  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    1/27

    a

    IFrom:Sent:To:Attachments:

    GIS HocSaturday, March 19, 2011 12:52 AMPMTERDS HocFukushima 3-19-11 1400JST.pdf

    OnVAL KI.

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    2/27

    Current and Predicted Weather Conditions-~ ~ ~ 'NNAqdarnu Nx~~ ietj $~>.

    I/

    ki

    -20, 7htan, m JSi.b, .: (I--

    Dwinds (

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    3/27

    \ / From: OST02 HOCTo: Abrams. Charlotte; Adams, John; Afshar-Tous, Mugeh; Alemu, Bezakulu; Alter. Peter; Anderson, James;Ashkeboussi. Nima; Athev. George; Baker. Steghen; Bergman. Thomas; Berry. Rollie; Bhachu, Ujaear; Bloom.Steven; Blount. Tom; Boger. Bruce; Borchardt. Bill; Bower. Anthony; Bowman. Gregory; Brandon. Lou; Brandt,Philip; Brock. Kathryn; Brown Cris; Brown. David; Brown. Eva; Brown. Frederick; Brown. Michael; Bukharin.Oleg; CamPer. Larry; Carpenter. Cynthia; Carter. Mary; Case. Michael; Casto. Greo; Cecere. Bethany; Cervera.Margaret; Chazell, Russell; Chen. Yen-Ju; Cheok. Michael; Chokshi. Nilesh; Chowdhurv. Prosanta; C ;Clement, Richard; Clinton. Rebecca; Cogoins. Anita; Collins. Frank; Cool, Donald; Costa, Arlon; Crutchiev, Mary

    Glenn; Cruz. Zahira; Cltiaar. Robert; Dacus, Eugene; DeCicco. Joseph; Decker. David; Dembek. Stephen;Devlin. Steohanie; Doane, Margaret; Dorman, Dan; Dorsev, Cynthia; Dozier, Jerry; Drogoitis. Soiros; Dube.Donald; Dudes, Laura; Eads. Johnny; Emche. Danielle; English. Lance; Erlanger. Craig; Esmaili. Hossein;Figueroa. Roberto; Fiske. Jonathan; Floyd. Daghene; Fogoie. Kirk; Foster. Jack; Fragovannis. Nancy;Franovich. Rani; Frazier. Alan; Freshwater. David; Fuller, Edward; Galletta. Thomas; Gambone. Kimberly;Gibson, Kathy; Giitter. Joseph; Gilmer. James; Gordon. Dennis; Gott. William; Grant. Jeffery; Grimes. Kelly;Grobe Jack; Gulla. Gerald; Jerry; Hardestv. Duane; Harris. Tim; Hart. Ken; Hart. Michelle; Harvey. Brad;Hasselberg. Rick; Henderson. Karen; Hiland. Patrick; Holahan. Patricia; Holahan. Vincent; Holian, Brian;Howard, Tabitha; Huffert Anthony; Hurd. Sapna; HuYck. Doug; Isom. James; Jackson, Karen; Jacobson. JeJessie. Janelle; Johnson, Michael; Jolicoeur. John; Jones. Andrea; Jones, Cynthia; Kahler. Carolyn; Kmmerer,Annie; Karas, Rebecca; Khan, Omar; Kolb, Timothy; Kotzalas. Margle; Kowalczik. Jeffrey; Kratchman, Jessica;Kugler. Andrew; Lamb, Christopher; Lahe. John; Larson, Emily; Laur. Steven; LaVie. Steve; Lewis. Robert; Li,Yong; LisinG, Jason; Lombard. Mark; Lubinski, John; Lui. Christiana; Lynch. Jeffery; Mamnish, Nader; ManahanMichelle; Marksberry. Don; Marshall, Jane; Masao, Nagai; Maugin, Cardilia; Mavros. Lauren; Mazaika. Michael;McConnell. Keith; McCooDin. Michael; McDermott. Brian; McGinty. Tim; McGovern, Denise; McMurtrav, Anthony;Merritt. Christina; Meyer. Karen; Miller. Charles; Miller. Chris; Millioan. Patricia; Mohseni. Abv; Moore, Scott;Morlano. Gary; Morris. Scott; Mroz (Sahm). Sara; Munson. Clifford; Murray. Charles; Nerret. Amanda; Nguyen.Carolyn; Norris, Michael; Norton, Charles; Ordaz. Vonna; Owens. Janice; Padoyan. Mark; Parillo. John; PateLJ& ; Perin. Vanice; Pope, Tia; Powell, Amy; Purdy. Gary; Ouinlan, Kevin; Ragland, Robert; Ragland, Randolph;Ralph. Melissa; Ramsey, Jack; Reed, Elizabeth; Reed. Sara; Reed. Wendy; Reis. Terrence; Resner. Mark; Riley(OCA). Timothy Riner. Kelly; Rini Brett; Robinson, Edward; Rodriouez-Luccioni. Hector; Rosenberg. Stacey;Ross-Lee. MaryJane; Roundtree. Amy; Ruland. William; Salay. Michael; Salter, Susan; Salus. Amy; SanfilipopNathan; Scarbrough. Thomas; Schaperow. Jason; Schmidt. Duane; Schmidt. Rebecca; Schoenebeck. Greg;Schrader. Eric; Schwartzman. Jennifer; Seber. Dooan; See. Kenneth; Shane. Raeann; Shea, James; Shepherd,Jill; Sheron. Brian; Skeen, David; Sloan, Scott; Smiroldo, Elizabeth; Smith, Brooke; Smith. Theodore; StahlEric; Stang. Annette; Steger (Tucci). Christine; Stieve. Alice; Stone. Rebecca; Stranskv. Robert; Sturz. Fritz;Sullivan. Randy; Sun. Casper; TaIoert. John; Temole. Jeffrey; Thagoard. Mark; Thomas. Eric; Thoro. John;Tobin, Jennifer; Trefethan. Jean; Tschiltz. Michael; Turtil. Richard; Uhle. Jennifer; Valencia. Sandra; Vaughn.James; Vick. Lawrence; Viroilio. Martin; Virailio. Rosetta; Ward. Leonard; Wastler. Sandra; Watson, Bruce;Webber, Robert; Weber, Michael; White. Bernard; Wiggins. Jim; Wiggins. Jim; Williams, Donna; illiams.Joseph; Williamson. Linda; Willis, Dor; Wimbush. Andrea; Wittick. Brian; Wray, John; Wright, Lisa (Gibney);Wright. Ned; Wunder. George; Young, Francis; Zimmerman. Roy

    Subject: Staffing PlanDate: Friday, March 18, 2011 3:06:42 PMAttachments: Staffing plan 3-19 - 3-25.odf

    This list is for next week Sat 3/19 at 7a.m. to Friday 3/25. We do recognize that some positions dono t have full staffing. We are looking to fill those. If you know anyone who would want to fill them,have them contact OPS Center at 816-5100.

