forwards copy of indicators discussed at 980610 fpl & nrc ...~ategory 1 regulatory information...
TRANSCRIPT
~ 'ATEGORY 1REGULATORY INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:980N,FACIL:50-335 St.
~ ~
50-389 St.AUTH.NAME
STALL,J.A.RECIP.NAME
6290323 DOC.DATE: 98/06/24 NOTARIZED: NOLucie Plant, Unit 1, Florida Power 6 Light Co.Lucie Plant, Unit 2, Florida Power 6 Light Co.
AUTHOR AFFILIATIONFlorida Power & Light Co.
RECIPIENT AFFILIATIONDocument Control Branch (Document Control Desk)
DOCKET0500033505000389
SUBJECT: Forwards copy of indicators discussed at 980610 FPL &. NRCbi-monthly mgt review review meeting held at St Lucie Plant.
DISTRXBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:TITLE: OR Submittal: General DistributionNOTES:
RECIPIENTID CODE/NAME
PD2-3 LAGLEAVES,W
COPIES RECIPIENTLTTR ENCL ID CODE/NAME
1 1 " PD2-3 PD1 1
COPIESLTTR ENCL
1 1
E
0
INTERNAL: ACRSNRR/DE/ECGB/ANRR/DRCH/HICBNRR/DSSA/SRXBOGC/HDS3
1 . CENTER 011 /DE EMCB1 NRR/DSSA/SPLB1 NUDOCS-ABSTRACT0
1 11 11 11 1
TERNAL: NOAC 1 1 NRC PDR 1 1
D
U
E
NOTE TO ALL "RIDS" RECIPIENTS:PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTSOR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROLDESK (DCD) ON EXTENSION 415-2083
t
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13
,
Florida Power 5 Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957
June 24, 1998
L-98-16910 CFR 50.4
U. S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, D.C. 20555
RE: St. Lucie Units 1 and 2Docket Nos. 50-335 and 50-389
H'uringa November 1995 meeting with the NRC, Florida Power and Light Company (FPL)reviewed the progress made in completing activities outlined in the St. Lucie Plan to ImproveOperational Performance. FPL stated that meetings to review performance would be heldmonthly. In the November meeting, FPL committed to provide the monthly review materials tothe NRC.
Enclosed is a copy of the indicators that were discussed at the June 10, 1998, FPL/NRCbimonthly management review meeting at the St. Lucie Plant. The NRC stated at this meeting thatbased on the significant performance improvements achieved by St. Lucie this was the last of thebimonthly meetings.
Ifyou have any questions on this material, please contact us.
Very truly yours,
J. A. StallVice PresidentSt. Lucie Plant
/,
JAS/spt
Enclosure
cc: Regional Administrator, USNRC, Region IISenior Resident Inspector, USNRC, St. Lucie Plant
9806290323 980624PDR ADOCK 05000335P PDR
an FPL Group company
I,I*
Florida Power 8, LightBi-MonthlyStatus Meeting
onSt. Lucie Plant Performance
June 1Q, 1998
Oo0
Agenda
Introductlon ......................................................................
J. A. Stall, Site Vice President0peratlons s ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
H. H. Johnson, Operations ManagerE. S. Katzman, Chemistry/Health Physics Supervisor
Malntenance .....................................................................
B. R. Sculthorpe, Maintenance Manager (Acting)E nglneerlng ......................................................................
C. R. Bible, Engineering Managerlant Support ~s ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~P
D. L. Fadden, Services Manager
Q l i AI'Iuallty Assurance ...........................................................
