    2005-01-17

    SWECO INTERNATIONAL

    Water Supply and Sanitation Project

    Implementation Unit

    FEASIBILITY STUDIES FOR SELECTEDTOWNS FOR SECOND SMALL TOWNWATER SUPPLY AND SANITATIONPROJECT IN MOLDOVA

    FEASIBILITY STUDY REPORT

    ORHEI

    FINAL REPORT

    Stockholm 9 November2007SWECO International AB

    Water and Environment

    Project No. 1989 161 000

    SWECO INTERNATIONAL

    Gjrwellsgatan 22

    P.O. Box 34044

    SE-100 26 Stockholm, Sweden

    Telephone +46 8 695 65 00

    Fax +46 8 695 65 10

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    2/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    Table of Content

    1 Executive Summary .......................................................................1

    2 Introduction ....................................................................................8

    3 General about Orhei....................................................................11

    4 Institutional Aspects ...................................................................13

    5 Socio-economic Aspects ............................................................38

    6 Financial Aspects ........................................................................48

    7 Technical Aspects .......................................................................64

    8 Outline Design ............................................................................70

    Drawing Drawing No. Description:

    1 1989161-WS-001 Water Supply Network Present Situation, year 2006

    2 1989161-WS-002 Short-Term Investment Needs Within Water Supply

    Network3 1898161-S-001 Sewerage Network Present Situation, year 2006

    4 1989161-S-002 Short-Term Investment Needs Within Sewerage

    Network

    Error! No text of specified style indocument.2007 Error! No text of specified style in

    KAPA/var/www/apps/conversion/tmp/scratch_5/126754721.doc

  • 7/29/2019 Fs Orhei Final

    3/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    Abbreviations and Acronyms

    BOD Biological Oxygen Demand

    COD Chemical Oxygen Demand

    DSCR debt service coverage ratio

    GIS Geographical Information System

    GDP Gross Development Product

    Ha hectare

    IAS International Accounting Standard

    JSC Joint Stock Company

    km kilometre

    kWh kilo Watt hour LAN Local Area Network

    l/cap/d litre per capita per day

    MDL the currency in Moldova, Moldavian lei

    mg/l milligram per litre

    MIS Management Information System

    m2 square metre

    m3 cubic metre

    n/a not available

    NGO Non-governmental Organization

    NRW Non Revenue Water p person

    PFS Pre-Feasibility Study

    PS pumping station

    SCADA Supervisory, Control and Data Acquisition

    UNDP United Nations Development Programme

    USD US dollar

    VAT Value Added Tax

    WB World Bank

    WWPS Wastewater Pumping Station

    WTP Water Treatment Plant

    WWTP Wastewater Treatment Plant

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for OrheiI

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    4/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    Feasibility Studies for Selected Towns forSecond Small Town Water Supply andSanitation Project in Moldova

    FEASIBILITY STUDY REPORT

    ORHEI

    1 Executive Summary

    1.1 General

    Orhei town is located in the centre of Republic of

    Moldova, on the left bank of Raut River, 35 km

    north of the capital on the road between Chiinu

    and Bli. Emigration has reduced to number of

    inhabitants from 47,000 to estimated 34,000.

    This feasibility study is prepared as a project within

    the frames of a Moldovan plan up to year 2015 for

    rehabilitation of the water and sewerage systems in

    the country. The project is called The second small

    town water supply and sanitation project in

    Moldova and is considered for financing by the

    World Bank.

    The project was divided into two main phases one

    pre-feasibility phase when 15 towns all over thecountry were analysed, and one feasibility phase

    for preparation of feasibility studies for ten towns

    selected from the first 15. On recommendation of

    the Consultant and after discussions with the Client

    and the World Bank the feasibility phase inslcudes

    the following ten towns: Bli, Cahul, Cueni,

    Drochia, Fleti, Floreti, Orhei, Rcani, Soroca

    Orhei near

    Chiinu, has

    some 34,000

    inhabitants

    This study is

    part of a

    Moldovan plan

    for the water

    sector

    15 towns pre-

    analysed, 10

    selected

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei1

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    5/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    and Ungheni.

    This document contains the feasibility study for

    Apa-Canal in Orhei. This is the FS

    for Orhei

    1.2 Institutional Aspects

    In meetings with representatives for Orhei Apa-

    Canal and its owner the Consultant got a clear

    impression that they want to develop Apa-Canal

    to a good service provider in terms of water

    quality, efficiency of operations, coverage andreliability of service, and customer satisfaction

    all statements in fact representing a long-term

    goalfor Apa-Canal.

    In order to reach these goals the Consultant

    believes it important that Apa-Canal acts more

    commercially and that Apa-Canals daily

    operation is more separated from the municipal

    ownership than now. Too close political

    involvement in a company often makes decisions

    and the business in general more bureaucratic

    and slow. Apa-Canal and its management have,

    and shall further develop, the capacity and know-

    how to accomplish what the political leadership

    in the municipality demands them to do, and

    what they are paid for from the customers and

    possibly from the town budget.

    The Consultant recommends the following

    distribution of roles: 1) The political leadership

    shall decide about the level of service in the townand about the principals for finance of the

    demanded service, and 2) Apa-Canal shall fulfil

    what the political leadership has decided.

    The Consultant believes that one way to reach

    this status is to change the utility to a 100%

    municipally owned Joint-stock company with a

    board consisting of for instance five to six

    persons representing different know-how and

    Orhei Apa-Canal

    seems committed

    to improvement

    Political influence

    too frequent

    Make clear

    division of

    responsibilities

    Commercialisation

    is important for

    efficiency

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei2

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    6/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    interests. The Consultant therefore recommends

    the Town to seriously consider this possibility -and perhaps other possibilities - in order to

    improve the efficiency of the company.

    The Consultant also recommends Apa-Canal to

    prepare an asset inventory including asset

    evaluation and performance and condition

    grading. This is important for qualified asset

    management and operations management and

    for determination of realistic asset values to be

    used for depreciation in the financial reporting.

    In order to better use the capacity and interest of

    all the personnel in the utility the presently

    practiced detailed top-down management and

    control model (management by directive) should

    be changed to more Management by Objectives

    and to a concept of Accountable Managers.

    Accountable managers would have delegated

    responsibilities and would normally be the

    functional Heads in the company; e.g. Head of

    Water Treatment Station, Head of Wastewater,

    Head of Networks etc.

    The bad condition of the water and wastewater

    facilities demands of course intensive and

    correct daily operation. In addition to this Apa-

    Canal is recommended to develop and

    implement a long-term business strategy - at

    least for the next 20 years and change focus

    from the presently dominating daily operation

    and emergency activities to a strategic long-term

    focused management. Preparation of a qualifiedBusiness Plan would support managers to

    include both short-term and long-term aspects in

    their work to develop the utility.

    The number of staff is, despite already carried

    out reductions, extremely high 6 staff / 1000

    inhabitants and constant efforts to further

    reduce this ratio must have high priority. Beside

    improved physical assets constant improvement

    Asset inventories

    needed

    Delegate

    responsibilities

    and make

    accountable

    A Business Plan

    would help to

    balance between

    short- and long-

    term measures

    Number of staff is

    extremely high,

    education needed

    to support

    reduction.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei3

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    7/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    of the quality of the personnel is important for the

    further staff reduction. The Consultant thereforeidentified a number of specific areas of training,

    which will enhance the skill and knowledge levels

    within relevant staff and greatly assist in

    ultimately reducing Apa-Canals costs.

    Good relations with the customers are crucial for

    instance for their willingness to pay for the

    service and consequently for increased incomes

    for Apa-Canal. The heart of good customer

    relations is to meet or exceed customers

    expectations and, when failures occur, to acceptresponsibility and take positive action. The

    Consultant has therefore prepared a list of

    suggested customer service standards which

    Apa-Canal may further develop in addition to

    Moldovan state regulations governing the

    provision of water and wastewater services.

    Customer

    relations must be

    improved to

    increase

    willingness to pay

    1.3 Socio-economic Aspects

    With industries active in many different sectors,

    Orhei seems to have a good industrial base; it also

    showed little better than average growth during the

    last years.

