full input data and results user and project details … application...full input data and results...
TRANSCRIPT
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2012 AM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2012 AM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2012 AM Peak' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 484
2/1 348
2/2 135
3/1 311
4/1 190
5/1 340
6/1 720
7/1 157
8/1 251
FG1: '2012 AM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 16.7 %
1935 1935 Arm 6 Left Inf 62.1 %
Arm 7 Ahead
Inf 21.2 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 11.6 %
1915 1915 Arm 6 Right Inf 49.5 %
Arm 8 Ahead
Inf 38.9 %
Scenario 1: 'Scenario 1' (FG1: '2012 AM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 35s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 15sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 35 4 15 8
Change Point 0 43 52 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 35
0
25 : 4
43
3 7 : 15
52
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2012 AM Peak - Base
- - N/A - - - - - - - - 94.6%
Unnamed Junction
- - N/A - - - - - - - - 94.6%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 35 - 484 1850 512 94.6%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 44 - 348 1700 850 40.9%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 44 4 135 1700 382 35.3%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 15 - 311 1935 334 93.1%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 15 - 190 1915 299 63.5%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2012 AM Peak - Base
- - 230 45 15 10.8 12.3 0.2 23.3 - - - -
Unnamed Junction
- - 230 45 15 10.8 12.3 0.2 23.3 - - - -
1/1 484 484 9 0 0 4.0 6.1 0.0 10.1 75.3 11.8 6.1 17.9
2/1 348 348 - - - 1.4 0.3 - 1.7 17.7 5.4 0.3 5.8
2/2 135 135 87 45 3 0.5 0.3 0.1 0.9 22.9 1.8 0.3 2.1
3/1 311 311 42 0 10 3.1 4.8 0.0 7.9 91.9 7.6 4.8 12.4
4/1 190 190 92 0 2 1.8 0.9 0.0 2.7 50.6 4.3 0.9 5.2
C1 PRC for Signalled Lanes (%): -5.1 Total Delay for Signalled Lanes (pcuHr): 23.30 Cycle Time (s): 90 PRC Over All Lanes (%): -5.1 Total Delay Over All Lanes(pcuHr): 23.30
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpi"(drive-on-the-left) at 15:40:51 on Monday, 5 December 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 2.55 I 3.82 I 2.55 I I ARM B I 15.00 I 45.00 I 75.00 I 2.33 I 3.49 I 2.33 I I ARM C I 15.00 I 45.00 I 75.00 I 2.91 I 4.37 I 2.91 I I ARM D I 15.00 I 45.00 I 75.00 I 5.04 I 7.56 I 5.04 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 AM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.098 I 0.348 I 0.554 I I I I 0.0 I 20.0 I 71.0 I 113.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.097 I 0.000 I 0.301 I 0.602 I I I I 18.0 I 0.0 I 56.0 I 112.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.768 I 0.094 I 0.000 I 0.137 I I I I 179.0 I 22.0 I 0.0 I 32.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.596 I 0.350 I 0.055 I 0.000 I I I I 240.0 I 141.0 I 22.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 AM AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 0.70 9.96 0.071 0.00 0.08 1.1 0.11 I I B-AD 1.63 7.77 0.210 0.00 0.26 3.8 0.16 I I A-BCD 1.59 10.29 0.155 0.00 0.20 3.0 0.11 I I A-B 0.21 I I A-C 0.75 I I D-A 3.01 9.55 0.315 0.00 0.45 6.5 0.15 I I D-BC 2.05 7.40 0.277 0.00 0.38 5.3 0.19 I I C-ABD 0.36 11.53 0.031 0.00 0.04 0.6 0.09 I I C-D 0.39 I I C-A 2.18 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 0.84 9.66 0.087 0.08 0.09 1.4 0.11 I I B-AD 1.95 7.57 0.257 0.26 0.34 5.0 0.18 I I A-BCD 1.95 10.24 0.190 0.20 0.26 4.0 0.12 I I A-B 0.24 I I A-C 0.86 I I D-A 3.60 9.00 0.400 0.45 0.65 9.4 0.18 I I D-BC 2.44 7.02 0.348 0.38 0.52 7.5 0.22 I I C-ABD 0.45 11.72 0.038 0.04 0.05 0.8 0.09 I I C-D 0.46 I I C-A 2.58 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 1.03 9.21 0.112 0.09 0.12 1.8 0.12 I I B-AD 2.39 7.30 0.327 0.34 0.48 6.9 0.20 I I A-BCD 2.48 10.20 0.243 0.26 0.37 5.5 0.13 I I A-B 0.28 I I A-C 0.98 I I D-A 4.40 8.06 0.547 0.65 1.16 16.3 0.27 I I D-BC 2.99 6.35 0.471 0.52 0.86 12.1 0.29 I I C-ABD 0.58 12.00 0.049 0.05 0.07 1.1 0.09 I I C-D 0.56 I I C-A 3.13 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 1.03 9.20 0.112 0.12 0.13 1.9 0.12 I I B-AD 2.39 7.29 0.327 0.48 0.48 7.2 0.20 I I A-BCD 2.48 10.19 0.244 0.37 0.37 5.6 0.13 I I A-B 0.28 I I A-C 0.98 I I D-A 4.40 8.03 0.549 1.16 1.19 17.7 0.28 I I D-BC 2.99 6.32 0.473 0.86 0.88 13.1 0.30 I I C-ABD 0.58 12.00 0.049 0.07 0.07 1.1 0.09 I I C-D 0.56 I I C-A 3.13 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 0.84 9.65 0.087 0.13 0.10 1.5 0.11 I I B-AD 1.95 7.57 0.257 0.48 0.35 5.5 0.18 I I A-BCD 1.95 10.24 0.191 0.37 0.27 4.0 0.12 I I A-B 0.24 I I A-C 0.86 I I D-A 3.60 8.97 0.401 1.19 0.68 10.8 0.19 I I D-BC 2.44 7.01 0.349 0.88 0.55 8.6 0.22 I I C-ABD 0.45 11.72 0.038 0.07 0.05 0.8 0.09 I I C-D 0.46 I I C-A 2.58 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 0.70 9.94 0.071 0.10 0.08 1.2 0.11 I I B-AD 1.63 7.77 0.210 0.35 0.27 4.2 0.16 I I A-BCD 1.59 10.28 0.155 0.27 0.21 3.1 0.12 I I A-B 0.21 I I A-C 0.75 I I D-A 3.01 9.52 0.316 0.68 0.47 7.3 0.15 I I D-BC 2.05 7.38 0.277 0.55 0.39 6.1 0.19 I I C-ABD 0.36 11.52 0.031 0.05 0.04 0.6 0.09 I I C-D 0.39 I I C-A 2.18 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.1
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.3 08.15 0.3 08.30 0.5 08.45 0.5 09.00 0.4 09.15 0.3
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.3 08.30 0.4 08.45 0.4 09.00 0.3 09.15 0.2
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.5 08.15 0.7 * 08.30 1.2 * 08.45 1.2 * 09.00 0.7 * 09.15 0.5
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.4 08.15 0.5 * 08.30 0.9 * 08.45 0.9 * 09.00 0.5 * 09.15 0.4
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 77.1 I 51.4 I 8.8 I 0.11 I 8.8 I 0.11 I I B-AD I 178.9 I 119.3 I 32.4 I 0.18 I 32.4 I 0.18 I I A-BCD I 180.8 I 120.6 I 25.3 I 0.14 I 25.3 I 0.14 I I A-B I 22.0 I 14.6 I I I I I I A-C I 78.0 I 52.0 I I I I I I D-A I 330.3 I 220.2 I 68.0 I 0.21 I 68.0 I 0.21 I I D-BC I 224.4 I 149.6 I 52.8 I 0.24 I 52.8 I 0.24 I I C-ABD I 41.6 I 27.7 I 5.0 I 0.12 I 5.0 I 0.12 I I C-D I 42.3 I 28.2 I I I I I I C-A I 236.8 I 157.9 I I I I I --------------------------------------------------------------------------- I ALL I 1412.2 I 941.5 I 192.3 I 0.14 I 192.3 I 0.14 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.32 I 7.99 I 5.32 I I ARM B I 15.00 I 45.00 I 75.00 I 2.20 I 3.30 I 2.20 I I ARM C I 15.00 I 45.00 I 75.00 I 1.60 I 2.40 I 1.60 I I ARM D I 15.00 I 45.00 I 75.00 I 4.09 I 6.13 I 4.09 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 PM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.026 I 0.401 I 0.573 I I I I 0.0 I 11.0 I 171.0 I 244.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.159 I 0.000 I 0.017 I 0.824 I I I I 28.0 I 0.0 I 3.0 I 145.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.711 I 0.148 I 0.000 I 0.141 I I I I 91.0 I 19.0 I 0.0 I 18.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.245 I 0.651 I 0.104 I 0.000 I I I I 80.0 I 213.0 I 34.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2012 PM AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.04 8.61 0.004 0.00 0.00 0.1 0.12 I I B-AD 2.17 7.78 0.279 0.00 0.38 5.4 0.18 I I A-BCD 3.84 11.23 0.342 0.00 0.60 8.9 0.13 I I A-B 0.09 I I A-C 1.41 I I D-A 1.00 8.55 0.117 0.00 0.13 1.9 0.13 I I D-BC 3.10 7.08 0.438 0.00 0.76 10.5 0.25 I I C-ABD 0.27 10.16 0.027 0.00 0.03 0.5 0.10 I I C-D 0.22 I I C-A 1.11 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.04 8.12 0.006 0.00 0.01 0.1 0.12 I I B-AD 2.59 7.53 0.344 0.38 0.51 7.4 0.20 I I A-BCD 4.81 11.38 0.423 0.60 0.86 13.0 0.15 I I A-B 0.09 I I A-C 1.47 I I D-A 1.20 7.46 0.161 0.13 0.19 2.8 0.16 I I D-BC 3.70 6.64 0.557 0.76 1.20 16.8 0.33 I I C-ABD 0.34 10.09 0.034 0.03 0.04 0.7 0.10 I I C-D 0.26 I I C-A 1.32 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.06 7.33 0.008 0.01 0.01 0.1 0.14 I I B-AD 3.17 7.20 0.441 0.51 0.77 10.9 0.25 I I A-BCD 6.30 11.60 0.543 0.86 1.41 21.3 0.19 I I A-B 0.09 I I A-C 1.43 I I D-A 1.47 5.18 0.283 0.19 0.39 5.5 0.27 I I D-BC 4.53 6.03 0.752 1.20 2.63 34.1 0.60 I I C-ABD 0.43 10.00 0.043 0.04 0.06 0.9 0.10 I I C-D 0.32 I I C-A 1.60 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.06 7.29 0.008 0.01 0.01 0.1 0.14 I I B-AD 3.17 7.19 0.442 0.77 0.78 11.6 0.25 I I A-BCD 6.31 11.60 0.544 1.41 1.44 21.9 0.19 I I A-B 0.09 I I A-C 1.42 I I D-A 1.47 4.94 0.297 0.39 0.41 6.1 0.29 I I D-BC 4.53 6.01 0.754 2.63 2.82 41.1 0.66 I I C-ABD 0.43 9.98 0.044 0.06 0.06 1.0 0.10 I I C-D 0.32 I I C-A 1.60 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.04 8.08 0.006 0.01 0.01 0.1 0.12 I I B-AD 2.59 7.51 0.345 0.78 0.54 8.4 0.20 I I A-BCD 4.83 11.39 0.424 1.44 0.90 13.6 0.15 I I A-B 0.09 I I A-C 1.46 I I D-A 1.20 7.24 0.166 0.41 0.20 3.1 0.17 I I D-BC 3.70 6.62 0.559 2.82 1.33 22.1 0.37 I I C-ABD 0.34 10.05 0.034 0.06 0.05 0.7 0.10 I I C-D 0.26 I I C-A 1.32 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.04 8.57 0.004 0.01 0.00 0.1 0.12 I I B-AD 2.17 7.76 0.280 0.54 0.39 6.1 0.18 I I A-BCD 3.85 11.23 0.343 0.90 0.62 9.4 0.14 I I A-B 0.09 I I A-C 1.40 I I D-A 1.00 8.45 0.119 0.20 0.14 2.1 0.13 I I D-BC 3.10 7.05 0.440 1.33 0.81 12.9 0.26 I I C-ABD 0.28 10.14 0.027 0.05 0.04 0.5 0.10 I I C-D 0.22 I I C-A 1.11 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.4 17.15 0.5 * 17.30 0.8 * 17.45 0.8 * 18.00 0.5 * 18.15 0.4
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.6 * 17.15 0.9 * 17.30 1.4 * 17.45 1.4 * 18.00 0.9 * 18.15 0.6 *
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.2 17.30 0.4 17.45 0.4 18.00 0.2 18.15 0.1
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.8 * 17.15 1.2 * 17.30 2.6 *** 17.45 2.8 *** 18.00 1.3 * 18.15 0.8 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.1 17.45 0.1 18.00 0.0 18.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2012 Base.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 4.1 I 2.8 I 0.5 I 0.13 I 0.5 I 0.13 I I B-AD I 238.1 I 158.7 I 50.0 I 0.21 I 50.0 I 0.21 I I A-BCD I 449.2 I 299.4 I 88.1 I 0.20 I 88.1 I 0.20 I I A-B I 8.3 I 5.5 I I I I I I A-C I 128.9 I 85.9 I I I I I I D-A I 110.1 I 73.4 I 21.5 I 0.19 I 21.5 I 0.20 I I D-BC I 340.0 I 226.7 I 137.5 I 0.40 I 137.5 I 0.40 I I C-ABD I 31.5 I 21.0 I 4.3 I 0.14 I 4.3 I 0.14 I I C-D I 23.9 I 15.9 I I I I I I C-A I 120.8 I 80.5 I I I I I --------------------------------------------------------------------------- I ALL I 1454.9 I 969.9 I 301.8 I 0.21 I 301.9 I 0.21 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:55:59 on 21/12/2011]
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2012 PM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2012 PM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2012 PM Peak' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 315
2/1 560
2/2 153
3/1 201
4/1 165
5/1 509
6/1 438
7/1 174
8/1 273
FG1: '2012 PM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 17.4 %
1935 1935 Arm 6 Left Inf 48.8 %
Arm 7 Ahead
Inf 33.8 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 7.9 %
1915 1915 Arm 6 Right Inf 43.6 %
Arm 8 Ahead
Inf 48.5 %
Scenario 1: 'Scenario 1' (FG1: '2012 PM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2012 PM Peak - Base
- - N/A - - - - - - - - 78.8%
Unnamed Junction
- - N/A - - - - - - - - 78.8%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 315 1850 409 77.0%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 560 1700 926 60.5%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 153 1700 583 26.2%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 201 1935 255 78.8%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 165 1915 228 72.4%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2012 PM Peak - Base
- - 240 12 16 8.8 5.6 0.1 14.5 - - - -
Unnamed Junction
- - 240 12 16 8.8 5.6 0.1 14.5 - - - -
1/1 315 315 7 0 0 2.4 1.6 0.0 4.1 46.5 7.3 1.6 9.0
2/1 560 560 - - - 2.2 0.8 - 2.9 18.8 9.5 0.8 10.3
2/2 153 153 138 12 3 0.4 0.2 0.1 0.7 16.1 1.9 0.2 2.1
3/1 201 201 31 0 4 2.1 1.7 0.0 3.9 69.1 4.9 1.7 6.6
4/1 165 165 64 0 8 1.7 1.3 0.0 3.0 65.3 3.9 1.3 5.2
C1 PRC for Signalled Lanes (%): 14.3 Total Delay for Signalled Lanes (pcuHr): 14.53 Cycle Time (s): 90 PRC Over All Lanes (%): 14.3 Total Delay Over All Lanes(pcuHr): 14.53
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2014 AM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2014 AM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2014 AM Peak' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 488
2/1 352
2/2 136
3/1 315
4/1 192
5/1 344
6/1 727
7/1 159
8/1 253
FG1: '2014 AM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 16.8 %
1935 1935 Arm 6 Left Inf 61.9 %
Arm 7 Ahead
Inf 21.3 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 11.5 %
1915 1915 Arm 6 Right Inf 49.5 %
Arm 8 Ahead
Inf 39.1 %
Scenario 1: 'Scenario 1' (FG1: '2014 AM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 35s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 15sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 35 4 15 8
Change Point 0 43 52 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 35
0
25 : 4
43
3 7 : 15
52
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2014 AM Peak - Base
- - N/A - - - - - - - - 99.4%
Unnamed Junction
- - N/A - - - - - - - - 99.4%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 35 - 488 1850 491 99.4%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 44 - 352 1700 850 41.4%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 44 4 136 1700 398 34.1%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 15 - 315 1935 333 94.5%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 15 - 192 1915 299 64.1%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2014 AM Peak - Base
- - 233 44 16 11.0 17.2 0.2 28.4 - - - -
Unnamed Junction
- - 233 44 16 11.0 17.2 0.2 28.4 - - - -
1/1 488 488 8 0 1 4.2 10.3 0.0 14.5 107.0 12.1 10.3 22.4
2/1 352 352 - - - 1.4 0.4 - 1.7 17.8 5.5 0.4 5.8
2/2 136 136 89 44 3 0.5 0.3 0.1 0.8 22.2 1.8 0.3 2.1
3/1 315 315 43 0 10 3.2 5.4 0.0 8.6 98.6 7.7 5.4 13.1
4/1 192 192 93 0 2 1.8 0.9 0.0 2.7 51.0 4.4 0.9 5.3
C1 PRC for Signalled Lanes (%): -10.4 Total Delay for Signalled Lanes (pcuHr): 28.43 Cycle Time (s): 90 PRC Over All Lanes (%): -10.4 Total Delay Over All Lanes(pcuHr): 28.43
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2014 AM Peak - Base + Dev
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2014 AM Peak - Base + Dev.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2014 AM Peak + Dev' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 492
2/1 389
2/2 136
3/1 320
4/1 242
5/1 371
6/1 762
7/1 182
8/1 264
FG1: '2014 AM Peak + Dev'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 16.6 %
1935 1935 Arm 6 Left Inf 60.9 %
Arm 7 Ahead
Inf 22.5 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 10.7 %
1915 1915 Arm 6 Right Inf 53.7 %
Arm 8 Ahead
Inf 35.5 %
Scenario 1: 'Scenario 1' (FG1: '2014 AM Peak + Dev', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 36s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 14sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 36 4 14 8
Change Point 0 44 53 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 36
0
25 : 4
44
3 7 : 14
53
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2014 AM Peak - Base + Dev
- - N/A - - - - - - - - 100.2%
Unnamed Junction
- - N/A - - - - - - - - 100.2%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 36 - 492 1850 491 100.2%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 45 - 389 1700 869 44.8%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 45 4 136 1700 414 32.8%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 14 - 320 1935 321 99.8%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 14 - 242 1915 276 87.6%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2014 AM Peak - Base + Dev
- - 246 44 42 12.0 23.8 0.2 36.0 - - - -
Unnamed Junction
- - 246 44 42 12.0 23.8 0.2 36.0 - - - -
1/1 492 491 12 0 1 4.3 11.3 0.0 15.6 114.1 12.3 11.3 23.6
2/1 389 389 - - - 1.5 0.4 - 1.9 17.7 6.2 0.4 6.6
2/2 136 136 89 44 3 0.4 0.2 0.1 0.8 21.3 1.8 0.2 2.0
3/1 320 320 40 0 13 3.3 8.8 0.0 12.2 136.7 7.9 8.8 16.7
4/1 242 242 105 0 25 2.4 3.0 0.1 5.5 81.7 5.8 3.0 8.8
C1 PRC for Signalled Lanes (%): -11.3 Total Delay for Signalled Lanes (pcuHr): 35.95 Cycle Time (s): 90 PRC Over All Lanes (%): -11.3 Total Delay Over All Lanes(pcuHr): 35.95
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: T218029 Beamhill Road
Title: 2014 AM Peak - Base + Dev + Imp
Location: A511 Tutbury Road / Beamhill Road / Harehedge Lane Junction
File name: 2014 AM Peak - Base + Dev + Imp.lsg3x
Author: Carl Hicks
Company: Waterman Boreham Ltd
Address: Halifax House, Halifax Place, The Lace Market, Nottingham, NG1 1QN
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 -
A5
11
Tu
tbu
ry R
oa
d (
No
rth
)
12
3
123
Arm 2 - Harehedge Lane
1
2
1
2
Arm
3 - A
511
Tu
tbu
ry R
oad
(So
uth
)
1 2
3
1 2 3
Arm 4 - Beamhill Road
1
2
1
2
Arm
5 - A
511
Tu
tbu
ry R
oad
(No
rth)
11
Arm 6 - Harehedge Lane
11
Arm
7 -
A5
11
Tu
tbu
ry R
oa
d (
So
ut h
)
11
Arm 8 - Beamhill Road
1 1
A
B
C D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
G
H
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Traffic 7 7
D Traffic 7 7
E Pedestrian 5 5
F Pedestrian 5 5
G Dummy 7 7
H Pedestrian 5 5
Full Input Data And Results
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F G H
A - - 7 7 8 8 8 8
B - - 7 7 8 8 8 8
C 7 7 - - 8 8 8 8
D 7 7 - - 8 8 8 8
E 8 8 8 8 - - 8 -
F 8 8 8 8 - - 8 -
G 8 8 8 8 8 8 - 8
H 8 8 8 8 - - 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 C D
3 E F H
Stages Diagram A
B
C
D
E
F
G
H
1 Min >= 7 A
B
C
D
E
F
G
H
2 Min >= 7 A
B
C
D
E
F
G
H
3 Min >= 5
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3
1 7 8
2 7 8
3 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (North))
6/1 (Left) 715 4/2 0.22 4/2 - - - - -
1/3 (A511 Tutbury Road (North))
8/1 (Right) 1440 3/2 1.09 3/2 2.00 - 0.50 2 2.00
2/2 (Harehedge Lane)
5/1 (Right) 1440 4/2 1.09 4/2 2.00 - 0.50 2 2.00
3/1 (A511 Tutbury Road (South))
8/1 (Left) 715 2/2 0.22 2/2 - - - - -
3/3 (A511 Tutbury Road (South))
6/1 (Right) 1440 1/2 1.09 1/2 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
5/1 (Left) 715 3/2 0.22 3/2
- - - - - 2/2 0.22 2/2
4/2 (Beamhill Road)
7/1 (Right) 1440 2/2 1.09 2/2 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (North))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 6 Left
Inf
1/2 (A511 Tutbury Road (North))
U A 2 3 60.0 Geom - 3.00 0.00 N Arm 7 Ahead
Inf
1/3 (A511 Tutbury Road (North))
O A 2 3 60.0 Geom - 3.00 0.00 Y Arm 8 Right
Inf
2/1 (Harehedge
Lane) U C 2 3 60.0 Geom - 3.25 0.00 Y
Arm 7 Left
Inf
2/2 (Harehedge
Lane) O C 2 3 60.0 Geom - 3.25 0.00 N
Arm 5 Right
Inf
Arm 8 Ahead
Inf
3/1 (A511 Tutbury Road (South))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 8 Left
Inf
3/2 (A511 Tutbury Road (South))
U B 2 3 60.0 Geom - 3.00 0.00 N Arm 5 Ahead
Inf
3/3 (A511 Tutbury Road (South))
O B 2 3 60.0 Geom - 3.00 0.00 Y Arm 6 Right
Inf
4/1 (Beamhill
Road) O 2 3 60.0 Geom - 3.50 0.00 Y
Arm 5 Left
Inf
4/2 (Beamhill
Road) O D 2 3 60.0 Geom - 3.00 0.00 N
Arm 6 Ahead
Inf
Arm 7 Right
Inf
5/1 (A511 Tutbury Road (North))
U 2 3 60.0 Inf - - - - - -
6/1 (Harehedge
Lane) U 2 3 60.0 Inf - - - - - -
7/1 (A511 Tutbury Road (South))
U 2 3 60.0 Inf - - - - - -
8/1 (Beamhill
Road) U 2 3 60.0 Inf - - - - - -
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2014 Base + Dev + Imp' 08:00 09:00 01:00
Full Input Data And Results
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 42
1/2 437
1/3 13
2/1 195
2/2 125
3/1 97
3/2 292
3/3 136
4/1 26
4/2 216
5/1 371
6/1 264
7/1 762
8/1 182
Full Input Data And Results
FG1: '2014 Base + Dev + Imp'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (North))
3.50 0.00 Y Arm 6 Left Inf 100.0 % 1965 1965
1/2 (A511 Tutbury Road (North))
3.00 0.00 N Arm 7 Ahead
Inf 100.0 % 2055 2055
1/3 (A511 Tutbury Road (North))
3.00 0.00 Y Arm 8 Right Inf 100.0 % 1915 1915
2/1 (Harehedge Lane)
3.25 0.00 Y Arm 7 Left Inf 100.0 % 1940 1940
2/2 (Harehedge Lane)
3.25 0.00 N
Arm 5 Right Inf 42.4 %
2080 2080 Arm 8 Ahead
Inf 57.6 %
3/1 (A511 Tutbury Road (South))
3.50 0.00 Y Arm 8 Left Inf 100.0 % 1965 1965
3/2 (A511 Tutbury Road (South))
3.00 0.00 N Arm 5 Ahead
Inf 100.0 % 2055 2055
3/3 (A511 Tutbury Road (South))
3.00 0.00 Y Arm 6 Right Inf 100.0 % 1915 1915
4/1 (Beamhill Road)
3.50 0.00 Y Arm 5 Left Inf 100.0 % 1965 1965
4/2 (Beamhill Road)
3.00 0.00 N
Arm 6 Ahead
Inf 39.8 % 2055 2055
Arm 7 Right Inf 60.2 %
5/1 (A511 Tutbury Road (North) Lane
1) Infinite Saturation Flow Inf Inf
6/1 (Harehedge Lane Lane 1)
Infinite Saturation Flow Inf Inf
7/1 (A511 Tutbury Road (South) Lane
1) Infinite Saturation Flow Inf Inf
8/1 (Beamhill Road Lane 1)
Infinite Saturation Flow Inf Inf
Scenario 1: 'Scenario 1' (FG1: '2014 Base + Dev + Imp', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram A
B
1 Min: 7
8 55s
C
D
2 Min: 7
7 37s
E
F
H
3 Min: 5
8 5s Stage Timings
Stage 1 2 3
Duration 55 37 5
Change Point 0 63 107
Full Input Data And Results
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
Time in cycle (sec)
Phases
1 8 : 55
0
2 7 : 37
63
3 8 : 5
107
H H
G G
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Junction Layout Diagram
Full Input Data And Results
Arm
1 -
A511
Tu
tbury
Ro
ad (
Nort
h)
12
3
69
66.0
%
95
945
.6%
46
22.8
%
Arm 2 - Harehedge Lane
1
2
614 31.7%
515 24.3%
Arm
3 - A
511
Tu
tbury
Ro
ad (S
outh
)
1 2
3
69
9
95
9
35
3
Arm 4 - Beamhill Road
1
2
6394.1%
47945.1%
Arm
5 - A
511
Tu
tbury
Ro
ad (N
orth
)
1In
f0.0
%
Arm 6 - Harehedge Lane
1Inf0.0%
Arm
7 -
A511
Tu
tbury
Ro
ad (
So
uth
)
Inf
0.0
%
Arm 8 - Beamhill Road
1 Inf 0.0%
B
C D
Full Input Data And Results
Full Input Data And Results
Link Results
Item Lane Description
Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2014 AM Peak - Base + Dev + Imp
- - N/A - - - - - - - - 45.6%
Unnamed Junction
- - N/A - - - - - - - - 45.6%
1/1 A511 Tutbury Road (North)
Left O N/A N/A - - - - 42 1965 696 6.0%
1/2 A511 Tutbury Road (North)
Ahead U N/A N/A A 1 55 - 437 2055 959 45.6%
1/3 A511 Tutbury Road (North)
Right O N/A N/A A 1 55 - 13 1915 462 2.8%
2/1 Harehedge Lane Left
U N/A N/A C 1 37 - 195 1940 614 31.7%
2/2 Harehedge Lane Right
Ahead O N/A N/A C 1 37 - 125 2080 515 24.3%
3/1 A511 Tutbury Road (South)
Left O N/A N/A - - - - 97 1965 699 13.9%
3/2 A511 Tutbury Road (South)
Ahead U N/A N/A B 1 55 - 292 2055 959 30.4%
3/3 A511 Tutbury Road (South)
Right O N/A N/A B 1 55 - 136 1915 353 38.5%
4/1 Beamhill Road
Left O N/A N/A - - - - 26 1965 639 4.1%
4/2 Beamhill Road Ahead Right
O N/A N/A D 1 37 - 216 2055 479 45.1%
5/1 A511 Tutbury Road (North)
U N/A N/A - - - - 371 Inf Inf 0.0%
6/1 Harehedge
Lane U N/A N/A - - - - 264 Inf Inf 0.0%
Full Input Data And Results
7/1 A511 Tutbury Road (South)
U N/A N/A - - - - 762 Inf Inf 0.0%
8/1 Beamhill Road U N/A N/A - - - - 182 Inf Inf 0.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2014 AM Peak - Base + Dev + Imp
- - 393 101 3 9.8 1.9 0.5 12.2 - - - -
Unnamed Junction
- - 393 101 3 9.8 1.9 0.5 12.2 - - - -
1/1 42 42 13 29 0 0.0 0.0 - 0.0 2.8 0.0 0.0 0.0
1/2 437 437 - - - 2.6 0.4 - 3.0 25.1 9.8 0.4 10.3
1/3 13 13 13 0 0 0.1 0.0 0.0 0.1 27.8 0.2 0.0 0.2
2/1 195 195 - - - 1.7 0.2 - 1.9 35.4 4.9 0.2 5.2
2/2 125 125 52 0 1 1.0 0.2 0.0 1.2 34.7 3.0 0.2 3.2
3/1 97 97 31 66 0 0.0 0.1 - 0.1 3.0 0.0 0.1 0.1
3/2 292 292 - - - 1.6 0.2 - 1.8 22.6 6.0 0.2 6.2
3/3 136 136 136 0 0 0.8 0.3 0.4 1.5 40.5 3.3 0.3 3.6
4/1 26 26 20 6 0 0.0 0.0 - 0.0 2.9 0.0 0.0 0.0
4/2 216 216 128 0 2 1.9 0.4 0.1 2.4 40.7 5.8 0.4 6.2
5/1 371 371 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
6/1 264 264 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
7/1 762 762 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
8/1 182 182 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
C1 PRC for Signalled Lanes (%): 97.5 Total Delay for Signalled Lanes (pcuHr): 12.08 Cycle Time (s): 120 PRC Over All Lanes (%): 97.5 Total Delay Over All Lanes(pcuHr): 12.21
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpi"(drive-on-the-left) at 08:23:21 on Tuesday, 6 December 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units A TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 2.61 I 3.92 I 2.61 I I ARM B I 15.00 I 45.00 I 75.00 I 2.51 I 3.77 I 2.51 I I ARM C I 15.00 I 45.00 I 75.00 I 2.99 I 4.48 I 2.99 I I ARM D I 15.00 I 45.00 I 75.00 I 5.19 I 7.78 I 5.19 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units A -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.096 I 0.349 I 0.555 I I I I 0.0 I 20.0 I 73.0 I 116.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.090 I 0.000 I 0.289 I 0.622 I I I I 18.0 I 0.0 I 58.0 I 125.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.766 I 0.096 I 0.000 I 0.138 I I I I 183.0 I 23.0 I 0.0 I 33.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.590 I 0.357 I 0.053 I 0.000 I I I I 245.0 I 148.0 I 22.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units A AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 0.73 9.83 0.074 0.00 0.08 1.2 0.11 I I B-AD 1.79 7.75 0.231 0.00 0.30 4.2 0.17 I I A-BCD 1.64 10.25 0.160 0.00 0.21 3.1 0.12 I I A-B 0.21 I I A-C 0.77 I I D-A 3.07 9.44 0.326 0.00 0.48 6.8 0.16 I I D-BC 2.13 7.36 0.290 0.00 0.40 5.7 0.19 I I C-ABD 0.37 11.54 0.032 0.00 0.04 0.6 0.09 I I C-D 0.40 I I C-A 2.22 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 0.87 9.50 0.091 0.08 0.10 1.5 0.12 I I B-AD 2.14 7.55 0.284 0.30 0.39 5.7 0.18 I I A-BCD 2.01 10.20 0.197 0.21 0.28 4.2 0.12 I I A-B 0.24 I I A-C 0.88 I I D-A 3.67 8.85 0.415 0.48 0.69 10.0 0.19 I I D-BC 2.55 6.97 0.365 0.40 0.56 8.1 0.22 I I C-ABD 0.47 11.74 0.040 0.04 0.06 0.8 0.09 I I C-D 0.48 I I C-A 2.64 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 1.06 8.98 0.119 0.10 0.13 2.0 0.13 I I B-AD 2.62 7.26 0.361 0.39 0.55 8.0 0.21 I I A-BCD 2.56 10.15 0.252 0.28 0.39 5.8 0.13 I I A-B 0.27 I I A-C 1.00 I I D-A 4.50 7.82 0.575 0.69 1.30 18.0 0.29 I I D-BC 3.12 6.23 0.501 0.56 0.96 13.5 0.32 I I C-ABD 0.62 12.03 0.051 0.06 0.08 1.2 0.09 I I C-D 0.58 I I C-A 3.19 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 1.06 8.96 0.119 0.13 0.13 2.0 0.13 I I B-AD 2.62 7.26 0.362 0.55 0.56 8.4 0.22 I I A-BCD 2.56 10.14 0.253 0.39 0.39 5.9 0.13 I I A-B 0.27 I I A-C 1.00 I I D-A 4.50 7.78 0.578 1.30 1.33 19.8 0.30 I I D-BC 3.12 6.20 0.503 0.96 0.99 14.7 0.32 I I C-ABD 0.62 12.02 0.051 0.08 0.08 1.2 0.09 I I C-D 0.58 I I C-A 3.19 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 0.87 9.48 0.092 0.13 0.10 1.6 0.12 I I B-AD 2.14 7.54 0.284 0.56 0.40 6.3 0.19 I I A-BCD 2.01 10.20 0.197 0.39 0.28 4.2 0.12 I I A-B 0.24 I I A-C 0.88 I I D-A 3.67 8.81 0.417 1.33 0.73 11.6 0.20 I I D-BC 2.55 6.95 0.367 0.99 0.59 9.4 0.23 I I C-ABD 0.47 11.73 0.040 0.08 0.06 0.9 0.09 I I C-D 0.48 I I C-A 2.64 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 0.73 9.81 0.074 0.10 0.08 1.2 0.11 I I B-AD 1.79 7.74 0.232 0.40 0.31 4.7 0.17 I I A-BCD 1.64 10.25 0.160 0.28 0.22 3.2 0.12 I I A-B 0.21 I I A-C 0.77 I I D-A 3.07 9.41 0.327 0.73 0.49 7.7 0.16 I I D-BC 2.13 7.35 0.290 0.59 0.42 6.5 0.19 I I C-ABD 0.37 11.53 0.032 0.06 0.04 0.7 0.09 I I C-D 0.40 I I C-A 2.22 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.1
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.3 08.15 0.4 08.30 0.6 * 08.45 0.6 * 09.00 0.4 09.15 0.3
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.3 08.30 0.4 08.45 0.4 09.00 0.3 09.15 0.2
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.5 08.15 0.7 * 08.30 1.3 * 08.45 1.3 * 09.00 0.7 * 09.15 0.5
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.4 08.15 0.6 * 08.30 1.0 * 08.45 1.0 * 09.00 0.6 * 09.15 0.4
