freiburg university library - homepage -...

28
Freiburg University Library Dr. Antje Kellersohn 13.04.2016

Upload: truongdieu

Post on 08-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Freiburg University LibraryDr. Antje Kellersohn13.04.2016

Page 2: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸2

University of Freiburg

- founded in 1457

- comprehensive university with in 11 faculties

- 160 degree programs

- 25.000 students

- 7.000 employees

- 10 Nobel Prize Laureates

© Universität Freiburg

Page 3: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸3

University of Freiburg

Humanities (Main Campus)

Natural Sciences

University Medical Center

Biology

Engineering (outside map)

Psychology

© Universität Freiburg

in

Page 4: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸4

Main Campus (Humanities)

© FHTM Freiburg

Page 5: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸5

http://www.freiburg.de/servlet/PB/show/1254143_l1/Broschuere_Rotteckring_Stand_Jan2012.pdf

A new space for urban life

Page 6: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸6

Freiburg University LibraryFacts and Figures

Collections3.3 Mio. printed volumes1 Mio. e-books52,000 e-journals

Services 24/7 opening24.000 registered clients1.13 Mio. items loaned p.a.

Staff165 fte ́s (250 persons)

Library System66 libraries on the campus2.0 Mio. printed volumes

Page 7: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸7

Goals for the new building

Reduction of energy costsby 65 %

Energy efficient facade

cooling/heating with well water,

solar collectors (2,000 m²)

24/7 opening and self servicesOpen stacks (formerly parking deck),

self check-out (RFID)

conveyior system

Differentiated work spacesTraditional reading room

modern learning center („Parlatorium“)

Modern ICT infrastructure

Page 8: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸8

Capacity

Work spaces

1,200 reader seats in the reading room

500 places for group working („Parlatorium“)

New media center

Conference rooms

Cafeteria

Lecture hall

Collections

230,000 volumes in the reading room

700,000 volumes in the open stack

3.5 million volumes in the closed stacks

Page 9: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸9

Entrance – Information desk

Page 10: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸10

Cafeteria

Gussasphalt

+0.35

-0.30

BF: 19.6 m2

VERMÖGEN UND BAU BADEN-WÜRTTEMBERG

UNIVERSITÄTSBAUAMT FREIBURGHUGSTETTER STRASSE 53

79106 FREIBURG I.BR.

0761 / 1203-0

0761 / 1203-107

Universitätsbibliothek

Platz der Universität 2

D-79098 Freiburg i.Br.

Datum

Maßstab

Plangröße

Bearbeiter

SAP-WE

SAP-Geb. Nr.

Bauwerk

Dienststelle

Layoutname

Dateiname XREF

Dateiname

Amtsvorstand/AbteilungleiterVerfilmt am: GesehenGezeichnet

Universitätsbibliothek Sanierung

00018256

00004890

0001825600004890

08111

03105730

Fachplaner

Projekt Nr.

Dateiname XREF Erweiterung

Index Änderung DatumBearbeiter

±0.00 = 274.62 ü.NN

Entwurfsplanung

0001825600004890 AR3G G+00 000025

0001825600004890 AR3G G+00 000025

135 / 84

Neu

Bestand

UK

OK

AK

LM

RHf

DE

WD

DD

BD

FD

KB

OKFFB

OKRFB

UKDR

OKSW

OKBR

OKBF

OKG

BRH

UKSTR

UKSTF

RR

HK

FBH

BE

F

BF

B

W

D

Mauerwerk

Mauerwerk / Klinker Sichtmauerwerk

Betonfertigteil

Dämmstoff

Leichtbauwand / Vorsatzschale

Stahlbeton

Beton

Strichpunktlinie

Strichpunktlinie

Punktlinie

Strichlinie

Kennzeichnung der

Containementgrenze

Kennzeichnung vonSchnittebenenAchsen

Unsichtbare Kantenvor oder ueberder Schnittebene

Unsichtbare Kantenunter oder hinterder Schnittebene

Schnittbezeichnung:

Verweis auf Schnittbezeichnungund Plannummer

Detailbezeichnung:

Verweis auf Plannummer

51WAS04001

Abkuerzungen:Baustoffe:

Legende:

Linienarten:

Aussparungen / Durchbrueche:

TGA Einlegeteil Elektro

TGA Einlegeteil

TGA Aussparungen

ARCH Aussparung

Darstellung nach DIN 1356-1 und ISO 2594 Typ A.

X

GKP - 2-lagig beplankt

Darstellung nach DIN 1356-1 und ISO 2594 Typ B.

Darstellung der Aussparungen nur nachrichtlich.

Fuer definitive Aussparungen siehe separaten Aussparungsplan.

Verweis auf Detailbezeichnungauf diesem Plan

X

= Unterkante

= Oberkante

= Aussenkante

= im Lichten (lichtes Mass)

= Raumhoehe fertig

= abgehaengte Decke

= Wanddurchbruch (Breite / Hoehe)

= Deckendurchbruch

= Bodendurchbruch

= Fundamentduchbruch

= Kernbohrung

= OK Bodenkote fertig Fussboden

= OK Bodenkote roh fertig Fussboden (inkl. Estrich)

= UK Decke roh

= OK Schwellenkote fertig

= OK Bruestungskote roh

= OK Bruestungskote fertig

= OK Gelaende

= Bruestungshoehe (von OKRFB bis OKBR)

= UK Sturzkote roh

= UK Sturzkote fertig

= Regenrinne

= Heizkoerper

= Fussbodenheizung

= Bodeneinlauf

= Feuerloeschposten

= Bodenflaeche

= Bodenmaterial Oberflaeche

= Wandmaterial Oberflaeche

= Deckenmaterial Oberflaeche

= Einfuegepunkt dxf / dwg

= OK fertig+16.58

+16.50 = OK roh Bestand / fertig Bestand

Farben:

Oberflächenbeläge:

Kerne und Kernerweiterungen werden verputzt.

1 Doppelboden + Nadelfilz

2 Unterlagsboden + Nadelfilz

3 Feinsteinzeug 50/50mm

4 Hartbelag

5 Unterlagsboden gestrichen

6 Gitterroste

7 extensiv Begrünung

8 Holzwerkstoffplatte gestrichen

9 abgehängte Decke weiss gestrichen

10 Sichtbeton Brettstruktur sandgestrahlt

11 Bestand gereinigt

12 Bestand gereinigt und gestrichen

13 Gipskarton weiss

14 verputzt und acrylweiss gestrichen

15 Glaswände

16 Dämmung

17 Putz

18 Linoleum

Die Masse sind am Bau zu kontrollieren, Unstimmigkeiten sind den Projektleitern und Fachplanern unverzüglich zu melden.

Alle Installationsdurchführungen durch brandschutztechnisch qualifizierte Wände und Decken sind gemäss den Brandschutzanforderungenabzuschotten.

Schnittebenen = OK Fertigboden

Dach = +23.76OG 5 = +20.21OG 4 = +16.26OG 3 = +12.31OG 2 = +08.36OG 1 = +04.36EG = +00.00UG 1 = -02.17UG 2 = -05.50UG 3 = -08.78

Türen:

Türmasse beziehen sich auf den Fertigboden

Türen in massiven Wänden und Gipsständerwänden mit Stahlzarge,

CNS Beschäge

Türblatt Holzwerkstoffplatte gestrichen

Glastüren mit CNS Beschlägen

Glaswand 1: normale Anforderung

Glaswand 2: erhöhte Anforderung

Stützen:

Die Vermassung der neuen Schrägstützen bezieht sich auf OK

Fertigrohboden (inkl. bestehenden Estrich)

(z.B. K2 W13 - Kern 2 Wand 13)

Boden- / Wand- / Deckenaufbauten siehe Bauteilkatalog

1 2 3 4 5 6 7 8 9 10

11

12

13

14

15

16

17

18

19

20

21

22

23

1 2 3 4 5 6 7 8 9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

OK

BR

-0

.08

DIN

18

09

0/1

809

1

OK

BR

-0.0

8

DIN

18

09

0/1

80

91

OK

BR

-0

.08

DIN

18

09

0/1

80

91

OK

BR

-0

.08

T3

0 R

S

OK

BR

-0

.08

T3

0 R

S

OK

BR

-0.0

7O

KB

R -

0.0

7

DIN 18090/18091

OKBR -0.08

BR

H =

-0.2

0

T30 RS

T30 RS

T30 RS

00.009B

1.50

+0.48 (275.10)

+0.49 (275.11)

00

.01

0A

00.011A

00

.01

30

0.0

16

00.001B

00.001A

00.2

02

A0

0.2

02

C0

0.2

02

B

00.2

01

00.402

00.005 00.00600.004

00

.20

9A

00.2

08

A

00.205

00.2

04

00

.20

9B

00

.20

8B

00.009A

00.008B

00

.10

40

0.1

06A

00

.107

00.1

05

A

00.203

00

.02

00

0.0

28

00.023 00.021C

00

.02

1A

00

.02

1B

00.02200.025

00.600A

00.600B

00.108A 00.108B

00.012

00.007B

00.007A

00.401

00

.105

B0

0.1

06

B

00

.10

2B

00

.10

2A

00.1

02

C

00.1

01

00.103

Ref.-Punkt 0.00 / 0.00 / 0.00

Klapptor Müllraum-

Andienung

24h Zugang

Parzellengrenze

Untergeschoss

Parzellengrenze

Untergeschoss

Kern 1

Kern 4

F

F

11 Stg.

28 / 182cm

11 Stg.28 / 182cm

11

Stg

.

28

/ 1

82cm

11 S

tg.

28

/ 1

82cm

11

Stg

.

28

/ 1

82cm

11

Stg

.2

8 /

18

2cm

Karusseltürenmit vollflächigen

Sauberlaufmatten

Karusseltüren

mit vollflächigenSauberlaufmatten

Kabine 26 Pers.

1.90 x 2.10mA = 4.25m2

Q = 2'000kg

F = 2'380kg

Rampeneigung 15.30%

Doppelflügeltür Notausgangbeide Flügel verblecht,mechan. Öffnung mit Türassistent,

Schwelle schräg,OK-Schwelle von +0.20 bis +0.22,

lichte Breite 1.49 m

Untergeschoss

Untergeschoss

Untergeschoss

Untergeschoss

WT WT

AG

AG

AG

Fassadenintegriert:Feuerwehrschlüsseldepot;

Blitzleuchte;Feuerwehreinspeisung

DN100, 2 Anschluß-stutzen (Absperrungim UG1)

Milchstraße

Belfort

str

e

Platz der Universität

Doppelflügeltür Notausgang

Flügel verblecht/verglast,mechan. Öffnung mit Türassistent,

Schwelle gerade,OK-Schwelle -0.27,lichte Breite mind. 1.80 m

Zugangstür Cafeteria

Flügel verglast,mechan. Öffnung mit Türassistent,Schwelle schräg,

OK-Schwelle von +0.48 bis +0.49,lichte Breite 1.00 m

Flügeltür NotausgangAnlieferung

Flügel verblecht,mechan. Öffnung mit Türassistent,

Schwelle gerade,OK-Schwelle -0.55,lichte Breite 0.84 m

Schiebetüre Fahrradgarage im UG1

beide Flügel verglast,elektrischer Antrieb (temperaturabhängig)

00.008A

00.011B

00.010B

00.400

00.018

Kern 2

AnlieferungSortieren

Sortieren, Vorsortieren

Wartezone

Einpacken

Frankieren

Stellfläche

Bücherwagen

Sackkarren

Hubwagen

25

,6lfm

160x50x4OH Versandmat.