L. W. Bladow, Site Quality ManagerC losing Remarks II~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
St. Lucre PlantKey Performance Areas
~ Regulatory Compliance
~ Cost Performance
~ Unit Reliability
~ Employee Development/Work Place Quality
ST. LUCIE PLANTOYERVIEW
St. Lu ie PlantPerformance Highlights
40
41OSHA Recordable Injuries
35
30~~
250
20
15
z 10
26
21
0
St. Lu e PlantPerformance Highlights
Combined Unit Average Equivalent Availability
100
90
80
a. 70
80.9
74.1
83.2 82.9*
90.989.68
60
601994 1996 1996 1997 1998 Proj. YE Top Decile
* Dual Vnit Outage Year
St. Lu ie PlantPerformance Highlights
100
90
80 75 8 73.6
91.2 90 8 92.1
80.9 83.5,
WANO Overall Performance
94.3CI Unit 1
RUnit 2
70
CL
60
66.8
62.1
68
50
40ill
0004DQl
St. L ie PlantPersonnel Changes
~ Nuclear Materials Manager -,Frank Fink
~ Security Supervisor - Gerry Bird
~ Chemistry/Health Physics Supervisor - Eric Katzman
St. L ie PlantEmployee Concerns
NRC Number of Allegations
70
Historical Data70
Current Data8
60
50
40
30
20
10 4
21
47
St. L ie PlantEmployee Concerns
Number of Anonymous Condition Reports
O05
2E
Z
0
Total3,051
1996
Total2,749
1997
0
Total901
1998 YTD
10
t SPEAKOUTSt. Lucie PlTotal Concerns
150
125
'i 990 - 1998 YTD
E3 Substantiated
0 Unsubstantiated
%Open
100
750S
50Z
75
62
7267
53
9184 87
39
67
48
25 158
C)OlOl
CACAT
11
St. Lucie Pl t SPEAKOUT% Anonymous Concerns
401994 - 1998 YTD
30
0O
20
~o 10O
30
24
18
12
1994 1995 1996 1997 1998 YTD
12
St. Lu ie PlantCorrective Actions
~ Condition Report Process Identical at Both Plants andCorporate Office
~ St. Lucie Has Established a.Culture of Identifying andReporting Conditions Which Need to Be Evaluated:
+ 1996 - 3,051 Total GRs Written+ 1997 - 2,749 Total CRs Written+ 1998 YTD - 901 YTD Total CRs Written
~ Effective Corrective Action Identification and Timely ClosureRemain a Challenge
+ Condition Report Closure Indicator+ Corrective Action Improvement Team+ Action Item Backlog Reduction+ Human Performance Improvements
St, Lu e Plant1998
CHALLENGES
~ Corrective Action Program
~ Fire Protection Program
~ Equipment Clearance. Order Implementation
~ Licensed Operator Staffing
~ Ownership of High Standards Throughout the Organization
14
OP E RATIONS
ACCOMPLISHMENTS
~ Conservative Operations
~ Command and Control
~ Questioning Attitude
'o Attention to Detail
~ Teamwork
~ Control Room Annunciator Response
16
OPERATIONS
ACCOMPLISHMENTS
~ Focus on Peer Checking I Self Checking
~ Annunciator Dark Board
~ Strengthened Watch Station Turnovers
~ Adherence to Plan of the Day
~ Configuration Risk Matrix
~ Red Sheet Program
~ Computerized Equipment Out-of-Service Program
17
OPERATIONS
LICENSED OPERATOR STAFFING
~ Technical Specification Minimum Staffing+ 35(TLicensed Operators Per ShiftX5 Shifts)
~ Current Status+ 45 (9 Licensed Operators Per Shift X 5 Shifts)
~ Self-Relieving Crew Minimum+ 55 (11 Licensed Operators Per Shift X5 Shifts)
~ Year End Projection+ 65: 45 (Current Complement)
3 (Hot License Class 13A)5 (SRO Class)
12 (Hot License Class 14)
OPERATIONS
Automatic Reactor Trips
VlO.
3
0IE
Z
01994 1995
0
1996
19
1997-
0
1998YTD
Operator Work Arounds
e 40
30
200L
«0Z
r W r Ar n: A problem that impedesan operator in performing duties within theapproved procedures or in accordance with theintended design.
Note: Additional Operator Work Arounds aresolicited following each refueling outage.
