frs document

27
Page 1 Sreevatsa Stainless Steel Fabricators P Ltd. 2009 Functional Requirement For Software Implementation - ERP Sreevatsa stainless Steel Fab P Ltd Functional Requirement statement (FRS) for an ERP System 16th nov 2009

Upload: srirangan-sampath

Post on 10-Apr-2015

1.491 views

Category:

Documents


69 download

TRANSCRIPT

Page 1: FRS Document

Page 1

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

Functional Requirement For Software Implementation - ERP

Sreevatsa stainless Steel Fab P Ltd

Functional Requirement statement (FRS) for an ERP System

16th nov 2009

Page 2: FRS Document

Page 2

Sreevatsa Stainless Steel Fabricators P Ltd 2009

Table of Contents

1 STATEMENT OF WORK......................................................................................................................3 1.1 PURPOSE.........................................................................................................................................3 1.2 COVERAGE & PARTICIPATION ........................................................................................................3

2 GENERAL INFORMATION .................................................................................................................3 2.1 ORIGINAL FRS DOCUMENT ............................................................................................................3 2.2 THE ORGANIZATION .......................................................................................................................3 2.3 EXISTING TECHNOLOGY ENVIRONMENT.........................................................................................4 2.4 SCHEDULE OF EVENTS....................................................................................................................5

3 PROPOSAL PREPARATION INSTRUCTIONS ................................................................................5 3.1 VENDOR’S UNDERSTANDING OF THE FRS ......................................................................................5 3.2 GOOD FAITH STATEMENT...............................................................................................................5 3.3 COMMUNICATION ...........................................................................................................................6 3.4 PROPOSAL SUBMISSION ..................................................................................................................7 3.5 METHOD OF AWARD.......................................................................................................................7 3.5.1 SELECTION AND NOTIFICATION ......................................................................................................8

4 SCOPE OF WORK, SPECIFICATIONS & REQUIREMENTS........................................................8 4.1 SALES ...................................................................................................................................................8 4.2 ORDER PROCESSING............................................................................................................................10 4.3 DESIGN ENGINEERING & R&D..........................................................................................................11 4.4 INVENTORY (STORES) & MATERIAL PLANNING. .................................................................................12 4.5 PROCUREMENT /PURCHASE.................................................................................................................14 4.6 PRODUCTION PLANNING .....................................................................................................................15 4.7 MANUFACTURING ...............................................................................................................................16 4.8 SUBCONTRACT....................................................................................................................................17 4.9 MAINTENANCE....................................................................................................................................17 4.10 QUALITY MANAGEMENT ..................................................................................................................18 4.11 DISPATCHES AND REPORTING ...........................................................................................................18 4.12 JOB COSTING.....................................................................................................................................19 4.13 FINANCIALS. .....................................................................................................................................20

5 VENDOR QUALIFICATIONS AND REFERENCES.......................................................................21 6 FEATURES , BUDGET & ESTIMATED PRICING .........................................................................22

6.1 DEPLOYMENT MODELS , SOFTWARE FEATURES AND VENDOR RESPONSIBILITIES. .............................22 6.2 FIVE YEAR TOTAL COST SUMMARY ...................................................................................................24

7 VENDOR CERTIFICATION...............................................................................................................26

Page 3: FRS Document

Page 3

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

1 Statement of Work

1.1 Purpose

The purpose of this Functional Requirement Statement (FRS) is to invite prospective vendors to

submit a proposal to supply an Enterprise Resource Planning (ERP) system to Sreevatsa Stainless

Steel Fab P Ltd.. The FRS provides vendors with the relevant operational, performance, application,

and architectural requirements of the system.

1.2 Coverage & Participation

The intended coverage of this FRS, and any agreement resulting from this solicitation, shall be for the

use of all departments at Sreevatsa Stainless Steel Fab P Ltd. along with any satellite offices. Sreevatsa

Stainless Steel Fab P Ltd. reserves the right to add and/or delete elements, or to change any element of

the coverage and participation at any time without prior notification and without any liability or

obligation of any kind or amount.

2 General Information

2.1 Original FRS Document

Sreevatsa Stainless Steel Fab P Ltd. shall retain the FRS, and all related terms and conditions, exhibits

and other attachments, in original form in an archival copy. Any modification of these, in the vendor’s

submission, is grounds for immediate disqualification.

