The Irrigation Association describes the process, issues and results of moving from the national paper and pencil (PNP) certification program to a computer based and managed programTRANSCRIPT
www.KryterionOnline.comwww.KryterionOnline.com
Irrigation Association Case Study
From Paper and Pencil Testing to Computer Based Testing Co-authored by the Irrigation Association and Kryterion, Inc. October 2010
Background
Every year the Irrigation
Association™ (IA) delivers
thousands certification exams across
the country to landscape contractors,
irrigation designers, water managers and agricultural engineers. Until recently, the
exams were delivered via the traditional method of paper and pencil. Exam sites
were scheduled across the country on a “on demand” basis. Packages of exam
papers with instruction booklets were sent via secure delivery to proctors at the
facilities and returned afterwards. However the number of candidates was growing
and the administration of exams was becoming more and more challenging.
Problems
The administration of the exams was becoming overwhelming and it was difficult to
scale the program. In some cases candidates had to wait months to be able to take
the exams and then they had to wait weeks for their results. Candidates looking to
Page 2 of 5
www.KryterionOnline.comwww.KryterionOnline.com Page 2 of 5
certification to improve their employment situation were being put off by long wait
times. An unknown number of candidates were dropping out of the process.
The IA is looking to become NCCA accredited. Consistency of delivery and test
security were issues that needed to be addressed. Computer based testing (CBT)
seemed like a good solution but the Board had a preconception that it would be
difficult to do. Some on the Board were not ready to go to computer based testing.
Some members of the board were not as technology based, and had, as well, a
general fear of the unknown.
Method/Solution
We (the management of IA) did a gap analysis
to start building a picture of what the differences
were between paper and pencil and CBT. Our
concerns included our current standing running
a program that was both NCCA accredited and
legally defensible. We looked at our current
vendor to see if they could meet our needs.
SMT, AMP and Kryterion also responded to an
RFP we sent out. Initially we wanted to run paper and pencil and CBT
simultaneously. However, after a review of our needs Kryterion advised against it.
They recommended against running a paper pencil program. They explained that
paper and pencil testing would probably increase the workload rather than
simplifying everything.
After lengthy discussions in December 2009 the board decided to bring together
the three vendors for a face-to-face meeting in January 2010. Kryterion presented
the only complete end-to-end CBT solution – online item banks, ability to manage
candidates, high levels of security, a network of over 300 testing centers in the US
“Initially we wanted to run paper and pencil and CBT simultaneously. However, after a review of our needs Kryterion advised against it.”
Page 3 of 5
www.KryterionOnline.comwww.KryterionOnline.com Page 3 of 5
and live access to information (we had none prior to this). Once the board was
able to see the demonstration they were able to visualize how this would be a
relatively straightforward transition. The board decided to move to CBT.
Results Achieved
We had originally planned for a one and one half
year transition to CBT. However, once we
understood how simple the transition could be
we did it over just a few months, during the
summer when things were quieter. The first
thing we had to do was upload our item banks
into Webassessor. While doing the transfer, we
discovered several mistakes in questions,
corrections and mis-keyed items that we thought
had been fixed. We now have the ability to fix
mistakes and be assured that they were fixed properly including an automatic audit
trail. This gives us great confidence moving forward. During the transition we went
through every item, painstakingly reviewing every question. We updated where
necessary to allow for changes in technology and the industry. Because of our
tight time schedule it was completely exhausting, yet the process itself was
relatively simple, fast and quite satisfying. Our certification director built the test
forms then the board reviewed and approved them.
Now registration is much faster. Candidates can register to test within a few weeks.
Candidates still must apply to the certification program but they can then register
for an exam location. While previously candidates had to wait 30-45 days for
results, they now get results right away. That quick turnaround time could make the
difference in career changes. This is an industry with high-turnover, getting trained
and certified quickly is important.
“We are more confident that we are giving good exams. We have the ability to write new sections quickly and efficiently.”
Sherrie Schulte, Certification & Education Director
Page 4 of 5
www.KryterionOnline.comwww.KryterionOnline.com Page 4 of 5
While it is too early to tell if there will be much in the way of cost savings, if there
are they will probably not be significant. However we have gained competitive
advantage and are able to make the exams more readily available, which
increases people’s willingness to test. For example, one program requires three
separate tests. These could now be taken in a matter of weeks versus several
years with the previous testing sytem. The perceived benefit to our candidates is
huge.
With regards to Kryterion we have had very positive interaction. If we had issues
they were handled in a timely manner.
Sherrie Schulte, Certification & Education Director, was intimately involved in the
transition.
“I was new and they (Kryterion) were very helpful with my many questions. In
the past our other vendor did all the testing and item banking so now it was
being thrown at me which was a totally different thing – now I wonder why we
didn’t switch a long time ago”
“We are more confident that we are giving good exams. We have the ability to
write new sections quickly and efficiently. In the old process we had there were
too many gaps and room for error and everything took weeks and months.
Now everything is all in one place, so it is much faster, and I can track where
we are. It’s a weight off my shoulders. We are no longer risking security of our
program on emails and mailing exams all over the country. It doesn’t take
much to send an email to the wrong person by mistake. Overall we have
greatly improved our efficiencies and are able to keep the exams relevant,
accurate and accessible in a timely manner”
Page 5 of 5
www.KryterionOnline.comwww.KryterionOnline.com Page 5 of 5
Irrigation Association Lessons Learned
CBT vendors are not all the same. Some have very similar solutions to PNP
vendors and don’t deliver the same benefits. Do your homework when seeking a
new vendor and talk to references. Don’t be afraid to switch, as long as you have a
good plan, it can be done quite quickly and with relatively few headaches. Avoid
trying to do both PNP and CBT at the same time as a transition plan as this is not
really necessary and might create an overwhelming amount of work for your
administrators.
About Kryterion
Kryterion is a full-service test development and delivery company that serves the
Association, Technology and Education markets with world-class secure testing
solutions.
Our solutions include the five key elements of certification and testing:
Psychometric services, exam management, security, real time access and test
delivery, all managed through our proprietary Webassessor test development and
deployment system. Our clients test with confidence and convenience.
For more information on how Kryterion can streamline your testing program
contact:
Kryterion Certification and Licensure Sales