12

,8lfm

160x50x4OH Versandmat.

160x50x4OH Garderobe

6,4

lfm

160x40x4OH Büromaterial

160x40x4OH Büromaterial

160x40x4OH Büromaterial

160x40x4OH Büromaterial

160x40x4OH Kisten, Div.

Wartezone

H 90cm

H 90cm

H 90cm

H 90cm

Wa

sch

be

cke

n ?

Ablagefach wandmontiert

Ablagefach wandmontiert

r als

Sic

hts

ch

utz

Kopierer, Drucker

Post, Material

Besprechung

T

REGAL

MOBIL

REGAL

MOBIL

REGAL

MOBIL

REGAL

MOBIL

REGAL

MOBIL

Schliessfächer unter

Arbeitsplatte

REGAL

MOBIL

Bücherregal

100x30 cm

Schriftensch rank

87x40x91cm

Müllkorb

45x45x75 cm

PC

-Arb

eits

pla

tz

16

0x9

0x7

6cm

Me

sser

14

0x2

30

x7

7cm

Ab

lag

eb

ere

ich

Pa

pp

sch

ere

80

x1

40

x9

0cm

Sta

ndg

erä

t

Ab

fal lko

rb

80

x64

x5

0cm

Reg

al

118

x11

0x160

cm

RC

Arb

eitsp

latz

25

0x10

0cm

51

x46

x6

0 c

m

Tis

ch

gerä

t

Sch

ubla

de

nsch

ran

k

12

0x6

3x73

cm

Fächerschrank 200x100

Nutmaschine

70x65x45 cm

Tischgerät

Metallpresse

51x46x60 cm

Tisch gerät

Tischhöhe

Sch

ub

lad

ensch

ran

k

12

0x6

3x7

3cm

Metallpresse

Schubladenschrank

Fächerschrank 200x100

Tischhöhe

55x4

5x2

2 c

m

Reg

al

11

8x11

0x1

60

cm

Hydraulische Presse

85x60x150cm

Standgerät

Kle

beb

ind

eg

erä

t9

0x4

2x1

20cm

mob

i l

60

x8

0x60

cm

Tis

ch

ge

rät

Sch

ne

idetisch

Tis

ch 1

20

x8

5S

ch

ub

lad

en

schra

nk

ch

err

eg

al

10

0x3

0 c

m

Umhausung neu

Werkzeugschrank

Obersch rank

PO

LA

R 6

6

REGAL

MOBIL

REGAL

MOBIL

REGAL

MOBIL

REGAL

MOBIL

Inte

rCa

rd

Tablett-

wagen

Tablett-wagen

Variante I:836 Schließfächer

Variante II:850 Schließfächer

Inte

rCa

rdIn

terC

ard

Inte

rCa

rdFeuerwehr

Aufstellfläche 12 x 7 m

Behindertenparkplatz

Feuerwehr

Aufstellfläche 12 x 7 m

Behindertenparkplatz

Bedienfeld Karusselltüre

Aussen integrierter Kartenleser

Bedienfeld Karusselltüre

Bedienfeld Karusselltüre

Aussen integrierter Kartenleser

Bedienfeld Karusselltüre

Grenze Strasse

VF

00.008

BB: 4

WB: 8, 13, 17

DB: 11

+0.00 bis -0.27

-1.15

NGF: 21.32 m2

RU: 19.61 m

WC H

00.208

BB: 3

WB: 3, 19

DB: 11

+0.00

-0.30

NGF: 11.96 m2

RU: 19.24 m

WC D

00.209

BB: 3

WB: 3, 19

DB: 11

+0.00

-0.30

NGF: 16.51 m2

RU: 21.45 m

VF

00.200

BB: 4

WB: 12

DB: 11

NGF: 8.10 m2

RU: 11.40 m

Büro Dezernent

00.004

Blendschutz

BB: 1

WB: 15

DB: 11

+0.00

-0.85

NGF: 14.66 m2

RU: 15.58 m

Büro OAL

00.006

Blendschutz

BB: 1

WB: 15

DB: 11

+0.00

-0.85

NGF: 16.01 m2

RU: 16.28 m

Büro Info

00.005

Blendschutz

BB: 1

WB: 15

DB: 11

+0.00

-0.85

NGF: 16.50 m2

RU: 16.71 m

Technik

besprinklert

00.203

NGF: 13.95 m2

RU: 15.30 m

Technik

00.402

NGF: 3.35 m2

RU: 8.84 m

Technik

besprinklert

00.103

NGF: 30.75 m2

RU: 23.20 m

Lüftung

besprinklert

00.204

NGF: 4.86 m2

RU: 9.24 m

Theke

00.002

BB: 1

DB: 11

+0.00

-0.30/-0.85

NGF:171.99 m2

RU: 84.13 m

Cafeteria

00.018

BB: 4

WB: 8

DB: 11

+0.20 / +0.50 mit ~1% Stg.

-0.30 / -0.55

NGF: 408.32 m2

RU: 123.54 m

Schliessfächer

854 Schränke

00.017

BB: 4

WB: 8, 17

DB: 11

+0.00 / +0.35 mit ~1% Stg.

-0.30/-1.05

NGF: 561.24 m2

RU: 146.47 m

Eingangshalle

00.001

BB: 4

WB: 8, 13, 17

DB: 11

+0.0 / ~1% Stg.

-0.30/-0.55/-0.85/-1.45

NGF: 894.31 m2

RU: 352.62 m

Büro Grossraum Leihstelle Inf.

00.003

Blendschutz

BB: 1

WB: 8, 13, 15, 17

DB: 11

+0.00

-1.15/-0.85/-0.30

NGF: 344.31 m2

RU: 126.23 m

PC Recherche

00.019

BB: 4

WB: 17

DB: 11

+0.05 / +0.38 mit ~1% Stg.

-0.30

NGF: 170.20 m 2

RU: 61.83 m

VF

00.400

BB: 4

WB: 17

DB: 11

~+0.20 mit ~1% Stg.

-0.30/-1.05

NGF: 15.13 m2

RU: 18.82 m

Behinderten WC

00.107

BB: 3

WB: 3, 19

DB: 11

+0.27

-0.30

NGF: 5.06 m2

RU: 9.13 m

WC H

00.105

BB: 3

WB: 3, 19

DB: 11

+0.27

-0.30

NGF: 14.65 m2

RU: 22.66 m

WC D

00.106

BB: 3

WB: 3, 19

DB: 11

+0.27

-0.30

NGF: 18.66 m2

RU: 24.88 m

Buchbinderei

00.012

BB: 18

WB: 13, 17

DB: 11

+0.00

-1.45

NGF: 68.05 m2

RU: 39.25 m

Putzraum

00.013

BB: 18

WB: 19

DB: 11

+0.00

-1.45

NGF: 8.66 m2

RU: 12.03 m

Poststelle

00.009

BB: 18

WB: 13, 17

DB: 11

+0.00

-1.15

NGF: 62.68 m2

RU: 32.37 m

Abfallraum

00.011

BB: Gussasphalt, Gefälle

WB: 16, 17

DB: 16

-0.55/OK aussen

-1.45

NGF: 74.86 m2

RU: 35.29 m

VF

00.010

BB: 4

WB: 13, 17

DB: 11

+0.00 / -0.55

-0.30 / -1.45 / -1.15

NGF: 66.88 m2

RU: 43.50 m

Cafeteria Theke

00.021

BB: 3

WB: 3, 19

DB: 11

+0.33

-0.30

NGF: 34.59 m2

RU: 29.20 m

Bücherlift

00.600

NGF: 3.31 m2

RU: 7.69 m

Hausdienst

00.016

BB: 4

WB: 13

DB: 11

+0.00

-1.45

NGF: 14.00 m2

RU: 15.31 m

Treppenhaus Kern II

00.201

BB: 11

WB: 12

DB: 11

NGF: 35.64 m2

RU: 34.62 m

Treppenhaus Kern I

00.101

BB: 11

WB: 12

DB: 11

NGF: 35.95 m2

RU: 35.06 m

Lastenaufzug

00.205

NGF: 8.40 m2

RU: 11.60 m

Personenaufzug I

00.102

NGF: 9.98 m2

RU: 14.30 mPersonenaufzug II

00.202

NGF: 9.97 m2

RU: 14.30 m

Elektroverteiler Kern I

00.108

NGF: 2.09 m2

RU: 9.84 m

Technikschacht Kern II

00.207

NGF: 1.98 m2

RU: 9.79 m

Technik

00.403

NGF: 2.43 m2

RU: 8.88 m

Cafeteria Büro

00.022

BB: 18

WB: 19

DB: 11

+0.33

-0.30

NGF: 5.01 m2

RU: 8.97 m

Cafeteria Lager

00.025

BB: 3

WB: 19

DB: 11

+0.33

-0.30

NGF: 3.93 m2

RU: 7.94 m

Cafeteria Kühlraum 1

00.024

BB: 3

WB: 3, 19

DB: 11

+0.21

-0.30

NGF: 5.22 m2

RU: 9.40 m

Cafeteria Spülküche

00.023

BB: 3

WB: 3, 19

DB: 11

+0.33

-0.30

NGF: 14.58 m2

RU: 17.05 m

Cafeteria Vorraum

00.020

BB: 3

WB: 3, 19

DB: 11

+0.33

-0.30

NGF: 11.54 m2

RU: 14.29 m

Cafeteria Kühlraum 2

00.026

BB: 3

WB: 3, 19

DB: 11

+0.21

-0.30

NGF: 6.86 m2

RU: 10.61 m

Cafeteria Vorbereit.

