Page 1: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District District-Wide Facility Study

VEBH ArchitectsCopyright2017

All Buildings HeritageNewlonsburgSloanMiddle SchoolHigh SchoolStadium

Exhibit C

• Exhibit C Existing Facilites Assessment

Page 2: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School DistrictDistrict-Wide Facility Study

Exhibit C - Cost Worksheets - 1

VEBH ArchitectsCopyright 2017

Introduction

Between August 2016 and March of 2017 numerous site visits to the five district buildings and two campuses were made by numerous design professionals, manufacturing professionals and district representatives to review and assess the condition of the District’s existing facilities.

The detail reports that follow were utilized to develop the facility assessment summaries included in Section C – Facilities Conditions portion of the preceding District-Wide Facilities Study report.

The maintenance upgrades costs worksheet that follows, based on the various conditions assessment reports, was developed as a baseline of comparison for the anticipated ongoing costs associated with continuing to maintain the existing facilities. These costs have been characterized as the costs associated with continuing to do nothing.

The documents and reports in Exhibit C of the District-Wide Facility Study were created by following design and manufacturing professionals:

• VEBH Architects – Architectural Conditions• Barber & Hoffman Engineering – Structural Conditions• Tower Engineering – HVAC, Plumbing, Electrical Conditions, Energy Analysis• RA Smith National – Site Conditions• Trans Associates - Traffic Study • The Garland Company, Inc. – Roof Conditions• McFarland Kistler & Associates – Food Service Conditions• Wallover Architects – Middle School Aquatics Conditions

Page 3: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School DistrictExisting Facility Study

Maintenance Upgrades Costs Worksheet

UPDATED - 04/11/17

Level 1 - Immediate Need

Level 2 - Within 5 years

Level 3 - Within 10 years

Level 4 - Beyond 10 years (level 4 improvements are not costed)

Summary

HERITAGE ELEMENTARY page 2 93,130 sf 1,158,050 12,029,994 $129 $15,277,387 $164

NEWLONSBURG ELEMENTARY page 5 50,635 sf 633,075 3,860,717 $76 $4,813,253 $95

SLOAN ELEMENTARY page 8 91,036 sf 1,110,325 8,973,119 $98 $11,825,084 $129

MIDDLE SCHOOL page 12 187,677 sf 2,837,625 15,939,794 $84 $23,129,626 $123

HIGH SCHOOL page 16 262,601 sf 994,750 26,505,239 $100 $36,349,239 $138

STADIUM & FIELDS page 20 48,875 6,524,111 $6,524,111

685,079

Based on the detailed assessments of each facility, the following maintenance costing analysis was created with various improvements ranked by

Level 1 to 4. Costs are approximated using rule of thumb costs per square foot & historical allowances.The scope & costs are best-guess calculations

and not based on actual designs.

Total Level 1 Total Levels 1 & 2

Preliminary maintenance costs for the next 5-10 year period are estimated to be between $74 and $98 million.

$6,782,700 $73,832,973

Total Levels 1, 2 & 3

$97,918,700

VEBH Architects

04/27/2017 Page 1 of 21

Page 4: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HERITAGE ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Site

Paving & Sidewalks

Re-Pave Drives 51,565 $8.00 sf x $412,520 $412,520

Re-Pave Parking Lots 58,868 $6.50 sf x $382,642 $382,642

Sidewalk & Curb Repair 1 $10,000.00 allowance x $10,000 $10,000

Sidewalk & Curb Replacement 30,126 $12.00 sf x $361,512 $361,512

Site Stair Repair (Upper Lot) 1 $35,000.00 allowance x $35,000 $35,000

Accessibility

Add Accessible Parking Spaces 1 $25,000.00 allowance x $25,000 $25,000

Add Accessible Route to Building 1 $20,000.00 allowance x $20,000 $20,000

Playspace

Playground Surfacing 2 $120,000.00 allowance x $240,000 $240,000

Playground Equipment 2 $180,000.00 allowance x $360,000 $360,000

Architectural/Structural

Exterior Envelope $0

Selective Maintenance of Garland Roof (Mod. Bit.) 1 $1,500.00 allowance x $1,500 $1,500

Repair of Hickman Roof (Mod. Bit.) 1 $75,000.00 sf x $75,000 $75,000

$0

Replace Exterior Windows x $0 $0

Replace Exterior Doors x $0 $0

Selective Masonry Repair 1 $120,000.00 allowance x $120,000 $120,000

Accessibility

ADA Restroom Improvements (accessories, grab bars

& pipe insulation)1

$15,000.00 allowance x $15,000 $15,000

Restroom Renovations (Upgrade facilities & comply

w/ADA)1

$150,000.00 allowance x $150,000 $150,000

Classroom Sinks 1 $60,000.00 allowance x $60,000 $60,000

Functional Upgrades

Computer Lab Upgrades (incl'd Arch, M, E, & P) 9,000 $175.00 sf x $1,575,000 $1,575,000

STREAM Room Upgrades (incl'd Arch, M, E, & P) 1,000 $160.00 sf x $160,000 $160,000

District Admin Upgrades (incl'd Arch, M, E, & P) 7,500 $150.00 sf x $1,125,000 $1,125,000

Old Locker Room Upgrades (incl'd Arch, M, E, & P) 2,500 $150.00 sf x $375,000 $375,000

VEBH Architects

04/27/2017 Page 2 of 21 Heritage Elementary

Page 5: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HERITAGE ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Interior Finishes