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    4/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Position Date Time StaffExecutive Team

    ET DirectorFri-Sat 3/18-3/19 11pm-7am Roy Zimmerman

    Sat 19-Mar 7am - 3pm Jim WigginsSat 19-Mar 3pm-11pm Brian Sheron

    Sat-Sun 3/19-3/20 11pm - 7am Mike JohnsonSun 20-Mar 7am - 3pm Jim WigginsSun 20-Mar 3pm-11pm Brian Sheron

    Sun-Mon 3/20-3/21 11pm - 7am Mike JohnsonMon 21-Mar 7am - 3pm Mike WeberMon 21-Mar 3pm-11pm Jim Wiggins

    Mon-Tues 3/21-3/22 11pm - 7am Mike JohnsonTues 22-Mar 7am - 3pm Mike WeberTues 22-Mar 3pm-11pm Jim Wiggins

    Tues-Wed 3/22-3/23 11pm - 7amWed 23-Mar 7am - 3pm Mike WeberWed 23-Mar 3pm-llpm

    Wed-Thur 3/23-3/24 11pm - 7amThur 24-Mar 7am - 3pmThur 24-Mar 3pm-llpm

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pmFri 25-Mar 3pm-llpm

    Fri-Sat 3/25-3/26 11pm-7am3/25-3/26 11pm-7am

    ET Response AdvisorFri-Sat 3/18-3/19 11pm-7am Scott Morris

    Sat 19-Mar 7am - 3pm Brian McDermottSat 19-Mar 3pm-11pm Mary Jane (MJ) Ross-Lee

    Sat-Sun 3/19-3/20 11pm - 7am Scott MorrisSun 20-Mar 7am - 3pm Chris MillerSun 20-Mar 3pm-llpm Mary Jane (MJ) Ross-Lee

    Sun-Mon 3/20-3/21 11pm - 7am Scott MorrisMon 21-Mar 7am - 3pm Brian McDermottMon 21-Mar 3pm-llpm Chris Miller

    Mon-Tues 3/21-3/22 11pm - 7am Scott MorrisTues 22-Mar 7am - 3pm Mary Jane (MJ) Ross-LeeTues 22-Mar 3pm-llpm Chris Miller

    Tues-Wed 3/22-3/23 11pm - 7am Scott MorrisWed 23-Mar 7am - 3pm Brian McDermottWed 23-Mar 3pm-11pm Chris Miller

    Wed-Thur 3/23-3/24 11pm - 7am Scott MorrisThur 24-Mar 7am - 3pm Mary Jane (MJ) Ross-LeeThur 24-Mar 3pm-llpm Brian McDermott

    Thur-Fri 3/24-3/25 11pm - 7am Chris MillerFri 25-Mar 7am - 3pm Mary Jane (MJ) Ross-LeeFri 25-Mar 3pm-11pm Brian McDermott

    Fri-Sat 3/25-3/26 11pm-7am

    ET Rx Prot Measures & State CoordinatorFri-Sat 3/18-3/19 llpm-7am Scott Moore

    Page 1 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    5/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Sat 19-Mar 7am - 3pm Larry CamperSat 19-Mar 3pm-11pm P. Holahan

    Sat-Sun 3/19-3/20 11pm - 7am K. McConnellSun 20-Mar 7am - 3pm Vonna OrdazSun 20-Mar 3pm-llpm Larry Camper

    Sun-Mon 3/20-3/21 11pm - 7am Rob LewisMon 21-Mar 7am - 3pm Charlie MillerMon 21-Mar 3pm-1lpm Larry Camper

    Mon-Tues 3/21-3/22 11pm - 7am Rob LewisTues 22-Mar 7am - 3pm Charlie MillerTues 22-Mar 3pm-11pm P. Holahan

    Tues-Wed 3/22-3/23 11pm - 7am C. CarpenterWed 23-Mar 7am - 3pm Charlie MillerWed 23-Mar 3pm-llpm P. Holahan

    Wed-Thur 3/23-3/24 11pm - 7am C. CarpenterThur 24-Mar 7am - 3pm Charlie MillerThur 24-Mar 3pm-11pm Larry Camper

    Thur-Fri 3/24-3/25 11pm - 7am C. CarpenterFri 25-Mar 7am - 3pm Charlie MillerFri 25-Mar 3pm-11pm P. Holahan

    Fri-Sat 3/25-3/26 11pm-7am C. Carpenter

    Executive Briefing TeamEBT Admin. Assistant

    Fri-Sat 3/18-3/19 11pm-7am Sapna HurdSat 19-Mar 7am - 3pm Carolyn KahlerSat 19-Mar 3pm-11pm Annette Stang

    Sat-Sun 3/19-3/20 11pm - 9am Sapna HurdSun 20-Mar 9am - 7pm Annette StangSun 3/20-3/21 7pm-7am Carolyn Kahler

    Sun-Mon 21-Mar 7am - 3pm A. Stang (7-11) / Sapna Hurd (11-3)Mon 21-Mar 3pm-llpm Tia PopeMon 3/21-3/22 11pm - 7am Christina Merritt

    Mon-Tues 22-Mar 7am - 3pm Carolyn Kahler/Sapna HurdTues 22-Mar 3pm-llpm Jon FiskeTues 3/22-3/23 11pm - 7am Tia Pope

    Tues-Wed 23-Mar 7am - 3pm Jon FiskeWed 23-Mar 3pm-11pmWed 3/23-3/24 11pm - 7am Christina Merritt

    Wed-Thur 24-Mar 7am - 3pm Carolyn Kahler/Sapna HurdThur 24-Mar 3pm-11pm Andrea WimbushThur 3/24-3/25 11pm - 7am Tia Pope

    Thur-Fri 25-Mar 7am - 3pm Annette StangFri 25-Mar 3pm-11pm Carolyn KahlerFri 3/25-3/26 11pm-7am Sapna Hurd

    Fri-SatEB T Coordinator

    Fri-Sat 3/18-3/19 11pm-7am Jim AndersonSat 19-Mar 7am - 3pm Christine StegerSat 19-Mar 3pm-llpm Sara Mroz

    Sat-Sun 3/19-3/20 11pm - 7am Jim AndersonSun 20-Mar 7am - 3pm Yen Chen

    Page 2 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    6/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Sun 20-Mar 3pm-llpm Sara MrozSun-Mon 3/20-3/21 1lpm.- 7am Jim Anderson

    Mon 21-Mar 7am - 3pm Yen ChenMon 21-Mar 3pm-llpm Sara Mroz

    Mon-Tues 3/21-3/22 11pm - 7am Jim AndersonTues 22-Mar 7am - 3pm Yen ChenTues 22-Mar 3pm-llpm Sara Mroz

    Tues-Wed 3/22-3/23 11pm - 7am Jim AndersonWed 23-Mar 7am - 3pm Yen ChenWed 23-Mar 3pm-llpm Sara Mroz

    Wed-Thur 3/23-3/24 11pm - 7am Jim AndersonThur 24-Mar 7am - 3pm Yen ChenThur 24-Mar 3pm-llpm Sara Mroz

    Thur-Fri 3/24-3/25 11pm - 7am Jim AndersonFri 25-Mar 7am - 3pm Yen ChenFri 25-Mar 3pm-llpm Sara Mroz

    Fri-Sat 3/25-3/26 llpm-7am Jim Anderson

    Executive Support TeamEST Status Officer

    Fri-Sat 3/18-3/19 11pm-7am Doug HuyckSat 19-Mar 7am - 3pm Craig ErlangerSat 19-Mar 3pm-llpm John Jolicoeur

    Sat-Sun 3/19-3/20 11pm - 7am Doug HuyckSun 20-Mar 7am - 3pm Craig ErlangerSun 20-Mar 3pm-llpm John Jolicoeur

    Sun-Mon 3/20-3/21 11pm - 7am Doug HuyckMon 21-Mar 7am - 3pm Jane MarshallMon 21-Mar 3pm-llpm Bill Gott

    Mon-Tues 3/21-3/22 11pm - 7am Jeff GrantTues 22-Mar 7am - 3pm Jane MarshallTues 22-Mar 3pm-llpm Bill Gott

    Tues-Wed 3/22-3/23 11pm - 7am Jeff GrantWed 23-Mar 7am - 3pm Jane MarshallWed 23-Mar 3pm-llpm Bill Gott