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 79.8 I 53.2 I 9.4 I 0.12 I 9.4 I 0.12 I I B-AD I 196.8 I 131.2 I 37.3 I 0.19 I 37.3 I 0.19 I I A-BCD I 186.4 I 124.3 I 26.5 I 0.14 I 26.5 I 0.14 I I A-B I 21.8 I 14.5 I I I I I I A-C I 79.5 I 53.0 I I I I I I D-A I 337.2 I 224.8 I 73.8 I 0.22 I 73.8 I 0.22 I I D-BC I 234.0 I 156.0 I 57.9 I 0.25 I 57.9 I 0.25 I I C-ABD I 43.8 I 29.2 I 5.4 I 0.12 I 5.4 I 0.12 I I C-D I 43.6 I 29.0 I I I I I I C-A I 241.6 I 161.1 I I I I I --------------------------------------------------------------------------- I ALL I 1464.5 I 976.3 I 210.2 I 0.14 I 210.2 I 0.14 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units P TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.41 I 8.12 I 5.41 I I ARM B I 15.00 I 45.00 I 75.00 I 2.31 I 3.47 I 2.31 I I ARM C I 15.00 I 45.00 I 75.00 I 1.64 I 2.46 I 1.64 I I ARM D I 15.00 I 45.00 I 75.00 I 4.26 I 6.39 I 4.26 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units P -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.025 I 0.402 I 0.573 I I I I 0.0 I 11.0 I 174.0 I 248.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.157 I 0.000 I 0.016 I 0.827 I I I I 29.0 I 0.0 I 3.0 I 153.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.710 I 0.145 I 0.000 I 0.145 I I I I 93.0 I 19.0 I 0.0 I 19.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.240 I 0.657 I 0.103 I 0.000 I I I I 82.0 I 224.0 I 35.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 + Dev 120 Units P AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.04 8.51 0.004 0.00 0.00 0.1 0.12 I I B-AD 2.28 7.75 0.295 0.00 0.41 5.8 0.18 I I A-BCD 3.92 11.22 0.349 0.00 0.62 9.2 0.14 I I A-B 0.09 I I A-C 1.42 I I D-A 1.03 8.36 0.123 0.00 0.14 2.0 0.14 I I D-BC 3.25 7.03 0.462 0.00 0.83 11.5 0.26 I I C-ABD 0.28 10.14 0.027 0.00 0.03 0.5 0.10 I I C-D 0.23 I I C-A 1.14 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.04 7.98 0.006 0.00 0.01 0.1 0.13 I I B-AD 2.73 7.49 0.364 0.41 0.56 8.1 0.21 I I A-BCD 4.92 11.37 0.433 0.62 0.90 13.6 0.15 I I A-B 0.09 I I A-C 1.47 I I D-A 1.23 7.12 0.173 0.14 0.21 3.0 0.17 I I D-BC 3.88 6.59 0.589 0.83 1.36 18.9 0.36 I I C-ABD 0.34 10.06 0.034 0.03 0.05 0.7 0.10 I I C-D 0.28 I I C-A 1.35 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.06 7.11 0.008 0.01 0.01 0.1 0.14 I I B-AD 3.34 7.15 0.467 0.56 0.85 12.1 0.26 I I A-BCD 6.45 11.59 0.556 0.90 1.49 22.5 0.19 I I A-B 0.09 I I A-C 1.41 I I D-A 1.50 4.51 0.333 0.21 0.48 6.8 0.33 I I D-BC 4.75 5.95 0.799 1.36 3.25 40.9 0.70 I I C-ABD 0.44 9.98 0.044 0.05 0.06 1.0 0.10 I I C-D 0.33 I I C-A 1.63 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.06 7.07 0.008 0.01 0.01 0.1 0.14 I I B-AD 3.34 7.14 0.468 0.85 0.86 12.9 0.26 I I A-BCD 6.46 11.59 0.557 1.49 1.52 23.2 0.20 I I A-B 0.09 I I A-C 1.40 I I D-A 1.50 4.17 0.361 0.48 0.55 8.0 0.37 I I D-BC 4.75 5.93 0.802 3.25 3.58 51.6 0.80 I I C-ABD 0.44 9.95 0.044 0.06 0.06 1.0 0.11 I I C-D 0.33 I I C-A 1.63 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.04 7.93 0.006 0.01 0.01 0.1 0.13 I I B-AD 2.73 7.47 0.365 0.86 0.59 9.2 0.21 I I A-BCD 4.93 11.38 0.434 1.52 0.94 14.2 0.16 I I A-B 0.09 I I A-C 1.46 I I D-A 1.23 6.81 0.180 0.55 0.22 3.5 0.18 I I D-BC 3.88 6.56 0.592 3.58 1.53 26.1 0.41 I I C-ABD 0.34 10.02 0.034 0.06 0.05 0.7 0.10 I I C-D 0.28 I I C-A 1.35 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.04 8.47 0.004 0.01 0.00 0.1 0.12 I I B-AD 2.28 7.73 0.295 0.59 0.43 6.6 0.18 I I A-BCD 3.93 11.22 0.351 0.94 0.65 9.7 0.14 I I A-B 0.09 I I A-C 1.41 I I D-A 1.03 8.23 0.125 0.22 0.14 2.2 0.14 I I D-BC 3.25 7.01 0.464 1.53 0.89 14.3 0.27 I I C-ABD 0.28 10.11 0.027 0.05 0.04 0.5 0.10 I I C-D 0.23 I I C-A 1.14 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.4 17.15 0.6 * 17.30 0.8 * 17.45 0.9 * 18.00 0.6 * 18.15 0.4
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.6 * 17.15 0.9 * 17.30 1.5 * 17.45 1.5 ** 18.00 0.9 * 18.15 0.6 *
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.2 17.30 0.5 17.45 0.5 * 18.00 0.2 18.15 0.1
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.8 * 17.15 1.4 * 17.30 3.2 *** 17.45 3.6 **** 18.00 1.5 ** 18.15 0.9 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.1 17.45 0.1 18.00 0.0 18.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base + Dev 120 Units.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 4.1 I 2.8 I 0.5 I 0.13 I 0.5 I 0.13 I I B-AD I 250.5 I 167.0 I 54.8 I 0.22 I 54.8 I 0.22 I I A-BCD I 459.3 I 306.2 I 92.3 I 0.20 I 92.3 I 0.20 I I A-B I 8.1 I 5.4 I I I I I I A-C I 128.6 I 85.7 I I I I I I D-A I 112.9 I 75.2 I 25.5 I 0.23 I 25.5 I 0.23 I I D-BC I 356.5 I 237.7 I 163.4 I 0.46 I 163.4 I 0.46 I I C-ABD I 31.7 I 21.1 I 4.3 I 0.14 I 4.3 I 0.14 I I C-D I 25.2 I 16.8 I I I I I I C-A I 123.4 I 82.3 I I I I I --------------------------------------------------------------------------- I ALL I 1500.3 I 1000.2 I 340.8 I 0.23 I 340.9 I 0.23 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:56:39 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpi"(drive-on-the-left) at 08:20:53 on Tuesday, 6 December 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 2.61 I 3.92 I 2.61 I I ARM B I 15.00 I 45.00 I 75.00 I 2.38 I 3.56 I 2.38 I I ARM C I 15.00 I 45.00 I 75.00 I 2.99 I 4.48 I 2.99 I I ARM D I 15.00 I 45.00 I 75.00 I 5.14 I 7.71 I 5.14 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 AM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.096 I 0.349 I 0.555 I I I I 0.0 I 20.0 I 73.0 I 116.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.095 I 0.000 I 0.300 I 0.605 I I I I 18.0 I 0.0 I 57.0 I 115.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.766 I 0.096 I 0.000 I 0.138 I I I I 183.0 I 23.0 I 0.0 I 33.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.596 I 0.350 I 0.054 I 0.000 I I I I 245.0 I 144.0 I 22.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 AM AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 0.72 9.92 0.072 0.00 0.08 1.1 0.11 I I B-AD 1.67 7.75 0.215 0.00 0.27 3.9 0.16 I I A-BCD 1.64 10.28 0.159 0.00 0.21 3.1 0.12 I I A-B 0.21 I I A-C 0.77 I I D-A 3.07 9.50 0.324 0.00 0.47 6.7 0.15 I I D-BC 2.08 7.35 0.283 0.00 0.39 5.5 0.19 I I C-ABD 0.37 11.55 0.032 0.00 0.04 0.6 0.09 I I C-D 0.40 I I C-A 2.22 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 0.85 9.62 0.089 0.08 0.10 1.4 0.11 I I B-AD 1.99 7.54 0.264 0.27 0.35 5.1 0.18 I I A-BCD 2.01 10.24 0.196 0.21 0.27 4.1 0.12 I I A-B 0.24 I I A-C 0.88 I I D-A 3.67 8.93 0.411 0.47 0.68 9.9 0.19 I I D-BC 2.49 6.96 0.357 0.39 0.54 7.8 0.22 I I C-ABD 0.47 11.76 0.040 0.04 0.06 0.8 0.09 I I C-D 0.48 I I C-A 2.64 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 1.05 9.15 0.114 0.10 0.13 1.9 0.12 I I B-AD 2.44 7.26 0.336 0.35 0.50 7.2 0.21 I I A-BCD 2.56 10.19 0.251 0.27 0.38 5.8 0.13 I I A-B 0.27 I I A-C 1.00 I I D-A 4.50 7.94 0.567 0.68 1.25 17.5 0.28 I I D-BC 3.05 6.24 0.488 0.54 0.92 12.9 0.31 I I C-ABD 0.62 12.04 0.051 0.06 0.08 1.2 0.09 I I C-D 0.58 I I C-A 3.19 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 1.05 9.14 0.114 0.13 0.13 1.9 0.12 I I B-AD 2.44 7.26 0.336 0.50 0.50 7.5 0.21 I I A-BCD 2.56 10.19 0.251 0.38 0.39 5.8 0.13 I I A-B 0.27 I I A-C 1.00 I I D-A 4.50 7.90 0.569 1.25 1.29 19.1 0.29 I I D-BC 3.05 6.21 0.490 0.92 0.94 14.0 0.32 I I C-ABD 0.62 12.04 0.051 0.08 0.08 1.2 0.09 I I C-D 0.58 I I C-A 3.19 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 0.85 9.61 0.089 0.13 0.10 1.5 0.11 I I B-AD 1.99 7.54 0.264 0.50 0.36 5.7 0.18 I I A-BCD 2.01 10.23 0.196 0.39 0.28 4.2 0.12 I I A-B 0.24 I I A-C 0.88 I I D-A 3.67 8.89 0.413 1.29 0.72 11.4 0.19 I I D-BC 2.49 6.94 0.358 0.94 0.57 9.0 0.23 I I C-ABD 0.47 11.75 0.040 0.08 0.06 0.9 0.09 I I C-D 0.48 I I C-A 2.64 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 0.72 9.91 0.072 0.10 0.08 1.2 0.11 I I B-AD 1.67 7.74 0.216 0.36 0.28 4.3 0.17 I I A-BCD 1.64 10.28 0.160 0.28 0.22 3.2 0.12 I I A-B 0.21 I I A-C 0.77 I I D-A 3.07 9.47 0.325 0.72 0.49 7.6 0.16 I I D-BC 2.08 7.34 0.284 0.57 0.40 6.3 0.19 I I C-ABD 0.37 11.54 0.032 0.06 0.04 0.7 0.09 I I C-D 0.40 I I C-A 2.22 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.1
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.3 08.15 0.4 08.30 0.5 08.45 0.5 * 09.00 0.4 09.15 0.3
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.3 08.30 0.4 08.45 0.4 09.00 0.3 09.15 0.2
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.5 08.15 0.7 * 08.30 1.3 * 08.45 1.3 * 09.00 0.7 * 09.15 0.5
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.4 08.15 0.5 * 08.30 0.9 * 08.45 0.9 * 09.00 0.6 * 09.15 0.4
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 78.5 I 52.3 I 9.1 I 0.12 I 9.1 I 0.12 I I B-AD I 183.1 I 122.0 I 33.6 I 0.18 I 33.7 I 0.18 I I A-BCD I 186.3 I 124.2 I 26.3 I 0.14 I 26.3 I 0.14 I I A-B I 21.8 I 14.5 I I I I I I A-C I 79.6 I 53.0 I I I I I I D-A I 337.2 I 224.8 I 72.2 I 0.21 I 72.2 I 0.21 I I D-BC I 228.5 I 152.3 I 55.5 I 0.24 I 55.5 I 0.24 I I C-ABD I 43.8 I 29.2 I 5.3 I 0.12 I 5.3 I 0.12 I I C-D I 43.6 I 29.0 I I I I I I C-A I 241.6 I 161.1 I I I I I --------------------------------------------------------------------------- I ALL I 1443.9 I 962.6 I 202.1 I 0.14 I 202.1 I 0.14 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.41 I 8.12 I 5.41 I I ARM B I 15.00 I 45.00 I 75.00 I 2.24 I 3.36 I 2.24 I I ARM C I 15.00 I 45.00 I 75.00 I 1.64 I 2.46 I 1.64 I I ARM D I 15.00 I 45.00 I 75.00 I 4.18 I 6.26 I 4.18 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 PM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.025 I 0.402 I 0.573 I I I I 0.0 I 11.0 I 174.0 I 248.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.162 I 0.000 I 0.017 I 0.821 I I I I 29.0 I 0.0 I 3.0 I 147.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.710 I 0.145 I 0.000 I 0.145 I I I I 93.0 I 19.0 I 0.0 I 19.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.246 I 0.650 I 0.105 I 0.000 I I I I 82.0 I 217.0 I 35.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2014 PM AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.04 8.57 0.004 0.00 0.00 0.1 0.12 I I B-AD 2.21 7.75 0.285 0.00 0.39 5.6 0.18 I I A-BCD 3.92 11.24 0.349 0.00 0.62 9.1 0.14 I I A-B 0.09 I I A-C 1.42 I I D-A 1.03 8.47 0.122 0.00 0.14 2.0 0.13 I I D-BC 3.16 7.04 0.449 0.00 0.79 11.0 0.25 I I C-ABD 0.28 10.16 0.027 0.00 0.03 0.5 0.10 I I C-D 0.23 I I C-A 1.14 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.04 8.06 0.006 0.00 0.01 0.1 0.12 I I B-AD 2.64 7.50 0.351 0.39 0.53 7.7 0.20 I I A-BCD 4.92 11.39 0.432 0.62 0.89 13.5 0.15 I I A-B 0.09 I I A-C 1.48 I I D-A 1.23 7.30 0.168 0.14 0.20 2.9 0.16 I I D-BC 3.78 6.59 0.573 0.79 1.28 17.8 0.35 I I C-ABD 0.34 10.09 0.034 0.03 0.05 0.7 0.10 I I C-D 0.28 I I C-A 1.35 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.06 7.24 0.008 0.01 0.01 0.1 0.14 I I B-AD 3.23 7.17 0.451 0.53 0.80 11.4 0.25 I I A-BCD 6.44 11.61 0.555 0.89 1.48 22.3 0.19 I I A-B 0.09 I I A-C 1.42 I I D-A 1.50 4.86 0.310 0.20 0.44 6.2 0.30 I I D-BC 4.62 5.96 0.775 1.28 2.92 37.3 0.65 I I C-ABD 0.44 10.01 0.044 0.05 0.06 0.9 0.10 I I C-D 0.33 I I C-A 1.63 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.06 7.20 0.008 0.01 0.01 0.1 0.14 I I B-AD 3.23 7.15 0.452 0.80 0.81 12.1 0.26 I I A-BCD 6.45 11.62 0.555 1.48 1.51 23.0 0.19 I I A-B 0.09 I I A-C 1.40 I I D-A 1.50 4.57 0.329 0.44 0.48 7.0 0.33 I I D-BC 4.62 5.94 0.778 2.92 3.17 46.0 0.73 I I C-ABD 0.44 9.98 0.044 0.06 0.06 1.0 0.10 I I C-D 0.33 I I C-A 1.63 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.04 8.02 0.006 0.01 0.01 0.1 0.13 I I B-AD 2.64 7.48 0.353 0.81 0.56 8.7 0.21 I I A-BCD 4.93 11.40 0.433 1.51 0.94 14.1 0.16 I I A-B 0.09 I I A-C 1.46 I I D-A 1.23 7.04 0.175 0.48 0.21 3.4 0.17 I I D-BC 3.78 6.57 0.575 3.17 1.42 23.9 0.39 I I C-ABD 0.34 10.05 0.034 0.06 0.05 0.7 0.10 I I C-D 0.28 I I C-A 1.35 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.04 8.53 0.004 0.01 0.00 0.1 0.12 I I B-AD 2.21 7.74 0.285 0.56 0.41 6.3 0.18 I I A-BCD 3.93 11.24 0.350 0.94 0.64 9.7 0.14 I I A-B 0.09 I I A-C 1.41 I I D-A 1.03 8.35 0.123 0.21 0.14 2.2 0.14 I I D-BC 3.16 7.01 0.451 1.42 0.85 13.5 0.27 I I C-ABD 0.28 10.14 0.027 0.05 0.04 0.5 0.10 I I C-D 0.23 I I C-A 1.14 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.4 17.15 0.5 * 17.30 0.8 * 17.45 0.8 * 18.00 0.6 * 18.15 0.4
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.6 * 17.15 0.9 * 17.30 1.5 * 17.45 1.5 ** 18.00 0.9 * 18.15 0.6 *
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.2 17.30 0.4 17.45 0.5 18.00 0.2 18.15 0.1
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.8 * 17.15 1.3 * 17.30 2.9 *** 17.45 3.2 *** 18.00 1.4 * 18.15 0.8 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.1 17.45 0.1 18.00 0.0 18.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2014 Base.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 4.1 I 2.8 I 0.5 I 0.13 I 0.5 I 0.13 I I B-AD I 242.3 I 161.5 I 51.7 I 0.21 I 51.7 I 0.21 I I A-BCD I 459.0 I 306.0 I 91.8 I 0.20 I 91.8 I 0.20 I I A-B I 8.1 I 5.4 I I I I I I A-C I 128.9 I 85.9 I I I I I I D-A I 112.9 I 75.2 I 23.6 I 0.21 I 23.6 I 0.21 I I D-BC I 346.9 I 231.2 I 149.6 I 0.43 I 149.6 I 0.43 I I C-ABD I 31.6 I 21.1 I 4.3 I 0.14 I 4.3 I 0.14 I I C-D I 25.2 I 16.8 I I I I I I C-A I 123.5 I 82.3 I I I I I --------------------------------------------------------------------------- I ALL I 1482.4 I 988.3 I 321.6 I 0.22 I 321.6 I 0.22 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:57:11 on 21/12/2011]
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2014 PM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2014 PM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2014 PM Peak' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 318
2/1 566
2/2 155
3/1 203
4/1 167
5/1 514
6/1 443
7/1 176
8/1 276
FG1: '2014 PM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 17.2 %
1935 1935 Arm 6 Left Inf 48.8 %
Arm 7 Ahead
Inf 34.0 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 7.8 %
1915 1915 Arm 6 Right Inf 43.7 %
Arm 8 Ahead
Inf 48.5 %
Scenario 1: 'Scenario 1' (FG1: '2014 PM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2014 PM Peak - Base
- - N/A - - - - - - - - 79.4%
Unnamed Junction
- - N/A - - - - - - - - 79.4%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 318 1850 409 77.8%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 566 1700 926 61.2%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 155 1700 583 26.6%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 203 1935 256 79.4%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 167 1915 227 73.5%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2014 PM Peak - Base
- - 241 12 17 9.0 5.8 0.1 14.9 - - - -
Unnamed Junction
- - 241 12 17 9.0 5.8 0.1 14.9 - - - -
1/1 318 318 7 0 0 2.5 1.7 0.0 4.2 47.1 7.4 1.7 9.1
2/1 566 566 - - - 2.2 0.8 - 3.0 19.0 9.6 0.8 10.4
2/2 155 155 140 12 3 0.4 0.2 0.1 0.7 16.2 1.9 0.2 2.1
3/1 203 203 30 0 5 2.1 1.8 0.0 3.9 70.0 4.9 1.8 6.7
4/1 167 167 64 0 9 1.7 1.3 0.0 3.1 66.3 3.9 1.3 5.3
C1 PRC for Signalled Lanes (%): 13.3 Total Delay for Signalled Lanes (pcuHr): 14.87 Cycle Time (s): 90 PRC Over All Lanes (%): 13.3 Total Delay Over All Lanes(pcuHr): 14.87
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2014 PM Peak - Base + Dev
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2014 PM Peak - Base + Dev.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2014 PM Peak + Dev' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 324
2/1 593
2/2 155
3/1 211
4/1 192
5/1 515
6/1 461
7/1 217
8/1 282
FG1: '2014 PM Peak + Dev'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 16.6 %
1935 1935 Arm 6 Left Inf 46.9 %
Arm 7 Ahead
Inf 36.5 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 7.3 %
1915 1915 Arm 6 Right Inf 47.4 %
Arm 8 Ahead
Inf 45.3 %
Scenario 1: 'Scenario 1' (FG1: '2014 PM Peak + Dev', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2014 PM Peak - Base + Dev
- - N/A - - - - - - - - 88.1%
Unnamed Junction
- - N/A - - - - - - - - 88.1%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 324 1850 368 88.1%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 593 1700 926 64.1%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 155 1700 558 27.8%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 211 1935 258 81.8%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 192 1915 218 87.9%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2014 PM Peak - Base + Dev
- - 220 40 34 9.7 9.3 0.2 19.2 - - - -
Unnamed Junction
- - 220 40 34 9.7 9.3 0.2 19.2 - - - -
1/1 324 324 13 0 0 2.7 3.2 0.0 5.9 65.7 7.8 3.2 11.1
2/1 593 593 - - - 2.4 0.9 - 3.2 19.7 10.2 0.9 11.1
2/2 155 155 112 40 3 0.4 0.2 0.1 0.7 16.5 1.9 0.2 2.1
3/1 211 211 30 0 5 2.2 2.1 0.0 4.3 73.3 5.1 2.1 7.2
4/1 192 192 66 0 25 2.0 3.0 0.1 5.0 94.5 4.6 3.0 7.6
C1 PRC for Signalled Lanes (%): 2.2 Total Delay for Signalled Lanes (pcuHr): 19.21 Cycle Time (s): 90 PRC Over All Lanes (%): 2.2 Total Delay Over All Lanes(pcuHr): 19.21
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: T218029 Beamhill Road
Title: 2014 PM Peak - Base + Dev + Imp
Location: A511 Tutbury Road / Beamhill Road / Harehedge Lane Junction
File name: 2014 PM Peak - Base + Dev + Imp.lsg3x
Author: Carl Hicks
Company: Waterman Boreham Ltd
Address: Halifax House, Halifax Place, The Lace Market, Nottingham, NG1 1QN
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 -
A5
11
Tu
tbu
ry R
oa
d (
No
rth
)
12
3
123
Arm 2 - Harehedge Lane
1
2
1
2
Arm
3 - A
51
1 T
utb
ury
Ro
ad
(So
uth
)
1 2
3
1 2 3
Arm 4 - Beamhill Road
1
2
1
2
Arm
5 - A
511
Tu
tbu
ry R
oad
(No
rth)
11
Arm 6 - Harehedge Lane
11
Arm
7 -
A5
11
Tu
tbu
ry R
oa
d (
So
ut h
)
11
Arm 8 - Beamhill Road
1 1
A
B
C D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
G
H
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Traffic 7 7
D Traffic 7 7
E Pedestrian 5 5
F Pedestrian 5 5
G Dummy 7 7
H Pedestrian 5 5
Full Input Data And Results
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F G H
A - - 7 7 8 8 8 8
B - - 7 7 8 8 8 8
C 7 7 - - 8 8 8 8
D 7 7 - - 8 8 8 8
E 8 8 8 8 - - 8 -
F 8 8 8 8 - - 8 -
G 8 8 8 8 8 8 - 8
H 8 8 8 8 - - 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 C D
3 E F H
Stages Diagram A
B
C
D
E
F
G
H
1 Min >= 7 A
B
C
D
E
F
G
H
2 Min >= 7 A
B
C
D
E
F
G
H
3 Min >= 5
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3
1 7 8
2 7 8
3 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (North))
6/1 (Left) 715 4/2 0.22 4/2 - - - - -
1/3 (A511 Tutbury Road (North))
8/1 (Right) 1440 3/2 1.09 3/2 2.00 - 0.50 2 2.00
2/2 (Harehedge Lane)
5/1 (Right) 1440 4/2 1.09 4/2 2.00 - 0.50 2 2.00
3/1 (A511 Tutbury Road (South))
8/1 (Left) 715 2/2 0.22 2/2 - - - - -
3/3 (A511 Tutbury Road (South))
6/1 (Right) 1440 1/2 1.09 1/2 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
5/1 (Left) 715 3/2 0.22 3/2
- - - - - 2/2 0.22 2/2
4/2 (Beamhill Road)
7/1 (Right) 1440 2/2 1.09 2/2 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (North))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 6 Left
Inf
1/2 (A511 Tutbury Road (North))
U A 2 3 60.0 Geom - 3.00 0.00 N Arm 7 Ahead
Inf
1/3 (A511 Tutbury Road (North))
O A 2 3 60.0 Geom - 3.00 0.00 Y Arm 8 Right
Inf
2/1 (Harehedge
Lane) U C 2 3 60.0 Geom - 3.25 0.00 Y
Arm 7 Left
Inf
2/2 (Harehedge
Lane) O C 2 3 60.0 Geom - 3.25 0.00 N
Arm 5 Right
Inf
Arm 8 Ahead
Inf
3/1 (A511 Tutbury Road (South))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 8 Left
Inf
3/2 (A511 Tutbury Road (South))
U B 2 3 60.0 Geom - 3.00 0.00 N Arm 5 Ahead
Inf
3/3 (A511 Tutbury Road (South))
O B 2 3 60.0 Geom - 3.00 0.00 Y Arm 6 Right
Inf
4/1 (Beamhill
Road) O 2 3 60.0 Geom - 3.50 0.00 Y
Arm 5 Left
Inf
4/2 (Beamhill
Road) O D 2 3 60.0 Geom - 3.00 0.00 N
Arm 6 Ahead
Inf
Arm 7 Right
Inf
5/1 (A511 Tutbury Road (North))
U 2 3 60.0 Inf - - - - - -
6/1 (Harehedge
Lane) U 2 3 60.0 Inf - - - - - -
7/1 (A511 Tutbury Road (South))
U 2 3 60.0 Inf - - - - - -
8/1 (Beamhill
Road) U 2 3 60.0 Inf - - - - - -
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2014 PM Peak - Base + Dev + Imp' 17:00 18:00 01:00
Full Input Data And Results
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 40
1/2 271
1/3 13
2/1 99
2/2 112
3/1 127
3/2 466
3/3 155
4/1 14
4/2 178
5/1 515
6/1 282
7/1 461
8/1 217
Full Input Data And Results
FG1: '2014 PM Peak - Base + Dev + Imp'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (North))
3.50 0.00 Y Arm 6 Left Inf 100.0 % 1965 1965
1/2 (A511 Tutbury Road (North))
3.00 0.00 N Arm 7 Ahead
Inf 100.0 % 2055 2055
1/3 (A511 Tutbury Road (North))
3.00 0.00 Y Arm 8 Right Inf 100.0 % 1915 1915
2/1 (Harehedge Lane)
3.25 0.00 Y Arm 7 Left Inf 100.0 % 1940 1940
2/2 (Harehedge Lane)
3.25 0.00 N
Arm 5 Right Inf 31.3 %
2080 2080 Arm 8 Ahead
Inf 68.8 %
3/1 (A511 Tutbury Road (South))
3.50 0.00 Y Arm 8 Left Inf 100.0 % 1965 1965
3/2 (A511 Tutbury Road (South))
3.00 0.00 N Arm 5 Ahead
Inf 100.0 % 2055 2055
3/3 (A511 Tutbury Road (South))
3.00 0.00 Y Arm 6 Right Inf 100.0 % 1915 1915
4/1 (Beamhill Road)
3.50 0.00 Y Arm 5 Left Inf 100.0 % 1965 1965
4/2 (Beamhill Road)
3.00 0.00 N
Arm 6 Ahead
Inf 48.9 % 2055 2055
Arm 7 Right Inf 51.1 %
5/1 (A511 Tutbury Road (North) Lane
1) Infinite Saturation Flow Inf Inf
6/1 (Harehedge Lane Lane 1)
Infinite Saturation Flow Inf Inf
7/1 (A511 Tutbury Road (South) Lane
1) Infinite Saturation Flow Inf Inf
8/1 (Beamhill Road Lane 1)
Infinite Saturation Flow Inf Inf
Scenario 1: 'Scenario 1' (FG1: '2014 PM Peak - Base + Dev + Imp', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram A
B
1 Min: 7
8 61s
C
D
2 Min: 7
7 31s
E
F
H
3 Min: 5
8 5s Stage Timings
Stage 1 2 3
Duration 61 31 5
Change Point 0 69 107
Full Input Data And Results
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
Time in cycle (sec)
Phases
1 8 : 61
0
2 7 : 31
69
3 8 : 5
107
H H
G G
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Junction Layout Diagram
Full Input Data And Results
Arm
1 -
A511
Tu
tbury
Ro
ad (
Nort
h)
12
3
69
65.7
%
10
6225
.5%
39
43.3
%
Arm 2 - Harehedge Lane
1
2
517 19.1%
448 25.0%
Arm
3 - A
511
Tu
tbury
Ro
ad (S
outh
)
1 2
3
69
8
10
62
54
6
Arm 4 - Beamhill Road
1
2
6052.3%
40144.4%
Arm
5 - A
511
Tu
tbury
Ro
ad (N
orth
)
1In
f0.0
%
Arm 6 - Harehedge Lane
1Inf0.0%
Arm
7 -
A511
Tu
tbury
Ro
ad (
So
uth
)
Inf
0.0
%
Arm 8 - Beamhill Road
1 Inf 0.0%
B
C D
Full Input Data And Results
Full Input Data And Results
Link Results
Item Lane Description
Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2014 PM Peak - Base + Dev + Imp
- - N/A - - - - - - - - 44.4%
Unnamed Junction
- - N/A - - - - - - - - 44.4%
1/1 A511 Tutbury Road (North)
Left O N/A N/A - - - - 40 1965 696 5.7%
1/2 A511 Tutbury Road (North)
Ahead U N/A N/A A 1 61 - 271 2055 1062 25.5%
1/3 A511 Tutbury Road (North)
Right O N/A N/A A 1 61 - 13 1915 394 3.3%
2/1 Harehedge Lane Left
U N/A N/A C 1 31 - 99 1940 517 19.1%
2/2 Harehedge Lane Right
Ahead O N/A N/A C 1 31 - 112 2080 448 25.0%
3/1 A511 Tutbury Road (South)
Left O N/A N/A - - - - 127 1965 698 18.2%
3/2 A511 Tutbury Road (South)
Ahead U N/A N/A B 1 61 - 466 2055 1062 43.9%
3/3 A511 Tutbury Road (South)
Right O N/A N/A B 1 61 - 155 1915 546 28.4%
4/1 Beamhill Road
Left O N/A N/A - - - - 14 1965 605 2.3%
4/2 Beamhill Road Ahead Right
O N/A N/A D 1 31 - 178 2055 401 44.4%
5/1 A511 Tutbury Road (North)
U N/A N/A - - - - 515 Inf Inf 0.0%
6/1 Harehedge
Lane U N/A N/A - - - - 282 Inf Inf 0.0%
Full Input Data And Results
7/1 A511 Tutbury Road (South)
U N/A N/A - - - - 461 Inf Inf 0.0%
8/1 Beamhill Road U N/A N/A - - - - 217 Inf Inf 0.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2014 PM Peak - Base + Dev + Imp
- - 347 126 2 8.1 1.6 0.3 10.1 - - - -
Unnamed Junction
- - 347 126 2 8.1 1.6 0.3 10.1 - - - -
1/1 40 40 11 29 0 0.0 0.0 - 0.0 2.7 0.0 0.0 0.0
1/2 271 271 - - - 1.2 0.2 - 1.4 18.4 5.0 0.2 5.1
1/3 13 13 13 0 0 0.1 0.0 0.0 0.1 28.5 0.2 0.0 0.2
2/1 99 99 - - - 0.9 0.1 - 1.1 38.3 2.5 0.1 2.6
2/2 112 112 34 0 1 1.1 0.2 0.0 1.2 39.7 2.9 0.2 3.1
3/1 127 127 34 93 0 0.0 0.1 - 0.1 3.1 0.0 0.1 0.1
3/2 466 466 - - - 2.3 0.4 - 2.7 21.1 9.7 0.4 10.1
3/3 155 155 155 0 0 0.7 0.2 0.2 1.1 26.2 3.1 0.2 3.3
4/1 14 14 11 3 0 0.0 0.0 - 0.0 3.0 0.0 0.0 0.0
4/2 178 178 89 0 2 1.8 0.4 0.1 2.3 45.9 5.0 0.4 5.4
5/1 515 515 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
6/1 282 282 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
7/1 461 461 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
8/1 217 217 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
C1 PRC for Signalled Lanes (%): 102.6 Total Delay for Signalled Lanes (pcuHr): 9.92 Cycle Time (s): 120 PRC Over All Lanes (%): 102.6 Total Delay Over All Lanes(pcuHr): 10.07
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2016 AM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2016 AM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2016 AM Peak' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 718
2/1 471
2/2 53
3/1 259
4/1 680
5/1 418
6/1 1107
7/1 338
8/1 318
FG1: '2016 AM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 27.4 %
1935 1935 Arm 6 Left Inf 19.3 %
Arm 7 Ahead
Inf 53.3 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 7.2 %
1915 1915 Arm 6 Right Inf 63.5 %
Arm 8 Ahead
Inf 29.3 %
Scenario 1: 'Scenario 1' (FG1: '2016 AM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 35s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 15sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 35 4 15 8
Change Point 0 43 52 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 35
0
25 : 4
43
3 7 : 15
52
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2016 AM Peak - Base
- - N/A - - - - - - - - 337.0%
Unnamed Junction
- - N/A - - - - - - - - 337.0%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 35 - 718 1850 388 184.9%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 44 - 471 1700 850 55.4%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 44 4 53 1700 478 11.1%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 15 - 259 1935 340 76.2%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 15 - 680 1915 202 337.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2016 AM Peak - Base
- - 197 14 56 55.8 407.9 0.2 464.0 - - - -
Unnamed Junction
- - 197 14 56 55.8 407.9 0.2 464.0 - - - -
1/1 718 388 13 0 2 19.9 165.9 0.0 185.8 931.7 26.2 165.9 192.1
2/1 471 471 - - - 2.0 0.6 - 2.7 20.3 8.1 0.6 8.7
2/2 53 53 38 14 1 0.2 0.1 0.0 0.3 17.6 0.7 0.1 0.7
3/1 259 259 69 0 2 2.5 1.5 0.0 4.1 56.9 6.1 1.5 7.7
4/1 680 202 77 0 51 31.2 239.8 0.2 271.2 1435.5 38.5 239.8 278.3
C1 PRC for Signalled Lanes (%): -274.4 Total Delay for Signalled Lanes (pcuHr): 463.99 Cycle Time (s): 90 PRC Over All Lanes (%): -274.4 Total Delay Over All Lanes(pcuHr): 463.99
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2016 AM Peak - Base + Dev
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2016 AM Peak - Base + Dev.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2016 AM Peak + Dev' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 696
2/1 580
2/2 51
3/1 286
4/1 922
5/1 441
6/1 1175
7/1 515
8/1 404
FG1: '2016 AM Peak + Dev'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 24.8 %
1935 1935 Arm 6 Left Inf 11.2 %
Arm 7 Ahead
Inf 64.0 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 8.0 %
1915 1915 Arm 6 Right Inf 62.5 %
Arm 8 Ahead
Inf 29.5 %
Scenario 1: 'Scenario 1' (FG1: '2016 AM Peak + Dev', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 35s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 15sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 35 4 15 8
Change Point 0 43 52 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 35
0
25 : 4
43
3 7 : 15
52
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2016 AM Peak - Base + Dev
- - N/A - - - - - - - - 563.9%
Unnamed Junction