    Healthy

    industry

    The calculation of the household monthly revenue

    at local level is difficult to accomplish in most

    Eastern European Countries. The situation is

    similar in Moldova. Usually the National

    Commission for Statistics (or similar entity)

    calculates the average household revenues atnational level without giving any values for county

    or local level.

    We estimate the salary levels are 15% lower in

    Orhei than the national average in Moldova. Still,

    we find the costs for water services affordable as

    they consume 2 % of average household incomes.

    Household

    revenues are

    difficult to

    estimate

    Although

    salaries are

    low, water

    costs are

    affordable.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei4

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    8/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    During the period June 15 till July 15 a survey was

    conducted in order to find the general perception ofthe population regarding the water and wastewater

    activity of the utility. For the purpose of the survey a

    representative sample on the basis of: education,

    age, gender considering the population from 6

    towns of Moldova: Bli, Cueni, Ungheni,

    Nisporeni, Leova and Cahul.

    Water is clearly reaching the utmost importance in

    all towns. Population wants to access all communal

    services, without discrimination, but rank water on a

    top of the options.

    Regarding the improvement of quality of water

    services during the last years, the general

    perception is that in most of the cities there were

    not recorded major achievements and the quality of

    the services remained the same or even worsened.

    People are willing to pay 35-50 Lei monthly for

    good water services. With improved customer

    relations and better understanding of the utilitys

    cost people can become willing to pay more.

    A willingness-

    to-pay surveywas conducted

    in 6 towns.

    Water is

    important..

    ..but quality is

    a (increasing)

    problem

    Willingness to

    pay is there

    and can be

    improved

    1.4 Financial Aspects

    Based on the analysis of the historical

    performances and considering the macroeconomic

    scenario envisaged by the authorities, a financial

    forecast for the period of the credit was prepared in

    order to generally assess the maximum level of the

    credit that can be contracted. A sensitivity analysis

    is performed in order to better assess the impact in

    variations of assumptions on the level of the creditand on the capacity of the utility to repay the

    proposed credit.

    The delayed adjustment of tariff compared with the

    cost increases had a negative impact on the

    performances of the water utility. The water utility

    cannot control the tariff adjustment process, which

    is the prerogative of the Local Council. The water

    utility can propose tariff increases based on cost

    Forecast 2007-

    2036 was

    developed

    The slow tariff

    development

    is a problem

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei5

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    9/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    increase but the Local Council takes the final

    decision, often with more attention to politics than tothe welfare of its company.

    The level of account receivables is relatively low

    showing a good collection level and the cash flow is

    positive.

    The financial model shows a stable cash flow

    development that under normal circumstances will

    secure repayment of credits. There are, however,

    three potential risks that not are under the control of

    the management team and that can affect the

    repayment capacity of the utility:1). The tariff adjustments;

    2). The energy price increases; and

    3). The salary increases.

    Cash flow is

    positive

    Forecast look

    stable, but

    some risks

    must be

    mitigated

    1.5 Technical Aspects

    This Feasibility Study has its main focus on water

    supply and sanitation investments. Main

    investments proposed are related to water supplynetwork renovations and designing new WWTP.

    Both Water and

    Sanitation sector

    investments isthe focus of this

    study

    Estimates of the short-term investments required

    to secure that the water supply and sanitation

    systems in Orhei can operate acceptably were

    prepared for the period of years 20072009.

    Small scale investment packages were also

    prepared, with the aim to provide suitable

    financing packages for potential financiers.

    Short-term

    investments to

    secure

    sustainable water

    and sanitation

    services and

    some expansion

    Estimates of medium-term investment needs were

    prepared for the years 20102013 in order to

    secure sufficient medium-term operation of the

    water supply and sanitation systems, as well as to

    provide proper wastewater treatment for town of

    Orhei and water supply for increased number of

    inhabitants in Orhei.

    Medium-term

    investment to

    secure medium-

    term water

    supply and

    sanitation

    services and

    proper ww

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei6

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    10/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    treatment

    Medium-term investments are not included in the

    outline design, which was prepared only for

    proposed short-term investments. Also the

    prioritization order for needed investments was

    done only for proposed short-term investments.

    Only short-term

    investments are

    designed

    Renovation of pressure pipeline from natural

    spring and connection of southern pressure zone

    to northern pressure zone was considered to bemost feasible in terms of needed short-term

    investments. Other feasible short-term

    investments prioritized were rehabilitation of

    existing water supply network preparation of detail

    design for new WWTP.

    Proposed short-

    term investments

    were prioritized

    Preliminary investment cost estimation for

    proposed short-term investments was 5.6 MUSD

    in total. Investment cost estimation for short-term

    investments needed on sewerage sector was 1.1

    MUSD and for water supply sector 4.5 MUSD.

    Preliminary

    investment cost

    estimations for

    proposed short-

    term investments

    were prepared

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei7

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    11/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    2 Introduction

    2.1 Background

    The Republic of Moldova has prepared a Plan up to year 2015 for

    water supply and sewerage. The Plan is a part of a complex of

    processes for rehabilitation of water supply sources and for

    increasing of the technical and sanitary condition of the water supply

    and sewerage systems, stipulated in the National Action Plan for

    health in relation to environment, approved by Government Decree

    no.487 dated June 19, 2001.

    The main scope of the Plan is solution of a set of problems, with

    organizational, technical, economical and legal character. Solving

    these will assure stable and continuous operation of centralized and

    decentralized water supply and sewerage systems.

    The scopes of the Plan are the following:

    Contribution to wealth increase and health protection of the

    population;

    Rational use of water

    Protection of environment;

    Protection against pollution and depletion of sources of water

    supply;

    Reasonable management of capital investments.

    Rehabilitation of the quality of services provided to consumers

    Increase of economic efficiency of water supply and sewage

    collection utilities operation

    Reducing by 50% of the number of population (about 1 million.inhabitants), which have not access to safe water supply.

    2.2 Project Objectives

    The project is called The second small town water supply and

    sanitation project in Moldova and is considered for financing by the

    World Bank. The ultimate objective of the project is to enable Apa-

    canals in selected towns to supply the population with continuous,

    efficient and sustainable water and wastewater services over time.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei8

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    12/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    The project is divided into two main phases one pre-feasibility

    phase when ten out of fifteen towns should be selected forparticipation in the subsequent feasibility phase.

    Pre-feasibility studies were carried out and delivered in June 2007.

    The ten towns recommended for preparation of feasibility studies

    were: Bli, Cahul, Clari, Cueni, Drochia, Fleti, Floreti, Orhei,

    Rcani and Ungheni.

    During the pre-feasibility phase Soroca Apa-Canal expressed that

    they did not want to participate in any credit financed project due to

    an already too heavy credit burden. In discussions between Soroca,

    the Client and the World Bank after the pre-feasibility study period itwas anyway decided that Soroca should be one of the ten towns

    selected for preparation of feasibility studies1. Therefore, the list now

    contains Bli, Cahul, Cueni, Drochia, Fleti, Floreti, Orhei,

    Rcani, Soroca and Ungheni.

    This document contains the feasibility study for Orhei.

    According to the Terms of Reference four Aspects should be

    analysed: the institutional, the socio-economic, the financial and the

    technical aspects. All these aspects were analysed during the pre-

    feasibility phase according to the Terms of Reference especially the

    three first ones. All the four aspects are analysed also in the present

    feasibility phase, now with deepened technical analyses and

    recommendations.

    2.3 Consultants Time Schedule

    Figure 2.1 presents a simplified time schedule for the whole project

    period including Pre-Feasibility Phase and Feasibility Phase.

    According to an agreement in June 2007 between the Client, the

    World Bank and the Consultant there are now three deadlines for thedraft feasibility studies, one for Soroca, one for Cueni and one for

    the remaining eight towns. The time needed for the Clients

    comments is not exactly specified in the contract and therefore only

    roughly indicated in the time schedule.