    Wed-Thur 3/23-3/24 11pm - 7am Jeff GrantThur 24-Mar 7am - 3pm Jane MarshallThur 24-Mar 3pm-llpm Bill Gott

    Thur-Fri 3/24-3/25 11pm - 7am Jeff GrantFri 25-Mar 7am - 3pm Jane MarshallFri 25-Mar 3pm-llpm Bill Gott

    Fri-Sat 3/25-3/26 11pm-7am Jeff Grant

    EST Actions OfficerFri-Sat 3/18-3/19 11pm-7am Amy Roundtree

    Sat 19-Mar 7am - 3pm Bezakulu AlemuSat 19-Mar 3pm-llpm Melissa Ralph

    Sat-Sun 3/19-3/20 11pm - 7am Jonathan FiskeSun 20-Mar 7am - 3pm Melissa RalphSun 20-Mar 3pm-llpm Jonathan Fiske

    Sun-Mon 3/20-3/21 11pm - 7am Dori Votolato-WillisMon 21-Mar 7am - 3pm Melissa Ralph

    Page 3 o~f 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    7/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Mon 21-Mar 3pm-llpm Amanda NerretMon-Tues 3/21-3/22 11pm - 7am Kelly Grimes

    Tues 22-Mar 7am - 3pm Melissa RalphTues 22-Mar 3pm-llpm Dori Votolato-Willis

    Tues-Wed 3/22-3/23 11pm - 7am Kelly GrimesWed 23-Mar 7am - 3pm Melissa RalphWed 23-Mar 3pm-11pm Dori Votolato-Willis

    Wed-Thur 3/23-3/24 11pm - 7am Kelly GrimesThur 24-Mar 7am - 3pm Wendy ReedThur 24-Mar 3pm-11pm Dori Votolato-Willis

    Thur-Fri 3/24-3/25 11pm - 7am Jonathan FiskeFri 25-Mar 7am - 3pm Amanda NerretFri 25-Mar 3pm-llpm Melissa Ralph

    Fri-Sat 3/25-3/26 12pm-7am Jonathan Fiske

    EST CoordinatorFri-Sat 3/18-3/19 llpm-7am Rebecca Stone

    Sat 19-Mar 7am - 3pm Clyde RaglandSat 19-Mar 3pm-llpm Tony Bowers

    Sat-Sun 3/19-3/20 11pm - 7am Rebecca StoneSun 20-Mar 7am - 3pm Clyde RaglandSun 20-Mar 3pm-llpm Tony Bowers

    Sun-Mon 3/20-3/21 11pm - 7am Rebecca StoneMon 21-Mar 7am - 3pm Tony McMurtrayMon 21-Mar 3pm-llpm Tony Bowers

    Mon-Tues 3/21-3/22 11pm - 7am Rebecca StoneTues 22-Mar 7am - 3pm Tony McMurtrayTues 22-Mar 3pm-12pm Tony Bowers

    Tues-Wed 3/22-3/23 11pm - 7am Rebecca StoneWed 23-Mar 7am - 3pm Tony McMurtrayWed 23-Mar 3pm-llpm Clyde Ragland

    Wed-Thur 3/23-3/24 11pm - 7am Rebecca StoneThur 24-Mar 7am - 3pm Tony McMurtrayThur 24-Mar 3pm-llpm Clyde Ragland

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pm Tony McMurtrayFri 25-Mar 3pm-21pm Clyde Ragland

    Fri-Sat 3/25-3/26 llpm-7am

    EST Chronology OfficerFri-Sat 3/18-3/19 11pm-7am Dennis Gordon

    Sat 19-Mar 7am - 3pm Carolyn NguyenSat 19-Mar 3pm-llpm Rebecca Karas

    Sat-Sun 3/19-3/20 11pm - 7am Cynthia DorseySun 20-Mar 7am - 3pm James VaughnSun 20-Mar 3pm-llpm Rebecca Karas

    Sun-Mon 3/20-3/21 11pm - 7am Mark ResnerMon 21-Mar 7am - 3pm Hector Rodriguez-LuccioniMon 21-Mar 3pm-22pm Rebecca Karas

    Mon-Tues 3/21-3/22 11pm - 7am Thomas ScarbroughTues 22-Mar 7am - 3pm Hector Rodriguez-LuccioniTues 22-Mar 3pm-llpm Rebecca Karas

    Page 4 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    8/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Tues-Wed 3/22-3/23 11pm - 7am Thomas ScarbroughWed 23-Mar 7am - 3pm James VaughnWed 23-Mar 3pm-llpm Rebecca Karas

    Wed-Thur 3/23-3/24 11pm - 7amThur 24-Mar 7am - 3pm Hector Rodriguez-LuccioniThur 24-Mar 3pm-llpm Rebecca Karas

    Thur-Fri 3/24-3/25 11pm - 7am Thomas ScarbroughFri 25-Mar 7am - 3pm Hector Rodriguez-LuccioniFri 25-Mar 3pm-llpm Rebecca Karas

    Fri-Sat 3/25-3/26 11pm-7am Thomas ScarbroughEST Response Ops Mgr

    Fri-Sat 3/18-3/19 11pm-7am Omar KhanSat 19-Mar 7am - 3pm Cris BrownSat 19-Mar 3pm-11pm Bob Stransky

    Sat-Sun 3/19-3/20 11pm - 7am Jean TrefethanSun 20-Mar 7am - 3pm Karen JacksonSun 20-Mar 3pm-llpm Roberto Figueroa

    Sun-Mon 3/20-3/21 11pm - 7am Jean TrefethanMon 21-Mar 7am - 3pm Bob StranskyMon 21-Mar 3pm-llpm Omar Khan

    Mon-Tues 3/21-3/22 11pm - 7am Cris BrownTues 22-Mar 7am - 3pm Bob StranskyTues 22-Mar 3pm-llpm Karen Jackson

    Tues-Wed 3/22-3/23 11pm - 7am Roberto FigueroaWed 23-Mar 7am - 3pm Bob StranskyWed 23-Mar 3pm-llpm Jean Trefethan

    Wed-Thur 3/23-3/24 11pm - 7am Cris BrownThur 24-Mar 7am - 3pm Karen JacksonThur 24-Mar 3pm-11pm Omar Khan

    Thur-Fri 3/24-3/25 11pm - 7am Roberto FigueroaFri 25-Mar 7am - 3pm Jean TrefethanFri 25-Mar 3pm-llpm Cris Brown

    Fri-Sat 3/25-3/26 11pm-7am Roberto Figueroa

    EST Admin. AssistantFri-Sat 3/18-3/19 11pm-7am Tabitha Howard

    Sat 19-Mar 7am - 3pm Karen MeyerSat 19-Mar 3pm-11pm Amy Salus

    Sat-Sun 3/19-3/20 11pm - 7am Chris LambSun 20-Mar 7am - 3pm Karen MeyerSun 20-Mar 3pm-11pm Linda Williamson

    Sun-Mon 3/20-3/21 11pm - 7am Chris LambMon 21-Mar 7am - 3pm Karen MeyerMon 21-Mar 3pm-llpm Mary Glenn Crutchley

    Mon-Tues 3/21-3/22 11pm - 7am Andrea WimbushTues 22-Mar 7am - 3pm Amy SalusTues 22-Mar 3pm-11pm Mary Glenn Crutchley

    Tues-Wed 3/22-3/23 11pm - 7am Michelle ManahanWed 23-Mar 7am - 3pm Karen MeyerWed 23-Mar 3pm-llpm Mary Glenn Crutchley