- - N/A - - - - - - - - 563.9%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 35 - 696 1850 265 262.6%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 44 - 580 1700 850 68.2%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 44 4 51 1700 574 8.9%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 15 - 286 1935 344 83.1%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 15 - 922 1915 164 563.9%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2016 AM Peak - Base + Dev
- - 172 10 60 80.3 599.6 0.3 680.1 - - - -
Unnamed Junction
- - 172 10 60 80.3 599.6 0.3 680.1 - - - -
1/1 696 265 14 0 4 26.1 216.3 0.1 242.4 1254.0 32.3 216.3 248.6
2/1 580 580 - - - 2.8 1.1 - 3.8 23.7 11.0 1.1 12.0
2/2 51 51 40 10 1 0.2 0.0 0.0 0.2 15.9 0.7 0.0 0.7
3/1 286 286 66 0 5 2.8 2.3 0.0 5.1 64.7 6.8 2.3 9.1
4/1 922 164 52 0 50 48.5 379.9 0.2 428.5 1673.1 57.6 379.9 437.5
C1 PRC for Signalled Lanes (%): -526.6 Total Delay for Signalled Lanes (pcuHr): 680.12 Cycle Time (s): 90 PRC Over All Lanes (%): -526.6 Total Delay Over All Lanes(pcuHr): 680.12
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: T218029 Beamhill Road
Title: 2016 AM Peak - Base + Dev + Imp
Location: A511 Tutbury Road / Beamhill Road / Harehedge Lane Junction
File name: 2016 AM Peak - Base + Dev + Imp.lsg3x
Author: Carl Hicks
Company: Waterman Boreham Ltd
Address: Halifax House, Halifax Place, The Lace Market, Nottingham, NG1 1QN
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 -
A5
11
Tu
tbu
ry R
oa
d (
No
rth
)
12
3
123
Arm 2 - Harehedge Lane
1
2
1
2
Arm
3 - A
511
Tu
tbu
ry R
oad
(So
uth
)
1 2
3
1 2 3
Arm 4 - Beamhill Road
1
2
1
2
Arm
5 - A
511
Tu
tbu
ry R
oad
(No
rth)
11
Arm 6 - Harehedge Lane
11
Arm
7 -
A5
11
Tu
tbu
ry R
oa
d (
So
ut h
)
11
Arm 8 - Beamhill Road
1 1
A
B
C D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
G
H
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Traffic 7 7
D Traffic 7 7
E Pedestrian 5 5
F Pedestrian 5 5
G Dummy 7 7
H Pedestrian 5 5
Full Input Data And Results
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F G H
A - - 7 7 8 8 8 8
B - - 7 7 8 8 8 8
C 7 7 - - 8 8 8 8
D 7 7 - - 8 8 8 8
E 8 8 8 8 - - 8 -
F 8 8 8 8 - - 8 -
G 8 8 8 8 8 8 - 8
H 8 8 8 8 - - 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 C D
3 E F H
Stages Diagram A
B
C
D
E
F
G
H
1 Min >= 7 A
B
C
D
E
F
G
H
2 Min >= 7 A
B
C
D
E
F
G
H
3 Min >= 5
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3
1 7 8
2 7 8
3 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (North))
6/1 (Left) 715 4/2 0.22 4/2 - - - - -
1/3 (A511 Tutbury Road (North))
8/1 (Right) 1440 3/2 1.09 3/2 2.00 - 0.50 2 2.00
2/2 (Harehedge Lane)
5/1 (Right) 1440 4/2 1.09 4/2 2.00 - 0.50 2 2.00
3/1 (A511 Tutbury Road (South))
8/1 (Left) 715 2/2 0.22 2/2 - - - - -
3/3 (A511 Tutbury Road (South))
6/1 (Right) 1440 1/2 1.09 1/2 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
5/1 (Left) 715 3/2 0.22 3/2
- - - - - 2/2 0.22 2/2
4/2 (Beamhill Road)
7/1 (Right) 1440 2/2 1.09 2/2 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (North))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 6 Left
Inf
1/2 (A511 Tutbury Road (North))
U A 2 3 60.0 Geom - 3.00 0.00 N Arm 7 Ahead
Inf
1/3 (A511 Tutbury Road (North))
O A 2 3 60.0 Geom - 3.00 0.00 Y Arm 8 Right
Inf
2/1 (Harehedge
Lane) U C 2 3 60.0 Geom - 3.25 0.00 Y
Arm 7 Left
Inf
2/2 (Harehedge
Lane) O C 2 3 60.0 Geom - 3.25 0.00 N
Arm 5 Right
Inf
Arm 8 Ahead
Inf
3/1 (A511 Tutbury Road (South))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 8 Left
Inf
3/2 (A511 Tutbury Road (South))
U B 2 3 60.0 Geom - 3.00 0.00 N Arm 5 Ahead
Inf
3/3 (A511 Tutbury Road (South))
O B 2 3 60.0 Geom - 3.00 0.00 Y Arm 6 Right
Inf
4/1 (Beamhill
Road) O 2 3 60.0 Geom - 3.50 0.00 Y
Arm 5 Left
Inf
4/2 (Beamhill
Road) O D 2 3 60.0 Geom - 3.00 0.00 N
Arm 6 Ahead
Inf
Arm 7 Right
Inf
5/1 (A511 Tutbury Road (North))
U 2 3 60.0 Inf - - - - - -
6/1 (Harehedge
Lane) U 2 3 60.0 Inf - - - - - -
7/1 (A511 Tutbury Road (South))
U 2 3 60.0 Inf - - - - - -
8/1 (Beamhill
Road) U 2 3 60.0 Inf - - - - - -
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2016 Base + Dev + Imp' 08:00 09:00 01:00
Full Input Data And Results
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 81
1/2 567
1/3 48
2/1 32
2/2 254
3/1 284
3/2 296
3/3 51
4/1 74
4/2 848
5/1 441
6/1 404
7/1 1175
8/1 515
Full Input Data And Results
FG1: '2016 Base + Dev + Imp'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (North))
3.50 0.00 Y Arm 6 Left Inf 100.0 % 1965 1965
1/2 (A511 Tutbury Road (North))
3.00 0.00 N Arm 7 Ahead
Inf 100.0 % 2055 2055
1/3 (A511 Tutbury Road (North))
3.00 0.00 Y Arm 8 Right Inf 100.0 % 1915 1915
2/1 (Harehedge Lane)
3.25 0.00 Y Arm 7 Left Inf 100.0 % 1940 1940
2/2 (Harehedge Lane)
3.25 0.00 N
Arm 5 Right Inf 28.0 %
2080 2080 Arm 8 Ahead
Inf 72.0 %
3/1 (A511 Tutbury Road (South))
3.50 0.00 Y Arm 8 Left Inf 100.0 % 1965 1965
3/2 (A511 Tutbury Road (South))
3.00 0.00 N Arm 5 Ahead
Inf 100.0 % 2055 2055
3/3 (A511 Tutbury Road (South))
3.00 0.00 Y Arm 6 Right Inf 100.0 % 1915 1915
4/1 (Beamhill Road)
3.50 0.00 Y Arm 5 Left Inf 100.0 % 1965 1965
4/2 (Beamhill Road)
3.00 0.00 N
Arm 6 Ahead
Inf 32.1 % 2055 2055
Arm 7 Right Inf 67.9 %
5/1 (A511 Tutbury Road (North) Lane
1) Infinite Saturation Flow Inf Inf
6/1 (Harehedge Lane Lane 1)
Infinite Saturation Flow Inf Inf
7/1 (A511 Tutbury Road (South) Lane
1) Infinite Saturation Flow Inf Inf
8/1 (Beamhill Road Lane 1)
Infinite Saturation Flow Inf Inf
Scenario 1: 'Scenario 1' (FG1: '2016 Base + Dev + Imp', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram A
B
1 Min: 7
8 37s
C
D
2 Min: 7
7 55s
E
F
H
3 Min: 5
8 5s Stage Timings
Stage 1 2 3
Duration 37 55 5
Change Point 0 45 107
Full Input Data And Results
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
Time in cycle (sec)
Phases
1 8 : 37
0
2 7 : 55
45
3 8 : 5
107
H H
G G
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Junction Layout Diagram
Full Input Data And Results
Arm
1 -
A511
Tu
tbury
Ro
ad (
Nort
h)
12
3
67
811
.9%
65
187
.1%
26
518
.1%
Arm 2 - Harehedge Lane
1
2
905 3.5%
789 32.2%
Arm
3 - A
511
Tu
tbury
Ro
ad (S
outh
)
1 2
3
67
5
65
1
91
Arm 4 - Beamhill Road
1
2
63411.7%
583145.4%
Arm
5 - A
511
Tu
tbury
Ro
ad (N
orth
)
1In
f0.0
%
Arm 6 - Harehedge Lane
1Inf0.0%
Arm
7 -
A511
Tu
tbury
Ro
ad (
So
uth
)
Inf
0.0
%
Arm 8 - Beamhill Road
1 Inf 0.0%
B
C D
Full Input Data And Results
Full Input Data And Results
Link Results
Item Lane Description
Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2016 AM Peak - Base + Dev + Imp
- - N/A - - - - - - - - 145.4%
Unnamed Junction
- - N/A - - - - - - - - 145.4%
1/1 A511 Tutbury Road (North)
Left O N/A N/A - - - - 81 1965 678 11.9%
1/2 A511 Tutbury Road (North)
Ahead U N/A N/A A 1 37 - 567 2055 651 87.1%
1/3 A511 Tutbury Road (North)
Right O N/A N/A A 1 37 - 48 1915 265 18.1%
2/1 Harehedge Lane Left
U N/A N/A C 1 55 - 32 1940 905 3.5%
2/2 Harehedge Lane Right
Ahead O N/A N/A C 1 55 - 254 2080 789 32.2%
3/1 A511 Tutbury Road (South)
Left O N/A N/A - - - - 284 1965 675 42.0%
3/2 A511 Tutbury Road (South)
Ahead U N/A N/A B 1 37 - 296 2055 651 45.5%
3/3 A511 Tutbury Road (South)
Right O N/A N/A B 1 37 - 51 1915 91 56.1%
4/1 Beamhill Road
Left O N/A N/A - - - - 74 1965 634 11.7%
4/2 Beamhill Road Ahead Right
O N/A N/A D 1 55 - 848 2055 583 145.4%
5/1 A511 Tutbury Road (North)
U N/A N/A - - - - 441 Inf Inf 0.0%
6/1 Harehedge
Lane U N/A N/A - - - - 404 Inf Inf 0.0%
Full Input Data And Results
7/1 A511 Tutbury Road (South)
U N/A N/A - - - - 1175 Inf Inf 0.0%
8/1 Beamhill Road U N/A N/A - - - - 515 Inf Inf 0.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2016 AM Peak - Base + Dev + Imp
- - 746 211 48 37.1 139.0 1.0 177.1 - - - -
Unnamed Junction
- - 746 211 48 37.1 139.0 1.0 177.1 - - - -
1/1 81 81 38 43 0 0.0 0.1 - 0.1 3.0 0.0 0.1 0.1
1/2 567 567 - - - 6.1 3.1 - 9.2 58.7 17.8 3.1 20.9
1/3 48 48 48 0 0 0.4 0.1 0.2 0.6 48.4 1.1 0.1 1.2
2/1 32 32 - - - 0.2 0.0 - 0.2 19.4 0.6 0.0 0.6
2/2 254 254 70 0 1 1.4 0.2 0.0 1.6 23.0 5.1 0.2 5.3
3/1 284 284 133 151 0 0.0 0.4 - 0.4 4.6 0.0 0.4 0.4
3/2 296 296 - - - 2.7 0.4 - 3.1 37.8 7.8 0.4 8.2
3/3 51 51 45 0 6 0.4 0.6 0.4 1.4 100.9 1.2 0.6 1.8
4/1 74 74 58 16 0 0.0 0.1 - 0.1 3.2 0.0 0.1 0.1
4/2 848 583 355 0 41 26.0 133.9 0.4 160.4 680.9 43.6 133.9 177.5
5/1 441 441 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
6/1 319 319 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
7/1 995 995 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
8/1 515 515 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
C1 PRC for Signalled Lanes (%): -61.5 Total Delay for Signalled Lanes (pcuHr): 176.61 Cycle Time (s): 120 PRC Over All Lanes (%): -61.5 Total Delay Over All Lanes(pcuHr): 177.10
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpi"(drive-on-the-left) at 09:49:25 on Friday, 18 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 + Full Dev LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 AM + Full Dev TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 3.41 I 5.12 I 3.41 I I ARM B I 15.00 I 45.00 I 75.00 I 5.80 I 8.70 I 5.80 I I ARM C I 15.00 I 45.00 I 75.00 I 2.66 I 3.99 I 2.66 I I ARM D I 15.00 I 45.00 I 75.00 I 4.11 I 6.17 I 4.11 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 AM + Full Dev -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.051 I 0.330 I 0.619 I I I I 0.0 I 14.0 I 90.0 I 169.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.075 I 0.000 I 0.313 I 0.612 I I I I 35.0 I 0.0 I 145.0 I 284.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.808 I 0.174 I 0.000 I 0.019 I I I I 172.0 I 37.0 I 0.0 I 4.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.228 I 0.690 I 0.082 I 0.000 I I I I 75.0 I 227.0 I 27.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 AM + Full Dev AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 1.82 7.95 0.229 0.00 0.29 4.2 0.16 I I B-AD 4.00 7.46 0.536 0.00 1.11 15.2 0.28 I I A-BCD 2.44 9.96 0.245 0.00 0.36 5.3 0.13 I I A-B 0.13 I I A-C 0.85 I I D-A 0.94 8.11 0.116 0.00 0.13 1.9 0.14 I I D-BC 3.19 7.15 0.446 0.00 0.78 10.8 0.25 I I C-ABD 0.58 10.94 0.053 0.00 0.08 1.1 0.10 I I C-D 0.05 I I C-A 2.05 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 2.17 6.51 0.334 0.29 0.49 7.0 0.23 I I B-AD 4.78 7.10 0.674 1.11 1.91 26.1 0.41 I I A-BCD 3.01 9.84 0.306 0.36 0.49 7.5 0.15 I I A-B 0.15 I I A-C 0.93 I I D-A 1.12 6.97 0.161 0.13 0.19 2.8 0.17 I I D-BC 3.81 6.73 0.566 0.78 1.24 17.4 0.34 I I C-ABD 0.72 11.02 0.066 0.08 0.10 1.5 0.10 I I C-D 0.06 I I C-A 2.41 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 2.66 3.72 0.715 0.49 2.10 26.0 0.80 I I B-AD 5.85 6.46 0.906 1.91 5.73 66.4 0.96 I I A-BCD 3.87 9.71 0.398 0.49 0.75 11.4 0.17 I I A-B 0.15 I I A-C 0.99 I I D-A 1.38 4.71 0.292 0.19 0.40 5.7 0.30 I I D-BC 4.66 6.12 0.761 1.24 2.75 35.5 0.60 I I C-ABD 0.94 11.15 0.085 0.10 0.14 2.1 0.10 I I C-D 0.07 I I C-A 2.90 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 2.66 3.05 0.872 2.10 4.03 49.3 1.60 I I B-AD 5.85 6.35 0.922 5.73 7.35 99.7 1.35 I I A-BCD 3.88 9.65 0.401 0.75 0.77 11.7 0.17 I I A-B 0.15 I I A-C 0.98 I I D-A 1.38 4.43 0.311 0.40 0.44 6.4 0.33 I I D-BC 4.66 6.08 0.767 2.75 2.99 43.4 0.68 I I C-ABD 0.95 11.13 0.085 0.14 0.14 2.1 0.10 I I C-D 0.07 I I C-A 2.90 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 2.17 5.77 0.376 4.03 0.62 12.3 0.32 I I B-AD 4.78 6.96 0.686 7.35 2.40 47.3 0.61 I I A-BCD 3.02 9.75 0.310 0.77 0.52 7.8 0.15 I I A-B 0.14 I I A-C 0.92 I I D-A 1.12 6.69 0.168 0.44 0.20 3.2 0.18 I I D-BC 3.81 6.67 0.571 2.99 1.40 23.3 0.38 I I C-ABD 0.72 10.99 0.066 0.14 0.10 1.5 0.10 I I C-D 0.06 I I C-A 2.41 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 1.82 7.74 0.235 0.62 0.31 4.9 0.17 I I B-AD 4.00 7.43 0.539 2.40 1.21 19.7 0.31 I I A-BCD 2.45 9.92 0.247 0.52 0.37 5.6 0.13 I I A-B 0.13 I I A-C 0.85 I I D-A 0.94 7.99 0.118 0.20 0.13 2.1 0.14 I I D-BC 3.19 7.12 0.448 1.40 0.83 13.3 0.26 I I C-ABD 0.58 10.92 0.053 0.10 0.08 1.2 0.10 I I C-D 0.05 I I C-A 2.05 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.3 08.15 0.5 08.30 2.1 ** 08.45 4.0 **** 09.00 0.6 * 09.15 0.3
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 1.1 * 08.15 1.9 ** 08.30 5.7 ****** 08.45 7.4 ******* 09.00 2.4 ** 09.15 1.2 *
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.4 08.15 0.5 08.30 0.8 * 08.45 0.8 * 09.00 0.5 * 09.15 0.4
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.2 08.30 0.4 08.45 0.4 09.00 0.2 09.15 0.1
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.8 * 08.15 1.2 * 08.30 2.7 *** 08.45 3.0 *** 09.00 1.4 * 09.15 0.8 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 199.6 I 133.1 I 103.7 I 0.52 I 103.7 I 0.52 I I B-AD I 439.1 I 292.7 I 274.5 I 0.63 I 274.6 I 0.63 I I A-BCD I 279.9 I 186.6 I 49.2 I 0.18 I 49.2 I 0.18 I I A-B I 12.9 I 8.6 I I I I I I A-C I 82.9 I 55.3 I I I I I I D-A I 103.2 I 68.8 I 22.0 I 0.21 I 22.0 I 0.21 I I D-BC I 349.6 I 233.1 I 143.7 I 0.41 I 143.7 I 0.41 I I C-ABD I 67.4 I 44.9 I 9.5 I 0.14 I 9.5 I 0.14 I I C-D I 5.1 I 3.4 I I I I I I C-A I 220.6 I 147.1 I I I I I --------------------------------------------------------------------------- I ALL I 1760.4 I 1173.6 I 602.5 I 0.34 I 602.7 I 0.34 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 PM + Full Dev TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 4.71 I 7.07 I 4.71 I I ARM B I 15.00 I 45.00 I 75.00 I 3.65 I 5.48 I 3.65 I I ARM C I 15.00 I 45.00 I 75.00 I 1.59 I 2.38 I 1.59 I I ARM D I 15.00 I 45.00 I 75.00 I 5.20 I 7.80 I 5.20 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 PM + Full Dev -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.069 I 0.416 I 0.515 I I I I 0.0 I 26.0 I 157.0 I 194.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.062 I 0.000 I 0.034 I 0.904 I I I I 18.0 I 0.0 I 10.0 I 264.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.732 I 0.228 I 0.000 I 0.039 I I I I 93.0 I 29.0 I 0.0 I 5.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.159 I 0.757 I 0.084 I 0.000 I I I I 66.0 I 315.0 I 35.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 PM + Full Dev AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.13 7.51 0.017 0.00 0.02 0.2 0.14 I I B-AD 3.54 7.64 0.463 0.00 0.84 11.7 0.24 I I A-BCD 3.08 10.97 0.281 0.00 0.46 6.8 0.13 I I A-B 0.23 I I A-C 1.42 I I D-A 0.83 6.86 0.121 0.00 0.14 1.9 0.17 I I D-BC 4.39 7.29 0.603 0.00 1.44 19.3 0.33 I I C-ABD 0.42 9.76 0.043 0.00 0.05 0.8 0.11 I I C-D 0.06 I I C-A 1.12 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.15 6.36 0.024 0.02 0.02 0.3 0.16 I I B-AD 4.23 7.36 0.574 0.84 1.29 18.1 0.31 I I A-BCD 3.87 11.06 0.350 0.46 0.65 9.8 0.14 I I A-B 0.25 I I A-C 1.53 I I D-A 0.99 4.71 0.210 0.14 0.26 3.7 0.27 I I D-BC 5.24 6.86 0.764 1.44 2.83 37.0 0.56 I I C-ABD 0.51 9.60 0.053 0.05 0.07 1.1 0.11 I I C-D 0.07 I I C-A 1.32 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.18 4.25 0.043 0.02 0.04 0.6 0.25 I I B-AD 5.17 6.99 0.740 1.29 2.54 33.6 0.50 I I A-BCD 5.09 11.21 0.454 0.65 1.02 15.4 0.16 I I A-B 0.26 I I A-C 1.57 I I D-A 1.21 1.17 1.039 0.26 4.15 39.2 3.26 I I D-BC 6.42 6.27 1.024 2.83 11.07 113.4 1.56 I I C-ABD 0.66 9.40 0.070 0.07 0.10 1.5 0.11 I I C-D 0.09 I I C-A 1.59 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.18 3.97 0.046 0.04 0.05 0.7 0.26 I I B-AD 5.17 6.93 0.747 2.54 2.74 39.9 0.56 I I A-BCD 5.10 11.20 0.455 1.02 1.04 15.8 0.16 I I A-B 0.26 I I A-C 1.56 I I D-A 1.21 1.29 0.936 4.15 5.11 69.9 4.40 I I D-BC 6.42 6.23 1.031 11.07 16.72 210.0 2.61 I I C-ABD 0.66 9.27 0.071 0.10 0.10 1.5 0.12 I I C-D 0.09 I I C-A 1.59 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.15 6.02 0.025 0.05 0.03 0.4 0.17 I I B-AD 4.23 7.24 0.583 2.74 1.47 24.0 0.35 I I A-BCD 3.88 11.04 0.351 1.04 0.68 10.2 0.14 I I A-B 0.25 I I A-C 1.52 I I D-A 0.99 2.33 0.424 5.11 0.81 22.7 1.14 I I D-BC 5.24 6.74 0.778 16.72 4.46 135.2 1.64 I I C-ABD 0.51 9.36 0.055 0.10 0.08 1.1 0.11 I I C-D 0.07 I I C-A 1.32 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.13 7.37 0.017 0.03 0.02 0.3 0.14 I I B-AD 3.54 7.60 0.466 1.47 0.90 14.3 0.25 I I A-BCD 3.09 10.95 0.282 0.68 0.48 7.2 0.13 I I A-B 0.23 I I A-C 1.41 I I D-A 0.83 6.40 0.129 0.81 0.15 2.5 0.18 I I D-BC 4.39 7.25 0.605 4.46 1.62 28.5 0.40 I I C-ABD 0.42 9.69 0.043 0.08 0.06 0.8 0.11 I I C-D 0.06 I I C-A 1.12 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.8 * 17.15 1.3 * 17.30 2.5 *** 17.45 2.7 *** 18.00 1.5 * 18.15 0.9 *
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.5 17.15 0.6 * 17.30 1.0 * 17.45 1.0 * 18.00 0.7 * 18.15 0.5
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.3 17.30 4.1 **** 17.45 5.1 ***** 18.00 0.8 * 18.15 0.2
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 1.4 * 17.15 2.8 *** 17.30 11.1 *********** 17.45 16.7 ***************** 18.00 4.5 **** 18.15 1.6 **
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base + Full Dev.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 13.8 I 9.2 I 2.6 I 0.19 I 2.6 I 0.19 I I B-AD I 388.2 I 258.8 I 141.6 I 0.36 I 141.6 I 0.36 I I A-BCD I 361.6 I 241.0 I 65.1 I 0.18 I 65.2 I 0.18 I I A-B I 22.4 I 14.9 I I I I I I A-C I 135.0 I 90.0 I I I I I I D-A I 90.8 I 60.6 I 139.9 I 1.54 I 139.9 I 1.54 I I D-BC I 481.7 I 321.2 I 543.4 I 1.13 I 543.5 I 1.13 I I C-ABD I 47.6 I 31.7 I 6.8 I 0.14 I 6.8 I 0.14 I I C-D I 6.5 I 4.3 I I I I I I C-A I 120.7 I 80.5 I I I I I --------------------------------------------------------------------------- I ALL I 1668.2 I 1112.2 I 899.4 I 0.54 I 899.7 I 0.54 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 10:15:55 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpi"(drive-on-the-left) at 08:04:44 on Tuesday, 6 December 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 3.89 I 5.83 I 3.89 I I ARM B I 15.00 I 45.00 I 75.00 I 4.65 I 6.98 I 4.65 I I ARM C I 15.00 I 45.00 I 75.00 I 3.13 I 4.69 I 3.13 I I ARM D I 15.00 I 45.00 I 75.00 I 3.85 I 5.77 I 3.85 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 AM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.042 I 0.325 I 0.633 I I I I 0.0 I 13.0 I 101.0 I 197.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.051 I 0.000 I 0.333 I 0.616 I I I I 19.0 I 0.0 I 124.0 I 229.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.728 I 0.184 I 0.000 I 0.088 I I I I 182.0 I 46.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.276 I 0.640 I 0.084 I 0.000 I I I I 85.0 I 197.0 I 26.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 AM AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 1.56 8.85 0.176 0.00 0.21 3.0 0.14 I I B-AD 3.11 7.43 0.419 0.00 0.70 9.8 0.23 I I A-BCD 2.88 10.17 0.283 0.00 0.44 6.5 0.14 I I A-B 0.12 I I A-C 0.91 I I D-A 1.07 8.58 0.124 0.00 0.14 2.0 0.13 I I D-BC 2.80 7.02 0.399 0.00 0.65 9.0 0.23 I I C-ABD 0.74 11.23 0.066 0.00 0.10 1.5 0.10 I I C-D 0.26 I I C-A 2.14 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 1.86 7.96 0.233 0.21 0.30 4.4 0.16 I I B-AD 3.72 7.11 0.522 0.70 1.05 14.9 0.29 I I A-BCD 3.56 10.10 0.352 0.44 0.61 9.2 0.15 I I A-B 0.13 I I A-C 0.98 I I D-A 1.27 7.64 0.167 0.14 0.20 2.9 0.16 I I D-BC 3.34 6.58 0.508 0.65 0.99 14.0 0.30 I I C-ABD 0.93 11.38 0.082 0.10 0.13 1.9 0.10 I I C-D 0.30 I I C-A 2.51 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 2.28 6.33 0.360 0.30 0.55 7.8 0.24 I I B-AD 4.55 6.63 0.687 1.05 2.01 27.0 0.45 I I A-BCD 4.58 10.03 0.456 0.61 0.95 14.4 0.18 I I A-B 0.13 I I A-C 1.00 I I D-A 1.56 5.79 0.269 0.20 0.36 5.2 0.24 I I D-BC 4.09 5.96 0.687 0.99 1.99 26.6 0.50 I I C-ABD 1.25 11.62 0.107 0.13 0.18 2.7 0.10 I I C-D 0.36 I I C-A 2.98 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 2.28 6.20 0.367 0.55 0.57 8.4 0.25 I I B-AD 4.55 6.60 0.689 2.01 2.11 31.0 0.48 I I A-BCD 4.58 10.02 0.457 0.95 0.97 14.7 0.18 I I A-B 0.13 I I A-C 1.00 I I D-A 1.56 5.64 0.276 0.36 0.38 5.6 0.24 I I D-BC 4.09 5.94 0.689 1.99 2.10 30.8 0.53 I I C-ABD 1.25 11.60 0.107 0.18 0.18 2.7 0.10 I I C-D 0.36 I I C-A 2.98 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 1.86 7.83 0.237 0.57 0.32 4.9 0.17 I I B-AD 3.72 7.09 0.524 2.11 1.14 18.5 0.31 I I A-BCD 3.56 10.09 0.353 0.97 0.63 9.5 0.15 I I A-B 0.12 I I A-C 0.97 I I D-A 1.27 7.50 0.170 0.38 0.21 3.2 0.16 I I D-BC 3.34 6.55 0.510 2.10 1.08 17.6 0.32 I I C-ABD 0.93 11.35 0.082 0.18 0.13 2.0 0.10 I I C-D 0.30 I I C-A 2.51 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 1.56 8.77 0.177 0.32 0.22 3.4 0.14 I I B-AD 3.11 7.41 0.420 1.14 0.74 11.7 0.24 I I A-BCD 2.88 10.15 0.284 0.63 0.45 6.8 0.14 I I A-B 0.12 I I A-C 0.90 I I D-A 1.07 8.50 0.125 0.21 0.14 2.2 0.13 I I D-BC 2.80 6.99 0.400 1.08 0.68 10.8 0.24 I I C-ABD 0.74 11.22 0.066 0.13 0.10 1.5 0.10 I I C-D 0.26 I I C-A 2.14 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.3 08.30 0.5 * 08.45 0.6 * 09.00 0.3 09.15 0.2
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.7 * 08.15 1.1 * 08.30 2.0 ** 08.45 2.1 ** 09.00 1.1 * 09.15 0.7 *
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.4 08.15 0.6 * 08.30 1.0 * 08.45 1.0 * 09.00 0.6 * 09.15 0.5
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.2 08.30 0.4 08.45 0.4 09.00 0.2 09.15 0.1
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.6 * 08.15 1.0 * 08.30 2.0 ** 08.45 2.1 ** 09.00 1.1 * 09.15 0.7 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.2 08.45 0.2 09.00 0.1 09.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 170.7 I 113.8 I 31.9 I 0.19 I 31.9 I 0.19 I I B-AD I 341.4 I 227.6 I 113.1 I 0.33 I 113.1 I 0.33 I I A-BCD I 330.6 I 220.4 I 61.0 I 0.18 I 61.1 I 0.18 I I A-B I 11.1 I 7.4 I I I I I I A-C I 86.4 I 57.6 I I I I I I D-A I 117.0 I 78.0 I 21.1 I 0.18 I 21.1 I 0.18 I I D-BC I 306.9 I 204.6 I 108.8 I 0.35 I 108.9 I 0.35 I I C-ABD I 87.6 I 58.4 I 12.3 I 0.14 I 12.3 I 0.14 I I C-D I 27.7 I 18.4 I I I I I I C-A I 228.8 I 152.5 I I I I I --------------------------------------------------------------------------- I ALL I 1708.1 I 1138.8 I 348.3 I 0.20 I 348.4 I 0.20 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.06 I 7.59 I 5.06 I I ARM B I 15.00 I 45.00 I 75.00 I 3.15 I 4.73 I 3.15 I I ARM C I 15.00 I 45.00 I 75.00 I 1.64 I 2.46 I 1.64 I I ARM D I 15.00 I 45.00 I 75.00 I 4.00 I 6.00 I 4.00 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 PM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.062 I 0.400 I 0.538 I I I I 0.0 I 25.0 I 162.0 I 218.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.063 I 0.000 I 0.036 I 0.901 I I I I 16.0 I 0.0 I 9.0 I 227.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.710 I 0.214 I 0.000 I 0.076 I I I I 93.0 I 28.0 I 0.0 I 10.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.206 I 0.684 I 0.109 I 0.000 I I I I 66.0 I 219.0 I 35.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2016 PM AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.11 8.06 0.014 0.00 0.01 0.2 0.13 I I B-AD 3.05 7.73 0.394 0.00 0.64 8.9 0.21 I I A-BCD 3.47 11.09 0.312 0.00 0.53 7.9 0.13 I I A-B 0.22 I I A-C 1.40 I I D-A 0.83 8.36 0.099 0.00 0.11 1.6 0.13 I I D-BC 3.19 7.18 0.444 0.00 0.78 10.8 0.24 I I C-ABD 0.40 10.07 0.040 0.00 0.05 0.8 0.10 I I C-D 0.12 I I C-A 1.12 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.13 7.23 0.019 0.01 0.02 0.3 0.14 I I B-AD 3.64 7.48 0.486 0.64 0.92 13.1 0.26 I I A-BCD 4.36 11.22 0.389 0.53 0.76 11.5 0.15 I I A-B 0.23 I I A-C 1.48 I I D-A 0.99 7.24 0.137 0.11 0.16 2.3 0.16 I I D-BC 3.81 6.76 0.563 0.78 1.23 17.2 0.33 I I C-ABD 0.50 9.98 0.050 0.05 0.07 1.0 0.11 I I C-D 0.14 I I C-A 1.32 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.17 5.77 0.029 0.02 0.03 0.4 0.18 I I B-AD 4.46 7.15 0.624 0.92 1.57 21.6 0.36 I I A-BCD 5.73 11.40 0.502 0.76 1.23 18.5 0.18 I I A-B 0.23 I I A-C 1.47 I I D-A 1.21 4.94 0.245 0.16 0.32 4.5 0.27 I I D-BC 4.66 6.17 0.755 1.23 2.68 34.7 0.59 I I C-ABD 0.63 9.88 0.064 0.07 0.09 1.4 0.11 I I C-D 0.17 I I C-A 1.60 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.17 5.68 0.029 0.03 0.03 0.4 0.18 I I B-AD 4.46 7.13 0.625 1.57 1.62 23.9 0.37 I I A-BCD 5.74 11.40 0.503 1.23 1.25 19.0 0.18 I I A-B 0.23 I I A-C 1.46 I I D-A 1.21 4.70 0.258 0.32 0.34 5.0 0.29 I I D-BC 4.66 6.15 0.757 2.68 2.87 41.9 0.65 I I C-ABD 0.63 9.85 0.064 0.09 0.09 1.4 0.11 I I C-D 0.17 I I C-A 1.60 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.13 7.14 0.019 0.03 0.02 0.3 0.14 I I B-AD 3.64 7.46 0.488 1.62 0.98 15.7 0.27 I I A-BCD 4.37 11.22 0.390 1.25 0.79 12.0 0.15 I I A-B 0.23 I I A-C 1.47 I I D-A 0.99 7.02 0.141 0.34 0.17 2.6 0.17 I I D-BC 3.81 6.73 0.565 2.87 1.36 22.6 0.37 I I C-ABD 0.50 9.95 0.050 0.09 0.07 1.0 0.11 I I C-D 0.14 I I C-A 1.32 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.11 7.99 0.014 0.02 0.01 0.2 0.13 I I B-AD 3.05 7.72 0.395 0.98 0.67 10.5 0.22 I I A-BCD 3.48 11.09 0.314 0.79 0.55 8.3 0.13 I I A-B 0.21 I I A-C 1.39 I I D-A 0.83 8.25 0.100 0.17 0.11 1.7 0.13 I I D-BC 3.19 7.15 0.446 1.36 0.83 13.2 0.26 I I C-ABD 0.40 10.05 0.040 0.07 0.05 0.8 0.10 I I C-D 0.12 I I C-A 1.12 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.6 * 17.15 0.9 * 17.30 1.6 ** 17.45 1.6 ** 18.00 1.0 * 18.15 0.7 *
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.5 * 17.15 0.8 * 17.30 1.2 * 17.45 1.2 * 18.00 0.8 * 18.15 0.6 *
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.2 17.30 0.3 17.45 0.3 18.00 0.2 18.15 0.1
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.8 * 17.15 1.2 * 17.30 2.7 *** 17.45 2.9 *** 18.00 1.4 * 18.15 0.8 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2016 Base.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 12.4 I 8.3 I 1.9 I 0.15 I 1.9 I 0.15 I I B-AD I 334.5 I 223.0 I 93.8 I 0.28 I 93.8 I 0.28 I I A-BCD I 407.2 I 271.5 I 77.1 I 0.19 I 77.1 I 0.19 I I A-B I 20.1 I 13.4 I I I I I I A-C I 130.1 I 86.8 I I I I I I D-A I 90.8 I 60.6 I 17.7 I 0.19 I 17.7 I 0.19 I I D-BC I 349.6 I 233.1 I 140.5 I 0.40 I 140.5 I 0.40 I I C-ABD I 46.0 I 30.6 I 6.3 I 0.14 I 6.3 I 0.14 I I C-D I 13.0 I 8.7 I I I I I I C-A I 121.3 I 80.9 I I I I I --------------------------------------------------------------------------- I ALL I 1525.1 I 1016.7 I 337.2 I 0.22 I 337.3 I 0.22 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 10:16:24 on 21/12/2011]
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2016 PM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2016 PM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2016 PM Peak' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 612
2/1 743
2/2 4
3/1 223
4/1 297
5/1 518
6/1 610
7/1 514
8/1 237
FG1: '2016 PM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 24.7 %
1935 1935 Arm 6 Left Inf 2.7 %
Arm 7 Ahead
Inf 72.6 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 5.1 %
1915 1915 Arm 6 Right Inf 45.8 %
Arm 8 Ahead
Inf 49.2 %
Scenario 1: 'Scenario 1' (FG1: '2016 PM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2016 PM Peak - Base
- - N/A - - - - - - - - 377.3%
Unnamed Junction
- - N/A - - - - - - - - 377.3%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 612 1850 162 377.3%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 743 1700 926 80.3%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 4 1700 718 0.6%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 223 1935 258 86.4%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 297 1915 140 211.8%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2016 PM Peak - Base
- - 86 1 52 44.0 309.6 0.2 353.9 - - - -
Unnamed Junction
- - 86 1 52 44.0 309.6 0.2 353.9 - - - -
1/1 612 162 10 0 5 27.5 225.6 0.1 253.2 1489.2 33.7 225.6 259.3
2/1 743 743 - - - 3.4 2.0 - 5.4 26.2 14.9 2.0 16.9
2/2 4 4 3 1 0 0.0 0.0 0.0 0.0 12.3 0.0 0.0 0.0
3/1 223 223 45 0 10 2.4 2.8 0.0 5.1 83.0 5.5 2.8 8.2
4/1 297 140 28 0 37 10.7 79.3 0.1 90.2 1092.7 14.2 79.3 93.5
C1 PRC for Signalled Lanes (%): -319.2 Total Delay for Signalled Lanes (pcuHr): 353.88 Cycle Time (s): 90 PRC Over All Lanes (%): -319.2 Total Delay Over All Lanes(pcuHr): 353.88
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2016 PM Peak - Base + Dev
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2016 PM Peak - Base + Dev.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2016 PM Peak + Dev' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 643