00.027

BB: 3

WB: 3, 19

DB: 11

+0.33

-0.30

NGF: 12.05 m2

RU: 14.52 m

Cafeteria Umkleide

00.028

BB: 3

WB: 3, 19

DB: 11

+0.29

-0.30

NGF: 3.24 m2

RU: 7.20 m

WC Cafeteria

00.104

BB: 3

WB: 3, 19

DB: 11

+0.27

-0.30

NGF: 2.85 m2

RU: 7.18 m

Sitzungs-/Pausenraum

00.007

BB: 1

WB: 15

DB: 11

+0.00

-0.30/-0.85

NGF: 40.50 m2

RU: 27.00 m

T30 RS

OKBR +0.13

OK

BR

+0

.22

OK

BR

+0

.22

DIN

18

09

0/1

80

91

OK

BR

+0

.00

5

DIN

18

09

0/1

80

91

OK

BR

+0

.00

5

DIN

18

09

0/1

809

1

OK

BR

+0

.00

5

T3

0 R

S

OK

BR

+0

.00

5

OKBR+0.15

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07

.50

7.5

07

.50

7.5

07.5

07

.50

Treppenhaus

00.401

BB: 11

WB: 12

DB: 11

NGF: 20.98 m2

RU: 19.06 m

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Untergeschoss

Untergeschoss

F

F

Untergeschoss

Untergeschoss

Untergeschoss

Untergeschoss

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07.5

07.5

07.5

07.5

07.5

07.5

0

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Architekt1 : 100

SDA

Erdgeschoss

Grundrisspläne

AW/SB/WC

18

17.12.2009aweSchnittebene 1.00m ab FRB, Türmasse, Cafeteria, Müllraum gedämmt

14.06.2010aweAnpassung Theke, Cafeteria Anpassungen Anforderungen Trennwände

12.07.2010awe/sbe/wchÜberarbeitung nach Nutzerangabe19

Anpassungen Leihbereich und Bodenbeläge awe/sbe/wch 12.08.201020

28.03.2011

21 28.03.2011aweÜberarbeitung nach Nutzerangabe

23 16.08.2012fscÜberarbeitung Türen nach Türliste

22 20.02.2012fscÜberarbeitung nach Nutzerangabe

24 fscÜberarbeitung Empfangstheke, Cafeteriabox, Fassadenklappen 07.06.2013

25 Ausschreibungsplan Theken fsc 20.02.2014

Ground floor

Entrance

Caféteria

WardrobeEntrance

© Degelo Architekten,/Basel, Bene, Stuttgart, UB Freiburg, UBA Freiburg

Central counterSelf check-out

Page 11: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸11

Entwurf: Degelo Architekten, Basel, © Bene, UB Freiburg u. UBA Freiburg

Workspaces

Cafeteria

Gussasphalt

+0.35

-0.30

BF: 19.6 m2

VERMÖGEN UND BAU BADEN-WÜRTTEMBERG

UNIVERSITÄTSBAUAMT FREIBURGHUGSTETTER STRASSE 53

79106 FREIBURG I.BR.

0761 / 1203-0

0761 / 1203-107

Universitätsbibliothek

Platz der Universität 2

D-79098 Freiburg i.Br.

Datum

Maßstab

Plangröße

Bearbeiter

SAP-WE

SAP-Geb. Nr.

Bauwerk

Dienststelle

Layoutname

Dateiname XREF

Dateiname

Amtsvorstand/AbteilungleiterVerfilmt am: GesehenGezeichnet

Universitätsbibliothek Sanierung

00018256

00004890

0001825600004890

08111

03105730

Fachplaner

Projekt Nr.

Dateiname XREF Erweiterung

Index Änderung DatumBearbeiter

±0.00 = 274.62 ü.NN

Entwurfsplanung

0001825600004890 AR3G G+02 000023

0001825600004890 AR3G G+02 000023

135 / 84

Neu

Bestand

UK

OK

AK

LM

RHf

DE

WD

DD

BD

FD

KB

OKFFB

OKRFB

UKDR

OKSW

OKBR

OKBF

OKG

BRH

UKSTR

UKSTF

RR

HK

FBH

BE

F

BF

B

W

D

Mauerwerk

Mauerwerk / Klinker Sichtmauerwerk

Betonfertigteil

Dämmstoff

Leichtbauwand / Vorsatzschale

Stahlbeton

Beton

Strichpunktlinie

Strichpunktlinie

Punktlinie

Strichlinie

Kennzeichnung der

Containementgrenze

Kennzeichnung vonSchnittebenenAchsen

Unsichtbare Kantenvor oder ueberder Schnittebene

Unsichtbare Kantenunter oder hinterder Schnittebene

Schnittbezeichnung:

Verweis auf Schnittbezeichnungund Plannummer

Detailbezeichnung:

Verweis auf Plannummer

51WAS04001

Abkuerzungen:Baustoffe:

Legende:

Linienarten:

Aussparungen / Durchbrueche:

TGA Einlegeteil Elektro

TGA Einlegeteil

TGA Aussparungen

ARCH Aussparung

Darstellung nach DIN 1356-1 und ISO 2594 Typ A.

X

GKP - 2-lagig beplankt

Darstellung nach DIN 1356-1 und ISO 2594 Typ B.

Darstellung der Aussparungen nur nachrichtlich.

Fuer definitive Aussparungen siehe separaten Aussparungsplan.

Verweis auf Detailbezeichnungauf diesem Plan

X

= Unterkante

= Oberkante

= Aussenkante

= im Lichten (lichtes Mass)

= Raumhoehe fertig

= abgehaengte Decke

= Wanddurchbruch (Breite / Hoehe)

= Deckendurchbruch

= Bodendurchbruch

= Fundamentduchbruch

= Kernbohrung

= OK Bodenkote fertig Fussboden

= OK Bodenkote roh fertig Fussboden (inkl. Estrich)

= UK Decke roh

= OK Schwellenkote fertig

= OK Bruestungskote roh

= OK Bruestungskote fertig

= OK Gelaende

= Bruestungshoehe (von OKRFB bis OKBR)

= UK Sturzkote roh

= UK Sturzkote fertig

= Regenrinne

= Heizkoerper

= Fussbodenheizung

= Bodeneinlauf

= Feuerloeschposten

= Bodenflaeche

= Bodenmaterial Oberflaeche

= Wandmaterial Oberflaeche

= Deckenmaterial Oberflaeche

= Einfuegepunkt dxf / dwg

= OK fertig+16.58

+16.50 = OK roh Bestand / fertig Bestand

Farben:

Oberflächenbeläge:

Kerne und Kernerweiterungen werden verputzt.

1 Doppelboden + Nadelfilz

2 Unterlagsboden + Nadelfilz

3 Feinsteinzeug 50/50mm

4 Hartbelag

5 Unterlagsboden gestrichen

6 Gitterroste

7 extensiv Begrünung

8 Holzwerkstoffplatte gestrichen

9 abgehängte Decke weiss gestrichen

10 Sichtbeton Brettstruktur sandgestrahlt

11 Bestand gereinigt

12 Bestand gereinigt und gestrichen

13 Gipskarton weiss

14 verputzt und acrylweiss gestrichen

15 Glaswände

16 Dämmung

17 Putz

18 Linoleum

Die Masse sind am Bau zu kontrollieren, Unstimmigkeiten sind den Projektleitern und Fachplanern unverzüglich zu melden.

Alle Installationsdurchführungen durch brandschutztechnisch qualifizierte Wände und Decken sind gemäss den Brandschutzanforderungenabzuschotten.

Schnittebenen = OK Fertigboden

Dach = +23.76OG 5 = +20.21OG 4 = +16.26OG 3 = +12.31OG 2 = +08.36OG 1 = +04.36EG = +00.00UG 1 = -02.17UG 2 = -05.50UG 3 = -08.78

Türen:

Türmasse beziehen sich auf den Fertigboden

Türen in massiven Wänden und Gipsständerwänden mit Stahlzarge,

CNS Beschäge

Türblatt Holzwerkstoffplatte gestrichen

Glastüren mit CNS Beschlägen

Glaswand 1: normale Anforderung

Glaswand 2: erhöhte Anforderung

Stützen:

Die Vermassung der neuen Schrägstützen bezieht sich auf OK

Fertigrohboden (inkl. bestehenden Estrich)

(z.B. K2 W13 - Kern 2 Wand 13)

Boden- / Wand- / Deckenaufbauten siehe Bauteilkatalog

1 2 3 4 5 6 7 8 9

10

11

12

13

14

15

16

17

18

19

20

21

Treppenhaus Kern II

02.201

BB: 11

WB: 12

DB: 11

NGF: 35.64 m2

RU: 34.62 m

T3

0 R

S

OK

BR

+8

.29

OK

BR

+8

.29

DIN

180

90

/18

09

1

OK

BR

+8.2

9

DIN

180

90

/18

09

1

OK

BR

+8.2

9

DIN

18

090

/180

91

OK

BR

+8

.29

T3

0 R

S

OK

BR

+8

.29

T3

0 R

S

DIN

180

90

/18

09

1

OK

BR

+8.2

9

DIN

180

90

/18

09

1

OK

BR

+8.2

9

DIN

18

090

/180

91

OK

BR

+8

.29

T3

0 R

S

OK

BR

+8

.29

DIN 18090/18091

OKBR +8.28

OKBR +8.29

OKBR +8.29OKBR +8.29

OKBR +8.34

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07

.50

7.5

07

.50

7.5

07

.50

7.5

0

02

.011

02.018B

02.402

02

.10

50

2.1

04

02

.10

2B

02

.10

2A

02

.10

2C

02

.10

1

02

.20

3

02.2

02

C0

2.2

02

B0

2.2

02

A

02

.20

1

02.205 02.210 02.209A02.208A

02.005

02

.02

3

02.600A

02.600B

02.107A 02.107B

02.006

02.010

02.103

02.018A

02.208B

02.209B

02.01402.012 02.013

02.401

02

.02

002

.021

02

.20

4

Ref.-Punkt 0.00 / 0.00 / +8.00

Kern 1

11 Stg.28 / 179cm

11 Stg.

28 / 182cm

11

Stg

.

28

/ 1

79cm

11

Stg

.

28

/ 1

82cm

11

Stg

.