    Wed-Thur 3/23-3/24 11pm - 7am Andrea Wimbush

    Page 5 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    9/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Thur 24-Mar 7am - 3pm Am y SalusThur 24-Mar 3pm-llpm Mary Glenn Crutchley

    Thur-Fri 3/24-3/25 11pm - 7am Tabitha HowardFri 25-Mar 7am - 3pm Karen MeyerFri 25-Mar 3pm-llpm Mary Glenn Crutchley

    Fri-Sat 3/25-3/26 llpm-7am Michelle Manahan

    Liason TeamLT Director

    Fri-Sat 3/18-3/19 1lpm-7am Tom BlountSat 19-Mar 7am - 3p m To m BergmanSa t 19-Mar 3pm-11pm Bob Webber

    Sat-Sun 3/19-3/20 11pm - 7am John AdamsSun 20-Mar 7am - 3pm Tom BergmanSun 20-Mar 3pm-llpm Bob Webber

    Sun-Mon 3/20-3/21. 11pm - 7am John AdamsMon 21-Mar 7am - 3pm Tom BergmanMon 21-Mar 3pm-11pm Bob Webber

    Mon-Tues 3/21-3/22 11pm - 7am John AdamsTues 22-Mar 7am - 3p m Tom BergmanTues 22-Mar 3pm-llpm Bob Webber

    Tues-Wed 3/22-3/23 11pm - 7am John AdamsW ed 23-Mar 7am - 3pm Michael TschiltzWed 23-Mar 3pm-llpm Joe Guitter

    Wed-Thur 3/23-3/24 11pm - 7am Tim McGintyThur 24-Mar 7am - 3pm Michael TschiltzThur 24-Mar 3pm-llpm Joe Guitter

    Thur-Fri 3/24-3/25 11pm - 7am Tim McGintyFri 25-Mar 7am - 3pm Michael TschiltzFri 25-Mar 3pm-11pm Joe Guitter

    Fri-Sat 3/25-3/26 11pm-7am Tim McGintyILT Coordinator

    Fri-Sat 3/18-3/19 11pm-7am Janelle JessieSat 19-Mar 7am - 3pm Jeff TempleSat 19-Mar 3pm-11pm Rani Franovich

    Sat-Sun 3/19-3/20 11pm - 7am Janelle JessieSun 20-Mar 7am - 3pm Jeff TempleSun 20-Mar 3pm-llpm Nathan Sanfilippo

    Sun-Mon 3/20-3/21 11pm - 7am Milt MurrayMon 21-Mar 7am - 3pm Jeff TempleMon 21-Mar 3pm-llpm Nathan Sanfilippo

    Mon-Tues 3/21-3/22 11pm - 7am Milt MurrayTues 22-Mar 7am - 3pm Rani FranovichTues 22-Mar 3pm-11pm Nathan Sanfilippo

    Tues-Wed 3/22-3/23 11pm - 7am Milt MurrayW ed 23-Mar 7am - 3pm Rani FranovichWed 23-Mar 3pm-11pm Jeff Temple

    Wed-Thur 3/23-3/24 11pm - 7am Milt MurrayThur 24-Mar 7am - 3pm Rani FranovichThur 24-Mar 3pm-11pm Jeff Temple

    Thur-Fri 3/24-3/25 l1pm - 7am Milt Murray

    Page 6 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    10/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Fri 25-Mar 7am - 3pm Janelle JessieFri 25-Mar 3pm-llpm Rani Franovich

    Fri-Sat 3/25-3/26 llpm-7am Milt Murray

    LT Federal Liason (2)Fri-Sat 3/18-3/19 11pm-7am Scott Sloan

    Sat 19-Mar 7am - 3pm Russ ChazellSat 19-Mar 3pm-llpm Jeff Lynch

    Sat-Sun 3/19-3/20 11pm - 7am Scott SloanSun 20-Mar 7am - 3pm Ned WrightSun 20-Mar 3pm-llpm Jerry Hale

    Sun-Mon 3/20-3/21 11pm - 7am Lisa WrightMon 21-Mar 7am - 3pm Beth Reed/Ted SmithMon 21-Mar 3pm-11pm Ned Wright

    Mon-Tues 3/21-3/22 l1pm - 7am Lisa WrightTues 22-Mar 7am - 3pm Beth Reed/Ted SmithTues 22-Mar 3pm-llpm Ned Wright

    Tues-Wed 3/22-3/23 11pm - 7am Lisa WrightWed 23-Mar 7am - 3pm Jerry Hale/Wed 23-Mar 3pm-1lpm Ted Smith

    Wed-Thur 3/23-3/24 11pm - 7am Lisa WrightThur 24-Mar 7am - 3pm /Ted SmithThur 24-Mar 3pm-11pm Jerry Hale

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pm /Ted SmithFri 25-Mar 3pm-11pm Jerry Hale

    Fri-Sat 3/25-3/26 llpm-7am_

    LT Congressional Liason (2)Sat 19-Mar 7am - 2pm Spiros Droggitis

    19-Mar 2pm-9pm Tim RileySun 20-Mar 7am - 2pm Rebecca Schmidt

    20-Mar 2pm-9pm Reanne ShaneMon 21-Mar 7am - 2pm

    21-Mar 2pm-9pmTues 22-Mar 7am - 2pm

    22-Mar 2pm-9pmWed 23-Mar 7am - 2pm

    23-Mar 2pm-9pmThur 24-Mar 7am - 2pm

    24-Mar 2pm-9pmFri 25-Mar 7am - 2pm

    25-Mar 2pm-9pm

    LT International Liason (2)Fri-Sat 3/18-3/19 llpm-7am Elizabeth Smiroldo/Danielle Emche

    Sat 19-Mar 7am - 3pm Lance English/Steve BloomSat 19-Mar 3pm-llpm Jenny Tobin/Jill Shephard

    Sat-Sun 3/19-3/20 11pm - 7am Elizabeth Smiroldo/Danielle EmcheSun 20-Mar 7am - 3pm Karen/Steve BakerSun 20-Mar 3pm-22lpm Eric Stahl/Nancy

    Sun-Mon 3/20-3/21 11pm - 7am Elizabeth Smiroldo/Jenny Tobin

    Page 7 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    11/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Mon 21-Mar 7am - 3pm Jen Schwartzman/Charlotte Abrams/Nancy (12-3Mon 21-Mar 3pm-llpm Danielle Emche/Lauren Mayros,

    Mon-Tues 3/21-3/22 11pm - 7am Eric Stahl/MugehTues 22-Mar 7am - 3pm Jen Schwartzman/Charlotte Abrams/Nancy (12-3Tues 22-Mar 3pm-lipm Danielle Emche/Lauren Mayros

    Tues-Wed 3/22-3/23 11pm - 7am Eric Stahl/MugehWed 23-Mar 7am - 3pm Jen Schwartzman/Charlotte Abrams/Nancy (12-3Wed 23-Mar 3pm-llpm Danielle Emche/Lauren Mayros

    Wed-Thur 3/23-3/24 11pm - 7am Eric Stahl/MugehThur 24-Mar 7am - 3pm Steve Bloom/Lance EnglishThur 24-Mar 3pm-llpm Janice/Jenny Tobin

    Thur-Fri 3/24-3/25 11pm - 7am Andrea/Elizabeth SmiroldoFri 25-Mar 7am - 3pm Steve Bloom/Lance EnglishFri 25-Mar 3pm-Ilpm Janice/Jenny Tobin