2/1 870
2/2 4
3/1 313
4/1 481
5/1 518
6/1 728
7/1 781
8/1 284
FG1: '2016 PM Peak + Dev'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 29.1 %
1935 1935 Arm 6 Left Inf 1.9 %
Arm 7 Ahead
Inf 69.0 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 4.8 %
1915 1915 Arm 6 Right Inf 55.3 %
Arm 8 Ahead
Inf 39.9 %
Scenario 1: 'Scenario 1' (FG1: '2016 PM Peak + Dev', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2016 PM Peak - Base + Dev
- - N/A - - - - - - - - 803.8%
Unnamed Junction
- - N/A - - - - - - - - 803.8%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 643 1850 80 803.8%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 870 1700 926 94.0%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 4 1700 852 0.5%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 313 1935 258 121.3%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 481 1915 147 327.6%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2016 PM Peak - Base + Dev
- - 94 0 78 66.4 486.3 0.3 553.0 - - - -
Unnamed Junction
- - 94 0 78 66.4 486.3 0.3 553.0 - - - -
1/1 643 80 0 0 12 34.5 282.1 0.2 316.8 1773.5 42.2 282.1 324.3
2/1 870 870 - - - 4.6 6.4 - 11.0 45.5 20.1 6.4 26.4
2/2 4 4 4 0 0 0.0 0.0 0.0 0.0 11.7 0.0 0.0 0.0
3/1 313 258 53 0 22 5.3 30.1 0.0 35.4 407.6 9.4 30.1 39.5
4/1 481 147 37 0 44 21.9 167.8 0.1 189.8 1420.7 27.0 167.8 194.8
C1 PRC for Signalled Lanes (%): -793.1 Total Delay for Signalled Lanes (pcuHr): 553.04 Cycle Time (s): 90 PRC Over All Lanes (%): -793.1 Total Delay Over All Lanes(pcuHr): 553.04
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: T218029 Beamhill Road
Title: 2016 PM Peak - Base + Dev + Imp
Location: A511 Tutbury Road / Beamhill Road / Harehedge Lane Junction
File name: 2016 PM Peak - Base + Dev + Imp.lsg3x
Author: Carl Hicks
Company: Waterman Boreham Ltd
Address: Halifax House, Halifax Place, The Lace Market, Nottingham, NG1 1QN
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 -
A5
11
Tu
tbu
ry R
oa
d (
No
rth
)
12
3
123
Arm 2 - Harehedge Lane
1
2
1
2
Arm
3 - A
51
1 T
utb
ury
Ro
ad
(So
uth
)
1 2
3
1 2 3
Arm 4 - Beamhill Road
1
2
1
2
Arm
5 - A
511
Tu
tbu
ry R
oad
(No
rth)
11
Arm 6 - Harehedge Lane
11
Arm
7 -
A5
11
Tu
tbu
ry R
oa
d (
So
ut h
)
11
Arm 8 - Beamhill Road
1 1
A
B
C D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
G
H
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Traffic 7 7
D Traffic 7 7
E Pedestrian 5 5
F Pedestrian 5 5
G Dummy 7 7
H Pedestrian 5 5
Full Input Data And Results
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F G H
A - - 7 7 8 8 8 8
B - - 7 7 8 8 8 8
C 7 7 - - 8 8 8 8
D 7 7 - - 8 8 8 8
E 8 8 8 8 - - 8 -
F 8 8 8 8 - - 8 -
G 8 8 8 8 8 8 - 8
H 8 8 8 8 - - 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 C D
3 E F H
Stages Diagram A
B
C
D
E
F
G
H
1 Min >= 7 A
B
C
D
E
F
G
H
2 Min >= 7 A
B
C
D
E
F
G
H
3 Min >= 5
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3
1 7 8
2 7 8
3 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (North))
6/1 (Left) 715 4/2 0.22 4/2 - - - - -
1/3 (A511 Tutbury Road (North))
8/1 (Right) 1440 3/2 1.09 3/2 2.00 - 0.50 2 2.00
2/2 (Harehedge Lane)
5/1 (Right) 1440 4/2 1.09 4/2 2.00 - 0.50 2 2.00
3/1 (A511 Tutbury Road (South))
8/1 (Left) 715 2/2 0.22 2/2 - - - - -
3/3 (A511 Tutbury Road (South))
6/1 (Right) 1440 1/2 1.09 1/2 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
5/1 (Left) 715 3/2 0.22 3/2
- - - - - 2/2 0.22 2/2
4/2 (Beamhill Road)
7/1 (Right) 1440 2/2 1.09 2/2 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (North))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 6 Left
Inf
1/2 (A511 Tutbury Road (North))
U A 2 3 60.0 Geom - 3.00 0.00 N Arm 7 Ahead
Inf
1/3 (A511 Tutbury Road (North))
O A 2 3 60.0 Geom - 3.00 0.00 Y Arm 8 Right
Inf
2/1 (Harehedge
Lane) U C 2 3 60.0 Geom - 3.25 0.00 Y
Arm 7 Left
Inf
2/2 (Harehedge
Lane) O C 2 3 60.0 Geom - 3.25 0.00 N
Arm 5 Right
Inf
Arm 8 Ahead
Inf
3/1 (A511 Tutbury Road (South))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 8 Left
Inf
3/2 (A511 Tutbury Road (South))
U B 2 3 60.0 Geom - 3.00 0.00 N Arm 5 Ahead
Inf
3/3 (A511 Tutbury Road (South))
O B 2 3 60.0 Geom - 3.00 0.00 Y Arm 6 Right
Inf
4/1 (Beamhill
Road) O 2 3 60.0 Geom - 3.50 0.00 Y
Arm 5 Left
Inf
4/2 (Beamhill
Road) O D 2 3 60.0 Geom - 3.00 0.00 N
Arm 6 Ahead
Inf
Arm 7 Right
Inf
5/1 (A511 Tutbury Road (North))
U 2 3 60.0 Inf - - - - - -
6/1 (Harehedge
Lane) U 2 3 60.0 Inf - - - - - -
7/1 (A511 Tutbury Road (South))
U 2 3 60.0 Inf - - - - - -
8/1 (Beamhill
Road) U 2 3 60.0 Inf - - - - - -
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2016 PM Peak - Base + Dev + Imp' 17:00 18:00 01:00
Full Input Data And Results
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 88
1/2 456
1/3 99
2/1 6
2/2 307
3/1 466
3/2 404
3/3 4
4/1 23
4/2 458
5/1 518
6/1 284
7/1 728
8/1 781
Full Input Data And Results
FG1: '2016 PM Peak - Base + Dev + Imp'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (North))
3.50 0.00 Y Arm 6 Left Inf 100.0 % 1965 1965
1/2 (A511 Tutbury Road (North))
3.00 0.00 N Arm 7 Ahead
Inf 100.0 % 2055 2055
1/3 (A511 Tutbury Road (North))
3.00 0.00 Y Arm 8 Right Inf 100.0 % 1915 1915
2/1 (Harehedge Lane)
3.25 0.00 Y Arm 7 Left Inf 100.0 % 1940 1940
2/2 (Harehedge Lane)
3.25 0.00 N
Arm 5 Right Inf 29.6 %
2080 2080 Arm 8 Ahead
Inf 70.4 %
3/1 (A511 Tutbury Road (South))
3.50 0.00 Y Arm 8 Left Inf 100.0 % 1965 1965
3/2 (A511 Tutbury Road (South))
3.00 0.00 N Arm 5 Ahead
Inf 100.0 % 2055 2055
3/3 (A511 Tutbury Road (South))
3.00 0.00 Y Arm 6 Right Inf 100.0 % 1915 1915
4/1 (Beamhill Road)
3.50 0.00 Y Arm 5 Left Inf 100.0 % 1965 1965
4/2 (Beamhill Road)
3.00 0.00 N
Arm 6 Ahead
Inf 41.9 % 2055 2055
Arm 7 Right Inf 58.1 %
5/1 (A511 Tutbury Road (North) Lane
1) Infinite Saturation Flow Inf Inf
6/1 (Harehedge Lane Lane 1)
Infinite Saturation Flow Inf Inf
7/1 (A511 Tutbury Road (South) Lane
1) Infinite Saturation Flow Inf Inf
8/1 (Beamhill Road Lane 1)
Infinite Saturation Flow Inf Inf
Scenario 1: 'Scenario 1' (FG1: '2016 PM Peak - Base + Dev + Imp', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram A
B
1 Min: 7
8 48s
C
D
2 Min: 7
7 44s
E
F
H
3 Min: 5
8 5s Stage Timings
Stage 1 2 3
Duration 48 44 5
Change Point 0 56 107
Full Input Data And Results
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
Time in cycle (sec)
Phases
1 8 : 48
0
2 7 : 44
56
3 8 : 5
107
H H
G G
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Junction Layout Diagram
Full Input Data And Results
Arm
1 -
A511
Tu
tbury
Ro
ad (
Nort
h)
12
3
68
312
.9%
83
954
.3%
30
432
.5%
Arm 2 - Harehedge Lane
1
2
727 0.8%
618 49.7%
Arm
3 - A
511
Tu
tbury
Ro
ad (S
outh
)
1 2
3
66
8
83
9
26
9
Arm 4 - Beamhill Road
1
2
6063.8%
412111.1%
Arm
5 - A
511
Tu
tbury
Ro
ad (N
orth
)
1In
f0.0
%
Arm 6 - Harehedge Lane
1Inf0.0%
Arm
7 -
A511
Tu
tbury
Ro
ad (
So
uth
)
Inf
0.0
%
Arm 8 - Beamhill Road
1 Inf 0.0%
B
C D
Full Input Data And Results
Full Input Data And Results
Link Results
Item Lane Description
Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2016 PM Peak - Base + Dev + Imp
- - N/A - - - - - - - - 111.1%
Unnamed Junction
- - N/A - - - - - - - - 111.1%
1/1 A511 Tutbury Road (North)
Left O N/A N/A - - - - 88 1965 683 12.9%
1/2 A511 Tutbury Road (North)
Ahead U N/A N/A A 1 48 - 456 2055 839 54.3%
1/3 A511 Tutbury Road (North)
Right O N/A N/A A 1 48 - 99 1915 304 32.5%
2/1 Harehedge Lane Left
U N/A N/A C 1 44 - 6 1940 727 0.8%
2/2 Harehedge Lane Right
Ahead O N/A N/A C 1 44 - 307 2080 618 49.7%
3/1 A511 Tutbury Road (South)
Left O N/A N/A - - - - 466 1965 668 69.7%
3/2 A511 Tutbury Road (South)
Ahead U N/A N/A B 1 48 - 404 2055 839 48.1%
3/3 A511 Tutbury Road (South)
Right O N/A N/A B 1 48 - 4 1915 269 1.5%
4/1 Beamhill Road
Left O N/A N/A - - - - 23 1965 606 3.8%
4/2 Beamhill Road Ahead Right
O N/A N/A D 1 44 - 458 2055 412 111.1%
5/1 A511 Tutbury Road (North)
U N/A N/A - - - - 518 Inf Inf 0.0%
6/1 Harehedge
Lane U N/A N/A - - - - 284 Inf Inf 0.0%
Full Input Data And Results
7/1 A511 Tutbury Road (South)
U N/A N/A - - - - 728 Inf Inf 0.0%
8/1 Beamhill Road U N/A N/A - - - - 781 Inf Inf 0.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2016 PM Peak - Base + Dev + Imp
- - 623 351 36 16.7 30.2 0.7 47.6 - - - -
Unnamed Junction
- - 623 351 36 16.7 30.2 0.7 47.6 - - - -
1/1 88 88 33 55 0 0.0 0.1 - 0.1 3.0 0.0 0.1 0.1
1/2 456 456 - - - 3.4 0.6 - 4.0 31.7 11.5 0.6 12.1
1/3 99 99 99 0 0 0.7 0.2 0.3 1.2 45.1 2.6 0.2 2.8
2/1 6 6 - - - 0.0 0.0 - 0.0 26.2 0.1 0.0 0.1
2/2 307 307 89 0 2 2.3 0.5 0.0 2.9 33.6 7.5 0.5 8.0
3/1 466 466 175 291 0 0.0 1.1 - 1.1 8.9 1.7 1.1 2.8
3/2 404 404 - - - 2.9 0.5 - 3.4 30.3 9.9 0.5 10.3
3/3 4 4 4 0 0 0.0 0.0 0.0 0.0 41.7 0.1 0.0 0.1
4/1 23 23 18 5 0 0.0 0.0 - 0.0 3.1 0.0 0.0 0.0
4/2 458 412 205 0 35 7.3 27.1 0.3 34.7 272.8 17.0 27.1 44.2
5/1 518 518 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
6/1 265 265 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
7/1 701 701 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
8/1 781 781 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
C1 PRC for Signalled Lanes (%): -23.5 Total Delay for Signalled Lanes (pcuHr): 46.32 Cycle Time (s): 120 PRC Over All Lanes (%): -23.5 Total Delay Over All Lanes(pcuHr): 47.56
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2026 AM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2026 AM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2026 AM Peak' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 870
2/1 550
2/2 21
3/1 284
4/1 906
5/1 526
6/1 1204
7/1 448
8/1 453
FG1: '2026 AM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 37.0 %
1935 1935 Arm 6 Left Inf 7.7 %
Arm 7 Ahead
Inf 55.3 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 10.4 %
1915 1915 Arm 6 Right Inf 56.6 %
Arm 8 Ahead
Inf 33.0 %
Scenario 1: 'Scenario 1' (FG1: '2026 AM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 35s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 15sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 35 4 15 8
Change Point 0 43 52 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 35
0
25 : 4
43
3 7 : 15
52
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2026 AM Peak - Base
- - N/A - - - - - - - - 425.2%
Unnamed Junction
- - N/A - - - - - - - - 425.2%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 35 - 870 1850 306 284.2%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 44 - 550 1700 850 64.7%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 44 4 21 1700 546 3.8%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 15 - 284 1935 324 87.6%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 15 - 906 1915 213 425.2%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2026 AM Peak - Base
- - 200 4 66 84.4 633.8 0.3 718.5 - - - -
Unnamed Junction
- - 200 4 66 84.4 633.8 0.3 718.5 - - - -
1/1 870 306 19 0 5 34.3 282.7 0.1 317.1 1312.0 42.3 282.7 325.0
2/1 550 550 - - - 2.5 0.9 - 3.5 22.6 10.1 0.9 11.0
2/2 21 21 16 4 0 0.1 0.0 0.0 0.1 15.8 0.3 0.0 0.3
3/1 284 284 90 0 15 2.8 3.1 0.1 5.9 75.2 6.9 3.1 9.9
4/1 906 213 75 0 45 44.7 347.1 0.1 392.0 1557.5 54.0 347.1 401.1
C1 PRC for Signalled Lanes (%): -372.4 Total Delay for Signalled Lanes (pcuHr): 718.52 Cycle Time (s): 90 PRC Over All Lanes (%): -372.4 Total Delay Over All Lanes(pcuHr): 718.52
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2026 AM Peak - Base + Dev
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2026 AM Peak - Base + Dev.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2026 AM Peak + Dev' 08:00 09:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 806
2/1 627
2/2 14
3/1 310
4/1 1152
5/1 559
6/1 1265
7/1 592
8/1 493
FG1: '2026 AM Peak + Dev'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 34.2 %
1935 1935 Arm 6 Left Inf 7.7 %
Arm 7 Ahead
Inf 58.1 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 11.5 %
1915 1915 Arm 6 Right Inf 53.9 %
Arm 8 Ahead
Inf 34.5 %
Scenario 1: 'Scenario 1' (FG1: '2026 AM Peak + Dev', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 35s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 15sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 35 4 15 8
Change Point 0 43 52 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 35
0
25 : 4
43
3 7 : 15
52
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2026 AM Peak - Base + Dev
- - N/A - - - - - - - - 560.0%
Unnamed Junction
- - N/A - - - - - - - - 560.0%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 35 - 806 1850 203 396.4%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 44 - 627 1700 850 73.8%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 44 4 14 1700 625 2.2%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 15 - 310 1935 328 94.6%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 15 - 1152 1915 206 560.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2026 AM Peak - Base + Dev
- - 182 2 74 103.7 782.6 0.3 886.6 - - - -
Unnamed Junction
- - 182 2 74 103.7 782.6 0.3 886.6 - - - -
1/1 806 203 18 0 9 36.9 302.0 0.1 339.1 1514.4 45.2 302.0 347.2
2/1 627 627 - - - 3.1 1.4 - 4.5 25.8 12.4 1.4 13.8
2/2 14 14 12 2 0 0.0 0.0 0.0 0.1 14.8 0.2 0.0 0.2
3/1 310 310 85 0 21 3.1 5.4 0.1 8.6 99.7 7.6 5.4 13.0
4/1 1152 206 68 0 43 60.5 473.8 0.1 534.4 1670.1 72.0 473.8 545.7
C1 PRC for Signalled Lanes (%): -522.2 Total Delay for Signalled Lanes (pcuHr): 886.62 Cycle Time (s): 90 PRC Over All Lanes (%): -522.2 Total Delay Over All Lanes(pcuHr): 886.62
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: T218029 Beamhill Road
Title: 2026 AM Peak - Base + Dev + Imp
Location: A511 Tutbury Road / Beamhill Road / Harehedge Lane Junction
File name: 2026 AM Peak - Base + Dev + Imp.lsg3x
Author: Carl Hicks
Company: Waterman Boreham Ltd
Address: Halifax House, Halifax Place, The Lace Market, Nottingham, NG1 1QN
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 -
A5
11
Tu
tbu
ry R
oa
d (
No
rth
)
12
3
123
Arm 2 - Harehedge Lane
1
2
1
2
Arm
3 - A
511
Tu
tbu
ry R
oad
(So
uth
)
1 2
3
1 2 3
Arm 4 - Beamhill Road
1
2
1
2
Arm
5 - A
511
Tu
tbu
ry R
oad
(No
rth)
11
Arm 6 - Harehedge Lane
11
Arm
7 -
A5
11
Tu
tbu
ry R
oa
d (
So
ut h
)
11
Arm 8 - Beamhill Road
1 1
A
B
C D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
G
H
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Traffic 7 7
D Traffic 7 7
E Pedestrian 5 5
F Pedestrian 5 5
G Dummy 7 7
H Pedestrian 5 5
Full Input Data And Results
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F G H
A - - 7 7 8 8 8 8
B - - 7 7 8 8 8 8
C 7 7 - - 8 8 8 8
D 7 7 - - 8 8 8 8
E 8 8 8 8 - - 8 -
F 8 8 8 8 - - 8 -
G 8 8 8 8 8 8 - 8
H 8 8 8 8 - - 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 C D
3 E F H
Stages Diagram A
B
C
D
E
F
G
H
1 Min >= 7 A
B
C
D
E
F
G
H
2 Min >= 7 A
B
C
D
E
F
G
H
3 Min >= 5
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3
1 7 8
2 7 8
3 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (North))
6/1 (Left) 715 4/2 0.22 4/2 - - - - -
1/3 (A511 Tutbury Road (North))
8/1 (Right) 1440 3/2 1.09 3/2 2.00 - 0.50 2 2.00
2/2 (Harehedge Lane)
5/1 (Right) 1440 4/2 1.09 4/2 2.00 - 0.50 2 2.00
3/1 (A511 Tutbury Road (South))
8/1 (Left) 715 2/2 0.22 2/2 - - - - -
3/3 (A511 Tutbury Road (South))
6/1 (Right) 1440 1/2 1.09 1/2 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
5/1 (Left) 715 3/2 0.22 3/2
- - - - - 2/2 0.22 2/2
4/2 (Beamhill Road)
7/1 (Right) 1440 2/2 1.09 2/2 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (North))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 6 Left
Inf
1/2 (A511 Tutbury Road (North))
U A 2 3 60.0 Geom - 3.00 0.00 N Arm 7 Ahead
Inf
1/3 (A511 Tutbury Road (North))
O A 2 3 60.0 Geom - 3.00 0.00 Y Arm 8 Right
Inf
2/1 (Harehedge
Lane) U C 2 3 60.0 Geom - 3.25 0.00 Y
Arm 7 Left
Inf
2/2 (Harehedge
Lane) O C 2 3 60.0 Geom - 3.25 0.00 N
Arm 5 Right
Inf
Arm 8 Ahead
Inf
3/1 (A511 Tutbury Road (South))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 8 Left
Inf
3/2 (A511 Tutbury Road (South))
U B 2 3 60.0 Geom - 3.00 0.00 N Arm 5 Ahead
Inf
3/3 (A511 Tutbury Road (South))
O B 2 3 60.0 Geom - 3.00 0.00 Y Arm 6 Right
Inf
4/1 (Beamhill
Road) O 2 3 60.0 Geom - 3.50 0.00 Y
Arm 5 Left
Inf
4/2 (Beamhill
Road) O D 2 3 60.0 Geom - 3.00 0.00 N
Arm 6 Ahead
Inf
Arm 7 Right
Inf
5/1 (A511 Tutbury Road (North))
U 2 3 60.0 Inf - - - - - -
6/1 (Harehedge
Lane) U 2 3 60.0 Inf - - - - - -
7/1 (A511 Tutbury Road (South))
U 2 3 60.0 Inf - - - - - -
8/1 (Beamhill
Road) U 2 3 60.0 Inf - - - - - -
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2026 Base + Dev + Imp' 08:00 09:00 01:00
Full Input Data And Results
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 81
1/2 620
1/3 105
2/1 24
2/2 286
3/1 307
3/2 320
3/3 14
4/1 133
4/2 1019
5/1 559
6/1 493
7/1 1265
8/1 592
Full Input Data And Results
FG1: '2026 Base + Dev + Imp'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (North))
3.50 0.00 Y Arm 6 Left Inf 100.0 % 1965 1965
1/2 (A511 Tutbury Road (North))
3.00 0.00 N Arm 7 Ahead
Inf 100.0 % 2055 2055
1/3 (A511 Tutbury Road (North))
3.00 0.00 Y Arm 8 Right Inf 100.0 % 1915 1915
2/1 (Harehedge Lane)
3.25 0.00 Y Arm 7 Left Inf 100.0 % 1940 1940
2/2 (Harehedge Lane)
3.25 0.00 N
Arm 5 Right Inf 37.1 %
2080 2080 Arm 8 Ahead
Inf 62.9 %
3/1 (A511 Tutbury Road (South))
3.50 0.00 Y Arm 8 Left Inf 100.0 % 1965 1965
3/2 (A511 Tutbury Road (South))
3.00 0.00 N Arm 5 Ahead
Inf 100.0 % 2055 2055
3/3 (A511 Tutbury Road (South))
3.00 0.00 Y Arm 6 Right Inf 100.0 % 1915 1915
4/1 (Beamhill Road)
3.50 0.00 Y Arm 5 Left Inf 100.0 % 1965 1965
4/2 (Beamhill Road)
3.00 0.00 N
Arm 6 Ahead
Inf 39.1 % 2055 2055
Arm 7 Right Inf 60.9 %
5/1 (A511 Tutbury Road (North) Lane
1) Infinite Saturation Flow Inf Inf
6/1 (Harehedge Lane Lane 1)
Infinite Saturation Flow Inf Inf
7/1 (A511 Tutbury Road (South) Lane
1) Infinite Saturation Flow Inf Inf
8/1 (Beamhill Road Lane 1)
Infinite Saturation Flow Inf Inf
Scenario 1: 'Scenario 1' (FG1: '2026 Base + Dev + Imp', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram A
B
1 Min: 7
8 37s
C
D
2 Min: 7
7 55s
E
F
H
3 Min: 5
8 5s Stage Timings
Stage 1 2 3
Duration 37 55 5
Change Point 0 45 107
Full Input Data And Results
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
Time in cycle (sec)
Phases
1 8 : 37
0
2 7 : 55
45
3 8 : 5
107
H H
G G
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Junction Layout Diagram
Full Input Data And Results
Arm
1 -
A511
Tu
tbury
Ro
ad (
Nort
h)
12
3
66
812
.1%
65
195
.3%
24
942
.2%
Arm 2 - Harehedge Lane
1
2
905 2.7%
699 40.9%
Arm
3 - A
511
Tu
tbury
Ro
ad (S
outh
)
1 2
3
67
6
65
1
60
Arm 4 - Beamhill Road
1
2
62221.4%
612166.6%
Arm
5 - A
511
Tu
tbury
Ro
ad (N
orth
)
1In
f0.0
%
Arm 6 - Harehedge Lane
1Inf0.0%
Arm
7 -
A511
Tu
tbury
Ro
ad (
So
uth
)
Inf
0.0
%
Arm 8 - Beamhill Road
1 Inf 0.0%
B
C D
Full Input Data And Results
Full Input Data And Results
Link Results
Item Lane Description
Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2026 AM Peak - Base + Dev + Imp
- - N/A - - - - - - - - 166.6%
Unnamed Junction
- - N/A - - - - - - - - 166.6%
1/1 A511 Tutbury Road (North)
Left O N/A N/A - - - - 81 1965 668 12.1%
1/2 A511 Tutbury Road (North)
Ahead U N/A N/A A 1 37 - 620 2055 651 95.3%
1/3 A511 Tutbury Road (North)
Right O N/A N/A A 1 37 - 105 1915 249 42.2%
2/1 Harehedge Lane Left
U N/A N/A C 1 55 - 24 1940 905 2.7%
2/2 Harehedge Lane Right
Ahead O N/A N/A C 1 55 - 286 2080 699 40.9%
3/1 A511 Tutbury Road (South)
Left O N/A N/A - - - - 307 1965 676 45.4%
3/2 A511 Tutbury Road (South)
Ahead U N/A N/A B 1 37 - 320 2055 651 49.2%
3/3 A511 Tutbury Road (South)
Right O N/A N/A B 1 37 - 14 1915 60 23.3%
4/1 Beamhill Road
Left O N/A N/A - - - - 133 1965 622 21.4%
4/2 Beamhill Road Ahead Right
O N/A N/A D 1 55 - 1019 2055 612 166.6%
5/1 A511 Tutbury Road (North)
U N/A N/A - - - - 559 Inf Inf 0.0%
6/1 Harehedge
Lane U N/A N/A - - - - 493 Inf Inf 0.0%
Full Input Data And Results
7/1 A511 Tutbury Road (South)
U N/A N/A - - - - 1265 Inf Inf 0.0%
8/1 Beamhill Road U N/A N/A - - - - 592 Inf Inf 0.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2026 AM Peak - Base + Dev + Imp
- - 844 236 39 50.6 213.9 0.8 265.3 - - - -
Unnamed Junction
- - 844 236 39 50.6 213.9 0.8 265.3 - - - -
1/1 81 81 38 43 0 0.0 0.1 - 0.1 3.1 0.0 0.1 0.1
1/2 620 620 - - - 6.9 6.9 - 13.9 80.4 20.1 6.9 27.1
1/3 105 105 105 0 0 1.0 0.4 0.3 1.6 56.0 3.0 0.4 3.3
2/1 24 24 - - - 0.1 0.0 - 0.1 19.4 0.4 0.0 0.4
2/2 286 286 104 0 2 1.6 0.3 0.0 1.9 24.5 5.9 0.3 6.2
3/1 307 307 143 164 0 0.0 0.4 - 0.4 4.9 0.0 0.4 0.4
3/2 320 320 - - - 2.9 0.5 - 3.4 38.6 8.6 0.5 9.1
3/3 14 14 14 0 0 0.1 0.2 0.1 0.4 97.8 0.3 0.2 0.5
4/1 133 133 104 29 0 0.0 0.1 - 0.1 3.7 0.0 0.1 0.1
4/2 1019 612 336 0 37 38.0 204.9 0.4 243.3 859.7 58.3 204.9 263.2
5/1 559 559 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
6/1 334 334 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
7/1 1017 1017 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
8/1 592 592 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
C1 PRC for Signalled Lanes (%): -85.1 Total Delay for Signalled Lanes (pcuHr): 264.72 Cycle Time (s): 120 PRC Over All Lanes (%): -85.1 Total Delay Over All Lanes(pcuHr): 265.34
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpi"(drive-on-the-left) at 09:49:10 on Friday, 18 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 + Full Dev LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 AM + Full Dev TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 3.10 I 4.65 I 3.10 I I ARM B I 15.00 I 45.00 I 75.00 I 7.75 I 11.63 I 7.75 I I ARM C I 15.00 I 45.00 I 75.00 I 2.22 I 3.34 I 2.22 I I ARM D I 15.00 I 45.00 I 75.00 I 3.85 I 5.77 I 3.85 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 AM + Full Dev -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.254 I 0.335 I 0.411 I I I I 0.0 I 63.0 I 83.0 I 102.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.310 I 0.000 I 0.595 I 0.095 I I I I 192.0 I 0.0 I 369.0 I 59.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.787 I 0.208 I 0.000 I 0.006 I I I I 140.0 I 37.0 I 0.0 I 1.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.367 I 0.581 I 0.052 I 0.000 I I I I 113.0 I 179.0 I 16.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 AM + Full Dev AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 4.63 8.60 0.538 0.00 1.13 15.5 0.24 I I B-AD 3.15 7.28 0.433 0.00 0.74 10.3 0.24 I I A-BCD 1.54 10.61 0.145 0.00 0.20 3.0 0.11 I I A-B 0.68 I I A-C 0.89 I I D-A 1.42 8.95 0.158 0.00 0.19 2.7 0.13 I I D-BC 2.45 7.07 0.346 0.00 0.52 7.3 0.21 I I C-ABD 0.55 10.69 0.052 0.00 0.07 1.0 0.10 I I C-D 0.01 I I C-A 1.67 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 5.53 7.60 0.728 1.13 2.42 32.1 0.45 I I B-AD 3.76 6.18 0.608 0.74 1.46 19.9 0.40 I I A-BCD 1.93 10.64 0.181 0.20 0.27 4.1 0.11 I I A-B 0.77 I I A-C 1.02 I I D-A 1.69 8.21 0.206 0.19 0.26 3.7 0.15 I I D-BC 2.92 6.66 0.439 0.52 0.76 10.8 0.27 I I C-ABD 0.69 10.72 0.064 0.07 0.09 1.4 0.10 I I C-D 0.01 I I C-A 1.97 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 6.77 6.34 1.068 2.42 13.82 132.2 1.74 I I B-AD 4.61 4.30 1.071 1.46 10.62 100.6 1.98 I I A-BCD 2.50 10.68 0.234 0.27 0.38 5.8 0.12 I I A-B 0.88 I I A-C 1.17 I I D-A 2.07 6.86 0.302 0.26 0.43 6.1 0.21 I I D-BC 3.58 6.06 0.591 0.76 1.36 18.7 0.39 I I C-ABD 0.89 10.79 0.082 0.09 0.12 1.9 0.10 I I C-D 0.02 I I C-A 2.36 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 6.77 6.20 1.093 13.82 23.84 283.8 3.42 I I B-AD 4.61 4.28 1.076 10.62 17.05 208.7 3.73 I I A-BCD 2.51 10.55 0.238 0.38 0.39 6.0 0.12 I I A-B 0.88 I I A-C 1.16 I I D-A 2.07 6.59 0.315 0.43 0.45 6.7 0.22 I I D-BC 3.58 5.92 0.605 1.36 1.46 21.4 0.42 I I C-ABD 0.89 10.78 0.082 0.12 0.12 1.9 0.10 I I C-D 0.02 I I C-A 2.36 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 5.53 6.45 0.857 23.84 13.87 282.9 3.11 I I B-AD 3.76 4.44 0.847 17.05 9.67 206.3 3.34 I I A-BCD 1.94 10.40 0.187 0.39 0.29 4.3 0.12 I I A-B 0.77 I I A-C 1.01 I I D-A 1.69 7.84 0.216 0.45 0.28 4.3 0.16 I I D-BC 2.92 6.42 0.455 1.46 0.86 13.8 0.29 I I C-ABD 0.69 10.71 0.064 0.12 0.09 1.4 0.10 I I C-D 0.01 I I C-A 1.96 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 4.63 7.83 0.591 13.87 1.54 52.9 0.56 I I B-AD 3.15 6.49 0.485 9.67 0.98 29.5 0.44 I I A-BCD 1.55 10.47 0.148 0.29 0.21 3.2 0.11 I I A-B 0.67 I I A-C 0.89 I I D-A 1.42 8.75 0.162 0.28 0.20 3.0 0.14 I I D-BC 2.45 6.93 0.353 0.86 0.56 8.8 0.23 I I C-ABD 0.56 10.68 0.052 0.09 0.07 1.1 0.10 I I C-D 0.01 I I C-A 1.67 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 1.1 * 08.15 2.4 ** 08.30 13.8 ************** 08.45 23.8 ************************ 09.00 13.9 ************** 09.15 1.5 **
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.7 * 08.15 1.5 * 08.30 10.6 *********** 08.45 17.1 ***************** 09.00 9.7 ********** 09.15 1.0 *
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.3 08.30 0.4 08.45 0.4 09.00 0.3 09.15 0.2
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.3 08.30 0.4 08.45 0.5 09.00 0.3 09.15 0.2
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.5 * 08.15 0.8 * 08.30 1.4 * 08.45 1.5 * 09.00 0.9 * 09.15 0.6 *
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 507.9 I 338.6 I 799.3 I 1.57 I 799.5 I 1.57 I I B-AD I 345.5 I 230.3 I 575.3 I 1.67 I 575.4 I 1.67 I I A-BCD I 179.5 I 119.7 I 26.3 I 0.15 I 26.3 I 0.15 I I A-B I 69.8 I 46.5 I I I I I I A-C I 92.0 I 61.3 I I I I I I D-A I 155.5 I 103.7 I 26.6 I 0.17 I 26.6 I 0.17 I I D-BC I 268.4 I 178.9 I 80.9 I 0.30 I 80.9 I 0.30 I I C-ABD I 63.9 I 42.6 I 8.6 I 0.13 I 8.6 I 0.13 I I C-D I 1.3 I 0.9 I I I I I I C-A I 179.8 I 119.9 I I I I I --------------------------------------------------------------------------- I ALL I 1863.7 I 1242.5 I 1517.0 I 0.81 I 1517.3 I 0.81 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 PM + Full Dev TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.29 I 7.93 I 5.29 I I ARM B I 15.00 I 45.00 I 75.00 I 5.16 I 7.74 I 5.16 I I ARM C I 15.00 I 45.00 I 75.00 I 1.61 I 2.42 I 1.61 I I ARM D I 15.00 I 45.00 I 75.00 I 6.78 I 10.16 I 6.78 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 PM + Full Dev -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.236 I 0.317 I 0.447 I I I I 0.0 I 100.0 I 134.0 I 189.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.220 I 0.000 I 0.068 I 0.712 I I I I 91.0 I 0.0 I 28.0 I 294.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.667 I 0.264 I 0.000 I 0.070 I I I I 86.0 I 34.0 I 0.0 I 9.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.133 I 0.801 I 0.066 I 0.000 I I I I 72.0 I 434.0 I 36.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 PM + Full Dev AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.35 5.78 0.061 0.00 0.06 0.9 0.18 I I B-AD 4.83 7.42 0.651 0.00 1.74 23.0 0.36 I I A-BCD 3.22 11.13 0.289 0.00 0.51 7.5 0.13 I I A-B 0.89 I I A-C 1.20 I I D-A 0.90 3.56 0.254 0.00 0.33 4.5 0.37 I I D-BC 5.90 6.95 0.848 0.00 4.20 49.0 0.65 I I C-ABD 0.49 9.23 0.053 0.00 0.07 1.0 0.11 I I C-D 0.11 I I C-A 1.02 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.42 3.33 0.126 0.06 0.14 2.0 0.34 I I B-AD 5.77 7.08 0.815 1.74 3.62 46.2 0.64 I I A-BCD 4.12 11.26 0.365 0.51 0.73 11.1 0.14 I I A-B 0.95 I I A-C 1.27 I I D-A 1.08 0.97 1.111 0.33 4.42 40.8 4.09 I I D-BC 7.04 6.46 1.090 4.20 16.50 162.1 2.07 I I C-ABD 0.61 8.93 0.068 0.07 0.09 1.4 0.12 I I C-D 0.13 I I C-A 1.20 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.51 0.47 1.092 0.14 2.64 24.2 5.69 I I B-AD 7.06 6.57 1.075 3.62 15.21 149.2 1.88 I I A-BCD 5.55 11.46 0.484 0.73 1.23 18.5 0.17 I I A-B 0.95 I I A-C 1.27 I I D-A 1.32 0.97 1.362 4.42 10.21 110.5 9.33 I I D-BC 8.62 5.84 1.477 16.50 58.51 563.1 6.81 I I C-ABD 0.78 8.42 0.093 0.09 0.13 2.0 0.13 I I C-D 0.15 I I C-A 1.43 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.51 0.53 0.963 2.64 3.52 46.5 8.26 I I B-AD 7.06 6.25 1.130 15.21 28.42 328.4 3.87 I I A-BCD 5.61 11.32 0.495 1.23 1.30 19.9 0.18 I I A-B 0.92 I I A-C 1.23 I I D-A 1.32 0.92 1.441 10.21 16.45 200.1 15.47 I I D-BC 8.62 5.74 1.504 58.51 101.87 1202.9 13.70 I I C-ABD 0.80 7.77 0.103 0.13 0.15 2.3 0.14 I I C-D 0.15 I I C-A 1.42 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.42 0.54 0.775 3.52 3.52 52.8 7.37 I I B-AD 5.77 6.34 0.910 28.42 23.09 386.3 4.23 I I A-BCD 4.20 10.90 0.385 1.30 0.84 12.7 0.15 I I A-B 0.92 I I A-C 1.23 I I D-A 1.08 0.98 1.106 16.45 18.23 260.1 18.78 I I D-BC 7.04 6.20 1.136 101.87 114.54 1623.1 17.49 I I C-ABD 0.63 7.40 0.085 0.15 0.12 1.8 0.15 I I C-D 0.12 I I C-A 1.18 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.35 1.04 0.339 3.52 0.61 19.1 2.40 I I B-AD 4.83 6.54 0.739 23.09 3.85 186.7 2.24 I I A-BCD 3.27 10.81 0.302 0.84 0.56 8.4 0.13 I I A-B 0.87 I I A-C 1.17 I I D-A 0.90 1.04 0.865 18.23 16.92 263.7 17.88 I I D-BC 5.90 6.67 0.884 114.54 103.75 1637.2 16.52 I I C-ABD 0.51 7.43 0.068 0.12 0.09 1.4 0.14 I I C-D 0.11 I I C-A 1.00 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 2.6 *** 17.45 3.5 **** 18.00 3.5 **** 18.15 0.6 *