2.2 The Organization

Sreevatsa Stainless currently has a variety of standalone information systems, many developed in-

house that do not support cross-functional coordination, do not provide sufficient data for

management analysis, and are costly to maintain.

Page 4: FRS Document

Page 4

Sreevatsa Stainless Steel Fabricators P Ltd 2009

In reviewing the scope for upgrading current systems, the company realized the need for

interdepartmental coordination of systems planning. The management has since been reviewing and

restructuring the existing system so as to make the transition from the existing to the new system as

easy as possible. This effort included the identification of the Scope of Work, Specifications, &

Requirements, and a Request for Information aimed at software solution vendors. The Information

Systems Master Plan was finalized in March 2007 and since then has gone through a series of

revisions. This Functional Requirement Statement (FRS) is the result of all those efforts.

The Management is now requesting proposals for a qualified ERP vendor to implement a new, fully

integrated information system that replaces many current systems. The scope of the project is expected

to include (a) software supporting a broad range of business functions, (b) server hardware &

Software (specification only), (c) and professional services including integration, customization and

training and to seamlessly integrate the operations in the various works and head office/ Branch

offices.

The management will consider proposals for ERP software supplemented with additional specialized

software, and will also consider proposals for integrated best-of-breed solutions. Preferred solutions

will (a) support all of the Key Business Functions outlined in section 4 Scope of Work, Specifications

& Requirements of this FRS, and (b) have a proven track record of integration.

Proposed solutions must address every function described in section 4 of this document in some

manner – through packaged software, custom programming, manual procedures, or a combination.

2.3 Existing Technology Environment

The following is a listing of our current technology environment.

Telephony hardware & software : Broadband Connection From Bsnl.

LAN type : Lan Thro Network Switches with Cat 5 Cable.

Server operating system : As Per Vendor Requirement

Desktop operating system : Windows Xp

Page 5: FRS Document

Page 5

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

2.4 Schedule of Events

The following is a tentative schedule that will apply to this FRS, but may change in accordance with

the organization’s needs or unforeseen circumstances.

Issuance of Functional Requirement November 20, 2009

Technical Questions/Inquiries Due November 25, 2009

Complete Initial Evaluation December 05, 2009

Final Award Notification December 15, 2009*

3 Proposal Preparation Instructions

3.1 Vendor’s Understanding of the FRS

In responding to this FRS, the vendor accepts the responsibility fully to understand the FRS in its

entirety, and in detail, including making any inquiries to Sreevatsa Stainless Steel Fab P Ltd. as

necessary to gain such understanding. Sreevatsa Stainless Steel Fab P Ltd. reserves the right to

disqualify any vendor who demonstrates less than such understanding. Further, Sreevatsa Stainless

Steel Fab P Ltd. reserves the right to determine, at its sole discretion, whether the vendor has

demonstrated such understanding. That right extends to cancellation of award if award has been made.

Such disqualification and/or cancellation shall be at no fault, cost, or liability whatsoever to Sreevatsa

Stainless Steel Fab P Ltd..

3.2 Good Faith Statement

All information provided by Sreevatsa Stainless Steel Fab P Ltd. in this FRS is offered in good faith.

Individual items are subject to change at any time. Sreevatsa Stainless Steel Fab P Ltd. makes no

certification that any item is without error. Sreevatsa Stainless Steel Fab P Ltd. is not responsible or

liable for any use of the information or for any claims asserted therefrom.

Page 6: FRS Document

Page 6

Sreevatsa Stainless Steel Fabricators P Ltd 2009

3.3 Communication

Verbal communication shall not be effective unless formally confirmed in writing by the specified

procurement official in charge of managing this FRS process. In no case shall verbal communication

govern over written communication.

Vendors’ inquiries, questions, and requests for clarification related to this FRS are to be directed in

writing to:

Sreevatsa Stainless Steel Fab P Ltd.

174 G, Habibullah Road,

T.Nagar.

Chennai 600 017

Attention: C.S.Srirangan

Telephone: +91 94443 80802

Fax: +91 44 43502454

E-mail: [email protected]

Applicable terms and conditions herein shall govern communications and inquiries between Sreevatsa

Stainless Steel Fab P Ltd. and vendors as they relate to this FRS.

