franklin county planning · pdf filewhat is the difference between a short subdivision and a...

6
Subdivisions (Plats) In Franklin County, Washington there are two (2) types of subdivisions: 1. Short Subdivision (also known as a short plat) and; 2. Subdivision (also known as a long plat). Subdivision type is determined by the number of lots proposed and the properties location. When a division of land is proposed and is located outside of an urban growth area, four (4) or less lots constitutes a short subdivision (short plat) while a proposal inside an urban growth area, nine (9) or less lots constitutes a short subdivision (short plat). Anything exceeding these numbers constitutes a subdivision (long plat). Please note that subdivision (long plat) developments are not permitted in the Agricultural Production 20 and the Agricultural Production 40 Zoning Districts. To determine if a property is located within an Urban Growth Area or its zoning designation, please call the Planning and Building Department at 509-545-3521, visit our office at 1016 North 4 th Avenue, Pasco, WA 99301 or access the County’s GIS Mapping Program at http://gis.co.franklin.wa.us/mappingdisclaimer.shtml . Additional Information o Subdivision or Short Subdivision Application Checklist o Land Development Application Form o Title 16 Subdivisions (Franklin County Code) https://library.municode.com/index.aspx?clientId=16300

Upload: vuphuc

Post on 05-Feb-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FRANKLIN COUNTY PLANNING · PDF fileWhat is the difference between a short subdivision and a short plat? In Franklin County, a short subdivision is also known as a short plat

Subdivisions (Plats)

In Franklin County, Washington there are two (2) types of subdivisions:

1. Short Subdivision (also known as a short plat) and;

2. Subdivision (also known as a long plat).

Subdivision type is determined by the number of lots proposed and the properties location.

When a division of land is proposed and is located outside of an urban growth area, four (4) or less lots constitutes a short subdivision (short plat) while a proposal inside an urban growth area, nine (9) or less lots constitutes a short subdivision (short plat). Anything exceeding these numbers constitutes a subdivision (long plat).

Please note that subdivision (long plat) developments are not permitted in the Agricultural Production 20 and the Agricultural Production 40 Zoning Districts. To determine if a property is located within an Urban Growth Area or its zoning designation, please call the Planning and Building Department at 509-545-3521, visit our office at 1016 North 4th Avenue, Pasco, WA 99301 or access the County’s GIS Mapping Program at http://gis.co.franklin.wa.us/mappingdisclaimer.shtml.

Additional Information

o Subdivision or Short Subdivision Application Checklist

o Land Development Application Form

o Title 16 Subdivisions (Franklin County Code)

https://library.municode.com/index.aspx?clientId=16300

Page 2: FRANKLIN COUNTY PLANNING · PDF fileWhat is the difference between a short subdivision and a short plat? In Franklin County, a short subdivision is also known as a short plat

Short Subdivision (SP- Short Plat)

FREQUENTLY ASKED QUESTIONS:

What is a short subdivision?

A short subdivision, also known as a short plat is the division or re-division of land into lots, tracts, parcels, sites, or

divisions for the purpose of sale, lease, or transfer of ownership.

For property located outside an Urban Growth Area, four (4) or less lots constitute a short subdivision (short plat). For property located inside an Urban Growth Area, nine (9) or less lots constitute a short subdivision (short plat).

What is the difference between a short subdivision and a short plat?

In Franklin County, a short subdivision is also known as a short plat.

Is a short subdivision allowed in the Agricultural Production 20 or Agricultural Production 40 Zoning Districts?

The AP-20 and AP-40 Zoning Districts may allow a short subdivision (4 or less lots) if certain zoning criteria is met, such as the required density standard, minimum lot size, and farm use. A subdivision (long plat) is not permitted in these zoning districts.

Do I have to attend a public hearing if I want to apply for a short subdivision?

A public hearing is not required for a short subdivision application. Short Subdivision applications involve an administrative review and decision by the Planning and Building Department. The guidelines for review are included in Title 16.32 of the County Code.

If I want to divide my property, where do I start?

Planning and Building Department Staff will assist you through the review process of a short subdivision. The

Department reviews and will make an administrative decision regarding the application request. In this process, all

established standards, criteria, and policies regarding the short subdivision within the applicable zoning district will

be reviewed.

Call the Planning and Building Department at 509-545-3521, visit our office at 502 W. Boeing Street, Pasco, WA

99301 or review Title 16.32 Short Subdivisions in the County Code which may be accessed at

http://www.co.franklin.wa.us/.

Page 3: FRANKLIN COUNTY PLANNING · PDF fileWhat is the difference between a short subdivision and a short plat? In Franklin County, a short subdivision is also known as a short plat

How do I apply for a short subdivision?

A pre- application meeting with the Planning and Building Department staff is encouraged for all short subdivision

applications. All application material is to be submitted to the Planning and Building Department. The following

items are needed to have a complete application:

1. Land Development Application;

2. Fees (see application checklist);

3. Written approval from the Benton Franklin Health Department;

4. 10 copies and an electronic copy of a preliminary short subdivision developed by a registered surveyor;

5. A plat certificate from a licensed title company showing the vested owner and others that have interest in

the property; and

6. Variance Report Fee (Names and Addresses of neighboring land owners within 500 feet in Urban Area/I

mile in Rural Area). This is completed by the Assessor’s Office or from a licensed Title Company. Once

requested by the Assessor’s Office, normal processing time to develop the report is one week.