    1 As Clari had the lowest scores among the ten towns recommended in the pre-

    feasibility study, this town will not be further analysed during the feasibility phase.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei9

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    13/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    Month Apr May June July Aug Sept Oct Nov Dec

    Activity

    Project start

    Pre-feasibility study

    Draft feasibility study for Soroca

    Draft feasibility study for Cueni

    Draft f easibility study for 8 towns

    Client's comments (assumed time)

    Final feasibility study for 10 towns

    2 weeks after Client's coments.

    Figure 2.1 Modified time schedule for the project period.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei10

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    14/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    3 General about Orhei

    Orhei town is located in the centre of Republic of Moldova, on the left

    bank of Raut River, 35 km north of the capital on the road between

    Chiinu and Bli.

    Figure 3.1 Location of Orhei

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei11

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    15/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    The official number of inhabitants was a few years ago 47,000. The

    real number is now, considering emigration to Chiinu and to othercountries and immigrants from the surrounding rural areas, estimated

    to around 34,000 inhabitants. A census was carried out during the

    summer 2007, but the result is not available when writing this report.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei12

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    16/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    4 Institutional Aspects

    4.1 General

    According to the contract for the project most of the institutional work

    was carried out during the pre-feasibility phase of the project. During

    the feasibility phase the work should be concentrated on Need for

    staff training and other forms of institutional strengthening. As a

    background for easier understanding of the discussions and

    proposals in this feasibility study some of the findings already

    presented in the pre-feasibility study are repeated here.

    4.2 The Owner. How the Owner Governs Apa-Canal

    Present Situation (Text from the Pre-feasibility study)

    The Town is the only owner of the service utility. The utility consists of

    one of the departments of the Town Administration.

    The Town Council appoints the Director of the utility, and he reports

    to the Deputy Mayor responsible for technical questions. Beside he

    also reports twice per year to the Town Council. Tariffs andconsumption norms are approved by the Town Council.

    The Town has no service agreement with Apa-Canal describing for

    instance the level of service.

    Consultants Comments

    In meetings and other contacts with representatives for the town and

    Apa-Canal in Orhei the Consultant has got a clear impression that the

    Town Councils purpose with Apa-Canal is to ensure the customers in

    Orhei reliable, high quality water supply and sewage treatmentservices in a cost effective and affordable way with a minimum impact

    on the environment.

    It is therefore important for the owner to understand that the

    institutional framework of a company is crucial for its efficiency. It

    determines the incentives for different parties concerned to deliver

    desired outputs. It also determines how the performance in achieving

    objectives is monitored and assessed. The key to a successful

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei13

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    17/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    institutional development lies thus in designing the institutional

    framework as well as the structure of the enterprise, so that rights,duties, incentives and sanctions produce outputs meeting the goals

    both of the owner and of the society as a whole. In discussions with

    the Mayor of the town, thus the representative of the owner, and the

    Director of Apa-Canal these facts seem to be well understood.

    According to the Consultants understanding, the situation in Orhei

    may also be described so that the local authorities as well as the Apa-

    Canal managers are interested in continuing the already started

    development of Apa-Canal to a good service provider in terms of

    water quality, efficiency of operations, coverage and reliability of

    service, and customer satisfaction. Each part of such a statementrepresents a long-term goal for Apa-Canal, in all probability

    demanding changes relating to the ownership and operation not

    only technical improvements through physical investments. In order to

    realize these statements there is a need for great efforts from all

    parties involved during long time.

    In order to reach the mentioned long-term goals, including optimal

    development of the efficiency of Apa-Canal, the Consultant believes it

    important that Apa-Canal acts more commercially and that Apa-

    Canals daily operation is separated from the municipal ownership.

    The cooperation between the owner and the utility seems presently to

    function well. However, usually too close political involvement in a

    company makes decisions and as well as business in general more

    bureaucratic and slow, and this might also be the situation in Orhei

    with other individuals than now involved. Apa-Canal and its

    management have, and shall further develop, the capacity and know-

    how to accomplish what the political leadership in the municipality

    demands them to do, and what they are paid for from the customers

    and possibly from the town budget.

    The Consultant recommends the following distribution of roles: 1) Thepolitical leadership shall decide about the level of service and about

    the principals for finance of the demanded service, and 2) Apa-Canal

    shall fulfil what the political leadership has decided. The Consultant

    recommends this to be specified in a performance agreement

    between the town and Apa-Canal.

    Such a situation may to some extent be compared with management

    by objective in a company, which properly handled may result in a

    win-win situation, when the subordinate has a more free and creative

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei14

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    18/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    work increasing his motivation, and the superior may concentrate on

    other more qualified tasks than using a major part of his timecontrolling his subordinates. This kind of leadership often results in

    better work at less cost. See more under section 4.4.

    The present form of municipal company in Orhei might function well

    and give a possibility to distribute the roles of the owner and operator

    as described above. The Consultant recommends, however, the town

    to reflect on changing the utility to a 100% municipally owned Joint-

    stock company with a board consisting of for instance five to six

    persons representing different know-how and interests. The board

    could have representatives from the municipality, specialists from a

    university in Moldova, market and business specialists, technicalspecialists, a representative for an NGO etc. The board is important

    for the strategic management necessary for efficient guiding of Apa-

    Canal to a modern commercial company. Besides functioning as the

    government of Apa-Canal it should be a resource for the Director in

    his difficult task of managing the company.

    Important advantages with a joint-stock company (JSC) are in many

    countries, and probably also in Moldova:

    Autonomy with clear roles, responsibilities and rights for the

    owner and for the company.

    Financial freedom and possibilities increases.

    Less bureaucracy resulting in more rapid decisions.

    Direct contact with the market and a feeling for the market.

    The company will have its own board. A board composed of

    carefully selected members is important not only for the

    companys long-term strategic development but also as a

    resource for the director when managing a company.

    Internationally there exist a number of forms for ownership and

    operation of water service utilities. In e.g. Sweden, Finland, Norway,

    Denmark, Netherlands and Germany the completely dominating legal

    form is just a municipal administration. In e.g. France, and especially

    in UK, private arrangements are dominating. Also in many countries

    with a low water and wastewater standard in need of major

    improvements, different kinds of private arrangements are common.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei15

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    19/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    Countries and municipalities have thus chosen different legal status

    and governance for their water and wastewater services. This showsthat there is no absolute, objective truth that one or another solution is

    the best. The reason for the existence of different solutions may be

    historical, e.g. that it started as a municipal responsibility, or it might

    be the technical or economic situation of the utility, demands from

    funding agencies, social considerations due to the fact that the water

    utility is a natural monopoly, a subjective conviction that one solution

    is more efficient than another, a political idea etc.

    Considering efficiency private engagement or personal incentives

    often gives the best result for a business. This is the case also in for

    instance most Swedish services, although water and wastewaterutilities, despite almost 100% municipally owned and operated, are

    highly efficient due to e.g. political pressure, outsourcing of non-core

    activities, high transparency, free and efficient media, free and active

    NGOs and efficient benchmarking. A few of these facts are

    commented below.

    Outsourcingcan be seen as a privatization of parts of the company

    and a concentration to the core business. Both the remaining core

    business and the outsourced parts may gain from this. For instance

    are, according to the Consultants experience, private companies also

    in former Soviet countries more efficient than municipal companies -

    the more private engagement and incentives though more efficient

    company.

    A high degree oftransparencyis crucial for democracy in general but

    also for the customers (owners/voters) trust in the utility and

    willingness to pay tariffs allowing full cost recovery and financial self-

    reliability.

    Benchmarking may be defined as a process of comparing

    business practices and performance levels between companies(or divisions in the same company or comparison betweendifferent periods of the same company) in order to gain newinsight and identify opportunities for making improvements.The key elements of benchmarking are simple: at its core,benchmarking is about systematically comparing theperformance of operations with a view to stimulatingperformance improvement either from the shock value of thecomparison or from the extraction of the principles of bestpractice from high(er) performing operations. It is this

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei16

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    20/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    combination identifying differentials in performance or

    processes and then using this information to leverageimprovement, learning and change, which best characterizesbenchmarking.