Flooring Upgrades 1 $80,000.00 sf x $80,000 $80,000

Paint 1 $65,000.00 sf x $65,000 $65,000

Casework Replacement (Sinks & UV issues) 1,000 $350.00 lf x $350,000 $350,000

Kitchen

Selective Kitchen Equipment Replacement 1 $54,000.00 allowance x $54,000 $54,000

Misc

Interior Door Repair/Replacement 1 $15,000.00 allowance x $15,000 $15,000

Compartmentalization Doors/Gates 1 $25,000.00 allowance x $25,000 $25,000

Water Infiltration/Remediation Issues (Basement) 800 $1,000.00 lf x $800,000 $800,000

HVAC

Replace Boilers w/ Condensing Boilers 2 $75,000 each x $150,000 $150,000

HW Pumps Replacement 2 $15,000 each x $30,000 $30,000

New Chiller 1 $170,000 each x $170,000 $170,000

CHW Pumps Replacement 2 $15,000 each x $30,000 $30,000

Blower Coil AHUs Replacement 12 $15,000 each x $180,000 $180,000

Gym AHUs Replacement 2 $25,000 each x $50,000 $50,000

Gym AHUs (add cooling) 2 $45,000 each x $90,000 $90,000

New Unit Ventilators 60 $25,000 each x $1,500,000 $1,500,000

Terminal Heating Equip. Replacement 1 $20,000 allowance x $20,000 $20,000

Exhaust Fans Replacement 16 $3,000 each x $48,000 $48,000

ATC upgrades 93,130 $4 sf x $372,520 $372,520

HW Piping System 93,130 $4 sf x $372,520 $372,520

CHW Piping System 93,130 $5 allowance x $465,650 $465,650

Basement Dehumidification 1 $300,000 allowance x $300,000 $300,000

$0

Electrical $0

Electrical Service 93,130 $5 sf x $465,650 $465,650

Emergency Power x $0 $0

Branch Receptacles 93,130 $1 sf x $93,130 $93,130

VEBH Architects

04/27/2017 Page 3 of 21 Heritage Elementary

Page 6: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HERITAGE ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Interior Lighting 93,130 $6 sf x $558,780 $558,780

Exterior Lighting Upgrades (Building Mounted) 30 $2,500 each x $75,000 $75,000

Exterior Site Lighting Improvements & Expansion 45 $7,500 each x $337,500 $337,500

Fire Alarm x $0 $0

Paging/Intercom 93,130 $1 sf x $93,130 $93,130

Audio/Visual Systems 50 $7,500 room x $375,000 $375,000

Telephone/Data Systems (Cell booster) 93,130 $1 sf x $93,130 $93,130

Security Upgrades 1 $100,000 allowance x $100,000 $100,000

Exterior Security Upgrades (Code Blue) 4 $10,000.00 each x $40,000 $40,000

Exterior Security Upgrades (Cameras) 1 $100,000.00 allowance x $100,000 $100,000

Plumbing

Replace Water heater & Tank 1 $100,000 allowance x $100,000 $100,000

Master Thermostaic Mixing (Gauges) 1 $500 allowance x $500 $500

Individual TMV's at sinks & Lavatories 1 $10,000 allowance x $10,000 $10,000

Water Service (Gauges) 1 $2,000 allowance x $2,000 $2,000

Gas Service (Code Compliance) 1 $10,000 allowance x $10,000 $10,000

Storm Sewer (Video Camera System) 1 $15,000 allowance x $15,000 $15,000

Storm Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Sanitary Sewer (Video Camera System) 1 $15,000 allowance x $15,000 $15,000

Sanitary Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Fire Service x $0 $0

Plumbing Fixtures - ADA Compliance 1 $40,000 allowance x $40,000 $40,000

SUBTOTAL $1,007,000 $9,453,864 $2,823,820 $0

Design & Estimating Contingency 15.00% $151,050 $1,418,080 $423,573

TOTAL ANTICIPATED CONSTRUCTION COSTS $1,158,050 $10,871,944 $3,247,393

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 AND 2) $12,029,994

Anticipated maintenance upgrades costs over the next 5 Years

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 THRU 3) $15,277,387

Anticipated maintenance/modernization costs over the next 10 Years

VEBH Architects

04/27/2017 Page 4 of 21 Heritage Elementary

Page 7: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

NEWLONSBURG ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Site

Paving & Sidewalks

Re-Pave Drives 4,365 $8.00 sf x $34,920 $34,920

Re-Pave Parking Lots 24,880 $6.50 sf x $161,720 $161,720

Sidewalk & Curb Repair 1 $4,000.00 allowance x $4,000 $4,000

Sidewalk & Curb Replacement 12,350 $12.00 sf x $148,200 $148,200

Add Bollards alond exterior wall at parking spaces 1 $8,000.00 allowance x $8,000 $8,000