    Fri-Sat 3/25-3/26 11pm-7am Andrea/Elizabeth Smiroldo

    Protective Measures TeamPMTR Director

    Fri-Sat 3/18-3/19 11pm-7am Kathy GibsonSat 19-Mar 7am - 3p m John LubinskiSat 19-Mar 3pm-llpm Don Cool

    Sat-Sun 3/19-3/20 11pm - 7am Kathy GibsonSun 20-Mar 7am - 3pm John LubinskiSun 20-Mar 3pm-llpm Don Cool

    Sun-Mon 3/20-3/21 11pm - 7am. Kathy GibsonMon 21-Mar 7am - 3pm John LubinskiMon 21-Mar 3pm-Ilpm Don Cool

    Mon-Tues 3/21-3/22 11pm - 7am John TappertTues 22-Mar 7am - 3pm John LubinskiTues 22-Mar 3pm-llpm Don Cool

    Tues-Wed 3/22-3/23 11pm - 7am John TappertWed 23-Mar 7am - 3pm Terry ReisWed 23-Mar 3pm-11pm Cindy Jones

    Wed-Thur 3/23-3/24 11pm - 7am Randy SullivanThur 24-Mar 7am - 3pm Terry ReisThur 24-Mar 5pm-llpm Cindy Jones

    Thur-Fri 3/24-3/25 11pm - 7am Randy SullivanFri 25-Mar 7am - 3pm Terry ReisFri 25-Mar 5pm-llpm Cindy Jones

    Fri-Sat 3/25-3/26 llpm-7am Randy SullivanPMTR Coordinator

    Fri-Sat 3/18-3/19 11pm-7am Mike NorrisSa t 19-Mar 7am - 3pm Duane HardestySa t 19-Mar 3pm-llpm Jay Patel

    Sat-Sun 3/19-3/20 11pm - 7am Lou BrandonSun 20-Mar 7am - 3p m Nima AshkeboussiSun 20-Mar 3pm-llpm Jay Patel

    Sun-Mon 3/20-3/21 11pm - 7a m Lou BrandonMon 21-Mar 7am - 3pm John Wray (volunteer from OE)Mon 21-Mar 3pm-llpm Jay Patel

    Mon-Tues 3/21-3/22 11pm - 7am Lou Brandon

    Page 8 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    12/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Tues 22-Mar 7am - 3pm John Wray (volunteer from OE)Tues 22-Mar 3pm-llpm Nima Ashkeboussi

    Tues-Wed 3/22-3/23 11pm - 7am Mike NorrisWed 23-Mar 7am - 3pm Prosanta Chowdhury (8 am)Wed 23-Mar 3pm-llpm Nima Ashkeboussi

    Wed-Thur 3/23-3/24 11pm - 7am Mike NorrisThur 24-Mar 7am - 3pm Prosanta Chowdhury (8 am)Thur 24-Mar 3pm-llpm Nima Ashkeboussi

    Thur-Fri 3/24-3/25 11pm - 7am Mike NorrisFri 25-Mar 7am - 3pm Duane HardestyFri 25-Mar 3pm-llpm Jay Patel

    Fri-Sat 3/25-3/26 llpm-7amPMTR Prot Actions Asst Dir

    Fri-Sat 3/18-3/19 11pm-7am Greg CastoSa t 19-Mar 7am - 3pm Kathryn BrockSa t 19-Mar 3pm-llpm Kevin Williams

    Sat-Sun 3/19-3/20 11pm - 7am Greg CastoSun 20-Mar 7am - 3pm Kathryn BrockSun 20-Mar 3pm-llpm Tim Harris

    Sun-Mon 3/20-3/21 11pm - 7am Greg CastoMon 21-Mar 7am - 3pm Kathryn BrockMon 21-Mar 3pm-llpm

    Mon-Tues 3/21-3/22 11pm - 7am, Jessica KratchmanTues 22-Mar 7am - 3pm Kathryn BrockTues 22-Mar 3pm-11pm Tim Harris

    Tues-Wed 3/22-3/23 11pm - 7am Jessica KratchmanWed 23-Mar 7am - 3pm Sandra WastlerWed 23-Mar 3pm-llpm

    Wed-Thur 3/23-3/24 11pm - 7am Jessica KratchmanThur 24-Mar 7am - 3pm Sandra WastlerThur 24-Mar 3pm-llpm

    Thur-Fri 3/24-3/25 11pm - 7am Jessica KratchmanFri 25-Mar 7am - 3pm Kathryn BrockFri 25-Mar 3pm-12pm

    Fri-Sat 3/25-3/26 11pm-7am Greg CastoPMTR RAAD

    Fri-Sat 3/18-3/19 11pm-7am Randy SullivanSa t 19-Mar 7am - 3pm Bruce WatsonSa t 19-Mar 3pm-llpm Michelle Hart

    Sat-Sun 3/19-3/20 11pm - 7am Patricia MilliganSun 20-Mar 7am - 3pm Eric SchraderSun 20-Mar 3pm-llpm Steve LaVieSun-Mon 3/20-3/21 11pm - 7am Randy Sullivan

    Mon 21-Mar 7am - 3pm Bruce WatsonMon 21-Mar 3pm-llpm Michelle Hart/Steve LavieMon-Tues 3/21-3/22 11pm - 7amTues 22-Mar 7am - 3pm Bruce WatsonTues 22-Mar 3pm-llpm Steve LaVie

    Tues-Wed 3/22-3/23 11pm - 7amWed 23-Mar 7am - 3pm Bruce Watson

    Page 9 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    13/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Wed 23-Mar 3pm-llpm Michelle Hart/Steve LavieWed-Thur 3/23-3/24 11pm - 7am Patricia Milligan

    Thur 24-Mar 7am - 3pm Bruce WatsonThur 24-Mar 3pm-l1pm Steve LaVie

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pmFri 25-Mar 3pm-llpm Michelle Hart/Steve Lavie

    Fri-Sat 3/25-3/26 11pm-7amPMTR Dose Assessment (RASCAL)

    Fri-Sat 3/18-3/19 11pm-7am Duane Schmidt/Tony HuffertSa t 19-Mar 7am - 3pm Casper SunSa t 19-Mar 3pm-llpm Margaret Cervera

    Sat-Sun 3/19-3/20 11pm - 7am Kimberly Gambone/John ParilloSun 20-Mar 7am - 3pm Casper SunSun 20-Mar 3pm-llpm Margaret Cervera

    Sun-Mon 3/20-3/21 11pm - 7am Kimberly Gambone/John ParilloMon 21-Mar 7am - 3pm Eric Schrader/Rich ClementMon 21-Mar 3pm-11pm Margaret Cervera/Tony Huffert

    Mon-Tues 3/21-3/22 11pm - 7am John ParilloTues 22-Mar 7am - 3pm Eric Schrader/Rich ClementTues 22-Mar 3pm-llpm Gary Purdy/Casper Sun

    Tues-Wed 3/22-3/23 11pm - 7am Margaret Cervera/Tony HuffertWed 23-Mar 7am - 3pm Eric Schrader/Rich ClementWed 23-Mar 3pm-llpm Kimberly Gambone/Casper Sun

    Wed-Thur 3/23-3/24 11pm - 7am Tony Huffert/John ParilloThur 24-Mar 7am - 3pm Eric Schrader/Rich ClementThur 24-Mar 3pm-11pm Kimberly Gambone/Casper Sun

    Thur-Fri 3/24-3/25 11pm - 7am Tony Huffert/John ParilloFri 25-Mar 7am - 3pm Eric Schrader/Rich ClementFri 25-Mar 3pm-llpm Gary Purdy/Casper Sun