    Systematic benchmarking, when comparing a number of carefully

    chosen key ratios indicating the performance of the utility, may be an

    efficient tool for the owners monitoring of the utility and for the utilitys

    own efforts to improve its efficiency.

    For the benchmarking it is important to identify which processesshould be benchmarked. Reliable statistical data should be

    prepared, preferably a sequence of data during a certain period.The ratios should cover different aspects of the efficiency, forinstance normal financial ratios. The ratios could also covermore apprehensible or tangible facts, for instance number ofdamages per kilometre of pipes, number of employees per1,000 inhabitants, costs per operational unit or department, etc.

    To summarize the above comments the Consultant recommends the

    Town Council of Orhei and the management of Apa-Canal to go

    through different opportunities and tools for management, ownership

    and government of the utility and then, based on a goal stating that

    Apa-canal shall provide Orhei with reliable, high quality water supply

    and sewage treatment services in a cost effective and affordable way

    with a good coverage, a minimum impact on the environment and a

    high customer satisfaction, continue to develop not only the technical

    facilitates but also the institutional situation including the legal status

    and form of government.

    In addition to the above text, see also Consultants comments under

    Section 4.4.

    4.3 Legal Aspects

    Present Situation (Text from the Pre-feasibility study)

    The enterprise has its own statutes but no separate service

    agreement with its owner describing for instance the level of service

    to the customers.

    Consultants comment:

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei17

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    21/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    Independent from the legal status chosen for the utility, but especially

    if it would be changed to a Join-Stock Company, the Consultantrecommends Apa-Canal and the Town Council to prepare a service

    agreement.

    A service agreement is in this case a contract between the Orhei

    municipality and Apa-Canal. The service agreement will be a good

    tool for both parties in order to define what service the Town

    demands and Apa-Canal shall deliver, define the quality of service

    and its improvement. The Town may also use it as a control and

    monitoring tool allowing the Town to follow the effect of the work for

    improvement of Apa-Canal and its tasks specified in the agreement

    and related documents, e.g. a business plan. Depending on thecontent of the agreement it might also help the Town and Apa-Canal

    to formally capture and respond to comments from customers and

    other stakeholders and use this for further development of the utility.

    In the service agreement Apa-Canal can agree to:

    effect the restructuring tasks and responsibilities specified in the

    agreement and in a business plan recommended by the

    Consultant;

    present to the Town Administration written quarterly and annualprogress reports about the performance of the implementation of

    the agreed activities (normally specified in a business plan);

    follow the demands and instructions from the Town

    Administration based on results from their control and monitoring

    of Apa-Canal and its tasks.

    As long as Apa-Canal is a municipal service enterprise, efforts

    relating to regulatory and institutional development may also be

    included in the service agreement. This may include management

    training, operational management, core business / non-core businessevaluation, cost cutting strategy, financial management and increased

    human resource management.

    When preparing a service agreement, it might be suitable to compare

    with a private contract, especially ifOrheiApa-Canal is transformed to

    a JSC, as a private company is directing towards profit maximisation.

    Apa-Canal is also according to its charter a profit making company,

    and there may be possibilities to introduce improved profit thinking

    also in this type of company and introduce relevant financial

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei18

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    22/92

    r

    ao1e

    2005-01-17

    SWECO INTERNATIONAL

    indicators parallel to other performance indicators. At least a few of

    the indicators in a service agreement for Apa-Canal should be linkedto costs.

    Present Situation (Text from the Pre-feasibility study)

    The Municipality is the owner of all the assets including both water

    and wastewater facilities. The enterprise operates these facilities.

    Consultants comment:

    The Consultant recommends OrheiApa-Canal to prepare a good

    asset inventory including a) asset evaluation and b) performance andcondition grading. This is important for qualified asset management

    and operations management. Cost evaluations of the assets will help

    to determine realistic values to be used for depreciation in the

    financial reporting.

    It is recommendable to put data into a computerised operational

    database. A person within a production department under the chief

    engineer may be responsible for data entry, validation and reporting,

    possibly supported by external specialists. Data held in an Excel

    spreadsheet format makes possible future updating, retrieval and

    reporting.

    Present Situation (Text from the Pre-feasibility study)

    Beside the national legislation Orhei has local rules for metering,

    wastewater discharge from enterprises to the municipal system and

    regulations on payment for being a client. Apa-Canal has written

    agreements with all its customers.

    Consultants comment:

    The situation in Orhei seems presently to be good. The local rules

    and agreements should of course be looked through and perhaps

    amended then and then.

    4.4 Organization and Management

    Present Situation (Text from the Pre-feasibility study)

    The organization chart for the enterprise is presented below.

    Water Supply and SanitationImplementation Unit09 November 2007 FINAL

    Feasibility Study Report for Orhei19

    P:\ 1080\01 Uppdrag\1989161000 FS 15 Towns Moldova

  • 7/29/2019 Fs Orhei Final

    23/92

    Figure 1 The Organization of Orhei Apa-Canal

    L a w ed e p -

    Safetydep-t

    Repairstation,

    garage

    Equipmentrepair

    station

    ecanic

    metrological

    station

    Wastewater

    tecnologydep-t

    Ecologicaldep-t

    Laboratory

    Planingdep-t

    HRsection

    Economydep-t

    Birouleconomic

    BiroulTPP

    Procurement&

    marketingdep-t

    Economydep-t

    Accountingdep-t

    Accountingdep-t

    Metrologydep-t

    Economydep-t

    Biroulfinanciar

    Biroulcontabil

    Secretary

    IToffice

    Sectoreviden

    ,

    controlapometre

    casa

    constructionteam

    operators

    Welder

    teamN1

    teamN2

    teamN3

    Machinists,

    operators&weldersof

    chlorineequipment

    drivers

    Welder-a

    uto

    Weldersteam

    welders-metrolo

    gists

    Loae

    rs,

    mash.opera

    tors

    Dispatcher-auto

    Serviceteam

    Emergencyteam

    Heatingservice

    Maitenancedep-t

    Laboratorytecn.team

    Deretictoare

    Brigadainstala

    rei

    deservire

    Oficiulca

    lcul

    echipadeco

    ntrol

    Magazio

    neri

    Ca

    sa

    S e r v i c i u l

    c o n tr a c t ,a bo na m e ,

    f a c tu r r i

    M a n a g e r- i

    officeassistant

    H e a d o f T r a d i

    P r o d uc id e p - t

    S e c ia"P re st is e r v i c i i

    G u a r d i a n

    Waterintake,

    pumping&

    maitenance

    W a t e r s u p pl D e p - t ot e c n o l o g

    e c o l o g y

    W a s t e w ad e p a r t - t

    G u a r d i a n

    S e w e r n e td e p - t

    G u a r d i a n

    Pumping&

    maitenancedep-t

    dispatchere

    &.publicrelations

    dep-t

    T e ch ni c al D i

    H R d eE n e r ge id e p - t

    D e p - t o f d e v e l o p - t i

    .M . R E G IE I " A p -C a n al " O rh e i

    F i n a n ca c c o un i

    d e p - t

    H e a d o f e c on o i

    O r ga n ig ra m a

  • 7/29/2019 Fs Orhei Final

    24/92

    The Director has worked in his present position since 2004 but came

    to the utility already 1978. He was at the utility 1978 and has worked

    as electrician, head of a department, chief engineer and technical

    director.

    The utility has a formal management team working almost as a sort of

    owners council. It consists of a few persons from the utility, often

    heads of departments elected by the Director, plus 2-3 persons from

    the Town Council and one from the Town Administration. The

    persons representing the town are appointed by the Town authorities

    and are not paid for their work in the management team. Written

    regulationsfor the management team are just now under preparation.

    The management team are controlling and supporting the director. All

    major questions are discussed in the management team. When the

    management team has discussed and approved a question, it is

    normally not necessary to take it up with the Town Council. The

    management team does not deal with the daily operation of the utility.

    The management team is using a fixed agenda and writing minutes of

    meetings.

    For the daily operation of the utility the Director has a meeting every

    day with the head of production and other heads of departments.

