fs2012 october
TRANSCRIPT
Financial StatementsFor the Period
September 1, 2012 ‐ October 31, 2012
For the Meeting of the Board of Trustees ‐ November 15, 2012
for
Houston Community College System&
Houston Community College Public Facility Corporation
Memorandum Management Discussion & Analysis
Summary HCCS Unrestricted Revenue & Expenditures 1
Adjusted Budgets by Division 2
Actual YTD by College 2
Cash Flow Analysis 3
Contact Hours Reimbursement 8
Enrollment Data 9Charts Revenue & Expenditure YTD thru October 31, 2012 10
Revenue and Expenditures with Trendlines 11
Revenue Source Comparison By Year 12
Expenditure Source Comparison By Year 13
Fund Balances Balance Sheet By Fund 14
Designated Funds Budget Summary / Cash Position 15
Capital Projects & Unexpended Plant Fund Projects 16
Unexpended 2004 CIP Projects 17
Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 25
Maintenance Tax Notes/Sr. Lien Bonds 2008 26
Maintenance Tax Notes 2010 28
Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 29
Auxiliary Sources and Uses of Auxiliary Funds 30
Restricted Funds Grants, Contracts and Student Aid 32
Position Control 2013 Positions 38
Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 41
Duplicated Headcount Monthly Comparison 50
Unduplicated Headcount Monthly Comparison 51
Statement of Net Assets PFC 1
Statement of Cash Flows (Cash Basis‐ Interim Period) PFC 2
Public Safety Institute PFC 3
Westgate PFC 4
Hayes Road ‐ Alief Project PFC 5
Northline Mall Project PFC 6
Houston Community College ‐ Public Facility Corporation
Table of ContentsFor the Period September 1, 2012 ‐ October 31, 2012
For the Meeting of the Board of Trustees
Houston Community College System
MEMORANDUM
To: Houston Community College System Board of Trustees
Via: Dr. Mary Spangler, Chancellor
From: Dr. Art Tyler, Deputy Chancellor Chief Operating Officer
Date: November 8, 2012
Re: Financial Report for Month Ended October 31, 2012
Enclosed please find the preliminary financial reports for the month ending October 31, 2012 for your review. The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.
Operating Fund net revenue through October 31, 2012 is $64,311,638 which is 4.9% below last year. Expenditures year‐to‐date total $49,676,408 which is 13.5% less than the same time last year, for a net of $14,635,230.
The reserves for the month of October 2012 are $62,779,856 or 21.2% of revenues (see page IV). Thus, we continue to project a healthy fiscal strength for the college.
Managements Discussion and Analysis
Thru October 31, 2012
Revenues
Expenditures
Tuition and Fees net revenue year to date totaled $43,969,299 which is 7.3% lower than the same time last year.
Current enrollment numbers for Fall 2012 are trending downward at 5%. We are projecting tuition and fees
revenue to be $114,588,415.
i
Insurance/Risk Management payments totaled $6,562,016 year‐to‐date, 5.7% above last year. The increase is
due to an increase in insurance premiums. Total expenses for the year are expected to be within budget at
$6,871,724.
Tuition & Fee‐Extended Learning receipts totaled $2,020,284 year to date, 6.3% above last year. Total tuition
and fees‐Extended Learning at fiscal year end are expected to be $6,188,581.
Marketing and Advertising expense totaled $299,509 year‐to‐date, a 29.9% increase compared to last year.
Marketing expenses are projected to be $1,496,807 at fiscal year end.
Rental and Leases expenses totaled $396,792 year‐to‐date, which is 77.8% below the previous year. Total
expenses at year end are projected to be $3,821,064.
Total revenue collections, net of exemptions and waivers, totaled $64,311,638 year‐to‐date. This is a 4.9% decrease below last year.
Total Salaries are $28,641,907 year‐to‐date, 0.4% below the previous year. Total salaries at year end are
expected to be $163,550,787.
Benefits costs totaled $3,080,654 year‐to‐date, 29.4% above last year. Total benefits at fiscal year end are
expected to be $18,209,301.
Contract Services expense totaled $1,832,381 year‐to‐date. Fiscal year end expenses are projected to be
$23,747,083.
Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one,
behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:
State Appropriations received year to date totaled $17,867,571, 0.4% below last year. Total appropriations
received are expected to be $70,014,007. This amount was reduced by $218,031 due to a formula reallocation
to align with the Legislative Budget Board data and methodology.
Ad Valorem Tax collections totaled $12,311 year‐to‐date. The year‐to‐date total is 24.4% below last year. We
project total tax revenue for the fiscal year will be $102,195,871
Utilities costs totaled $1,085,312 year‐to‐date. We will continue to monitor these costs. Total utilities cost at
fiscal year end is projected to $12,889,610.
Managements Discussion and Analysis
Thru October 31, 2012
Budget Priorities funding allocated for the year are detailed below through October 31, 2012.
Contingency/Budget Priorities
Capital Outlay & Equipment
Position Management
Other
Total Contingency/Budget Priorities
Grants
Unexpended Plant Fund
Public Facility Corporation
Total grant awards (federal, state & private) year‐to‐date total, $43,830,979.
Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was
discontinued in FY 2009. All deferred maintenance expense is captured in the operating account. See page 15
for prior year encumbrances.
Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition
projects for a budget of $46,124,917. Funds for these projects are 100% committed. See page 16 for more
details.
The 2004 CIP budgets are $263,779,995 and are 99.98% committed. The spending categories in the schedule
have now been revised for more ease of reference to the Board approved budget. Please see page 17 for the
summary and pages 19 through 23 for details.
The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant. Commitments year‐to‐
date total $12.5 million, 99.87% of budget. See page 25 for the details.
The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate),
Alief and Northline Mall deferred maintenance, new construction and renovation projects. Expenditures year‐to‐
date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details.
ii
5,834,411$
3,800,000 4,481,452 (681,452)
Instructional and Other Materials expenses totaled $1,268,115 year‐to‐date, which is 22% below last year.
Expenses in this area are projected to be $11,215,877.
Transfers/Debt activities totaled $5,005,690 year‐to‐date. Items in this expense category include all student
revenue bond payments, transfers for scholarship matching funds, and transfers to the Unexpended Plant Fund.
Total expenses are expected to be $33,699,339.
Total operating fund expenditures year‐to‐date total $49,676,408, a 13.5% decrease below last year.
Budget expenditures for grant‐funded projects so far this year total $2,136,514.
Budgeted
1,445,240 513,014 932,226
11,372,376$ 5,287,191$ 6,085,185$
Expensed Remaining
6,127,136$ 292,725$
The college has received $340,529 in new grant awards since the beginning of the current fiscal year.
Managements Discussion and Analysis
Thru October 31, 2012
Balance Sheet – Operating Fund
Cash and Investments
Cash
Investments
Total
Fund Balance
Unaudited Fund Balance, August 31, 2012
Projected Revenue @ 08/31/2013
Total Projected Revenue
Projected Expenses @ 08/31/2013
FY 2012 Purchase Order Roll
Total Projected Expenses @ 08/31/2013
Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)
Required Reserve for FY 2013 (11% Projected Revenues)
Added Reserves
Additional Expenditures Funded From Reserves:
FY2012‐2013 Salary Increases
Total Expenses Paid From Reserves
Added Reserves
Required Reserve for FY 2013 (11% Projected Revenues)
Current Reserves
% of Total Operating Revenue
The projected reserves at October 31, 2012 of $62,779,856 is an estimate at this time and represents 21.2% of
expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain
a fund balance of 9% ‐11% of general fund revenues as of August 31.
iii
(1,836,560) ‐ (1,836,560)
(1,836,560)$ ‐$ (1,836,560)
30,226,539$
32,553,317$
62,779,856$
21.2%
Budget
298,335,238$
64,616,416$
32,553,317$
32,063,099$
Expense to Date Balance
295,939,244
362,951,654$
295,939,244$
2,395,994
10,984,386 ‐
78,338,534$ 45,537,947$
67,012,410$
October 2012 October 2011
67,354,148$ 45,537,947$
FY2011‐12 FY2012‐13
Tuition
Budget:AdjustedBudgetFY2012‐13 43,067,676$Exemptions&Waivers (2,899,110)AdjustedBudgetFY2012‐13,Net 40,168,566$
RevenuesReceived:Tuition 48,824,432 21,611,314 20,065,809
Waivers&Exemptions:DualCredit (5,170,736) (2,390,985) (2,133,727)Other (1,693,502) (709,011) (765,383)
TotalWaivers&Exemptions (6,864,238) (3,099,996) (2,899,110)TotalTuitionRevenue,Net 41,960,194$ 18,511,318$ 17,166,699$
Tuition‐ExtendedLearning
Budget:BudgetFY2012‐13 6,188,581$Exemptions&Waivers (448,758)BudgetFY2012‐13,Net 5,739,823$
RevenuesReceived:
Tuition 8,853,381 2,356,317 2,469,042Waivers&Exemptions:
Corrections (2,612,080) (455,319) (448,758)
TotalELTuitionRevenue,Net 6,241,301$ 1,900,998$ 2,020,284$
Exemptions&WaiversDeptofCorrections 2,612,080$ 455,319$ 448,758$DualCreditWaiver 5,170,736 2,390,985 2,133,727
Other:EmployeeFeeExemptions 84,810 34,701 29,491Firemen 42,521 23,691 12,155Hazelwood 906,036 360,138 451,740Deaf&Blind 309,603 129,168 123,026HighRankingHiSCHGrad 868 372 1,271ChildofDisabledVetETC 431 978 1,139NonresMilitaryPer&Dep 2,390 708 ‐NonresTeach/ResearchAsst 13,905 5,418 5,841NonresCompetitiveScholar ‐ ‐ 1,062SeniorCitizens 18,730 8,017 6,519ScholarshipDistribution 1,450 1,450 ‐ApprenticeshipWaivers (28) ‐ ‐SpecialFeesWaiverHFD 117 117 ‐AVISAWaiver(Non‐AlienWaiver) 1,110 1,110 ‐RefugeeWaiver (1,554) (1,110) (162)FosterChildren‐Resident 294,543 135,096 127,937FireAcademyWaiver 157 ‐ ‐UndocumentedStudents 2,171 1,282 ‐TXTomorrowWaiver 2,874 2,875 ‐PeaceOfficerExemption 13,368 5,000 5,364
TotalOtherExemptions 1,693,502 709,011 765,383GrandTotalExemptions&Waivers 9,476,318$ 3,555,315$ 3,347,868$
Note:AsofDecember31,2008,thefinancialstatementsreflectallexpensesincurredforExemptionsandWaiversasnetoftuitionandfeerevenue.PriortothisdateExemptions&Waiverswereshownasanexpenditureandrevenuewasshownasgrossrevenue.
iv
Exemptions&WaiversThruOctober31,2012
Year‐to‐DateActivitythru10/31/2012
Year‐to‐DateActivitythru10/31/2011
EndofYearActivityAccount
g
YTD Adjusted Budget
YTD Actuals Thru
October 31, 2012
YTD Actuals Thru
October 31, 2011
2012‐2013 Inc/(Dec)
vs. 2011‐2012
Actuals %
Inc/(Dec)YTD vs.
