Friday May 10th 2002 Alex Howard Imperial College London Slide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the opportunity of using the growing resource of the GRID particularly for Particle Astrophysics (LISA and UKDMC) which has no direct funding to (or from) the GRIDPP It is increasingly clear we NEED use of the GRID in order to carry out accurate simulations for both LISA and Dark Matter – either to investigate signals or possible backgrounds on micro and macroscopic levels. Specifically this is

Upload: amy-francis

Post on 03-Jan-2016

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 1

Experiences of Submitting UKDMC and LISA GEANT4 Jobs

FIRST I should say thanks for the opportunity of using the growing resource of the GRID particularly for Particle Astrophysics (LISA and UKDMC) which has no direct funding to (or from) the GRIDPP

It is increasingly clear we NEED use of the GRID in order to carry out accurate simulations for both LISA and Dark Matter – either to investigate signals or possible backgrounds on micro and macroscopic levels. Specifically this is processor intensive work

I am a novice – only 5 weeks usage of the GRID

Page 2: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 2

Experiences of Submitting UKDMC and LISA GEANT4 Jobs

1. Experimental configurationa) Dark Matterb) LISA

2. Output of >100 Jobs

3. Benefits

4. Comments on Functionality and UI

Page 3: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 3

UKDMC Experiment

Page 4: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 4

Two-Phase Liquid Xenon, Two-Phase Liquid Xenon, ZEPLIN IIIZEPLIN III

ZEPLIN III, our near future detector will offer extreme levels of signal-to-background discrimination. Interpretation will only be possible with full Monte Carlo studies (a novelty for DM)

A m 24 1 S in g le E v en t Tw o-P h a se 1 3k V

T im e /5 n s

Vol

tage

/mV

S 2 w id th = 2 s

S 1

S 1 E x p a n d e d

-0 .2 5

-0 .2

-0 .1 5

-0 .1

-0 .0 5

0

0 500 100 0 150 0 200 0 250 0 300 0 350 0

Page 5: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 5

Prototype Simulation: Full Lab Geometry

Page 6: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 6

GEANT 4• Due to the need to develop Monte Carlo simulations for

Dark Matter experiments, I have become involved in the development of Geant4 – particularly exploiting the low energy, radioactivity decay and neutron extensions of the toolkit (see advanced example DMX within the release package)

• From basic simulations of our prototype system it is clear that greater computing power is required in order to produce high statistics and accurately model our detectors.

• In addition it is envisaged to develop a simulation of the underground environment, UNEX, to give accurate spectra and particle types within the experimental area.

• Furthermore, Imperial is also involved in LISA a gravitational wave experiment, where charging of proof masses becomes critical. To simulate the charging rate requires large number of cosmic events with rare hadronic showers resulting in residual charge

Page 7: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 7

One High Energy event:

LXe

GXe

PMT

mirror

source

Page 8: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 8

room elastic

inelastic outside

Neutrons

Page 9: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 9

LISA/STEP• Gravitational wave experiment• STEP = test of the equivalence

principle• Both rely on floating proof masses

with no electrical connections prone to charging effects

from cosmic rays

However, charging rate is relatively low (~1 in 5000 particles)

Page 10: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 10

LISA Geometry and Geant4 Images

Page 11: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 11

LISA Geometry and Geant4 Images

Page 12: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 12

OUTPUT from Grid Running• Over 100 jobs have been run on the

grid to try and estimate the charging rate in the proof mass and test different cuts and processes within Geant4.

• 1.9 million events have been run in ~300 hours of CPU time

• The preliminary outcome is as follows:

Page 13: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 13

6secs and Convergence of Charging Rate

Page 14: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 14

6secs and Convergence of Charging Rate

Initial indications of charging rate

Page 15: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 15

GRID JOB SUBMISSION – My Experience

• With the auspicious title of DataGrid User…..

• After running >100 jobs I have had some experience of running of jobs on the DataGrid – mostly good

• However, there are a few things that if implemented would be useful, although their unavailability may just be the youthful nature of the GRID and therefore already present, at least in the design… (some of which are due to my ignorance)

Page 16: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 16

Things Missing, apparently (1)1. Status of job events run, near completion?2. Run-time Partial grab of output files check on job:

RB release 1.4 (Dave’s talk)3. Length of identifier – cumbersome4. Saving identifiers to file ease of

management of many jobs5. Request output to be saved to file

automatically when job completed6. Proxy expiration and file loss – can protect

against it, but can occur 7. File back up – prevent losses when things

crash, and therefore reduce number of repeat jobs

8. Job clearing and file clearing – particularly if job crashes/disappears

Page 17: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 17

Things Missing, apparently (2)10. Diagnostics

memory usage (single event leaks) – max/average CPU Time – can access at runtime with Globus Disc access = efficiency of local staging, etc…

11. Forced killing of jobs? Clearing of files or keeping of partial files – cancelling jobs loses everything

12. Run time limit/Disk Usage/Memory Usage in case of problems/diagnostic?

14. Node limit Batch script to run jobs sequentially without clogging up the farm – from proxy-request?

15. Shared Disc for data? – Input files are ~500 Mbytes and copied 32 times…

Page 18: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 18

Things Missing, apparently (3)

16.What decides resource management? Queued at IC or at RAL – speed of processor? Disc transfer time?

17.Jobs cleared before get output (RB dies)

18.Housekeeping/cleaning of tmp files19.Script to save output to your account

without 3rd party access?20.Prone to abuse?21.Tidy up – clear up dangling jobs and

tmp files for a given user

Page 19: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 19

Things Missing, apparently (4)22. Reliability?23. Compilers and inter-site homogeneity

IC = egcs 1.1.2 whereas RAL = gcc 2.95.2

24. Level of resource available and average usage/users/CPU power – stage requests, think about optimising problem, look elsewhere

25. More nodes with my VO would naturally be helpful

IC = 16 nodes (user limit 14)RAL = 8 nodes

elsewhere?

Apologies if some of these comments are due to me…

Page 20: Friday May 10th 2002 Alex Howard Imperial College LondonSlide 1 Experiences of Submitting UKDMC and LISA GEANT4 Jobs FIRST I should say thanks for the

Friday May 10th 2002

Alex Howard Imperial College LondonSlide 20

Conclusions• The GRID is clearly a very powerful

resource that has enabled me to run a lot of jobs in a very short space of time

• It is clear that Dark Matter and Spacecraft charging studies at this time NEED the GRID - particularly for accurate Monte Carlo simulations of future detectors (ZEPLIN III) and Spacecraft charging rates (LISA/STEP)