Foundation improvement ofhistorical buildings by micro piles
Museum Island Berlin,St. Kolumba Cologne
Dipl.-Ing. Klaus DietzDr.-Ing. André Schürmann
Dietz Geotechnik Consult GmbH, Hilden, GermanyStump Spezialtiefbau GmbH, Langenfeld, Germany
7th ISM workschop 2006, Schrobenhausen 2
structuring
1. introduction
2. micro pile as foundation improvement element
3. case histories3.1 Museum Island, Berlin3.2 St. Kolumba, Cologne
4. conclusions
7th ISM workschop 2006, Schrobenhausen 3
Stump-system steel-tube pile
Stump-system composite pile
7th ISM workschop 2006, Schrobenhausen 4
Load bearing systems and wall connections
Wall-recess
tensionanchor
micro pile
mortar connectionbeam
plug in girder
7th ISM workschop 2006, Schrobenhausen 5
Museum Island, Berlin
New Museum
Erected 1841 – 1855
Destroyed WW II
Renovation 1990 - 2009
7th ISM workschop 2006, Schrobenhausen 6
Museum Island, Berlin
New Museum
7th ISM workschop 2006, Schrobenhausen 7
„Mudde“muddy soil
dense-medium sand
7th ISM workschop 2006, Schrobenhausen 8
7th ISM workschop 2006, Schrobenhausen 9
7th ISM workschop 2006, Schrobenhausen 10
7th ISM workschop 2006, Schrobenhausen 11
7th ISM workschop 2006, Schrobenhausen 12
7th ISM workschop 2006, Schrobenhausen 13
7th ISM workschop 2006, Schrobenhausen 14
7th ISM workschop 2006, Schrobenhausen 15
History of St. Kolumba
church before WW II church short before renovation
7th ISM workschop 2006, Schrobenhausen 16
concept of new
Diözesanmuseum
above the ruins
of St. Kolumba
by
Peter Zumtor
7th ISM workschop 2006, Schrobenhausen 17
Foundation concept new Diözesanmuseum
cross section digging field
RB +12,919
OK Kuppel+12,919
+0,073
bestehende Kapelle
Ø 298,5 x 30 mm
GEWI-PfahlØ 32 mm
GEWI-PfahlØ 63,5 mm
GEWI-Mehrstabpfahl2 x 40 mm + 1 x 50 mmGEWI-Pfahl Ø63,5 mm
Ø 298,5 x 30 mm
Grabungsfeld
RB +12,919
7th ISM workschop 2006, Schrobenhausen 18
preparing investigations
before
masonry core
after grouting
test drilling
7th ISM workschop 2006, Schrobenhausen 19
preparing investigations
execution of pile test
Kraft - Verschiebungsdiagramm, Pfahl G1
0
5
10
15
20
25
30
0 500 1000 1500 2000 2500 3000 3500 4000
Kraft [kN]
Ver
schi
ebun
g [m
m]
proaf load 4000 kNpile test equipment
disp
lace
men
t[m
m]
Load displacement diagram, test pile G1Load [kN]
7th ISM workschop 2006, Schrobenhausen 20
View arrangement of implants and nailcolumns
internal column
support constructionimplant
7th ISM workschop 2006, Schrobenhausen 21
implant in theoutside walls(cross section and view, detail implantcoupling)
Steel tupe 298,5x 30mm
Steel tubeextension
Reinforcedconrete Beam
Masonrynew building
GEWI single bar-or multi bar-pile
Bend securingGEWI-pile2x 32mm
Ground level
High-quality steel tube
Existing masonryof ruin
Top ofexcavation
Old foundation arch
Gravel
VaultPre-stabilizationof masonry
+7,14m top of implant
Bottom level implant
Cross-section View
7th ISM workschop 2006, Schrobenhausen 22
view masonry column and cross section implant
Steel tube (298,5 x 30 mm)Special-steel-protection tube (330 x 5 mm)
GEWI-pile
grout
Steel-tubeProtection tube
Cross section
7th ISM workschop 2006, Schrobenhausen 23
5
1
2
3
4
Pile production
7th ISM workschop 2006, Schrobenhausen 24
Core drilling through the old walls
7th ISM workschop 2006, Schrobenhausen 25
drilling for pile installation
7th ISM workschop 2006, Schrobenhausen 26
foundation nailcolumns digging field
□ 350/350/30 mm+12,26
10 StahlrohrØ 289,5 x 30mm
10 Brandschutz
420/420/60 mm
Ankerbolzen
Pagel Verguss
7036
36
verdichtete Anschüttung (Kies)
Kontermutter
AnkermutterAnkerplatte
Sauberkeitsschicht
KunststoffripprohrDistanzhalter
Bohrung Ø 220 mm
GEWI-Pfahl Ø 63,5 mmmit doppeltem Korrosionsschutz
Pfahlneigung 10° zur Vertikalen
Einb
i nd e
t i efe
t =
6 m im
ge w
a ch s
e ne n
Kie
s /S a
n d
Einbindetiefe t = 6m im gewachsenen Kies/Sand
7th ISM workschop 2006, Schrobenhausen 27
Drilling for micro piles at the chapel and on the digging field
7th ISM workschop 2006, Schrobenhausen 28
conclusions
• introduction of project specific measures• quality safety programme
7th ISM workschop 2006, Schrobenhausen 29
Thank you for yourattention