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 1.7 ** 17.15 3.6 **** 17.30 15.2 *************** 17.45 28.4 **************************** 18.00 23.1 *********************** 18.15 3.9 ****
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.5 * 17.15 0.7 * 17.30 1.2 * 17.45 1.3 * 18.00 0.8 * 18.15 0.6 *
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.3 17.15 4.4 **** 17.30 10.2 ********** 17.45 16.5 **************** 18.00 18.2 ****************** 18.15 16.9 *****************
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 4.2 **** 17.15 16.5 **************** 17.30 58.5 *********************************************************** 17.45 101.9 ****************************************************************************************** 18.00 114.5 ****************************************************************************************** 18.15 103.8 ******************************************************************************************
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.1 17.45 0.2 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base + Full Dev.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 38.5 I 25.7 I 145.6 I 3.78 I 145.7 I 3.78 I I B-AD I 529.9 I 353.3 I 1119.9 I 2.11 I 1121.0 I 2.12 I I A-BCD I 389.3 I 259.5 I 78.1 I 0.20 I 78.1 I 0.20 I I A-B I 82.5 I 55.0 I I I I I I A-C I 110.5 I 73.7 I I I I I I D-A I 99.1 I 66.1 I 879.8 I 8.88 I 1016.8 I 10.26 I I D-BC I 646.9 I 431.3 I 5237.4 I 8.10 I 6043.9 I 9.34 I I C-ABD I 57.3 I 38.2 I 10.0 I 0.17 I 10.0 I 0.17 I I C-D I 11.4 I 7.6 I I I I I I C-A I 108.8 I 72.6 I I I I I --------------------------------------------------------------------------- I ALL I 2074.3 I 1382.8 I 7470.6 I 3.60 I 8415.5 I 4.06 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 10:16:47 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpi"(drive-on-the-left) at 09:43:57 on Friday, 18 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 LOCATION : DATE : 06/10/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MINOR ROAD (ARM D) I I I I I I MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Rolleston Road (South) ARM B IS Harehedge Lane ARM C IS Rolleston Road (North) ARM D IS Bitham Lane
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- ---------------------------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I MINOR ROAD D I ---------------------------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.00 M. I ( W ) 6.50 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I (WCR ) 0.00 M. I I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I (WA-D) 2.20 M. I I - VISIBILITY I (VC-B)100.00 M. I (VA-D)100.00 M. I I - BLOCKS TRAFFIC I YES I YES I I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 41.0 M. I (VD-A) 33.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 42.0 M. I (VD-C) 33.0 M. I I - LANE 1 WIDTH I (WB-C) - I (WD-A) - I I - LANE 2 WIDTH I (WB-A) - I (WD-C) - I I WIDTH AT 0 M FROM JUNCTION I 10.00 M. I 10.00 M. I I WIDTH AT 5 M FROM JUNCTION I 4.90 M. I 5.40 M. I I WIDTH AT 10 M FROM JUNCTION I 2.80 M. I 2.40 M. I I WIDTH AT 15 M FROM JUNCTION I 2.60 M. I 3.00 M. I I WIDTH AT 20 M FROM JUNCTION I 2.50 M. I 3.00 M. I I - LENGTH OF FLARED SECTION I 1 VEHS I 1 VEHS I ---------------------------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-C STREAM A-B STREAM A-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I --------------------------------------------------------------------------------------------------
* Due to the presence of a flare, data is not available
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 4 -------------------------------------------------------------------------------- C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 3.01 I 4.52 I 3.01 I I ARM B I 15.00 I 45.00 I 75.00 I 7.57 I 11.36 I 7.57 I I ARM C I 15.00 I 45.00 I 75.00 I 2.35 I 3.52 I 2.35 I I ARM D I 15.00 I 45.00 I 75.00 I 3.54 I 5.31 I 3.54 I ------------------------------------------------------------------------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 AM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 07.45 - 08.00 I I I I I I I I ARM A I 0.000 I 0.266 I 0.353 I 0.382 I I I I 0.0 I 64.0 I 85.0 I 92.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.302 I 0.000 I 0.587 I 0.111 I I I I 183.0 I 0.0 I 356.0 I 67.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.798 I 0.186 I 0.000 I 0.016 I I I I 150.0 I 35.0 I 0.0 I 3.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.378 I 0.565 I 0.057 I 0.000 I I I I 107.0 I 160.0 I 16.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 5 -------------------------------------------------------------------------------- QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 AM AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-C 4.47 8.64 0.517 0.00 1.04 14.3 0.23 I I B-AD 3.14 7.40 0.424 0.00 0.72 10.0 0.23 I I A-BCD 1.40 10.60 0.132 0.00 0.18 2.7 0.11 I I A-B 0.70 I I A-C 0.93 I I D-A 1.34 9.13 0.147 0.00 0.17 2.5 0.13 I I D-BC 2.21 7.09 0.311 0.00 0.44 6.3 0.20 I I C-ABD 0.53 10.84 0.049 0.00 0.07 1.0 0.10 I I C-D 0.04 I I C-A 1.79 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-C 5.33 7.67 0.696 1.04 2.11 28.4 0.40 I I B-AD 3.75 6.42 0.583 0.72 1.33 18.3 0.36 I I A-BCD 1.75 10.63 0.164 0.18 0.24 3.7 0.11 I I A-B 0.80 I I A-C 1.06 I I D-A 1.60 8.49 0.189 0.17 0.23 3.4 0.15 I I D-BC 2.64 6.70 0.394 0.44 0.63 9.1 0.24 I I C-ABD 0.66 10.90 0.061 0.07 0.09 1.3 0.10 I I C-D 0.04 I I C-A 2.11 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-C 6.53 6.27 1.041 2.11 11.88 116.2 1.57 I I B-AD 4.59 4.40 1.043 1.33 9.52 92.0 1.80 I I A-BCD 2.27 10.68 0.213 0.24 0.34 5.2 0.12 I I A-B 0.92 I I A-C 1.23 I I D-A 1.96 7.37 0.267 0.23 0.36 5.2 0.18 I I D-BC 3.23 6.13 0.527 0.63 1.07 14.9 0.34 I I C-ABD 0.85 11.00 0.078 0.09 0.12 1.8 0.10 I I C-D 0.05 I I C-A 2.54 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-C 6.53 6.15 1.063 11.88 19.67 238.2 2.96 I I B-AD 4.59 4.38 1.047 9.52 14.69 182.9 3.26 I I A-BCD 2.28 10.56 0.216 0.34 0.35 5.3 0.12 I I A-B 0.92 I I A-C 1.22 I I D-A 1.96 7.16 0.274 0.36 0.37 5.5 0.19 I I D-BC 3.23 6.01 0.538 1.07 1.13 16.6 0.36 I I C-ABD 0.86 11.00 0.078 0.12 0.12 1.8 0.10 I I C-D 0.05 I I C-A 2.54 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 6 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-C 5.33 6.41 0.833 19.67 7.79 207.8 2.43 I I B-AD 3.75 4.56 0.822 14.69 6.85 159.7 2.67 I I A-BCD 1.76 10.43 0.169 0.35 0.26 3.9 0.12 I I A-B 0.80 I I A-C 1.06 I I D-A 1.60 8.21 0.195 0.37 0.25 3.8 0.15 I I D-BC 2.64 6.50 0.406 1.13 0.70 11.2 0.26 I I C-ABD 0.66 10.89 0.061 0.12 0.09 1.3 0.10 I I C-D 0.04 I I C-A 2.11 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-C 4.47 8.14 0.549 7.79 1.27 27.9 0.35 I I B-AD 3.14 7.05 0.445 6.85 0.83 19.1 0.32 I I A-BCD 1.40 10.50 0.133 0.26 0.19 2.8 0.11 I I A-B 0.70 I I A-C 0.93 I I D-A 1.34 8.99 0.149 0.25 0.18 2.7 0.13 I I D-BC 2.21 6.99 0.316 0.70 0.47 7.4 0.21 I I C-ABD 0.53 10.83 0.049 0.09 0.07 1.0 0.10 I I C-D 0.04 I I C-A 1.79 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 1.0 * 08.15 2.1 ** 08.30 11.9 ************ 08.45 19.7 ******************** 09.00 7.8 ******** 09.15 1.3 *
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.7 * 08.15 1.3 * 08.30 9.5 ********** 08.45 14.7 *************** 09.00 6.8 ******* 09.15 0.8 *
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.2 08.30 0.3 08.45 0.4 09.00 0.3 09.15 0.2
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 7 -------------------------------------------------------------------------------- QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.2 08.15 0.2 08.30 0.4 08.45 0.4 09.00 0.2 09.15 0.2
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.4 08.15 0.6 * 08.30 1.1 * 08.45 1.1 * 09.00 0.7 * 09.15 0.5
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 8 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 490.0 I 326.7 I 632.8 I 1.29 I 632.9 I 1.29 I I B-AD I 344.1 I 229.4 I 482.0 I 1.40 I 482.1 I 1.40 I I A-BCD I 162.8 I 108.6 I 23.6 I 0.15 I 23.6 I 0.15 I I A-B I 72.5 I 48.4 I I I I I I A-C I 96.3 I 64.2 I I I I I I D-A I 147.3 I 98.2 I 23.1 I 0.16 I 23.1 I 0.16 I I D-BC I 242.3 I 161.5 I 65.3 I 0.27 I 65.4 I 0.27 I I C-ABD I 61.4 I 41.0 I 8.3 I 0.14 I 8.3 I 0.14 I I C-D I 3.9 I 2.6 I I I I I I C-A I 193.5 I 129.0 I I I I I --------------------------------------------------------------------------- I ALL I 1814.1 I 1209.4 I 1235.2 I 0.68 I 1235.3 I 0.68 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) B-C Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-C STREAM A-C STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available B-AD Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-AD STREAM A-C STREAM A-D STREAM D-A STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-A STREAM C-B STREAM C-D -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-A Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-A STREAM C-A STREAM D-C STREAM A-B STREAM D-B I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available D-BC Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM D-BC STREAM C-A STREAM B-A STREAM C-D STREAM B-D I -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available -------------------------------------------------------------------------------------------------- I Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI
I STREAM A-C STREAM A-B STREAM A-D
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 10 -------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------- I 0.00 0.00 0.00 I -------------------------------------------------------------------------------------------------- * Due to the presence of a flare, data is not available C-B Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM C-B STREAM A-C STREAM A-B STREAM D-C STREAM D-B I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I -------------------------------------------------------------------------------------------------- A-D Stream -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM A-D STREAM C-A STREAM C-D STREAM B-A STREAM B-D I -------------------------------------------------------------------------------------------------- I 631.87 0.24 0.24 0.24 0.24 I --------------------------------------------------------------------------------------------------
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I I D I 100 I -----------------------
Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.56 I 8.34 I 5.56 I I ARM B I 15.00 I 45.00 I 75.00 I 4.68 I 7.01 I 4.68 I I ARM C I 15.00 I 45.00 I 75.00 I 1.63 I 2.44 I 1.63 I I ARM D I 15.00 I 45.00 I 75.00 I 6.25 I 9.38 I 6.25 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 11 -------------------------------------------------------------------------------- Demand set: 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 PM -------------------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I ----------------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ARM D I -------------------------------------------------------------------- I 16.45 - 17.00 I I I I I I I I ARM A I 0.000 I 0.204 I 0.317 I 0.479 I I I I 0.0 I 91.0 I 141.0 I 213.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM B I 0.233 I 0.000 I 0.075 I 0.693 I I I I 87.0 I 0.0 I 28.0 I 259.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM C I 0.662 I 0.254 I 0.000 I 0.085 I I I I 86.0 I 33.0 I 0.0 I 11.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I I ARM D I 0.150 I 0.770 I 0.080 I 0.000 I I I I 75.0 I 385.0 I 40.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I -------------------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR DEMAND SET 218029 - Harehedge Lane / Rolleston Road Junction - Base 2026 PM AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-C 0.35 6.52 0.054 0.00 0.06 0.8 0.16 I I B-AD 4.34 7.45 0.582 0.00 1.33 18.0 0.30 I I A-BCD 3.61 11.22 0.321 0.00 0.58 8.6 0.13 I I A-B 0.78 I I A-C 1.20 I I D-A 0.94 4.71 0.200 0.00 0.24 3.4 0.26 I I D-BC 5.33 6.89 0.774 0.00 2.93 36.2 0.52 I I C-ABD 0.47 9.38 0.051 0.00 0.06 1.0 0.11 I I C-D 0.13 I I C-A 1.03 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-C 0.42 4.64 0.090 0.06 0.10 1.4 0.24 I I B-AD 5.18 7.13 0.727 1.33 2.40 32.2 0.48 I I A-BCD 4.60 11.37 0.405 0.58 0.85 12.9 0.15 I I A-B 0.81 I I A-C 1.25 I I D-A 1.12 1.10 1.018 0.24 3.81 36.3 3.32 I I D-BC 6.37 6.36 1.002 2.93 9.95 105.3 1.46 I I C-ABD 0.59 9.13 0.064 0.06 0.09 1.3 0.12 I I C-D 0.15 I I C-A 1.21 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 12 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-C 0.51 0.93 0.551 0.10 0.94 10.9 1.95 I I B-AD 6.35 6.66 0.953 2.40 7.61 84.4 1.14 I I A-BCD 6.18 11.60 0.533 0.85 1.46 22.0 0.18 I I A-B 0.78 I I A-C 1.21 I I D-A 1.38 1.10 1.246 3.81 8.71 95.0 7.27 I I D-BC 7.80 5.73 1.360 9.95 41.46 387.1 4.89 I I C-ABD 0.76 8.75 0.087 0.09 0.12 1.9 0.13 I I C-D 0.18 I I C-A 1.44 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-C 0.51 0.54 0.952 0.94 2.45 26.9 4.74 I I B-AD 6.35 6.42 0.989 7.61 11.59 146.3 1.88 I I A-BCD 6.22 11.54 0.539 1.46 1.52 23.2 0.19 I I A-B 0.76 I I A-C 1.18 I I D-A 1.38 1.05 1.306 8.71 13.86 169.5 11.72 I I D-BC 7.80 5.69 1.372 41.46 73.24 860.4 10.01 I I C-ABD 0.77 8.26 0.093 0.12 0.14 2.1 0.13 I I C-D 0.18 I I C-A 1.43 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-C 0.42 2.16 0.194 2.45 0.25 6.3 0.68 I I B-AD 5.18 6.58 0.788 11.59 4.53 98.1 1.24 I I A-BCD 4.65 11.24 0.413 1.52 0.93 14.0 0.15 I I A-B 0.79 I I A-C 1.23 I I D-A 1.12 1.14 0.990 13.86 14.31 211.3 13.02 I I D-BC 6.37 6.24 1.021 73.24 75.55 1116.0 11.80 I I C-ABD 0.60 8.03 0.075 0.14 0.11 1.6 0.13 I I C-D 0.15 I I C-A 1.19 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-C 0.35 5.22 0.067 0.25 0.07 1.2 0.21 I I B-AD 4.34 6.88 0.631 4.53 1.82 31.9 0.45 I I A-BCD 3.63 11.16 0.325 0.93 0.61 9.2 0.13 I I A-B 0.77 I I A-C 1.19 I I D-A 0.94 1.23 0.765 14.31 11.19 191.2 11.23 I I D-BC 5.33 6.73 0.793 75.55 55.94 986.1 9.93 I I C-ABD 0.49 8.20 0.059 0.11 0.08 1.2 0.13 I I C-D 0.13 I I C-A 1.01 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 13 -------------------------------------------------------------------------------- QUEUE FOR STREAM B-C ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.9 * 17.45 2.4 ** 18.00 0.3 18.15 0.1
QUEUE FOR STREAM B-AD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 1.3 * 17.15 2.4 ** 17.30 7.6 ******** 17.45 11.6 ************ 18.00 4.5 ***** 18.15 1.8 **
QUEUE FOR STREAM A-BCD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.6 * 17.15 0.9 * 17.30 1.5 * 17.45 1.5 ** 18.00 0.9 * 18.15 0.6 *
QUEUE FOR STREAM D-A ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.2 17.15 3.8 **** 17.30 8.7 ********* 17.45 13.9 ************** 18.00 14.3 ************** 18.15 11.2 ***********
QUEUE FOR STREAM D-BC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 2.9 *** 17.15 10.0 ********** 17.30 41.5 ***************************************** 17.45 73.2 ************************************************************************* 18.00 75.5 **************************************************************************** 18.15 55.9 ********************************************************
QUEUE FOR STREAM C-ABD ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Harehedge Lane - Rolleston Road Crossroads\2026 Base.vpo - Page 14 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-C I 38.5 I 25.7 I 47.5 I 1.23 I 47.5 I 1.23 I I B-AD I 476.2 I 317.5 I 410.9 I 0.86 I 411.1 I 0.86 I I A-BCD I 433.2 I 288.8 I 89.9 I 0.21 I 90.0 I 0.21 I I A-B I 70.3 I 46.9 I I I I I I A-C I 109.0 I 72.7 I I I I I I D-A I 103.2 I 68.8 I 706.8 I 6.85 I 757.7 I 7.34 I I D-BC I 585.0 I 390.0 I 3491.2 I 5.97 I 3723.7 I 6.37 I I C-ABD I 55.2 I 36.8 I 9.0 I 0.16 I 9.0 I 0.16 I I C-D I 14.0 I 9.4 I I I I I I C-A I 109.7 I 73.1 I I I I I --------------------------------------------------------------------------- I ALL I 1994.4 I 1329.6 I 4755.2 I 2.38 I 5038.9 I 2.53 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 10:17:11 on 21/12/2011]
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2026 PM Peak - Base
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2026 PM Peak - Base.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2026 PM Peak' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 697
2/1 946
2/2 27
3/1 388
4/1 615
5/1 707
6/1 890
7/1 713
8/1 363
FG1: '2026 PM Peak'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 34.0 %
1935 1935 Arm 6 Left Inf 4.9 %
Arm 7 Ahead
Inf 61.1 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 6.5 %
1915 1915 Arm 6 Right Inf 58.2 %
Arm 8 Ahead
Inf 35.3 %
Scenario 1: 'Scenario 1' (FG1: '2026 PM Peak', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2026 PM Peak - Base
- - N/A - - - - - - - - 871.3%
Unnamed Junction
- - N/A - - - - - - - - 871.3%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 697 1850 80 871.3%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 946 1700 926 102.2%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 27 1700 852 3.2%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 388 1935 257 150.7%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 615 1915 167 369.1%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2026 PM Peak - Base
- - 135 2 82 83.5 622.0 0.3 705.7 - - - -
Unnamed Junction
- - 135 2 82 83.5 622.0 0.3 705.7 - - - -
1/1 697 80 0 0 7 37.9 309.1 0.1 347.1 1792.7 46.3 309.1 355.3
2/1 946 926 - - - 6.2 21.3 - 27.5 104.8 24.2 21.3 45.5
2/2 27 27 24 2 1 0.1 0.0 0.0 0.1 11.7 0.3 0.0 0.3
3/1 388 257 60 0 27 10.0 66.8 0.0 76.8 712.9 14.8 66.8 81.6
4/1 615 167 50 0 47 29.2 224.9 0.1 254.2 1488.0 35.6 224.9 260.4
C1 PRC for Signalled Lanes (%): -868.1 Total Delay for Signalled Lanes (pcuHr): 705.74 Cycle Time (s): 90 PRC Over All Lanes (%): -868.1 Total Delay Over All Lanes(pcuHr): 705.74
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: 218029 Beamhill Road, Burton-On-Trent
Title: 2026 PM Peak - Base + Dev
Location: Beamhill Road/Tutbury Road/Harehedge Lane
File name: 2026 PM Peak - Base + Dev.lsg3x
Author: Jon Wilkinson
Company: Waterman-Boreham
Address: 49 Stoney Stree, The Lace Market, Nottingham
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 - A
511
Tu
tbury
Ro
ad (S
outh
bo
und)
11
Ar m
2 - A
511
Tu
tbury
Ro
ad ( N
ort h
bound
)
1
2
1 2
Arm 3 - Harehedge Lane
1 1
Arm 4 - Beamhill Road
11
Arm
5 - A
511
Nor th
boun
d E
xit
11
Arm
6 - A
511
South
bound
Exit
11
Arm 7 - Beamhill Road Exit
1 1
Arm 8 - Harehedge Lane Exit
11
A
B
C
D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Ind. Arrow A 4 4
D Traffic 7 7
E Traffic 7 7
F Pedestrian 8 8
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F
A - - - 7 7 8
B - - 5 7 7 8
C - 7 - 7 7 8
D 7 7 7 - - 8
E 7 7 7 - - 8
F 8 8 8 8 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 A C
3 D E
4 F
Full Input Data And Results
Stages Diagram
A
B
C
D
E
F
1 Min >= 7
A
B
C
D
E
F
2 Min >= 4
A
B
C
D
E
F
3 Min >= 7
A
B
C
D
E
F
4 Min >= 8
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3 4
1 5 7 8
2 7 7 8
3 7 7 8
4 8 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (Southbound))
7/1 (Right) 1440 2/1 1.09 2/1 2.00 - 0.50 2 2.00
2/2 (A511 Tutbury Road (Northbound))
8/1 (Right) 1440 1/1 1.09 1/1 2.00 - 0.50 2 2.00
3/1 (Harehedge Lane)
5/1 (Right) 1440 4/1 1.09 4/1 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
6/1 (Right) 1440 3/1 1.09 3/1 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (Southbound))
O B 2 3 60.0 User 1850 - - - - -
2/1 (A511 Tutbury Road (Northbound))
U A 2 3 60.0 User 1700 - - - - -
2/2 (A511 Tutbury Road (Northbound))
O A C 2 3 60.0 User 1700 - - - - -
3/1 (Harehedge Lane)
O E 2 3 60.0 Geom - 3.20 0.00 Y
Arm 5 Right Inf
Arm 6 Left Inf
Arm 7 Ahead Inf
4/1 (Beamhill Road)
O D 2 3 60.0 Geom - 3.00 0.00 Y
Arm 5 Left Inf
Arm 6 Right Inf
Arm 8 Ahead Inf
5/1 (A511 Northbound Exit)
U 2 3 60.0 Inf - - - - - -
6/1 (A511 Southbound Exit)
U 2 3 60.0 Inf - - - - - -
7/1 (Beamhill Road Exit)
U 2 3 60.0 Inf - - - - - -
8/1 (Harehedge Lane Exit)
U 2 3 60.0 Inf - - - - - -
Full Input Data And Results
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2026 PM Peak + Dev' 17:00 18:00 01:00
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 716
2/1 1049
2/2 24
3/1 450
4/1 786
5/1 681
6/1 1005
7/1 936
8/1 403
FG1: '2026 PM Peak + Dev'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (Southbound)
Lane 1) This lane uses a directly entered Saturation Flow 1850 1850
2/1 (A511 Tutbury Road (Northbound)
Lane 1) This lane uses a directly entered Saturation Flow 1700 1700
2/2 (A511 Tutbury Road (Northbound)
Lane 2) This lane uses a directly entered Saturation Flow 1700 1700
3/1 (Harehedge Lane)
3.20 0.00 Y
Arm 5 Right Inf 29.1 %
1935 1935 Arm 6 Left Inf 4.2 %
Arm 7 Ahead
Inf 66.7 %
4/1 (Beamhill Road)
3.00 0.00 Y
Arm 5 Left Inf 6.1 %
1915 1915 Arm 6 Right Inf 61.5 %
Arm 8 Ahead
Inf 32.4 %
Scenario 1: 'Scenario 1' (FG1: '2026 PM Peak + Dev', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram
A
B1 Min: 7
8 39s
AC
2 Min: 4
5 4s
D
E
3 Min: 7
7 11sF
4 Min: 8
8 8s
Full Input Data And Results
Stage Timings
Stage 1 2 3 4
Duration 39 4 11 8
Change Point 0 47 56 74
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
Time in cycle (sec)
Phases
1 8 : 39
0
25 : 4
47
3 7 : 11
56
4 8 : 8
74
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Link Results
Item Lane Description Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2026 PM Peak - Base + Dev
- - N/A - - - - - - - - 895.0%
Unnamed Junction
- - N/A - - - - - - - - 895.0%
1/1 A511 Tutbury Road
(Southbound) Ahead Right Left
O N/A N/A B 1 39 - 716 1850 80 895.0%
2/1 A511 Tutbury Road (Northbound) Ahead
Left U N/A N/A A 1 48 - 1049 1700 926 113.3%
2/2 A511 Tutbury Road (Northbound) Right
O N/A N/A A C 1 48 4 24 1700 852 2.8%
3/1 Harehedge Lane Right Left Ahead
O N/A N/A E 1 11 - 450 1935 258 174.4%
4/1 Beamhill Road Left
Right Ahead O N/A N/A D 1 11 - 786 1915 147 535.8%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2026 PM Peak - Base + Dev
- - 117 2 81 105.1 801.7 0.3 907.1 - - - -
Unnamed Junction
- - 117 2 81 105.1 801.7 0.3 907.1 - - - -
1/1 716 80 0 0 10 39.1 318.6 0.1 357.8 1799.0 47.7 318.6 366.3
2/1 1049 926 - - - 11.0 65.7 - 76.7 263.2 29.3 65.7 95.0
2/2 24 24 22 2 1 0.1 0.0 0.0 0.1 11.7 0.3 0.0 0.3
3/1 450 258 54 0 21 13.9 97.2 0.0 111.1 888.6 19.2 97.2 116.4
4/1 786 147 41 0 49 41.0 320.3 0.1 361.4 1655.3 48.8 320.3 369.0
C1 PRC for Signalled Lanes (%): -894.4 Total Delay for Signalled Lanes (pcuHr): 907.06 Cycle Time (s): 90 PRC Over All Lanes (%): -894.4 Total Delay Over All Lanes(pcuHr): 907.06
Full Input Data And Results
Full Input Data And Results User and Project Details
Project: T218029 Beamhill Road
Title: 2026 PM Peak - Base + Dev + Imp
Location: A511 Tutbury Road / Beamhill Road / Harehedge Lane Junction
File name: 2026 PM Peak - Base + Dev + Imp.lsg3x
Author: Carl Hicks
Company: Waterman Boreham Ltd
Address: Halifax House, Halifax Place, The Lace Market, Nottingham, NG1 1QN
Notes:
Junction Layout Diagram
Unnamed Junction
Arm
1 -
A5
11
Tu
tbu
ry R
oa
d (
No
rth
)
12
3
123
Arm 2 - Harehedge Lane
1
2
1
2
Arm
3 - A
51
1 T
utb
ury
Ro
ad
(So
uth
)
1 2
3
1 2 3
Arm 4 - Beamhill Road
1
2
1
2
Arm
5 - A
511
Tu
tbu
ry R
oad
(No
rth)
11
Arm 6 - Harehedge Lane
11
Arm
7 -
A5
11
Tu
tbu
ry R
oa
d (
So
ut h
)
11
Arm 8 - Beamhill Road
1 1
A
B
C D
Full Input Data And Results
Phase Diagram
A
B
C
D
E
F
G
H
Phase Input Data
Phase Name Phase Type Assoc. Phase Street Min Cont Min
A Traffic 7 7
B Traffic 7 7
C Traffic 7 7
D Traffic 7 7
E Pedestrian 5 5
F Pedestrian 5 5
G Dummy 7 7
H Pedestrian 5 5
Full Input Data And Results
Phase Intergreens Matrix
Starting Phase
Terminating Phase
A B C D E F G H
A - - 7 7 8 8 8 8
B - - 7 7 8 8 8 8
C 7 7 - - 8 8 8 8
D 7 7 - - 8 8 8 8
E 8 8 8 8 - - 8 -
F 8 8 8 8 - - 8 -
G 8 8 8 8 8 8 - 8
H 8 8 8 8 - - 8 -
Phases in Stage
Stage No. Phases in Stage
1 A B
2 C D
3 E F H
Stages Diagram A
B
C
D
E
F
G
H
1 Min >= 7 A
B
C
D
E
F
G
H
2 Min >= 7 A
B
C
D
E
F
G
H
3 Min >= 5
Phase Delays
Term. Stage Start Stage Phase Type Value Cont value
There are no Phase Delays defined
Prohibited Stage Changes
To Stage
From Stage
1 2 3
1 7 8
2 7 8
3 8 8
Full Input Data And Results
Give-Way Link Input Data
Junction: Unnamed Junction
Lane Movement
Max Flow when
Giving Way (PCU/Hr)
Opposing Lane
Opp. Lane Coeff.
Opp. Mvmnts.
Right Turn Storage (PCU)
Non-Blocking Storage (PCU)
RTF Right Turn Move up (s)
Max Turns in Intergreen
(PCU)
1/1 (A511 Tutbury Road (North))
6/1 (Left) 715 4/2 0.22 4/2 - - - - -
1/3 (A511 Tutbury Road (North))
8/1 (Right) 1440 3/2 1.09 3/2 2.00 - 0.50 2 2.00
2/2 (Harehedge Lane)
5/1 (Right) 1440 4/2 1.09 4/2 2.00 - 0.50 2 2.00
3/1 (A511 Tutbury Road (South))
8/1 (Left) 715 2/2 0.22 2/2 - - - - -
3/3 (A511 Tutbury Road (South))
6/1 (Right) 1440 1/2 1.09 1/2 2.00 - 0.50 2 2.00
4/1 (Beamhill Road)
5/1 (Left) 715 3/2 0.22 3/2
- - - - - 2/2 0.22 2/2
4/2 (Beamhill Road)
7/1 (Right) 1440 2/2 1.09 2/2 2.00 - 0.50 2 2.00
Full Input Data And Results
Lane Input Data
Junction: Unnamed Junction
Lane Lane Type
Phases Start Disp.
End Disp.
Physical Length (PCU)
Sat Flow Type
Def User Saturation
Flow (PCU/Hr)
Lane Width
(m) Gradient
Nearside Lane
Turns Turning Radius
(m)
1/1 (A511 Tutbury Road (North))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 6 Left
Inf
1/2 (A511 Tutbury Road (North))
U A 2 3 60.0 Geom - 3.00 0.00 N Arm 7 Ahead
Inf
1/3 (A511 Tutbury Road (North))
O A 2 3 60.0 Geom - 3.00 0.00 Y Arm 8 Right
Inf
2/1 (Harehedge
Lane) U C 2 3 60.0 Geom - 3.25 0.00 Y
Arm 7 Left
Inf
2/2 (Harehedge
Lane) O C 2 3 60.0 Geom - 3.25 0.00 N
Arm 5 Right
Inf
Arm 8 Ahead
Inf
3/1 (A511 Tutbury Road (South))
O 2 3 60.0 Geom - 3.50 0.00 Y Arm 8 Left
Inf
3/2 (A511 Tutbury Road (South))
U B 2 3 60.0 Geom - 3.00 0.00 N Arm 5 Ahead
Inf
3/3 (A511 Tutbury Road (South))
O B 2 3 60.0 Geom - 3.00 0.00 Y Arm 6 Right
Inf
4/1 (Beamhill
Road) O 2 3 60.0 Geom - 3.50 0.00 Y
Arm 5 Left
Inf
4/2 (Beamhill
Road) O D 2 3 60.0 Geom - 3.00 0.00 N
Arm 6 Ahead
Inf
Arm 7 Right
Inf
5/1 (A511 Tutbury Road (North))
U 2 3 60.0 Inf - - - - - -
6/1 (Harehedge
Lane) U 2 3 60.0 Inf - - - - - -
7/1 (A511 Tutbury Road (South))
U 2 3 60.0 Inf - - - - - -
8/1 (Beamhill
Road) U 2 3 60.0 Inf - - - - - -
Traffic Flow Groups
Flow Group Start Time End Time Duration Formula
1: '2026 PM Peak - Base + Dev + Imp' 17:00 18:00 01:00
Full Input Data And Results
Link Traffic Flows
Lane Scenario 1: Scenario 1
Junction: Unnamed Junction
1/1 124
1/2 503
1/3 89
2/1 19
2/2 431
3/1 547
3/2 502
3/3 24
4/1 48
4/2 738
5/1 681
6/1 403
7/1 1005
8/1 936
Full Input Data And Results
FG1: '2026 PM Peak - Base + Dev + Imp'
Lane Saturation Flows
Junction: Unnamed Junction
Lane Lane Width
(m) Gradient
Nearside Lane
Allowed Turns
Turning Radius
(m)
Turning Prop.
