TASNEE BI Project -
BAYAN
Functional Specification
Document
Author : Navin Kishore Prasad
Version : V 1.0
Date : 29-Dec-2010
Status : Created
Procurement Department
- Order Processing Time
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
2/18
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
3/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 3 of 18
Functional SpecificationSAP BO Report
PROJECT IDENTIFICATION
Project Name Customer Name Customer Manager
TASNEE BOIMPLEMENTATION
TASNEE Mansoor Siddiqui
Technical Project Lead Project Manager
Balan Srinivasan Sandeep Anand
OBJECT OVERVIEW
Object ID
BAYAN_BI_PROCUREMENT_KPI_PR003
BusinessProcess
Procurement
SAP Release
To be takenfrom ProjectSchedule
SAP Module Procurement
Object Title Order Processing Time
Object Description Order Processing Time
Cycle of Testing
Three (Unit, Integration/ Functional, UserAcceptence)
RequiredDevelopmentCompletion Date
To be taken from ProjectSchedule
Complexity of ObjectMedium
Report run Daily
Report Style/TypeReport / KPI
Priority High
SAP Transaction Name
Report will be available
through SAP BO Infoview Area MenuKPI -> Procurement -> Order
Processing Time
Similar SAP Transactionzmm5, ME5A, Me2n Similar SAP
ProgramN.A.
Other Contact andPhone Number
N.A. Other Contact andPhone Number
N.A.
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
4/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 4 of 18
JUSTIFICATION
FS Number: FS_BAYAN_BI_PROCUREMENT_KPI_PR003
Report/KPI Title : PO Line Items by PO Type (Service / Material) / Buyer
FUNCTIONAL DESCRIPTION
Detailed Description Including Intended Business Purpose:
Intended Business Purpose:
This KPI will analyze the performance in conversion of a PR into PO, and present it in theform of KPI. This will give management a near real time understanding on how much time its takingfor PR to get converted into a PO.
Detailed Description:
1. This aggregated KPI will be displayed as Grid and Pie chart.2. This KPI will be based out of R/3 Table EBAN (Purchase Requisition), and EKKO (PO Line
Item).3. This KPI will consider the entire POs which has been created (Created On date (AEDAT) of
Table EKKO to be taken here) during the date Range specified in the user entry parameterscreen.
4. From EKKOAEDAT, Calendar week, Calendar Month, Calendar Quarter, need to be derived
and made available in the data pool (which can later be used in queries created by powerusers).5. This KPI will consider only PRs with Processing Status = B. Meaning there by Purchase
requisition, corresponding to which Purchase Order has been created.6. Where Document Type is NB (MRP Related PR, where PR is generated by System), there is
no release date for PR (Its released by system immediately), and hence we need to considerPR Creation date. If Creation date is not there in that case Purchase Requisition date need tobe considered.
7. For other document type consider release date. Consider the last release date, the case maybe that we have more than one modification and release to PR, in that case please considerthe last release date.
8. Logic to calculate Processing Time:If Document Type is NB
If EBAN - ERDAT is not Initial (EKKO-AEDAT)(EBAN - ERDAT)Else (EKKO-AEDAT)(EBAN - BEDAT)
Else (EKKO-AEDAT)(EBAN- FRGDT).9. This report is at Purchase Order Line Item level.10. Deleted Purchase Order / Deleted Purchase Order Line Item Level should not be considered.11. This report is at PO Line Item level, meaning there by one PO can have more than one PR,
and hence each PR line item will have different time period it took to get converted to PO.Report will be on the basis or PR Line Item (Which has been converted to PO).
12. For Material PO: We need to consider country of the vendor to classify whether its a local orForeign PO. In case of Material PO time limit to process Local PO is 15 working days, and time
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
5/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 5 of 18
limit to process foreign supplies is 21 working days. We need to consider factory calendar.Material PO Can be identified by using field EBAN / EKKO PSTYP. If this field is havingvalue 9 or D in this case its Service PO, Otherwise its a Material PO.