Accessibility

Add Accessible Parking Spaces 1 $15,000.00 allowance x $15,000 $15,000

Add Accessible Route to Building 1 $15,000.00 allowance x $15,000 $15,000

Playspace

Playground Surfacing 2 $60,000.00 allowance x $120,000 $120,000

Playground Equipment 2 $90,000.00 allowance x $180,000 $180,000

Architectural/Structural

Exterior Envelope

Selective Maintenance of Built-Up-Roof 1 $1,500.00 allowance x $1,500 $1,500

Replace Exterior Windows x $0 $0

Replace Exterior Doors x $0 $0

Accessibility

ADA Restroom Improvements (accessories, grab bars

& pipe insulation)1

$15,000.00 allowance x $15,000 $15,000

Classroom Sinks 1 $60,000.00 allowance x $60,000 $60,000

Interior Finishes

Flooring Upgrades 1 $80,000.00 allowance x $80,000 $80,000

Paint 1 $50,000.00 allowance x $50,000 $50,000

Casework Replacement (Sinks & UV issues) 1,500 $350.00 lf x $525,000 $525,000

Kitchen

Selective Kitchen Equipment Replacement 1 $26,000.00 allowance x $26,000 $26,000

Misc

VEBH Architects

04/27/2017 Page 5 of 21 Newlonsburg Elementary

Page 8: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

NEWLONSBURG ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Interior Door Repair/Replacement 1 $8,000.00 allowance x $8,000 $8,000

Compartmentalization Doors/Gates 1 $10,000.00 allowance x $10,000 $10,000

Water Infiltration/Remediation Issues (Basement) 200 $1,000.00 lf x $200,000 $200,000

HVAC

Replace Boilers w/ Condensing Boilers 3 $50,000 each x $150,000 $150,000

HW Primary Pumps Replacement 3 $4,000 each x $12,000 $12,000

HW Building Pumps Replacement 2 $15,000 each x $30,000 $30,000

New Chiller 1 $125,000 each x $125,000 $125,000

CHW Pumps Replacement 2 $15,000 each x $30,000 $30,000

Gym AHUs Replacement 1 $25,000 each x $25,000 $25,000

Gym AHUs (add cooling) 1 $45,000 each x $45,000 $45,000

New Unit Ventilators 30 $25,000 each x $750,000 $750,000

New Administration Fan Coil Units x $0 $0

Electrical/IT Rooms HVAC 3 $3,000 each x $9,000 $9,000

Terminal Heating Equip. Replacement 1 $15,000 allowance x $15,000 $15,000

Exhaust Fans Replacement 25 $3,000 each x $75,000 $75,000

ATC upgrades 50,635 $4 sf x $202,540 $202,540

HW Piping System x $0 $0

CHW Piping System x $0 $0

Electrical

Electrical Service (1960) 25,000 $5 sf x $125,000 $125,000

Electrical Service (1998) x $0 $0

Emergency Power x $0 $0

Branch Receptacles 50,635 $1 sf x $50,635 $50,635

Interior Lighting (1960) 25,000 $6 sf x $150,000 $150,000

Interior Lighting (1998) x $0 $0

Exterior Lighting (Building Mounted) 20 $2,500 each x $50,000 $50,000

Exterior Site Lighting Improvements & Expansion 10 $7,500 each x $75,000 $75,000

Fire Alarm 50,635 $1.50 sf x $75,953 $75,953

Paging/Intercom 50,635 $1 sf x $50,635 $50,635

Audio/Visual Systems 25 $7,500 room x $187,500 $187,500

VEBH Architects

04/27/2017 Page 6 of 21 Newlonsburg Elementary

Page 9: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

NEWLONSBURG ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Telephone/Data Systems (Cell booster) 50,635 $1 sf x $50,635 $50,635

Security Upgrades 1 $100,000 allowance $100,000

Exterior Security Upgrades (Code Blue) 1 $10,000.00 each x $10,000 $10,000

Exterior Security Upgrades (Cameras) 1 $40,000.00 allowance x $40,000 $40,000

Plumbing

Replace Water heater x $0 $0

Master Thermostaic Mixing 1 $3,000 each x $3,000 $3,000

Individual TMV's at sinks & Lavatories 40 $150 each x $6,000 $6,000

Water Service x $0 $0

Gas Service (Install Pipe Bollards) 2 $100 each x $200 $200

Storm Sewer (Video Camera System) 1 $15,000 allowance x $15,000 $15,000

Storm Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Sanitary Sewer (Video Camera System) 1 $15,000 allowance x $15,000 $15,000

Sanitary Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Fire Service x $0 $0

Plumbing Fixtures - ADA Compliance 1 $40,000 allowance x $40,000 $40,000

Replace Roof Drains 1 $20,000 allowance x $20,000 $20,000

SUBTOTAL $550,500 $2,806,645 $828,293 $0

Design & Estimating Contingency 15.00% $82,575 $420,997 $124,244

TOTAL ANTICIPATED CONSTRUCTION COSTS $633,075 $3,227,642 $952,536

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 AND 2) $3,860,717

Anticipated maintenance upgrades costs over the next 5 Years

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 THRU 3) $4,813,253Anticipated maintenance/modernization costs over the next 10 Years

VEBH Architects

04/27/2017 Page 7 of 21 Newlonsburg Elementary

Page 10: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

SLOAN ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Site

Paving & Sidewalks

Re-Pave Drives 76,230 $8.00 sf x $609,840 $609,840

Re-Pave Parking Lots 48,020 $6.50 sf x $312,130 $312,130

Sidewalk & Curb Repair 1 $8,000.00 allowance x $8,000 $8,000

Sidewalk & Curb Replacement 30,000 $12.00 allowance x $360,000 $360,000

Loading Area Repairs 1 $5,000.00 allowance x $5,000 $5,000

Accessibility

Add Accessible Parking Spaces 1 $50,000.00 allowance x $50,000 $50,000

Add Accessible Route to Building 1 $40,000.00 allowance x $40,000 $40,000

Add Accessible Route to Nature Area 1 $40,000.00 allowance x $40,000 $40,000

Add Accessible Route to 3-5 Playground 1 $75,000.00 allowance x $75,000 $75,000

Playspace

Playground Surfacing at K-2 Playground 2 $120,000.00 allowance x $240,000 $240,000

