fuji test beam line commissioning y.sudo univ. of tsukuba

5
Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba

Upload: roland-haynes

Post on 19-Jan-2018

222 views

Category:

Documents


0 download

DESCRIPTION

M1 M2 M3 M4 M5 M6 M7 position of magnets and monitors ( Fuji strait section ) Trigger counter Target + rate monitor Electron monitor(strip scintillator ) 10/11 at 18:00 Magnets are turned on with 3.0GeV/c. 10/12 at 11:00 HER started injection of beam. Beam shutter lead-glass counter

TRANSCRIPT

Page 1: Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba

Fuji Test Beam Linecommissioning

Y.SudoUniv. of Tsukuba

Page 2: Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba

Room for test beam @Fuji B3

We can control currents of magnets from this room.Network is ready.

Page 3: Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba

M1M2

M3 M4M5

M6M7

position of magnets and monitors ( Fuji strait section )

Trigger counter

Target + rate monitor Electron monitor(strip scintillator )

10/11 at 18:00 Magnets are turned on with 3.0GeV/c.

10/12   at 11:00HER started injection of beam.

Beam shutter

lead-glass counter

Page 4: Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba

This stage is able to move only vertically.

Controller of the stage

Concreteblock

Beam line

Beam shutter Beam shutter

Page 5: Fuji Test Beam Line commissioning Y.Sudo Univ. of Tsukuba

Result of last week and planHER 700mA, LER 1200mAWe observed beam ~ 30Hz.Beam energy looks constant.(according to oscilloscope)When shutter is closed, rate of the beam goes down 0Hz.

Plans of this week•Measurement of correlation between beam intensity and - HER current - condition of the vacuum correlation of intensity between upper side of shutter and lower side • Measurement of beam profile with electron monitor.• Adjustment of magnets adjust currents of B2-4 between -1% and +1%

Pulse shape of lead-glass counter