    Apa-Canal has an integrated management information system. The

    system includes computers and software for accounting, for technical

    purposes and for commercial and billing, although it must be partly

    upgraded, especially for the commercial and billing. Information isopen and spread in all directions in the utility.

    Apa-Canal has prepared a very good document called Feasibility

    Study March 2007. There the company has defined its mission and

    strategic objectives. There is also a table listing approximately 40

    indicators, of which many can be used as performance indicators in

    a possible future business plan.

    The company uses to some extent principals of accountable

    manager and management by objective. The Director and theheads of different groups agree a budget. If a group can work reach a

    better result than the budget, 50% of the profit go to a bonus for the

    group members, 25% go to activities for the development of the

    group, 14% to the management of Apa-Canal and 11% to others

    outside the group but involved in the result. The latter may for

    instance be the companys lawyer.

    The agreements with the group leaders are written. Goals and

    performance indicators are specified (operational costs, water losses,

    energy consumption and good management for the group).

  • 7/29/2019 Fs Orhei Final

    25/92

    Consultants comment:

    The existing formal management team in Orhei seems to work at

    least partly as a sort of owners council or board of directors. This is

    an interesting idea, which seems to function well. See, however, also

    Section 4.2, where the Consultant discusses the Owners government

    of the utility. The Consultant believes that a development towards the

    situation discussed there would be of interest to consider for Orhei.

    The written regulations for the management team were still under

    preparation during the Consultants visit to Orhei and not available.

    Also as long as the utility is working as the present Municipal

    Company, the regulations could more or less include the same type

    as the corporate governance framework as for a joint-stock company.

    Management by objective.

    The type of management in Orhei Apa-Canal seems to be less

    dominated by detailed top-down management and control

    (management by directive) then in many other utilities visited. The

    Consultant judges this to be very good for the continued development

    of the utility. Although this already rather well developed type of

    management of the utility, there are always possibilities for further

    improvements. In meetings with the Major, the Director and others in

    Orhei management by objectives and the concept of Accountable

    Managers were discussed. These management models seemed to be

    known and also partly used, but the Consultant repeats them anyway

    briefly below.

    In contrast to many other management models, for instance

    management by directive, where objectives flow from the top of the

    hierarchy down, management by objectives presumes that every unit

    manager and employee has a primary responsibility for the

    implementation of his tasks or the establishment of his units

    objectives. A typical approach is that a superior and a subordinate

    meet and discuss goals (defined in terms of results) for the

    subordinate. The goals are often of two types. One sets forth the

    subordinates unit goals and relates them to overall organizational

    goals. The second sets usually aims at personal development goals

    for the subordinate. (See also Staff Review Scheme under Section4.5 point 7.) The goals should be stated in terms of results and

    indicate an area of activity and performance level. It is important that

    goals are realistic, clearly formulated in few words and are

    understood and accepted by both parties. For example, a production

    manager may agree to reduce production costs by 5% during the next

    year. In a later meeting the superior and subordinate evaluate the

    performance in terms of stated goals.

    Although management by objectives, as all management models, has

    its limitations, it usually uses the capacity, ability and experience of

  • 7/29/2019 Fs Orhei Final

    26/92

    the subordinate in a much better way than a detailed top-down

    management and control model. It stimulates the creativity of the

    employees. It increases motivation especially if it is combined with

    some sort of benefit, e.g. a share of gained result, improved working

    conditions, better carrier possibilities etc. Properly handled both

    parties may be winners the subordinate who may have a more free,

    creative and profitable work, the superior who may concentrate more

    on other tasks than detailed direction and control of his subordinates,

    and the company who may deliver better service to the clients at less

    costs. Therefore the Consultant believes it is of interest for Apa-Canal

    to continually further test and develop its already started use of

    management by objective in systematic and judicious way.

    Accountable Managers

    Partly related to the above described management model is the

    concept of Accountable Managers, which also is at least partly

    introduced into the management structure of Orhei Apa-Canal.

    Accountable managers shall have delegated responsibilities and shall

    normally be the functional Heads in the company; e.g. Head of Water

    Treatment Station, Head of Wastewater, Head of Networks, Head of

    Transport, etc.

    The managers shall receive budget allocations and management

    information reports indicating unit cost performance and overall

    performance against issued budget.

    The idea is that the managers shall utilise a combination of these

    reports to control expenditure and undertake performance analysis

    and comparisons. The reports may also enable senior management

    to use benchmarking to compare Orhei Apa-Canals performance

    with other Apa-Canals. The performance data can furthermore be

    used for decision making regarding outsourcing.

    Organizational Changes

    The organization of Apa-Canal may need to be strengthened and

    clearer in order to meet the requirements of daily operation, planned

    maintenance, investment activities and long-term strategic planning.

    The present technical and financial situation makes it of coursenecessary for the management to concentrate lots of efforts on the

    daily operation and emergency activities, but the focus must be

    changed to include also a more long-term view, something requiring a

    strong management of Apa-Canal. Therefore the Consultant

    recommends Apa-Canal to analyze and maybe modify its

    organization in order to simplify and strengthen the daily activities and

    long-term planning as well as the decision making process. As a

    starting-point it is necessary to clearly pinpoint the most important

    activities in the company. Under a strong and long-term focused

    management these activities are:

  • 7/29/2019 Fs Orhei Final

    27/92

    Daily operation and emergency activities;

    Maintenance and investment activities;

    Economy and Customer Service;

    Supporting Services.

    Especially needs focus on long-term managementand businessstrategies to be further strengthened and developed in order to meet

    the future requirements of a more business driven organization within

    frames given by the owner (the Town) and to fulfil the service

    objectives for the customers There may therefore during the coming

    intensive years of investments and institutional development be a

    need to have in the organization a separate person, who together

    with the Director has the main responsibility for the long-term

    strategic development of Apa-Canal. There is already a position in

    Apa-Canals organization chart called Department of development

    and investment. The person having that position could perhaps take

    care also of the long-term strategic development, but it is moreprobable that a separate person during a couple of years would be

    more efficient.

    The role of Orhei Apa-Canal as a customer service companyhas to

    be emphasized.

    Development and implementation of a long-term business strategy(at

    least for the next 20 years) for Apa-Canal is necessary. The long-term

    business strategy should include, for example, the following strategic

    issues: Level of Services to be fulfilled (Customer related). (See also

    the table Suggested Customer Service Standards in Section

    4.7) ;

    Environmental, Quality and Technical requirements;

    Improvement of the effectiveness in the daily operation;

    Improvement of the effectiveness of planning and

    implementation of the maintenance activities;

    Improvement of the effectiveness of planning and

    implementation of investments.

    A business adapted investment programme (partly developed in this

    feasibility study) is also seriously needed, as international financiers

    need to be fully convinced that grants and credits will be properly

    handled by Apa-Canal and the Town.

    The IT office has now a very low position in the organization. It is

    under the Accounting department which is under the Contract,

    customer and invoicing department which is under the Head of

    Trading department. IT covers, or will at least cover, more than just

  • 7/29/2019 Fs Orhei Final

    28/92

    accounting and Apa-Canal should therefore consider moving it higher

    up in the organization, perhaps even directly under the Director.

    See more comments relating to the organization under Section 4.6

    Staff Structure below.

    Business plan

    Orhei Apa-Canals Feasibility Study from March 2007 includes partly

    what is normal for a Business Plan. The Consultant anyway

    recommends Apa-Canal to prepare and annually update a more

    complete annual Business Plan (Corporate Development Plan)

    describing e.g.

    the utilitys Mission in Orhei,

    the utilitys Vision defined as a guiding star to strive towards

    and

    the main Strategic Objectives such as Institutional objectives,Financial objectives, Society and Customer objectives,

    Operational and technical objectives and Human resources

    objectives.

    The Business Plan should also define a number of concrete goals to

    achieve, goals crucial for Apa-Canals efforts to move towards the

    vision. The Business Plan should furthermore include an Action Plan

    specifying:

    activities in order to reach the goals,

    individuals appointed to be responsible for implementation of

    each activity,

    deadlines when each of the activities shall be completed and

    performance indicators making it possible to measure the

    progress towards each goal.

