foundation for the mcc building-2
DESCRIPTION
Spreadsheet calculation of Foundation for the MCC Building-2TRANSCRIPT
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09)
Corporate Base Page 1 of 11
Calculation Cover Sheet
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location'file:///tt/file_convert/55cf9c8c550346d033aa35e2/document.xls'#$Calculation Cover Sheet
Project File Location DA004-041.TNK.CA.40-9029 Page 1 of 7
Calculation Objective
The purpose of these calculations is to document the structural analysis and design of the foundation for the MCC building
Calculation Method
Assumptions
Software Used
Validation (Y / N / N/A)
Excel 97-2003
References
Conclusions
The results of the analysis show that the section of the slab provided is adequate to support the imposed loads
J01 17-02-10 Issued for IDC A.Adejare G.Mahadeo G.Chime
Rev Date Description By Checked Approved
The foundation comprises of a reinforced concrete slab supported by soil. The slab is designed in accordance to the simplified method for flat slab in BS 8110.
[1] Grade of Concrete, fcu=35N/mm2, Grade of Steel,fy=410N/mm2 [2] Weight of MCC Cabin =350KN., Live load = 15KN
Title Version
[1] Structural Design Brief - DA004-041-40-0001[2] BS 8110 - Part 1: 1997 - Structural use of concrete[3] T.J. MacGinley and B.S. Choo - Reinforced Concrete, Theory and Examples, Second Edition[4] W.H. Mosley and J.H. Bungey - Reinforced Concrete Design, Second edition
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09)
Corporate Base Page 2 of 11
This calculation is confidential and has been prepared solely for the use of WorleyParsons’ Contractual Customer. If you are not the Contractual Customer, you are not entitled to access or use the information contained in this calculation. WorleyParsons disclaims any liability or responsibility suffered due to unauthorized access or use.
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09)
Corporate Base Page 3 of 11
Calculation Checklist
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location'file:///tt/file_convert/55cf9c8c550346d033aa35e2/document.xls'#$Calculation Cover Sheet
Project File Location DA004-041.TNK.CA.40-9029 Page 2 of 7 0
Please check boxes for all applicable items checked or mark as "N/A" if not appropriate:
Calculations:
Project title shown.
Calculation title shown.
Revision history box complete and signed.
Table of Contents.
Appropriate stamp for preliminary issues.
Calculation objectives (aims) stated.
Calculation method defined or described (including formulae if relevant).
Reference made to text, standard or code. Check version/edition with that required for project.
Source of input data stated (with revision number and date if relevant).
Customer's requirements included/addressed.
Assumptions stated.
Summary of results or conclusions if appropriate.
For software based calculations, reference to software verification if available.
Approach used is appropriate for problem being solved.
Method clear and easy to follow.
Input data correct.
Calculation arithmetically correct OR software previously verified and reference to verification checked.
Calculation result within expected limits.
Calculation tolerances stated if significant.
Units used as required by client.
Abbreviations correct.
Appropriate cross-references.
Sketches included and clearly labelled, where required.
Appendices included and referenced, as required.
Considered design reviews, Hazop actions, client input, safety and environmental issues, etc.
Checking Records:
Checked and annotated copy of calculation filed (use "Check Print" stamp).
Corrections made as required and calculation dated and signed on cover sheet by checker.
Alternative method calculation and/or representative check performed and filed, as required.
Revisions:
Changes clouded.
Revision history block updated.
Calculation re-checked if required.
0 30-Dec-99 0 0 0 30-Dec-99
0 30-Dec-99 0 0 0 30-Dec-99
J01 17-02-10 Issued for IDC A.Adejare G.Mahadeo G.Chime
Rev Date Description By Checked Approved
Calculation number assigned and registered (refer to project numbering system or Document Numbering System EPP-0040 for format).
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09)
Corporate Base Page 4 of 11
This calculation is confidential and has been prepared solely for the use of WorleyParsons’ Contractual Customer. If you are not the Contractual Customer, you are not entitled to access or use the information contained in this calculation. WorleyParsons disclaims any liability or responsibility suffered due to unauthorized access or use.
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 5 of 11
Calculation Sheet
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location'file:///tt/file_convert/55cf9c8c550346d033aa35e2/document.xls'#$Calculation Cover Sheet
Project File Location DA004-041.TNK.CA.40-9029 Page 3 of 7 0
Rev Date By Checked Rev Date By Checked Rev Date By Checked
J01 17-02-10 A.Adejare G.Mahadeo 0 30-Dec-99 0 0 0 30-Dec-99 0 0
Table of Contents
* Calculation Cover Note 1
* Calculation Checklist 2
* Table of Content 3
* Calculation Sheet 4-7
This calculation is confidential and has been prepared solely for the use of WorleyParsons’ Contractual Customer. If you are not the Contractual Customer, you are not entitled to access or use the information contained in this calculation. WorleyParsons disclaims any liability or responsibility suffered due to unauthorized access or use.
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 3 of 4
Calculation Sheet
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location
Project File Location DA004-041.TNK.CA.40-9026 Page 4 of 7
Rev Date By Checked Rev Date By Checked Rev Date By Checked
P1 08-Feb-10 A.Adejare G. Mahadeo 0 30-Dec-99 0 0 0 30-Dec-99 0 0
Booster Pump Bund
.