01995 1996 1997 1998 YTD YE Target
20
OPERATIONS
CHALLENGES
~ Error Reduction in Clearance Process
~ Shift Supervisors Embracing High Standards of Performance
~ Strengthen Non-Licensed Operator {NLO)Career Path
~ Continuous Improvement Through Self Assessment
21
CHEMISTRY
ACCOMPLISHMENTS
~ Chemistry Sampling and Analyses Upgrades+ Dionex In-Line Sampling Instrumentation for Enhanced
SG / Condenser Monitoring+ In-Line Sodium Analysis for Early Detection of Seawater
In-Leakage+ Enhanced In-Line RCS Hydrogen and Oxygen Monitoring
~ Primary Chemistry Lab Improvements
~ "CE Plant Best" Steam Generator Replacement Project Dose+ Hydrogen Peroxide Addition to RCS
22
CHEMISTRY
Effluent Releases - Liquids
1.7 All Release TotalsAre in Curies
0.9
0.6
0.2
1994 1996 1998 YTD
CHEMISTRY
Effluent Releases - Gaseous
400
387
300
200IO
100
0
170
52
All Release TotalsAre in Curies
1.4
1994 1995 1996 1997 1998 YlK)
24
e
CHEMISTRY
CHALLENGES
~ Micro-Biological Induced Corrosion (MIC)+ Closed Cooling Water Systems Biocide Program
~ Secondary System Iron+ Iron Transport Study+ Alternate Amine Program
~ Reactor Coolant System Source Term+ Microfiltration
25
HEALTH PHYSICS
ACCOMPLISHMENTS
~ Personnel Exposure Reduction+ "CE Plant Best" Steam Generator Replacement Project Dose+ Remote Monitoring+ Best Ever Monthly Exposure, 0.764 REM (May 1998)+ Reduction in High Radiation Areas
~ RCA Material Condition+ Reduction of On-Site Radwaste+ Recoverable Containment Floor Space Maintained at '0'q/ft
26
HEALTH PHYSICS
Recoverable Contaminated Floor Space
5000
4600
4000
3500
3000
I 2500
2000
1600
1000
500
0
4600
1993
2848
1994
1480
1995
200
1996 1997 1998YTD
27
HEALTH PHYSICS
90
80
70
81f„'5
Low Level Solid Waste3-Year Running Average
0PSLILttj Industry Average0 WANO
60L
~ So
o 40O
30O
20
45 46
54
4751
4236
3236
45
10
01993 1994 1995 1996 1997 1998 YTD 2000
28
HEALTH PHYSICS
700
600
500
400E
(g 300
200
100
0
505
413
Radiation Exposure
646'GRP
224
422
24.
187 185
29
CICD l-CD 0-
* Dual Unit
Cl
Outage Year
0
HEALTH PHYSICS
200
180
160
140
120
happ
80
TargetActual
TLD Cumulative Exposure183 185
60
40
20 10
p 8
272422 24
20 22 23
37404345
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
30
HEALTH P HYSICS
INITIATIVES
~ Reactor Coolant Pump Seals~ Non-Depleting In-Core Fission Detectors~ Inter-Departmental Dose Reduction Teams
CHALLENGES
~ "ONE MILLIREMAT A TIME"
~ Improve Radiation Worker Standards~ Enhance Radioactive Material Control Program
MAINTENANCE
ACCOMPLISHMENTS
~ Work Control Planning
~ Refueling Outage Optimization
~ Continuous Process Improvements
MAINTENANCE0
'I
ACCOMPLISHMENTS
~ Plan of the Day
~ Red Sheet Program
~ Long Range Planning of On-Line Critical MaintenanceManagement {CMM}
~ 13 Week Schedule Fully Implemented With Probabilistic SafetyAssessment {PSA} Input
MAINTENANCE
ACCOMPLISHMENTS
~ Levelized Maintenance for Operations Support
~ Human Performance Standards
~ Continue Process Improvements Through Self Assessments
~ Effective Predictive Maintenance Program
~ Looking Outward into the Industry
35
MAINTENANCEi
ACCOMPLISHMENTS
~ Equipment Upgrades+ Unit 1 Automatic Control Element Assembly (CEA)
Timing Module (ACTM} .
+ Traveling Screens+ In-Core Instrumentation "Quickloc" Modification
~ Non-Depleting In-Core Detectors
36
MAINTENANCE
1300
1200
1247
Maintenance BacklogNon-Outage - AllTypes
11OO
01000
900
Q.
800
700
z600
500L
Q0
TCO
959
895
L
Q'a
tOClCA
786
COOl,CD
704
903
Q'Q
C4
Cb
648
L
.Q
CS
618
521
790
0OQ.0I-
37
MAINTENANCE
Trouble 8 Breakdown Plant Work Orders
100
gp 85 88 89
80
70
60
50L
40E
30
20
10
6760
Goal cl= 90
73 73 72
90
75
57
46
35
CllC)
CA
Q.CltD
38
MAINTENANCE
PWO Aging Curve
600
500
. 600 ~ Actual-- ~-- Target
0 400
300
CL
O.