Formal Communications shall include, but are not limited to:

• Errors and omissions in this FRS and enhancements: Vendors shall bring to Sreevatsa Stainless

Steel Fab P Ltd. any discrepancies, errors, or omissions that may exist within this FRS. With

respect to this FRS, vendors shall recommend to Sreevatsa Stainless Steel Fab P Ltd. any

enhancements, which might be in Sreevatsa Stainless Steel Fab P Ltd. best interests.

• Inquiries about technical interpretations may be sent by email

• Addenda: Sreevatsa Stainless Steel Fab P Ltd. will make a good-faith effort to provide a

written response to each question or request for clarification that requires addenda within

2(two) business days.

Page 7: FRS Document

Page 7

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

3.4 Proposal Submission

Proposals must be delivered sealed to:

Sreevatsa Stainless Steel Fab P Ltd.

174 G, Habibullah Road,

T.Nagar.

Chennai 600 017

Attention: C.S.Srirangan

Telephone: +91 94443 80802

Fax: +91 44 43502454

E-mail: [email protected]

The proposals may preferably be sent electronically With a follow-up copy by Courier.

3.5 Method of Award

The evaluation of each response to this FRS will be based on its demonstrated competence,

compliance, format, and organization. The purpose of this FRS is to identify those suppliers that have

the interest, capability, and financial strength to supply Sreevatsa Stainless Steel Fab P Ltd. with an

ERP system identified in the Scope of Work.

Evaluation Criteria:

1. Capability of vendor to meet or exceed requirements set forth in Scope of Work.

2. Expressed interest in working with Sreevatsa Stainless Steel Fab P Ltd..

3. Confirmation to work within the stipulated budget.

4. Ability of vendor to communicate its vision and capacity for establishing a relationship that

addresses current and future needs and trends in the industry.

Page 8: FRS Document

Page 8

Sreevatsa Stainless Steel Fabricators P Ltd 2009

5. Apparent likelihood and desirability of proposed software.

3.5.1 Selection and Notification

Vendors determined by Sreevatsa Stainless Steel Fab P Ltd. to possess the capacity to compete for

this contract will be selected to move into the negotiation phase of this process. Written

notification will be sent to these vendors via mail.

4 Scope of Work, Specifications & Requirements The below mentioned scope of work is as perceived by the management in accordance to the suitability

and functional requirement in each department. The vendors will have to match

4.1 Sales

• Create Estimate Templates From Previous Estimates

• Detailed Estimating Including Unlimited Cost Types

• Integration with Financials and Inventory

• Issue Multiple Estimates Per Project

• Maintain Job Templates for Typical Jobs

• Multi-Currency Capabilities

• Store Multiple Estimate Revisions

• Tax Computation

• All prospects to go thro approval process before submission of quote.

• All prospects turned down to be available in database with reasons to do Lost opportunity analysis

• Quotations to be approved before submission

• Discounts offered to be approved .

• Discounts offered to be recorded.

• Unlimited Levels of Detail in the Bill of Material with Full Costing

• Provision to create new part nos( tentative*) and tentative BOm for the purpose of quoting for new

products. All such tentative BOMs to be tagged/Flagged for review and approval at design

engineering stage post work order/manufacturing order release.

• Generate quote on prescribed format

Page 9: FRS Document

Page 9

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

• EMD and Performance Bank Guarantees issued along with quotations/government tenders to be

linked with finance* and maturity of such instruments to be highlighted to people concerned.

• Provision to scan customer drawings and upload into database for future reference.

• Such scanned data to be made available as a link in the necessary user interface windows

• Performance/track record of Customer in terms of payment etc to be available (highlighted) in the

UI of the quotation approval Window.

• Provision to cancel , amend exisiting /current workorders based on customer feedback. To be

routed thro divisional head.

• Provsion to reopen closed work orders . reasons for the same to be recorded . To go thro approval

process by divisional head .

Page 10: FRS Document

Page 10

Sreevatsa Stainless Steel Fabricators P Ltd 2009

4.2 Order Processing

Orders can be for ;

New Workorder which will be billed /invoiced

For internal use ( will not be billed but costing will be done)

R&D ( will not be billed , but will be accounted for taxation purpose)

Amendments to existing work order

&

For new product with old part nos

For new product with new part nos

For standard product

For customer Samples.

Job work .( labour only , material supplied by party)

New orders to specify

Quantity

Quality/grade of material

Expected delivary period

Delivary address

Spl instruction like , sample approval before bulk production etc

Attach customer or approved general arrangement drawings as PDF to the

Database and enabling other users to view the same from the User screen.