A-A
Length of slab, L = 5486.4 mmWidth of slab, B = 762 mmSlab thickness, h = 200 mm
= (L x B) = 4.18= 24
Material
= 35= 410
Loads
Weight of slab = = 20 KN= 20 KN
= 22 KN
= = 42 KN
= = 10
= 36
< OK
K:\19117\10.0 Engineering\10.07 Structural\Calculations\IDC\Booster Pump foundation\[Booster Pump Foundation.xls]Calculation Cover Sheet
Total Area of base, Abase m2
Density of concrete, rc KN/m3
Grade of concrete, fcu N/mm2
Grade of steel, fy N/mm2
h*rc*L*BTotal dead load, Gk
Weight of cabin, Qk
Total service load, Ws Gk + Qk
Actual bearing pressure, sactual Ws/Abase KN/m2
Allowable Bearing pressure of soil, dallow KN/m2
sactual sallow
h
B
A
A
A 2
L
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 4 of 4
Calculation Sheet
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location
Project File Location DA004-041.TNK.CA.40-9026 Page 5 of 7
Rev Date By Checked Rev Date By Checked Rev Date By Checked
P1 08-Feb-10 A.Adejare G. Mahadeo 0 30-Dec-99 0 0 0 30-Dec-99 0 0
Load factors
= 1.4= 1.6
Design load, F = = 63
= 2
Net upward pressure, n = -5
Moments
Four edges discontinuous BS 8110, Part 1: Table 3.14= 1.136= 0.041= 0.33
Short span= = -8 KNm/m
long span= = -49 KNm/m
Section
h = 200 mmb = 1000 mm
Reinforcement
Cover = 50 mm= 12 mm
Spacer bar = 0 mmd = 138 mmd' = 0 mm
Short span
= -8 KN/m/mK = = -0.012 BS 8110, Part 1: 3.4.4.4K' = 0.156 Compression reinft. not req.z = = 131 mm
= -168= 1149
Long span
= -49 KN/m/mK = = -0.074 BS 8110, Part 1: 3.4.4.4
K' = 0.156 Compression reinft. not req.z = = 131 mm
-1049
503
K:\19117\10.0 Engineering\10.07 Structural\Calculations\IDC\Booster Pump foundation\[Booster Pump Foundation.xls]Calculation Cover Sheet
Dead load factor, gG
Live load factor, gQ
gG*Gk + gQ*Qk KN/m2
Earth pressure, sp F/Abase KN/m2
sp - gG*rc*h KN/m2
ly/lxbsx+
bsy+
Bending moment, Msx+ bsx+*n*lx2
Bending moment, Msy+ bsy+*n*lx3
ftension
Bending moment, Msx+
M/(b*d2*fcu)
d*(0.5+(0.25-K'/0.9)1/2)As Area mm2/mAs prov mm2/m Y16@175
Bending moment, Msy+
M/(b*d2*fcu)
d*(0.5+(0.25-K'/0.9)1/2)
As prov mm2/m
As prov mm2/m Y12@225
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 4 of 4
Calculation Sheet
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location
Project File Location DA004-041.TNK.CA.40-9026 Page 6 of 7
Rev Date By Checked Rev Date By Checked Rev Date By Checked
P1 08-Feb-10 A.Adejare G. Mahadeo 0 30-Dec-99 0 0 0 30-Dec-99 0 0
Staircase
length = 780 mmWidth = 1425 mmNo of Steps = 5 Nos.Tread length = 300 mmRiser height = 250 mm
Weight of slab = = 36 KN36 KN
15 KN
Load factors
= 1.4= 1.6
Design load, F = = 74 KN/m
Length = 0.5 m
BEAM 1
Moments
= = 2.3 KN-m
Reinforcement
= 0.15
K:\19117\10.0 Engineering\10.07 Structural\Calculations\IDC\Booster Pump foundation\[Booster Pump Foundation.xls]Calculation Cover Sheet
h*rc*L*BTotal dead load, Gk
Live load , Qk
Dead load factor, gG
Live load factor, gQ
gG*Gk + gQ*Qk
MAB w*l2/8
M/bd2
As = 0.15%bd = 231mm2/m
Provide Y12 @ 300c/c, As = 377mm2/m (Top&Bottom)
L
w (kN/m)
A bB
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 4 of 4
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 4 of 4
Calculation Sheet
Customer CHEVRON NIGERIA LIMITED Proj No 19117
Project Title ESCRAVOS TERMINAL DIESEL STORAGE PROJECT Calc No 10
Calculation Title MCC BUILDING FOUNDATION Phase/CTR 134
Elec File Location
Project File Location DA004-041.TNK.CA.40-9026 Page 7 of 7
Rev Date By Checked Rev Date By Checked Rev Date By Checked
P1 08-Feb-10 A.Adejare G. Mahadeo 0 30-Dec-99 0 0 0 30-Dec-99 0 0
Ramp
Length = 1833 mmWidth = 2325 mmHeight = 200 mm
= 24Total Area of Ramp, Aramp = 4.26
Weight of slab = = 20 KN= 20 KN
15 KN
Load factors
= 1.4= 1.6
Design load, F = = 53 KN/m
Length = 0.5 m
BEAM 1
Moments
= = 1.6 KN-m
Reinforcement
= 0.11
K:\19117\10.0 Engineering\10.07 Structural\Calculations\IDC\Booster Pump foundation\[Booster Pump Foundation.xls]Calculation Cover Sheet
Density of concrete, rc KN/m3
m2
h*rc*L*BTotal dead load, Gk
Live load , Qk
Dead load factor, gG
Live load factor, gQ
gG*Gk + gQ*Qk
MAB w*l2/8
M/bd2
As = 0.15%bd = 231mm2/m
Provide Y12 @ 300c/c, As = 377mm2/m (Top&Bottom)
L
w (kN/m)
A bB
002-000-PDF-566 (015311) EPF-0027Rev 6 (1-Sep-09) Corporate Base Page 4 of 4