Sat Flow (PCU/Hr)
Flared Sat Flow
(PCU/Hr)
1/1 (A511 Tutbury Road (North))
3.50 0.00 Y Arm 6 Left Inf 100.0 % 1965 1965
1/2 (A511 Tutbury Road (North))
3.00 0.00 N Arm 7 Ahead
Inf 100.0 % 2055 2055
1/3 (A511 Tutbury Road (North))
3.00 0.00 Y Arm 8 Right Inf 100.0 % 1915 1915
2/1 (Harehedge Lane)
3.25 0.00 Y Arm 7 Left Inf 100.0 % 1940 1940
2/2 (Harehedge Lane)
3.25 0.00 N
Arm 5 Right Inf 30.4 %
2080 2080 Arm 8 Ahead
Inf 69.6 %
3/1 (A511 Tutbury Road (South))
3.50 0.00 Y Arm 8 Left Inf 100.0 % 1965 1965
3/2 (A511 Tutbury Road (South))
3.00 0.00 N Arm 5 Ahead
Inf 100.0 % 2055 2055
3/3 (A511 Tutbury Road (South))
3.00 0.00 Y Arm 6 Right Inf 100.0 % 1915 1915
4/1 (Beamhill Road)
3.50 0.00 Y Arm 5 Left Inf 100.0 % 1965 1965
4/2 (Beamhill Road)
3.00 0.00 N
Arm 6 Ahead
Inf 34.6 % 2055 2055
Arm 7 Right Inf 65.4 %
5/1 (A511 Tutbury Road (North) Lane
1) Infinite Saturation Flow Inf Inf
6/1 (Harehedge Lane Lane 1)
Infinite Saturation Flow Inf Inf
7/1 (A511 Tutbury Road (South) Lane
1) Infinite Saturation Flow Inf Inf
8/1 (Beamhill Road Lane 1)
Infinite Saturation Flow Inf Inf
Scenario 1: 'Scenario 1' (FG1: '2026 PM Peak - Base + Dev + Imp', Plan 1: 'Staging Plan No. 1')
Staging Plan Diagram A
B
1 Min: 7
8 48s
C
D
2 Min: 7
7 44s
E
F
H
3 Min: 5
8 5s Stage Timings
Stage 1 2 3
Duration 48 44 5
Change Point 0 56 107
Full Input Data And Results
Signal Timings Diagram
0
0
10
10
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
Time in cycle (sec)
Phases
1 8 : 48
0
2 7 : 44
56
3 8 : 5
107
H H
G G
F F
E E
D D
C C
B B
A A
Full Input Data And Results
Junction Layout Diagram
Full Input Data And Results
Arm
1 -
A511
Tu
tbury
Ro
ad (
Nort
h)
12
3
69
717
.8%
83
959
.9%
23
937
.3%
Arm 2 - Harehedge Lane
1
2
727 2.6%
666 64.7%
Arm
3 - A
511
Tu
tbury
Ro
ad (S
outh
)
1 2
3
65
0
83
9
23
8
Arm 4 - Beamhill Road
1
2
5768.3%
301245.3%
Arm
5 - A
511
Tu
tbury
Ro
ad (N
orth
)
1In
f0.0
%
Arm 6 - Harehedge Lane
1Inf0.0%
Arm
7 -
A511
Tu
tbury
Ro
ad (
So
uth
)
Inf
0.0
%
Arm 8 - Beamhill Road
1 Inf 0.0%
B
C D
Full Input Data And Results
Full Input Data And Results
Link Results
Item Lane Description
Lane Type
Controller Stream
Position In Filtered Route
Full Phase Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Network: 2026 PM Peak - Base + Dev + Imp
- - N/A - - - - - - - - 245.3%
Unnamed Junction
- - N/A - - - - - - - - 245.3%
1/1 A511 Tutbury Road (North)
Left O N/A N/A - - - - 124 1965 697 17.8%
1/2 A511 Tutbury Road (North)
Ahead U N/A N/A A 1 48 - 503 2055 839 59.9%
1/3 A511 Tutbury Road (North)
Right O N/A N/A A 1 48 - 89 1915 239 37.3%
2/1 Harehedge Lane Left
U N/A N/A C 1 44 - 19 1940 727 2.6%
2/2 Harehedge Lane Right
Ahead O N/A N/A C 1 44 - 431 2080 666 64.7%
3/1 A511 Tutbury Road (South)
Left O N/A N/A - - - - 547 1965 650 84.1%
3/2 A511 Tutbury Road (South)
Ahead U N/A N/A B 1 48 - 502 2055 839 59.8%
3/3 A511 Tutbury Road (South)
Right O N/A N/A B 1 48 - 24 1915 238 10.1%
4/1 Beamhill Road
Left O N/A N/A - - - - 48 1965 576 8.3%
4/2 Beamhill Road Ahead Right
O N/A N/A D 1 44 - 738 2055 301 245.3%
5/1 A511 Tutbury Road (North)
U N/A N/A - - - - 681 Inf Inf 0.0%
6/1 Harehedge
Lane U N/A N/A - - - - 403 Inf Inf 0.0%
Full Input Data And Results
7/1 A511 Tutbury Road (South)
U N/A N/A - - - - 1005 Inf Inf 0.0%
8/1 Beamhill Road U N/A N/A - - - - 936 Inf Inf 0.0%
Item Arriving (pcu) Leaving (pcu)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Uniform Delay (pcuHr)
Rand + Oversat Delay (pcuHr)
Storage Area Uniform Delay (pcuHr)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Max. Back of Uniform Queue (pcu)
Rand + Oversat Queue (pcu)
Mean Max Queue (pcu)
Network: 2026 PM Peak - Base + Dev + Imp
- - 684 434 41 51.3 224.9 1.0 277.2 - - - -
Unnamed Junction
- - 684 434 41 51.3 224.9 1.0 277.2 - - - -
1/1 124 124 46 77 0 0.0 0.1 - 0.1 3.1 0.0 0.1 0.1
1/2 503 503 - - - 3.9 0.7 - 4.6 33.1 13.1 0.7 13.9
1/3 89 89 89 0 0 0.6 0.3 0.4 1.3 52.9 1.8 0.3 2.1
2/1 19 19 - - - 0.1 0.0 - 0.1 26.3 0.4 0.0 0.4
2/2 431 431 129 0 2 3.6 0.9 0.0 4.5 37.8 11.5 0.9 12.4
3/1 547 547 200 347 0 0.1 2.5 - 2.7 17.6 7.0 2.5 9.5
3/2 502 502 - - - 3.9 0.7 - 4.6 33.1 13.0 0.7 13.7
3/3 24 24 24 0 0 0.1 0.1 0.1 0.3 46.3 0.5 0.1 0.5
4/1 48 48 38 10 0 0.0 0.0 - 0.0 3.4 0.0 0.0 0.0
4/2 738 301 158 0 39 39.0 219.4 0.4 258.8 1262.5 51.7 219.4 271.1
5/1 681 681 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
6/1 252 252 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
7/1 719 719 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
8/1 936 936 - - - 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0
C1 PRC for Signalled Lanes (%): -172.6 Total Delay for Signalled Lanes (pcuHr): 274.34 Cycle Time (s): 120 PRC Over All Lanes (%): -172.6 Total Delay Over All Lanes(pcuHr): 277.16
TRICS 2010(b)v6.6.1 270610 B14.36 (C) 2010 JMP Consultants Ltd on behalf of the TRICS Consortium Thursday 29/07/10
Beamhill Road, Burton upon Trent Page 1
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use : 03 - RESIDENTIAL
Category : A - HOUSES PRIVATELY OWNED
VEHICLES
Selected regions and areas:
04 EAST ANGLIA
CA CAMBRIDGESHIRE 1 days
06 WEST MIDLANDS
WO WORCESTERSHIRE 1 days
08 NORTH WEST
MS MERSEYSIDE 1 days
Filtering Stage 2 selection:
Parameter: Number of dwellings
Range: 363 to 792 (units: )
Public Transport Provision:
Selection by: Include all surveys
Date Range: 01/01/02 to 06/10/05
Selected survey days:
Thursday 2 days
Friday 1 days
Selected survey types:
Manual count 3 days
Directional ATC Count 0 days
Selected Locations:
Edge of Town Centre 1
Edge of Town 1
Neighbourhood Centre (PPS6 Local Centre) 1
Selected Location Sub Categories:
Residential Zone 3
TRICS 2010(b)v6.6.1 270610 B14.36 (C) 2010 JMP Consultants Ltd on behalf of the TRICS Consortium Thursday 29/07/10
Beamhill Road, Burton upon Trent Page 2
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
LIST OF SITES relevant to selection parameters
1 CA-03-A-02 MIXED HOUSES, PETERBOROUGH CAMBRIDGESHIRE
THORPE ROAD
PETERBOROUGH
Edge of Town Centre
Residential Zone
Total Number of dwellings: 3 6 3
Survey date: THURSDAY 13/05/04 Survey Type: MANUAL
2 MS-03-A-01 TERRACED, RUNCORN MERSEYSIDE
PALACE FIELDS AVENUE
RUNCORN
Neighbourhood Centre (PPS6 Local Centre)
Residential Zone
Total Number of dwellings: 3 7 2
Survey date: THURSDAY 06/10/05 Survey Type: MANUAL
3 WO-03-A-04 MIXED HOUSES, WORCESTER WORCESTERSHIRE
MALVERN ROAD
WORCESTER
Edge of Town
Residential Zone
Total Number of dwellings: 7 9 2
Survey date: FRIDAY 24/05/02 Survey Type: MANUAL
TRICS 2010(b)v6.6.1 270610 B14.36 (C) 2010 JMP Consultants Ltd on behalf of the TRICS Consortium Thursday 29/07/10
Beamhill Road, Burton upon Trent Page 3
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE for Land Use 03 - RESIDENTIAL/A - HOUSES PRIVATELY OWNED
VEHICLES
Calculation factor: 1 DWELLS
Estimated TRIP rate value per 850 DWELLS shown in shaded columns
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip Estimated No. Ave. Trip Estimated No. Ave. Trip Estimated
Time Range Days DWELLS Rate Trip Rate Days DWELLS Rate Trip Rate Days DWELLS Rate Trip Rate
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00000:00 - 01:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00001:00 - 02:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00002:00 - 03:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00003:00 - 04:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00004:00 - 05:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00005:00 - 06:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00006:00 - 07:00
3 509 0.055 46.758 3 509 0.177 150.851 3 509 0.232 197.60907:00 - 08:00
3 509 0.132 112.443 3 509 0.347 295.023 3 509 0.479 407.46608:00 - 09:00
3 509 0.150 127.472 3 509 0.173 146.955 3 509 0.323 274.42709:00 - 10:00
3 509 0.134 113.556 3 509 0.170 144.172 3 509 0.304 257.72810:00 - 11:00
3 509 0.185 156.974 3 509 0.174 147.511 3 509 0.359 304.48511:00 - 12:00
3 509 0.188 159.758 3 509 0.153 130.255 3 509 0.341 290.01312:00 - 13:00
3 509 0.158 134.152 3 509 0.162 138.048 3 509 0.320 272.20013:00 - 14:00
3 509 0.196 166.994 3 509 0.204 173.674 3 509 0.400 340.66814:00 - 15:00
3 509 0.235 199.836 3 509 0.200 169.777 3 509 0.435 369.61315:00 - 16:00
3 509 0.259 219.876 3 509 0.164 139.718 3 509 0.423 359.59416:00 - 17:00
3 509 0.325 276.654 3 509 0.194 165.324 3 509 0.519 441.97817:00 - 18:00
3 509 0.235 199.836 3 509 0.203 172.561 3 509 0.438 372.39718:00 - 19:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00019:00 - 20:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00020:00 - 21:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00021:00 - 22:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00022:00 - 23:00
0 0 0.000 0.000 0 0 0.000 0.000 0 0 0.000 0.00023:00 - 24:00
Total Rates: 2.252 2.321 4.5731914.309 1973.869 3888.178
Parameter summary
Trip rate parameter range selected: 363 - 792 (units: )
Survey date date range: 01/01/02 - 06/10/05
Number of weekdays (Monday-Friday): 3
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 0
A511 Tutbury Road
A511 Tutbury Road
Beamhill Road
Harehedge Lane
Highway boundary
Highway boundary
Highway boundary
Highway boundary
6.5m6.0m
3.3m
6.0m
5.0m
5.0m
5.73m
For Tender
For Approval
Preliminary
For Information
For Construction
As Built
Purpose of Issue
________
RevProject No.
Scale @ A2 Date
ApprovedDrawn CheckedTeam
Title
Project
Client
APPDRAWNDATE AMENDMENTS CHKREV
R:\P
roje
cts\
2180
29 B
eam
hill
Roa
d
Drawing No.
CM14 4JE
Brentwood
Regent House
Hubert Road
Essex
Facsimile: (01277) 238 150
Email: [email protected]
Telephone: (01277) 238 100
Waterman Boreham Ltd
BSI
drawing. Only figured dimensions are to be worked to.Waterman Boreham Ltd accept no responsibility for any unauthorised amendments to this
Hallam Land Management
Beamhill Road
Signal Junction Layout
N CD HS25.11.10
BF25.11.10
1:500 25 Nov 2010
218029 02 C
A 05.02.11 Amendments following SCC comments DMW CH DC
B 02.03.11 Lane added to Northern Tutbury Road Arm DMW CH CH
C 20.09.11 Splitter islands and signals added. CD CH DC
Based upon the Ordnance Survey's (1:1250) Map of 2008 with permission of the controller of HerMajesty's Stationery Office, Crown copyright reserved. Waterman Boreham Ltd, Regent House,Hubert Road, Brentwood, Essex, CM14 4JE. License No: AL 100010602.
Uttoxeter - Doveridge - Sudbury - Foston - Hatton - Tutbury - Rolleston - Burton 1Monday to Saturday from 27 October 2012
Route Number 1 1 1 1 1 1 1 1 1 1 1 1 1Day Code NS NS SUttoxeter, Bus Station 0550 0610 0620 0720 0755 0835 --- 0935 -- 35 --- 1435 ---Doveridge, Post Office 0557 0617 0627 0727 0802 0842 --- 0942 -- 42 --- 1442 ---Sudbury, Vernon Arms 0603 0623 0633 0733 0808 0848 --- 0948 then -- 48 --- 1448 ---Foston Village 0608 0628 0638 0738 0813 0853 --- 0953 at -- 53 --- 1453 ---Hatton, Salt Box 0613 0633 0643 0743 0818 0858 --- 0958 these -- 58 --- 1458 ---Tutbury, High Street 0619 0639 0649 0749 0824 0904 --- 1004 mins -- 04 until --- 1504 ---Tutbury, Holts Lane 0621 0641 0651 0751 0826 --- 0931 --- past 31 -- 1431 --- 1536Tutbury, Duke Street 0626 0646 0656 0756 0831 --- 0936 --- each 36 -- 1436 --- 1541Rolleston, Spread Eagle 0630 0650 0700 0800 0835 0911 0941 1011 hour 41 11 1441 1511 1546Beam Hill, Beacon 0637 0657 0707 0807 0842 0918 --- 1018 -- 18 --- 1518 ---Horninglow, St Mary's Drive --- --- --- --- --- --- 0950 --- 50 -- 1450 --- 1555Burton, High Street 0649 0709 0719 0819 0854 0930 1000 1030 00 30 1500 1530 1605
Route Number 1 1 1 1 1 1 1 1 1 1Note Sch C C C CUttoxeter, Bus Station 1520 1540 --- 1640 1740 1845 1945 2045 2145 2245Doveridge, Post Office 1527 1547 --- 1647 1747 1852 1952 2052 2152 2252Sudbury, Vernon Arms --- 1553 --- 1653 1753 1858 1958 2058 2158 2258Foston Village --- 1558 --- 1658 1758 1901 2001 2101 2201 2301Hatton, Salt Box --- 1603 --- 1703 1803 1905 2005 2105 2205 2305Tutbury, High Street --- 1609 --- 1709 1809 1910 2010 2110 2210 2310Tutbury, Holts Lane --- --- 1636 --- 1811 1912 2012 2112 2212 2312Tutbury, Duke Street --- --- 1641 --- 1816 1917 2017 2117 2217 2317Rolleston, Spread Eagle --- 1616 1646 1716 1821 --- --- --- --- ---Beam Hill, Beacon --- 1623 --- 1723 1827 1919 2019 2119 2219 2319Horninglow, St Mary's Drive --- --- 1655 --- --- --- --- --- --- ---Burton, High Street --- 1635 1705 1735 1837 1929 2029 2129 2229 2329
NotesNS - Not Saturday S - Saturday only C - Commences from Pennycroft Road as service 4 Sch - Schooldays only.
1Monday to Saturday
Route Number 1 1 1 1 1 1 1 1 1 1 1 1 1Day Code NS NS S every 30 mins Burton, High Street 0620 0650 0710 0720 0835 0905 35 05 1435 1510 1540 1610 1640Horninglow, St Mary's Drive --- --- --- --- --- 0915 -- 15 --- 1520 --- 1620 ---Beam Hill, Beacon 0632 0703 0723 0732 0848 --- 48 -- 1448 --- 1553 1623 1653Rolleston, Spread Eagle 0637 0709 0729 0737 0854 0924 then 54 24 1454 1529 1559 1629 1659Tutbury, Duke Street 0642 0714 0734 0742 --- 0929 at -- 29 --- 1534 --- 1634 ---Tutbury, Holts Lane 0644 0716 0736 0744 --- 0931 these -- 31 until --- 1536 --- 1636 ---Tutbury, High Street 0648 0721 0741 0748 0859 --- mins 59 -- 1459 --- 1604 --- 1704Hatton, Salt Box 0652 0726 0746 0752 0906 --- past 06 -- 1506 --- 1611 --- 1711Foston Hall 0658 0732 0752 0758 0912 --- each 12 -- 1512 --- 1617 --- 1717Sudbury, Vernon Arms 0701 0735 0755 0801 0915 --- hour 15 -- 1515 --- 1620 --- 1720Doveridge, Post Office 0707 0741 0801 0807 0921 --- 21 -- 1521 --- 1626 --- 1726Uttoxeter, Bus Station 0715 0749 0809 0819 0929 --- 29 -- 1529 --- 1634 --- 1734
Route Number 1 1 1 1 1 1 1Burton, High Street 1710 1740 1835 1935 2035 2135 2235Beam Hill, Beacon 1723 1753 1845 1945 2045 2145 2245Rolleston, Spread Eagle 1729 1759 --- --- --- --- ---Tutbury, Duke Street 1734 1804 1850 1950 2050 2150 2250Tutbury, Holts Lane 1736 1806 1852 1952 2052 2152 2252Tutbury, High Street 1741 1811 1855 1955 2055 2155 2255Hatton, Salt Box 1746 1816 1900 2000 2100 2200 2300Foston Hall 1752 1822 1905 2005 2105 2205 2305Sudbury, Vernon Arms 1755 1825 1908 2008 2108 2208 2308Doveridge, Post Office 1801 1831 1914 2014 2114 2214 2314Uttoxeter, Bus Station 1809 1839 1921 2021 2121 2221 2321
C C C C C
Notes
Burton - Beam Hill - Rolleston - Tutbury - Hatton - Foston - Sudbury - Doveridge - Uttoxeter
NS - Not Saturday C - Continues to Pennycroft Road as service 4 Sch - Schooldays only.
Uttoxeter - Sudbury - Hatton - Tutbury - Beam Hill - Burton 1ESunday and Bank Holiday Mondays operated by Wardles Transport
wardletransport.comRoute Number 1E 1E 1E 1E 1E 1EUttoxeter, Bus Station 0825 1025 1225 1425 1625 1825Doveridge, Post Office 0832 1032 1232 1432 1632 1832Sudbury, Vernon Arms 0838 1038 1238 1438 1638 1838Foston Village 0841 1041 1241 1441 1641 1841Foston, Dove Valley Park 0842 1042 1242 1442 1642 1842Hatton, Salt Box 0845 1045 1245 1445 1645 1845Tutbury, High Street 0850 1050 1250 1450 1650 1850Tutbury, Holts Lane 0852 1052 1252 1452 1652 1852Tutbury, Duke Street 0856 1056 1256 1456 1656 1856Beam Hill, Beacon 0859 1059 1259 1459 1659 1859Horninglow, Church 0902 1102 1302 1502 1702 1902Burton, Rail Station 0907 1107 1307 1507 1707 1907Burton, New Street 0910 1110 1310 1510 1710 1910
Sunday buses are operated by Wardle Transport - all Arriva Midlands multi-journey tickets accepted.
Burton - Beam Hill - Tutbury - Hatton - Sudbury - Uttoxeter 1ESunday and Bank Holiday Mondays operated by Wardles Transport
wardletransport.comRoute Number 1E 1E 1E 1E 1E 1EBurton, High Street 0935 1135 1335 1535 1735 1935Burton, Rail Station 0938 1138 1338 1538 1738 1938Horninglow, Church 0943 1143 1343 1543 1743 1943Beam Hill, Beacon 0945 1145 1345 1545 1745 1945Tutbury, Duke Street 0950 1150 1350 1550 1750 1950Tutbury, Holts Lane 0952 1152 1352 1552 1752 1952Tutbury, High Street 0955 1155 1355 1555 1755 1955Hatton, Salt Box 1000 1200 1400 1600 1800 2000Foston, Dove Valley Park 1003 1203 1403 1603 1803 2003Foston Hall 1005 1205 1405 1605 1805 2005Sudbury, Vernon Arms 1007 1207 1407 1607 1807 2007Doveridge, Post Office 1014 1214 1414 1614 1814 2014Uttoxeter, Bus Station 1021 1221 1421 1621 1821 2021
Sunday buses are operated by Wardle Transport - all Arriva Midlands multi-journey tickets accepted.
Uttoxeter - Draycott - Newborough - Hanbury - Burton 402Monday to Saturday
Route Number 402 402 402 402 402 402Uttoxeter, Bus Station, Bay 1 0730 0930 1130 1330 1540 1730Uttoxeter, Tesco 0732 0932 1132 1332 1542 1732Uttoxeter, Rail Station 0733 0933 1133 1333 1543 1733Netherland Green 0738 0938 1138 1338 1548 1738Marchington, Bulls Head 0743 0943 1143 1343 1553 1743Draycott in the Clay, Fountain 0748 0948 1148 1348 1558 1748Dovegate Prison 0753 0953 1153 1353 1603 ---Draycott in the Clay, Fountain 0758 0958 1158 1358 1608 ---Newborough, Church 0804 1004 1204 1404 1614 1754 Abbots Bromley --- --- --- --- 1625 1805Hanbury, Bus Shelter 0811 1011 1211 1411 1643 ---Anslow, School 0821 1021 1221 1421 1653 ---Beam Hill, Beacon 0825 1025 1225 1425 1657 ---Burton, Queens Hospital 0829 1029 1229 1429 1701 ---Burton, Rail Station 0834 1034 1234 1434 1706 ---Burton, New Street 0838 1038 1238 1438 1710 ---
Burton - Hanbury - Newborough - Draycott - Uttoxeter 402Monday to Saturday
Route Number 402 402 402 402 402 402 402 Day Code NS S Burton, New Street --- --- 0845 1045 1245 1445 1715Burton, Rail Station --- --- 0848 1048 1248 1448 1719Burton,Queens Hospital --- --- 0852 1052 1252 1452 1723Beam Hill, Beacon --- --- 0856 1056 1256 1456 1727Anslow, School --- --- 0900 1100 1300 1500 1731Hanbury, Bus Shelter --- --- 0909 1109 1309 1509 1740 Abbots Bromley 0755 0815 --- --- --- --- ---Newborough, Church --- --- 0916 1116 1316 1516 1747Draycott in the Clay, Fountain --- --- 0922 1122 1322 1522 1753Dovegate Prison --- --- 0927 1127 1327 1527 1758Draycott in the Clay, Fountain 0808 0828 0932 1132 1332 1532 1803Marchington, Bulls Head 0813 0833 0937 1137 1337 1537 1808Netherland Green 0818 0838 0942 1142 1342 1542 1813Uttoxeter, George Elliott Close --- --- 0945 --- --- --- ---Uttoxeter, Kingfisher Way --- --- 0948 --- --- --- ---Uttoxeter, Rail Station 0823 0843 --- 1147 1347 1547 1818Uttoxeter, Bus Station 0825 0845 0956 1149 1349 1549 1821Uttoxeter, Tesco --- --- C C C --- ---
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
06420201 511ARoad: Grid Reference: 324100424590Acc. Ref. No:
17-July-2006Time: 1132
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNINGLOW RD BURTON APPROX 15 MTRS N/W J/W DALLOW ST
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified5 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle cleared junction or waiting/parked atjunction exit and collided with vehicle 2. The male driver aged 18 lived in DE65 had regularly travelled through the site before.
Vehicle 2 Car, travelling from SE to NW was going ahead but held up on the main carriageway. The vehicle cleared junction or waiting/parked atjunction exit and collided with vehicle 1. The male driver aged 26 lived in DE11 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 26 suffered a slight injury.
Contributory Factors
Following too closeVehicle 1
Vehicle 1 Sudden braking
06422977 511ARoad: Grid Reference: 323750424740Acc. Ref. No:
25-July-2006Time: 1230
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: HORNINGLOW ST LITTLE BURTON APPROX 283MTRS SE J/W DERBY RD
The accident occured on the A511, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead but held up on the main carriageway. The vehicle was not at, or within 20M of ajunction and collided with vehicle 2. The female driver aged 24 lived in LE67.
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 1. The male driver aged 28 lived in DE11.
Vehicle 3 Car, travelling from SE to NW was going ahead but held up on the main carriageway. The vehicle was not at, or within 20M of ajunction and collided with vehicle 1. The female driver aged 28 lived in DE13.
Casualty 1 (Vehicle 1) A female driver aged 24 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 2
06421578 5DRoad: Grid Reference: 324080424600Acc. Ref. No:
28-July-2006Time: 1350
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: DALLOW ST J/W HORNINGLOW RD BUTON
The accident occured at a T or staggered junction on the D5, a single carriageway at its junction with the A511 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from N to W was turning right on the main carriageway. The vehicle was entering main road. The male driver aged 29lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 41 suffered a slight injury crossing from driver's nearside1.
Contributory Factors
Poor turn or manoevreVehicle 1
Vehicle 1 Failed to look properly
1Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
06421229 511ARoad: Grid Reference: 324010424640Acc. Ref. No:
31-July-2006Time: 1140
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNINGLOW ST APPROX 10MTRS SE J/W DERBY ST BOT
The accident occured at a roundabout on the A511, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Goods 3.5 tonnes mgw and under, travelling from SE to SW was turning left on the main carriageway. The vehicle was mid junction -on roundabout or main road and collided with vehicle 2. The untraced driver of an unknown age .
Vehicle 2 Pedal Cycle, travelling from SE to NW was starting on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The male driver aged 55 lived in DE11.
Casualty 1 (Vehicle 2) A male rider aged 55 suffered a slight injury.
Contributory Factors
Road layout (eg bend, hill etc.)Vehicle 1
Vehicle 1 Following too close
Vehicle 2 Failed to look properly
Vehicle 1 Passing too close to cyclist, horse rider or pedestrian
06424222 5121ARoad: Grid Reference: 324010424650Acc. Ref. No:
07-September-2006Time: 0536
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: DERBY RD R/ABOUT J/W HORNINGLOW ST BURTON
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from S to NW was starting on the main carriageway. The vehicle was entering roundabout and collided with vehicle 2.The male driver aged 41 lived in DE11.
Vehicle 2 Pedal Cycle, travelling from NE to W was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout ormain road and collided with vehicle 1. The male driver aged 28 lived in DE14.
Vehicle 3 Car, travelling from NW to S was going ahead other on the main carriageway. The vehicle was leaving roundabout. The untraced driverof an unknown age .
Casualty 1 (Vehicle 2) A male rider aged 28 suffered a slight injury.
Contributory Factors
Vehicle blind spotVehicle 1
Vehicle 3 Careless/Reckless/In a hurry
Vehicle 1 Failed to look properly
06427116 5121ARoad: Grid Reference: 324040424650Acc. Ref. No:
07-October-2006Time: 1735
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: DERBY RD R/ABOUT J/W HORNINGLOW ST BURTON
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 2. The male driver aged 21 lived in SO41 had not travelled through the site before.
Vehicle 2 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The female driver aged 23 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 23 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Junction overshoot
Vehicle 1 Junction restart
2Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
06426807 5018BRoad: Grid Reference: 323570424830Acc. Ref. No:
08-October-2006Time: 0320
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: HAWKINS LANE APP 10MTRS N/E J/E HORNINGLOW ST BURTON
The accident occured at a T or staggered junction on the B5018, a single carriageway at its junction with the A511 controlled by automatictraffic signal(s)..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NE was turning right on the main carriageway. The vehicle cleared junction or waiting/parked at junction exitand collided with vehicle 3. The male driver aged 28 lived in DE13.
Vehicle 2 Taxi/Private hire car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle cleared junction orwaiting/parked at junction exit and collided with vehicle 1. The male driver aged 40 lived in DE14.
Vehicle 3 Car, on the main carriageway. The vehicle cleared junction or waiting/parked at junction exit and collided with vehicle 1. The untraceddriver of an unknown age lived in DE14.
Casualty 1 (Vehicle 2) A female vehicle or pillion passenger aged 25 suffered a slight injury.
Casualty 2 (Vehicle 2) A male vehicle or pillion passenger aged 26 suffered a slight injury.
Contributory Factors
Impaired by alcoholVehicle 1
06032206 511ARoad: Grid Reference: 324100424600Acc. Ref. No:
29-November-2006Time: 2130
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW RD APPROX 14 MTRS NW J/W DALLOW ST
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified5 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The male driver aged 27 lived in DE14.
Vehicle 2 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 1. The female driver aged 39 lived in DE14.
Casualty 1 (Vehicle 2) A female driver aged 39 suffered a slight injury.
Casualty 2 (Vehicle 2) A female vehicle or pillion passenger aged 16 suffered a slight injury.
Casualty 3 (Vehicle 2) A male vehicle or pillion passenger aged 10 suffered a slight injury.
Contributory Factors
Careless/Reckless/In a hurryVehicle 1
07001216 511ARoad: Grid Reference: 324050424650Acc. Ref. No:
08-January-2007Time: 1645
Raining without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNINGLOW ROAD J/W DERBY ROAD SHOBNALL
The accident occured at a roundabout on the A511, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from S to NE was stopping on the main carriageway. The vehicle was mid junction - on roundabout or main road andcollided with vehicle 2. The male driver aged 35 lived in DE15.
Vehicle 2 Pedal Cycle, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was entering roundabout andcollided with vehicle 1. The male driver of an unknown age lived in DE13.
Casualty 1 (Vehicle 2) A male rider age unknown suffered a slight injury.
Contributory Factors
Failed to judge other persons path or speedVehicle 1
Vehicle 2 Cyclist wearing dark clothing at night
3Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
07001350 5121ARoad: Grid Reference: 324030424640Acc. Ref. No:
10-January-2007Time: 2220
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: DERBY ROAD J/W HORNINGLOW ST BURTON
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled. There was acentral reservation within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 2. The female driver aged 56 lived in DE23 had regularly travelled through the site before.
Vehicle 2 Pedal Cycle, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was mid junction - on roundaboutor main road and collided with vehicle 1. The male driver aged 23 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 23 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Failed to judge other persons path or speed
07005488 511ARoad: Grid Reference: 324040424640Acc. Ref. No:
20-February-2007Time: 2045
Fine without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: HORNINGLOW RD J/W DERBY RD SHOBNALL
The accident occured at a roundabout on the A511, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to S was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 2. The female driver aged 24 lived in DE11 had regularly travelled through the site before.
Vehicle 2 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The male driver aged 24 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A female driver aged 24 suffered a slight injury.
Casualty 2 (Vehicle 2) A male driver aged 24 suffered a slight injury.
Casualty 3 (Vehicle 2) A female vehicle or pillion passenger aged 24 suffered a slight injury.
Contributory Factors
Exceeding speed limitVehicle 2
Vehicle 2 Careless/Reckless/In a hurry
Vehicle 1 Failed to look properly
07028123 511ARoad: Grid Reference: 323560424810Acc. Ref. No:
04-November-2007Time: 1500
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SERIOUS
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: HORNINGLOW ST J/W HAWKINS LN BOT
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the B5018 controlled by automatictraffic signal(s)..
Special conditions and hazards: None
Vehicle 1 Motorcycle 50cc and under, travelling from S to E was turning right on the main carriageway. The vehicle was mid junction - onroundabout or main road and collided with vehicle 2. The male driver aged 16 lived in DE13.
Vehicle 2 Car, travelling from N to S was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or main roadand collided with vehicle 1. The male driver aged 33 lived in DE15 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male rider aged 16 suffered a serious injury.
Contributory Factors
Poor turn or manoevreVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Inexperienced or learner driver/rider
4Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
070X0446 5121ARoad: Grid Reference: 324050424650Acc. Ref. No:
22-December-2007Time: 0115
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: DERBY RD R/B J/W HORNINGLOW RD B.O.T
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 2. The male driver of an unknown age lived in DE14 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was entering main road and collided withvehicle 1. The male driver aged 33 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female vehicle or pillion passenger aged 31 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 2 Failed to look properly
070X0410 5121ARoad: Grid Reference: 324050424650Acc. Ref. No:
27-December-2007Time: 1620
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: DERBY TURN R'BOUT BURTON J/W HORNINGLOW RD
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 2. The female driver aged 71 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Motorcycle over 500cc, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was mid junction - onroundabout or main road and collided with vehicle 1. The male driver aged 46 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 46 suffered a slight injury.
Contributory Factors
Disobeyed Give Way or Stop sign or markingsVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Failed to judge other persons path or speed
08008109 5121ARoad: Grid Reference: 324030424640Acc. Ref. No:
09-April-2008Time: 1125
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: DERBY ST.R/B J/W HORNINGLOW ST.BURTON.
The accident occured at a roundabout on the A5121, a single carriageway at its junction with the A511 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to SE was turning right on the main carriageway. The vehicle was entering roundabout and collided with vehicle2. The male driver aged 79 lived in DE15.
Vehicle 2 Motor Cycle over 125 cc and up to 500cc, travelling from SE to NW was going ahead other on the main carriageway. The vehicle wasmid junction - on roundabout or main road and collided with vehicle 1. The male driver aged 26 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 26 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
5Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
08008867 5018BRoad: Grid Reference: 323570424830Acc. Ref. No:
23-April-2008Time: 1209
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HAWKINS LN. J/W HORNINGLOW ST. BURTON.
The accident occured at a crossroads on the B5018, a single carriageway at its junction with the A511 controlled by automatic trafficsignal(s)..
Special conditions and hazards: None
Vehicle 1 Goods 7.5 tonnes mgw and over, travelling from NW to NE was turning left on the main carriageway. The vehicle cleared junction orwaiting/parked at junction exit. The male driver aged 43 lived in LE65 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 15 suffered a slight injury9.
Contributory Factors
Careless/Reckless/In a hurryCasualty 1
08009034 511ARoad: Grid Reference: 323560424820Acc. Ref. No:
24-April-2008Time: 1045
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: HORNINGLOW ST BURTON J/W HAWKINS LANE
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the B5018 controlled by automatictraffic signal(s). There was a pedestrian phase at the traffic signal junction.
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NE was turning right on the main carriageway. The vehicle was leaving main road and collided with vehicle 2.The male driver aged 61 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The female driver aged 46 lived in DE11 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male driver aged 61 suffered a slight injury.
Casualty 2 (Vehicle 2) A female driver aged 46 suffered a slight injury.
08013746 511ARoad: Grid Reference: 323580424810Acc. Ref. No:
12-June-2008Time: 1740
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: HORNINGLOW ST APPROX 10MTRS NTH J/W HAWKINS LANE BURTON
The accident occured at an other junction on the A511, a single carriageway at its junction with the B5018 controlled by automatic trafficsignal(s)..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was overtaking a moving vehicle on the offside on the main carriageway. The vehicle was approachingjunction or waiting/parked at junction approach and collided with vehicle 2. The male driver aged 53 lived in DE14 had regularly travelled through the site before.
Vehicle 2 Pedal Cycle, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver aged 35 lived in DE15 had regularly travelled through the site before.
Vehicle 3 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach. The female driver aged 23 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 35 suffered a slight injury.
6Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
08016725 511ARoad: Grid Reference: 323540424830Acc. Ref. No:
22-October-2008Time: 1430
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW ST APPROX 13MTS SE BREWERY FLYOVER/HAWKINS LN BURTON
The accident occured at a crossroads on the A511, a single carriageway at its junction with the B5018 controlled by automatic trafficsignal(s). There was a pedestrian phase at the traffic signal junction.
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was overtaking a moving vehicle on the offside on the main carriageway. The vehicle cleared junction orwaiting/parked at junction exit and collided with vehicle 2. The male driver aged 46 lived in DE13.
Vehicle 2 Pedal Cycle, travelling from NW to SE was going ahead other on the main carriageway. The vehicle cleared junction or waiting/parkedat junction exit and collided with vehicle 1. The female driver aged 41 lived in DE15 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female rider aged 41 suffered a slight injury.
Contributory Factors
Careless/Reckless/In a hurryVehicle 1
Vehicle 1 Passing too close to cyclist, horse rider or pedestrian
08017290 5121ARoad: Grid Reference: 324060424670Acc. Ref. No:
09-November-2008Time: 2142
Raining with high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: DERBY RD APPROX 15MTS NE J/W HORNINGLOW RD R'BOUT BURTON
The accident occured at a roundabout on the A5121, at its junction with the A5121 controlled by a give way or uncontrolled. There was acentral reservation within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to NE was going ahead other on the main carriageway. The vehicle cleared junction or waiting/parked atjunction exit and collided with vehicle 2. The female driver aged 28 lived in DE15.
Vehicle 2 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle cleared junction or waiting/parked atjunction exit and collided with vehicle 1. The male driver aged 42 lived in DE23.
Casualty 1 (Vehicle 1) A female driver aged 28 suffered a slight injury.
Contributory Factors
Careless/Reckless/In a hurryVehicle 2
Vehicle 1 Inexperienced or learner driver/rider
09001741 511ARoad: Grid Reference: 323550424820Acc. Ref. No:
21-February-2009Time: 0030
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: HORNINGLOW ST.J/W HAWKINS LN.BURTON.
The accident occured at a crossroads on the A511, a single carriageway at its junction with the B5018 controlled by automatic trafficsignal(s)..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The male driver aged 20.
Vehicle 2 Pedal Cycle, travelling from SE to NE was waiting to turn right on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver aged 36 lived in DE65 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 36 suffered a slight injury.
Contributory Factors
Loss of controlVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Distraction in vehicle
7Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
09002562 5121ARoad: Grid Reference: 324020424650Acc. Ref. No:
26-March-2009Time: 2229
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: DERBY TURN ISLAND J/W HORNINGLOW ST B.O.T.
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was entering main road and collided withvehicle 2. The male driver aged 76 lived in DE15 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SW was turning right on the main carriageway. The vehicle was mid junction - on roundabout or main roadand collided with vehicle 1. The female driver aged 26 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male vehicle or pillion passenger aged 22 suffered a slight injury.
Casualty 2 (Vehicle 2) A female driver aged 26 suffered a slight injury.
09003768 5121ARoad: Grid Reference: 324030424640Acc. Ref. No:
07-May-2009Time: 0636
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: DERBY RD.R/B J/W DERBY ST. BURTON.
The accident occured at a roundabout on the A5121, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 2. The male driver aged 40 lived in DE15 had regularly travelled through the site before.
Vehicle 2 Motorcycle 50cc and under, travelling from NE to NW was turning right on the main carriageway. The vehicle was mid junction - onroundabout or main road and collided with vehicle 1. The male driver aged 56 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 56 suffered a slight injury.
Contributory Factors
Dazzling sunVehicle 1
09005152 5121ARoad: Grid Reference: 324050424650Acc. Ref. No:
28-June-2009Time: 2340
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: DERBY ROAD R'BOUT J/W HORNINGLOW ROAD CLAY MILLS BOT
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 2. The male driver aged 19 lived in DE12 had occasionally travelled through the site before.
Vehicle 2 Taxi/Private hire car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was mid junction - onroundabout or main road and collided with vehicle 1. The male driver aged 56 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 56 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
8Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
09005148 5121ARoad: Grid Reference: 324030424640Acc. Ref. No:
01-July-2009Time: 0115
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: DERBY TURN R/B J/W HORNINGLOW ROAD BURTON.
The accident occured at a roundabout on the A5121, a single carriageway at its junction with the A511 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 2. The male driver aged 44 lived in S40 .
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The male driver aged 37 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 37 suffered a slight injury.
Casualty 2 (Vehicle 2) A female vehicle or pillion passenger aged 24 suffered a slight injury.
Contributory Factors
Disobeyed Give Way or Stop sign or markingsVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Failed to judge other persons path or speed
Vehicle 2 Emergency vehicle on call
09008072 511ARoad: Grid Reference: 324000424660Acc. Ref. No:
27-October-2009Time: 1615
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: HORNINGLOW ST BURTON 20MTRS STH J/W DERBY RD R'BOUT
The accident occured at a roundabout on the A511, a single carriageway at its junction with the A5121 controlled by a give way oruncontrolled. There was a central reservation within 50 metres..
Special conditions and hazards: None
Vehicle 1 Motorcycle over 500cc, travelling from S to N was overtaking a moving vehicle on the offside on the main carriageway. The vehicle wasapproaching junction or waiting/parked at junction approach and collided with vehicle 2. The male driver aged 55 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from S to NE was changing lane to right on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver aged 24 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male rider aged 55 suffered a slight injury.