New order alerts to be given to all department heads. And alerts needs to be seen and

accepted by viewer to ensure knowledge of same

New orders to be routed to Works through Works In Charge and Planning

Page 11: FRS Document

Page 11

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

4.3 Design Engineering & R&D

Design Engineering will

Review all work orders received from Planning and sales

Review part numbers and associcated drawings from data base .

Incorporate any revisions to existing drawings / part numbers based on requirement

Prepare drawings for new parts and components and register new components . to upload

new drawings as PDFs into the database and should be available for the users to see.

Based on feed back from planning and production, any changes to drawings from the

process / fabrication point of view need to be incorporated

All such amendments needs to go thru an approval process ,

o in some cases they may need approval from sales if cost implication /or change to

design intent is there .

o In some cases , production head may approve the deviation

Will co- ordinate with Production planning and Finalise Process chart( production stages)

at drawing board level and incorporate the same in the design

Page 12: FRS Document

Page 12

Sreevatsa Stainless Steel Fabricators P Ltd 2009

4.4 Inventory (stores) & Material Planning.

• Handle Export/Import documentation (Statutory)

• Handle Excise documentation(statutory)

• Handle Subcontract documentation ( statutory)

• Inventory Control

Purchase Requisition (Indent generation)

• PR can be raised by all HOD’s ( Quality , maintenance , Stores,

Production, Purchase ,Admin ) Respective User Windows to be

customized as required.

Goods inward ( stock to be updated after qc pass)

Gin print out. To have Provision for Customised comments

Issues & returns

Issues to be flagged if Balance Material has to be returned to stores

EOD report to be generated showing all unclosed issues

EOD report for Material Received But Not Inspected

EOD report for Material Inspected and rejected

Material Receipt alert to be sent to Purch./Prod./Quality/Planning Prior to QC

Pass.

Stock Adjustments

Re-order levels (Dynamic)

Economic Order Quantity (EOQ)

Stock Management

Stock locations

Stock audit

To codify rawmaterial, tools , consumables and spares.

Tools to be issued to production under suspense and to be collected back at the

end of day. ( Tools Issue Note)

Stores to maintain Min and Max levels for tools ( specific) also

Scrap to be accounted in Kgs/suitable Units and shown as separate item code.

Salvage to be done against cash invoice .

Page 13: FRS Document

Page 13

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

GIN to be routed to finance through purchase after verification

Issues to be mapped against BOM quanity.

Deviations to be sent thro approval process

Provision to block available material against Work orders based on instruction

from Planning/purchase /Sales

Physical verification of Material to be undertaken and system to capture the same

prior to blocking- ( to avoid Blocking of Unusable Material)

Block Tags to be System Generated.

Stock Register to Disallow Issue of Blocked Material

Diversion of Material for One WO to another to be captured and has to go thro

approval Process

• Storage and accounting of Customer /or Returnable material to be handled by system with

necessary statutory documents

• Finished goods stores and accounting.

• Multiple Locations.

• Stock statement as per bank norms.

Page 14: FRS Document

Page 14

Sreevatsa Stainless Steel Fabricators P Ltd 2009

4.5 Procurement /Purchase

1. Amendments

2. Ageing Analysis

3. Bill Passing

4. Enquiries

5. Purchasing ( cash /Credit)

6. Purchase Order Placement

7. Purchase Order Processing

8. Quotation Analysis

9. Rate Contracts /Job Orders ( covered Under Subcontract)

10. Reconciliation

11. List of Pending PR&PO, Closed PO, Supplied but Rejected etc

12. Vendor Rating( credit, Quality Etc)

13. Vendor Payment Status ( Outstanding Ledger)

14. PDC cheque Issued – Statement

15. Provision to black list vendors

16. Inclusion of new vendors thru approval process

17. Debit note advice

18. Cash Purchase Limit.

19. Bank and cash /day book ( purchase department)

20. Cash purchases to go thro approval process

21. GIN to be prepared for Cash Purchases also

Page 15: FRS Document

Page 15

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

4.6 Production Planning

• Manufacturing Order Processing

• Infrastructure Augmentation plan Based on New Process or Capacity enhancement of Particular

Process due to Bottle neck Condition.

• Provision to Divert In House material to Subcontractors based on Priority/Machine Brk dwn.