13. For services PO: Purchasing group will specify how long it should take to Process a PR. Belowis the table with Purchasing Group and Time it should take to Process a PR.
Cluster Purchasing Groups (EKGRP) Processing Time (in Days)
Short Term 023, 019, 030, EPS, ARC 15
Mid Term 031, 035, 025, 026, 028, 024 30
Long Term 020, 029, 034, 021, 022, 034, 027 90
14. In this KPI, we need Total number of PR line item processed within time and total number ofPR line item processed beyond time limit specified in case of both services and Material PO.
15. In the initial layout we should have one Pie chart with the %Material PO and % Service PO.16. Upon drill down on any of these two initial KPIs (Material / Services), we should have buyer
wise bar chart specifying how much has been processed within time and how much beyond
time for both material and Services. For material POs we will have two set of bar chartcorresponding to each buyer, one for domestic and another for international. For Services wewill have single set of Bar Chart corresponding to each Buyer (Within time, exceeding the timelimit defined).
17. For Reference of the scenario in production environment we have a sample PR: 1601274418. Within Dataset Purchase Order Number, Purchase Order Item, Deletion Indicator, Document
Type, Buyer, Purchasing Group, Department, Purchase Order Creation Date (EKKO AEDAT), Purchase Order Date (EKKOBEDAT), Item Category need to be maintained.
19. Buyer is not maintained in anywhere in the PR Document, whereas we do have PurchasingGroup associated with the PR Document. In current system Relation between PurchasingGroup and Buyer is not maintained anywhere. Relation between Purchasing Group and Buyerwould require to be maintained in system. Tasnee to provide the relation between PurchasingGroup and Buyer, which will be maintained in ERP system in the form of Transparent Table,Which can be edited / updated in future (if needed so).
20. Department is not maintained in the PR Document, whereas we do have Document Typeassociated with the PR Document. In current system Relation between Document Type andDepartment is not maintained anywhere. Relation between Document Type and Departmentwould require to be maintained in system. Tasnee to provide the relation between DocumentType and Department, which will be maintained in ERP system in the form of TransparentTable, Which can be edited/updated in future (if needed so).
21. This Report will be defaulted to Company Codes 2000 and 3000 in a user input variable.22. This Report will be defaulted to Plant 2000, 2100, and 3000 in a user input variable.23. Below mentioned fields needs to be maintained in the pool, so that it can be used in future for
power user to create / modify queryEKPO-LIFNR - VendorEKKO-EBELN - Purchase Order Number,EKKO-EBELP - Purchase Order Line Item,
EKKO-BEDAT - Date of Purchasing Document,EKKO-BSART - Purchasing Document Category,EKKO-BSTYP - Purchasing Document Type,EKKO-BUKRS - Company Code,EKKO-EKGRP - Purchasing Group,EKKO-EKORG - Purchasing Organization,EKKO-PSTYP - Item Category in Purchasing Document,EKKO-STATU - Status of Purchasing Document,EKKO-AEDAT - Purchasing Document Creation Date,
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
6/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 6 of 18
EBAN-BANFN - Purchase requisition number,EBAN-BNFPO - Item number of purchase requisition,EBAN-BSART - Purchase requisition document type,EBAN-BSTYP - Purchasing document category,EBAN-LOEKZ - Deletion indicator in purchasing document,EBAN-STATU - Processing status of purchase requisition,EBAN-FRGKZ - Release Indicator,EBAN-FRGZU - Release status,EBAN-EKGRP - Purchasing group,EBAN-ERNAM - Name of Person who Created the Object,EBAN-ERDAT - Date of Last Change,EBAN-AFNAM - Name of requisitioner/requester,EBAN-MATNR - Material Number,EBAN-WERKS - Plant,EBAN-MATKL - Material Group,EBAN-MENGE - Purchase requisition quantity,EBAN-MEINS - Purchase requisition unit of measure,