Contributory Factors
Exceeding speed limitVehicle 1
Vehicle 2 Failed to signal/Misleading signal
Vehicle 1 Failed to look properly
Vehicle 2 Failed to look properly
Vehicle 1 Poor turn or manoevre
Vehicle 1 Stationary or parked vehicle
10001266 511ARoad: Grid Reference: 323550424820Acc. Ref. No:
18-February-2010Time: 1350
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: HORNINGLOW ST OPP J/W HAWKINS LANE BURTON
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the B5018 controlled by a give wayor uncontrolled. There was a central reservation within 50 metres..
Special conditions and hazards: None
Vehicle 1 Goods 3.5 tonnes mgw and under, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was midjunction - on roundabout or main road. The male driver aged 69 had occasionally travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 52 suffered a slight injury crossing from driver's nearside3.
Contributory Factors
Failed to look properlyCasualty 1
Casualty 1 Impaired by alcohol
9Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
10003079 511ARoad: Grid Reference: 323540424830Acc. Ref. No:
12-May-2010Time: 1642
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW ST J/W BROOK ST HAWKINS LANE BURTON
The accident occured at a crossroads on the A511, a single carriageway at its junction with the B5018 controlled by automatic trafficsignal(s). There was a pedestrian phase at the traffic signal junction.
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach. The female driver aged 54 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 20 suffered a slight injury crossing from driver's offside6.
Contributory Factors
Failed to look properlyCasualty 1
10003479 511ARoad: Grid Reference: 323879424700Acc. Ref. No:
29-May-2010Time: 1215
Raining without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: HORNINGLOW RD BURTON ON BRIDGE APPROX 141MTS SE DERBY ST R'BT
The accident occured on the A511, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead but held up on the main carriageway. The vehicle was not at, or within 20M of ajunction and collided with vehicle 2. The male driver aged 50 lived in ST11.
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 1. The male driver of an unknown age lived in SK23.
Casualty 1 (Vehicle 1) A female vehicle or pillion passenger aged 46 suffered a slight injury.
Casualty 2 (Vehicle 1) A male driver aged 50 suffered a slight injury.
Contributory Factors
Slippery road (due to weather)Vehicle 2
10003627 5121ARoad: Grid Reference: 324023424627Acc. Ref. No:
08-June-2010Time: 0725
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: DERBY ST BURTON APPROX 10MTS SW J/W DERBY RD R'BT
The accident occured at a roundabout on the A5121, a single carriageway at its junction with the A511 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The female driver aged 30.
Vehicle 2 Car, travelling from SW to NE was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The female driver aged 26 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 26 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Failed to judge other persons path or speed
10Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
10003786 5121ARoad: Grid Reference: 324030424634Acc. Ref. No:
14-June-2010Time: 0830
Fine without high winds
Dry
Daylight: street lighting unknown
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: DERBY ST J/W HORNINGLOW RD DERBY TURN
The accident occured at a roundabout on the A5121, a single carriageway at its junction with the A511 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach. The female driver aged 42 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A female pedestrian aged 17 suffered a slight injury crossing from driver's nearside4.
Contributory Factors
Failed to look properlyCasualty 1
Casualty 1 Failed to judge vehicles path or speed
10003826 5121ARoad: Grid Reference: 324044424669Acc. Ref. No:
16-June-2010Time: 1720
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: DERBY RD.R/B J/W HORNINGLOW ST.DERBY TURN B.O.T.
The accident occured at a roundabout on the A5121, at its junction with the A511 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NE to SW was starting on the main carriageway. The vehicle was approaching junction or waiting/parked at junctionapproach and collided with vehicle 2. The female driver aged 20.
Vehicle 2 Pedal Cycle, travelling from NE to SW was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver aged 39 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 39 suffered a slight injury.
10006942 5121ARoad: Grid Reference: 324023424649Acc. Ref. No:
06-November-2010Time: 1420
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: DERBY RD R'BOUT BURTON J/W HORNINGLOW ST
The accident occured at a roundabout on the A5121, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Goods 7.5 tonnes mgw and over, travelling from SE to NW was changing lane to left on the main carriageway. The vehicle wasentering roundabout and collided with vehicle 2. The untraced driver of an unknown age .
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was entering roundabout and collided withvehicle 1. The female driver aged 34 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 34 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
11Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
10007333 511ARoad: Grid Reference: 324103424601Acc. Ref. No:
25-November-2010Time: 0857
Fine without high winds
Wet/Damp
Daylight: no street lighting
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: HORNINGLOW RD APPROX 8 MTS NW J/W DALLOW STREET
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified5 controlled by agive way or uncontrolled. There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from W to NW was turning left on the main carriageway. The vehicle was entering main road and collided with vehicle 2.The untraced driver of an unknown age .
Vehicle 2 Taxi/Private hire car, travelling from SE to NW was going ahead but held up on the main carriageway. The vehicle cleared junction orwaiting/parked at junction exit and collided with vehicle 1. The male driver aged 28 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 28 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
10007492 511ARoad: Grid Reference: 324034424638Acc. Ref. No:
01-December-2010Time: 1024
Snowing without high winds
Snow
Daylight: no street lighting
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW ST.R/B J/W DERBY ST.B.O.T.
The accident occured at a roundabout on the A511, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to N was reversing on the main carriageway. The vehicle was entering roundabout and collided with vehicle 2.The male driver aged 25 lived in DE14 had regularly travelled through the site before.
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was leaving roundabout and collided withvehicle 1. The male driver aged 66 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 66 suffered a slight injury.
Contributory Factors
Rain, sleet, snow, or fogVehicle 1
10007776 511ARoad: Grid Reference: 324053424631Acc. Ref. No:
14-December-2010Time: 1605
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: A511 J/W DERBYTURN ROUNDABOUT
The accident occured at a roundabout on the A511, at its junction with the A5121 controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NE to NW was turning right on the main carriageway. The vehicle was leaving roundabout. The male driver aged 73lived in DE13.
Casualty 1 (Vehicle 1) A male pedestrian aged 35 suffered a slight injury crossing from driver's nearside2.
Contributory Factors
Failed to look properlyCasualty 1
Casualty 1 Pedestrian wearing dark clothing at night
Casualty 1 Failed to judge vehicles path or speed
12Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Horninglow Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
10007852 511ARoad: Grid Reference: 324092424609Acc. Ref. No:
18-December-2010Time: 1345
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: HORNINGLOW RD.J/W DALLOW ST.B.O.T.
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified5 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to SE was turning right on the main carriageway. The vehicle was entering main road and collided with vehicle2. The male driver of an unknown age lived in DE14.
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The female driver aged 37 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 37 suffered a slight injury.
Casualty 2 (Vehicle 2) A female vehicle or pillion passenger aged 14 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
11000926 511ARoad: Grid Reference: 323691424762Acc. Ref. No:
16-February-2011Time: 0915
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW ST BURTON APPROACHING J/W ENT G HODGES & SON
The accident occured at a private drive on the A511, a single carriageway controlled by a give way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to W was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The male driver aged 18 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from SE to NW was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The female driver aged 42 lived in DE13.
Casualty 1 (Vehicle 2) A female driver aged 42 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
11002700 511ARoad: Grid Reference: 324067424633Acc. Ref. No:
13-May-2011Time: 1339
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: HORNINGLOW RD APPROX 20MTS NW J/W DERBY RD AT THE DERBY TURN P.H
The accident occured at a roundabout on the A511, a single carriageway at its junction with the A5121 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The male driver aged 41 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SE was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The female driver aged 29 lived in DE13 had regularly travelled through the site before.
Vehicle 3 Car, travelling from NW to SE was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 2. The male driver aged 51 lived in DE23 had regularly travelled through the site before.
Casualty 1 (Vehicle 3) A male vehicle or pillion passenger aged 49 suffered a slight injury.
Casualty 2 (Vehicle 3) A male vehicle or pillion passenger aged 30 suffered a slight injury.
Casualty 3 (Vehicle 2) A female driver aged 29 suffered a slight injury.
13Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
06418723 240CRoad: Grid Reference: 325690424130Acc. Ref. No:
24-June-2006Time: 1820
Unknown
Dry
Daylight: street lighting unknown
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: OS 57 ROLLESTON RD APPROX 5MTRS SE J/W ST MARYS DR HORNINGLOW
The accident occured at a private drive on the C240, a single carriageway at its junction with the Unclassified9 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was starting on footway. The vehicle was approaching junction or waiting/parked at junction approachand collided with vehicle 2. The male driver aged 51 lived in LE5 .
Vehicle 2 Pedal Cycle, travelling from SE to NW was going ahead other on footway. The vehicle was approaching junction or waiting/parked atjunction approach and collided with vehicle 1. The male driver aged 20.
Casualty 1 (Vehicle 2) A male rider aged 20 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 2 Failed to look properly
06420111 8DRoad: Grid Reference: 325260423790Acc. Ref. No:
16-July-2006Time: 1830
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: FIELD LANE BURTON APPROX 15MTRS WEST J/W CALAIS RD
The accident occured at a T or staggered junction on the D8, a single carriageway at its junction with the Unclassified8 controlled by a giveway or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from W to E was reversing on the main carriageway. The vehicle cleared junction or waiting/parked at junction exit andcollided with vehicle 2. The female driver aged 17.
Vehicle 2 Car, travelling from E to W on the main carriageway. The vehicle cleared junction or waiting/parked at junction exit and collided withvehicle 1. The male driver aged 40.
Casualty 1 (Vehicle 2) A male driver aged 40 suffered a slight injury.
Contributory Factors
Poor turn or manoevreVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Loss of control
Vehicle 1 Stationary or parked vehicle
Vehicle 1 Vehicle blind spot
06031594 9DRoad: Grid Reference: 325340424040Acc. Ref. No:
27-November-2006Time: 0845
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNBROOK ROAD 15MTS EAST OF POPLARS ROAD HORNINGLOW BURTON
The accident occured at a T or staggered junction on the D9, a single carriageway at its junction with the Unclassified9 controlled by a giveway or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was overtaking a static vehicle on the offside on the main carriageway. The vehicle cleared junction orwaiting/parked at junction exit. The female driver aged 22 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 10 suffered a slight injury crossing from driver's offside masked2.
Contributory Factors
Failed to look properlyCasualty 1
Casualty 1 Careless/Reckless/In a hurry
1Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
06032613 240CRoad: Grid Reference: 326040423960Acc. Ref. No:
07-December-2006Time: 1700
Fine without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: ROLLESTON RD BURTON J/W HAREHEDGE LANE
The accident occured at a T or staggered junction on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from W to SE was turning right on the main carriageway. The vehicle was entering main road and collided with vehicle 2.The untraced driver of an unknown age .
Vehicle 2 Pedal Cycle, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was mid junction - on roundaboutor main road and collided with vehicle 1. The male driver aged 18 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 18 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
07001330 240CRoad: Grid Reference: 326040423960Acc. Ref. No:
09-January-2007Time: 2128
Raining without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: ROLLESTON ROAD J/W HAREHEDGE LANE STRETTON BURTON
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was entering main road and collided withvehicle 2. The male driver aged 19 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from W to E was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or main roadand collided with vehicle 1. The female driver aged 35 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male driver aged 19 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
07007383 58CRoad: Grid Reference: 326000423750Acc. Ref. No:
13-March-2007Time: 0840
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: HAREHEDGE LN ADJ NAJELUEM BARN B.O.T
The accident occured on the C58, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from W to E was overtaking a static vehicle on the offside on the main carriageway. The vehicle was not at, or within20M of a junction. The male driver aged 46 lived in DE13.
Vehicle 2 Bus or coach, on the main carriageway. The vehicle was not at, or within 20M of a junction. The male driver aged 23 lived in DE14.
Casualty 1 (Vehicle 1) A female pedestrian aged 13 suffered a slight injury9.
Contributory Factors
Crossed road masked by stationary vehCasualty 1
Casualty 1 Careless/Reckless/In a hurry
2Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
07012590 511ARoad: Grid Reference: 325190424090Acc. Ref. No:
19-May-2007Time: 1945
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: HORNINGLOW RD NORTH J/W ROLLESTON RD HORNINGLOW
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the C240 controlled by a give wayor uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The male driver aged 24 lived in DE13.
Vehicle 2 Car, travelling from SE to NE was waiting to turn right on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 1. The male driver aged 20.
Casualty 1 (Vehicle 2) A male driver aged 20 suffered a slight injury.
Contributory Factors
Exceeding speed limitVehicle 1
Vehicle 1 Following too close
Vehicle 1 Failed to look properly
Vehicle 1 Sudden braking
Vehicle 1 Loss of control
Vehicle 1 Careless/Reckless/In a hurry
07019549 511ARoad: Grid Reference: 325300423800Acc. Ref. No:
26-July-2007Time: 0720
Raining without high winds
Wet/Damp
Daylight: no street lighting
Road surface
Speed limit: 60
SERIOUS
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: TUTBURY RD APPROX 40MTS N/TH HORNINGLOW NORTH BOT
The accident occured on the A511, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from N to S was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 2. The female driver aged 40 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Bus or coach, travelling from S to N was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junctionand skidded and collided with vehicle 1. The male driver aged 40 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A female vehicle or pillion passenger aged 8 suffered a slight injury.
Casualty 2 (Vehicle 1) A female vehicle or pillion passenger age unknown suffered a serious injury.
Casualty 3 (Vehicle 2) A male driver aged 40 suffered a serious injury.
Casualty 4 (Vehicle 1) A female driver aged 40 suffered a slight injury.
07028241 511ARoad: Grid Reference: 325450423740Acc. Ref. No:
06-November-2007Time: 0914
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: TUTBURY RD BURTON APPROX 10 MTRS N/W J/W CASTLE PARK RD
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified9 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Minibus, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 2. The male driver aged 83 lived in DE14 had regularly travelled through the site before.
Vehicle 2 Bus or coach, travelling from NW to SE on the main carriageway. The vehicle was approaching junction or waiting/parked at junctionapproach and collided with vehicle 1. The male driver aged 28 lived in DE24 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male driver aged 83 suffered a slight injury.
Casualty 2 (Vehicle 1) A male vehicle or pillion passenger aged 78 suffered a slight injury.
Contributory Factors
Dazzling sunVehicle 1
Vehicle 1 Travelling too fast for conditions
3Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
08000615 511ARoad: Grid Reference: 325930423480Acc. Ref. No:
04-January-2008Time: 1630
Raining without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: TUTBURY RD J/W HAREHEDGE LA ROLLESTON ON DOVE
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the C58 controlled by automatictraffic signal(s). There was a pedestrian phase at the traffic signal junction.
Special conditions and hazards: None
Vehicle 1 Car, travelling from S to N was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or main road.The female driver aged 58 lived in DE65 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 45 suffered a slight injury9.
Contributory Factors
Failed to look properlyCasualty 1
Casualty 1 Wrong use of pedestrian crossing facility
08003199 511ARoad: Grid Reference: 325950423480Acc. Ref. No:
29-January-2008Time: 1115
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: TUTBURY RD BURTON APPROX 6 MTRS NTH J/W HAREHEDGE LANE
The accident occured at a crossroads on the A511, a single carriageway at its junction with the C58 controlled by automatic trafficsignal(s). There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: Road works
Vehicle 1 Car, travelling from N to S was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parked atjunction approach and collided with vehicle 2. The male driver of an unknown age lived in DE65.
Vehicle 2 Car, travelling from N to S was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver of an unknown age lived in DE15 had occasionally travelled through the site before.
Casualty 1 (Vehicle 2) A male vehicle or pillion passenger aged 51 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Sudden braking
08005850 240CRoad: Grid Reference: 326020423970Acc. Ref. No:
03-March-2008Time: 1923
Fine without high winds
Dry
Daylight: no street lighting
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: ROLLESTON ROAD XRD J/W HAREHEDGE LANE/BITHAM LANE STRETTON BOT
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach. The male driver aged 28 lived in DE13.
Casualty 1 (Vehicle 1) A female pedestrian aged 13 suffered a slight injury9.
Contributory Factors
Impaired by alcoholVehicle 1
Casualty 1 Failed to judge vehicles path or speed
Casualty 1 Careless/Reckless/In a hurry
4Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
08009966 511ARoad: Grid Reference: 325550423660Acc. Ref. No:
08-May-2008Time: 1515
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: TUTBURY RD BURTON APPROX 24MTRS SE J/W FOREST EDGE WAY
The accident occured on the A511, a dual carriageway There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 2. The male driver aged 79 lived in de13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from SE to NW was stopping on the main carriageway. The vehicle was not at, or within 20M of a junction and collidedwith vehicle 1. The female driver aged 24 lived in de65 had regularly travelled through the site before.
Vehicle 3 Goods 3.5 tonnes mgw and under, travelling from SE to NW was stopping on the main carriageway. The vehicle was not at, or within20M of a junction and collided with vehicle 2. The male driver aged 44 lived in de14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 24 suffered a slight injury.
Contributory Factors
Failed to judge other persons path or speedVehicle 1
Vehicle 1 Failed to look properly
Vehicle 2 Sudden braking
08012510 9DRoad: Grid Reference: 325280424050Acc. Ref. No:
23-June-2008Time: 1910
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SERIOUS
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: FARM ROAD BURTON OPP. NO. 7
The accident occured on the D9, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from N to S was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction. Thefemale driver aged 54 lived in DE11 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 8 suffered a serious injury9.
Contributory Factors
Failed to look properlyCasualty 1
08014616 511ARoad: Grid Reference: 325230423880Acc. Ref. No:
25-August-2008Time: 1340
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNINGLOW RD NORTH OS ENT CO OP SUPERMARKET BOT
The accident occured at a private drive on the A511, a single carriageway at its junction with the Unclassified0 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from E to N was turning right on the main carriageway. The vehicle was mid junction - on roundabout or main road andcollided with vehicle 2. The male driver aged 63 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Motorcycle over 500cc, travelling from NW to E was going ahead on a left bend on the main carriageway. The vehicle was mid junction- on roundabout or main road and collided with vehicle 1. The male driver aged 46 lived in DE65 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 46 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Failed to judge other persons path or speed
Vehicle 1 Poor turn or manoevre
5Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
08015729 511ARoad: Grid Reference: 325260423810Acc. Ref. No:
26-September-2008Time: 1205
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: HORNINGLOW RD.N/TH J/W CALAIS RD.B.O.T.
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified8 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from S to N was turning left on the main carriageway. The vehicle was entering main road and collided with vehicle 2.The male driver of an unknown age lived in DE13.
Vehicle 2 Car, travelling from E to N was going ahead on a right bend on the main carriageway. The vehicle was mid junction - on roundabout ormain road and collided with vehicle 1. The male driver aged 48 lived in ST14 had occasionally travelled through the site before.
Casualty 1 (Vehicle 2) A female vehicle or pillion passenger aged 38 suffered a slight injury.
Contributory Factors
Disobeyed Give Way or Stop sign or markingsVehicle 1
Vehicle 1 Failed to look properly
08017932 240CRoad: Grid Reference: 326050423970Acc. Ref. No:
27-November-2008Time: 1910
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 40
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: ROLLESTON ROAD J/W HAREHEDGE LANE STRETTON
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 2. The male driver aged 61 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Pedal Cycle, travelling from W to E was going ahead other on the main carriageway. The vehicle was entering main road and collidedwith vehicle 1. The male driver aged 36.
Casualty 1 (Vehicle 2) A male rider aged 36 suffered a slight injury.
Contributory Factors
Impaired by alcoholVehicle 2
Vehicle 2 Disobeyed Give Way or Stop sign or markings
Vehicle 2 Cyclist wearing dark clothing at night
Vehicle 2 Defective lights or indicators
Vehicle 2 Slippery road (due to weather)
Vehicle 2 Junction overshoot
08018183 511ARoad: Grid Reference: 325230423870Acc. Ref. No:
03-December-2008Time: 0830
Fine without high winds
Frost/Ice
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW RD NORTH APPROX 55MTS WEST J/W MORLEYS HILL BOT
The accident occured on the A511, a dual carriageway There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from E to NW was going ahead on a right bend on the main carriageway. The vehicle was not at, or within 20M of ajunction. The male driver aged 33 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 10 suffered a slight injury crossing from driver's nearside masked1.
Contributory Factors
Failed to look properlyCasualty 1
Casualty 1 Failed to judge vehicles path or speed
6Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
09002602 240CRoad: Grid Reference: 326040423970Acc. Ref. No:
20-March-2009Time: 1920
Fine without high winds
Dry
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: ROLLESTON ROAD BURTON J/W BITHAM LANE
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from E to W was starting on the main carriageway. The vehicle was entering main road and collided with vehicle 2. Thefemale driver aged 81 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from W to SE was turning right on the main carriageway. The vehicle was entering main road and collided with vehicle 1.The male driver aged 18 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male vehicle or pillion passenger aged 18 suffered a slight injury.
Contributory Factors
Careless/Reckless/In a hurryVehicle 1
09003414 511ARoad: Grid Reference: 325940423480Acc. Ref. No:
14-April-2009Time: 0946
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: TUTBURY RD.J/W HAREHEDGE LN .BURTON
The accident occured at a crossroads on the A511, a single carriageway at its junction with the C58 controlled by automatic trafficsignal(s). There was a pedestrian phase at the traffic signal junction.
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to E was turning left on the main carriageway. The vehicle was leaving main road and collided with vehicle 2.The untraced driver of an unknown age .
Vehicle 2 Pedal Cycle, travelling from NW to SE was overtaking on the nearside on the main carriageway. The vehicle was mid junction - onroundabout or main road and collided with vehicle 1. The male driver aged 60 lived in DE.
Casualty 1 (Vehicle 2) A male rider aged 60 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
09003742 240CRoad: Grid Reference: 326040423970Acc. Ref. No:
09-May-2009Time: 0850
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SERIOUS
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: ROLLESTON RD.STRETTON J/W BITHAM LN.
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and skidded and collided with vehicle 2. The male driver aged 19 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from E to W was going ahead other on the main carriageway. The vehicle was entering main road and collided withvehicle 1. The male driver aged 26 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male driver aged 19 suffered a serious injury.
Contributory Factors
Exceeding speed limitVehicle 1
Vehicle 1 Travelling too fast for conditions
Vehicle 1 Loss of control
Vehicle 1 Aggressive driving
Vehicle 1 Careless/Reckless/In a hurry
7Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
09006291 240CRoad: Grid Reference: 325630424170Acc. Ref. No:
14-August-2009Time: 1750
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: ROLLESTON ROAD J/W ST ANDREWS DRIVE HORNINGLOW BURTON
The accident occured at a T or staggered junction on the C240, a single carriageway at its junction with the Unclassified9 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Pedal Cycle, travelling from SW to S was turning right on the main carriageway. The vehicle was entering main road and collided withvehicle 2. The male driver aged 11 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from S to NW was going ahead on a left bend on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver aged 51 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male rider aged 11 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
09008291 58CRoad: Grid Reference: 325950423530Acc. Ref. No:
05-November-2009Time: 1545
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: HAREHEDGE LANE APPROX 40MTS EAST OF TUTBURY ROAD BURTON
The accident occured on the C58, a single carriageway There was a pedestrian phase at the traffic signal junction.
Special conditions and hazards: None
Vehicle 1 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction. Themale driver aged 73 lived in DE17 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male pedestrian aged 12 suffered a slight injury crossing from driver's offside masked1.
Contributory Factors
Crossed road masked by stationary vehCasualty 1
Casualty 1 Careless/Reckless/In a hurry
Casualty 1 Failed to look properly
09009470 511ARoad: Grid Reference: 325220424050Acc. Ref. No:
16-December-2009Time: 1500
Raining without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HORNINGLOW RD.NORTH J/W FARM DR.B.O.T.
The accident occured at an other junction on the A511, a single carriageway at its junction with the Unclassified9 controlled by a give wayor uncontrolled. There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from E to W was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parked atjunction approach and collided with vehicle 2. The male driver aged 19 lived in DE11.
Vehicle 2 Car, travelling from E to W was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parked atjunction approach and collided with vehicle 1. The female driver aged 45 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 45 suffered a slight injury.
Contributory Factors
Failed to judge other persons path or speedVehicle 1
Vehicle 1 Sudden braking
8Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
10004042 240CRoad: Grid Reference: 325732424121Acc. Ref. No:
28-June-2010Time: 0853
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: ROLLESTON RD.APPROX.30MTS.N/TH J/W ST.MARY'S DR.HORNINGLOW.
The accident occured on the C240, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Motorcycle 50cc and under, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was not at, or within20M of a junction and collided with vehicle 2. The male driver aged 17 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SE was stopping on the main carriageway. The vehicle was not at, or within 20M of a junction and collidedwith vehicle 1. The male driver aged 45 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male rider aged 17 suffered a slight injury.
Casualty 2 (Vehicle 2) A male driver aged 45 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Failed to judge other persons path or speed
10005781 240CRoad: Grid Reference: 325633424172Acc. Ref. No:
18-September-2010Time: 1710
Raining without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: ROLLESTON RD.J/W ST.ANDREWS DR.HORNINGLOW B.O.T.
The accident occured at a T or staggered junction on the C240, a single carriageway at its junction with the Unclassified9 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The male driver aged 17 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SW was waiting to turn right on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The female driver aged 48 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male vehicle or pillion passenger aged 17 suffered a slight injury.
Casualty 2 (Vehicle 2) A male vehicle or pillion passenger aged 49 suffered a slight injury.
Contributory Factors
Inexperienced or learner driver/riderVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Exceeding speed limit
Vehicle 1 Following too close
10006353 58CRoad: Grid Reference: 326038424023Acc. Ref. No:
06-October-2010Time: 1300
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: BITHAM LN.APPROX.50MTS.EAST J/W ROLLESTON RD.
The accident occured on the C58, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Goods 3.5 tonnes mgw and under, travelling from E to W was reversing on the main carriageway. The vehicle was not at, or within 20Mof a junction and collided with vehicle 2. The male driver of an unknown age had regularly travelled through the site before.
Vehicle 2 Car, travelling from W to E was going ahead but held up on the main carriageway. The vehicle was not at, or within 20M of a junctionand collided with vehicle 1. The male driver aged 35 lived in DE13 had occasionally travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 35 suffered a slight injury.
Casualty 2 (Vehicle 2) A female vehicle or pillion passenger aged 23 suffered a slight injury.
Casualty 3 (Vehicle 2) A female vehicle or pillion passenger aged 22 suffered a slight injury.
Casualty 4 (Vehicle 2) A male vehicle or pillion passenger aged 31 suffered a slight injury.
Casualty 5 (Vehicle 2) A male vehicle or pillion passenger aged 8 suffered a slight injury.
9Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
10006180 240CRoad: Grid Reference: 326038423971Acc. Ref. No:
07-October-2010Time: 0655
Fine without high winds
Dry
Darkness: street lighting unknown
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: ROLLESTON RD BURTON J/W BITHAM LANE
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to E was turning right on the main carriageway. The vehicle was leaving main road and collided with vehicle 2.The male driver aged 49 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The male driver aged 61 lived in DE6 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female vehicle or pillion passenger aged 60 suffered a slight injury.
Casualty 2 (Vehicle 1) A male driver aged 49 suffered a slight injury.
Casualty 3 (Vehicle 2) A male driver aged 61 suffered a slight injury.
Contributory Factors
Poor turn or manoevreVehicle 1
Vehicle 1 Failed to judge other persons path or speed
Vehicle 1 Careless/Reckless/In a hurry
10006513 511ARoad: Grid Reference: 325694423587Acc. Ref. No:
23-October-2010Time: 1825
Fine without high winds
Dry
Darkness: street lighting unknown
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: TUTBURY RD BURTON O/S NO.230
The accident occured on the A511, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 2. The male driver aged 41 lived in DE14.
Vehicle 2 Car, travelling from SE to NW was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 1. The male driver aged 50 lived in ST14 had occasionally travelled through the site before.
Casualty 1 (Vehicle 2) A male driver aged 50 suffered a slight injury.
Contributory Factors
Impaired by alcoholVehicle 1
Vehicle 1 Careless/Reckless/In a hurry
10007110 511ARoad: Grid Reference: 325261423812Acc. Ref. No:
15-November-2010Time: 0845
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNINGLOW RD NTH J/W CALAIS RD BURTON
The accident occured at a multiple junction on the A511, a single carriageway at its junction with the Unclassified8 controlled by a give wayor uncontrolled. There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from S to E was turning right on the main carriageway. The vehicle was leaving main road and collided with vehicle 2.The male driver aged 56 lived in DE11 had regularly travelled through the site before.
Vehicle 2 Car, travelling from E to NW was going ahead on a right bend on the main carriageway. The vehicle was mid junction - on roundaboutor main road and collided with vehicle 1. The female driver aged 33 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male vehicle or pillion passenger aged 8 suffered a slight injury.
Casualty 2 (Vehicle 2) A female driver aged 33 suffered a slight injury.
Casualty 3 (Vehicle 2) A male vehicle or pillion passenger aged 6 suffered a slight injury.
Contributory Factors
Disobeyed Give Way or Stop sign or markingsVehicle 1
Vehicle 1 Junction restart
Vehicle 1 Dazzling sun
Vehicle 1 Failed to look properly
10Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
11000437 511ARoad: Grid Reference: 325430423761Acc. Ref. No:
20-January-2011Time: 1000
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SERIOUS
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: TUTBURY RD BURTON APPROX 15MTS SE J/W CASTLE PARK RD
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified9 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle cleared junction or waiting/parked atjunction exit and collided with vehicle 2. The male driver aged 74 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Bus or coach, travelling from NW to SE was going ahead but held up on the main carriageway. The vehicle cleared junction orwaiting/parked at junction exit and collided with vehicle 1. The male driver aged 42 lived in CW12 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A male driver aged 74 suffered a slight injury.
Casualty 2 (Vehicle 2) A female vehicle or pillion passenger aged 80 suffered a serious injury.
Casualty 3 (Vehicle 2) A male driver aged 42 suffered a slight injury.
Contributory Factors
Dazzling sunVehicle 1
Vehicle 1 Road layout (eg bend, hill etc.)
11000863 511ARoad: Grid Reference: 325227424029Acc. Ref. No:
13-February-2011Time: 2310
Fine without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: HORNINGLOW RD NOETH J/W FARM RD BURTON
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the Unclassified9 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to W was going ahead on a left bend on the main carriageway. The vehicle was mid junction - on roundabout ormain road and skidded and overturned. The male driver aged 29 lived in DE14.
Casualty 1 (Vehicle 1) A male driver aged 29 suffered a slight injury.
Contributory Factors
Loss of controlVehicle 1
Vehicle 1 Swerved
Vehicle 1 Careless/Reckless/In a hurry
Vehicle 1 Dazzling headlights
11002095 511ARoad: Grid Reference: 325188424103Acc. Ref. No:
11-April-2011Time: 1255
Fine without high winds
Dry
Daylight: no street lighting
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
MondayEast Staffordshire
Location: HORNINGLOW RD NTH BURTON J/W ROLLESTON RD
The accident occured at a T or staggered junction on the A511, a single carriageway at its junction with the C240 controlled by a give wayor uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NE to SE was turning left on the main carriageway. The vehicle was entering main road and collided with vehicle 2.The male driver aged 86 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Pedal Cycle, travelling from W to SE was going ahead on a right bend on the main carriageway. The vehicle was approaching junctionor waiting/parked at junction approach and collided with vehicle 1. The male driver aged 18 lived in DE11 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A male rider aged 18 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Poor turn or manoevre
Vehicle 1 Failed to judge other persons path or speed
11Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
A511 Tutbury Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
11002527 240CRoad: Grid Reference: 326037423971Acc. Ref. No:
04-May-2011Time: 1635
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: ROLLESTON RD.J/W BITHAM LN.B.O.T.
The accident occured at a crossroads on the C240, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from SE to E was turning right on the main carriageway. The vehicle was leaving main road and collided with vehicle 2.The female driver aged 44 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The male driver aged 86 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A female driver aged 44 suffered a slight injury.
Contributory Factors
Poor turn or manoevreVehicle 1
Vehicle 1 Failed to look properly
Vehicle 1 Failed to judge other persons path or speed
12Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
Bridge Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
07004280 58CRoad: Grid Reference: 326320425290Acc. Ref. No:
09-January-2007Time: 1725
Raining with high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: HILLFIELD LN J/W MAINST/BRIDGE ST STRETTON B-O-T
The accident occured at a crossroads on the C58, a single carriageway at its junction with the C58 controlled by a give way or uncontrolled.There was a pelican/puffin/toucan within 50 metres..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parkedat junction approach and collided with vehicle 2. The female driver aged 51 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Motor Cycle over 125 cc and up to 500cc, travelling from SW to NE was going ahead other on the main carriageway. The vehicle wasapproaching junction or waiting/parked at junction approach and collided with vehicle 1. The male driver aged 45 lived in DE13.
Casualty 1 (Vehicle 2) A male rider aged 45 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Failed to judge other persons path or speed
Vehicle 1 Rain, sleet, snow, or fog
07011357 58CRoad: Grid Reference: 326330425280Acc. Ref. No:
03-May-2007Time: 1610
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
ThursdayEast Staffordshire
Location: BRIDGE ST APPROX 10 MTRS W J/W CHURCH RD STRETTON
The accident occured at a T or staggered junction on the C58, a single carriageway at its junction with the Unclassified25 controlled by agive way or uncontrolled..
Special conditions and hazards: None
Vehicle 1 Pedal Cycle, travelling from N to S was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout ormain road and collided with vehicle 2. The male driver aged 10 lived in DE13.
Vehicle 2 Car, travelling from N to W was going ahead other on the main carriageway. The vehicle cleared junction or waiting/parked at junctionexit and collided with vehicle 1. The male driver aged 81 lived in DE13.
Casualty 1 (Vehicle 1) A male rider aged 10 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Failed to judge other persons path or speed
Vehicle 1 Cyclist entering road from pavement
08017933 147CRoad: Grid Reference: 326280425280Acc. Ref. No:
28-November-2008Time: 2210
Fine without high winds
Wet/Damp
Darkness: street lights present and lit
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: MAIN ST NEAR J/W THE GREEN STRETTON BURTON
The accident occured on the C147, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Motorcycle 50cc and under, travelling from N to S was going ahead other on the main carriageway. The vehicle was not at, or within20M of a junction. The male driver aged 22 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 1) A female pedestrian aged 41 suffered a slight injury9.
Casualty 2 (Vehicle 1) A male rider aged 22 suffered a slight injury.
Contributory Factors
Slippery road (due to weather)Vehicle 1
Vehicle 1 Impaired by alcohol
Vehicle 1 Aggressive driving
Vehicle 1 Careless/Reckless/In a hurry
1Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
Bridge Street
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
09002980 25DRoad: Grid Reference: 326340425300Acc. Ref. No:
05-April-2009Time: 1430
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: CHURCH RD.J/W BRIDGE ST.STRETTON.
The accident occured at a T or staggered junction on the D25, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to NE was turning left on the main carriageway. The vehicle was leaving main road and collided with vehicle 2.The male driver aged 18 lived in DE13.
Vehicle 2 Car, travelling from NW to NE was going ahead but held up on the main carriageway. The vehicle cleared junction or waiting/parked atjunction exit and collided with vehicle 1. The male driver aged 39 lived in DE13.
Casualty 1 (Vehicle 2) A female vehicle or pillion passenger aged 8 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Careless/Reckless/In a hurry
Vehicle 1 Inexperienced or learner driver/rider
10001611 147CRoad: Grid Reference: 326329425298Acc. Ref. No:
28-February-2010Time: 0130
Fine without high winds
Wet/Damp
Darkness: no street lighting
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: MAIN STREET STRETTON BURTON J/W BRIDGE STREET
The accident occured at a crossroads on the C147, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SE was going ahead other on the main carriageway. The vehicle was entering main road and collided withvehicle 2. The male driver aged 31 lived in DE11.
Vehicle 2 Car, travelling from SW to NE was going ahead other on the main carriageway. The vehicle was mid junction - on roundabout or mainroad and collided with vehicle 1. The female driver aged 62 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 62 suffered a slight injury.
Contributory Factors
Disobeyed Give Way or Stop sign or markingsVehicle 1
Vehicle 1 Failed to judge other persons path or speed
Vehicle 1 Impaired by alcohol
10007211 58CRoad: Grid Reference: 326329425299Acc. Ref. No:
19-November-2010Time: 1135
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: BRIDGE ST.J/W HILLFIELD LN.STRETTON B.O.T.
The accident occured at a crossroads on the C58, a single carriageway at its junction with the C58 controlled by a give way oruncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from NW to SW was turning right on the main carriageway. The vehicle was entering main road and collided with vehicle2. The female driver aged 17 lived in DE13 had occasionally travelled through the site before.
Vehicle 2 Car, travelling from SE to NE was turning right on the main carriageway. The vehicle was entering main road and collided with vehicle1. The female driver aged 74 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 74 suffered a slight injury.
Contributory Factors
Failed to signal/Misleading signalVehicle 2
Vehicle 1 Inexperienced or learner driver/rider
2Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
Hopley Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
06420894 38CRoad: Grid Reference: 324130420470Acc. Ref. No:
29-July-2006Time: 1138
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SaturdayEast Staffordshire
Location: HOPLE RD O/S NO 45 ANSLOW BURTON
The accident occured on the C38, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from NE to S was going ahead other on the main carriageway. The vehicle was not at, or within 20M of a junction andcollided with vehicle 2. The female driver aged 30 lived in DE14 had regularly travelled through the site before.