Playground Surfacing at 3-5 Playground 1 $180,000.00 allowance x $180,000 $180,000

Architectural/Structural

Exterior Envelope $0

Replace Fully Adheared EPDM Roof w/ Modified

Bitumen6,000 $22.00 allowance x $132,000 $132,000

Replace Fully Adheared EPDM Roof w/ Modified

Bitumen42,700 $22.00 sf x $939,400 $939,400

Selective Repair of Hickman Roof 1 $1,500.00 allowance x $1,500 $1,500

Replace Exterior Windows 81 $1,200.00 ea. x $97,200 $97,200

Replace Exterior Doors 34 $1,200.00 x $40,800 $40,800

Masonry Repair at Enrances M & L 1 $8,000.00 allowance x $8,000 $8,000

Accessibility

ADA Restroom Improvements (accessories, grab bars

& pipe insulation)1 $8,000.00 allowance x $8,000 $8,000

Restroom Renovations (Upgrade facilities & comply

w/ADA)1 $250,000.00 allowance x $250,000 $250,000

Classroom Sinks 1 $40,000.00 allowance x $40,000 $40,000

Interior Finishes

Flooring Upgrades 1 $80,000.00 sf x $80,000 $80,000

VEBH Architects

04/27/2017 Page 8 of 21 Sloan Elementary

Page 11: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

SLOAN ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Paint 1 $65,000.00 sf x $65,000 $65,000

Casework Replacement (Sinks & UV issues) 1,500 $350.00 lf x $525,000 $525,000

Gym Floor Replacement 8,000 $20.00 sf x $160,000 $160,000

Kitchen

Cooler/Freezer Addition 120 $160.00 sf x $19,200 $19,200

Kitchen Equipment Replacement 1 $283,000.00 lump sum x $283,000 $283,000

Kitchen Renovation (includes Arch, M, E, & P) 2,300 $120.00 sf x $276,000 $276,000

Functional Upgrades

LGI Upgrades (incl'd Arch, M, E, & P) 3,000 $150.00 sf x $450,000 $450,000

Music Classroom Renovation - relocate (incl'd Arch,

M, E, & P) 1,200 $150.00 sf x $180,000 $180,000

Misc

Concrete Stair Repair at Entrance F 1 $8,000.00 allowance x $8,000 $8,000

Concrete Stair Repair at 1959 Basement Entrance 1 $12,000.00 allowance x $12,000 $12,000

Interior Door Repair/Replacement 1 $25,000.00 allowance x $25,000 $25,000

HVAC

Replace Boilers w/ Condensing Boilers 6 $30,000.00 each x $180,000 $180,000

HW Primary Pumps Replacement 6 $4,000.00 each x $24,000 $24,000

HW Building Pumps Replacement 2 $15,000.00 each x $30,000 $30,000

New Chiller 1 $130,000.00 each x $130,000 $130,000

CHW Pumps Replacement 2 $15,000.00 each x $30,000 $30,000

VAV RTUs Replacement 8 $55,000.00 each x $440,000 $440,000

New VAV Terminal Reheat Boxes 55 $2,000.00 each x $110,000 $110,000

Gym RTU Replacement 1 $25,000.00 each x $25,000 $25,000

Gym RTU (add cooling) 1 $45,000.00 each x $45,000 $45,000

Cafeteria AHU Replacement 1 $50,000.00 each x $50,000 $50,000

New Vertical Unit Ventilators 30 $25,000.00 each x $750,000 $750,000

Terminal Heating Equip. Replacement 1 $20,000.00 lump sum x $20,000 $20,000

Exhaust Fans Replacement 15 $3,000.00 each x $45,000 $45,000

Kitchen MAU Replacement 1 $30,000.00 each x $30,000 $30,000

ATC upgrades 91,036 $4.00 sf x $364,144 $364,144

VEBH Architects

04/27/2017 Page 9 of 21 Sloan Elementary

Page 12: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

SLOAN ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

HW Piping System x $0

CHW Piping System x $0

$0

Electrical $0

Electrical Service (1973) 45,000 $5.00 sf x $225,000 $225,000

Electrical Service (1991) x $0

Emergency Power x $0

Branch Receptacles 91,036 $1.00 sf x $91,036 $91,036

Interior Lighting (1988) 91,036 $6.00 sf x $546,216 $546,216

Exterior Lighting Upgrades (building mounted) 30 $2,500.00 each x $75,000 $75,000

Exterior Site Lighting Improvements & Expansion 50 $7,500 each x $375,000 $375,000

Fire Alarm 91,036 $1.50 sf x $136,554 $136,554

Paging/Intercom 91,036 $1.00 sf x $91,036 $91,036

Audio/Visual Systems 45 $7,500.00 room $337,500

Telephone/Data Systems (Cell booster) 91,036 $1.00 sf x $91,036 $91,036

Security 1 $100,000 allowance x $100,000 $100,000

Exterior Security Upgrades (Code Blue) 3 $10,000.00 each x $30,000 $30,000

Exterior Security Upgrades (Cameras) 1 $100,000.00 allowance x $100,000 $100,000

Plumbing

Replace Water Heater & Tank 1 $100,000.00 allowance x $100,000 $100,000

Replace Water Electric heaters 3 $5,000.00 each x $15,000 $15,000

Master Thermostaic Mixing (Demo & New) 1 $8,000.00 each x $8,000 $8,000

Individual TMV's at sinks & Lavatories 1 $10,000.00 allowance x $10,000 $10,000

Water Service (Code Compliance) 1 $20,000.00 each x $20,000 $20,000

Gas Service (Code Compliance) 1 $10,000.00 allowance x $10,000 $10,000

Storm Sewer (Video Camera) 1 $15,000.00 allowance x $15,000 $15,000

Storm Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Sanitary Sewer (Video Camera) 1 $15,000.00 allowance x $15,000 $15,000