28

/ 1

79cm

11

Stg

.2

8 /

18

2cm

AG

Kabine1.90 x 2.10mFl = 4.20m2

Q = 2'000kg

F

Kern 4

Kern 2

WC H

02.104

BB: 3

WB: 3, 19

DB: 11

+8.36

+7.92

NGF: 11.40 m2

RU: 21.23 m

WC D

02.105

BB: 3

WB: 3, 19

DB: 11

+8.36

+7.92

NGF: 13.35 m2

RU: 19.02 m

PC Recherche

12 RP

02.001

BB: 1

DB: 11

+8.36

+7.92

NGF: 37.26 m2

RU: 28.35 m

Technik

02.402

NGF: 3.35 m2

RU: 8.84 m

Lüftung

besprinklert

02.204

NGF: 4.86 m2

RU: 9.24 m

Büro Referent

02.012

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+8.36

+7.92

NGF: 19.98 m2

RU: 18.55 m

Büro Referent

02.013

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+8.36

+7.92

NGF: 18.88 m2

RU: 20.36 m

Schulungsraum

02.020

Verdunkelung

BB: 1

WB: 13, 14

DB: 11

+8.36

+7.92

NGF: 78.91 m2

RU: 36.51 m

Lesesaal 2

250 LM / 259 LP

02.002

BB: 1

WB: 13, 15, 17

DB: 11

+8.36

+7.92

NGF: 1'850.98 m 2

RU: 380.98 m

Blindenleseplatz a

02.010

BB: 1

WB: 13, 15

DB: 11

+8.36

+7.92

NGF: 7.24 m2

RU: 10.86 m

Büro Referent

02.014

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+8.36

+7.92

NGF: 19.49 m2

RU: 18.15 m

Parlatorium VF

02.023

BB: 1

WB: 13, 15, 17

DB: 11

+8.36

+7.92

NGF: 190.29 m2

RU: 155.58 m

Kopierraum

02.005

BB: 18

WB: 13, 17

DB: 11

+8.36

+7.92

NGF: 36.74 m2

RU: 24.55 m

Putzraum

02.006

BB: 18

WB: 13, 17, 19

DB: 11

+8.36

+7.92

NGF: 16.43 m2

RU: 16.70 m

Bücherlift

02.600

NGF: 3.31 m2

RU: 7.69 m

VF

02.004

BB: 1

WB: 8, 13, 15, 17

DB: 11

+8.36

+7.92

NGF: 91.00 m2

RU: 85.41 m

Parlatorium

02.022

BB: 1

WB: 13

DB: 11

+8.36

+7.92

NGF:269.43 m2

RU: 75.11 m

Forum Juridicum

02.018

BB: 1

WB: 13, 15, 17

DB: 11

+8.36

+7.92

NGF: 107.34 m2

RU: 54.27 m

Elektroverteiler Kern I

02.107

NGF: 2.09 m2

RU: 9.84 m

Technikschacht Kern II

02.207

NGF: 1.98 m2

RU: 9.79 m

Lastenaufzug

02.205

NGF: 8.40 m2

RU: 11.60 m

Personenaufzug I

02.102

NGF: 9.98 m2

RU: 14.30 m

Personenaufzug II

02.202

NGF: 9.97 m2

RU: 14.30 m

Treppenhaus Kern IV

02.401

BB: 11

WB: 12

DB: 11

NGF: 20.21 m2

RU: 25.72 m

Treppenhaus Kern I

02.101

BB: 11

WB: 12

DB: 11

NGF: 35.64 m2

RU: 34.62 m

Schulungsraum

02.021

Verdunkelung

BB: 1

WB: 13, 14

DB: 11

+8.36

+7.92

NGF: 74.92 m2

RU: 34.87 m

Blindenleseplatz b

02.011

Blendschutz

BB: 1

WB: 13

DB: 11

+8.36

+7.92

NGF: 11.66 m2

RU: 14.02 m

WC H

02.208

BB: 3

WB: 3, 19

DB: 11

+8.36

+7.92

NGF: 9.02 m2

RU: 15.83 m

Behinderten WC

02.210

BB: 3

WB: 3, 19

DB: 11

+8.36

+7.92

NGF: 5.39 m2

RU: 9.65 m

WC D

02.209

BB: 3

WB: 3, 19

DB: 11

+8.36

+7.92

NGF: 14.44 m2

RU: 20.93 m

Technik

02.403

NGF: 2.44 m2

RU: 8.89 m

Technik

besprinklert

02.103

NGF: 30.75 m2

RU: 23.20 m

Technik

besprinklert

02.203

NGF: 22.50 m2

RU: 21.00 m

T30 RS

BRH = +8.31

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

BR

H =

+8

.34

Theke

6 LM

02.003

BB: 1

DB: 11

+8.36

+7.92

NGF: 45.21 m2

RU: 26.72 m

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07.5

07.5

07

.50

7.5

07

.50

7.5

0

F

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Architekt1 : 100

SDA

2. Obergeschoss

Grundrisspläne

AW/SB/WC

12.07.2010awe/sbe/wchÜberarbeitung nach Nutzerangabe15

21.07.2010awe/sbe/wchÄnderung Wände Referenten16

Anpassungen Türpositionen und -.breiten, Blindenarbeitsplatz awe/sbe/wch 12.08.201017

28.03.2011

18 28.03.2011aweÜberarbeitung nach Nutzerangabe

19 16.06.2011fscForum Juridicum

20.02.2012fscÜberarbeitung nach Nutzerangabe20

21 16.08.2012fscÜberarbeitung Türen nach Türliste, Glaswand Lesesaal/Parl. verschoben

22 fscFassadenklappen 07.06.2013

23 Ausschreibungsplan Theken fsc 20.02.2014

Reading room – „Parlatorium“

concentration, reflection communication,confidentiality teamwork

Privacy Interaction

Page 12: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸12

Workspaces

Page 13: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸13

Workspaces

Page 14: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸14

Workspaces

Page 15: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸15

Workspaces

Page 16: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸16

Cafeteria

Gussasphalt

+0.35

-0.30

BF: 19.6 m2

VERMÖGEN UND BAU BADEN-WÜRTTEMBERG

UNIVERSITÄTSBAUAMT FREIBURGHUGSTETTER STRASSE 53

79106 FREIBURG I.BR.

0761 / 1203-0

0761 / 1203-107

Universitätsbibliothek

Platz der Universität 2

D-79098 Freiburg i.Br.

Datum

Maßstab

Plangröße

Bearbeiter

SAP-WE

SAP-Geb. Nr.

Bauwerk

Dienststelle

Layoutname

Dateiname XREF

Dateiname

Amtsvorstand/AbteilungleiterVerfilmt am: GesehenGezeichnet

Universitätsbibliothek Sanierung

00018256

00004890

0001825600004890

08111

03105730

Fachplaner

Projekt Nr.

Dateiname XREF Erweiterung

Index Änderung DatumBearbeiter

±0.00 = 274.62 ü.NN

Entwurfsplanung

0001825600004890 AR3G G+03 000023

0001825600004890 AR3G G+03 000023

135 / 84

Neu

Bestand

UK

OK

AK

LM

RHf

DE

WD

DD

BD

FD

KB

OKFFB

OKRFB

UKDR

OKSW

OKBR

OKBF

OKG

BRH

UKSTR

UKSTF

RR

HK

FBH

BE

F

BF

B

W

D

Mauerwerk

Mauerwerk / Klinker Sichtmauerwerk

Betonfertigteil

Dämmstoff

Leichtbauwand / Vorsatzschale

Stahlbeton

Beton

Strichpunktlinie

Strichpunktlinie

Punktlinie

Strichlinie

Kennzeichnung der

Containementgrenze

Kennzeichnung vonSchnittebenenAchsen

Unsichtbare Kantenvor oder ueberder Schnittebene

Unsichtbare Kantenunter oder hinterder Schnittebene

Schnittbezeichnung:

Verweis auf Schnittbezeichnungund Plannummer

Detailbezeichnung:

Verweis auf Plannummer

51WAS04001

Abkuerzungen:Baustoffe:

Legende:

Linienarten:

Aussparungen / Durchbrueche:

TGA Einlegeteil Elektro

TGA Einlegeteil

TGA Aussparungen

ARCH Aussparung

Darstellung nach DIN 1356-1 und ISO 2594 Typ A.

X

GKP - 2-lagig beplankt

Darstellung nach DIN 1356-1 und ISO 2594 Typ B.

Darstellung der Aussparungen nur nachrichtlich.

Fuer definitive Aussparungen siehe separaten Aussparungsplan.

Verweis auf Detailbezeichnungauf diesem Plan

X

= Unterkante

= Oberkante

= Aussenkante

= im Lichten (lichtes Mass)

= Raumhoehe fertig

= abgehaengte Decke

= Wanddurchbruch (Breite / Hoehe)

= Deckendurchbruch

= Bodendurchbruch

= Fundamentduchbruch

= Kernbohrung

= OK Bodenkote fertig Fussboden

= OK Bodenkote roh fertig Fussboden (inkl. Estrich)

= UK Decke roh

= OK Schwellenkote fertig

= OK Bruestungskote roh

= OK Bruestungskote fertig

= OK Gelaende

= Bruestungshoehe (von OKRFB bis OKBR)

= UK Sturzkote roh

= UK Sturzkote fertig

= Regenrinne

= Heizkoerper

= Fussbodenheizung

= Bodeneinlauf

= Feuerloeschposten

= Bodenflaeche

= Bodenmaterial Oberflaeche

= Wandmaterial Oberflaeche

= Deckenmaterial Oberflaeche

= Einfuegepunkt dxf / dwg

= OK fertig+16.58

+16.50 = OK roh Bestand / fertig Bestand

Farben:

Oberflächenbeläge:

Kerne und Kernerweiterungen werden verputzt.

1 Doppelboden + Nadelfilz

2 Unterlagsboden + Nadelfilz

3 Feinsteinzeug 50/50mm

4 Hartbelag

5 Unterlagsboden gestrichen

6 Gitterroste

7 extensiv Begrünung

8 Holzwerkstoffplatte gestrichen

9 abgehängte Decke weiss gestrichen

10 Sichtbeton Brettstruktur sandgestrahlt

11 Bestand gereinigt

12 Bestand gereinigt und gestrichen

13 Gipskarton weiss

14 verputzt und acrylweiss gestrichen

15 Glaswände

16 Dämmung

17 Putz

18 Linoleum

Die Masse sind am Bau zu kontrollieren, Unstimmigkeiten sind den Projektleitern und Fachplanern unverzüglich zu melden.

Alle Installationsdurchführungen durch brandschutztechnisch qualifizierte Wände und Decken sind gemäss den Brandschutzanforderungenabzuschotten.

Schnittebenen = OK Fertigboden

Dach = +23.76OG 5 = +20.21OG 4 = +16.26OG 3 = +12.31OG 2 = +08.36OG 1 = +04.36EG = +00.00UG 1 = -02.17UG 2 = -05.50UG 3 = -08.78

Türen:

Türmasse beziehen sich auf den Fertigboden

Türen in massiven Wänden und Gipsständerwänden mit Stahlzarge,

CNS Beschäge

Türblatt Holzwerkstoffplatte gestrichen

Glastüren mit CNS Beschlägen

Glaswand 1: normale Anforderung

Glaswand 2: erhöhte Anforderung

Stützen:

Die Vermassung der neuen Schrägstützen bezieht sich auf OK

Fertigrohboden (inkl. bestehenden Estrich)

(z.B. K2 W13 - Kern 2 Wand 13)

Boden- / Wand- / Deckenaufbauten siehe Bauteilkatalog

12345678910

11

12

13

14

15

16

17

18

19

20

21

T30

RS

OK

BR

+1

2.2

4O

KB

R +

12

.24

DIN

18

09

0/1

80

91

OK

BR

+1

2.2

4

DIN

18

09

0/1

80

91

OK

BR

+1

2.2

4

DIN

18

09

0/1

80

91

OK

BR

+1

2.2

4T

30 R

S

OK

BR

+1

2.2

4

T3

0 R

S

DIN

18

09

0/1

80

91

OK

BR

+1

2.2

4

DIN

18

09

0/1

80

91

OK

BR

+1

2.2

4

DIN

18

09

0/1

80

91

OK

BR

+1

2.2

4T

30 R

S

OK

BR

+1

2.2

4

DIN 18090/18091

OKBR +12.23

OKBR +12.24

OKBR +12.24OKBR +12.24

OK

BR

+12

.29

OKBR +12.29

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07

.50

7.5

07

.50

7.5

07

.50

7.5

0

03

.03

30

3.0

32

03.107A 03.107B

03

.40

2

03

.10

40

3.1

05

03

.10

2B

03

.10

2A

03

.10

2C

03

.101

03.2

03

03

.20

2C

03

.20

2B

03

.20

2A

03

.20

1

03

.04

1A

02

.04

1B

03.040

03.042B

03.042A

03.005

03.011 03.012 03.013 03.014 03.034B

03.205 03.210 03.209A03.208A

03.2

04

03

.04

2C

03

.04

1C

03.600A

03.600B

03.006

03

.03

1B

03

.03

1A

03

.01

6B

03

.01

6A

03.020A 03.019 03.018

03.020B

03

.01

7

03.031C

03.030C

03.030B

03.029A 03.030A

03.029B

03.103

03.208B

03.209B

03

.02

3B

03

.02

3A

03.401

03

.02

4B

03

.02

4A

03.034A

Ref.-Punkt 0.00 / 0.00 / +11.95

Kern 1

F

F

11 Stg.

28 / 179cm

11 Stg.

28 / 18cm

11

Stg

.2

8 /

17

9cm

11

Stg

.