    The purpose of the Business Plan would for instance be to:

    Promote strategic development of Apa-Canal and facilitate

    guidance and supervision provided by the Town of Orhei Convince the financiers of the viability and sustainability of Apa-

    Canal operations in order to attract funding for investments

    Lead management development and organizational

    restructuring at Apa-Canal

    Enhance staff interest and motivation

    Attract new talent to Apa-Canal

    Present Apa-Canal to customers and suppliers as a competent

    and reliable business partner

  • 7/29/2019 Fs Orhei Final

    29/92

    Create a favourable image of Apa-Canal internationally

    Attract potential investors and partners

    The Business Plan could contain inter alia:

    a proposal for changed legal status;

    proposals for new and higher tariffs, as well as other financial

    changes for improved financial status;

    a financial model for simulation of the consequences of different

    decisions and situations;

    development of management information systems;

    short-term and long-term investment plans;

    an environmental policy;

    proposals for improved contacts with the customers;

    proposals for cost savings, improved organization and

    development of the personnel.

    4.5 Staff. Efficiency and training needs

    Present Situation (Text from the Pre-feasibility study)

    The total number of personnel in the enterprise is now 203.

    Total number of consumers 23,961. The productivity in the water

    services based on this figure is therefore around 118 customers peremployee.

    The number of households connected to water services is 10,903,

    and the number of commercial and budget organizations is 281. The

    productivity in the water services is therefore around 55 customers

    per employee.

    The number of households connected to the wastewater services is

    5,914. If adding some 250 commercial and budget organizations, the

    productivity based on wastewater customers is around 30.

    The number of connections to the water system is according to

    received information 5005 resulting in a productivity of 25 connections

    per employee. This is probably only population connected, and if 229

    business companies and 20 budget organizations are added, the

    productivity figure is slightly better.

    The number of connections to the wastewater system is 3,600.

  • 7/29/2019 Fs Orhei Final

    30/92

    Most of the heads of departments, engineers and specialists have an

    education in the right area for their work, although there is a

    considerable need for further training in the utility. The following

    training needs were presented to the Consultant:

    The average salary is too low in the company. This causes difficulties

    to attract and keep qualified persons, and the personnel turnover is

    round 20%.

    Apa-Canal has an experienced implementation unit capable to

    organize and manage investment projects.

    Consultants comment:

    As the real number of inhabitants is around 34,000 and the number of

    employees is 203, the efficiency of the company may be expressed

    as a ratio 6.0 staff / 1,000 inhabitants2. This is extremely high. If the

    ratio is calculated on the official number of inhabitants, 47,000, it is4.3 staff / 1,000 inhabitants, which also is very high. One of the most

    important tasks for Orhei Apa-Canal management is to analyse every

    possibility to reduce the number of staff.

    The high level is of course to some degree dictated by the low levels

    of automation and poor state of equipment, but the high ratio

    indicates anyway that there must be possibilities to reduce staff

    already now. There is also already some new equipment, for instance

    a rather developed integrated management information system with

    computers connected through a local network. Such new equipment

    should make it possible to use less number of personnel.

    Until such time as more automation is introduced, together with

    procurement of modern equipment, the very large staff reductions will

    be difficult or even unattainable. However, as new equipment and

    technologies are introduced, an initial phased target of 4.0 / 1,000

    inhabitants should be achievable over 3 years, i.e. 33% staff

    reduction during that period. As more automation and labour-reducing

    equipment is introduced a further target of 2.5 staff / 1,000 inhabitants

    could be introduced over another 2 or 3 years. These are rather

    drastic reductions, but if there is not any very special reason for thepresently high ratio, they should be achievable. To some degree the

    2In Arkhangelsk in Russia the ratio is around 3.5, in Kaunas inLithuania reducedfrom around 2.5 some ten years ago to presently around 1.2. InSweden the ratio isaround 0.2 staff / 1,000 inhabitants, and if also all externalconsultants, persons inconstruction companies etc temporarily working for the waterwastewater utilities,the ratio is around 0.6 staff / inhabitant.

  • 7/29/2019 Fs Orhei Final

    31/92

    reduction can probably be achieved by natural wastage. National

    safety standards of efficient operation must of course be followed.

    The figures are based on results in successful water utilities in other

    former Soviet countries, for instance Kaunas in Lithuania. External

    personnel such as temporary engaged consultants and constructors

    during the proposed investments in Orhei as well as personnel to a

    possible new wastewater treatment plant are not considered in the

    assumptions.

    Apa-Canal management is aware of the very high staffing levels but

    in many cases this is a consequence of the high levels of plant and

    system failure and low levels of automation. In terms of re-structuring,

    a major limitation is the difficulty in attracting the right calibre of staff

    to Apa-Canal, mainly because salaries are lower than in the private

    sector.

    The Consultant recommends the utility to prepare a Cost Reduction

    Strategy. In such a strategy further reduction of staff is an importantpart. Less staff will help reducing costs and allow more attractive

    salaries and help the company to attract and keep good personnel.

    See further underStaff Structure below.

    The number of computers is rather good and there is a local area

    network (LAN) connecting all the computers. This should be further

    developed and cover all commercial, administrative and technical

    activities. See more comments below under Training

    Recommendations Point 2 Management Information Systems (MIS.

    Another point to emphasize in the Cost Reduction Strategy is that theutility should normally use tender procedures for procurement in order

    to assure that the lowest price is paid for a specified and demanded

    product or service.

    Present Situation (Text from the Pre-feasibility study)

    Most of the heads of departments, engineers and specialists have an

    education in the right area for their work, although there is a

    considerable need for further training in the utility. The following

    training needs were presented to the Consultant:

    Description of areas Managerial staff Number of persons

    1 Financial Management Top and medium level 12

  • 7/29/2019 Fs Orhei Final

    32/92

    2 Technical Management Top and medium level 123 Technical Audit Top and medium level 124 Financial Audit Top and medium level 125 Senior Management Top and medium level 126 Quality Management Top and medium level 12

    Consultants comment:

    Training Recommendations

    Successful companies all have one thing in common they ensure

    that there is a training culture within the organization. This does not

    simply relate to programmed training events for staff but includes

    motivation and encouragement for employees to develop themselves

    by self-study, using the Internet or distance learning. A well trained

    and developed workforce makes a significant contribution to the

    advancement and success of the organization. In fact, without

    continual vocational training Apa-Canal can, at best, only stand still. It

    cannot advance.

    The Consultant discussed the need for training with the management

    of Orhei Apa-Canal. Based on this, and mainly in line with the table

    above, the Consultant identified the following specific areas of training

    which will enhance the skill and knowledge levels within relevant staff

    and greatly assist in ultimately reducing costs:

    1. Strategic Management & Business Finance

    Apa-Canal is operating under the restrictions caused by under-funding, a partly ageing infrastructure and inadequate cost-

    recovery tariffs. Although cost-savings are uppermost in the

    minds of the Director and others involved in the financial

    management, there is a large element of fire-fighting in the daily

    routine of the Chief Engineer and other senior managers. There is

    a need for a management course, which would motivate the

    senior management to manage strategically, rather than on a day

    by day basis. Such a course would include the following

    elements:

    The economics of running a modern water utility includingprofit, cash flow; financial impact of the capital expenditure

    programme; network development, marginal costs,

    maintenance costs, tariffs, operational staffing and

    outsourcing.

    International Accounting Standards

    Asset Management Planning

    Business & Corporate Planning.

    Delegating

  • 7/29/2019 Fs Orhei Final

    33/92

    Negotiating

    Crisis and emergency management

    Time management

    Managing meetings

    This course should be a minimum of two weeks duration andwould be for Director and other Senior Managers and Heads of

    departments. It can also include middle managers who are

    considered as potential directors or senior managers. The course

    should be conducted by a professional management training

    organization or as part of a study tours to a successful water utility

    in which case it should be for three weeks and would include

    meetings with directors and heads of departments in order to gain

    further knowledge transfer.