PriorYTD
Projected Actuals
2012‐2013
Projected 2012‐2013
Inc/(Dec) vs. Adj
Budget
Projected 2012‐
2013 Inc/(Dec) vs.
Adj Budget %
REVENUES
State Appropriations 70,232,038$ 17,867,571$ 17,947,320$ (79,749)$ ‐0.44% 70,014,007$ (218,031)$ ‐0.31%Ad Valorem Taxes 102,195,871 12,311 16,286 (3,975) ‐24.41% 102,195,871 ‐ 0.00%Tuition, Net 43,067,676 17,166,699 18,511,318 (1,344,619) ‐7.26% 43,067,676 ‐ 0.00%Fees 71,520,739 26,802,600 28,898,132 (2,095,532) ‐7.25% 71,520,739 ‐ 0.00%Other Local Income* 2,952,370 359,518 296,900 62,617 21.09% 2,952,370 ‐ 0.00%Tuition & Fee, Net
‐‐ Extended Learning6,188,581 2,020,284 1,900,998 119,286 6.27% 6,188,581 ‐ 0.00%
Grant Revenue ‐ 82,656 39,998 42,657 106.65% ‐ ‐
Total Revenues 296,157,275 64,311,638 67,610,952 (3,299,315) ‐4.88% 295,939,244$ (218,031)$ ‐0.07%
EXPENSES
Faculty‐FT 53,221,588 10,765,367 10,479,826 285,541 2.72% 53,221,588 ‐ 0.00%
Faculty‐PT 30,518,118 5,200,028 5,297,312 (97,284) ‐1.84% 30,518,118 ‐ 0.00%
Librarian/Counselor‐FT 4,896,219 911,991 1,223,935 (311,944) ‐25.49% 4,896,219 ‐ 0.00%
Librarian/Counselor‐PT 829,099 113,283 97,729 15,553 15.91% 829,099 ‐ 0.00%
Staff‐FT 64,192,361 10,437,687 10,315,289 122,398 1.19% 64,192,361 ‐ 0.00%Staff‐PT 9,893,402 1,213,552 1,327,230 (113,678) ‐8.57% 9,893,402 ‐ 0.00%
Sub‐total Salaries 163,550,787 28,641,907 28,741,321 (99,414) ‐0.35% 163,550,787 ‐ 0.00%
Employee Benefits 18,209,301 3,080,654 2,380,567 700,087 29.41% 18,209,301 ‐ 0.00%
Supplies Gen Exp 5,627,847 888,373 774,519 113,854 14.70% 5,627,847 ‐ 0.00%
Travel 938,063 129,398 90,430 38,968 43.09% 938,063 ‐ 0.00%
Marketing Costs 1,496,807 299,509 230,612 68,896 29.88% 1,496,807 ‐ 0.00%
Rental & Leases 3,821,064 396,792 1,783,642 (1,386,850) ‐77.75% 3,821,064 ‐ 0.00%
Insurance/Risk Mgmt 6,871,724 6,562,016 6,205,960 356,056 5.74% 6,871,724 ‐ 0.00%
Contract Services 23,747,083 1,832,381 1,351,373 481,009 35.59% 23,747,083 ‐ 0.00%
Utilities 12,889,610 1,085,312 738,062 347,251 47.05% 12,889,610 ‐ 0.00%
Other Departmental Expenses 1,786,272 412,863 350,298 62,565 17.86% 1,568,241 (218,031) ‐12.21%
Instructional & Other Materials 11,215,877 1,268,115 1,626,814 (358,699) ‐22.05% 11,215,877 ‐ 0.00%
Maintenance & Repair 1,211,077 60,616 58,856 1,760 2.99% 1,211,077 ‐ 0.00%
Transfers/Debt 33,699,339 5,005,690 13,072,784 (8,067,095) ‐61.71% 33,699,339 ‐ 0.00%
Contingency 2,923,114 ‐ ‐ ‐ 0.00% 2,923,114 ‐ 0.00%Capital Outlay 8,169,310 12,781 40,275 (27,493) ‐68.26% 8,169,310 ‐ 0.00%
Total Expenses 296,157,275 49,676,408 57,445,514 (7,769,106) ‐13.52% 295,939,244 (218,031) ‐0.07%
REVENUES H/(L) Vs EXPENSES 0 14,635,230 10,165,439 4,469,791 ‐ ‐
* Includes interest & dividends income, fines & penalties and parking fines
1
HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures HCCS CURRENT UNRESTRICTED
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Adjusted
Budget
EXPENSES
Faculty‐FT 10,274,237 10,146,406 7,282,384 12,064,145 4,907,675 5,860,770 2,370,440 ‐ ‐ ‐ 180,406 135,125 ‐ ‐ 53,221,588 17.97%
Faculty‐PT 4,753,315 6,327,932 4,066,211 5,833,205 3,779,081 1,790,194 3,637,035 ‐ ‐ ‐ 330,386 759 ‐ ‐ 30,518,118 10.30%
Librarian/Counselor‐FT 1,119,093 1,115,400 886,744 683,319 613,571 53,730 2,887 ‐ ‐ ‐ 340,010 ‐ 81,465 ‐ 4,896,219 1.65%
Librarian/Counselor‐PT 87,030 194,185 119,380 182,495 82,452 33,248 ‐ ‐ ‐ ‐ 19,773 ‐ 110,536 ‐ 829,099 0.28%
Staff‐FT 5,366,410 4,311,675 4,720,002 5,617,026 3,658,512 2,365,929 3,722,075 3,683,972 15,437,806 102,108 3,394,112 7,518,710 4,294,024 ‐ 64,192,361 21.68%
Staff‐PT 1,985,499 1,643,253 741,149 1,481,270 1,226,383 441,322 619,862 263,028 573,372 ‐ 261,790 235,344 421,130 ‐ 9,893,402 3.34%
Sub‐total Salaries 23,585,584 23,738,851 17,815,870 25,861,460 14,267,674 10,545,193 10,352,299 3,947,000 16,011,178 102,108 4,526,477 7,889,938 4,907,155 ‐ 163,550,787 55.22%
Employee Benefits ‐ ‐ ‐ 4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 18,209,297 18,209,301 6.15%
Supplies Gen Exp 226,414 375,314 200,632 229,606 202,137 337,228 209,666 311,425 1,356,826 ‐ 151,064 219,779 7,756 1,800,000 5,627,847 1.90%
Travel 103,360 88,682 34,545 62,926 56,181 87,347 70,555 121,304 140,510 ‐ 56,671 83,281 32,701 ‐ 938,063 0.32%
Marketing Costs 49,979 46,349 109,159 36,266 89,207 38,323 191,180 81,220 853,124 ‐ ‐ 2,000 ‐ ‐ 1,496,807 0.51%
Rental & Leases 34,418 123,010 1,314,554 633,560 41,484 508,719 48,180 24,980 228,951 ‐ ‐ 853,487 9,721 ‐ 3,821,064 1.29%
Insurance/Risk Mgmt 794 15 ‐ 154 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 676 ‐ 6,870,085 6,871,724 2.32%
Contract Services 321,129 277,847 57,350 49,485 168,144 345,565 58,574 427,798 13,687,586 ‐ 111,335 2,252,284 31,883 5,958,103 23,747,083 8.02%
Utilities 5,025 ‐ 4,600 ‐ ‐ ‐ ‐ ‐ 1,575,778 ‐ ‐ 1,400,000 ‐ 9,904,207 12,889,610 4.35%
Other Departmental Expenses 80,205 45,543 39,683 43,695 139,172 85,724 52,044 299,064 234,893 ‐ 136,159 213,624 138,493 277,973 1,786,272 0.60%
Instructional & Other Materials 449,461 306,438 137,914 265,802 68,115 364,475 1,350,175 36,261 131,277 ‐ 1,058,476 6,769,694 277,789 ‐ 11,215,877 3.79%
Maintenance & Repair 116,709 24,787 52,353 33,463 15,772 84,713 158,150 825 704,028 ‐ 8,472 8,870 416 2,519 1,211,077 0.41%
Transfers/Debt ‐ 845,619 5,636,142 1,155,001 ‐ ‐ ‐ ‐ 3,264 ‐ ‐ ‐ ‐ 26,059,313 33,699,339 11.38%
Contingency 50,000 29,647 60,250 49,044 40,000 50,000 ‐ 83,000 125,000 ‐ 50,000 50,000 50,000 2,286,173 2,923,114 0.99%
Capital Outlay 602,055 310,856 284,443 135,237 282,606 559,924 30,859 58,150 1,055,548 ‐ 1,089 719,534 1,873 4,127,136 8,169,310 2.76%
Total Budget 25,625,133 26,212,958 25,747,495 28,555,703 15,370,492 13,007,211 12,521,682 5,391,027 36,107,963 102,108 6,099,743 20,463,167 5,457,787 75,494,806 296,157,275 100.00%
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Actuals
EXPENSES
Faculty‐FT 2,126,793 2,052,681 1,469,276 2,457,524 1,003,606 1,165,509 468,512 ‐ ‐ ‐ 7,253 14,211 ‐ ‐ 10,765,367 21.67%
Faculty‐PT 863,641 1,121,076 691,602 1,031,769 642,549 244,146 556,861 ‐ ‐ ‐ 48,385 ‐ ‐ ‐ 5,200,028 10.47%
Librarian/Counselor‐FT 192,522 200,948 173,775 134,877 118,217 8,942 2,886 ‐ ‐ ‐ 64,097 ‐ 15,727 ‐ 911,991 1.84%
Librarian/Counselor‐PT 10,624 24,832 21,902 31,347 10,837 4,562 ‐ ‐ ‐ ‐ ‐ ‐ 9,180 ‐ 113,283 0.23%
Staff‐FT 882,835 684,495 768,050 907,153 588,615 392,304 599,788 613,210 2,551,147 17,018 559,503 1,203,221 670,349 ‐ 10,437,687 21.01%
Staff‐PT 214,088 226,727 113,066 205,727 146,126 45,740 100,598 21,082 60,988 ‐ 17,301 18,552 43,559 ‐ 1,213,552 2.44%
Sub‐total Salaries 4,290,501 4,310,759 3,237,672 4,768,396 2,509,949 1,861,204 1,728,645 634,291 2,612,135 17,018 696,539 1,235,984 738,815 ‐ 28,641,907 57.66%
Employee Benefits ‐ ‐ ‐ 3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,080,650 3,080,654 6.20%
Supplies Gen Exp 21,095 26,341 29,106 43,209 34,133 30,580 44,638 43,712 182,774 ‐ 31,108 14,530 24,512 362,634 888,373 1.79%
Travel 3,328 13,959 3,476 5,913 2,782 14,675 20,293 22,204 13,951 ‐ 16,012 8,263 4,544 ‐ 129,398 0.26%
Marketing Costs 1,098 11,097 ‐ 12,228 8,996 1,346 34,694 5,984 224,066 ‐ ‐ ‐ ‐ ‐ 299,509 0.60%
Rental & Leases 30,000 13,825 200,832 36,275 5,000 72,051 2,418 1,720 33,012 ‐ ‐ 854 805 ‐ 396,792 0.80%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,562,016 6,562,016 13.21%
Contract Services 9,934 14,427 4,578 5,365 4,540 236,033 14,716 6,330 703,849 ‐ 3,789 27,580 19,076 782,166 1,832,381 3.69%
Utilities 1,168 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 87,103 ‐ ‐ 279,200 ‐ 717,841 1,085,312 2.18%
Other Departmental Expenses 4,695 2,300 2,517 5,144 1,138 16,192 17,290 30,393 15,477 ‐ 16,407 17,488 9,452 274,370 412,863 0.83%
Instructional & Other Materials 56,533 18,277 5,800 11,179 3,605 14,993 76,918 ‐ 1,436 ‐ 182,016 893,213 4,146 ‐ 1,268,115 2.55%
Maintenance & Repair 10,203 1,870 1,682 658 1,681 1,089 14,353 ‐ 23,674 ‐ 4,853 552 ‐ ‐ 60,616 0.12%
Transfers/Debt ‐ 221,329 1,651,966 664,709 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,467,686 5,005,690 10.08%
Contingency ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.00%
Capital Outlay 2,020 3,360 78 4,030 1,739 ‐ ‐ ‐ 1,555 ‐ ‐ ‐ ‐ ‐ 12,781 0.03%
Total Expense 4,430,574 4,637,542 5,137,707 5,557,110 2,573,563 2,248,162 1,953,966 744,633 3,899,032 17,018 950,724 2,477,664 801,349 14,247,363 49,676,408 100.00%% of Adjusted
Budget by Division 17.29% 17.69% 19.95% 19.46% 16.74% 17.28% 15.60% 13.81% 10.80% 16.67% 15.59% 12.11% 14.68% 18.87% 16.77% 100.00%
Remaining Balance 21,194,559 21,575,416 20,609,788 22,998,593 12,796,929 10,759,049 10,567,716 4,646,394 32,208,931 85,090 5,149,019 17,985,503 4,656,438 61,247,443 246,480,867
HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures
YTD Adjusted Budget by Division
YTD Actuals by Division
2
Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug.