200
z100
0
553
189
300
'
'
150
29
75
7 0
Totals 3 mos. & greater 6 mos. &greater 9 mo. & greater 12 mos. & greater
700
Minor Maintenance Tool Pouch MaintenanceInitial Implementation Status
May 1998619
8 600
500
4000
3000I 200
100Z
172
53
Total WorkRequests
Worked asMinor
Maintenance
40
Worked asTool Pouch
eMAINTENANCE
CHALLENGES
~ Equipment Obsolescence Issues
~ Maintenance Rule a{1} Equipment I Systems+ Preventive Maintenance Review+ Predictive Maintenance Programs
~ Power Supply Aging
~ Radiation Monitor Reliability
~ Reactor Coolant Pump Seals
41
ENGINEERING
ACCOMPLISHMENTS
~ Major Projects - Reliability Improvements+ Steam Generator Replacement Project .
+ Pressurizer Heater Sleeve Nickel Plating+ Automatic Control Element. Assembly {CEA)
Timing Module {ACTM)
~ 10 CFR 50.59 Screening Improvements+ Detailed Procedure Developed to Standardize Screening
Process+ Program Requires Written Screening Justifications
43
ENGINEERING
ACCOMPLISHMENTS
~ System Engineer Program Developed and Implemented
~ Reactivity Management Support to Operations+ Reactor Engineers on Shift During Power Maneuvers+ Reload Core Design Approved by Operations+ Zero Defect Fuel *
~ Significant Programs Transferred to Engineering andUpgraded
+ Post Maintenance Testing+ Software Control
44
ENGINEERING
ACCOMPLISHMENTS
~ Risk Based Assessments+ 13 Week On-Line Maintenance+ Outage Schedule Logic for Shutdown Risk+ Emergent Issues
~ Comprehensive Self Assessment of Reactor EngineeringProgram and Procedures
+ Integrated Team Including NSSS Vendor
~ Maintenance Rule Program Review and Self Assessment+ Implemented Annunciator Summary Type System Status
~ Self-Identification of Concerns+ Engineering Program Reviews
45
0
ENGINEERING
Program Reviews
RPS, ESFAS, AndAFAS
Setpoints .'„.
1997 Evaluations1997 EngineeringCorrespondence,
','I
1990'-TO 1996.Sampled
Engineering'valuation."".: '-
;—:1990TO "1996--';-"
Sampled- Engineering
Corresp*o'ndence -.—;.
GL 96-01 Program(ESFAS Logic
Testing)
GL 89-10 Program(MOVTesting) .,
SetpointEnhancement
=. Program-,.
FSAR ProceduralConsistency
,.- RevieIIIr Program
Self-Assessment Of— — -Select Safety
Systems'A/E Inspectiori)':.
Scaffolding Criteria. And Procedures
Heavy LoadsHandling. Procedure
a
FSAR SystemReviews
(In-Progress)
EQ ProgramReview
(In-Progress)
SWOPIReview
(In-Progress)
MaintenanceSpecifications AndPiocedures'ire
ProtectionProgram
(In-Progress)
Offsite DoseCalculation
Review
(In-Progress)
46
Safety Relief ValveSettings Program
Review
(In-Progress)
EDFSIImplementation
Review
(In-Progress)
GREEN = COMPLETE
ENGINEERING
Unit 1System Windows Unit 2
V w W I'0 20 fY IY IY IY 2W2AI2WIW IY ff 2W 2W f Y W W IV IY IY IY 20 20 24 24 20 IY IV 2W 2W