• Manufacturing Standards

• Master Schedule

• Batch card generation

• Materials Requirements Planning

• Optional Pick List for Stocking Point-of-Use in Discrete or Repetitive Environments

• Product Structure Routing Copy

• Production Data

• Production Monitoring & Control

• Production Statistic & Costing

• Project Monitoring

• Rough Cut Capacity Planning

• Scrap Factors for Use by Materials Requirements Planning

• Shop Floor Control ( tracking Of batch Cards Material Planning for Work centers based on master

schedule.

• Provision to Divert Material For Priority Work Orders from Current Work orders . In case of

Diversion, Batch cards to be Re mapped to Diverted Work Order to have effective costing figure.

• Specific Manufacturing Support

1. Discrete Repetitive Process Support

2. Mixed-mode Process Support

3. Batch Processing Support

4. Process Manufacturing Support

• Technical Documents

• Where-used Inquiry

Page 16: FRS Document

Page 16

Sreevatsa Stainless Steel Fabricators P Ltd 2009

4.7 Manufacturing

• Bill of Material

o Effective Dates Controlled by Engineering Change Notification

o Unlimited Revisions & Alternate Routings

o Copy Bill of Materials

o Update Standard Costs With Most Recent Costs

o Change or Delete Support

o Maintain Yields for Each Component

o Checks for Recursive Items

o Records Engineering Changes

o CAD Integration

o Break-down Management ( Plan B – To achieve Production

• Capacity Requirements Planning

• Component Availability Checking & Ability to Substitute Items

• Cumulative Item Cost and Work Center Productivity Reporting

• Cumulative Lead Time Calculations

• Daily Productions Scheduling by Item/Site/Production Line

• Detailed Labor/ WIP/Sub Contract Tracking

• Engineering Change Notice

• Engineering Change Notices/Requests (ECN/ECR)

o File and Drawing Reference

o Reasons for change to be recorded and has to go thro

o approval process.

o Customer Driven Requests Responses.

o Effective by Date or Inventory Quantity & Run Rate

o Report on Affected Items & Assemblies

o Permanent Audit Trail of all Bill of Material Changes

• Break Down Slip – To be Routed thru Maintenance for Necessary action In case of Break Down.

With Copy to Planning/Works In charge.

Page 17: FRS Document

Page 17

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

• End of day report to be logged on to the system with status of each batch card to have a real time

status of work order ( Batch card Progress Report)

4.8 Subcontract

• Job order generation

• Job order tracking

• List of vendors

• Vendor rating

• List of pending jobs with vendors

• Job orders to go thru approval process

• To receive alerts on receipt of material from vendor at stores

• To do list based on planning inputs

• Scrap accounting ( balance material from vendors)

• Access to approved drawings from user interface

• Batch cards to be generated for subcontract items also and mapped to jo’s

• EOD on batch cards to be generated.

• Bill Passing

• Other features deemed pertinent from Purchase features.

4.9 Maintenance

• Asset numbering

• Maintenance Contract Monitoring

• Maintenance Materials/Tools Management

• Preventative Maintenance

• Break down history of Machine

• Vendor List

• Ageing of List- Expiry Date tracking

• Generation of Work order for Preventive maintenance /Periodic Maintenance

Page 18: FRS Document

Page 18

Sreevatsa Stainless Steel Fabricators P Ltd 2009

• Recording of Breakdown Slips and Corrective action to be captured/handled by system

• System to Flag / Highlight all such Breakdown with Pending Corrective action

• Provision to raise pr for spares/ replacement etc . to go thru approval process.

4.10 Quality Management

• Auto-Prompts for Test Results in Shop Floor

• Certificate of Analysis for Lots Passing All Tests

• Complete History of Each Test

• ISO 9000 Requirements & Documentation Support

• Manufacturing and Purchasing Quality Tracking

• Master Specifications Define Standard Testing Procedures

• Multiple Steps in Procedures Supported

• Quality Order Tracking

• Real-Time Notification of Out-of-Tolerance Conditions

• Sampling Patterns for Quality Orders

• Test Result Entry in Shop Floor Control, Repetitive, or Quality Management

• Unlimited Quality Comments on Each Test/Report

4.11 Dispatches and Reporting

• All dispatches to be Notified to Sales and approved by them

• Statutory Documents for Dispatches to be captured / handled by system

• Dispatches against Work orders to be mapped against Issues of Rm & BOM . To ensure

Production does not Divert Material Issued against one Work order to another with out the

Knowledge of the stores. Any deviations to be brought to the Attention of the

Management.