Central FY2013 8.77% 17.29%
FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%
Northwest FY2013 8.26% 17.69%
FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%
Northeast FY2013 6.80% 19.95%
FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%
Southwest FY2013 8.59% 19.46%
FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%
Southeast FY2013 7.94% 16.74%
FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%
Coleman FY2013 8.06% 17.28%
FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%
Extended Learning FY2013 7.79% 15.60%
3 FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%
Chancellor FY2013 7.14% 13.81%
FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%
Deputy Chancellor FY2013 4.52% 10.80%
FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%
Institute Effectiveness FY2013 8.33% 16.67%
FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%
Instruction FY2013 6.55% 15.59%
FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%
Info Tech FY2013 5.56% 12.11%
FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%
Student Success FY2013 7.33% 14.68%
FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%
System FY2013 12.41% 18.87%
FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%
Total HCCS FY2013 8.55% 16.77%
FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%
Houston Community College
Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 11,323,534 2,288,526 20.21% 10,274,237 2,126,793 20.70%
Faculty‐PT 3,769,822 652,854 17.32% 4,753,315 863,641 18.17%
Librarian/Counselor‐FT 1,048,871 204,943 19.54% 1,119,093 192,522 17.20%
Librarian/Counselor‐PT 49,873 10,145 20.34% 87,030 10,624 12.21%
Staff‐FT 5,296,359 885,076 16.71% 5,366,410 882,835 16.45%
Staff‐PT 1,809,062 259,108 14.32% 1,985,499 214,088 10.78%
Sub‐total Salaries 23,297,521 4,300,653 18.46% 23,585,584 4,290,501 18.19%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 221,448 24,950 11.27% 226,414 21,095 9.32%
Travel 98,911 2,486 2.51% 103,360 3,328 3.22%
Marketing Costs 56,879 9,911 17.43% 49,979 1,098 2.20%
Rental & Leases 84,498 19,500 23.08% 34,418 30,000 87.16%
Insurance/Risk Mgmt 794 ‐ 0.00% 794 ‐ 0.00%
Contract Services 330,483 20,049 6.07% 321,129 9,934 3.09%
Utilities ‐ ‐ ‐ 5,025 1,168 0.00%
Other Departmental Expenses 62,728 4,406 7.02% 80,205 4,695 5.85%
Instructional & Other Materials 456,640 64,632 14.15% 449,461 56,533 12.58%
Maintenance & Repair 86,838 8,885 10.23% 116,709 10,203 8.74%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 44,919 ‐ 0.00% 50,000 ‐ ‐
Capital Outlay 170,356 2,521 1.48% 602,055 2,020 0.34%
Total Expenses 24,912,015 4,457,994 17.89% 25,625,133 4,430,574 17.29%
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 10,093,756 2,026,124 20.07% 10,146,406 2,052,681 20.23%
Faculty‐PT 4,196,906 783,430 18.67% 6,327,932 1,121,076 17.72%
Librarian/Counselor‐FT 842,964 177,207 21.02% 1,115,400 200,948 18.02%
Librarian/Counselor‐PT 133,561 20,999 15.72% 194,185 24,832 12.79%
Staff‐FT 3,488,099 581,738 16.68% 4,311,675 684,495 15.88%
Staff‐PT 1,168,139 188,254 16.12% 1,643,253 226,727 13.80%
Sub‐total Salaries 19,923,425 3,777,751 18.96% 23,738,851 4,310,759 18.16%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 289,729 6,648 2.29% 375,314 26,341 7.02%
Travel 76,266 7,807 10.24% 88,682 13,959 15.74%
Marketing Costs 41,176 10,105 24.54% 46,349 11,097 23.94%
Rental & Leases 73,501 10,716 14.58% 123,010 13,825 11.24%
Insurance/Risk Mgmt ‐ ‐ 0.00% 15 ‐ 0.00%
Contract Services 286,700 37,375 13.04% 277,847 14,427 5.19%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 34,464 9,547 27.70% 45,543 2,300 5.05%
Instructional & Other Materials 168,602 12,297 7.29% 306,438 18,277 5.96%
Maintenance & Repair 24,154 668 2.77% 24,787 1,870 7.54%
Transfers/Debt 875,943 228,548 26.09% 845,619 221,329 ‐
Contingency 30,858 ‐ 0.00% 29,647 ‐ ‐
Capital Outlay 92,998 2,066 2.22% 310,856 3,360 1.08%
Total Expenses 21,917,816 4,103,528 18.72% 26,212,958 4,637,542 17.69%
Central College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Northwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
4
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 8,043,440 1,564,811 19.45% 7,282,384 1,469,276 20.18%
Faculty‐PT 2,891,228 607,570 21.01% 4,066,211 691,602 17.01%
Librarian/Counselor‐FT 1,100,054 189,965 17.27% 886,744 173,775 19.60%
Librarian/Counselor‐PT 116,019 14,864 12.81% 119,380 21,902 18.35%
Staff‐FT 4,551,958 760,527 16.71% 4,720,002 768,050 16.27%
Staff‐PT 678,197 113,375 16.72% 741,149 113,066 15.26%
Sub‐total Salaries 17,380,896 3,251,113 18.71% 17,815,870 3,237,672 18.17%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 329,948 21,392 6.48% 200,632 29,106 14.51%
Travel 31,865 1,780 5.59% 34,545 3,476 10.06%
Marketing Costs 46,417 1,533 3.30% 109,159 ‐ 0.00%
Rental & Leases 1,263,216 212,784 16.84% 1,314,554 200,832 15.28%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 56,049 2,025 3.61% 57,350 4,578 7.98%
Utilities 4,600 ‐ 0.00% 4,600 ‐ 0.00%
Other Departmental Expenses 46,640 5,319 11.41% 39,683 2,517 6.34%
Instructional & Other Materials 150,923 8,805 5.83% 137,914 5,800 4.21%
Maintenance & Repair 27,811 3,415 12.28% 52,353 1,682 3.21%
Transfers/Debt 5,640,942 1,697,155 30.09% 5,636,142 1,651,966 ‐
Contingency 41,706 ‐ 0.00% 60,250 ‐ ‐
Capital Outlay 48,101 106 0.22% 284,443 78 0.03%
Total Expenses 25,069,114 5,205,427 20.76% 25,747,495 5,137,707 19.95%
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 13,860,660 2,768,588 19.97% 12,064,145 2,457,524 20.37%
Faculty‐PT 5,613,233 1,055,307 18.80% 5,833,205 1,031,769 17.69%
Librarian/Counselor‐FT 1,621,480 378,227 23.33% 683,319 134,877 19.74%
Librarian/Counselor‐PT 259,572 32,770 12.62% 182,495 31,347 17.18%
Staff‐FT 5,718,965 965,972 16.89% 5,617,026 907,153 16.15%
Staff‐PT 1,665,551 285,110 17.12% 1,481,270 205,727 13.89%
Sub‐total Salaries 28,739,460 5,485,973 19.09% 25,861,460 4,768,396 18.44%
Employee Benefits ‐ ‐ ‐ 4 3 ‐
Supplies Gen Exp 254,387 23,399 9.20% 229,606 43,209 18.82%
Travel 65,224 4,536 6.95% 62,926 5,913 9.40%
Marketing Costs 37,367 5,121 13.71% 36,266 12,228 33.72%
Rental & Leases 855,864 75,872 8.87% 633,560 36,275 5.73%
Insurance/Risk Mgmt 113 ‐ ‐ 154 ‐ 0.00%
Contract Services 42,150 5,951 14.12% 49,485 5,365 10.84%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 42,828 13,019 30.40% 43,695 5,144 11.77%
Instructional & Other Materials 239,436 22,736 9.50% 265,802 11,179 4.21%
Maintenance & Repair 19,554 1,106 5.66% 33,463 658 1.97%
Transfers/Debt 2,492,129 687,010 27.57% 1,155,001 664,709 57.55%
Contingency 44,734 ‐ 0.00% 49,044 ‐ 0.00%
Capital Outlay 129,654 637 0.49% 135,237 4,030 2.98%
Total Expenses 32,962,900 6,325,360 19.19% 28,555,703 5,557,110 19.46%
5
Northeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Southwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 5,652,540 1,085,038 19.20% 4,907,675 1,003,606 20.45%
Faculty‐PT 2,654,529 509,731 19.20% 3,779,081 642,549 17.00%
Librarian/Counselor‐FT 694,643 121,811 17.54% 613,571 118,217 19.27%
Librarian/Counselor‐PT 67,814 7,582 11.18% 82,452 10,837 13.14%
Staff‐FT 3,354,662 561,745 16.75% 3,658,512 588,615 16.09%
Staff‐PT 993,213 162,621 16.37% 1,226,383 146,126 11.92%
Sub‐total Salaries 13,417,402 2,448,528 18.25% 14,267,674 2,509,949 17.59%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 188,962 27,228 14.41% 202,137 34,133 16.89%
Travel 48,263 4,892 10.14% 56,181 2,782 4.95%
Marketing Costs 115,335 11,002 9.54% 89,207 8,996 10.08%
Rental & Leases 177,160 46,311 26.14% 41,484 5,000 12.05%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 135,939 50,999 37.52% 168,144 4,540 2.70%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 182,266 3,250 1.78% 139,172 1,138 0.82%
Instructional & Other Materials 60,917 7,718 12.67% 68,115 3,605 5.29%
Maintenance & Repair 15,172 341 2.25% 15,772 1,681 10.66%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 32,436 ‐ 0.00% 40,000 ‐ 0.00%
Capital Outlay 93,901 219 0.23% 282,606 1,739 0.62%
Total Expenses 14,467,753 2,600,488 17.97% 15,370,492 2,573,563 16.74%
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 6,690,713 1,210,153 18.09% 5,860,770 1,165,509 19.89%
Faculty‐PT 1,191,206 192,664 16.17% 1,790,194 244,146 13.64%
Librarian/Counselor‐FT 186,866 31,188 16.69% 53,730 8,942 16.64%
Librarian/Counselor‐PT 31,357 5,230 16.68% 33,248 4,562 13.72%
Staff‐FT 2,356,976 389,144 16.51% 2,365,929 392,304 16.58%
Staff‐PT 361,635 54,849 15.17% 441,322 45,740 10.36%
Sub‐total Salaries 10,818,753 1,883,227 17.41% 10,545,193 1,861,204 17.65%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 318,629 23,680 7.43% 337,228 30,580 9.07%
Travel 78,252 10,395 13.28% 87,347 14,675 16.80%
Marketing Costs 43,823 ‐ 0.00% 38,323 1,346 3.51%
Rental & Leases 489,486 74,720 15.27% 508,719 72,051 14.16%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 322,241 146,093 45.34% 345,565 236,033 68.30%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 62,343 10,575 16.96% 85,724 16,192 18.89%
Instructional & Other Materials 294,951 14,851 5.04% 364,475 14,993 4.11%
Maintenance & Repair 50,834 2,488 4.89% 84,713 1,089 1.29%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 48,017 ‐ 0.00% 50,000 ‐ 0.00%
Capital Outlay ‐ ‐ 0.00% 559,924 ‐ 0.00%
Total Expenses 12,527,329 2,166,029 17.29% 13,007,211 2,248,162 17.28%
Southeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Coleman College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
6
Adjusted Budget
FY2012
YTD Actuals Thru
October 31, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
October 31, 2012 % of Budget Used
EXPENSES
Faculty‐FT 2,379,308 450,340 18.93% 2,370,440 468,512 19.76%
Faculty‐PT 3,205,781 520,649 16.24% 3,637,035 556,861 15.31%
Librarian/Counselor‐FT 67,910 11,318 16.67% 2,887 2,886 99.97%
Librarian/Counselor‐PT ‐ ‐ 0.00% ‐ ‐ 0.00%
Staff‐FT 3,674,157 608,246 16.55% 3,722,075 599,788 16.11%
Staff‐PT 689,123 79,696 11.56% 619,862 100,598 16.23%
Sub‐total Salaries 10,016,279 1,670,249 16.68% 10,352,299 1,728,645 16.70%
Employee Benefits ‐ ‐ ‐ ‐ ‐ 0.00%
Supplies Gen Exp 199,366 14,020 7.03% 209,666 44,638 21.29%
Travel 68,930 8,194 11.89% 70,555 20,293 28.76%
Marketing Costs 206,496 68,960 33.40% 191,180 34,694 18.15%
Rental & Leases 47,975 3,909 8.15% 48,180 2,418 5.02%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ 0.00%
Contract Services 93,052 2,309 2.48% 58,574 14,716 25.12%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 54,193 12,232 22.57% 52,044 17,290 33.22%
Instructional & Other Materials 1,178,083 79,596 6.76% 1,350,175 76,918 5.70%
Maintenance & Repair 102,500 16,932 16.52% 158,150 14,353 9.08%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency ‐ ‐ ‐ ‐ ‐ ‐
Capital Outlay 7,942 912 0.00% 30,859 ‐ 0.00%
Total Expenses 11,974,816 1,877,313 15.68% 12,521,682 1,953,966 15.60%
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
7
Division of Extended Learning
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256
Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072
Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940
Total Fundable Contact Hou 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268
Source: Certified CBM004 & CBM00C.
8
HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours
FY 2006-07 thru FY 2011-12
0
5000000
10000000
15000000
20000000
25000000
30000000
2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12
Continuing Education Technical Academic
+5.9%+15.1%
+10.7%+2.5%
‐2.6%
HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2009‐10 thru FY 2012‐13)
Fall Semester (Unduplicated Enrollment ‐ All Students)*
Spring Semester (Unduplicated Enrollment ‐ All Students)
Summer Semester (Unduplicated Enrollment ‐ All Students)
* As of November 07, 2012.