28

/ 1

8cm

11

Stg

.2

8 /

17

9cm

11

Stg

.2

8 /

18

cm

AG

Kabine1.90 x 2.10m

Fl = 4.20m2

Q = 2'000kg

Kern 4

03.021

Kern 2

sonic chair

sonic chair

Hohlboden-verstärkung

Rollregal

LAGERUN G

TECHNIKAUSRÜSTUNG

1800x600x 2200

ROLLREGAL -ANLAGE

1800x400x 2200

RA

CK

Kabelklappe

Ka

be

lkla

pp

eK

abe

lkla

pp

e

Ka

be

lkla

pp

e

WC H

03.104

BB: 3

WB: 3, 19

DB: 11

+12.31

+11.91

NGF: 11.40 m2

RU: 21.23 m

WC D

03.105

BB: 3

WB: 3, 19

DB: 11

+12.31

+11.91

NGF: 13.35 m2

RU: 19.02 m

Lesesaal 3a

36 LP

03.001

BB: 1

DB: 11

+12.31

+11.91

NGF: 89.78 m2

RU: 79.21 m

Technik

03.402

NGF: 3.35 m2

RU: 8.84 m

Lüftung

besprinklert

03.204

NGF: 4.86 m2

RU: 9.24 m

Schränke / Regale

52 LM / 30 LM

03.003

BB: 1

WB: 15

DB: 11

+12.31

+11.91

NGF:347.91 m2

RU: 78.00 m

Tonstudio A

03.041

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 18.24 m2

RU: 17.20 m

Videokonferenzraum

03.033

Verdunkelung

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 41.28 m2

RU: 27.75 m

Büro Referent

03.011

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 19.28 m2

RU: 20.14 m

Lesesaal 3b

116 LP

03.002

BB: 1

WB: 13, 15, 17

DB: 11

+12.31

+11.91

NGF:750.47 m2

RU: 195.02 m

Schulungsraum

03.040

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 34.40 m2

RU: 23.80 m

Kopierraum

03.005

BB: 18

WB: 13, 17

DB: 11

+12.31

+11.91

NGF: 23.96 m2

RU: 20.95 m

Putzraum

03.006

BB: 18

WB:13, 17, 19

DB: 11

+12.31

+11.91

NGF: 10.72 m2

RU: 13.10 m

Lesesaal 3c

48 LP

03.004

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91 / +12.05

NGF:114.75 m2

RU: 69.03 m

Büro Referent

03.014

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 19.21 m2

RU: 17.64 m

Büro Referent

03.013

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 15.92 m2

RU: 16.42 m

Büro Referent

03.012

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 19.45 m2

RU: 20.32 m

VF

03.024

BB: 1

WB: 13, 15, 17

DB: 11

+12.31

+11.91

NGF:233.59 m2

Bücherlift

03.600

NGF: 3.32 m2

RU: 7.70 m

VF

03.007

BB: 1

WB: 13, 15, 17

DB: 11

+12.31

+11.91

NGF: 248.91 m2

RU: 246.96 m

Lastenaufzug

03.205

NGF: 8.40 m2

RU: 11.60 m

Personenaufzug I

03.102

NGF: 9.98 m2

RU: 14.30 m

Personenaufzug II

03.202

NGF: 9.97 m2

RU: 14.30 m

Treppenhaus Kern IV

03.401

BB: 11

WB: 12

DB: 11

NGF: 20.21 m2

RU: 25.72 m

Parlatorium

03.025

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 53.93 m2

RU: 33.30 m

Elektroverteiler Kern I

03.107

NGF: 2.09 m2

RU: 9.84 m

Technikschacht Kern II

03.207

NGF: 1.98 m2

RU: 9.79 m

Treppenhaus Kern II

03.201

BB: 11

WB: 12

DB: 11

NGF: 35.64 m2

RU: 34.62 m

Treppenhaus Kern I

03.101

BB: 11

WB: 12

DB: 11

NGF: 35.81 m2

RU: 34.92 m

Medienübungsraum

03.032

Verdunkelung

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 45.35 m2

RU: 29.33 m

Uni-TV / Uni-Radio

03.034

Blendschutz

BB: 1

WB: 15

DB: 11

+12.31

+11.91

NGF:139.42 m2

RU: 75.02 m

Videostudio

03.031

BB: 18

WB: 13

DB: 11

+12.31

+11.91

NGF: 54.91 m2

RU: 29.90 m

Multimedia- und AV-Arbeitsp.

03.015

BB: 1

WB: 15

DB: 11

+12.31

+11.91

NGF:180.14 m 2

RU: 86.20 m

Videoschnittplatz 1

03.016

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 26.21 m2

RU: 20.49 m

Videoschnittplatz 4

03.019

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 9.15 m2

RU: 12.72 m

Videoschnittplatz 2

03.017

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 9.15 m2

RU: 12.72 m

NMC Videoschnittplatz

03.020

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 17.80 m2

RU: 17.06 m

Geräteausgabe

03.021

BB: 1

WB: 15

DB: 11

+12.31

+11.91

NGF: 36.48 m2

RU: 24.89 m

NMC Büro

03.022

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 95.33 m2

RU: 49.90 m

Büro Dezernatsleiter

03.023

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 22.75 m2

RU: 19.51 m

Regiebereich

03.030

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 9.13 m2

RU: 12.70 m

Sprechkabine

03.029

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 4.71 m2

RU: 8.68 m

Tonschnittplatz 3

03.018

BB: 1

WB: 13, 15

DB: 11

+12.31

+11.91

NGF: 16.30 m2

RU: 16.34 m

Tonstudio B

03.042

BB: 1

WB: 13

DB: 11

+12.31

+11.91

NGF: 15.84 m2

RU: 16.20 m

WC H

03.208

BB: 3

WB: 3, 19

DB: 11

+12.31

+11.91

NGF: 9.02 m2

RU: 15.83 m

Behinderten WC

03.210

BB: 3

WB: 3, 19

DB: 11

+12.31

+11.91

NGF: 5.39 m2

RU: 9.65 m

WC D

03.209

BB: 3

WB: 3, 19

DB: 11

+12.31

+11.91

NGF: 14.44 m2

RU: 20.93 m

Technik

besprinklert

03.203

NGF: 22.50 m2

RU: 21.00 m

Technik

besprinklert

03.103

NGF: 30.75 m2

RU: 23.20 m

T30 RS

BRH = +12.26

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Technik

03.403

NGF: 2.44 m2

RU: 8.89 m

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07

.50

7.5

07

.50

7.5

07

.50

7.5

0

F

F

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Architekt1 : 100

SDA

3. Obergeschoss

Grundrisspläne

AW/SB/WC

12.07.2010awe/sbe/wchÜberarbeitung nach Nutzerangabe15

21.07.2010awe/sbe/wchÄnderung Wände Referenten16

Anpassungen Türpositionen und -.breiten, Ton und Videostudio awe/sbe/wch 12.08.201017

29.03.2011

18 28.03.2011aweÜberarbeitung nach Nutzerangabe

19 29.03.2011aweAnpassungen Raumstempel und Türbezeichnungen

20 20.02.2012fscÜberarbeitung nach Nutzerangabe

21 16.08.2012fscÜberarbeitung Türen nach Türliste

22 fscFassadenklappen 07.06.2013

23 Ausschreibungsplan Theken fsc 20.02.2014

New media center

© Degelo Architekten,/Basel, Bene, Stuttgart, UB Freiburg, UBA Freiburg

Crossmedia-editorial office

Seminar roomsVideo conferencing

Studios (audio, video)

Video andaudio editing

Service counter

Third floor

Page 17: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸17

New media center

Page 18: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸18

New media center

Page 19: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸19

Open office concept

© Degelo Architekten,/Basel, Bene, Stuttgart, UB Freiburg, UBA Freiburg

Cafeteria

Gussasphalt

+0.35

-0.30

BF: 19.6 m2

VERMÖGEN UND BAU BADEN-WÜRTTEMBERG

UNIVERSITÄTSBAUAMT FREIBURGHUGSTETTER STRASSE 53

79106 FREIBURG I.BR.

0761 / 1203-0

0761 / 1203-107

Universitätsbibliothek

Platz der Universität 2

D-79098 Freiburg i.Br.

Datum

Maßstab

Plangröße

Bearbeiter

SAP-WE

SAP-Geb. Nr.

Bauwerk

Dienststelle

Layoutname

Dateiname XREF

Dateiname

Amtsvorstand/AbteilungleiterVerfilmt am: GesehenGezeichnet

Universitätsbibliothek Sanierung

00018256

00004890

0001825600004890

08111

03105730

Fachplaner

Projekt Nr.

Dateiname XREF Erweiterung

Index Änderung DatumBearbeiter

±0.00 = 274.62 ü.NN

Entwurfsplanung

0001825600004890 AR3G G+05 000025

0001825600004890 AR3G G+05 000025

135 / 84

Neu

Bestand

UK

OK

AK

LM

RHf

DE

WD

DD

BD

FD

KB

OKFFB

OKRFB

UKDR

OKSW

OKBR

OKBF

OKG

BRH

UKSTR

UKSTF

RR

HK

FBH

BE

F

BF

B

W

D

Mauerwerk

Mauerwerk / Klinker Sichtmauerwerk

Betonfertigteil

Dämmstoff

Leichtbauwand / Vorsatzschale

Stahlbeton

Beton

Strichpunktlinie

Strichpunktlinie

Punktlinie

Strichlinie

Kennzeichnung der

Containementgrenze

Kennzeichnung vonSchnittebenenAchsen

Unsichtbare Kantenvor oder ueberder Schnittebene

Unsichtbare Kantenunter oder hinterder Schnittebene

Schnittbezeichnung:

Verweis auf Schnittbezeichnungund Plannummer

Detailbezeichnung:

Verweis auf Plannummer

51WAS04001

Abkuerzungen:Baustoffe:

Legende:

Linienarten:

Aussparungen / Durchbrueche:

TGA Einlegeteil Elektro

TGA Einlegeteil

TGA Aussparungen

ARCH Aussparung

Darstellung nach DIN 1356-1 und ISO 2594 Typ A.

