Morning: First physics fill with 48 bunches per beam: 20:30: Injection finished 4.5 10 12 protons per beam in 48 bunches; e x1 = 2.9 mm; e y1 = 2.9 mm; e x2 = 3.3 mm; e y2 = 3.5 mm; 21:00: Start ramp; 21:40: End ramp; 22:20: Start Squeeze Initial luminosity: L = 6.65 10 30 cm -2 sec -1 ; 23:30: Stable physics; L = 6.15 10 30 cm -2 sec -1 ; fitted average emittances for bunch current of N b = 9 10 10 : s = 4.05mm; with b * = 3.6m (average of three 1/b * measurement in IR5) Friday 20.8. 1 8:30 meeting

Upload: addo

Post on 06-Feb-2016

28 views

Category:

Documents


0 download

DESCRIPTION

Friday 20.8. Morning: First physics fill with 48 bunches per beam: 20:30: Injection finished  4.5 10 12 protons per beam in 48 bunches ; e x1 = 2.9 m m; e y1 = 2.9 m m; e x2 = 3.3 m m; e y2 = 3.5 m m; 21:00: Start ramp; 21:40: End ramp; 22:20: Start Squeeze - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Friday 20.8

● Morning: First physics fill with 48 bunches per beam:– 20:30: Injection finished 4.5 1012 protons per beam in 48 bunches;

ex1 = 2.9 mm; ey1 = 2.9 mm; ex2 = 3.3 mm; ey2 = 3.5 mm; – 21:00: Start ramp;– 21:40: End ramp;– 22:20: Start Squeeze

Initial luminosity: L = 6.65 1030 cm-2 sec-1;– 23:30: Stable physics; L = 6.15 1030 cm-2 sec-1;

fitted average emittances for bunch current of Nb = 9 1010: s = 4.05mm; with b* = 3.6m (average of three 1/b* measurement in

IR5)

integrated luminosity = 240 nb-1 after 16 hours;

Friday 20.8.

1 8:30 meeting

Page 2: Friday 20.8

● 48 bunches in both beams: integrated Luminosity of more than 240 nb-1

Firday 19.8.

2 8:30 meeting

Page 3: Friday 20.8

● 48 bunches in both beam: beginning of the fill.

Thursday 19.8.

3 8:30 meeting

Page 4: Friday 20.8

● Beam 1 bunch distribution at end of fill:

Firday 19.8.

4 8:30 meeting

Page 5: Friday 20.8

● Beam 1 bunch distribution at end of fill:

Firday 19.8.

5 8:30 meeting

Page 6: Friday 20.8

giulia papotti (BE/OP/LHC)

03.08.2010

200 400 600 800 10000

5

10

15

20

25

30

time [min]

loss

es [

%]

fill 1295 - beam 1

200 400 600 800 10000

5

10

15

20

25

30

time [min]

loss

es [

%]

fill 1295 - beam 2

200 400 600 800 10005

6

7

8

9

10

11

time [min]in

tens

ity [

1e10

p+/

bunc

h]

fill 1295 - beam 1

put in collisions

stable beams

200 400 600 800 10005

6

7

8

9

10

11

time [min]

inte

nsity

[1e

10 p

+/bu

nch]

fill 1295 - beam 2

Fill 1295

• 16 hours of stable beams– first 48 + 48

IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8

giulia papotti (BE/OP/LHC)

Page 7: Friday 20.8

giulia papotti (BE/OP/LHC)

03.08.2010

Fill 1295

IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8

0 1 2 30

5

10

15

20

25

30

number of collisions

loss

es 2

hrs

aft

er c

oll [

%]

fill 1295 - beam 1

0 1 2 30

5

10

15

20

25

30

number of collisions

loss

es 2

hrs

aft

er c

oll [

%]

fill 1295 - beam 2

1 LR in 2 (33m) 1 LR in 2 (33m)

1 LR in 8 (33m) 1 LR in 8 (33m)

1 LR in 2 (22m)1 LR in 2 (22m)

no Long Range interactions

with Long Range

giulia papotti (BE/OP/LHC)

Page 8: Friday 20.8

● Very clean dump by operator switch:

Firday 19.8.

8 8:30 meeting

Page 9: Friday 20.8

● End of Fill studies:– Luminosity scans in all IPs (large scan in IP1);– Damper studies;– Orbit feedback test for radial loop correctio;– 16:15: Beam dump; very clean & without any unusual losses

Friday 20.8.

9 8:30 meeting

Page 10: Friday 20.8

● Lumi scans in IR1:average beam emittances:

ex = 4.4mm ey = 4.9mm

growth of 10% to 20% over the fill!

Firday 19.8.

10 8:30 meeting

Page 11: Friday 20.8

● Morning until noon:– Recovery from cryo problem in Pt6.

● Afternoon and over night:– New physics fill with 48 on 48 bunches.

● Sunday to Monday:– Physics Fills with 48 bunches per beam.

Saturday 21.8.

11 8:30 meeting

Page 12: Friday 20.8

● Open Issues for next Technical Stop:– CMS cooling for central tracker.– Ion pumps in dump line MKB (B2 only 4 out of 8 pumps working; few days

intervention).– BLM racks (in buildings SR1 and SR5 and both at position BY02): would like to

correct the way the power cable for the multi-plug arrives inside the rack. – QPS boards: several boards had to switch from channel A to B.– Access team to replace oxydized connectors for PAD-PX24 (3 hours).– CV needs to replace a motorization of the water valve of the sector 56 (3h).– RCBH18.R7B2 – Miguel Cerqueira Bastos.

Week 33