What happens after I apply?

The Planning and Building Department Staff will notify in writing (Notification of Pending Short Subdivision) all the

property owners of record within 500 feet of your property (if within an Urban Growth Area) or 1 mile of your

property (if located outside an Urban Growth Area).

Additionally, the Staff will conduct a review of your request and will do the following:

1. Send notification of the request to applicable technical agencies for comments;

2. Send notification of the request to neighboring landowners (see above); and

3. Compile public and agency comments to help develop a decision for the application. The decision will be

mailed to the applicant/representative.

When do I find out if my short subdivision application was approved or denied?

The Planning and Building Department will determine if the short subdivision application is to be approved with

conditions, returned to the applicant for modifications or denied. A typical process timeline is 30 days from the

date the Planning and Building Department receives the required Variance Report (From Assessor’s Office or Title

Company) and all other application materials are submitted.

Additional Information

o Short Subdivision Checklist

o Land Development Application Form

o Title 16 Subdivisions (Franklin County Code) https://library.municode.com/index.aspx?clientId=16300

jmacpherson
Snapshot
Page 4: FRANKLIN COUNTY PLANNING · PDF fileWhat is the difference between a short subdivision and a short plat? In Franklin County, a short subdivision is also known as a short plat

SHORT PLAT APPLICATION CHECKLIST Land Development Application. Short Plat Fee: $350.00 plus $25.00 Per Lot Fee. Checks made payable to

the Franklin County Planning and Building Department. $80.00 Variance Report Fee: Check made payable to the Franklin County

Assessor’s Office. An applicant does not need to contact the Assessor’s Office to obtain this report. At the time of application, the Planning Division will request the report from the Assessor’s Office. The report includes the Adjoining Property Owners Names and Addresses (500 feet within an Urban Growth Area or one (1) mile outside an Urban Growth Boundary). As an alternative to the Assessor’s Office, an applicant may also obtain this report from a licensed title company.

Please note….the typical 30 day review period requirement for a short plat will

not begin until this Variance Report is completed. From a Licensed Title Company: A plat certificate showing the vested owner

and other who have interest in the property. This shall be generated within 30 days of applying for the Short Plat.

Eleven (11) Copies: 10 copies of the plat map from a registered surveyor and

1 copy in a digital or electronic format (disk, cd, or e-mail). Written approval from the Benton-Franklin Health Department (7102 West

Okanogan Place, Kennewick, WA – (509) 460-4205) prior to application submittal to Planning Department.

ADDITIONAL FEES: Prior to final short plat approval or prior to a building permit being issued

for a new parcel, a Park Dedication Fee(s) shall be paid to the Public Works Department: a. Urban Growth Area Boundaries: $300.00 per expected dwelling unit. b. Rural Areas (lands outside Urban Growth Areas): $50.00 per expected

dwelling unit. * All application requirements shall be submitted to the Planning Department. * All short plat applications require that proper notice be given (surrounding

property owners and newspaper).

jmacpherson
Snapshot
jmacpherson
Snapshot
Page 5: FRANKLIN COUNTY PLANNING · PDF fileWhat is the difference between a short subdivision and a short plat? In Franklin County, a short subdivision is also known as a short plat

PLA��I�G DIVISIO�

LA�D DEVELOPME�T APPLICATIO�

Application Number: _____________________

Applicant/Representative:

Name:

Address: Street/City/State

Phone: Cell: Fax: Email:

Owner(s): (attach additional sheet if necessary)

Name:

Address: Street/City/State

Phone: Cell: Fax: Email:

Existing Land Use Zoning District(s):

Legal Description of Property:

Site Address: Street/City/State

Total Acreage Involved: Source of Water:

Source of Irrigation: Sewage Disposal System:

Source of Power: Comprehensive Plan:

jmacpherson
Snapshot
jmacpherson
Snapshot
jmacpherson
Snapshot
jmacpherson
Snapshot
Page 6: FRANKLIN COUNTY PLANNING · PDF fileWhat is the difference between a short subdivision and a short plat? In Franklin County, a short subdivision is also known as a short plat

Description of Improvements on Property:

Existing Use of Site/Property:

Proposed Development Application Request (Specify; Short Plat, Cond Use, Zone Change, Home Occupation, etc.)

We, the undersigned, hereby authorize the filing of this application and certify that the information contained in this

application is complete and correct to the best of our knowledge. This authorizes the designated Applicant’s

representative (if applicable) to act on behalf of the applicant for the processing of this request.

_______________________________________________ _____________________________________________

( ) Owner Date ( ) Applicant/Representative Date

Print �ame:____________________________________ Print �ame:__________________________________

__________________________________________________________________________________

jmacpherson
Snapshot
jmacpherson
Snapshot
jmacpherson
Snapshot
jmacpherson
Snapshot