X

GKP - 2-lagig beplankt

Darstellung nach DIN 1356-1 und ISO 2594 Typ B.

Darstellung der Aussparungen nur nachrichtlich.

Fuer definitive Aussparungen siehe separaten Aussparungsplan.

Verweis auf Detailbezeichnungauf diesem Plan

X

= Unterkante

= Oberkante

= Aussenkante

= im Lichten (lichtes Mass)

= Raumhoehe fertig

= abgehaengte Decke

= Wanddurchbruch (Breite / Hoehe)

= Deckendurchbruch

= Bodendurchbruch

= Fundamentduchbruch

= Kernbohrung

= OK Bodenkote fertig Fussboden

= OK Bodenkote roh fertig Fussboden (inkl. Estrich)

= UK Decke roh

= OK Schwellenkote fertig

= OK Bruestungskote roh

= OK Bruestungskote fertig

= OK Gelaende

= Bruestungshoehe (von OKRFB bis OKBR)

= UK Sturzkote roh

= UK Sturzkote fertig

= Regenrinne

= Heizkoerper

= Fussbodenheizung

= Bodeneinlauf

= Feuerloeschposten

= Bodenflaeche

= Bodenmaterial Oberflaeche

= Wandmaterial Oberflaeche

= Deckenmaterial Oberflaeche

= Einfuegepunkt dxf / dwg

= OK fertig+16.58

+16.50 = OK roh Bestand / fertig Bestand

Farben:

Oberflächenbeläge:

Kerne und Kernerweiterungen werden verputzt.

1 Doppelboden + Nadelfilz

2 Unterlagsboden + Nadelfilz

3 Feinsteinzeug 50/50mm

4 Hartbelag

5 Unterlagsboden gestrichen

6 Gitterroste

7 extensiv Begrünung

8 Holzwerkstoffplatte gestrichen

9 abgehängte Decke weiss gestrichen

10 Sichtbeton Brettstruktur sandgestrahlt

11 Bestand gereinigt

12 Bestand gereinigt und gestrichen

13 Gipskarton weiss

14 verputzt und acrylweiss gestrichen

15 Glaswände

16 Dämmung

17 Putz

18 Linoleum

Die Masse sind am Bau zu kontrollieren, Unstimmigkeiten sind den Projektleitern und Fachplanern unverzüglich zu melden.

Alle Installationsdurchführungen durch brandschutztechnisch qualifizierte Wände und Decken sind gemäss den Brandschutzanforderungenabzuschotten.

Schnittebenen = OK Fertigboden

Dach = +23.76OG 5 = +20.21OG 4 = +16.26OG 3 = +12.31OG 2 = +08.36OG 1 = +04.36EG = +00.00UG 1 = -02.17UG 2 = -05.50UG 3 = -08.78

Türen:

Türmasse beziehen sich auf den Fertigboden

Türen in massiven Wänden und Gipsständerwänden mit Stahlzarge,

CNS Beschäge

Türblatt Holzwerkstoffplatte gestrichen

Glastüren mit CNS Beschlägen

Glaswand 1: normale Anforderung

Glaswand 2: erhöhte Anforderung

Stützen:

Die Vermassung der neuen Schrägstützen bezieht sich auf OK

Fertigrohboden (inkl. bestehenden Estrich)

(z.B. K2 W13 - Kern 2 Wand 13)

Boden- / Wand- / Deckenaufbauten siehe Bauteilkatalog

OK

BR

+20

.14

OK

BR

+2

0.1

4

DIN

18

09

0/1

80

91

OK

BR

+2

0.1

4

DIN

18

09

0/1

80

91

OK

BR

+2

0.1

4

DIN

18

09

0/1

809

1

OK

BR

+2

0.1

4T

30

RS

OK

BR

+2

0.1

4

DIN 18090/18091

OKBR +20.13

OKBR +20.14

OKBR +20.14OKBR +20.14

OK

BR

+2

0.1

9

T30

RS

DIN

18

09

0/1

80

91

OK

BR

+2

0.1

4

DIN

18

09

0/1

80

91

OK

BR

+2

0.1

4

DIN

18

09

0/1

809

1

OK

BR

+2

0.1

4T

30

RS

OK

BR

+2

0.1

4

T3

0 R

S

OKBR +20.19

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07.5

07

.50

7.5

07

.50

7.5

07

.50

0.8

25

5.4

05

1.2

7

0.4

75

0.6

54

.55

0.2

05

0.9

2

2.025 5.46 2.025

2.18 5.15 2.18

1.0

01.4

01

.00

1.4

00

.54

05.401B

05.024B05.02505.026B05.028

05

.02

4A

05

.02

6A

05

.01

0

05

.10

40

5.1

05

05.1

02

B0

5.1

02

A0

5.1

02

C

05

.10

1

05.205 05.210 05.209A05.208A

05

.20

4

05.008

05.014

05.10705.108

05

.20

3

05

.20

2C

05

.20

2B

05

.20

2A

05

.201

05.600A

05.600B

05.109A 05.109B

05.018B05.020B 05.017B05.021B 05.019B 05.016B

05.016A05.017A05.018A05.021A 05.020A 05.019A

05

.02

3B

05.023A

05.103

05.208B

05.209B

05.401A

Ref.-Punkt 0.00 / 0.00 / +19.85

Kern 1

F

11 Stg.28 / 18cm

11

Stg

.28

/ 1

8cm

11

Stg

.2

8 /

17

9cm

11

Stg

.28

/ 1

8cm

11

Stg

.2

8 /

17

9cm

AG

Kabine1.90 x 2.10mFl = 4.20m2

Q = 2'000kg

Kern 4

Kern 2

1200x600, 4OH 1556

ROLLREGAL -ANLAGE

Glasschiebetüre

Gla

ssch

ieb

etü

re

WC H

05.104

BB: 3

WB: 3, 19

DB: 11

+20.21

+19.81

NGF: 0.00 m2

RU: 1.74 m

Entrauchung Süd

05.700

WB: 19

NGF: 21.93 m2

RU: 18.82 m

WC D

05.105

BB: 3

WB: 3, 19

DB: 11

+20.21

+19.81

NGF: 13.35 m2

RU: 19.02 m

Aufenthalt/Küche

05.014

BB: 18

WB: 13, 15, 17, 19

DB: 11

+20.21

+19.81

NGF: 93.48 m2

RU: 45.52 m

Monographien

05.004

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF:699.57 m2

RU: 158.98 m

Zeitschriften/Periodika

05.001

Blendschutz

BB: 1

WB:

DB: 11

+20.21

+19.81

NGF:259.15 m 2

RU: 71.66 m

Druckerei

05.008

BB: 18

WB: 13, 17

DB: 11

+20.21

+19.81

NGF: 35.97 m2

RU: 27.71 m

Lüftung

besprinklert

05.204

NGF: 4.86 m2

RU: 9.24 m

Kopierstelle

05.007

Blendschutz

BB: 1

WB: 10, 13

DB: 11

+20.21

+19.81

NGF: 45.75 m2

RU: 37.19 m

Einbandstelle / Beschriftung

05.009

Blendschutz

BB: 18

WB: 13, 17

DB: 11

+20.21

+19.81

NGF:148.23 m 2

RU: 86.79 m

VF

05.005

BB: 1

WB: 13, 15, 17

DB: 11

+20.21

+19.81

NGF: 131.97 m 2

RU: 147.67 m

Bücherlift

05.600

NGF: 6.25 m2

RU: 10.00 m

Sachkatalogisierung

05.003

BB: 1

DB: 11

+20.21

+19.81

NGF:181.87 m2

RU: 78.07 m

Büro NME

05.002

Blendschutz

BB: 1

WB: 15

DB: 11

+20.21

+19.81

NGF:136.51 m2

RU: 50.37 m

Parlatorium a

05.011

BB: 1

WB: 13, 17

DB: 11

+20.21

+19.81

NGF: 69.52 m2

RU: 37.03 m

EDV Verteilerraum

05.107

BB: 18

WB: 3, 19

DB: 11

+20.21

+19.81

NGF: 21.87 m2

RU: 21.70 m

Putzraum

05.108

BB: 18

WB: 13, 17, 19

DB: 11

+20.21

+19.81

NGF: 18.99 m2

RU: 19.55 m

VF

05.010

BB: 1

WB: 13, 15, 17

DB: 11

+20.21

+19.81

NGF:149.00 m2

RU: 106.62 m

Parlatorium b

05.012

BB: 1

WB: 13

DB: 11

+20.21

+19.81

NGF:160.40 m2

RU: 52.87 m

Lastenaufzug

05.205

NGF: 8.40 m2

RU: 11.60 m

Personenaufzug I

05.102

NGF: 9.98 m2

RU: 14.30 m

Personenaufzug II

05.202

NGF: 9.97 m2

RU: 14.30 m

Treppenhaus Kern IV

05.401

BB: 11

WB: 12

DB: 11

NGF: 20.21 m2

RU: 25.72 m

Elektroverteiler Kern I

05.109

NGF: 2.09 m2

RU: 9.84 m

Technikschacht Kern II

05.207

NGF: 1.98 m2

RU: 9.79 m

Treppenhaus Kern II

05.201

BB: 11

WB: 12

DB: 11

NGF: 36.01 m2

RU: 34.99 m

Treppenhaus Kern I

05.101

BB: 11

WB: 12

DB: 11

NGF: 35.64 m2

RU: 34.62 m

VF

05.023

BB: 1

WB: 15

DB: 11

+20.21

+19.81

NGF:142.22 m2

RU: 66.91 m

Postverteiler

05.020

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 10.12 m2

RU: 13.45 m

Sitzungsraum 1

05.018

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 20.60 m2

RU: 18.16 m

Sekretariat

05.025

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 35.91 m2

RU: 24.11 m

Quiet Room

05.021

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 9.61 m2

RU: 13.22 m

Verwaltungsleitung

05.028

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 23.03 m2

RU: 21.20 m

Büro Direktorin

05.024

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 31.19 m2

RU: 25.85 m

Grosser Sitzungsraum

05.016

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 54.85 m2

RU: 33.55 m

Büro stellv. Direktor

05.026

Blendschutz

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 32.40 m2

RU: 23.77 m

Sitzungsraum 2

05.019

BB: 1

WB: 13, 15

DB: 11

+20.21

+19.81

NGF: 20.60 m2

RU: 18.16 m

Teeküche

05.017

BB: 18

WB: 15, 13, 19

DB: 11

+20.21

+19.81

NGF: 8.01 m2

RU: 12.50 m

WC H

05.208

BB: 3

WB: 3, 19

DB: 11

+20.21

+19.81

NGF: 9.02 m2

RU: 15.83 m

Behinderten WC

05.210

BB: 3

WB: 3, 19

DB: 11

+20.21

+19.81

NGF: 5.39 m2

RU: 9.65 m

WC D

05.209

BB: 3

WB: 3, 19

DB: 11

+20.21

+19.81

NGF: 14.44 m2

RU: 20.97 m

Technik

05.403

NGF: 2.44 m2

RU: 8.89 m

Verfügungsfläche

05.015

NGF: 13.24 m2

RU: 18.91 m

Technik

besprinklert

05.103

NGF: 30.75 m2

RU: 23.20 m

Technik

besprinklert

05.203

NGF: 22.50 m2

RU: 21.00 m

T30 RS

BRH = +20.16

T30 RS

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Technik

05.402

NGF: 3.35 m2

RU: 8.84 m

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07.5

07.5

07.5

07.5

07.5

07.5

0

F

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Architekt1 : 100

SDA

5. Obergeschoss

Grundrisspläne

AW/SB/WC

14.06.2010aweAnpassungen Direktion, Anpassungen Anforderungen Trennwände17

12.07.2010awe/sbe/wchÜberarbeitung nach Nutzerangabe18

21.07.2010awe/sbe/wchÄnderung Wand Parlatorium / Küche Aufenthalt19

20 Anpassungen Bodenbeläge, Garderobe, Türen awe/sbe/wch 12.08.2010

28.03.2011

21 28.03.2011aweÜberarbeitung nach Nutzerangabe

22 20.02.2012fscÜberarbeitung nach Nutzerangabe

23 16.08.2012fscÜberarbeitung Türen nach Türliste

24 23.11.2012fscWandverschiebungen Sitzungsräume Direktion

25 fscFassadenklappen 07.06.2013

Fifth floor

Page 20: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸20

Stacks

Page 21: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸21

Cafeteria

Gussasphalt

+0.35

-0.30

BF: 19.6 m2

VERMÖGEN UND BAU BADEN-WÜRTTEMBERG

UNIVERSITÄTSBAUAMT FREIBURGHUGSTETTER STRASSE 53

79106 FREIBURG I.BR.

0761 / 1203-0

0761 / 1203-107

Universitätsbibliothek

Platz der Universität 2

D-79098 Freiburg i.Br.

Datum

Maßstab

Plangröße

Bearbeiter

SAP-WE

SAP-Geb. Nr.

Bauwerk

Dienststelle

Layoutname

Dateiname XREF

Dateiname

Amtsvorstand/AbteilungleiterVerfilmt am: GesehenGezeichnet

Universitätsbibliothek Sanierung

00018256

00004890

0001825600004890

08111

03105730

Fachplaner

Projekt Nr.

Dateiname XREF Erweiterung

Index Änderung DatumBearbeiter

±0.00 = 274.62 ü.NN

Entwurfsplanung

0001825600004890 AR3G G-01 000024

0001825600004890 AR3G G-01 000024

135 / 84

Neu

Bestand

UK

OK

AK

LM

RHf

DE

WD

DD

BD

FD

KB

OKFFB

OKRFB

UKDR

OKSW

OKBR

OKBF

OKG

BRH

UKSTR

UKSTF

RR

HK

FBH

BE

F

BF

B

W

D

Mauerwerk

Mauerwerk / Klinker Sichtmauerwerk

Betonfertigteil

Dämmstoff

Leichtbauwand / Vorsatzschale

Stahlbeton

Beton

Strichpunktlinie

Strichpunktlinie

Punktlinie

Strichlinie

Kennzeichnung der

Containementgrenze

Kennzeichnung vonSchnittebenenAchsen

Unsichtbare Kantenvor oder ueberder Schnittebene

Unsichtbare Kantenunter oder hinterder Schnittebene

Schnittbezeichnung:

Verweis auf Schnittbezeichnungund Plannummer

Detailbezeichnung:

Verweis auf Plannummer

51WAS04001

Abkuerzungen:Baustoffe:

Legende:

Linienarten:

Aussparungen / Durchbrueche:

TGA Einlegeteil Elektro

TGA Einlegeteil

TGA Aussparungen

ARCH Aussparung

Darstellung nach DIN 1356-1 und ISO 2594 Typ A.

X

GKP - 2-lagig beplankt

Darstellung nach DIN 1356-1 und ISO 2594 Typ B.

Darstellung der Aussparungen nur nachrichtlich.

Fuer definitive Aussparungen siehe separaten Aussparungsplan.

Verweis auf Detailbezeichnungauf diesem Plan

X

= Unterkante

= Oberkante

= Aussenkante

= im Lichten (lichtes Mass)

= Raumhoehe fertig

= abgehaengte Decke

= Wanddurchbruch (Breite / Hoehe)

= Deckendurchbruch

= Bodendurchbruch

= Fundamentduchbruch

= Kernbohrung

= OK Bodenkote fertig Fussboden

= OK Bodenkote roh fertig Fussboden (inkl. Estrich)

= UK Decke roh

= OK Schwellenkote fertig

= OK Bruestungskote roh

= OK Bruestungskote fertig

= OK Gelaende

= Bruestungshoehe (von OKRFB bis OKBR)

= UK Sturzkote roh

= UK Sturzkote fertig

= Regenrinne

= Heizkoerper

= Fussbodenheizung

= Bodeneinlauf

= Feuerloeschposten

= Bodenflaeche

= Bodenmaterial Oberflaeche

= Wandmaterial Oberflaeche

= Deckenmaterial Oberflaeche

= Einfuegepunkt dxf / dwg

= OK fertig+16.58

+16.50 = OK roh Bestand / fertig Bestand

Farben:

Oberflächenbeläge:

Kerne und Kernerweiterungen werden verputzt.

1 Doppelboden + Nadelfilz

2 Unterlagsboden + Nadelfilz

3 Feinsteinzeug 50/50mm

4 Hartbelag

5 Unterlagsboden gestrichen

6 Gitterroste

7 extensiv Begrünung

8 Holzwerkstoffplatte gestrichen

9 abgehängte Decke weiss gestrichen

10 Sichtbeton Brettstruktur sandgestrahlt

11 Bestand gereinigt

12 Bestand gereinigt und gestrichen

13 Gipskarton weiss

14 verputzt und acrylweiss gestrichen

15 Glaswände

16 Dämmung

17 Putz

18 Linoleum

Die Masse sind am Bau zu kontrollieren, Unstimmigkeiten sind den Projektleitern und Fachplanern unverzüglich zu melden.

Alle Installationsdurchführungen durch brandschutztechnisch qualifizierte Wände und Decken sind gemäss den Brandschutzanforderungenabzuschotten.

Schnittebenen = OK Fertigboden

Dach = +23.76OG 5 = +20.21OG 4 = +16.26OG 3 = +12.31OG 2 = +08.36OG 1 = +04.36EG = +00.00UG 1 = -02.17UG 2 = -05.50UG 3 = -08.78

Türen:

Türmasse beziehen sich auf den Fertigboden

Türen in massiven Wänden und Gipsständerwänden mit Stahlzarge,

CNS Beschäge

Türblatt Holzwerkstoffplatte gestrichen

Glastüren mit CNS Beschlägen

Glaswand 1: normale Anforderung

Glaswand 2: erhöhte Anforderung

Stützen:

Die Vermassung der neuen Schrägstützen bezieht sich auf OK

Fertigrohboden (inkl. bestehenden Estrich)

(z.B. K2 W13 - Kern 2 Wand 13)

Boden- / Wand- / Deckenaufbauten siehe Bauteilkatalog

12345678910

11

12

13

14

15

16

17

18

19

20

21

22 T3

0T

30

T3

0

Vorraum b

-01.011b

BB: 5, 87cm DB, 18

WB: 7,12

DB: 11

-3.30

-4.25

NGF: 57.77 m2

RU: 43.67 m

Vorraum a

-01.011a

BB: 5

WB: 7, 12

DB: 11

-4.17

-4.25

NGF: 46.90 m2

RU: 34.51 m

Technik Kälte, Wärme

besprinklert

-01.012

BB: 5

WB: 7, 12, 16

DB: 16

-4.17

-4.25

NGF:566.61 m2

RU: 143.85 m

Vorraum c

nicht besprinklert

-01.011c

BB: 5

WB: 7

DB: 11

-4.17

-4.25

NGF: 42.15 m2

RU: 32.00 m

GA Gebäudeautomation

-01.025

BB: 5

WB: 7

DB: 11

-4.17

-4.25

NGF: 19.69 m2

RU: 18.53 m

ISP Informationsschwerpunkte

-01.024

BB: 5

WB: 7, 16

DB: 11

-4.17

-4.25

NGF: 21.03 m2

RU: 23.18 m

T90

T3

0 R

S

T3

0 R

S

DIN

18

090

/180

91

DIN

18

09

0/1

80

91

DIN

18

09

0/1

80

91

DIN

18

09

0/1

80

91

DIN

18

090

/180

91

DIN

18

09

0/1

80

91

T30 RS

BH 0.25

T3

0 R

S

T3

0-R

S

OK

BR

-4

.18

T30 RS

T30 RS

T3

0 R

S

BH

0.1

7

T3

0-R

S

T3

0 R

S

DIN 18090/18091

T90

T30 T30 T30

T30

T30

T3

0

T9

0

T9

0

T30

T30

T30

T3

0 R

S

T3

0 R

S

T90

T30 RS

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07

.50

7.5

07

.50

7.5

07

.50

7.5

0

0.40 4.75 4.70 4.70 3.32

0.10 1.80 1.75 3.00 1.75 3.00 1.75 3.00 1.72

1.21

0.6

51

.55

1.5

00

.10

15

.40

3.8

0

0.4

0

0.4

0

1.1

5

BEDN 150 Ablauf

DN 100

Fortluftausblasung

Aussenluftansaugung

Stahlgittertüre

aus Kern 2einbauen

Türe mit innererStahlschwelle,

eingedichtet

Türe mit innerer

Stahlschwelle,eingedichtet

-01

.01

4-0

1.0

17A

-01

.01

6

-01

.001

A

-01.1

04

-01

.10

3

-01

.40

2

-01

.10

1

-01

.10

2B

-01

.10

2A

-01

.10

2C

-01.2

02

C-0

1.2

02B

-01

.20

2A

-01.301

-01

.20

1

-01

.20

3

-01.100B

-01.100A

-01.302

-01

.20

4

-01.031B

-01.205

-01.012

-01.020 -01.021 -01.022

-01.023A

-01.019

-01

.01

7B

-01

.011

A

-01

.00

3

-01

.02

6

-01.030

-01

.03

2

-01.023B

-01

.011

C

-01.018

-01.500

-01

.10

5A

-01

.10

5B

-01.600A

-01.600D

-01.107A -01.107B

-01.600B

-01.600C

-01.015

-01.025-01.024

-01.031A

-01

.20

9A

-01.210B

-01.208A

-01

.21

0A

-01.209B-01.209C

-01.208B

-01.00_

-01.033B

-01.033A

-01.401

-01.404

Ref.-Punkt 0.00 / 0.00 / -4.05

Sprinklerwasserbevorratung

Füllvolumen nach Dimensionierung Fa. GFA

LöschwasservorratFüllvolumen nach Dimensionierung Fa. GFA

Schmutzwasser DN 100Schmutzwasser DN 150

Regenwasser DN 150Trinkwasser DN 100

Kern 3

Kern 1

Kern 4

BE DN 100 BE DN 100

BE DN 100 BE DN 100

Entl.