Sanitary Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Fire Service 91,036 $2.50 sf x $227,590 $227,590

Plumbing Fixtures - ADA Compliance 1 $100,000.00 allowance x $100,000 $100,000

Replace roof drains 1 $18,000.00 allowance x $18,000 $18,000

VEBH Architects

04/27/2017 Page 10 of 21 Sloan Elementary

Page 13: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

SLOAN ELEMENTARY

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

SUBTOTAL $965,500 $6,837,212 $2,479,970

Design & Estimating Contingency 15.00% $144,825 $1,025,582 $371,996

TOTAL ANTICIPATED CONSTRUCTION COSTS $1,110,325 $7,862,794 $2,851,966

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 AND 2) $8,973,119

Anticipated maintenance upgrades costs over the next 5 Years

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 THRU 3) $11,825,084

Anticipated maintenance/modernization costs over the next 10 Years

VEBH Architects

04/27/2017 Page 11 of 21 Sloan Elementary

Page 14: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

MIDDLE SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Site

Paving & Sidewalks

Re-Pave Drives 57,935 $8.00 sf x $463,480 $463,480

Re-Pave Parking Lots 38,050 $6.50 sf x $247,325 $247,325

Sidewalk & Curb Repair 1 $10,000.00 allowance x $10,000 $10,000

Sidewalk & Curb Replacement 13,300 $12.00 sf x $159,600 $159,600

Accessibility

Add Accessible Parking Spaces 1 $75,000.00 allowance x $75,000 $75,000

Add Accessible Route to Building 1 $60,000.00 allowance x $60,000 $60,000

Architectural/Structural

Exterior Envelope

Replace Built-Up-Roof w/ Mod. Bit. 51,500 $22.00 sf x $1,133,000 $1,133,000

Replace Canopy Roof 2,000 $22.00 sf x $44,000 $44,000

Selective Repair of Fully Adheared Roof 1 $1,500.00 allowance x $1,500 $1,500

Replace Fully Adheared EPDM w/ Mod. Bit. 3,300 $22.00 sf x $72,600 $72,600

Selective Repair of Garland Roof ( Mod. Bit.) 1 $1,500.00 allowance x $1,500 $1,500

Selective Repair of Hickman Roof (BUR @ Pool) 1 $1,500.00 allowance x $1,500 $1,500

Replace Hickman Roof @ Pool w/ Mod. Bit. 6,500 $22.00 sf x $143,000 $143,000

Replace Exterior Windows 75 $1,200.00 ea x $90,000 $90,000

Replace Exterior Doors 34 $1,200.00 ea x $40,800 $40,800

Selective Masonry Repair (at Parapets) 1 $150,000.00 allowance x $150,000 $150,000

Accessibility

ADA Restroom Improvements (accessories, grab bars

& pipe insulation)1 $20,000.00 allowance x $20,000 $20,000

Restroom Renovations (Upgrade facilities & comply

w/ADA)1 $200,000.00 allowance x $200,000 $200,000

Classroom Sinks 1 $60,000.00 allowance x $60,000 $60,000

Functional Upgrades

Science Room Upgrades (incl'd Arch, M, E, & P) 9,000 $175.00 sf x $1,575,000 $1,575,000

Aux Gym Upgrades (incl'd Arch, M, E, & P) 4,000 $120.00 sf x $480,000 $480,000

Library Upgrades 4,000 $140.00 sf x $560,000 $560,000

VEBH Architects

04/27/2017 Page 12 of 21 Middle School

Page 15: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

MIDDLE SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Tech-Ed/STEAM Addition 4,000 $220.00 sf x $880,000 $880,000

Tech-Ed/STEAM Equipmnt 1 $450,000.00 allowance x $450,000 $450,000

Interior Finishes

Flooring Upgrades 1 $500,000.00 sf x $500,000 $500,000

Paint 1 $180,000.00 sf x $180,000 $180,000

Casework Replacement (Sinks & UV issues) 1,500 $350.00 lf x $525,000 $525,000

Natatorium

Natatorium Upgrades (acoustics, seating, etc) 8,000 $60.00 allowance x $480,000 $480,000

Pool Tank & Systems Upgrades (Wallover Report) 1 $60,500.00 allowance x $60,500 $60,500

Kitchen

Kitchen/Foodcourt Renovations (incl'd Arch, M, E, & P) 3,600 $160.00 sf x $576,000 $576,000

