ftx initial planning conference arf direx 2015. participants agreed with the proposed scenarios ...

7
FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015

Upload: dayna-watson

Post on 05-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

FTX• INITIAL PLANNING CONFERENCE

• ARF DIREX 2015

Page 2: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

Participants agreed with the proposed scenarios Participation:

Laos = observers Indonesia = building collapse (20 responders) China = CBRN (20 – 30 responders); RTA & HAZMAT

(25 responders); building collapse and flood (30 responders) China requested for a separate location for their CISAR Site plan of the venue will be proposed in FPC SAR Team will consist of a collaboration team with

other countries Korea = to be confirmed (CBRN, HAZMAT, building

collapse and medical)

SAR WORKING GROUP

Page 3: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

• 1. Reporting mechanism from foreign country to host .. refer to operational framework slide• Ground operational issue: reporting to commander medical

teams to on site

• 2. Logistic of medical assistance• Water supply and water purification• specific personnel identification of medical teams i.e emergency

physician/surgeon/specialized teams• volunteers for stretcher bearers • medical tent cleanliness, and sterility• medical waste management• medical staff hygiene• liaison officer at strategic place i.e evacuation camp• Field hospital, medical base station

MEDICAL WORKING GROUP

Page 4: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

MEDICAL WORKING GROUP

• Communication among the medical teams • communication support locally among the medical

teams• language barrier: requirement of translator

(recommended english-speaking personnel in each team/bilingual )

• Safety and security• rescuers, medical base, personnel

• Hygiene • clean water supply

Page 5: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

MEDICAL WORKING GROUP

• management of dead body

• psychosocial support

• victims tracking system

Page 6: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

• Assumption: All Comms down

• 2 Comms persons from Malaysia will be assigned to each of the foreign response entities

• All four sites will be connected to the EOC via voice and data

• Internet will be available at EOC

COMMUNICATION WORKING GROUP

Page 7: FTX INITIAL PLANNING CONFERENCE ARF DIREX 2015.  Participants agreed with the proposed scenarios  Participation:  Laos = observers  Indonesia = building

• Discussions are going on with Mercy Malaysia and China giving a lot of inputs both in the assets side and plan / layout of the evacuation centre.A number of new inputs are being discussed at the moment. AHA and OCHA are also coming in.

EVACUATION WORKING GROUP