9
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
-70
-60
-50
-40
-30
-20
-10 0 10 20 30 40 50 60 70 80 90
Spr 12
Spr 11
Spr 10
Census Day
First Class Day
Spr 12 Enrollment:‐5.9% (Spr12 to 11)‐1.4% (Spr12 to 10)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
-62
-52
-42
-32
-22
-12 -2 8 18 28 38 48 58 68
Sum 12
Sum 11
Sum 10
First Class Day
Census Day
Sum 12 Enrollment:‐0.0% (Sum12 to 11)‐4.1% (Sum12 to 10)
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000-1
10
-100 -90
-80
-70
-60
-50
-40
-30
-20
-10 0 10 20 30 40 50 60 70
Fall 12
Fall 11
Fall 10Fall 12 Enrollment:
‐5.5% (Fall12 to 11)‐1.9% (Fall12 to 10)
First Class Day
Census Day
HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru October 31, 2012
2009 Positions
Revenues Expenditures Rev H/(L) Exp
YTD Actuals Thru October 31, 2012 64,311,638 49,676,408 14,635,230
YTD Actuals Thru October 31, 2011 67,610,952 57,445,514 10,165,439
(3,299,315) (7,769,106)
10
‐
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
Revenues Expenditures
` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month
Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 58,227,650 9,431,856
2011‐2012 61,685,752 9,480,515 24,214,599 37,832,575 66,013,487 35,495,964 10,116,378 16,794,724 15,263,177 9,332,949 7,924,181 9,726,145
2009 Positions
Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 28,324,834 24,699,442
2011‐2012 37,698,782 23,302,047 20,581,833 17,164,427 19,407,583 18,185,253 18,965,252 39,130,360 18,696,899 18,586,628 21,489,075 18,505,226
11
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru October 31, 2012 by Source
2009 Positions
State
Appropriations Ad Valorem Taxes Tuition, Net Fees
Other Local
Income* Extended Learning Grant Revenue Total Revenues
YTD Actuals Thru October 31, 2012 17,867,571 12,311 17,166,699 26,802,600 359,518 2,020,284 82,656 64,311,638
YTD Actuals Thru October 31, 2011 17,947,320 16,286 18,511,318 28,898,132 296,900 1,900,998 39,998 67,610,952
(79,749) (3,975) (1,344,619) (2,095,532) 62,617 119,286 42,657 (3,299,315)
12
‐
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
StateAppropriations
Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*
Extended Learning Grant Revenue
HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru October 31, 2012 by Source
2009 Positions
YTD Actuals Thru Faculty‐FT Faculty‐PT
Librarian/
Counselor‐FT
Librarian/
Counselor‐PT Staff‐FT Staff‐PT
Employee
Benefits
Supplies Gen
Exp Travel
Marketing
Costs
Rental &
Leases
Insurance/
Risk Mgmt
Contract
Services Utilities
Other
Departmental
Expenses
Instructional &
Other
Materials
Maintenance &
Repair
Transfers/
Debt Capital Outlay Total Expenses
October 31, 2012 10,765,367 5,200,028 911,991 113,283 10,437,687 1,213,552 3,080,654 888,373 129,398 299,509 396,792 6,562,016 1,832,381 1,085,312 412,863 1,268,115 60,616 5,005,690 12,781 49,676,408
October 31, 2011 10,479,826 5,297,312 1,223,935 97,729 10,315,289 1,327,230 2,380,567 774,519 90,430 230,612 1,783,642 6,205,960 1,351,373 738,062 350,298 1,626,814 58,856 13,072,784 40,275 57,445,514
285,541 (97,284) (311,944) 15,553 122,398 (113,678) 700,087 113,854 38,968 68,896 (1,386,850) 356,056 481,009 347,251 62,565 (358,699) 1,760 (8,067,095) (27,493) (7,769,106)
13
‐
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
14,000,000
15,000,000
16,000,000
17,000,000
18,000,000
19,000,000
20,000,000
21,000,000
22,000,000
23,000,000
24,000,000
25,000,000
26,000,000
27,000,000
28,000,000
29,000,000
30,000,000
Unrestricted Auxiliary Restricted Total
Unexpended
Plant Renewal
Retirement of
Debt
Investment in
Plant Total
Consolidation &
Elimination Total All Funds
ASSETSCurrent Assets:
Cash & cash equivalents 67,354,148$ 9,371,308$ ‐$ 76,725,456$ 1,421,844$ 9,866,965 ‐$ 11,288,809$ ‐$ 88,014,265$
Restricted cash & cash equivalents ‐ ‐ 12,493,313 12,493,313 138,011,474 681,148 ‐ 138,692,622 ‐ 151,185,935
Short term Investments ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Accounts/Other receivable (net) 13,293,133 2,613,138 9,758,795 25,665,066 70,798 747,950 ‐ 818,748 ‐ 26,483,814
Deferred charges ‐ 669,701 ‐ 669,701 ‐ ‐ ‐ ‐ ‐ 669,701
Prepaids ‐ 76,674 ‐ 76,674 1,762,224 ‐ ‐ 1,762,224 ‐ 1,838,898
Total Current Assets 80,647,281 12,730,821 22,252,108 115,630,210 141,266,340 11,296,063 ‐ 152,562,403 ‐ 268,192,613
Non‐current Assets:
Deferred charges, net ‐ ‐ ‐ ‐ 3,548,100 ‐ 2,601,880 6,149,980 ‐ 6,149,980
Restricted long‐term investments ‐ ‐ ‐ ‐ 2,869,441 2,683,632 ‐ 5,553,073 ‐ 5,553,073
Long‐term investments 10,984,386 ‐ ‐ 10,984,386 ‐ ‐ ‐ ‐ ‐ 10,984,386
Capital Assets, net ‐ ‐ ‐ ‐ 71,886,315 ‐ 654,277,934 726,164,249 ‐ 726,164,249
Total Non‐current Assets 10,984,386 ‐ ‐ 10,984,386 78,303,856 2,683,632 656,879,814 737,867,302 ‐ 748,851,688
Total Assets 91,631,667$ 12,730,821$ 22,252,108$ 126,614,596$ 219,570,196$ 13,979,695$ 656,879,814$ 890,429,705$ ‐$ 1,017,044,301$
LIABILITIESCurrent Liabilities:
Accounts payable 8,094,952 523,799 8,067,292 16,686,043 44,739 ‐ ‐ 44,739 ‐ 16,730,782
Accrued liabilities 92,789 2,871 31,449 127,109 1,442,493 558,933 ‐ 2,001,426 ‐ 2,128,535
Compensated absences 2,351,464 ‐ ‐ 2,351,464 ‐ ‐ ‐ ‐ ‐ 2,351,464
Funds held for others 17,527 107,889 473,043 598,459 189,209 ‐ ‐ 189,209 ‐ 787,668
Deferred revenue ‐ 297,461 1,236,491 1,533,952 1,474,662 ‐ (1,600,060) (125,398) ‐ 1,408,554
Notes payable‐current portion ‐ ‐ ‐ ‐ 4,655,000 ‐ 2,595,000 7,250,000 ‐ 7,250,000
Bonds payable‐current portion ‐ ‐ ‐ ‐ ‐ ‐ 14,175,000 14,175,000 ‐ 14,175,000
Capital lease obligations‐current ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Current Liabilities 10,556,732 932,020$ 9,808,275 21,297,027 7,806,103 558,933 15,169,940 23,534,976 ‐ 44,832,003
Non‐current Liabilities:
Deposits ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Notes payable ‐ ‐ ‐ ‐ 146,206,719 ‐ 31,405,318 177,612,037 ‐ 177,612,037
Bonds payable ‐ ‐ ‐ ‐ 62,554,009 1,279,420 269,438,431 333,271,860 ‐ 333,271,860
Capital lease obligations ‐ ‐ ‐ ‐ ‐ ‐ 108,309,832 108,309,832 ‐ 108,309,832
Total Non‐current Liabilities ‐ ‐ ‐ ‐ 208,760,728 1,279,420 409,153,581 619,193,729 ‐ 619,193,729
Total Liabilities 10,556,732$ 932,020$ 9,808,275$ 21,297,027$ 216,566,831$ 1,838,353$ 424,323,521$ 642,728,705$ ‐$ 664,025,729$
Fund Balance‐
August 31, 2012 Unaudited 67,012,410 11,758,303 9,079,932 87,850,645 3,709,864 9,980,240 235,429,798 249,119,902 ‐ 336,970,547
Revenues Over Expenditures
Unrestricted 14,062,525 40,498 14,103,023 14,103,023
Restricted 3,363,901 3,363,901 3,363,901
Net Investment in Plant (706,497) 2,161,102 (2,873,504) (1,418,899) (1,418,899)
Total Fund Balances 81,074,935$ 11,798,801$ 12,443,833$ 105,317,569$ 3,003,367$ 12,141,342$ 232,556,294$ 247,701,003$ ‐$ 353,018,572$
Total Liabilities & Fund Balances 91,631,667$ 12,730,821$ 22,252,108$ 126,614,596$ 219,570,197$ 13,979,695$ 656,879,815$ 890,429,708$ ‐$ 1,017,044,301$
14
PLANT & BOND FUNDS
Houston Community CollegeBalance Sheet By Fund
For Month Ended October 31, 2012
CURRENT & LOAN FUNDS
TOTAL
Unexpended Plant Funds
Total Unexpended Plant Fund Balances per Books (847,186)$
Spending/Encumbrances/Reserve for Future Use
‐ Encumbrances/PO Issued General Unexpended FY13 847,186
Total Plant Fund PO 847,186$
Anticipated Unexpended Plant Shortfall ‐$
HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP
Cash Position to October 31, 2012
15
Description of Use
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances To
Date Unexpended
DEFERRED MAINTENANCE FY05
System Administration 604,863$ 604,863$ ‐$ ‐$
Subtotal 604,863$ 604,863$ ‐$ ‐$
DEFERRED MAINTENANCE FY06
System Administration 649,625$ 649,624$ ‐$ ‐$
Northwest College 412,743 412,743 ‐ ‐
Coleman College 190,738 190,736 ‐ ‐
Subtotal 1,253,106$ 1,253,103$ ‐$ ‐$
DEFERRED MAINTENANCE FY07
System Administration 775,610$ 775,610$ ‐$ ‐$
Central College 373,917 373,917 ‐ ‐
Northwest College 599,383 599,383 ‐ ‐
Northeast College 1,059,733 1,059,733 ‐ ‐
Southwest College 74,607 74,607 ‐ ‐
Southeast College 38,742 38,742 ‐ ‐
Coleman College 9,900 9,900 ‐ ‐
Subtotal 2,931,893$ 2,931,892$ ‐$ ‐$
DEFERRED MAINTENANCE FY08
System Administration 10,195$ 10,195$ ‐$ ‐$
Central College 478,637 478,637 ‐ ‐
Northwest College 1,217,755 1,217,755 ‐ ‐
Northeast College 494,886 494,886 ‐ ‐
Southwest College 42,063 42,063 ‐ ‐
Coleman College 73,813 73,813 ‐ ‐
Subtotal 2,317,348$ 2,317,349$ ‐$ ‐$
OTHER GENERAL PROJECTS
Minor Construction 657,807$ 657,807$ ‐$ ‐$
System 11,555,483 10,990,789 564,694 ‐
Central College 3,054,409 2,906,526 147,883 ‐
Northwest College 4,060,039 4,044,540 15,499 ‐
Northeast College 626,331 619,524 6,807 ‐
Southwest College 1,103,100 1,000,997 102,103 ‐
Southeast College 1,995,204 1,987,854 7,350 ‐
Coleman College 1,341,159 1,341,159 ‐
Subtotal 24,393,532$ 23,549,196$ 844,336$ ‐$
SURPLUS PROPERTY
Palmetto Property ‐ Purchase 495,154$ 495,154$ ‐$ ‐$
Dixie Property‐ Refund 20,000 20,000 ‐
288 Property‐ Purchase 1,142,402 1,139,552 2,850 ‐
Warehouse Property 12,966,619 12,966,619 ‐ ‐
Subtotal 14,624,175$ 14,621,325$ 2,850$ ‐$
Total Anticipated Uses 46,124,917$ 45,277,728$ 847,186$ ‐$
UNEXPENDED PLANT FUND PROJECTSas of October 31, 2012
16
HOUSTON COMMUNITY COLLEGE
Total Budget
to Date
Total
Expenditures
To Date
Encumbrances
To Date
% of
Expen‐
ditures Unexpended
% of
Total
BudgetSources:
Central College 2001A Bond 25,318,535$
2003 Limited Tax Bond and Premium 150,748,497
Actural Interest Earned 2003 Limited Tax Bonds 20,868,074
2005 Limited Tax and Building Bond 1,875,000
2003/2005 LTD Bond Issuance Cost (2,068,522)
2006 Jr Lien Bond Std Revenue Bond 30,000,000
Bond Issuance Cost (913,149)
Actual Interest Earned 2006 Jr Lien Bonds 2,608,533
Transferred to Fund 7305/Hayes Road (3,169,049)
2008 Maintenance Tax Notes 56,912,320
2008 MTN Bond Issuance Cost (1,056,912)
Actual Interest Earned 2008 MTN 1,654,029
2008 Sr. Lien Bond 1,714,953
Transferred to Residual CIP Funds (20,712,314)
Total Available with Reclassification 263,779,995$
Uses:
Construction 119,626,029$ 119,499,752$ 126,277$ 100% ‐$ 0%
CPMS PGAL 11,121,809 11,121,809 ‐ 100% ‐ 0%
Facility Planning 1,677,989 1,677,989 ‐ 100% ‐ 0%
Architect Fees and Engineering 7,604,912 7,505,762 99,149 100% ‐ 0%
Other Costs including Bldg/Land Purchase 2,273,077 2,258,218 14,859 100% ‐ 0%
Inspectors 890,000 890,000 ‐ 100% ‐ 0%
Design Standard 103,370 103,370 ‐ 100% ‐ 0%
Site Improvement and Infrastructure Development 52,562,059 51,540,329 1,021,730 100% ‐ 0%
IT Infrastructure Master Plan 29,728,464 29,038,477 689,987 100% ‐ 0%
Furniture and Fixtures 14,352,845 13,909,258 443,071 100% 516 0%
Small Business 567,383 567,383 ‐ 100% ‐ 0%
Administrative Services 3,376,760 3,186,703 190,057 100% (0) 0%
Material Testing 574,120 537,606 36,513 100% ‐ 0%
Contingency for Construction 48,562 0% 48,562 100%
Surveying 471,813 460,552 11,260 100% ‐ 0%
Design and Geotech 110,911 110,111 800 100% ‐ 0%
Signage 70,000 70,000 100% ‐ 0%
Blue Light Security 126,000 115,200 10,800 100% ‐ 0%
PGAL Website Development 181,208 181,208 ‐ 100% ‐ 0%
System Architect Furniture Consultant 11,367 11,367 100% ‐ 0%
Northline Demolition‐Pizza Hut 226,246 226,246 100% ‐ 0%
Police Cars 342,223 341,613 610 100% ‐ 0%
Bering St. Property 50,687 50,687 100% ‐ 0%
General Repairs & Maintenance 2,079,239 2,079,239 100% ‐ 0%
Land Purchase 1,919,729 1,919,729 100% ‐ 0%
Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067 2,213,648 18,119 100% 3,300 0%
Total Construction Cost 252,331,872$ 249,616,259$ 2,663,234$ 100% 52,378$ 0%
Note: Expenditures Not In Construction Schedule
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ 100% ‐$ 0%
IT Development 6,448,123 6,448,122 ‐ 100% ‐ 0%
263,779,995$ 261,064,381$ 2,663,235$ 100% 52,378$ 0%
Anticipated Budget Shortfall/Surplus (0)
*Footnote on next page
HOUSTON COMMUNITY COLLEGE2004 CIP Projectsas of October 31, 2012
17
2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732
1,855,504 213,018 2,068,522
2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974
913,149
2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463
1,056,912
18
HOUSTON COMMUNITY COLLEGE2004 CIP Projects Footnotes
as of October 31, 2012
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
Central ‐ San Jacinto:*