• Dispatches - returnable and Non Returnable to be handled

• EOD Report of Pending Returnable Dispatches to be Constantly Monitored

• Short Closing of Returnable dispatches to be allowed but to be authorized by top

Management

Page 19: FRS Document

Page 19

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

• Packing instructions to be followed based on sales instruction

• Packing slip to be generated by system

• Mode of transport to be finalized . External mode of transport to be approved prior to

dispatch

• To maintain Log book of all sorties of Co Owned Despatches with Mileage of Vehicle

• Responsible for Maintenance of Co Vehicle.

4.12 Job Costing

• Individual Expenditure Allocation To Job

Production Cost Information Capture

Costs Summarized by Cost Group

Exception Reporting

• Cost Overrun Reporting

Job Problem Flagging

Revenue Recognition and WIP Schedule Worksheet

Unlimited Job Cost Categories

Change Order Management System

Estimates, Purchase Orders, Work Orders & Invoicing by Project

• Machine hours to be Mapped to Work Orders.

• Labour expenses to be captured based on time cards and mapped to work orders

• All issues of Rm/ Consumables to be Mapped to Work Orders

• Subcotract items to be issued to Work orders with value addition.

• Finished Goodes to be issued to Work orders with Value addition

Page 20: FRS Document

Page 20

Sreevatsa Stainless Steel Fabricators P Ltd 2009

4.13 Financials.

• Accounts Payable

• Accounts Receivable

• Advance License Accounting

• Agent Account

• Analysis Module

• Bank Check Book Master Control

• Bank Reconciliation

• Bill Discounting

• Budget

• Budget Check/Control

• Captive Capitalization

• Cash Flow - Actual & Projected

• Check & Bank Payment Advise/Voucher Printing

• Consolidated P&L & Balance Sheet for Group Companies

• Excise Accounting

• Fixed Asset Accounting

• Fixed Deposits Accounting

• Flexible Accounting Period

• General Ledger

• Group Company Global Master

• Inter Company Fund Transfer

• Inter Cost Center Secondary Allocation

• Interest Calculations

• Letter of Credit

• Loan Accounting/Interest Calculation/Rate/Terms/Periodic Entry

• Multi Currency Payment/Receipt

• Multiple Level Trial Balance

• On Account Adjustment Against Bill

Page 21: FRS Document

Page 21

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

• Parameterized Cost Allocation

• Parameterized Integration with Inventory & Payroll*

• Party - Currency Assignment

• Party Credit Days & Credit Limit control fro Credit Management

• Post-Dated Checks

• Reversal of Voucher

• Sales Tax Set Return

• Tax Accounting

• Tax Summary

• TDS Accounting wile Payment/Receipt Transaction

• Transaction Authorization Multiple

• Transaction History Log

• Transporter Bill Passing

• Voucher Entry/Authorization/Payment

• Voucher Replication

• WIP/Shop/SC Value Added Accounting

5 Vendor Qualifications and References

All vendors must provide the following information in order for their proposal to be considered:

Example:

1. A brief outline of the vendor company and services offered, including:

• Full legal name of the company.

• Year business was established.

• Number of people currently employed.

• Income statement and balance sheet for each of the two most recently completed fiscal years

certified by a public accountant.

Page 22: FRS Document

Page 22

Sreevatsa Stainless Steel Fabricators P Ltd 2009

2. An outline of the product line-up they currently support.

3. A description of their geographic reach and market penetration.

4. An outline of their partnerships and relationships to date.

5. An outline of their current and future strategies in the marketplace.

6. Information on current software clients, including:

• Total number of current clients.

• A list of clients with similar needs using the same software.

• Evidence of successful completion of a project of a similar size and complexity.

7. References: Contact information for references from projects similar in size, application, and

scope and a brief description of their implementation.

8. A undertaking letter from the parent company if the vendor is an Implemetation Partner to be

provided at the time of award of contract in the parent company letter head.

6 Features , Budget & Estimated Pricing

Sreevatsa Stainless Steel Fab P Ltd. Is working on a fixed budget and is looking at a turnkey Licence ,

Customisation , Implemetation, integration and Training Cost.