    2. Management Information Systems (MIS)

    Orhei Apa-Canal has, as mentioned above, already a MIS and

    has trained accountants and others in using it.

    The Consultant recommends anyway Apa-Canal to further

    develop the system and continue the training of different

    personnel. Good hardware, a developed Local Area Network

    (LAN) and advanced software result of course not, in itself,

    automatically in management information being fed to the right

    people at the right time. The whole concept of the effective and

    efficient use of MIS must be understood otherwise managers willsuffer from data overload or lack of well-presented key data for

    efficient management of the company. This course would be

    aimed at all users of the system, whether they be inputting raw

    data or monitoring Apa-Canals performance. The course would

    be slightly different for differing levels of management but in

    essence the following topics should be discussed:

    Data in data out. What inputs are required in order that

    required outputs are available;

    Filtering information different levels of management

    require different degrees of information;

    Reporting how to create useful and timely reports;

    Security and data protection;

    Storing, archiving, retrieving and backing-up data;

    Accuracy verification of data;

    This course can be addressed either in-house using experienced

    MIS specialists and / or as part of a study tour to other water

  • 7/29/2019 Fs Orhei Final

    34/92

    utilities. For full and effective use to be made of the system a

    study tour is advantageous as it would provide an insight into the

    advantages and limitations of such a system.

    3. SCADA.

    If Apa-Canal would install a SCADA (Supervisory, Control and

    Data Acquisition) system, helping the utility to make operation

    more efficient, there will be a need for training. SCADA is much

    more than simple telemetry and it would be a totally new concept

    to Apa-Canal. Therefore the future operators of the system, along

    with relevant managers would need varying levels of training in

    order to maximise the use of such a system. Depending on the

    possible future reorganization and change of legal status the

    names of the positions in need of training might be different, but in

    principle the following type of managers and other categories of

    personnel will need training: The director, the chief accountant,

    chief economist, chief engineer, heads of energy and IT,operators and technicians.

    The courses could for instance include both study tours to a water

    utility experienced in the procurement, installation, commissioning

    and use of a modern SCADA system and a technical, hands-on

    course provided by the supplier.

    4. Non-Revenue Water Reduction

    There appears to be insufficient knowledge about internationally

    accepted non-revenue water terminology and water balance

    calculations.

    Training is required for Technical staff, including the Chief

    Engineer and staff responsible for the reduction of non-revenue

    water in the following topics:

    Leak detection and mains tracing techniques and

    equipment Districts and meters

    Pressure effects

    International Water Association Water (IWA) Water

    Balance terms and definitions:o Real losses

    o Apparent losses

    o Measurements / data required

    o Calculations

    o Assumptions

  • 7/29/2019 Fs Orhei Final

    35/92

    o Confidence limits

    The course could be a one-week course presented by experts in

    the field of non-revenue water; preferably as part of a study tour

    to a successful water utility. The training in the use of leak

    detection and mains tracing equipment should be provided by the

    suppliers of such equipment.

    5. General Training Programme

    In general the operators have been trained on the job in the early

    days of their appointment to the particular post. The training is

    concluded with an examination but thereafter there is no routine

    refresher training.

    Apart from training generated by the introduction of new

    equipment or technologies there is also a need to periodically

    provide short training events to achieve the following:

    Break bad habits than can develop over time Reinforce safety procedures Remind operators of best practice Improve operators knowledge of the process in

    addition to pure skills Promote a quality culture whereby employees take

    pride in doing a good job Promote cost savings, encourage more efficient

    working practices Encourage team working Encourage the staff to develop ideas for financial

    and technical improvements to the processes.

    Operator courses should conclude with a test and successful

    candidates awarded a certificate. For multi-skilled operators

    several training modules would lead to a vocational qualification

    and special award.

    Courses would include, but not be limited to:

    Treatment processes Mains and service repairs

    Leakage detection Network operation Pumping operations Water sampling and basic testing

    The scheme should not be limited to operators; administration

    staff and technical staff should benefit from further training,

    especially in IT such as:

    Advanced use of word processing package Advanced use of database

  • 7/29/2019 Fs Orhei Final

    36/92

    Reporting using 1C software Basic computer skills and knowledge such as

    antivirus, internet and e-mail. PowerPoint presentations.

    As part of the succession plan to promote potential managers

    there should be a programme of personal skills training to include:

    Time management Management of people Giving presentations Report writing Managing meetings Negotiation

    There should also be a programme of sharing knowledge; this

    promotes teamwork and broadens the knowledge of all staff,

    enabling them to contribute more fully to the activities of Apa-

    Canal. The purpose is not to replace existing specialists with half-trained people; it is a way of developing staff with a well-grounded

    background and a generalist approach to the services that Apa-

    Canal provides. It provides an appreciation of the activities of

    other departments and reduces parochial behaviour. Events are

    usually short, up to five days, and would include:

    Finance for non-specialists Water supply for non-specialists Wastewater for non-specialists Reduction of non-revenue water

    Publicity campaigns and customer surveys

    In addition, each Head of Department should give presentations

    to other staff on the activities and outputs of his / her department.

    This promotes teamwork and provides a forum for reviewing

    activities and the interaction between departments.

    6. Development of an in-house training capability

    Technically competent and experienced employees should be

    selected as potential trainers and provided with presentation skills

    training. This would be the start of an in-house training capabilityand would encourage a learning culture. The new presenters

    could be given salary enhancements as encouragement to take

    on the role of presenter. These would not be seen as full-time

    positions but it would provide a core of trainers who would be

    involved in the General Training Programme (see 5, above).

    A few of the Apa-canals in Moldova seem to be more developed

    in some areas then the others. The Consultant has for instance

    got an impression that Apa-Canal in Orhei has a more developed

    type management than many others. Another example is Floreti

  • 7/29/2019 Fs Orhei Final

    37/92

    where Apa-Canal already is a Joint-Stock Company. In Cueni

    the staff was reduced by more than one third during a period of

    three years. Bli has fewer employees per thousand inhabitants

    than the other towns in the project, a ratio of 2.5 staff /1,000

    inhabitants. Although the Apa-Canals, which are more developed

    or successful in one or another area, still have to develop much

    more, a cooperation where they share there experience with the

    others would be useful for all the utilities.

    7. Staff Review Scheme (sometimes called Annual Appraisal orPerformance Review)

    No matter what infrastructure improvements are made, new

    equipment procured or modern technologies introduced, without

    well trained, motivated staff Apa-Canal will never live up to a

    statement of the kind the Consultant indicated under Section 4.2,

    namely that Apa-canal shall provide Orhei with reliable, high

    quality water supply and sewage treatment services in a cost

    effective and affordable way with a good coverage, a minimum

    impact on the environment and a high customer satisfaction.

    Such a statement (which could be further developed to a vision

    for Apa-canal) requires staff motivated to develop new skills and

    gain new knowledge, not for its own sake but for the long-term

    benefit of Apa-Canal and its customers. Because it is difficult for

    Apa-Canal to recruit ready-trained staff of the right calibre the

    existing staff need to be trained (and re-trained if necessary) and

    developed such that they become more effective in their presentroles, and in addition can offer extra skills which are essential to

    Apa-Canals success.

    A Staff Appraisal Scheme, with the full support of management

    will, if properly conducted, provide a vehicle for developing staff. It

    will provide information for managers to be able to fairly assess

    the performance and potential of employees. In addition it

    identifies training and development needs which, when fulfilled,

    will significantly increase the overall skill and knowledge base

    within Apa-Canal.

    Ultimately it will assist the Director to objectively assess

    professional / administrative staff for re-grading and ultimately

    promotion. A Staff Appraisal Scheme can form the core of a

    succession plan, ensuring that Apa-Canal has potential managers

    and directors of the future ready to take on new responsibilities

    when the current senior staff reaches retirement age.

  • 7/29/2019 Fs Orhei Final

    38/92

    4.6 Staff Structure

    The Cost Reduction Strategy recommended in the first Consultants

    Comment under Section 4.5 above should include not only technical

    areas and training but also other aspects such as staff functions.