Construction Cost 1,241,868$ 1,241,868$ ‐$
CPMS PGAL 111,440 111,440 ‐ ‐
Facilities Space Programming 393,715 393,715 ‐ ‐
Material Testing ‐ ‐ ‐ ‐
IT Infrastructure Capital Projects 10,000 5,687 4,314 ‐
Design Standards 3,904 3,904 ‐
Total Central ‐ San Jacinto 1,785,007$ 1,780,694$ 4,314$ ‐$
Central ‐ Learning Hub/Science Bldg:*
Construction Cost 21,484,282$ 21,455,534$ 28,748$ -$ CPMS PGAL 1,967,801 1,967,801 ‐
Facilities Space Programming 148,096 148,096 ‐ ‐
Architect and Engineering 1,242,506 1,242,506 ‐
Furniture, Fixtures & Equipment 2,049,869 2,019,706 30,163 ‐
Inspectors 187,000 187,000 ‐
Project Software 7,614 7,614 ‐
Design Standards 15,086 15,086 ‐
Site Infrastructure Improvements 5,693,396 4,979,400 713,994 ‐
IT Infrastructure Master Plan 2,751,121 2,726,528 24,593 ‐
Design Geotech 10,150 10,150 ‐
Material Testing 32,994 32,356 638 ‐
Surveying 69,453 64,118 5,335 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total Central ‐ Learning Hub/Science
Bldg:*
35,677,368$ 34,872,095$ 805,271$ ‐$
NEC ‐ Learning Hub:*
Construction Cost 14,001,119$ 14,001,119$ ‐
CPMS PGAL 1,187,440 1,187,440 ‐
Facilities Space Programming 145,889 145,889 ‐
Architect and Engineering 723,556 723,556 ‐
Furniture, Fixtures & Equipment 1,660,682 1,651,908 8,774 ‐
Other Costs including Bldg/Land Purchase ‐ ‐
Inspectors 205,000 205,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,015 9,015 ‐
Site Infrastructure Improvements 92,682 92,682 ‐ ‐
IT Infrastructure Master Plan 1,250,254 1,249,836 418 ‐
Design Geotech ‐ ‐
Material Testing 131,870 123,607 8,263 ‐
Surveying 71,081 71,081 ‐
Total NEC ‐ Learning Hub 19,478,588$ 19,461,133$ 17,455$ ‐$
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of October 31, 2012
19
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of October 31, 2012
NEC ‐ Science Engineering & Technology:*
Construction Cost 11,627,061$ 11,626,428$ 633$ ‐$
CPMS PGAL 857,203 857,203 ‐ ‐
Facilities Space Programming 52,058 52,058 ‐
Architect and Engineering 635,906 635,906 ‐
Furniture, Fixtures & Equipment 644,019 607,016 37,003 ‐
Other Costs including Bldg/Land Purchase 84,400 73,800 10,600 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 6,818 6,818 ‐
Site Infrastructure Improvements 15,423,846 15,339,461 84,385 (0)
IT Infrastructure Master Plan 1,173,585 1,160,824 12,761 ‐
Design Geotech 28,500 28,500 ‐
Material Testing 95,465 95,465 ‐ ‐
Surveying 15,960 10,035 5,925 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total NEC ‐ Science Eng & Technology 30,662,821$ 30,509,714$ 153,107$ (0)$
NEC ‐ Pinemont:
CPMS PGAL 6,269$ 6,269$ ‐$ ‐$
Facilities Space Programming 71,292 71,292 ‐ ‐
Other Costs including Bldg/Land Purchase
102,156 102,156
‐ ‐
Surveying 22,483 22,483 ‐ ‐
Total NEC ‐ Pinemont 202,200$ 202,200$ ‐$ ‐$
SEC - Felix Fraga (Drennan):*Construction Cost 12,419,860$ 12,333,251$ 86,609$ ‐$
CPMS PGAL 1,216,969 1,216,969 ‐
Facilities Space Programming 227,023 227,023 ‐
Architect and Engineering 850,383 835,511 14,872 ‐
Furniture, Fixtures & Equipment 1,007,615 977,469 30,146 ‐
Other Costs including Bldg/Land Purchase 62,466 62,466 ‐
Inspectors - ‐
Project Software - ‐
Design Standards 6,873 6,873 ‐
Site Infrastructure Improvements 5,981,474 5,959,525 21,949 ‐
IT Infrastructure Master Plan 1,279,923 1,268,405 11,518 ‐
Design Geotech 19,000 18,200 800 ‐
Material Testing 150,272 137,662 12,610 ‐
Surveying 27,674 27,674 ‐
HUB/Small Business Program ‐ ‐ ‐ ‐
HUB/Small Business Program ‐ ‐
Bering St Property 50,687 50,687 ‐
Signage ‐ ‐
Blue Light Security 18,000 16,200 1,800 ‐ Total SEC - Felix Fraga (Drennan):* 23,318,219$ 23,137,915$ 180,304$ ‐$
20
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of October 31, 2012
SEC ‐ Felix Morales:*
Construction Cost 3,653,331$ 3,653,330$ ‐$
CPMS PGAL 667,905 667,905 ‐
Facilities Space Programming 62,181 62,181 ‐
Architect and Engineering 367,853 351,968 15,885 ‐
Furniture, Fixtures & Equipment 929,072 898,276 30,796 ‐
Inspectors ‐ ‐ ‐ ‐
Project Software ‐ ‐ ‐ ‐
Design Standards 3,117 3,117 ‐ ‐
Site Infrastructure Improvements 98,015 96,070 1,945 ‐
IT Infrastructure Master Plan 1,165,326 1,008,321 157,005 ‐
Design Geotech ‐ ‐ ‐ ‐
Material Testing 10,009 5,808 4,201 ‐
Surveying 1,225 1,225 ‐ ‐
Total SEC ‐ Felix Morales 6,958,033$ 6,748,200$ 209,832$ ‐$
SEC ‐ Learning Hub:*
Construction Cost 16,555,351$ 16,550,039$ 5,312$ ‐$
CPMS PGAL 1,744,048 1,744,048 ‐
Facilities Space Programming 126,588 126,588 ‐
Architect and Engineering 875,415 875,415 ‐
Furniture, Fixtures & Equipment 2,006,664 1,839,187 167,476 ‐
Other Costs including Bldg/Land Purchase 32,480 28,221 4,259 ‐
Inspectors 258,000 258,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,367 9,367 ‐
Site Infrastructure Improvements 12,134,156 12,000,427 133,729 ‐
IT Infrastructure Master Plan 2,177,705 2,157,010 20,695 ‐
Administrative Services ‐ ‐
Design Geotech 9,525 9,525 ‐ ‐
Material Testing 122,370 115,883 6,487 ‐
Surveying 144,094 144,094 ‐
Blue Light Security 18,000 18,000 - ‐
Total SEC ‐ Learning Hub 36,213,761$ 35,875,804$ 337,958$ ‐$
21
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of October 31, 2012
SW ‐ Missouri City:*
Construction Cost 8,891,630$ 8,891,630$ ‐$
CPMS PGAL 601,635 601,635 ‐ ‐
Facilities Space Programming 194,111 194,111 ‐
Architect and Engineering 989,044 958,905 30,139 ‐
Furniture, Fixtures & Equipment 1,053,411 1,011,146 42,265 ‐
Library & Bookstore 1,991,575 1,991,575 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 4,999 4,999 ‐
Site Infrastructure Improvements 5,061,234 5,061,234 ‐ ‐
IT Infrastructure Capital Projects 2,259,481 2,246,083 13,398 ‐
Design Geotech ‐ ‐
Material Testing ‐ ‐
Surveying 48,311 48,311 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ Missouri City 21,113,430$ 21,025,828$ 87,602$ ‐$
SW ‐ West Loop Phase I:*
Construction Cost 9,033,809$ 9,031,922$ 1,887$ ‐$
CPMS PGAL 1,033,865 1,033,865 ‐
Facilities Space Programming 76,260 76,260 ‐
Architect and Engineering 718,694 718,694 ‐
Furniture, Fixtures & Equipment 2,166,396 2,154,214 12,182 ‐
Design Standards 8,170 8,170 ‐
IT Infrastructure Capital Projects 2,893,767 2,864,190 29,577 ‐
Design Geotech 22,116 22,116 ‐
Material Testing 21,141 21,140 1 ‐
Surveying 14,995 14,995 ‐ ‐
Exterior Signage 70,000 70,000 ‐ ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ West Loop Phase I 16,077,212$ 16,031,765$ 45,447$ ‐$
22
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of October 31, 2012
SW ‐ Learning Hub ‐ Stafford:*
Construction Cost 20,717,717$ 20,714,629$ 3,088$ ‐$
CPMS PGAL 1,727,234 1,727,234 ‐
Facilities Space Programming 180,778 180,778 ‐
Architect and Engineering 1,193,942 1,155,688 38,254 ‐
Furniture, Fixtures & Equipment 2,835,121 2,750,339 84,265 517
Inspectors 240,000 240,000 ‐
Project Software ‐ ‐
Design Standards 15,845 15,845 ‐
Site Infrastructure Improvements 8,077,256 8,011,530 65,726 ‐
IT Infrastructure Capital Projects 2,611,069 2,535,820 75,249 ‐
Design Geotech 21,620 21,620 ‐
Material Testing ‐ ‐
Surveying 56,536 56,536 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ Learning Hub ‐ Stafford 37,695,119$ 37,426,219$ 268,382$ 517$
System ‐ Network:
IT Infrastructure Capital Projects 12,162,330$ 11,817,556$ 344,774$ ‐
Administrative Services 3,376,760 3,186,703 190,057 ‐
PGAL Website Development 181,209 181,208 1 ‐
HUB/Small Business Program 567,383 567,383 ‐ ‐
System Architect Furniture Consultant
11,367 11,367
‐
Ft. Bend Library Inflation Cost Increase
‐
‐
Northline Demolition‐Pizza Hut 226,246 226,246 ‐
Police Cars 342,223 341,613 610 ‐
General Repairs & Maintenance 2,079,239 2,079,239 ‐
Land Purchase 1,919,729 1,919,729 ‐
Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067 2,213,648 18,119 3,300
Total ‐ System ‐ Network 23,101,553$ 22,544,692$ 553,559$ 3,300$
Construction Contingency 48,562$ ‐$ ‐$ 48,562
Subtotal Above 252,331,873$ 249,616,258$ 2,663,232$ 52,378$
100.00% 98.92% 1.06% 0.02%
EXPENDITURES NOT IN CONSTRUCTION SCHEDULE
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ ‐$
IT Development 6,448,123 6,448,122 ‐ ‐
GRAND TOTAL 263,779,996$ 261,064,380$ 2,663,232$ 52,378$
100.00% 98.97% 1.01% 0.02%
23
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures to
Date Encumbrances Unexpended
Sources:Transferred CIP Funds 20,712,314
Uses:
Central Learning Hub/Science Bldg:
Site Infrastructure Improvements 6,599,554$ 76,954$ 168,284$ 6,354,316$
NEC ‐ Science Engineering & Technology:
Site Infrastructure Improvements 100,059 2,184 97,875 ‐
SEC ‐ Learning Hub:
Site Infrastructure Improvements 1,992,932 ‐ 1,992,932 ‐
System ‐ Network:
IT Infrastructure Capital Projects 7,569,405 2,966,394 4,523,027 79,984
Site Infrastructure Improvements 96,600 ‐ 96,600 ‐
Construction Contingency 1,163,695 ‐ 1,163,695
Contingency 3,190,069 ‐ 3,190,069
Total Construction Cost 20,712,314$ 3,045,533$ 6,878,718$ 10,788,064$
Anticipated Budget Shortfall/Surplus ‐
24
HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds
as of 10/31/12
Total Budget
to Date
Total
Revenues /
Expenditures
To Date
Encumbrances To
Date Unexpended
Sources of funds:
Proceeds from
2006 Tax Maintenance Notes 12,000,000$
Discount (88,756)
Bond Issuance Cost (256,244)
Interest Income 835,338
Funds Available 12,490,338$
Uses of funds:
Site Infrastructure 341,092$ 327,728$ 13,364$ ‐$
Project Management 450,479 450,479 ‐ ‐
Construction 8,805,292 8,805,292 ‐ ‐
Design Phase 1,117,820 1,117,820 ‐ ‐
Architecture 17,822 17,822 ‐
Material Testing & Inspection 6,399 6,399 ‐ ‐
Land/Demolition 420,541 420,541 ‐ ‐
Survey 9,473 9,473 ‐ ‐
Construction‐Maintenance 1,259,003 1,247,114 11,889 ‐
Contingency 62,416 46,700 15,716
Grand Total Uses 12,490,338$ 12,449,368$ 25,253$ 15,716$
Net Available 0$
25
HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)
as of October 31, 2012
Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Sources:
2008 Maintenance Tax Notes 39,780,489$
2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286
Transferred to CIP Residual Fund (7170) (17,522,242)
Interest Earned To date 1,677,987
Funds Available for Projects 39,014,520$
Uses:
Site Infrastructure Improvements 5,666,582$ 5,162,973$ 503,609$ 0$
Architectural/Engineering Fees 165,537 151,654 13,883 ‐
IT Infrastructure Master Plan 19,553,388 19,199,543 353,845 ‐
Furniture, Fixtures & Equipment 5,056,049 4,572,572 483,477 ‐
Material Testing 33,351 29,035 4,316 ‐
Construction 5,437,915 5,381,526 56,389 ‐
Construction Management 132,478 132,478 ‐
Campus Security 243,116 242,415 600 101
Truck Driving School 99,200 99,200 ‐
Land 517,306 517,306 ‐
Energy Services 8,860 8,860 ‐
Design GEOTECH 5,189 5,189 ‐ ‐
Surveying 16,310 16,310 ‐ ‐
Contracted Services 2,079,239 2,079,239 ‐
Residual Funds for Completion of CIP Projects ‐ ‐ ‐ ‐
Total 39,014,520$ 37,598,300$ 1,416,119$ 101$
Bond Issuance Cost:
Bond counsel fees 63,500$
Underwriters' discount 342,526
Insurance premium 498,600
Financial advisory fee 95,105
Rating agencies fees 47,100
Printing costs 9,617
CPA consent letter fee 463
Total 1,056,912$
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
as of October 31, 2012
Fund 7203
Fund 7203 ‐ Maintenance Tax Notes
26
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Source:
2008 Senior Lien Bonds:
Southeast Workforce Project 14,300,000$
Emergency Preparedness 1,000,000
Interest Earned To date 469,549
Funds Available for Projects 15,769,549$
Uses:
Operation and Maintenance 77,034 77,034 ‐
Major Repairs and Renovation 821,560 820,726 834 ‐
South East Work Force Project 3,717,599 3,447,891 269,708 ‐
Land Purchase (Rosalie Property) 2,314,967 2,314,967 ‐
Material Engineering and Testing 8,380 3962 4,418 ‐
Construction of Workforce Building 7,262,398 6,995,583 266,815 ‐
Residual Funds for All Projects 1,567,611 1,567,611
15,769,549$ 13,660,163$ 541,775$ 1,567,611$
Bond Issuance Cost:
Bond counsel fees 123,267$
Underwriters' discount 336,128
Insurance premium 620,827
Financial advisory fee 100,981
Rating agencies fees 51,750
Printing costs 5,880
Paying agent fee 460
Verification fee 5,000
Escrow agent fee 4,600
1,248,893$
27
Fund 7308 ‐ Senior Lien Bonds
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
Fund 7308as of October 31, 2012
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Central
