northwest Projects Update 1
16MW
66 MW
195 MW
Forrest Kerr Spec’s
2Northwest Projects Update
• Gross Head: 97.2 - 102.8m
• Net Head: 87.2m
• Design Flow: 252.0 m3/s
• Plant Capacity: 195 MW
• 9 Francis Turbines (28 m3/s each)
• 3.1 km Tunnel ‘D’ – shape 9.6m x 9.8m high
• Underground (120m) Powerhouse 17m x 127m
• 38 KM 287 KV Transmission Line
Forrest Overview
3Northwest Projects Update
Forrest Kerr Intake Area
4
Power Tunnel
De-sander
Sluiceway and
Box Culvert
Obermeyer Weirs
Northwest Projects Update
Radial Gate
Forrest Kerr Sluiceway and Box Culvert
5Northwest Projects Update
Desander System
6Northwest Projects Update
Forrest Kerr Powerhouse
Northwest Projects Update 7
Forrest Kerr Switchyard and 13.8KV Bus
8Northwest Projects Update
Forrest Kerr Video