Fuel S CEAs RCS CVCS
NSSS N))oh'sr j'»vdaw Oa
Safety g.~c)r Vedas
IYGFuel Og Fur)I 8 CEAs
NSSSVfhtej 2w Iw Iw rr
RCS
ef» fdbw
CVCS HPSI
Q)vdoh j afbvdeh
safety fnl. DIG Fu'el al;rfyrfrrfc j ICCOeir.'-".j 'vr EDG
afbaeowy", jCntne Spray AFW Main FAV
I)Vdhw
CCW ICW
ado Sana j 42)AOAe
SITs
Seen
W V 20 u) IWIW
Mdfn F)W CCW
~Cb Aaoh j ac) Oooo
)W IW 1W 20 'm 20
ICW
afb wise
IKCYVhtej 2W rf rf Tf 2w ah Iw 2w
AFAS RPS ESFAS
rcboeen j arbwhh j acbwhh
SGBORd Rad Mon
arb Oooo j ~ (»Yelaw
Rc Reg RPS
afbfdlwIKCYefovj20 20 2w 2w
ESFAS SGBO Rd I)j afbaoes
Red Mon Hyd Anal Rc Reg
~Cr) Seen jg) Sees
Nues fnsu
afb acne
CEDM QSPOS
acbveaow j acbwhle
w Ar w w )wwrw)w . 2w)wxf 2020480 VAC
SWGRSBRK 12C1208VAC 120VkyfAC
~0)AOrh j au)Whh
Vfhte j 20 20 m 24 20 20 )w Iw Iw
Sa Gmd Cca)vnun Pfotectfon .~CSOewo'j Seen j erbvdwo
W w 20 20 2W2W2W 20 2AI2020 '0
125 VDC
e) Whh
IY Iv If ff416 KV
SWGRSBRK
acf) vuc
thsKV
Gen 4 IX'WGRSBRKrdb aeon j am Own
4 W W 202W2W480 VAC
SVVGRABRK
wy)whh jViej 20 20 20 20
W W W 2W;020 2W
$20208 VAC 120 Vkal AC
afb Whh
Catbocac
Pfctectk)n
~Cbwhlo
416KV125 VDC S)NGRSBRK
~Cbaeen j rff)vance
Gen 8 Distr
Nfrvue
480 VAC
SWGR SBRK
~~W)
Myk)Seam Extr Stean HtrVnts8Dr
~4) Whse g dean j Sewf
Whte 4 2w )w w )w
Tfstdne Tfabtne
Cndensate ang Water tcd)e Oit'c))
Seen j 4) Whse g Seen j rfbSoon
are Water
42) ONA BOPWbte j Iw Iw Tw 2w
Extr Steam
n2)Vno
terVnts8Dr
Turb)ne Turbine Cond ensyce;
CCndenyate ang Water Lube at pegyfdnrg arC Water
ad)Seers j afbWhh g rdbvdee j Saon jacbWhh
Tfabk)e
4)Tv'Ar w 2w2w1v rf 2w)w)wrw 0 W Y )W)WIWIW
IsuufnentAIr HVAC(RS)
~Cbvddo j ary)whloSUPPORTVotue j
enetratlon Fuel POOl
Oooo j au)VVhbo
waste Service
Managenvd 'ksy)whh
HVAC(NRS) ECCS DRNS
N2)Vdde SUPPORTWhiej
trulnNCAt
Airw2raeen'
HVAC(RS) ennttatf !on
aryr Vehw j Whla
Fuel Poof =
Waste SelvkeAir HVAC(NRS)
acbvwe
Hydrogen tasnv)te
Rcfffnrs Heat Snk42) VWe j Seen
FlxlPASS Handkng
~CSWNN j aCCOean
Structure Fohr Crane
acb Vdeh j Ores
IW ff IR
Igumate
Heat Snkrfbwhrh
PASS
)Yebcw
Potar Crane
afbwhh j eu)neon
a ~ruseW Whh Rainy
YYeaow Rankly
R Ihd Raere
jNeead Trend
g Cwan freed
'henrhelan wrhr rorrrwby byes parer ~If)bn RAny wcrefcaue
SYS NAME
a Ihw lhhu
. Whh Ihlny
AYelow Rainy
R Red Rainy
g upfeefjNnnel Tend
y Ooeerend
'eonhafcn ender rtwwby lrpwlPanel
RS: Reh ecrdcwd
ons. Iae fbwrege%canl
~12) ue Ihdny ccecleua
~(I) lnRoan'rcepedh
SYS NAME
47
ENGINEERINGI-
0.029
Safety System UnavailabilityEmergency AC Power System
(1-Year Running Average}
OUnit 1
lEUnit 2
0.013
0.001
0.006
0.002s- 'l.J,
o.ooa
0.0010 ~ 002
1995 1996 1997 1998 YTD
3-Year Running AveragesEmergency AC Power
nit1nit 2
1995
0.0 9
0.