San Jacinto Memorial 21,391,231$ 7,703,630 3,247,345 10,440,257$
J.B. Whitely Bldg. 4,540,000 669,110 1,134,290 2,736,600
Theater One 1,699,500 159,101 48,311 1,492,088
Staff Instructional Services 1,100,000 153,621 35,334 911,045
Curriculum Innovation Center 190,000 ‐ 190,000
Fine Arts Parking Structure 190,000 138,731 37,452 13,818
Crawford Annex 68,200 18,138 ‐ 50,062
Learning Hub/Science Bldg. 27,500 15,953 ‐ 11,547
Planned Parenthood Renovation 1,608,769 1,605,024 3,746 ‐
Total Central 30,815,200$ 10,463,307$ 4,506,477$ 15,845,417$
Northeast
Automotive Tech. Training Ctr. 4,000,000$ 630,213$ 65,599$ 3,304,188$
Pinemont 66,558 39,237 ‐ 27,321
Codwell Hall 438,000 204,117 166,538 67,345
Codwell Hall Shower (Temp) 150,000 ‐ 150,000
Roland Smith Truck Driving Ctr. 140,000 54,406 ‐ 85,594
Northline 120,000 11,636 2,789 105,575
Public Safety Institute 115,000 11,668 ‐ 103,332
NE Science and Tech. Bldg 49,500 ‐ 49,500
NE Learning Hub 47,500 6,309 ‐ 41,191
Total Northeast 5,126,558$ 957,585$ 234,925$ 3,934,046$
Southeast
Angela Morales 599,000$ 413,199$ ‐$ 185,801$
Office City 38,500 ‐ ‐ 38,500
Total Southeast 637,500$ 413,199$ ‐$ 224,301$
Southwest
Stafford Campus (7 Bldgs) 4,242,406$ 3,927,204$ 315,201$ ‐$
Scarcella Center 927,356 347,710 91,289 488,357
Alief 138,680 132,664 ‐ 6,016
Academic Ctr Sienna Plantation 93,500 85,660 7,736 104
Stafford Learning Hub 54,000 ‐ 54,000
Applied Technology Center 50,000 1,715 ‐ 48,285
Greenbriar Annex 30,000 22,033 414 7,553
Total Southwest 5,535,942$ 4,516,986$ 414,641$ 604,315$
System
System Building 2,368,630$ 1,599,627$ 769,002$ ‐$
Teaching Enhancement Renovations 2,737,135 1,037,074 88,462 1,611,599
Surface Parking & Civil Infrastructure 2,400,000 1,308,031 308,982 782,987
Parking Structure 2,394,235 2,286,034 108,201$ ‐
Total System 9,900,000$ 6,230,766$ 1,274,646$ 2,394,586$
Grand Total 52,015,200$ 22,581,843$ 6,430,689$ 23,002,665$
HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes
as of October 31, 2012
28
Description Date Issued
Original Bond
Amount
Principal
Payments
Principal
Balance
Principal &
Interest FY12
Final Due
Date Call Dates
Foot‐
note
2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (13,540,000) 37,745,000 6,676,363 04/15/20 04/15/15 (A)
2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (15,360,000) 57,455,000 6,274,230 04/15/30 04/15/16 (A) (B)
2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (6,115,000) 48,425,000 4,075,100 04/15/30 04/15/18 (A)
2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (875,000) 26,375,000 2,124,275 04/15/31 04/15/20 (A)
2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (2,350,000) 31,590,000 4,150,431 04/15/25 04/15/21 (A)
2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800 04/15/21 11/15/13 (A)
2003 Limited Tax Bonds 12/01/03 144,155,000 (142,960,000) 1,195,000 782,175 02/15/14 (C)
2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)
2006 Maintenance Tax Notes 02/01/06 12,000,000 (2,660,000) 9,340,000 890,550 02/15/26 02/15/16 (C)
2008 Maintenance Tax Notes 03/01/08 54,975,000 (7,735,000) 47,240,000 4,171,426 02/15/28 02/15/18 (C)
2009 Maintenance Tax Notes 09/01/09 13,830,000 (1,445,000) 12,385,000 1,242,569 02/15/25 02/15/19 (C)
2010 Maintenance Tax Notes 07/29/10 47,645,000 (1,840,000) 45,805,000 3,998,400 02/15/29 02/15/20 (C)
2011 Maintenance Tax Notes 03/10/11 41,560,000 (1,295,000) 40,265,000 3,293,775 02/15/31 02/15/21 (C)
2011A Maintenance Tax Notes 10/12/11 19,590,000 19,590,000 1,583,875 02/15/31 02/15/21 (C)
PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,485,000) 9,120,000 837,663 04/15/28 04/15/15 (A)
PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,155,000) 16,000,000 1,313,456 04/15/30 04/15/15 (A)
PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (5,135,000) 31,815,000 2,484,773 04/15/31 04/15/16 (A) (D)
PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (6,285,000) 52,600,000 4,321,500 04/15/31 04/15/17 (A) 825,670,000 (213,235,000) 612,435,000 53,917,660
Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 10/31/12;
previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)
Footnotes:
(A) Funded from current operations, Fund 1110
(B) Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from
current operations
(C) Funded from real estate taxes, Fund 8300
(D) $1,329,772 of interest expense to be funded from real estate taxes
Schedule of Bonds and Maintenance Tax Notes
For the Month Ended October 31, 2012
Houston Community College
29
3101‐3100 Main
Leasing
3102‐Conference
Training Center 3103‐HCC‐TV
Auxiliary
3105‐HCCS ‐ PFC
Leasing 3110‐Auxiliary
3201‐Cafe Club
NEO 3100 Main
3202‐Fitness
Center‐Central
3204‐Heinen
Theater
3207‐
International
Initiatives
3208‐Saudi
Consulting
Services 3209‐Qatar Subtotal
Fund Balance 8/31/12 16,586,942$ (744,125)$ 36,165$ 898,968$ (7,498,516)$ (1,362,924)$ (76,298)$ 33,917 (82,495) 203,712 807,349 8,802,695
FY2013 Revenue 896,969 9,992 ‐ 4,606 969,391 92,696 3,358 5,855 23,333 ‐ 1,280,510 3,286,711
Salaries 54,498 52 111,262 43,819 597 480 3,500 979,980 1,194,189
Benefits 14,817 4 25,008 10,539 3 154,773 205,145
Supplies Gen Exp 6,627 1,678 368,937 1,230 435 394 1,822 963 382,085
Travel 9,096 1,489 462 11,047
Marketing Costs ‐
Rental & Leases 446 715 380 1,541
Contract Services 81,931 287,825 655 38,910 409,322
Utilities 43,103 43,103
Departmental Expenses 1,531,564 270 ‐ 1,531,834
Instructional & Other Materials ‐
Maintenance & Repair 600 215 1,291 2,817 4,923
Indirect Cost Expenditures 23,392 23,392
Exemptions and Waivers ‐
Capital Outlay ‐
Transfer 84,736 84,736
Net Income /(Loss) FY13 610,656 7,812 ‐ 4,606 (1,365,231) 13,336 2,324 2,765 13,705 ‐ 105,421 (604,607)
17,197,598 (736,313) 36,165 903,574 (8,863,747) (1,349,588) (73,974) 36,682 (68,790) 203,712 912,770 8,198,088
*Discretionary Funds
30
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of October 31, 2012
Auxiliary Funds*
Net Fund Balance
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of October 31, 2012
3110‐ Student
Vending
Commission
3111‐Auxiliary
Student
Services
3112‐Auxiliary
Student Athletic
Fee Subtotal Grand Total
Fund Balance 8/31/12 1,197,891 172,750 1,584,968 2,955,608 11,758,303
FY2013 Revenue 9,299 470,264 351,179 830,742 4,117,453
Salaries 700 34,352 35,052 35,052
Benefits 6,031 6,031 6,031
Supplies Gen Exp 2,521 63,252 49,270 115,043 115,043
Travel 136 730 10,558 11,424 11,424
Marketing Costs ‐ ‐
Rental & Leases ‐ ‐
Contract Services 3,200 3,835 7,035 7,035
Utilities ‐ ‐
Departmental
Expenses
2,750 1,500 4,250 4,250
Instructional &
Other Materials
‐ ‐
Maintenance &
Repair
‐ ‐
Indirect Cost
Expenditures
‐ ‐
Exemptions and
Waivers
‐ ‐
Capital Outlay 1,553 5,250 6,803 6,803
Transfer ‐ ‐
Net Income /(Loss) FY13 1,640 396,332 247,133 645,105 40,498
1,199,530 569,082 1,832,101 3,600,713 11,798,801
*Funds can only be used for services related to students
31
Net Fund Balance
Student Auxiliary Funds ‐ Restricted*
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts
U. S. Department of Education
Direct Programs:
Higher Education ‐ Institutional Aid 5 yrs. 84.031A 17,417 214,275 1,542,133 9/30/2014 10/1/2009
TRIO ‐ Student Support Services 5 yrs. 84.042 57,202 436,682 2,078,155 8/31/2015 9/1/2010
TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 2,575 16,669 1,172,562 ^ 8/31/2012 9/1/2007
TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 35,872 291,335 1,465,615 8/31/2017 9/1/2012
TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 53,702 410,056 2,845,845 5/31/2017 6/1/2012
Astra Stem Grant 3 yrs. 84.120A 35,516 293,375 881,873 9/30/2014 10/1/2011
Vast Academy TPSID 5 yrs. 84.407A 72,342 292,577 2,498,250 9/30/2015 10/1/2010
Pass‐Through From:
Texas Educational Agency
Adult Education ‐ State Grant Program 1 yr. 84.002 740,607 5,084,289 5,542,104 6/30/2013 7/1/2012
Adult Education ‐ State Grant Program 1 yr. 84.002 13,003 96,974 102,000 6/30/2013 7/1/2012
University of St. Thomas
Higher Education ‐ Institutional Aid 5 yrs. 84.031C 151,262 212,731 3,243,025 9/30/2016 10/1/2011
Texas Higher Education Coordinating Board
Vocational Education ‐ Basic Grants to States 1 yr. 84.048 46,480 1,051,987 1,051,987 8/31/2013 9/1/2012
College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000 26,707 208,548 8/13/2012 4/6/2011
College Access Challenge Grant Program 1 yr. 84.378A 10,359 169,803 171,798 8/13/2013 8/14/2012
Total Department of Education 1,251,337$ 8,597,461$ 22,803,895$
U.S. Department of Agriculture
Direct Programs:
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 2,105 36,414 298,538 ^ 8/31/2013 8/1/2009
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 (0) 26,428 244,000 ^ 8/14/2013 8/15/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 4,392 135,610 445,000 ^ 8/31/2013 9/1/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 23,515 202,726 245,000 8/31/2013 9/1/2011
Pass‐Through From:
Texas A & M University‐Corpus Christi 2 yrs 10.223 2,980 30,435 48,700 ^ 8/31/2013 9/1/2010
Total Department of Agriculture 32,992$ 431,613$ 1,281,238$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
32
HOUSTON COMMUNITY COLLEGE
as of October 31, 2012
Date Grant
Schedule of Federal Awards *
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award
Program Title Period Number Expenditures Amount Amount** Ends Starts
U.S. Department of Housing and Urban Development
Direct Programs:
Pass‐Through From:
Child Care Council of Greater Hous. Inc
Community Development Block Grant‐Entitlement Grant 1 yr 14.218 5,416 3,976 32,000 ^ 12/31/12 8/1/2011
Total Department of Housing And Urban Development 5,416$ 3,976$ 32,000$
Department of Labor
DOL‐Logistics Technician Training 3yrs. 33,492$ 159,097 327,404 6/30/2013 7/1/2010
Pass‐Through From:
Texas Workforce Commission
Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 8,415 61,804 243,163 9/30/2012 7/1/2011
Total Department of Labor 41,907$ 220,901$ 570,567$
Department of State
Pass‐Through From:
Northern Virginia Community College 1 yr 19 12,407 73,538 109,830 5/31/2013 3/8/2012
Total Department of State 12,407$ 73,538$ 109,830$
National Science Foundation
Direct Programs:
Education and Human Resources 4 yrs. 47.076 4,793 64,204 423,300 1/31/2013 2/15/2009
Pass‐Through From:
University of Houston System
Education and Human Resources 5 yrs. 47.076 2,400 25,212 190,000 8/31/2013 9/1/2011
Total National Science Foundation 7,193$ 89,415$ 613,300$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
33
as of October 31, 2012
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
Date Grant
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award
Program Title Period Number Expenditures Amount Amount** Ends Starts
U. S. Department of Energy
Energy Sector Grant (SECO) 8 mos 81.041 37,180 63,836 460,480 ^ 9/30/2012 5/10/2010
Solar Energy Technical Program 13 mos 81.087 24,776 591,069 750,000 12/30/14 11/1/2012
Total U. S. Department of Energy 61,956$ 654,905$ 1,210,480$
U. S. Department of Health and Human Services
Direct Programs:
Head Start 5 yrs. 93.600 15,204 34,617 936,660 9/29/2013 9/30/2008
Head Start 5 yrs. 93.600 8,791 187,332 936,660 9/29/2013 9/30/2008
Pass‐Through From:
Texas Education Agency
Temporary Assistance for Needy Families 1 yr. 93.558 10,178 10,200 208,614 8/31/2012 9/1/2011
Temporary Assistance for Needy Families 1 yr. 93.558 24,243 244,749 244,749 8/31/2013 9/1/2012
YMCA of Greater Houston
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 21,048 82,578 374,938 9/30/2012 10/1/2011
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 14,170 85,527 374,938 9/30/2013 10/1/2012
Pitt Community College
Health Information Tech Professionals 2 yrs. 93.721 62,347 461,664 1,287,568 4/1/2013 4/2/2010
University of Texas at Austin
Block Grants for Prevention and Treatment of Substance Abus 1 yr. 93.959 ‐ 9,015 22,000 9/29/2012 9/30/2011
Total Department of Health and Human Services 155,980$ 1,115,681$ 4,386,127$
U. S. Department of Homeland Security
Direct Programs:
Homeland Security 2 yrs. 97.062 5,090 58,856 250,000 ^ 12/31/12 9/1/2010
Total Department of Homeland Security 5,090$ 58,856$ 250,000$
Total Federal Financial Assistance 1,574,278$ 11,246,346$ 31,257,437$
* Scholarship grants are not included in this schedule.