    Fri-Sat 3/25-3/26 11pm-7am John ParilloPMTR GIS Analyst

    Fri-Sat 3/18-3/19 11pm-7am Stephanie DevlinSat 19-Mar 7am - 3pm Nebiyu TirahSa t 19-Mar 3pm-11pm Yong Li

    Sat-Sun 3/19-3/20 11pm - 7amSun 20-Mar 7am - 3pm Phil BrandtSun 20-Mar 3pm-11pm Ken See

    Sun-Mon 3/20-3/21 11pm - 7amMon 21-Mar 7am - 3pm Nebiyu TirahMon 21-Mar 3pm-11pm

    Mon-Tues 3/21-3/22 11pm - 7amTues 22-Mar 7am - 3pm Yong LiTues 22-Mar 3pm-llpm

    Tues-Wed 3/22-3/23 11pm - 7amWed 23-Mar 7am - 3pmWed 23-Mar 3pm-llpm

    Wed-Thur 3/23-3/24 11pm - 7amThur 24-Mar 7am - 3pm Yong LiThur 24-Mar 3pm-llpm

    Page 10 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    14/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pmFri 25-Mar 3pm-llpm

    Fri-Sat 3/25-3/26 11pm-7am

    PMTR MeteorologistFri-Sat 18-Mar 3pm-llpm Mike Mazaika

    Sat 3/18-3/19 11pm-7am Dave BrownSat 19-Mar 7am - 3pm Kevin Quinlan

    Sat-Sun 19-Mar 3pm-llpm Mike MazaikaSun 3/19-3/20 11pm - 7am David BrownSun 20-Mar 7am - 3pm Kevin Quinlan

    Sun-Mon 20-Mar 3pm-llpm Mike MazaikaMon 3/20-3/21 11pm - 7am David BrownMon 21-Mar 7am - 3pm Mike Mazaika

    Mon-Tues 21-Mar 3pm-11pmTues 3/21-3/22 11pm - 7amTues 22-Mar 7am - 3pm

    Tues-Wed 22-Mar 3pm-llpmWed 3/22-3/23 11pm - 7amWed 23-Mar 7am - 3pm

    Wed-Thur 23-Mar 3pm-llpmThur 3/23-3/24 11pm - 7amThur 24-Mar 7am - 3pm

    Thur-Fri 24-Mar 3pm-llpmFri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pm

    Fri-Sat 25-Mar 3pm-11pm3/25-3/26 11pm-7am

    Reactor Safety TeamRS T Director

    Fri-Sat 3/18-3/19 11pm-7am Jennifer UhleSat 19-Mar 7am - 3pm Laura DudesSat 19-Mar 3pm-llpm Dave Skeen

    Sat-Sun 3/19-3/20 11pm - 7am Jennifer UhleSun 20-Mar 7am - 3pm Laura DudesSun 20-Mar 3pm-llpm Dave Skeen

    Sun-Mon 3/20-3/21 11pm - 7am Jennifer UhleMon 21-Mar 7am - 3pm Fred BrownMon 21-Mar 3pm-llpm Dave Skeen

    Mon-Tues 3/21-3/22 11pm - 7am Jennifer UhleTues 22-Mar 7am - 3pm Fred BrownTues 22-Mar 3pm-llpm Dave Skeen

    Tues-Wed 3/22-3/23 11pm - 7am Brian HolianWed 23-Mar 7am - 3pm Fred BrownWed 23-Mar 3pm-llpm Bill Ruland

    Wed-Thur 3/23-3/24 11pm - 7am Brian HolianThur 24-Mar 7am - 3pm Fred BrownThur 24-Mar 3pm-llpm Bill Ruland

    Thur-Fri 3/24-3/25 11pm - 7am Brian HolianFri 25-Mar 7am - 3pm Pat Hiland

    Page 11 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    15/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Fri 25-Mar 3pm-llpm Bill RulandFri-Sat 3/25-3/26 llpm-7am Brian Holian

    Sat 26-Mar 0700 -1500 Jerry Dozier?Sat 26-Mar 1500- 2300 Hussein EsmailSat 3/26-27/2011 2300 - 0700

    RS T CoordinatorFri-Sat 3/18-3/19 11pm-7am Rollie Berry

    Sat 19-Mar 7am - 3pm Scott SloanSat 19-Mar 3pm-llpm Oleg Bukharin

    Sat-Sun 3/19-3/20 11pm - 7am Frank CollinsSun 20-Mar 7am - 3pm Peter AlterSun 20-Mar 3pm-llpm Eric Thomas

    Sun-Mon 3/20-3/21 11pm - 7am Mike MorlangMon 21-Mar 7am - 3pm Peter AlterMon 21-Mar 3pm-llpm Greg Schoenebeck

    Mon-Tues 3/21-3/22 11pm - 7am Frank CollinsTues 22-Mar 7am - 3pm Rick HasselbergTues 22-Mar 3pm-llpm MikeMorlang

    Tues-Wed 3/22-3/23 11pm - 7am Oleg BukharinWed 23-Mar 7am - 3pm Eric Thomas*Wed 23-Mar 3pm-llpm Greg Schoenebeck

    Wed-Thur 3/23-3/24 11pm - 7am Frank CollinsThur 24-Mar 7am - 3pm Rick HasselbergThur 24-Mar 3pm-llpm Brett Rini

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pm Eric Thomas*Fri 25-Mar 3pm-llpm Brett Rini

    Fri-Sat 3/25-3/26 llpm-7am Frank Collins

    Severe Accident/PRAFri-Sat 3/18-3/19 11pm - 7am Don Marksberry

    Sat 19-Mar 7am - 3pm Len WardSat 19-Mar 3pm-llpm Ed Fuller

    Sat-Sun 3/19-3/20 11pm - 7am Mike SalaySun 20-Mar 7am - 3pm John LaneSun 20-Mar 3pm-llpm

    Sun-Mon 3/20-3/21 11pm - 7am Don DubeMon 21-Mar 7am - 3pm Jeff CircleMon 21-Mar 3pm-llpm Hossein Esmaili

    Mon-Tues 3/21-3/22 l1pm - 7am Jim GilmerTues 22-Mar 7am - 3pm Ed FullerTues 22-Mar 3pm-llpm Len Ward

    Tues-Wed 3/22-3/23 11pm - 7amWed 23-Mar 7am - 3pm Jeff CircleWed 23-Mar 3pm-llpm Jerry Dozier

    Wed-Thur 3/23-3/24 11pm - 7am Mike SalayThur 24-Mar 7am - 3pm Jeff CircleThur 24-Mar 3pm-llpm Steve Laur

    Thur-Fri 3/24-3/25 11pm - 7am

    Page 12 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    16/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    Fri 25-Mar 7am - 3pm Jerry Dozier?Fri 25-Mar 3pm-11pm Steve Laur

    Fri-Sat 3/25-3/26 11pm-7am_BWR Expertise

    Fri-Sat 3/18-3/19 llpm-7am Mike BrownSat 19-Mar 7am - 3pm Peter AlterSa t 19-Mar 3pm-11pm Chuck Norton

    Sat-Sun 3/19-3/20 11pm - 7a m John KauffmanSun 20-Mar 7am - 3pm Larry VickSun 20-Mar 3pm-11pm Chuck Norton

    Sun-Mon 3/20-3/21 11pm - 7am Mike BrownMon 21-Mar 7am - 3pm Gerry Gulla (OE volunteer)Mon 21-Mar 3pm-llpm Chuck Norton

    Mon-Tues 3/21-3/22 11pm - 7am Mike BrownTues 22-Mar 7am - 3pmTues 22-Mar 3pm-11pm Chuck Norton