EBAN-FRGDT - Purchase requisition release date,EBAN-PSTYP - Item category in purchasing document,EBAN-EKORG - Purchasing Organization,EBAN-VRTYP - Purchasing document category,EBAN-GSFRG - Overall release of purchase requisitionsEBAN-LOEKZ - Deletion indicator in purchasing documentEBAN-FRGDT - Purchase requisition release dateEBAN-ERDAT - Date of Last Change
Business units that willuse this report
TASNEE Management Team
Process Area: Procurement
Name of Current LegacyReport
ZMM5, ME5A
Created by: Date Created:Navin Kishore Prasad 29thof December 2010
Report Required in Specific Languages
Country Report Required in Specific Languages /Comments
KSA English
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
7/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 7 of 18
TECHNICAL REPORTING FIELDS,KEY FIGURES,KPISAND THEIR CALCULATIONS
Reporting Characteristics:
#Field Name Data
TypeLen Deci
malsNotes
1Processing status of purchaserequisition
CHAR 1 0EBAN-STATU
2 Document Type CHAR 4 0 EKKO- BSART
3 Deletion Indicator CHAR 1 0 EKKO- LOEKZ
5Item category in purchasingdocument
CHAR 1 0EBAN-PSTYP
6 Buyer CHAR 12 0Mapping from Purchasing Group(EBAN-EKGRP) to Buyer to beprovided by Tasnee.
7 Purchasing Group CHAR 3 0 EBAN-EKGRP
8 Department 0Mapping from Document Type to(EKKO- BSART) Department to beprovided by Tasnee.
9 Item Category CHAR 1 0 EKKO-PSTYP
10 Vendor CHAR 10 0 EKPO-LIFNR
Reporting Hierarchy:
Hierarchy Name Data Type Length Notes
None
Required Time Characteristics:
# Field Name Data Type Length Notes
1Purchase OrderCreation Date
DATE 8 EKKOAEDAT
2 Purchase Order Date DATE 8 EKKOBEDAT
3Purchase requisitionrelease date
DATE 8 EBAN-FRGDT
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
8/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 8 of 18
Required KPIS / Calculated Key Figures (CKF)
Description Calculations
KP1 % MaterialCount of Purchase Order Item Document Type (Whether its Material PO Or Service PO, it will bedetermined from Item Category) wise, If Item Category is 9 or D its service PO, otherwise itsmaterial PO.
KP2 % ServiceCount of Purchase Order Item Document Type (Whether its Material PO Or Service PO, it will bedetermined from Item Category) wise, If Item Category is 9 or D its service PO, otherwise itsmaterial PO.
KP3
Buyer wise Count of Purchase OrderLine Item Processed within Time forMaterial PO
Within Time = 0Beyond Time = 0If Purchase Requisition Item Category D or 9 Then
If Document Type is NBIf EBAN - ERDAT is not Initial
Processing Time = (EKKO-AEDAT)(EBANERDAT)Else
Processing Time = (EKKO-AEDAT)(EBANBEDAT)End If.
ElseProcessing Time = (EKKO-AEDAT)(EBAN- FRGDT)
End If.End If.
If Vendor-Country KSA ThenIf Processing Time
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
9/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 9 of 18
KP4
Buyer wise Count of Purchase OrderLine Item Processed within Time for
Service PO
Within Time = 0Beyond Time = 0If Purchase Requisition Item Category = D or 9 Then
If Document Type is NB
If EBAN - ERDAT is not InitialProcessing Time = (EKKO-AEDAT)(EBANERDAT)Else
Processing Time = (EKKO-AEDAT)(EBANBEDAT)End If.
ElseProcessing Time = (EKKO-AEDAT)(EBAN- FRGDT)
End If.End If.
IF EBAN-EKGRP =023,019,030,EPS,ARC ThenIf Processing Time
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
10/18
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
11/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 11 of 18
SELECTION CRITERIA
Fields SelectionCriteria
RequiredY/N
Comments
Purchase Order CreationDate
Single Value YEKKOAEDAT
VALIDATION OF SELECTION CRITERIA
Any Authorization Check required for running report?