**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
as of October 31, 2012
FY12 ‐ 13
34
Date Grant
Perform‐
ance Total Budget Total Award
Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts
Texas Education Agency
Adult Education 1 yr. 24,620$ 24,615$ 1,165,635$ 8/31/2012 9/1/2011
Adult Education 1 yr. 194,735 1,165,635 1,165,635 8/31/2013 9/1/2012
Drop‐Out Recovery Program 18mos 960 43,998 194,000 2/28/2013 8/1/2011
Drop‐Out Recovery Performance Pay 1 yr. 9,679 181,750 181,750 until expended 6/1/2011
Temporary Assistance for Needy Families 1 yr. 16,311 16,869 111,445 8/31/2012 9/1/2011
Temporary Assistance for Needy Families 1 yr. 14,578 131,283 131,283 8/31/2013 9/1/2012
Total Texas Education Agency 260,882$ 1,564,151$ 2,949,748$
Texas Higher Education Coordinating Board
Adult Basic Education Innovation Grant 1 yr. 58,400$ 158,314 500,000 8/31/2013 9/1/2012
Collegiate G‐Force Mentorship 1 yr. ‐ 27,148 50,000 8/31/2013 9/1/2009
First Year Experience 13 mos. 4,952 8,709 50,000 until expended 7/18/2011
Nursing Shortage Reduction Program 4 yrs. ‐ 112,280 157,314 8/31/2014 9/1/2010
Nursing Shortage Under 70 Program 1 yr. 616 383,891 383,891 8/31/2013 9/1/2012
Rider 58 ATCP School Grant 8 1/2 mos. ‐ 13,960 46,360 until expended 12/18/2009
Pass‐Through From:
University of Tex Health Science Center
Navigator Grant 1 yr. 14,213 51,452 129,195 ^ 11/30/2012 6/1/2011
Total Texas Higher Education Coordinating Board 78,181$ 755,754$ 1,316,760$
Texas Workforce Commission
Skills Development ‐ Skills for Small Business Initiatives 1 yr. ‐ 18,791 20,000 5/31/2013 6/1/2012
The Methodist 14 mos. 2,337 902,965 902,965 10/31/2013 8/20/2012
Pass‐Through From:
Total Texas Workforce Commission 2,337$ 921,756$ 922,965$
Total State Financial Assistance 341,401$ 3,241,660$ 5,189,473$
* Scholarship grants are not included in this schedule.**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
Date Grant
as of October 31, 2012
Schedule of State Awards *
FY12 ‐ 13
35
HOUSTON COMMUNITY COLLEGE
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts
21st Century FY 12 10 mos. ‐ 1 984 10/31/2012 1/3/2012
Achieving the Dream ‐ Intiative 1 yr.‐cont. ‐ 9,433 20,000 until expended 12/1/2009
Achieving the Dream ‐ Gates Foundation 3 yrs. 25,087 262,135 743,000 ^12/31/2012 7/1/2009
Adult Education/We Can Work 1 yr. ‐ ‐ 11,500 until expended 1/1/2010
American Chemical Society 8 mos 70 248 500 until expended 9/1/2011
AT&T High School Success Grant 1 yr. 7 mos. ‐ 25,216 35,000 until expended 1/31/2010
Bank of America 2 yrs. ‐ 316 50,000 until expended 5/1/2008
Baylor Summer Interns 1 yr. ‐ 1,638 60,000 until expended 5/1/2010
Brown Foundation 1 yr.‐cont. ‐ ‐ 100,000 until expended 2/1/2008
Bulletproof Vest Partnership Program 1 yr.‐cont. ‐ ‐ 5,345 until expended 9/1/2004
Capital Idea project 1 yr. 1,609 73,794 341,000 until expended 8/1/2010
Carnegie FDTN 1 yr 4,501 30,901 67,500 12/31/2012 1/1/2012
Citibank ‐ College Connection Program 1 yr. ‐ 20,475 41,718 until expended 8/15/2007
Civic Ventures 1 yr. 1 mo. ‐ 1,246 25,000 until expended 7/1/2010
Dow Male Minority Initiative Summer Prog. 1 yr. ‐ 12,588 23,986 1/2/2013 1/2/2012
Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐ 6,779 400,000 until expended 6/10/2005
Financial Empowerment Strat. Student Success 2 yrs. 1,181 60,808 63,050 12/31/2013 1/1/2012
Goldman Sachs Grant ‐ Phase I 5 yrs. 125,856 765,458 1,786,121 5/31/2016 1/3/2011
Gulf Coast Pass 3 yrs. 8,754 227,625 318,750 12/31/2014 1/1/2012
Hammill FDTN ‐ Veterans Grants 2 yrs. ‐ 11 18,191 until expended 9/1/2010
Houston Endowment Grant 3 yrs. ‐ 814 267,000 until expended 11/16/2005
Houston Pathways Initiative 2 yrs. 15,054 345,471 1,580,000 8/31/2013 3/26/2009
Interlocal Metro (PSI) 10 yrs. ‐ 45,000 200,000 8/23/2017 8/23/2008
Interlocal Stafford ‐ City of Stafford 1 yr. 6,400 71,986 149,011 until expended 10/1/2010
KBR Veterans Orientation 1 yr.‐cont. ‐ 5,540 19,685 until expended 9/1/2008
Kresge Fdtn‐Coordinator/Evaluation 1 yr. 10,681 17,221 82,450 until expended 9/1/2011
Kresge Fdtn‐Parent Academy 1 yr. 1,887 40,254 89,320 until expended 9/1/2011
Kresge Fdtn‐Veterans Grant 1 yr. 17,972 51,298 128,230 until expended 9/1/2011
MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐ 26,495 60,233 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐ 738 75,000 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐ 385 33,000 until expended 11/1/2007
Metlife Caregiving for Older Americans 1 yr.‐cont. ‐ 18,012 23,855 until expended 7/1/2007
Microsoft Elevate America 1 yr. ‐ 31,985 34,969 3/20/2013 3/20/2012
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
FY12 ‐ 13
36
HOUSTON COMMUNITY COLLEGE
Schedule of Local Government and Private Awards *
as of October 31, 2012
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts
Mobile Go Center ‐ Valero 1 yr.‐cont. ‐ 494 7,293 until expended 9/1/2007
National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐ 29,273 29,273 until expended 4/1/2005
North Forest GED Preparation 3 mos 241 6,799 25,000 until expended 10/1/2011
St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐ 4,178 142,650 until expended 9/10/2008
Susan B Komen Breast Cancer Initiative 1 yr. ‐ 6,610 123,230 until expended 4/1/2010
Texas Pioneer Foundation Grant 1 yr. 162 2,851 23,117 12/31/2012 1/26/2012
Vast Job Developer 1 yr. 1,380 20,299 94,898 until expended 11/1/2009
Verizon Foundation Grant 1 yr. ‐ 510 12,510 until expended 1/1/2010
Walmart ‐ Minority Male Initiative 1 yr. ‐ 25,215 40,000 until expended 9/1/2009
Washington Mutual 1 yr.‐cont. ‐ 16,717 31,700 until expended 9/1/2006Total Private Financial Assistance 220,835$ 2,266,817$ 7,384,069$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
37
HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *
Schedule of Local Government and Private Awards * continued
as of October 31, 2012
FY12 ‐ 13
CHANCELLOR
1
DEPUTY CHANCELLOR
12
VICE CHANCELLOR INSTRUCTION
2
VICE CHANCELLOR STUDENT SUCCESS
6
VICE CHANCELLOR INFORMATION TECHNOLOGY
1
New Postions
Transcript Evaluator
Replacement‐External ‐
‐
NewPosition‐Internal
‐
NewPosition‐External 4
Interim ‐
Leslie Dye
Randi Sprouse
‐
Kimberly Davis Oct
New Position‐Hired External
1
Application Dev
Instructional Designer
Dir., Outreach & Student Development
Replacement‐Internal
Scott Godley
NewPosition‐External
New Position‐Hired External
1
NewPosition‐Internal NewPosition‐External1
Larke Clishe
Mona Terrell Registrar
Outreach & Student Dev
Transcript Evaluator
Workforce Initiatives Program Manager
New Position‐Hired External
Replacement‐External
Oct
Instructional
Registrar
Transcript Evaluator
Henry Thomas
Oct
Transcript Evaluator
6
Repl Shantay Grays‐Hired External
4 2 Replacement‐Internal
New Position‐Hired External
Paul Donaldson
NewPosition‐Internal
Sep
New Position‐Hired External
Oct
Registrar
VC Instr
Wanda Taft
Interim
Repl David Lin‐Hired Internal
Interim ‐ Deputy Chancell
Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep
Antonio Hill
Oct
Oct
Oct
Registrar
Repl Deshaunta Stewart‐Hired Internal
Aracelia Saucedo
Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal
OctPolice Department
Repl John Chen‐Hired External‐TempManagerHR‐Compensation
James Lindsey
Oct
Houston College Community
2012‐2013 Positions
Employee Name Department Month
SepBarlett Sheinberg Resource & Economic Dev
CommentsJob Title
Interim 1 ‐ NewPosition‐External‐ ‐
Edwin Johnson Police Department
My'Keshia Robinson
Ules Harris
Executive Secretary
Police Department
Oct
Security Officer Repl Kenneth Bridges‐Hired External
Oct
NewPosition‐Internal ‐ Replacement‐InternalChancellor Replacement‐External
Patricia Thompson
Sep
Police Department Corporal Repl Timothy Ramirez‐Hired Internal
Repl Willie Rostan‐Hired External Oct
Repl Anthony Maxie‐Hired Internal
Repl Alice Binkley‐Hired Internal
Security Officer
Maria Alarcon
Sep
Police Department Corporal New Position‐Budger 11‐12‐Hired Internal Sep
Police Department
Shirley Voisin
Repl Victor Fisher‐Hired External
Police Department
Tobin Anderson
Navidad Martinez
Sep
Corporal
Oct
Corporal New Position‐Budger 11‐12‐Hired Internal
Security Officer Repl Grayland Jones‐Hired External
Repl Majid Iqbal‐Hired ExternalPolice Department Security Officer
Accounts Payable Accounting Specialist
Business Affairs
Police Department
Security OfficerKatherine McCabe
Repl Norma Jackson‐Hired Internal
Oct
NewPosition‐InternalReplacement‐ExternalVCSS
SepSystem Analyst
2 ‐ ‐ Replacement‐Internal
‐ ‐ VCIT ‐ Replacement‐ExternalReplacement‐Internal NewPosition‐External Interim
38
‐
CENTRAL
4
NORTHWEST
13
NORTHEAST
9
New Postions
Construction
Oct
Repl Mallikarjun Shintri‐Hired External‐Temp Oct
Oct
COO
New Position‐Hired External
NewPosition‐External 1
Dean Instruction
Repl Samuel sannl‐Hired External
Repl Bonnie Gallup‐Hired External‐Temp
2
NORTHEAST
Technician Services
Student Services
Sep
William Nicholson
Oct
Thomas Tankersley
Sep
Northwest
Bharat Sutaria
Nellie Bradley
Repl Carlana Brooks‐Hired External‐Temp
Fine Arts
Admissions
1 Interim
Instructor
Steven Cohan
Sep Eva Foster English
Repl Kimberly Crocker Montgomery‐Hire External‐Temp
Oct
Senior Advisor Oct
Student Life Coordinator
Student Services
Instructor
‐
Oct
Repl Joaquin Torres‐Hired External‐Temp
1
Sep
Ronald Dewlen
Instructor Repl Homer Stewart‐Hired External‐Temp
Retention Specialist Repl Joseph Willis‐Hired Internal
Lesley Savoy‐Green Enrollment Services AssociateStudent Services Repl Alonia Whitmore‐Hired Internal
New Position‐Budget 12‐13‐Hired Internal
Instructor
Betty Keller
Repl John Jagdish‐Hired External‐Temp
Office Manager
Sep
Sep
David Jones
Instructor
SepIfeanyi Oramulu
Replacement‐Internal Replacement‐External3 5 NewPosition‐Internal ‐ 1 Interim‐ NewPosition‐External
Hosein Tahvillian Electronic Engineering
NewPosition‐Internal
Repl Barbara Smith‐Hired Internal
Student Services Oct
Nicki Norman
Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep
Repl Pratap Talusani‐Hired External
Student Services
Student Services
Advising Manager
Technology
Technology
‐
Hardware/Software Technician
Repl Rima Adil‐Hired External‐Temp
Instructional
Sep
Replacement‐Internal InterimReplacement‐External
Repl Lois Avery‐Hired External
Khansaa Almansor
Sep
10
Rima Adil
Repl Manhal Chbat‐Hired External‐Temp
1
Testing AssociateInstruction‐Testing
Public Relations
Oct
Instructor
New Position‐Budget 12‐13‐Hired External
Laleh Golestani
InstructorEngineering
Enrollment Service Assistant
Sandra Brooks Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp
Sep
NewPosition‐External 1
Christine Moore
Instructor
Director of Public Relations
Student Services Interim Dean of Student Dev
Oct
Oct
Repl Johnny Watson‐Hired External‐Temp
Cashier II
Paul Brady
Anthony Hilliard
Central NewPosition‐Internal
Sep
Anika Chowdhury
Repl Nellie Bradley‐Hired Internal‐Temp
Accounting
New Position‐Budget 12‐13‐Hired Internal
Sep
Replacement‐Internal ‐
Community Outreach CoordinatorCOO
Lusinda Eshelman
Sep
Replacement‐External
Biology
Repl Cheryl Johnson‐Hired Internal
OctDora Whiteside
Repl Denny Smith‐Hired ExternalSonya Sneed
Houston College Community
2012‐2013 Positions
Employee Name Department Job Title Comments Month
Student Services ADA Counselor
Jason Wilson
39
James Connery
Repl Stella Villarreal‐Hired External‐Temp
Instructor
Student Services
SOUTHWEST
5
SOUTHEAST
3
COLEMAN
4
EXTENDED LEARNING, DIVISION OF‐
Adm. Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 22
College Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 38
Grand Total Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 60
Over all Total
New Postions
Micalyn Flagg
Jose Cruz
Kelli Caraway
COO
Ashley Nichols
Daniel Guzman
Southeast
Southwest
Christine Moore
Brandi Gaza
Oct
Instructor
Senior Advisor
1 ‐ NewPosition‐External3 NewPosition‐Internal