    Tues-Wed 3/22-3/23 11pm - 7am Mike BrownWed 23-Mar 7am - 3pm Larry VickWed 23-Mar 3pm-1lpm Chuck Norton

    Wed-Thur 3/23-3/24 11pm - 7am Eva BrownThur 24-Mar 7am - 3pmThur 24-Mar 3pm-llpm Chuck Norton

    Thur-Fri 3/24-3/25 11pm - 7a m Eva BrownFri 25-Mar 7am - 3pm_Fri 25-Mar 3pm-11pm_

    Fri-Sat 3/25-3/26 llpm-7am Eva BrownRST Comm/ERDS Operator

    Fri-Sat 3/18-3/19 11pm-7am Andy KuglerSat 19-Mar 7am - 3p m Joseph WilliamsSat 19-Mar 3pm-11pm John ThorpSat-Sun 3/19-3/20 11pm - 7am Ujagav BhachuSun 20-Mar 7am - 3p m Denise McGovernSun 20-Mar 3pm-11pm Donna Williams

    Sun-Mon 3/20-3/21 11pm - 7a m Ujagav BhachuMon 21-Mar 7am - 3p m Joseph WilliamsMon 21-Mar 3pm-11pm

    Mon-Tues 3/21-3/22 11pm - 7amTues 22-Mar 7am - 3pm Steve BloomTues 22-Mar 3pm-llpm Jim Isom

    Tues-Wed 3/22-3/23 11pm - 7amWed 23-Mar 7am - 3pm Joseph WilliamsWed 23-Mar 3pm-11pm Ken HartWed-Thur 3/23-3/24 11pm - 7amThur 24-Mar 7am - 3pm John ThorpThur 24-Mar 3pm-1lpm Ken Hart

    Thur-Fri 3/24-3/25 11pm - 7amFri 25-Mar 7am - 3pm Donna WilliamsFri 25-Mar 3pm-llpm Jim Isom

    Fri-Sat 3/25-3/26 11pm-7am

    Page 13 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    17/27

    JAPAN EARTHQUAKE - ERO STAFFING SCHEDULEMARCH 18-26

    RST Support (Seismology Q&A)Fri-Sat 3/18-3/19 llpm-7am Off (On Call)

    Sa t 19-Mar 7am - 3p m Off (On Call)Sa t 19-Mar 3pm-11pm Off (On Call)

    Sat-Sun 3/19-3/20 11pm - 7a m Off (On Call)Sun 20-Mar 7am - 3pm Off (On Call)Sun 20-Mar 3pm-11pm Off (On Call)

    Sun-Mon 3/20-3/21 11pm - 7am Off (On Call)Mon 21-Mar 7am - 3pm Off (On Call)Mon 21-Mar 3pm-11pm Off (On Call)

    Mon-Tues 3/21-3/22 11pm - 7am Off (On Call)Tues 22-Mar 7am - 3pm Off (On Call)Tues 22-Mar 3pm-llpm Off (On Call)

    Tues-Wed 3/22-3/23 11pm - 7am Off (On Call)Wed 23-Mar 7am - 3pm Off (On Call)Wed 23-Mar 3pm-11pm Off (On Call)

    Wed-Thur 3/23-3/24 11pm - 7am Off (On Call)Thur 24-Mar 7am - 3pm Off (On Call)Thur 24-Mar 3pm-11pm Off (On Call)

    Thur-Fri 3/24-3/25 11pm - 7am Off (On Call)Fri 25-Mar 7am - 3pm off (On Call)Fri 25-Mar 3pm-llpm Off (On Call)

    Fri-Sat 3/25-3/26 llpm-7am Off (On Call)

    Page 14 of 14 3/18/2011 3:05 PM

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    18/27

    From: Zimmerman, RoySent: Wednesday, April 20, 2011 12:30 PMTo : Kowalczik, JeffreyCc: OST01 HOCSubject: FW: Japan One-Pager Updates

    Didn't you give me a quick tutorial on what we can do with the sharepoint site? Can we apply it to this issue.From: Virgilio, MartinSent: Wednesday, April 20, 2011 12:11 PMTo: Zimmerman, Roy; Holahan, PatriciaSubject: Fw: Japan One-Pager UpdatesAnother opportunity to post stuff to a sharepoint site and allow users to select what information they want.Marty

    From: Franovich, MikeTo: OST01 HOCCc: Brown, Michael; Castleman, Patrick; Hipschman, Thomas; Orders, William; Snodderly, Michael; Weber, Michael;Virgilio, MartinSent: Wed Apr 20 11:40:39 2011Subject: Japan One-Pager UpdatesPlease continue forwarding the Japan one-pager updates. Several Commissioners offices did notreceive updates since yesterday.Thanks,Mike FranovichTechnicalAssistantforReactorsOffice of CommissionerOstendorif301-415-1784

    ----- riginal Message -----From: OST0l HOCSent: Wednesday, April 20, 2011 7:37 AMTo: Bro,wn, Michael; Castleman, Patrick; Franovich, Mike; Hipschman, Thomas;Orders, William; Snodderly, Michael; Weber, MichaelSubject;: 20 APR 0600 DOE SITREP**chm- ntts ar ***

    Attached 0600 [sic] SITREP Powerpoint and Policy WG report.

    1~1z

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    19/27

    Nuclear Incident TeamOffice of Emergency ResponseNational Nuclear Security Administration US Department of Energy 202-586-8100nitopseonnsa.doe.gov [email protected]

    2

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    20/27

    From:To:Subject:Date:

    ErlanQer. CraigCorreia. RichardRE: USNRC Earthquake-Tsunami Update 03-20.11--0600 EDTSunday, March 20, 2011 9:48:21 AM

    BTW, everyone from Bill B. to Marty to all of the ODs at some point this weekend. Jim is the ETDirector for the day shift

    From: Correia, RichardSent: Sunday, March 20, 2011 9:40 AMTo: Erlanger, Craig; Huyck, DougSubject: Fw: USNRC Earthquake-Tsunami Update 03-20.11--0600 EDT

    ,How did the night shift go? Many folks there? ET members?Th xRich Correia, DirectorDivision of Security PolicyNSIR

    From: LIA07 HocCc: LIA07 HocSent: Sun Mar 20 06:20:01 2011Subject: USNRC Earthquake-Tsunami Update 03-20.11--0600 EDTAttached, please find the 0600 EDT March 20, 2011 status update from the US Nuclear RegulatoryCommission's Emergency Operations Center regarding the impacts of the earthquake/tsunami.

    Please note that this information is "Official Use Only" and is only being shared within the federalfamily.

    Please call the Headquarters Operations Officer at 301-816-5100 with questions.

    -Jim

    Jim AndersonOffice of Nuclear Security and Incident ResponseUS Nuclear Regulatory Commissioniames.anderson( nrc.govLIA07.HOC(@nrc.gov (Operations Center)

    q VA A/ I ; -5

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    21/27

    IFrom:Sent:To :Subject:Attachments:

    PMT01 HocSunday, March 20, 2011 11:46 AMPMTERDS HocWind RoseWindrose Plot for ERDs monitor 3-21-2011 1100.pdf

    VW\V>) I&9.

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    22/27

    40-hour wind rose FORECASTMarch 21 Midnight - March 22 3 PM JSTSource: NARAC WRF Forecast (simulation) 3/21/2011 10:30 am

    Points show percentage of time wind blows from the given direction........... .....----H .......