Authorization is based on the User-Group. The report is available to users that belong to the
Group that is authorized to view the report.
Any Authorization check required on specific fields?
No authorization check at the Field level
FUNCTIONAL SPECIFICATION DOCUMENT
FS Document Id: FS_BAYAN_BI_PROCUREMENT_KPI_PR003 Order ProcessingTime
FS Created by: Navin Kishore Praad
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
12/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 12 of 18
REPORT OUTPUT -INITIAL SCREEN
Order Processing Time (Initial Screen)Material PO Processing Status
77.4%
22.6%
Material PO Processing Status
%On Time
% Beyond Time Limit
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
13/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 13 of 18
REPORT OUTPUT -INITIAL SCREEN
Order Processing Time (Initial Screen)Service PO Processing Status
71.6%
28.4%
Service PO Processing Status
%On Time
% Beyond Time Lim
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
14/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 14 of 18
REPORT OUTPUT -FIRST NAVIGATION /DRILL DOWN
Buyer wise Material PO Li Processed (For Domestic Vendor)
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
Syed
M.Zulfiqar
Abdul
Rehman S.
Al-Ghamdi
Mohammad
Khalifa Al-
Binali
Ahmed S. Al-
Ghamdi
Marvin L.
Molina
Moosa
Arrakal
77.78%73.81%
85.94% 86.67%88.46%
34.48%
22.22%26.19%
14.06% 13.33%11.54%
65.52%
% PO Li
Buyer
Buyer wise Material PO Li Processed (For Domestic Vendor)
% On Tim
% Beyond
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
15/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 15 of 18
REPORT OUTPUT -FIRST NAVIGATION /DRILL DOWN
Order Processing TimeBuyer wise Material PO Li Processed (For International Vendor)
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
Syed
M.Zulfiqar
Abdul
Rehman S.
Al-Ghamdi
Mohammad
Khalifa Al-
Binali
Ahmed S.
Al-Ghamdi
Marvin L.
Molina
Moosa
Arrakal
69.44%
72.22%
55.26%
82.14%
88.00%
96.61%
30.56%27.78%
44.74%
17.86%
12.00%
3.39%
% PO Li
Buyer
Buyer wise Material PO Li Processed (For International
Vendor)
% On Time
% Beyond Time
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
16/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 16 of 18
REPORT OUTPUT -FIRST NAVIGATION /DRILL DOWN
Order Processing TimeBuyer wise Service PO Li Processed
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
71.62%
63.51%
80.30%
62.71%60.58% 62.07%
28.38%
36.49%
19.70%
37.29%39.42% 37.93%% PO Li
Buyer
Buyer wise Service PO Li Processed
% On Time
% Beyond Time
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
17/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 17 of 18
Reporting Key figures /KPI Formatting
Decimal Places 0 decimal places
Rounding N.A.
Variances N.A.
Formulas N.A.
Currencies N.A.
Language English
Statutory Reporting N.A.
Sorting Requirement for the report:Users will be able to sort in either ascending or descending or by any of the columns available in theoutput.
Character/KeyFigure Sort Details
None
Reporting Drill Down Requirement:
Drill-Down Field Navigation Path
None
Reporting Totaling Requirement:
Sl No Details
None
ERROR HANDLING[Include potential errors, notification procedures, and contingency procedures.]
Typical errors include: No data found for given selection criteria.
-
8/11/2019 Fs Bayan Bi Procurement Kpi Pr003 - Order Processing Time v02[1]Updated
18/18
BAYAN BI : Functional Specifications For Reports/KPIs
QMS@GDC BAYAN Procurement KPIFunctional Specs 18 of 18
RELATED DOCUMENTATION (ATTACH OSSNOTES,EMAILS,DOWNLOAD OF EXISTINGREPORT
,ETC
)