All vendors must fill out the following cost breakdown for the implementation of their ERP system for

Sreevatsa Stainless Steel Fab P Ltd.’s project as, described in this FRS. The vendor must agree to keep

these prices valid for 60 days as of 30th November 2009. The value of the Contract will not change/escalate

during the tenure of the Project for the defined scope of work .

6.1 Deployment Models , Software Features and Vendor Responsibilities.

We are presently considering a completely web enabled Solution and the application should preferably

be accessible also through a Mobile Handset . And the User should be able to access the

database/application from remote locations and issue approvals / authorizations etc. The server of the

Page 23: FRS Document

Page 23

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

configuration specified by the vendor shall be installed at the Buyers choice of location and the vendor

shall provide in writing all necessary features/ peripheral equipments ( Like Firewalls etc) that needs to be

installed for the proper functioning of the application. The Vendor also shall advice the board on a suitable

Networking/cabling scheme to ensure accesses speed , post implementation .

The software should have features of Auto-backup of data and should not insist on offline data back-up by

personnel. Data security incase of untoward incidents like hardware or software mal functions should be

ensured by vendor.

The vendor shall active part in training of the staff and make them conversant with the software

application for the success of the implementation.

Vendor shall ensure proper implementation of Software and be proactive in bringing to the attention of the

management , any issue that may hinder the successful completion .

Vendor has to ensure defect free performance of the software post implementation and signing off . The

vendor and management to arrive at a mutually agreeable acceptance period post Signoff during which

any performance issues will be cleared by the vendor on his own accord. Any maintenance plan to come

into effect post acceptance period. The above issue to be discussed in detail by vendor and management

prior to award of contract.

Page 24: FRS Document

Page 24

Sreevatsa Stainless Steel Fabricators P Ltd 2009

6.2 Five Year Total Cost Summary

For all above deployment model listed above, provide a five year cost summary as displayed below.

Five Year Total Cost Summary

Costs Total Year 1 Year 2 Year 3 Year 4 Year 5

Hardware

Software Licensing

Third Party Software

Application Software

Documentation & Training

Maintenance

Installation

Integration

Legacy Data Loading

Project Management

Misc.

Other (specify)

Total:

Descriptions:

Hardware: List, describe, and record the cost of each piece of hardware that is required to optimally run

the software.

Software Licensing: List, describe, and record the licensing, implementation, maintenance, support, and

training fees associated with your proposed software.

Third-Party Software (Middleware): List, describe, and record the cost of each piece of software

(including operating systems) that is required to optimally run the software.

Installation: Describe any labor, equipment, supplies, or other costs associated with installing your

proposed software.

Page 25: FRS Document

Page 25

Sreevatsa Stainless Steel Fabricators P Ltd. 2009

Integration: Describe any labor, equipment, supplies, or other costs associated with integrating your

software into our current architecture and back-end systems.

Legacy Data Loading: Describe any labor, equipment, or other costs associated with importing legacy

data from current systems into your ERP software.

Maintenance: Describe and cost out any other ongoing costs associated with the operation and

maintenance of your proposed software.

Documentation & Training: If there are fees associated with your user or technical documentation, list

them here.

Project Management: If there are project management fees associated with your proposed software, list

and describe them here.

Miscellaneous: List and describe any other costs associated with your proposed software solution.

Page 26: FRS Document

Page 26

Sreevatsa Stainless Steel Fabricators P Ltd 2009

7 Vendor Certification

This certification attests to the vendor’s awareness and agreement to the content of this FRS and all

accompanying calendar schedules and provisions contained herein.

The vendor must ensure that the following certificate is duly completed and correctly executed by an

authorized officer of your company.

This proposal is submitted in response to Functional Requirement Statement for ERP Software issued by

Sreevatsa Stainless Steel Fab P Ltd.. The undersigned is a duly authorized officer, hereby certifies that:

(Vendor Name)

agrees to be bound by the content of this proposal and agrees to comply with the terms, conditions, and

provisions of the referenced Functional Requirement Statement(FRS) and any addenda thereto in the event

of an award. Exceptions are to be noted as stated in the FRS. The proposal shall remain in effect for a

period of 60 calendar days from 30th November 2009.

Person[s] authorized to negotiate on behalf of this firm for purposes of this FRS are:

Name: Title:

Signature: Date:

Name: Title:

Signature: Date:

Signature of Authorized Officer:

Name: Title:

Signature: Date:

Page 27: FRS Document

Page 27

Sreevatsa Stainless Steel Fabricators P Ltd. 2009