    Some key areas relating to staff are mentioned below as examples

    for review of Apa-Canal management. The positions should not

    automatically be full time manned, especially as Orhei Apa-Canal is arather small company; part time manning should be considered in

    order to keep costs down.

    When preparing the next organization chart it might be of interest to

    create a Technical Support function, which is off-line as opposed to

    the operational part of the organization. The logic for this is to a)

    reduce the number of people reporting directly to the Technical

    Director and b) to gradually separate core and non-core functions,

    eventually providing opportunities for future outsourcing.

    It might also be of value to appoint a person responsible for quality

    and reporting directly to the Director. This person would cover internal

    processes, and could even carry out business process reviews. The

    responsibility could be expanded to cover all quality issues including

    the environment, working practises and conditions, etc.

    Another recommendation is an Internal Auditor. The role would be

    that of policeman in terms of undertaking financial and technical

    audits to ensure that Apa-Canal obtains best values for money from

    suppliers and that Apa-Canals customers are also receiving an

    effective service at a reasonable cost.

    Customers and society in general as well as the staff of the utility are

    important for Apa-Canal. A Public Relations Function, for instance

    within the Trading department or the Human Resources department,

    would therefore be valuable. Given the modern need for proactive

    customer relations, and the need to keep staff informed of changes, a

    bespoke function is recommended. See more under Section 4.7

    below.

    Before any major reorganisation takes place it is recommended that a

    business process review takes place. This will highlight duplicatedeffort and reveal unnecessary or out-dated activities. It will help to re-

    align reporting and responsibility lines, and it will help to improve the

    speed of response to customers queries and requests. It will also

    provide a scientific approach to staff reductions, enabling Apa-Canal

    to be fair, methodical, transparent and consistent when making

    redundancies.

  • 7/29/2019 Fs Orhei Final

    39/92

    4.7 Relations to customers

    Present Situation (Text from the Pre-feasibility study)

    In addition to working with different kinds of media such as radio and

    newspapers for information to the customers Apa-Canal has also

    broschures and other written iformation. This information treats e.g.

    the need for water saving, different methods for water saving,different basic information about the utility and its activities. There is

    no tradition of letting school classes, pensioners groups etc visiting

    Apa-Canal.

    Consultants comment:

    As for all companies the customers are very important for Orhei Apa-

    Canal. Good relations with the customers are crucial for instance for

    their willingness to pay for the service. The already existing above-

    mentioned information to and contacts with the customers should

    therefore constantly be improved.

    The heart of good customer relations is to meet or exceed customers

    expectations both when it comes to information and other contacts

    and of course when it comes to the product sold and, when failures

    occur, to accept responsibility and take positive action.

    There are a range of Moldovan state regulations governing the

    provision of water and wastewater services, but these tend to focus

    mostly on the technical aspects of the service. It is suggested that

    Apa-Canal should expand these regulations to formulate its ownCustomer Service Standards.

    A list of suggested customer service standards is contained in the

    below table for consideration. Apa-Canal should establish targets for

    reaching full compliance over a period of (say) 5 years. Note: If Apa-

    Canal can claim 100% compliance today, then the targets are not

    sufficiently rigorous!

    Apa-Canals performance against these standards should be

    provided by the responsible department each month, with the results

    consolidated into a monthly report for the Director. Selected resultscould also be included in the written quarterly and annual progress

    reports to the Town Administration mentioned under Section 4.3.

  • 7/29/2019 Fs Orhei Final

    40/92

    Suggested Customer Service Standards

    Water Supply Services 5-YEAR ULTIMATE STANDARDFresh water supply 100% compliance with Moldovan norms and

    regulationsProgressive compliance with EC directives

    Cold water supply pressure 100% compliance with Moldovan norms and

    regulationsNo properties without overnight water

    Availability Water and wastewater services will beavailable 24 hours a day, 7 days a week

    Response time for attendance to fault complaints- Fresh water or wastewater supply fault Normally within 12 hours- Others Normally within 24 hours

    Notice of planned suspension of water supplyor wastewater services- Suspension of less than 12 hours 2-days advance notice to all affected

    customers- Suspension greater than 12 hours 5-days advance notice to all affected

    customers

    Duration of any suspension of water supply Restoration within 12 hours (water)or wastewater services (planned or emergency) Restoration within 4 hours (wastewater)

    Suspension of water supply exceeding 12 hours An alternative water source will be(planned or emergency) made available to all affected customers

    Account-related ServicesNew application for water/sewerage connection 14 days to grant approval

    Change of customer details 2 days (where no technical changesrequired)

    Water service bills- Accuracy 100% accurate- Timing Issued within 2 days of end of month

    (domestic); 2 days of meter reading

    (enterprises)

    - Amended bills Issued within 2 days of authorisation

    Reply to written requests or complaints- Interim reply 2 days- Full response 10 days

    Telephone response 10 rings

    Accessibility:- emergencies 24 hours a day, 365 days a year - non-emergencies 8am 5pm, Monday to Friday

    9am 1pm, Saturdays

  • 7/29/2019 Fs Orhei Final

    41/92

    5 Socio-economic Aspects

    5.1 Presentation of the Area

    5.1.1 Social Environment

    The population in Orhei town at 1st of January 2007 is the following:

    Table 5.1: Population

    Population (Thou.)

    Total 33.7

    Urban 33.7

    Rural -

    Average number of population for 2006 35.15Source: National Institute for Statistics

    In the last years the population evolution recorded a decreasing trend

    mainly as result of negative natural growth of population and

    emigrations for work in Western European countries.

    5.1.2 Economic Aspects

    The volume of industrial production in Orhei Raion, compared to the

    total industrial production in the Republic of Moldova, is presented in

    the following table:

    Table 5.2: Volume of Industrial Production Evolution Orhei Raion

    Volume ofindustrial

    production in

    2006

    2004 2005 2006

    Current

    prices

    (mil.

    lei)

    Compared

    to

    previous

    year (%)

    Current

    prices

    (mil.

    lei)

    Compared

    to

    previous

    year (%)

    Current

    prices

    (mil.

    lei)

    Compared

    to

    previous

    year (%)

    Total 17533 106.9 21123.5 106.3 22243.2 93.1

    out of which

    Orhei 266.3 104.1 401.7 132.1 350.8 81.9Source: National Institute for Statistics

    Total production in the Republic of Moldova increased with 26%

    during 2004-2006. For Orhei Raion, the production increased

    considerably with 50% in 2005 (current prices), and decreased with13% in 2006 (current prices). Therefore, for the analyzed period, the

    production increased with 32% (current prices), being above the

    national average.

    Financial situation of Commercial Companies in Orhei Raion,

    compared to the total financial situation of Republic of Moldova, is

    presented in the following table:

    Table 5:3: Financial Status of Commercial Companies

  • 7/29/2019 Fs Orhei Final

    42/92

    Financial status Jan.-Sept. 2004 Jan.-Sept. 2005 Jan.-Sept. 2006

    Total Orhei Total Orhei Total Orhei

    Number of reporting

    enterprises, out of which29423 617 31870 651 34700 695

    Profitable enterprises 11289 278 12380 308 13155 303

    Enterprises with loss 13906 270 14893 265 16532 310

    Average Number of

    employees

    57278

    611507 570143 11178

    56969

    810808

    Financial result before

    tax (profit/loss) -mil. Lei2790 -0.9 3424 18.8 3689 -2.3

    Sales revenues-mil. Lei 53031 572.6 66870 693.8 79052 820.2

    Receivables related to

    commercial invoices and

    budget compensation

    -total, mil. Lei

    19140 159.0 22717 258.4 26867 252.7

    Debts -mil. Lei 61291 723.8 68420 790.0 81804 971.Source: National Institute for Statistics

    As can be observed from the table above, the number of profitable

    enterprises is increasing, but the percentage of profitable enterprisesin total reporting enterprises remains approximately the same (46%).

    In Orhei Raion, the number of enterprises and the profitable

    enterprises slightly increased.

    Average number of employees at national level kept a stable trend. In

    Orhei Raion, during the analyzed period, the average number of