Cafeteria Renovations 3,500 $120.00 sf x $420,000 $420,000

Kitchen Equipment Replacement 1 $700,000.00 lump sum x $700,000 $700,000

Misc

Interior Door Repair/Replacement 1 $35,000.00 allowance x $35,000 $35,000

Compartmentalization Doors/Gates 1 $250,000.00 allowance x $250,000 $250,000

HVAC

Replace 2542 MBH Boilers x $0 $0

HW Pumps Replacement x $0 $0

Replace 5 x 1700 MBH Boiler x $0 $0

HW Pumps Replacement x $0 $0

Replace Chiller 1 $90,000 each x $90,000 $90,000

CHW Pumps 2 $15,000 each x $0

Auditorium AHU Replacement 1 $40,000 each x $40,000 $40,000

Office area AHU w/ Split CU Replacement 1 $30,000 each x $30,000 $30,000

Computer Classrooms/LGI RTU Replacement 1 $75,000 each x $75,000 $75,000

Music Classrooms AHU Replacement 1 $30,000 each x $30,000 $30,000

Gym RTUs Replacement x $0 $0

Natatorium RTU Repair 1 $25,000 allowance x $25,000 $25,000

VEBH Architects

04/27/2017 Page 13 of 21 Middle School

Page 16: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

MIDDLE SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Pool Equipment Room Ventilation 1 $35,000 allowance x $35,000 $35,000

Natatorium RTU Replacement x $0 $0

Unit Ventilators Replacement (art rooms) 3 $25,000 each x $75,000 $75,000

Terminal Heating Equip. Replacement 1 $40,000 allowance x $40,000 $40,000

Exhaust Fans Replacement x $0 $0

ATC upgrades 187,677 $4 sf x $750,708 $750,708

HW Piping System x $0 $0

CHW Piping System x $0 $0

Electrical

Electrical Service (1973) 80,000 $5 sf x $400,000 $400,000

Electrical Service (1991) x $0 $0

Emergency Power 1 $75,000 allowance x $75,000 $75,000

Branch Receptacles 187,677 $1 sf x $187,677 $187,677

Interior Lighting 187,677 $6 sf x $1,126,062 $1,126,062

Exterior Lighting Upgrades (building mounted) 40 $2,500 each x $100,000 $100,000

Exterior Site Lighting Improvements & Expansion 35 $7,500 each x $262,500 $262,500

Fire Alarm x $0 $0

Paging/Intercom 187,677 $1 sf x $187,677 $187,677

Audio/Visual Systems 70 $7,500 room x $525,000 $525,000

Telephone/Data Systems (Cell booster) 187,677 $1 sf x $187,677 $187,677

Security Upgrades 1 $500,000 allowance x $500,000 $500,000

Exterior Security Upgrades (Code Blue) 4 $10,000.00 each x $40,000 $40,000

Exterior Security Upgrades (Cameras) 1 $150,000.00 allowance x $150,000 $150,000

Plumbing

Replace Water Heaters & Tanks 1 $100,000 allowance x $100,000 $100,000

Replace Water Heaters & Tanks (1992) 1 $100,000 allowance x $100,000 $100,000

Master Thermostaic Mixing Valve (Gauges) 1 $1,000 allowance x $1,000 $1,000

Individual TMV's at sinks & Lavatories 1 $10,000 allowance x $10,000 $10,000

Water Service (Gauges & Valves) 1 $8,000 allowance x $8,000 $8,000

Gas Service x $0 $0

Storm Sewer (Video Camera) 1 $15,000 allowance x $15,000 $15,000

VEBH Architects

04/27/2017 Page 14 of 21 Middle School

Page 17: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

MIDDLE SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Storm Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Sanitary Sewer (Video Camera) 1 $15,000 allowance x $15,000 $15,000

Sanitary Sewer Repairs/Replacement 1 $45,000 allowance x $45,000 $45,000

Fire Service 187,677 $3 sf x $469,193 $469,193

Plumbing Fixtures - ADA Compliance 1 $200,000 allowance x $200,000 $200,000

Replace Roof Drains 1 $30,000 allowance x $30,000 $30,000

SUBTOTAL $2,048,000 $11,223,191 $3,344,108

Design & Estimating Contingency 15.00% $307,200 $1,683,479 $501,616

TOTAL ANTICIPATED CONSTRUCTION COSTS $2,355,200 $12,906,669 $7,189,832

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 AND 2) $15,261,869

Anticipated maintenance upgrades costs over the next 5 Years

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 THRU 3) $22,451,701Anticipated maintenance/modernization costs over the next 10 Years

VEBH Architects

04/27/2017 Page 15 of 21 Middle School

Page 18: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HIGH SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Site

Paving & Sidewalks

Re-Pave Drives 98,986 $8.00 sf x $791,888 $791,888

Re-Pave Parking Lots 127,554 $6.50 sf x $829,101 $829,101

Sidewalk & Curb Repair 1 $10,000.00 allowance x $10,000 $10,000

Sidewalk & Curb Replacement 26,360 $12.00 sf x $316,320 $316,320

Miscellaneous

Site Signage 1 $160,000.00 allowance x $160,000 $160,000

Storm Sewer Upgrades 1 $220,000.00 allowance x $220,000 $220,000

Accessibility

Add Accessible Parking Spaces 1 $150,000.00 allowance x $150,000 $150,000

Add Accessible Route to Building 1 $150,000.00 allowance x $150,000 $150,000

Architectural/Structural

Exterior Envelope

Selective Repair of Modified Bit. Roof @ Blistered

Seams1 $1,500.00 allowance

x $1,500 $1,500

Replace Modified Bit. Roof membrane 157,000 $18.00 sf x $2,826,000 $2,826,000

Replace Exterior Window Wall w/ Stud & Masonry

Infill500 $10,000.00 lf

x $5,000,000 $5,000,000

Replace Exterior Windows 50 $1,200.00 x $60,000 $60,000

Replace Exterior Doors 40 $1,200.00 x $48,000 $48,000

Selective Masonry Repair 1 $50,000.00 allowance x $50,000 $50,000

Accessibility

ADA Restroom Improvements (accessories, grab bars

& pipe insulation)1 $20,000.00 allowance

x $20,000 $20,000

Restroom Renovations (Upgrade facilities & comply

w/ADA)1 $180,000.00 allowance

x $180,000 $180,000

Classroom Sinks 1 $60,000.00 allowance x $60,000 $60,000

Functional Upgrades

Science Room Upgrades (incl'd Arch, M, E, & P) 9,000 $175.00 sf x $1,575,000 $1,575,000