    30%/The wind forecast at the Fukushima plant 24%/ ~18% "is to be variable but northerly or 1./o/ ~12% ,northwesterly until Tuesday March 22 atapprox 0900 JST. ----- T-----:WEST::EATThe wind is forecast to rotate tonortheasterly (onshore) flow for approx. 12 ., ' -' /' WIND SPEEDhours (until 2100 JST) on Tuesday. (Knots)Winds are expected to remain either SU 21northerly or offshore through Thursday ..........- 11

    4-71-4

    Calms: 0.00%

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    23/27

    I-

    IFrom:Sent:To:Subject:Attachments:

    PMT01 HocSunday, March 20, 2011 5:10 AMPMTERDS HocUpdated Windrose 03202011 0500Windrose 3202011 0500 EDT.pdf

    1

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    24/27

    8qre NARAC WRF Fore cast (simulation) 3/1 9/2011 10:46 pm~Poin1tsshow percentage of time wind blows. from the g iven directioni

    NORTH

    The wind forecast at the Fukushima1 25i ; ' ........ 20%plant is to be onshore (wind directioprimarily from southeast,) for the 10_period from 7 AM through 7 PIV JS 1 .5% ASopn Sunday 20 M~arch.

    WIND SPEED(Knots)

    17- 21SOUTH 11-17

    4-7lms: 1-4Calms: .00%

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    25/27

    From: Covm KeiTo:Cc: Do MartinDea tlvliarniSubject: RE:msnbcDate: Sunday, March20, 20117:05:21 PM

    Rich -The MSNBC BillDedman article (your second link) is definitely the one the kicked off the current GI-199 fervor. I hadn't heard about the daily techstory before. As some additional background, Marty Stutzke (one of our PRA SLs) spent part of Thursday making the rounds with Jennifer Uhle oncapitol hill to brief a few members of congress (included reps from NY) on the GI-199 report. Marty then worked with OPA on Friday morning to helpclarify what the GI-199 report says and how the information should be interpreted - not sure of the final status of this effort. Additionally, followingthe Region I call with NY state and county officials on Thursday (Ben Beasley, John Kauffman, and John Ake provided support), it wa s recommendedthat a response to the article be drafted - below is what Ben, John K, and John A prepared and forwarded over to Scott Burnell in OPA on Thursdayafternoon (again, not sure how OPA choose to use it...):

    Draft Press Release Responding to MSNBC ArticleA recent article by MSNBC ("What are the odds? US nuke plants ranked by quake risk", 3/16/2011) cites results of a U.S. NuclearRegulatory Commission study released in September, 2010. The study investigated the implications of updated seismic hazard estimates inthe central and eastern United States.The study wa s prepared as a screening assessment to evaluate iffurther investigations of seismic safety for operating reactors in the centraland eastern U.S. are warranted, consistent with NRC directives. The report cleady states that 'work to date supports a decision to continue tothe (next] stage...; the methodology, input assumptions, and data are not sufficiently developed to support other regulatory actions ordecisions." Accordingly, the results were not used to rank or compare plants.Th e study produced plant-specific results of the estimated change in risk from seismic hazards. The study did not rely on the absolute valueof the seismic risk except to assure that all operating plants are safe. Th e plant-specific results were used in aggregate to determine theneed for continued evaluation and were included in the report for openness and transparency. The use of the absolute value of the seismichazard-related risk, as done in the MSNBC article, is not the intended use, and the NR C considers it an inappropriate use of the results.Th e report reached three main conclusions: 1) Seismic hazard estimates have increased at some operating plants in the central and easternUS; 2) there is no immediate safety concem, plants have significant safety margin and overall seismic risk estimates remain small; and 3)assessment of updated seismic hazards and plant performance should continue.

    For what its worth, the NRC's FAQ page on the Japan earthquake does have several question and answers related to GI-199(http:/www .nrc.Lov/iapan/faqs-related-to-iapan.pdf).I've cc'ed Ben and Marty so they can jump in and offer any additional insights they may have on this...Kevin

    From: Correia, RichardSent: Sunday, March 20, 2011 4:56 PMTo : Coyne, Kevin; Coe, DougSubject: Fw: msnbcKevin. Doug. Is this the MsNBc article and related story related to GI 199?Rich Correia, DirectorDivision of Security PolicyNSIR

    From: Janet To : Correia, RichardSent: Sun Mar 20 14:41:10 2011Subject: rnsnbchftp://www.dailytech.com/EDITORIAL+US+N RC+Confirms+MSNBCcom+Reporter+Mislead+Sensationalized+Story/article21170.htm

    http://www.msnbc.msn.com/id/42103936/ns/world-news-asiapacific/

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    26/27

    I - 1

    From:To:Subject:Date:Attachments:

    Cathy HawesCorreia. RichardREVISED IN 2011-05 (ML110760432)Tuesday, March 22, 2011 1:29:25 PMML110760432.pdf

    REVISED version of IN 2011-05. The revision are adding Nuclear Reactor ofOperations to the Title on the first page and adding MShuaibi to the signature andconcurrence pages indicating that he signed for LDudes.Attached is an PDF version Information Notice 2011-05, Tohoku-Taiheiyou-OkiEarthquake Effects On Japanese Nuclear Power Plants, dated March 18, 2011,(ML110760432), that has been posted to the NRR GCC Web, along with the URL forWeb access to generic communications files on the NRC Homepage:http://www.nrc.gov/reading-rm/doc-collections/gen-comm/info-notices/2011/.To subscribe or unsubscribe send an email to lyris(nrc.gov, no subject, and useone of the following commands in the message portion:subscribe gc-nrr (first and last name)unsubscribe gc-nrr (first and last name)thanksCathy

  • 8/2/2019 Fukushima Current and Predicted Weather Conditions - 03-19 1400 - Pages From Ml12068a096 - Foia Pa-2011-011

    27/27

    UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, DC 20555-0001March 18, 2011

    NRC INFORMATION NOTICE 2011-05: TOHOKU-TAIHEIYOU-OKI EARTHQUAKEEFFECTS ON JAPANESE NUCLEAR POWERPLANTS

    ADDRESSEESAll holders of or applicants for operating licenses for nuclear power reactors under the provisionof Title 10 of the Code of FederalRegulations (10 CFR) Part 50, "Domestic Licensing ofProduction and Utilization Facilities," except those who have permanently ceased operationsand have certified that fuel has been permanently removed from the reactor vessel.Al l holders of or applicants for a standard design certification, standard design approval,manufacturing license, limited work authorization, early site permits or combined license issuedunder 10 CF R Part 52, "Licenses, Certifications and Approvals for Nuclear Power Plants."

    PURPOSEThe U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) o informaddressees of effects of the Tohoku-Taiheiyou-Oki Earthquake on nuclear power plants inJapan. The NRC expects that recipients will review the information for applicability to theirfacilities an d consider actions, as appropriate, to avoid similar problems. Suggestions containedin this INare not NRC requirements; therefore, no specific action or written response isrequired.

    DESCRIPTION OF CIRCUMSTANCESTh e following summary of events is provided based on the best information available at thistime. The situation in Japan regarding recovery efforts for the Fukushima Daiichi NuclearPower Station continues to evolve on an hourly basis.On March 11 , 2011, the Tohoku-Taiheiyou-Oki Earthquake occurred near the east coast ofHonshu, Japan. This magnitude 9.0 earthquake and the subsequent tsunami caused significantdamage to at least four of the six units of the Fukushima Daiichi nuclear power station as theresult of a sustained loss of both the offsite and on-site power systems. Efforts to restore powerto emergency equipment have been hampered or impeded by damage to the surrounding areasdu e to the tsunami and earthquake.

    ML110760432