48
1996 1997 19985198
0.016 0.015 0.015
.0 2
ENGINEERING
Safety System UnavailabilityAuxiliaryFeedwater System
(1-Year Running Average)0.0291
0.025
C3 Unit 1
iiiilUnit2
0.020.0188 0.0184
0.01 62
Sl0.015
(0C
0.01
0.0050.0037
0.0074
0.0050.0035
0
1995 1996 1997 1998 YTD
3- ear Running AveragesAuxiliary Feedwater
Unit1
nit
1995
0.0
49
1996
0.01
1997
0.01
9985/98
0.0
ENGINEERlNG
0.05
0.045
0.04
0.035
0.0473
Safety System UnavailabilityHigh Pressure Safety Injection
(1-Year Running Average)
Cl Unit 1
EI Unit 2
0.03
0.025
0.02D
0.015
0.01
0.005
0
0.0155
0.0095
0.0033 0.00510.0008
0.0058
1995 1996 1997 1998 YTD
3-Year Running AveragesHigh Pressure Safety Injection
nit
nit
1995 1996
0.025 0.026
1997
0.025
.00
19985/98
0.007
50
350
Open Plant Change / Modifications (PC/Ms)
300
250O
200
o 150L
100z
50
84
52
1995 1996 1997 1998 YTD
51
ENGINEERING
CHALLENGES
~ Fire Protection Issues Resolution
~ Year 2000 Resolution
~ Long-Term Planning Development
52
ENGINEERING
CHALLENGES
~ Continual Strengthening of System Engineering
~ Equipment Issues+ Equipment Obsolescence Issues+ Power Supply Aging+ Radiation Monitor Reliability+ Reactor Coolant Pump Seals
PLANT SUPPORT
0
TRAINING
ACCOMPLISHMENTS
~ Implemented Integrated Site Training Plan
~ Line Management Sets Training Standards+ Managers Chair Training Review Committees (TRC)+ Site VP Chairs Plant Training Advisory Board (PTAB)+ Line Supervisors Attend Training+ Line Supervisors Approve New Lesson Material
~ Reduced and Maintained a Low Backlog of Simulator OpenIssues
~ Real Time Training Coaches~ Improved Feedback From Customers
+ TRGs Include Incumbents+ Student Feedback Sessions
90
80
o) 70
60
6 500v- 400L
30E
20
10
0
85
1993 1994
TRAINING
Open Simulator Issues
37
19961995
56
10
1997
10
1998 YTD
TRAINING
CHALLENGES
t Increase the Number of Licensed Operators
~ Human Performance
~ Raising Qualification Standards
57
EME ENCYPREPAREDNESS
ACCOMPLISHMENTS
~ Successful 1998 Emergency Preparedness Exercise
~ Upgraded Emergency Plan Implementing Procedures (EPIPs)
~ Upgraded Personnel Qualifications
~ Quarterly Integrated Drills With Scheduled Rotation of EmergencyResponders
~ Upgraded Emergency Response Capabilities
~ Emergency Response Facility Improvements
~ Quarterly Self Assessments58
EME ENCYPREPAREDNESS
CHALLENGES
~ Continual Program Improvements
~ Relations With Outside Agencies
59
SECURITY
ACCOMPLISHMENTS
~ Training
~ Reduction in Loggable Events
~ Self Assessment Program
~ Fitness For Duty Program
60
Security Loggable Events
450
400
350
300
2500e 200
150
'|00
50
352
264 268
420 423
231
26
01992 1993 1994 1995 1996 1997 1998 YTD
61
SECURITY
CHALLENGES
~ Access Authorization Issues
62
PROCEDURE UPGRADES
ACCOMPLISHMENTS
~ Improved Procedure Usage
~ Simplified Procedure Development and Revision Process
~ Tied Procedure Revisions to Training
1400
Procedure Upgrades ProgramARPs not included
1200
e 1000
o 80000cc
600
400
200
~ Target-c3- Actual ADM
HPCHEMMMEMICM~STotal
13582
~
. 66155154302
1365
1365
Data Date: 6/5/98Target = 203Complete = 413Remaining = 952
Ol CD CD CD Ol Ol
m eu K
h h. g h hCD CD Ol CD CD
Ql L ~ ) 00tO O 2 0
CO CO CO CO CO COOl Ol CD Ol Ol Ol
ccc e ccc 0 ccc
L.