Art Classroom Upgrades (incl'd Arch, M, E, & P) 2,500 $160.00 sf x $400,000 $400,000

Admin Area Upgrades (incl'd Arch, M, E, & P) 2,500 $150.00 sf x $375,000 $375,000

VEBH Architects

04/27/2017 Page 16 of 21 High School

Page 19: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HIGH SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Aux Gym Locker Room Upgrades (incl'd Arch, M, E, &

P)4,000 $160.00 sf

x $640,000 $640,000

Tech-Ed/STEAM Addition 8,000 $220.00 x $1,760,000 $1,760,000

Tech-Ed/STEAM Equipment 1 $750,000.00 x $750,000 $750,000

Interior Finishes

Flooring Upgrades 1 $650,000.00 sf x $650,000 $650,000

Paint 1 $250,000.00 sf x $250,000 $250,000

Casework Replacement (Sinks & UV issues) 2,000 $350.00 lf x $700,000 $700,000

Kitchen

Food Court Renovations (incl'd Arch, M, E, & P) 2,200 $120.00 sf x $264,000 $264,000

Kitchen Equipment Replacement 1 $395,000.00 allowance x $395,000 $395,000

Misc

Interior Door Repair/Replacement 1 $35,000.00 allowance x $35,000 $35,000

Compartmentalization Doors/Gates 1 $350,000.00 allowance x $350,000 $350,000

HVAC

Replace 2730 MBH Boilers 2 $70,000.00 each x $140,000 $140,000

HW Primary Pump Replacement 2 $4,000.00 each x $8,000 $8,000

Replace 3687 MBH Boiler x $0 $0

HW Primary Pump Replacement x $0 $0

HW Pumps Replacement 2 $12,000.00 each x $24,000 $24,000

New Chillers (Replace 3 units with 2 units) 2 $220,000.00 each x $440,000 $440,000

New Chiller Primary Pumps 2 $10,000.00 each x $20,000 $20,000

CHW Pumps Replacement 2 $15,000.00 each x $30,000 $30,000

Gym AHU Replacement 4 $25,000.00 each x $100,000 $100,000

Gym AHU (add cooling) 4 $45,000.00 each x $180,000 $180,000

Cafeteria AHU Replacement 1 $100,000.00 each x $100,000 $100,000

Library AHU Replacement 1 $50,000.00 each x $50,000 $50,000

Library Dehumidification 1 $50,000.00 allowance x $50,000 $50,000

Auditorium AHU Replacement 2 $30,000.00 each x $60,000 $60,000

New Unit Ventilators 100 $25,000.00 each x $2,500,000 $2,500,000

Admin Fan Coil Unit Replacement 20 $10,000.00 each x $200,000 $200,000

VEBH Architects

04/27/2017 Page 17 of 21 High School

Page 20: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HIGH SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Terminal Heating Equip. Replacement 1 $50,000.00 allowance x $50,000 $50,000

Exhaust Fans Replacement 30 $3,000.00 each x $90,000 $90,000

ATC upgrades 262,601 $4.00 sf x $1,050,404 $1,050,404

HW Piping System 262,601 $4.00 sf x $1,050,404 $1,050,404

CHW Piping System 262,601 $5.00 sf x $1,313,005 $1,313,005

Electrical

Electrical Service (Label Service Disconnects) 1 $500.00 allow. x $500 $500

Emergency Power x $0 $0

Branch Receptacles (1988) 112,601 $1.00 sf x $112,601 $112,601

Branch Receptacles (1998) 150,000 $1.00 sf x $150,000 $150,000

Interior Lighting (1988) 112,601 $6.00 sf x $675,606 $675,606

Interior Lighting (1998) x $0 $0

Exterior Lighting Upgrades (building mounted) 70 $2,500.00 each x $175,000 $175,000

Exterior Site Lighting Improvements & Expansion 70 $7,500.00 each x $525,000 $525,000

Fire Alarm x $0 $0

Paging/Intercom 262,601 $1.00 sf x $262,601 $262,601

Audio/Visual Systems 76 $7,500.00 room x $570,000 $570,000

Auditorium Sound System 1 $200,000.00 allowance x $200,000 $200,000

Telephone/Data Systems (Cell booster) 262,601 $1.00 sf x $262,601 $262,601

Security Upgrades 1 $750,000.00 allowance x $750,000 $750,000

Exterior Security Upgrades (Code Blue) 5 $10,000.00 each x $50,000 $50,000

Exterior Security Upgrades (Cameras) 1 $250,000.00 allowance x $250,000 $250,000

Plumbing

Replace Water heater & Tank 1 $100,000.00 allowance x $100,000 $100,000

Master Thermostaic Mixing (Gauges) 1 $5,000.00 each x $5,000 $5,000

Individual TMV's at sinks & Lavatories 1 $10,000.00 allowance x $10,000 $10,000

Water Service (Gauges) 1 $2,000.00 allowance x $2,000 $2,000

Gas Service (Code Compliance) 1 $10,000.00 allowance x $10,000 $10,000

Storm Sewer (Video Camera System) 1 $15,000.00 allowance x $15,000 $15,000

Storm Sewer Repairs/Replacement 1 $45,000.00 allowance x $45,000 $45,000

Sanitary Sewer (Video Camera System) 1 $15,000.00 allowance x $15,000 $15,000

Sanitary Sewer Repairs/Replacement 1 $45,000.00 allowance x $45,000 $45,000

VEBH Architects

04/27/2017 Page 18 of 21 High School

Page 21: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

HIGH SCHOOL

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Fire Service 262,601 $2.50 sf x $656,503 $656,503