DN 50

Entl.DN 50

Üb

erw

ach

un

gs-

zen

tra

le

Sprinklerverteiler

Rinne mit Abgang DN 150

BE DN 100

Osm

ose

10 Stg.28 / 175cm

11 Stg.28 / 182cm

10 Stg.28 / 175cm

11

Stg

.

28

/ 1

82cm

10

Stg

.

28

/ 1

75cm

11

Stg

.2

8 /

18

2cm

10

Stg

.2

8 /

17

5cm

Kabine1.90 x 2.10m

Fl = 4.20m2

Q = 2'000kg

StW bis Rohboden

F

AG

AG

T30 RS

T3

0 R

S

Kern 2

OK

RF

B =

-4

.17

Sprinklerwasserbevorratung

auf Stahlträgern gelagert.Füllvolumen nach Dimensionierung Fa. GFA

OKRFB = -4.17

UKD = -1.95

OKRFB = -1.45

Deckendämmung 6 cm Schaumglas

Stellfläche für Fahrradanhänger und Liegeräder

Gitterzaun-Abtrennung

Höhe 2.50 m

49

75

Gesamt354 Stellplätze

69 70 74

10 6

Stellfläche für Mitarbeiter-Fahrräder

OK

Ge

län

de =

-1

.09

= 2

73

.53

rge

rste

ig

OK

Ge

län

de =

-1

.14

= 2

73

.48

Sch

litzri

nn

e im

Au

sse

nb

ela

g E

G

Freihandmagazin

32 LP / 1'484 LM

-01.001

BB: 2

WB: 11, 13, 17

DB: 10, 11

-4.17

-4.25

NGF: 3'632.10 m 2

RU: 490.49 m

Fahrradgarage

-01.003

BB: 5

WB: 17

DB: 16

-4.15

-4.25

NGF: 517.53 m2

RU: 107.66 m

Technikschacht

besprinklert

-01.103

NGF: 30.76 m2

RU: 23.20 m

Treppenhaus Kern III

-01.301

BB: 11

WB: 12

DB: 11

NGF: 20.21 m2

RU: 25.72 m

Treppenhaus Kern IV

-01.401

BB: 11

WB: 12

DB: 11

NGF: 20.21 m2

RU: 25.72 m

Trafo 1

nicht besprinklert

-01.019

BB: 5

WB: 7

DB: 11

-4.17 / -4.14

-4.25

NGF: 8.03 m2

RU: 11.74 m

Trafo 2

nicht besprinklert

-01.020

BB: 5

WB: 7

DB: 11

-4.17 / -4.14

-4.25

NGF: 8.18 m2

RU: 11.66 m

Schleuse Fahrradgarage

-01.100

BB: 11

WB: 12

DB: 10, 11

-4.00

-4.08

NGF: 16.07 m2

RU: 19.50 m

Trafo 3

nicht besprinklert

-01.021

BB: 5

WB: 7

DB: 11

-4.17 / -4.14

-4.25

NGF: 8.17 m2

RU: 11.66 m

Trafo 4

nicht besprinklert

-01.022

BB: 5

WB: 7

DB: 11

-4.17 / -4.14

-4.25

NGF: 7.89 m2

RU: 11.66 m

Niederspannung SV

nicht besprinklert

-01.017

BB: 5, 87cm DB, 18

WB: 7

DB: 11

-3.30

-4.25

NGF: 23.30 m2

RU: 20.31 m

Zählerraum

nicht besprinklert

-01.023

BB: 5, 87cm DB, 18

WB: 7

DB: 11

-3.30

-4.25

NGF: 9.36 m2

RU: 12.34 m

Technik

besprinklert

-01.203

NGF: 22.50 m2

RU: 21.00 m

Technik

-01.402

NGF: 3.35 m2

RU: 8.84 m

Technik

-01.302

WB: 10

NGF: 3.35 m2

RU: 8.84 m

Lüftung

besprinklert

-01.204

NGF: 4.86 m2

RU: 9.24 m

Tankraum

besprinklert

-01.026

BB: 5

WB: 7, 11

DB: 16

-4.17

-4.25

NGF: 12.75 m2

RU: 21.05 m

Mittelspannung AV

nicht besprinklert

-01.018

BB: 5, 87cm DB, 18

WB: 7

DB: 11

-3.30

-4.25

NGF: 34.52 m2

RU: 26.26 m

Technik

-01.404

BB: 11

WB: 12

DB: 11

NGF: 5.55 m2

RU: 10.12 m

VF

-01.200

BB: 2

WB: 17

DB: 11

-4.00

-4.08

NGF: 18.83 m2

RU: 21.10 mNiederspannung AV

nicht besprinklert

-01.016

BB: 5, 87cm DB, 18

WB: 7

DB: 11

-3.30

-4.25

NGF: 55.17 m2

RU: 38.89 m

Zentrale Sprinkler

-01.031

BB: 5

WB: 12

DB: 11

-4.25

-4.25

NGF:268.46 m2

RU: 74.40 m

VF

-01.030

BB: 5

WB: 12

DB: 11

-4.17

-4.25

NGF: 19.26 m2

RU: 22.82 m

Sanitärzentrale

-01.032

BB: 5

WB: 12

DB: 11

-4.17

-4.25

NGF: 62.28 m2

RU: 33.28 m

Büchersortieranlage

-01.600

Sichtfenster

BB: 2

WB: 13

DB: 11

-4.17

-4.25

NGF: 76.43 m2

RU: 37.81 m

Treppenhaus Kern II

-01.201

BB: 11

WB: 12

DB: 11

NGF: 35.64 m2

RU: 34.62 m

Treppenhaus Kern I

-01.101

BB: 11

WB: 12

DB: 11

NGF: 35.81 m2

RU: 34.92 m

Lastenaufzug

-01.205

NGF: 8.40 m2

RU: 11.60 m

Personenaufzug I

-01.102

NGF: 9.98 m2

RU: 14.30 m

Personenaufzug II

-01.202

NGF: 9.97 m2

RU: 14.30 m

Technikschacht Kern II

-01.207

NGF: 2.09 m2

RU: 9.84 m

Elektroverteiler Kern I

-01.107

NGF: 2.09 m2

RU: 9.84 m

Putzraum Kern V

-01.500

BB: 18

WB: 19

DB: 11

-4.17

-4.25

NGF: 5.29 m2

RU: 9.20 m

EDV

nicht besprinklert

-01.014

BB: 5, 87cm DB, 18

WB: 7

DB: 11

-3.30

-4.25

NGF: 11.11 m2

RU: 13.34 m

Fluchttunnel

-01.105

BB: 5

WB: 13, 17

DB: 10, 11

-4.17

-4.25

NGF: 27.70 m2

RU: 39.94 m

Du/WC D

-01.209

BB: 3

WB: 3, 19

DB: 11

-4.17

-4.25

NGF: 22.43 m2

RU: 29.75 mDu/WC H

-01.208

BB: 3

WB: 3, 19

DB: 11

-4.17

-4.25

NGF: 11.55 m2

RU: 17.58 m

Flur Gaderobe H / D

-01.210

BB: 18

WB: 19

DB: 11

-4.17

-4.25

NGF: 12.71 m2

RU: 17.86 m

Technikschacht

-01.104

NGF: 27.37 m2

RU: 22.30 m

Dublettenraum

-01.033

BB: 2

WB: 19

DB: 10, 11

-4.17

-4.25

NGF: 93.02 m2

RU: 58.96 m

T30 RS T90

Sicherheitsbatterieraum

nicht besprinklert

-01.015

BB: 5

WB: 7, 16

DB: 11

-4.17

-4.25

NGF: 14.56 m2

RU: 15.97 m

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50 7.50

7.5

07

.50

7.5

07

.50

7.5

07.5

07.5

0

F

J J

H H

G G

F F

E E

D D

C C

14

14

13

13

12

12

11

11

10

10

9

9

8

8

7

7

6

6

5

5

4

4

3

3

1

1

2

2

B B

Architekt1 : 100

SDA

1. Untergeschoss

Grundrisspläne

AW/SB/WC

16

17

18 27.07.2009

19 awe 17.12.2009

15

20.01.2009

15.12.2009

04.11.2008

awe

awe

awe

aweAnpassungen

Anpassungen

Anpassungen

Anpassungen

Schnittebene 1.00m ab FRB, Türmasse

12.07.2010awe/sbe/wchÜberarbeitung nach Nutzerangabe20

28.03.2011

21 28.03.2011aweÜberarbeitung nach Nutzerangabe

22 20.02.2012fscÜberarbeitung nach Nutzerangabe

23 16.08.2012fscÜberarbeitung Türen nach Türliste, Türe Sortieranlage

105 m x 60 m = 6.300 m²

Open stack

Parking deck for bicycles

Book sorter

© Degelo Architekten,/Basel, Bene, Stuttgart, UB Freiburg, UBA Freiburg

First basement floor

Page 22: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸22

Closed stacks

© Universitätsbauamt

Second and third basement floor

Page 23: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸23

Demolition/Rebuilding+5 Office area+4 Reading rooms,+3 Parlatorium…+2+10 Entrance, Café

Conversion

-1 Open stack

Operating-2 Closed stacks-3

© Degelo Architekten,/Basel, Bene, Stuttgart, UB Freiburg, UBA Freiburg

Under constructionSectional view B-B

Page 24: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸24

Under construction

Page 25: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸25

Library services during the renovation

UB 1

UB 2

Reading room350,000 volumes950 working places

Lending departmentReading room for raw materialsNew media centre

© UB Freiburg

© UB Freiburg

Page 26: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸26

Opening21.07.2015

Page 27: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸27

Excellent Usage

0

2.000

4.000

6.000

8.000

10.000

12.000

14.000

10

.8

17

.8

24

.8

31

.8

7.9

14

.9

21

.9

28

.9

5.1

0

12

.10

19

.10

26

.10

2.1

1

9.1

1

16

.11

23

.11

30

.11

7.1

2

14

.12

21

.12

28

.12

4.1

11

.1

18

.1

25

.1

1.2

8.2

15

.2

Visits per day

August 2015 to February 2016: > 1.5 Mio. visits

Page 28: Freiburg University Library - Homepage - LIBERlibereurope.eu/.../2013/10/Kellersohn_FreiburgUniversityLiberary.pdf · Dr. Antje Kellersohn ⎸UB Freiburg ⎸2 University of Freiburg

Dr. Antje Kellersohn ⎸UB Freiburg ⎸28

Let´s have a look inside ...

Dr. Antje [email protected]