Repl Adballah Cherif‐Hired External‐TempLorraine Donovan
Student Dev/Advising
Oct
‐
Oct
New Position‐Hired External
Financial Aid
Nancy Garcia
Christy Muniz
Replacement‐External
11 33 6 8 2
3 1
NewPosition‐Internal 1 NewPosition‐External
‐ NewPosition‐Internal ‐ NewPosition‐External ‐ Interim ‐
5 4
2 5 1 6
Interim ‐ 2
Ex. Learning
‐
Replacement‐Internal
Replacement‐External
‐
1
Replacement‐External
60
25
Replacement‐InternalColeman
8
Instructor
Interim ‐
SepChlinical Simulation Lab Technician
Caroline Couto‐Ortiz
Charmaine Lewinson‐Evans
Repl Verlicia Pope‐Hired External
Student Services
‐ Replacement‐Internal
Repl Sharon McCowan‐Hired External
Health Science SepNew Position‐Budget 12‐13‐Hired ExternalDental Hygiene Operations Assistant
Simulation Center
Sep
Sep
3
Oct
Advisor
‐ Replacement‐External
Natural Sciences
NewPosition‐Internal
Vocaitonal Nursing
‐
Instructor
New Position‐Budget 12‐13‐Hired Internal
NewPosition‐External
Repl Pearlie Watts‐Hired ExternalVocaitonal Nursing
Instructor
1 Replacement‐Internal
Secretary II
Repl Vivian Flores‐Hired External
Senior Advisor New Position‐Budget 12‐13‐Hired Internal
Repl Margie Ricks‐Hired External‐Temp
Financial Aid Associate
Interim
English
Oct
OctStudent Dev/Advising
Academic
Oct
Sep
New Position‐Budget 12‐13‐Hired Internal
2012‐2013 Positions
Employee Name Department Job Title
Houston College Community
Campus Service Technician Repl Belinda Defalco‐Hired Internal
Comments Month
40
HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,361 1,514
2011‐2012 1,451 1,582 1,598 1,564 823 1,530 1,573 1,598 1,576 1,003 1,098 955
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,401 1,426
2011‐2012 1,429 1,415 1,425 1,327 1,407 1,429 1,396 1,404 1,410 1,397 1,391 1,429
F
T
E
F
T
E
41
‐
200
400
600
800
1,000
1,200
1,400
1,600
1,800
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
1,600
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 238 270
2011‐2012 254 293 296 293 159 279 298 300 291 184 204 178
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 155 159
2011‐2012 161 158 165 145 155 163 157 157 158 156 154 161
42
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 108 107
2011‐2012 115 112 113 109 82 109 107 110 110 99 98 84
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 56 55
2011‐2012 58 58 59 55 56 58 55 55 57 54 54 55
F
T
E
F
T
E
43
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 281 310
2011‐2012 267 292 293 307 155 323 330 334 335 198 224 190
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 131 135
2011‐2012 104 106 108 108 129 138 122 129 130 132 131 138
F
T
E
F
T
E
44
‐
50
100
150
200
250
300
350
400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 187 208
2011‐2012 200 211 216 207 112 204 212 212 211 129 137 124
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 126 125
2011‐2012 127 126 128 118 121 128 124 127 126 126 126 128
F
T
E
F
T
E
45
‐
50
100
150
200
250
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 318 385
2011‐2012 380 433 435 422 183 377 382 386 382 229 252 217
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 152 154
2011‐2012 185 184 182 145 146 155 144 150 152 151 147 153
46
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
400
450
500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 130 160
2011‐2012 143 168 173 169 77 161 178 183 179 101 120 95
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 96 103
2011‐2012 99 96 97 86 94 98 91 95 96 99 96 101
F
T
E
F
T
E
47
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 90 67
2011‐2012 85 69 68 56 55 72 63 67 64 59 57 64
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 79 81
2011‐2012 78 79 79 75 79 80 77 79 79 79 78 81
F
T
E
F
T
E
48
‐
10
20
30
40
50
60
70
80
90
100
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
80
90
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
DISTRICTFTE Comparison Year‐To‐Date Thru October 31, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 8 7
2011‐2012 7 4 4 1 ‐ 5 4 5 3 4 4 3
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 606 612
2011‐2012 616 609 608 595 627 609 625 612 614 601 605 612
F
T
E
F
T
E
49
‐
1
2
3
4
5
6
7
8
9
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
100
200
300
400
500
600
700
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru October 31, 2012 by Type
FACULTY HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 787 795
12‐13 PT 1,992 2,361
12‐13 Total Fac 2,779 3,156 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
11‐12 FT 792 797 793 788 793 785 784 782 783 768 757 794
11‐12 PT 1,911 2,334 2,390 2,331 275 2,387 2,391 2,351 2,367 1,075 1,372 679
11‐12 Total Fac 2,703 3,131 3,183 3,119 1,068 3,172 3,175 3,133 3,150 1,843 2,129 1,473
STAFF HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 1,238 1,250
12‐13 PT 840 833
12‐13 Total Staff 2,078 2,083 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
11‐12 FT 1,256 1,256 1,238 1,235 1,253 1,242 1,249 1,235 1,240 1,201 1,240 1,250
11‐12 PT 877 879 883 839 629 822 834 828 846 767 790 790
11‐12 Total Staff 2,133 2,135 2,121 2,074 1,882 2,064 2,083 2,063 2,086 1,968 2,030 2,040
50
S
t
a
f
f
Headcount
F
a
c
u
l
t
y
Headcount
‐
500
1,000
1,500
2,000
2,500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru October 31, 2012 by Type
UNDUPLICATED HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 Total 4,475 4,446
11‐12 Total 4,543 4,902 4,917 4,833 2,891 4,728 4,814 4,805 4,806 3,373 3,575 3,303
* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs
51
Unduplicated* Headcount
‐
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Non‐current assets:
Restricted cash 6,804$
Restricted investment in trust accounts 2,298,886
Lease receivable from HCCS 172,194,009
Deferred charges ‐ bond issuance costs 2,046,534
Capital Assets:
Land ‐
Other Structures ‐
Furniture & equipment ‐
Leasehold improvements ‐
Construction in process 791,957
791,957
TOTAL ASSETS 177,338,190$
Current liabilities:
Accounts payable ‐ HCC 60,979$
Accounts payable 19,982
Accrued liabilities ‐ interest ‐
Current bond payable 3,880,000
Total current liabilities 3,960,961$
Non‐current liabilities:
Deposits 440
Arbitrage payable ‐
Unearned interest income (23 years) ‐ HCC 70,298,500
Premium on bonds 2,209,548
Bonds payable 105,655,000
Total non‐current liabilities 178,163,488$
TOTAL LIABILITIES 182,124,449
TOTAL NET ASSETS ‐ restricted (4,786,259)$
PFC 1
Houston Community College ‐ Public Facility CorporationStatement of Net Assets
Cash Basis ‐ Interim Period
as of October 31, 2012
ASSETS
LIABILITIES
Cash Flows from Capital Financing Activities
Receipt from HCCS for lease payment 2,538,004$
Purchases of capital assets (815,068)
Payment on capital debt ‐ principal and interest (2,538,696)
Net cash provided (used by) in financing activities (815,760)
Cash Flows from Investing Activities
Interest income 738
Increase (decrease) in restricted cash and
restricted investment in trust accounts (815,022)
Restricted cash and restricted investment in
trust accounts ‐ beginning of year 3,120,712
Restricted cash and restricted investment in
trust accounts ‐ end of period 2,305,690$
Houston Community College System Public Facility CorporationStatement of Cash Flows
Cash Basis ‐ Interim Period
Two Month Ended as of October 31, 2012
PFC 2
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Proceeds from
2005C Lease Revenue Bond 19,155,000$
Discount (170,064) Land Purchase (4,212,644) Bond Issuance Cost (606,201) Interest Expense (524,785)
13,641,306$ Interest Income 1,003,532 Vendor Contract Refund 102,706 Transfer to Payment Account (1,354,990)
Funds Available 13,392,554$
Uses of funds:4,092$ 4,092$ ‐$ ‐$
11,550,643 11,550,643 ‐ ‐ Maintenance 393,940 141,479 252,461 ‐
6,443 6,443 ‐ 563,928 563,928 ‐
7,200 7,200 ‐ ‐ 27,403 26,326 1,077 ‐ 24,940 24,940 ‐ 44,695 44,695 ‐ ‐
596,787 596,787 ‐ ‐
172,483 8,100 164,383
Grand Total Uses 13,392,554$ 12,974,634$ 253,537$ 164,383$
Net Available ‐$
PFC requires GMP before inception.
Total Proceeds from Bond
Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of October 31, 2012
PFC 3
Bank Service ChargesConstruction
Waste Water Management *Geo Technical Services*
Survey*Architect
Engineering ServicesFFE
Contingency
* Included in GMP
Site Infrasturcture
Total Budget to
Date
Total Revenues
/ Expenditures
to Date
Encumbrances
to Date Unexpended
Sources of funds:
Proceeds from
2005 A Bonds 11,605,000$
Premium Received 492,931
Accrued Interest Received 53,425
Interest Income 998
Bond Issuance Costs (391,474)
Repayment of Loans (11,392,147)
Funds Available 368,733$
Uses of funds:
Debt Service 53,425$ 53,425$ ‐$ ‐$
Renovation & Construction 169,759 169,759 ‐ ‐
Demolish & Renovate Office 56,244 56,244 ‐ ‐
Furniture & Fixtures 46,857 46,857 ‐ ‐
Legal Fees 42,448 42,448 ‐
Grand Total Uses 368,733$ 368,733$ ‐$ ‐$
Net Available ‐$
Note 1: PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationWestgate (Katy)
as of October 31, 2012
PFC 4
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount on Bonds 36,950,000$
Discount on Bonds (546,238)
Underwriter's Discount (209,273)
Accrued Interest on Bonds 98,080
Amount Available 36,292,569$
Issuance Costs (490,131)
Accrued and Capitalized Interest (1,449,023)
Repair and Replacement (1,000,000)
Title Fees Capitalized (81,379)
Amount Available for Project 33,272,036$
Repayment to HCC (188,006)
Project Account Balance 33,084,030$
Administrative & Legal Fees (29,486)
Interest Income 836,330
Transfer Cost Issuance 85,509
Interest Expense on Notes (135,299)
Funds Available 33,841,084$
Uses of funds:
Land & Building 17,807,972$ 17,807,972$ ‐$ ‐$
Maintenance Rehabilitation &
Deferred Maintenance
12,856,469 12,856,469 ‐
CPMS PGAL 211,959 211,959 ‐
Facilities Space Programming 214,620 214,620 ‐
Furniture, Fixtures & Equipment 1,040,112 1,006,277 14,273 19,562
Site Infrastructure 971,369 854,984 4,859 111,526
Architect and Engineering 517,509 428,355 4,632 84,522
Repair & Maintenance Contingency ‐
per bond requirement
221,074 83,089 2,000 135,985
Grand Total Uses 33,841,084$ 33,463,726$ 25,764$ 351,595$
Net Available ‐$
PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project
as of October 31, 2012
PFC 5
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount of 2007 Series Bonds 58,885,000$
Premium on Bonds 3,094,498
Underwriter's Discount (346,244)
Accrued Interest Income‐ Bonds 173,733
Total Amount Available 61,806,987$
Issuance Cost (839,837)
Accrued and Capitalized Interest (4,632,122)
Repair and Maintenance Account ‐
Amount Available for Project 56,335,028$
Interest Income on Trust Account 2,496,540
Interest Expense on Notes (414,601)
Transfer to Trustee Payment Account (4,712,985)
Vendor Contract Refunds 230,035
Sale of Land 569,890
Funds Available 54,503,907$
Uses of funds:
Land & Building 10,671,234$ 10,671,234$ ‐$ ‐$
Construction Cost‐ Building 18,200,000 18,200,000 ‐ ‐
Construction‐Demolition 494,972 ‐ ‐ 494,972
Constuction‐ Site 640,988 630,793 10,194 ‐
Site Improvement 14,221,039 13,804,804 416,235 ‐
Site Demolition & Abatement 791,298 791,298 ‐
CPMS PGAL 1,391,958 1,391,958 ‐ ‐
Site and Infrastructure Design 2,334,840 2,334,840 ‐ ‐
Facilities Space Programming 29,274 29,274 ‐ ‐
Architect and Engineering 1,256,727 1,256,727 ‐
Furniture, Fixtures & Equipment 1,828,332 1,818,281 10,051 ‐
Library 66,564 66,182 382 ‐
Inspections 214,981 214,981 ‐ ‐
Design Geotech 17,500 17,500 ‐ ‐
Material Testing 24,503 24,503 ‐ ‐
Communications IT‐ PGAL 253,614 253,614 ‐
IT Telephone & Communications 790,467 790,467 ‐
Surveying 62,398 59,124 3,274 ‐
Administrative Expenses 34,505 34,505 ‐
Preconstruction Costs 886,377 886,377 ‐
Contingency 292,338 186 ‐ 292,154
Grand Total Uses 54,503,907$ 53,276,647$ 440,135$ 787,126$
PFC requires GMP before inception.
as of October 31, 2012
PFC 6
Houston Community College ‐ Public Facility CorporationNorthline Mall Project