Plumbing Fixtures - ADA Compliance 1 $200,000.00 allowance x $200,000 $200,000

Grease Trap (Jet Clean System) 1 $8,000.00 allowance x $8,000 $8,000

Replace Roof Drains 1 $40,000.00 allowance x $40,000 $40,000

SUBTOTAL $865,000 $22,183,034 $8,560,000

Design & Estimating Contingency 15.00% $129,750 $3,327,455 $1,284,000

TOTAL ANTICIPATED CONSTRUCTION COSTS $994,750 $25,510,489 $9,844,000

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 AND 2) $26,505,239

Anticipated maintenance upgrades costs over the next 5 Years

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 THRU 3) $36,349,239

Anticipated maintenance upgrades costs over the next 10 Years

VEBH Architects

04/27/2017 Page 19 of 21 High School

Page 22: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

STADIUM & FIELDS

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Track & Field

Re-Turf Field 1 $450,000.00 allowance x $450,000 $450,000

Re-Surface Track 1 $250,000.00 allowance x $250,000 $250,000

South Light Pole Base Repair 3 $7,500.00 allowance x $22,500 $22,500

Replace Stadium Lighting 4 $600,000.00 allowance x $2,400,000 $2,400,000

Renovate Pressbox 1 $150,000.00 allowance x $150,000 $150,000

Re-Pave Parking Lots 24,220 $12.00 sf x $290,640 $290,640

Replace Sidewalks & Curbs 34,340 $10.00 sf x $343,400 $343,400

Exterior Security Upgrades (Code Blue) 4 $10,000.00 each x $40,000 $40,000

Exterior Security Upgrades (Security Cameras) 1 $100,000.00 allowance x $100,000 $100,000

Existing Fieldhouse

HVAC Unit Replacement 1 $150,000.00 allowance x $150,000 $150,000

Plumbing Fixture Replacement 1 $40,000.00 allowance x $40,000 $40,000

Comprehensive Renovations 2,760 $160.00 $/SF x $441,600 $441,600

Midget Concessions (Visitor Side)

Roofing & Fascia Repair $10,000.00 allowance x $10,000 $10,000

Comprehensive Renovations 250 $200.00 $/SF x $50,000 $50,000

Booster Concessions (End Zone) allowance

Roofing & Fascia Repair $10,000.00 allowance x $10,000 $10,000

Comprehensive Renovations 250 $200.00 $/SF x $50,000 $50,000

Misc. Plumb Items: (RPZ, pipe insul, temp guages, exp.

Tank) 1 $25,000.00 $/SF x $25,000 $25,000

HS Stadium Support Facilities

Concession Stand Renovations 250 $300.00 $/SF x $75,000 $75,000

Toilet Room Renovations 250 $200.00 $/SF x $50,000 $50,000

Team Locker Room Renovations 1,200 $200.00 $/SF x $240,000 $240,000

Trainer Renovations 250 $200.00 $/SF x $50,000 $50,000

Baseball Field

Dugouts 1 $50,000.00 allowance x $50,000 $50,000

Field Upgrades 1 $175,000.00 allowance x $175,000 $175,000

Fencing & Equipment 1 $50,000.00 allowance x $50,000 $50,000

ADA Access/Parking 1 $30,000.00 allowance x $30,000 $30,000

Softball Field

VEBH Architects

04/27/2017 Page 20 of 21 Stadium Support

Page 23: Franklin Regional School District€¦ · Franklin Regional School District MAINTENANCE UPGRADES COSTS Preliminary Cost Worksheet CONSTRUCTION COSTS ONLY HERITAGE ELEMENTARY AREA

Franklin Regional School District

MAINTENANCE UPGRADES COSTS

Preliminary Cost Worksheet

CONSTRUCTION COSTS ONLY

STADIUM & FIELDS

AREA / # UNITS UNIT PRICE UNIT OF MEASURE

Lev

el

1IM

ME

DIA

TE

RE

CO

MM

EN

DA

TIO

N

Lev

el

2

</=

5

Lev

el

3

5-

10

YE

AR

S

Lev

el

4

>/=

10

YE

AR

S

TOTAL Level 1 Level 2 Level 3Level 4

(not costed)

Field Upgrades 1 $100,000.00 allowance x $100,000 $100,000

ADA Access/Parking 1 $30,000.00 allowance x $30,000 $30,000

SUBTOTAL $42,500 $5,630,640 $0

Design & Estimating Contingency 15.00% $6,375 $844,596 $0

TOTAL ANTICIPATED CONSTRUCTION COSTS $48,875 $6,475,236 $0

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 AND 2) $6,524,111

Anticipated maintenance upgrades costs over the next 5 Years

TOTAL ANTICIPATED CONSTRUCTION COSTS (LEVELS 1 THRU 3) $6,524,111Anticipated maintenance/modernization costs over the next 10 Years

VEBH Architects

04/27/2017 Page 21 of 21 Stadium Support