CO CO CO COCD Ol Ol CD
0l Q. 0
CO
002
CO Ol Ol OlOl Ol CD Ol0 L
Ca ClO ~ Lc.
CD
Q.
Ol Ol Ol CDOl CD Ol Ol
co
CD CDOl Ol0 00
CD
00 Cl2 0
Date
64
25
~ 20I0
15'00O
10
0
o 5
Q.
naO4
CClChOl
19.1
13
PROCEDURE UPGRADES
Procedure Adherence I Procedure Adequacy EventsIdentified by Condition Reports
~ Proc. Adherence~ Proc. Adequacy20.4
17.4
13.412.3
10.79.6
7.67.
52
4.8
L
6'0C9CClCllOl
L,
6U
ClCll
I
QlAT
QlCh
L
Q
COClQl
65
6.5
3.6
L
6
CaQlCA
PROCEDURE UPGRADES
CHALLENGES
~ Moving to On-Line Procedures
~ Timely Procedure Revisions to Support Outages
66
QUALITYASSURANCE
ACCOMPLISHMENTSPLANT AREAS THAT HAVE DEMONSTRATED IMPROVEDPERFORMANCE IN 1997
~ Safety Conscience and Conservative Operations
~ Maintenance Performance, Planning and Scheduling
~ Safe and Well Executed Outages
~ Reliable Plant Operations Following Refueling Outages
~ Emergency Preparedness Program
~ Industrial Safety
~ Engineering Quality and Problem Solving
68
QUALITYASSURANCE
FPL
St. Lucie PlantPerformance Windows Report
1st Quarter 1998
GREENWHITE
YELLOW. RED
Excellent Per'formance:..Satisfactory Performance
Improvement Needed. =Poor Performance
OPERATIONSMAINTENANCE/
WORK MANAGEMENT ENGINEERING SERVICES MISCELLANEOUS
Sqtr4997 4qtr.1997(CREEN) (OREEN)
Safety Focus(GREEN)
Sqtr 19ST,: 4qtr1SST'OREEH)".:(O)tEK.H),
Safety Foc'us(GREEN)
Sqtr 1SST- 4qtr1$$7(OREKH) (ORKKH)
C
Safety Focus -.
. (GREEN)
Sqtr 1997 4qtr 1997(YELLOW) (YELLOW)
Security(WHITE)
Sqtr 1$ST 4qtr 1997(YELLOW) .- (REO)
Overtime(YELLOW)
Sqtr 1997 4qtr 1SST(WHITE) (WHITE)
Sqtr 1997 4qtr 1997(WHITE) (WHITE)
Sqtr 1997(WHITE)
4qtr 19ST(WHITE)
Sqtr 1997 4qtr 1997(YELLOW) (WHITE)
ro BnlIdentification
and CorrectionWHITE
ro emIdentification
and CorrectionWHITE
ro emIdentification and
CorrectionWHITE
Training(WHITE)
Corrective Actions(YELLOW)
Sqtr 1997 4qtr 1997(WHITE) (WHITE)
Sqtr 1997 4qtr 1SST(YKLLOW) (WHITE)
Sqtr 1997(WHITE)
4qtr 1997(WHITE)
Sqtr 1997 4qtr 1997(WHITE) (WHITE)
Quality ofOperations
(WHITE)
Quality ofIVlaintenance
(WHITE)
Quality of'ngineering.
(GREEN)
Industrial Safety(WHITE)
Clearances(YELLOW)
Sqtr 1997(WHITE)
4qtr 1997(WHITE)
Sqtr 1997(WHITE)
4qtr 1$ST(WHITE)
Sqtr 1997(WHITE)
4qtr 1997(WHITE)
Sqtr 1997 4qtr 1997(WHITE) 0NHITE)
Programs/Processesand Procedures
(WHITE)
Work IVIanagement(WHITE)
Programs/Processesand Procedures
(WHITE)
,...Emergency -, .;- 'Preparedness ",',
". (GREEN)
Sqtr 1997(WHITE)
4qtr 1997(WHITE)
Sqtr 1997- 4qtr 1997(YELLOW) (YELLOW)
EquipmentPerformance
—(YELLOW)
FireProtection(YELLOW)
For Comments or InputsContact Quality Assurance
69
SOURCE:PSL Nuclear Assurance
1st Quarter Quality Report
CLOSING REMARKS