Vehicle 2 Car, on the main carriageway. The vehicle was not at, or within 20M of a junction and collided with vehicle 1. The untraced driver of anunknown age lived in DE13.
Casualty 1 (Vehicle 1) A male vehicle or pillion passenger aged 6 suffered a slight injury.
Casualty 2 (Vehicle 1) A female driver aged 30 suffered a slight injury.
Contributory Factors
Failed to look properlyVehicle 1
Vehicle 1 Sudden braking
Vehicle 1 Swerved
Vehicle 1 Loss of control
Vehicle 1 Distraction in vehicle
06423916 58CRoad: Grid Reference: 325270421180Acc. Ref. No:
01-September-2006Time: 0815
Fine without high winds
Wet/Damp
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
FridayEast Staffordshire
Location: MAIN RD ANSLOW O/S MOSLEY SCHOOL
The accident occured on the C58, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Car, travelling from N to S was going ahead on a left bend on the main carriageway. The vehicle was not at, or within 20M of a junctionand skidded and collided with vehicle 2. The male driver aged 24 lived in DE13 had regularly travelled through the site before.
Vehicle 2 Car, travelling from S to N was going ahead on a right bend on the main carriageway. The vehicle was not at, or within 20M of ajunction and collided with vehicle 1. The female driver aged 44 lived in DE13 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female driver aged 44 suffered a slight injury.
Contributory Factors
Exceeding speed limitVehicle 1
06027870 5017BRoad: Grid Reference: 323900420490Acc. Ref. No:
15-October-2006Time: 1500
Fine without high winds
Dry
Daylight:street lights present
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
SundayEast Staffordshire
Location: CALLINGWOOD RD J/W HOPLEY RD ROUGH HAY
The accident occured at a T or staggered junction on the B5017, a single carriageway at its junction with the C58 controlled by a give wayor uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from N to W was turning right on the main carriageway. The vehicle was mid junction - on roundabout or main road andcollided with vehicle 2. The male driver of an unknown age .
Vehicle 2 Car, travelling from W to E was going ahead other on the main carriageway. The vehicle was approaching junction or waiting/parked atjunction approach and collided with vehicle 1. The male driver aged 44 lived in DE14 had regularly travelled through the site before.
Casualty 1 (Vehicle 2) A female vehicle or pillion passenger aged 15 suffered a slight injury.
Contributory Factors
Poor turn or manoevreVehicle 1
Vehicle 1 Failed to look properly
1Registered to: Staffordshire County Council
FULL LISTING Run on:13/ 10/2011
AccsMap - Accident Analysis System
(60) months
Notes:
Hopley Road
Selection:
andAccidents between dates 31/05/201101/06/2006
Selected using Manual Selection
07001370 58CRoad: Grid Reference: 323910420490Acc. Ref. No:
09-January-2007Time: 0930
Fine with high winds
Wet/Damp
Daylight: no street lighting
Road surface
Speed limit: 30
SLIGHT
District Council:
Severity:
Lighting: Weather:
TuesdayEast Staffordshire
Location: HOPLEY RD BURTON APPROX 6 MTRS NTH J/W HENHURST HILL
The accident occured at a T or staggered junction on the C58, a single carriageway at its junction with the B5017 controlled by a give wayor uncontrolled..
Special conditions and hazards: None
Vehicle 1 Car, travelling from N to S was stopping on the main carriageway. The vehicle was approaching junction or waiting/parked at junctionapproach and collided with vehicle 2. The female driver aged 32 lived in DE14.
Vehicle 2 Car, travelling from N to S was going ahead but held up on the main carriageway. The vehicle was approaching junction orwaiting/parked at junction approach and collided with vehicle 1. The male driver aged 64 lived in DE13.
Casualty 1 (Vehicle 2) A male driver aged 64 suffered a slight injury.
Contributory Factors
Slippery road (due to weather)Vehicle 1
Vehicle 1 Loss of control
07023212 58CRoad: Grid Reference: 324730420710Acc. Ref. No:
05-September-2007Time: 1300
Fine without high winds
Dry
Daylight: no street lighting
Road surface
Speed limit: 60
FATAL
District Council:
Severity:
Lighting: Weather:
WednesdayEast Staffordshire
Location: HOPLEY RD ANSLOW BURTON O/S NUMBER 144
The accident occured on the C58, a single carriageway .
Special conditions and hazards: None
Vehicle 1 Motorcycle over 500cc, travelling from N to S was going ahead on a left bend on the main carriageway. The vehicle was not at, or within20M of a junction and collided with vehicle 2. The male driver aged 26 lived in DE11 had not travelled through the site before.
Vehicle 2 Car, travelling from SW to N was going ahead on a left bend on the main carriageway. The vehicle was not at, or within 20M of ajunction and collided with vehicle 1. The female driver aged 37 lived in DE13 had occasionally travelled through the site before.
Casualty 1 (Vehicle 1) A male rider aged 26 suffered a fatal injury.
Contributory Factors
Exceeding speed limitVehicle 1
Vehicle 1 Careless/Reckless/In a hurry
Vehicle 1 Inexperienced or learner driver/rider
2Registered to: Staffordshire County Council
Revised (from Pells Technical Note) Table 1.1 Modification of LDF matrices from the old Option 3
Site Location
Housing Employment
LDF Option 3
(OLD)
Phil Somerfield Option 1 (NEW)
LDF Option 3
(OLD)
Phil Somerfield Option 1 (NEW)
Redhouse Farm 320 0 Beamhill 2400 850
North of Harehedge Lane 760 400
South of Branston 800 650 18.16
20
Now a B2 / B8 Mix not B1 / B2 / B8
Lawns Farm 0 3000 22 25
Branston Depot 992 500 0 5 Hospital 0 60
Town Centre 500 500 North of Stretton 0 350 Rocester 120 90 Barton 280 250
Tutbury 340 225 West of Uttoxeter 240 500 Additional Uttoxeter 0 690 Employment figures are developable floor areas in hectares.
N.B - Pirelli was amended from what is on the list to:-
• 280 residential units • 3728m2 B1 • 1061m2 B2 • 4246m2 B8 • 568 A4 Pub • 583 A3 Rest. • 90 Bed Hotel
Tesco (Hawkins Lane) was also added into the model.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpi"(drive-on-the-left) at 11:46:06 on Monday, 21 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 Beamhill Road / Eastern Site Access Base 2014 + Dev 120 Units LOCATION : DATE : 21/11/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Beamhill Road (East) ARM B IS Eastern Site Access ARM C IS Beamhill Road (West)
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- -------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I -------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.20 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I I - VISIBILITY I (VC-B) 90.00 M. I I - BLOCKS TRAFFIC I YES I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 59.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 59.0 M. I I - LANE 1 WIDTH I (WB-C) 3.25 M. I I - LANE 2 WIDTH I (WB-A) 0.00 M. I -------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2014 + Dev 120 Units AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 4.59 I 6.88 I 4.59 I I ARM B I 15.00 I 45.00 I 75.00 I 0.63 I 0.94 I 0.63 I I ARM C I 15.00 I 45.00 I 75.00 I 7.36 I 11.04 I 7.36 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 3 -------------------------------------------------------------------------------- Demand set: 218029 Beamhill Road / Eastern Site Access Base 2014 + Dev 120 Units AM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 07.45 - 08.00 I I I I I I I ARM A I 0.000 I 0.063 I 0.937 I I I I 0.0 I 23.0 I 344.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 1.000 I 0.000 I 0.000 I I I I 50.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 1.000 I 0.000 I 0.000 I I I I 589.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-AC 0.63 6.75 0.093 0.00 0.10 1.5 0.16 I I C-AB 0.00 8.48 0.000 0.00 0.00 0.0 0.00 I I C-A 7.39 I I A-B 0.29 I I A-C 4.32 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-AC 0.75 6.32 0.119 0.10 0.13 1.9 0.18 I I C-AB 0.00 8.28 0.000 0.00 0.00 0.0 0.00 I I C-A 8.82 I I A-B 0.34 I I A-C 5.15 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-AC 0.92 5.72 0.160 0.13 0.19 2.7 0.21 I I C-AB 0.00 8.01 0.000 0.00 0.00 0.0 0.00 I I C-A 10.81 I I A-B 0.42 I I A-C 6.31 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 4 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-AC 0.92 5.72 0.160 0.19 0.19 2.8 0.21 I I C-AB 0.00 8.01 0.000 0.00 0.00 0.0 0.00 I I C-A 10.81 I I A-B 0.42 I I A-C 6.31 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-AC 0.75 6.32 0.119 0.19 0.14 2.1 0.18 I I C-AB 0.00 8.28 0.000 0.00 0.00 0.0 0.00 I I C-A 8.82 I I A-B 0.34 I I A-C 5.15 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-AC 0.63 6.75 0.093 0.14 0.10 1.6 0.16 I I C-AB 0.00 8.48 0.000 0.00 0.00 0.0 0.00 I I C-A 7.39 I I A-B 0.29 I I A-C 4.32 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.2 08.45 0.2 09.00 0.1 09.15 0.1
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.0 08.30 0.0 08.45 0.0 09.00 0.0 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 5 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 68.8 I 45.9 I 12.7 I 0.18 I 12.7 I 0.18 I I C-AB I 0.0 I 0.0 I 0.0 I 0.00 I 0.0 I 0.00 I I C-A I 810.7 I 540.5 I I I I I I A-B I 31.7 I 21.1 I I I I I I A-C I 473.5 I 315.7 I I I I I --------------------------------------------------------------------------- I ALL I 1384.7 I 923.1 I 12.7 I 0.01 I 12.7 I 0.01 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2014 + Dev 120 Units PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 6 -------------------------------------------------------------------------------- DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 6.78 I 10.16 I 6.78 I I ARM B I 15.00 I 45.00 I 75.00 I 0.32 I 0.49 I 0.32 I I ARM C I 15.00 I 45.00 I 75.00 I 3.66 I 5.49 I 3.66 I ------------------------------------------------------------------------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2014 + Dev 120 Units PM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 16.45 - 17.00 I I I I I I I ARM A I 0.000 I 0.076 I 0.924 I I I I 0.0 I 41.0 I 501.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 1.000 I 0.000 I 0.000 I I I I 26.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 1.000 I 0.000 I 0.000 I I I I 293.0 I 0.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-AC 0.33 6.82 0.048 0.00 0.05 0.7 0.15 I I C-AB 0.00 8.00 0.000 0.00 0.00 0.0 0.00 I I C-A 3.68 I I A-B 0.51 I I A-C 6.29 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-AC 0.39 6.40 0.061 0.05 0.06 0.9 0.17 I I C-AB 0.00 7.71 0.000 0.00 0.00 0.0 0.00 I I C-A 4.39 I I A-B 0.61 I I A-C 7.51 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-AC 0.48 5.82 0.082 0.06 0.09 1.3 0.19 I I C-AB 0.00 7.31 0.000 0.00 0.00 0.0 0.00 I I C-A 5.38 I I A-B 0.75 I I A-C 9.19 I I I
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 8 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-AC 0.48 5.82 0.082 0.09 0.09 1.3 0.19 I I C-AB 0.00 7.31 0.000 0.00 0.00 0.0 0.00 I I C-A 5.38 I I A-B 0.75 I I A-C 9.19 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-AC 0.39 6.40 0.061 0.09 0.07 1.0 0.17 I I C-AB 0.00 7.71 0.000 0.00 0.00 0.0 0.00 I I C-A 4.39 I I A-B 0.61 I I A-C 7.51 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-AC 0.33 6.82 0.048 0.07 0.05 0.8 0.15 I I C-AB 0.00 8.00 0.000 0.00 0.00 0.0 0.00 I I C-A 3.68 I I A-B 0.51 I I A-C 6.29 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.1 18.15 0.1
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2014 + Dev 120 Units.vpo - Page 9 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 35.8 I 23.9 I 6.1 I 0.17 I 6.1 I 0.17 I I C-AB I 0.0 I 0.0 I 0.0 I 0.00 I 0.0 I 0.00 I I C-A I 403.3 I 268.9 I I I I I I A-B I 56.4 I 37.6 I I I I I I A-C I 689.6 I 459.7 I I I I I --------------------------------------------------------------------------- I ALL I 1185.1 I 790.1 I 6.1 I 0.01 I 6.1 I 0.01 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:46:39 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpi"(drive-on-the-left) at 14:06:57 on Monday, 21 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 Beamhill Road / Eastern Site Access Base 2016 + Full Dev LOCATION : DATE : 21/11/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Beamhill Road (East) ARM B IS Eastern Site Access ARM C IS Beamhill Road (West)
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- -------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I -------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.20 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I I - VISIBILITY I (VC-B) 90.00 M. I I - BLOCKS TRAFFIC I YES I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 59.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 59.0 M. I I - LANE 1 WIDTH I (WB-C) 3.25 M. I I - LANE 2 WIDTH I (WB-A) 0.00 M. I -------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2016 + Full Dev AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.46 I 8.19 I 5.46 I I ARM B I 15.00 I 45.00 I 75.00 I 2.46 I 3.69 I 2.46 I I ARM C I 15.00 I 45.00 I 75.00 I 7.76 I 11.64 I 7.76 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 3 -------------------------------------------------------------------------------- Demand set: 218029 Beamhill Road / Eastern Site Access Base 2016 + Full Dev AM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 07.45 - 08.00 I I I I I I I ARM A I 0.000 I 0.197 I 0.803 I I I I 0.0 I 86.0 I 351.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.792 I 0.000 I 0.208 I I I I 156.0 I 0.0 I 41.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.968 I 0.032 I 0.000 I I I I 601.0 I 20.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-AC 2.47 7.05 0.350 0.00 0.53 7.4 0.21 I I C-AB 0.25 9.12 0.028 0.00 0.03 0.4 0.11 I I A-B 1.08 I I A-C 4.40 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-AC 2.95 6.59 0.448 0.53 0.79 11.2 0.27 I I C-AB 0.30 8.86 0.034 0.03 0.04 0.5 0.12 I I A-B 1.29 I I A-C 5.26 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-AC 3.62 5.94 0.609 0.79 1.46 19.9 0.41 I I C-AB 0.37 8.51 0.043 0.04 0.05 0.7 0.12 I I A-B 1.58 I I A-C 6.44 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-AC 3.62 5.94 0.609 1.46 1.50 22.3 0.43 I I C-AB 0.37 8.51 0.043 0.05 0.05 0.7 0.12 I I A-B 1.58 I I A-C 6.44 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-AC 2.95 6.59 0.448 1.50 0.84 13.4 0.28 I I C-AB 0.30 8.86 0.034 0.05 0.04 0.5 0.12 I I A-B 1.29 I I A-C 5.26 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-AC 2.47 7.05 0.351 0.84 0.55 8.7 0.22 I I C-AB 0.25 9.12 0.028 0.04 0.03 0.4 0.11 I I A-B 1.08 I I A-C 4.40 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.5 * 08.15 0.8 * 08.30 1.5 * 08.45 1.5 ** 09.00 0.8 * 09.15 0.6 *
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.0 08.30 0.0 08.45 0.0 09.00 0.0 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 6 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 271.2 I 180.8 I 82.9 I 0.31 I 83.0 I 0.31 I I C-AB I 27.5 I 18.4 I 3.4 I 0.12 I 3.4 I 0.12 I I A-B I 118.4 I 78.9 I I I I I I A-C I 483.1 I 322.1 I I I I I --------------------------------------------------------------------------- I ALL I 1727.4 I 1151.6 I 86.3 I 0.05 I 86.3 I 0.05 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2016 + Full Dev PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 7 -------------------------------------------------------------------------------- DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 7.93 I 11.89 I 7.93 I I ARM B I 15.00 I 45.00 I 75.00 I 1.24 I 1.86 I 1.24 I I ARM C I 15.00 I 45.00 I 75.00 I 4.15 I 6.23 I 4.15 I ------------------------------------------------------------------------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2016 + Full Dev PM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 16.45 - 17.00 I I I I I I I ARM A I 0.000 I 0.194 I 0.806 I I I I 0.0 I 123.0 I 511.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.838 I 0.000 I 0.162 I I I I 83.0 I 0.0 I 16.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.901 I 0.099 I 0.000 I I I I 299.0 I 33.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-AC 1.24 6.88 0.181 0.00 0.22 3.1 0.18 I I C-AB 0.41 8.52 0.049 0.00 0.05 0.8 0.12 I I A-B 1.54 I I A-C 6.41 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-AC 1.48 6.40 0.232 0.22 0.30 4.3 0.20 I I C-AB 0.49 8.15 0.061 0.05 0.07 1.0 0.13 I I A-B 1.84 I I A-C 7.66 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-AC 1.82 5.74 0.316 0.30 0.45 6.5 0.25 I I C-AB 0.61 7.64 0.079 0.07 0.09 1.4 0.14 I I A-B 2.26 I I A-C 9.38 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 9 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-AC 1.82 5.74 0.316 0.45 0.46 6.8 0.25 I I C-AB 0.61 7.64 0.079 0.09 0.09 1.4 0.14 I I A-B 2.26 I I A-C 9.38 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-AC 1.48 6.40 0.232 0.46 0.31 4.8 0.20 I I C-AB 0.49 8.15 0.061 0.09 0.07 1.0 0.13 I I A-B 1.84 I I A-C 7.66 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-AC 1.24 6.87 0.181 0.31 0.22 3.5 0.18 I I C-AB 0.41 8.52 0.049 0.07 0.05 0.8 0.12 I I A-B 1.54 I I A-C 6.41 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.2 17.15 0.3 17.30 0.5 17.45 0.5 18.00 0.3 18.15 0.2
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2016 + Full Dev.vpo - Page 10 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 136.3 I 90.8 I 29.0 I 0.21 I 29.0 I 0.21 I I C-AB I 45.4 I 30.3 I 6.3 I 0.14 I 6.3 I 0.14 I I A-B I 169.3 I 112.9 I I I I I I A-C I 703.4 I 468.9 I I I I I --------------------------------------------------------------------------- I ALL I 1465.9 I 977.3 I 35.2 I 0.02 I 35.2 I 0.02 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:47:59 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpi"(drive-on-the-left) at 14:07:42 on Monday, 21 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 Beamhill Road / Eastern Site Access Base 2026 + Full Dev LOCATION : DATE : 21/11/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Beamhill Road (East) ARM B IS Eastern Site Access ARM C IS Beamhill Road (West)
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- -------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I -------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.20 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I I - VISIBILITY I (VC-B) 90.00 M. I I - BLOCKS TRAFFIC I YES I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 59.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 59.0 M. I I - LANE 1 WIDTH I (WB-C) 3.25 M. I I - LANE 2 WIDTH I (WB-A) 0.00 M. I -------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2026 + Full Dev AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 6.79 I 10.18 I 6.79 I I ARM B I 15.00 I 45.00 I 75.00 I 2.47 I 3.71 I 2.47 I I ARM C I 15.00 I 45.00 I 75.00 I 11.14 I 16.71 I 11.14 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 3 -------------------------------------------------------------------------------- Demand set: 218029 Beamhill Road / Eastern Site Access Base 2026 + Full Dev AM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 07.45 - 08.00 I I I I I I I ARM A I 0.000 I 0.142 I 0.858 I I I I 0.0 I 77.0 I 466.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.712 I 0.000 I 0.288 I I I I 141.0 I 0.0 I 57.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.969 I 0.031 I 0.000 I I I I 863.0 I 28.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-AC 2.48 6.42 0.387 0.00 0.61 8.6 0.25 I I C-AB 0.97 16.22 0.060 0.00 0.10 1.4 0.07 I I C-A 10.21 I I A-B 0.97 I I A-C 5.85 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-AC 2.97 5.78 0.513 0.61 1.01 14.1 0.35 I I C-AB 1.39 17.32 0.080 0.10 0.15 2.2 0.06 I I C-A 11.96 I I A-B 1.15 I I A-C 6.98 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-AC 3.63 4.87 0.747 1.01 2.50 31.8 0.70 I I C-AB 2.41 19.19 0.125 0.15 0.30 4.5 0.06 I I C-A 13.94 I I A-B 1.41 I I A-C 8.55 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 4 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-AC 3.63 4.86 0.747 2.50 2.69 39.2 0.79 I I C-AB 2.41 19.20 0.126 0.30 0.30 4.6 0.06 I I C-A 13.94 I I A-B 1.41 I I A-C 8.55 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-AC 2.97 5.78 0.514 2.69 1.11 18.6 0.38 I I C-AB 1.40 17.33 0.081 0.30 0.15 2.3 0.06 I I C-A 11.95 I I A-B 1.15 I I A-C 6.98 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-AC 2.48 6.42 0.387 1.11 0.65 10.3 0.26 I I C-AB 0.97 16.22 0.060 0.15 0.10 1.5 0.07 I I C-A 10.21 I I A-B 0.97 I I A-C 5.85 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.6 * 08.15 1.0 * 08.30 2.5 *** 08.45 2.7 *** 09.00 1.1 * 09.15 0.6 *
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.1 08.15 0.1 08.30 0.3 08.45 0.3 09.00 0.2 09.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 5 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 272.5 I 181.7 I 122.6 I 0.45 I 122.7 I 0.45 I I C-AB I 143.2 I 95.4 I 16.6 I 0.12 I 16.6 I 0.12 I I C-A I 1083.2 I 722.2 I I I I I I A-B I 106.0 I 70.7 I I I I I I A-C I 641.4 I 427.6 I I I I I --------------------------------------------------------------------------- I ALL I 2246.3 I 1497.6 I 139.2 I 0.06 I 139.3 I 0.06 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2026 + Full Dev PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 6 -------------------------------------------------------------------------------- DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 10.09 I 15.13 I 10.09 I I ARM B I 15.00 I 45.00 I 75.00 I 1.24 I 1.86 I 1.24 I I ARM C I 15.00 I 45.00 I 75.00 I 8.39 I 12.58 I 8.39 I ------------------------------------------------------------------------------------
Demand set: 218029 Beamhill Road / Eastern Site Access Base 2026 + Full Dev PM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 16.45 - 17.00 I I I I I I I ARM A I 0.000 I 0.130 I 0.870 I I I I 0.0 I 105.0 I 702.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.778 I 0.000 I 0.222 I I I I 77.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.925 I 0.075 I 0.000 I I I I 621.0 I 50.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-AC 1.24 5.79 0.215 0.00 0.27 3.8 0.22 I I C-AB 1.42 13.64 0.104 0.00 0.22 3.3 0.08 I I C-A 7.00 I I A-B 1.32 I I A-C 8.81 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-AC 1.48 5.05 0.294 0.27 0.41 5.8 0.28 I I C-AB 2.02 14.36 0.141 0.22 0.36 5.5 0.08 I I C-A 8.03 I I A-B 1.57 I I A-C 10.52 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-AC 1.82 4.02 0.452 0.41 0.78 10.8 0.44 I I C-AB 3.30 15.55 0.212 0.36 0.72 10.8 0.08 I I C-A 9.01 I I A-B 1.93 I I A-C 12.88 I I I
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 8 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-AC 1.82 4.02 0.452 0.78 0.80 11.9 0.45 I I C-AB 3.31 15.57 0.213 0.72 0.73 11.2 0.08 I I C-A 9.00 I I A-B 1.93 I I A-C 12.88 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-AC 1.48 5.05 0.294 0.80 0.43 6.8 0.28 I I C-AB 2.03 14.38 0.141 0.73 0.38 5.8 0.08 I I C-A 8.02 I I A-B 1.57 I I A-C 10.52 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-AC 1.24 5.78 0.215 0.43 0.28 4.4 0.22 I I C-AB 1.43 13.65 0.105 0.38 0.23 3.5 0.08 I I C-A 6.99 I I A-B 1.32 I I A-C 8.81 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.3 17.15 0.4 17.30 0.8 * 17.45 0.8 * 18.00 0.4 18.15 0.3
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.2 17.15 0.4 17.30 0.7 * 17.45 0.7 * 18.00 0.4 18.15 0.2
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Eastern Site Access\Base 2026 + Full Dev.vpo - Page 9 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 136.3 I 90.8 I 43.5 I 0.32 I 43.5 I 0.32 I I C-AB I 202.8 I 135.2 I 40.1 I 0.20 I 40.1 I 0.20 I I C-A I 720.8 I 480.5 I I I I I I A-B I 144.5 I 96.3 I I I I I I A-C I 966.3 I 644.2 I I I I I --------------------------------------------------------------------------- I ALL I 2170.6 I 1447.1 I 83.6 I 0.04 I 83.6 I 0.04 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:48:26 on 21/12/2011]
Existing
play area
Anslow
Park
Woods
Kitling Greaves Lane
N
7
2
m
c
o
n
to
u
r
9
0
m
c
o
n
to
u
r
0 250m
N
50 100 150 200
Application Area 66.44ha
Housing Area - 950 dwellings 33.68ha
(Average density c28 dph; area includes
associated streets and private gardens)
Local Centre 1.00ha
(Consent is sought for up to 5000m² of A1-A5 uses
and D1 health care provision, and associated uses)
Community Primary School 2.00ha
and Pre-School Provision
(Land for a 210 place school)
SUDS Strategy Detention Basins 2.46ha
Indicative Primary Streets
(Main Street and The Avenue)
Existing Rights of Way / Footways
(Public footpath retained in situ and designed as new 'Greenway')
Existing Children's Play Area
Retained Mature Vegetation / Features
(Existing Woodland, Hedgerow and Trees. To include TPO trees
and existing Kitling Greaves Brook)
'Greenways'
(Multi purpose routes providing walking and
cycling, indicative alignments shown)
Equipped Children's Play Area (NEAP)
(1000m²)
Open Space 3.81ha
(Excluding retained existing planting. Open space includes
new habitat creation such as trees and hedgerows etc)
Retained Young Tree and Shrub Planting 2.21ha
(Recently planted)
Structural Landscape 18.21ha
(Multifunctional landscape of new woodland, tree and
hedgerow planting and mixed grassland habitats)
Equipped Children's Play Area (LEAP)
(400m²)
N
L
Green Infrastructure (GI)
NOTES:
1. Properties 92, 94, 142 and 144 Beamhill Road to be
demolished.
Outwoods Farm agricultural buildings to be demolished,
the farmhouse is retained.
Green Acres on Kitling Greaves Lane to be demolished.
2. Refer to ES Volume 3: FRA for details of SUDS strategy.
3. Refer to ES Volume 4: TA for details of proposed access.
4. Refer to ES Volume 2, Appendix 2 for further details of the
green infrastructure principles.
5. Maximum building height 12m from ground level to ridge.
rev
drawn CAD file
environmental assessment
architecture
ecology
masterplanning
landscape design
urban designFPCR Environment and Design Ltd
Lockington Hall
Lockington
Derby DE74 2RH
t: 01509 672772
f: 01509 674565
w: www.fpcr.co.uk
arboriculture
Hallam Land Management Ltd
Land at Upper Outwoods Farm
Burton upon Trent
FIGURE 4: EIA PARAMETERS PLAN1:2500 @ A1
January 2012
3457-P-50 M
JMG J:\3400\3457\CAD\3457-P-50 Figure 4 - EIA Parameters Plan.dwg
Ordnance Survey material is used with the permission of
The Controller of HMSO, Crown copyright AR 018896.
Beamhill, Burton
2007 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor -
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
17 Tutbury Road
6 395 23
115
56
Beamhill Road Harehedge Lane
5151
110
54 271 23
13
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
53 Beacon Rd53 Beacon Rd
21 170 31
107
17
Harehedge Lane Harehedge Lane
21
134
19 68 108
228228
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
595 94
Rolleston Rd
160
186
232 109
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
48 Church Road
178 503 29
82
115
Bridge St Hillfield Lane
5
42
162 101 107
7
Main StSATURN node 530
Horninglow Street / Hawkins Lane
146 Hawkins Lane
153 275153 275
583
Horninglow Street
364 Horninglow Street
460
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
165 Derby Road
298 476 0
580
197
Horninglow Road Horninglow Street
0
454
72 316 187 162
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
99
59 14 75
533
83
Henhurst Hill Henhurst Hill
31
234
49 8 10
Postern Road 55
SATURN node 661
Hopley Road / Hanbury Road
0
0
00
0
0 0
Tutbury Road / Calais Road / Field Lane
0
0
Tutbury Road Horninglow Road
0
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Beamhill, Burton
2007 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor -Actual Flows used; flows in PCUs Growth Factor -
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
8 Tutbury Road
30 351 66
103
2929
Beamhill Road Harehedge Lane
27
196
91 465 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
18 88 18
139
27
Harehedge Lane Harehedge Lane
33
205
11 164 234
77
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
300 213
Rolleston Rd
58
137137
509 277
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
243 Church Road
42 273 2
32
115
Bridge St Hillfield Lane
1414
176
97 390 134
46
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
92 Hawkins Lane
169 368
629
Horninglow Street
260 Horninglow Street
581
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
152 Derby Road
163 308 41
507
159
Horninglow Road Horninglow Street
00
626
52 471 180 155
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
43
97 6 111
293
58
Henhurst Hill Henhurst Hill
64
448
64 14 27
Postern Road 18
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
0
0 0
Tutbury Road / Calais Road / Field Lane
0
0
Tutbury Road Horninglow Road
00
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Beamhill, Burton
2012 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor - 1.052
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
22 B Tutbury Road
9 433 42
74
94
Beamhill Road D Harehedge Lane
C
5252
66
82 266 135
193
A
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
56 Beacon Rd56 Beacon Rd
22 179 32
112
18
Harehedge Lane Harehedge Lane
22
141
20 71 113
240240
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
626 99
Rolleston Rd
168
196
244 115
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
51 Church Road
187 529 30
87
121
Bridge St Hillfield Lane
5
44
171 107 113
7
Main StSATURN node 530
Horninglow Street / Hawkins LaneA
154 Hawkins Lane
161 289161 289
613
C Horninglow Street B
382 Horninglow Street
484
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
173 Derby Road
314 501 0
610
207
Horninglow Road 0 Horninglow Street
0
477
76 332 197 170
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
104
62 14 79
560
87
Henhurst Hill Henhurst Hill
33
246
52 8 11
Postern Road 58
SATURN node 661
Hopley Road / Hanbury Road
48
5
6262
124
1 95
Tutbury Road / Calais Road / Field Lane
418
414
Tutbury Road Horninglow Road
279
214 101
128
52 14 528
39
Field Lane
10 263
Calais Road
Beamhill, Burton
2012 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor - 1.041Actual Flows used; flows in PCUs Growth Factor - 1.041
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
13 Tutbury Road
B 7 268 40
80
7272
Beamhill Road C Harehedge Lane
D
35
68
99 461 153
98
A
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 91 18
145
28
Harehedge Lane Harehedge Lane
34
213
11 171 244
80
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
313 222
Rolleston Rd
60
143143
530 288
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
253 Church Road
44 284 2
33
120
Bridge St Hillfield Lane
1515
183
101 406 140
48
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins LaneA
95 Hawkins Lane
0 176 384
655
C Horninglow Street B
271 Horninglow Street
604
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
158 Derby Road
170 321 43
528
166
Horninglow Road Horninglow Street
00
652
0
54 490 188 161
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
44
100 6 116
304
60
Henhurst Hill Henhurst Hill
67
466
66 15 28
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
55
7
49
77
3 118
Tutbury Road / Calais Road / Field Lane
362
237
Tutbury Road Horninglow Road
370370
390 116
138
41 59 316
21
Field Lane
40 466
Calais Road
Beamhill, Burton
2014 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor - 1.076
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
22 Tutbury Road
9 437 42
75 B
95
Beamhill Road D Harehedge Lane
C
5353
A 67
83 269 136
195
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
57 Beacon Rd57 Beacon Rd
23 183 33
115
18
Harehedge Lane Harehedge Lane
22
144
20 73 116
245245
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
640 101
Rolleston Rd
172
201
249 117
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
52 Church Road
191 541 31
89
124
Bridge St Hillfield Lane
5
45
175 109 116
7
Main StSATURN node 530
Horninglow Street / Hawkins LaneA
157 Hawkins Lane
165 295165 295
627
C Horninglow Street B
391 Horninglow Street
495
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
177 Derby Road
321 513 0
624
212
Horninglow Road Horninglow Street
0
488
77 340 202 174
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road 59
106
63 15 81
573
89
Henhurst Hill Henhurst Hill
33
251
53 9 11
Postern Road 59
SATURN node 661
Hopley Road / Hanbury Road
49
5
6363
126
1 97
Tutbury Road / Calais Road / Field Lane
426
422
Tutbury Road Horninglow Road
285
218 103
131
53 14 539
40
Field Lane
10 268
Calais Road
Beamhill, Burton
2014 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor - 1.06Actual Flows used; flows in PCUs Growth Factor - 1.06
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
13 Tutbury Road
7 271 40
81
7373
Beamhill Road Harehedge Lane
35
69
100 466 155
99
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 93 19
147
29
Harehedge Lane Harehedge Lane
35
217
11 174 248
82
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
318 226
Rolleston Rd
61
145145
540 294
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
258 Church Road
44 290 2
34
122
Bridge St Hillfield Lane
1515
187
103 414 142
49
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
97 Hawkins Lane
179 391
667
Horninglow Street
275 Horninglow Street
615
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
173 327 43
537
0
169
Horninglow Road Horninglow Street
00
664
0
55 499 191 164
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
45
102 6 118
310
61
Henhurst Hill Henhurst Hill
68
475
67 15 29
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
56
7
50
79
3 120
Tutbury Road / Calais Road / Field Lane
369
242
Tutbury Road Horninglow Road
377377
398 118
141
42 60 322
21
Field Lane
41 475
Calais Road
Beamhill, Burton
2016 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs.
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
49 Tutbury Road
27 625 66
199
432
Beamhill Road Harehedge Lane
7171
138
173 298 53
50
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
124 Beacon Rd124 Beacon Rd
46 182 22
229
19
Harehedge Lane Harehedge Lane
26
197
13 101 197
8585
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
1003 216
Rolleston Rd
124
187
278 120
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
219 Church Road
71 577 5
74
152
Bridge St Hillfield Lane
6
65
170 291 51
31
Main StSATURN node 530
Horninglow Street / Hawkins Lane
247 Hawkins Lane
303 362303 362
737
Horninglow Street
453 Horninglow Street
548
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
118 Derby Road
538 408 4
779
293
Horninglow Road Horninglow Street
5
608
138 342 239 242
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
375
175 33 76
52
216
Henhurst Hill Henhurst Hill
125
136
64 65 36
Postern Road 81
SATURN node 661
Hopley Road / Hanbury Road
50
5
6464
129
1 99
Tutbury Road / Calais Road / Field Lane
435
431
Tutbury Road Horninglow Road
290
223 105
133
54 15 549
41
Field Lane
10 274
Calais Road
Beamhill, Burton
2016 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
15 Tutbury Road
57 468 87
146
136136
Beamhill Road Harehedge Lane
55
162
295 448 4
6
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
9 Beacon Rd
28 93 10
227
16
Harehedge Lane Harehedge Lane
35
219
25 162 218
66
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
447 253
Rolleston Rd
80
124124
631 185
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
304 Church Road
38 270 5
29
121
Bridge St Hillfield Lane
1919
138
141 482 154
168
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
253 Hawkins Lane
191 360
695
Horninglow Street
470 Horninglow Street
724
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
266 Derby Road
247 427 68
640
192
Horninglow Road Horninglow Street
11
676
143 535 247 278
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
144
261 21 97
239
83
Henhurst Hill Henhurst Hill
44
140
157 42 177
Postern Road 47
SATURN node 661
Hopley Road / Hanbury Road
57
7
51
80
3 123
Tutbury Road / Calais Road / Field Lane
376
246
Tutbury Road Horninglow Road
385385
406 121
144
43 61 329
22
Field Lane
42 485
Calais Road
Beamhill, Burton
2026 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
94 Tutbury Road
68 669 133
299
513513
Beamhill Road Harehedge Lane
105
157
223 327 21
22
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
67 Beacon Rd
35 150 3
356
183
Harehedge Lane Harehedge Lane
16
160
64 85 92
107
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
808 56
Rolleston Rd
93
323323
332 195
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
164 Church Road
75 622 27
68
199
Bridge St Hillfield Lane
55
47
159 229 63
25
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
125 Hawkins Lane
142 370
653
Horninglow Street
512 Horninglow Street
608
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
147 Derby Road
441 432 5
603
416
Horninglow Road Horninglow Street
2323
650
121 360 202 82
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
404
191 67 129
261
79
Henhurst Hill Henhurst Hill
265
228
104 131 48
Postern Road 81
SATURN node 661
Hopley Road / Hanbury Road
52
5
68
135
1 104
Tutbury Road / Calais Road / Field Lane
456
451
Tutbury Road Horninglow Road
304
233 110
140
57 15 576
43
Field Lane
11 287
Calais Road
Beamhill, Burton
2026 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
40 Tutbury Road
65 513 119
217
358358
Beamhill Road Harehedge Lane
132
237
411 535 27
19
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
28 Beacon Rd
33 86 11
259
87
Harehedge Lane Harehedge Lane
40
385
91 141 213
75
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
687 235
Rolleston Rd
67
207207
553 315
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
315 Church Road
57 275 4
47
121
Bridge St Hillfield Lane
1414
143
297 398 139
117
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
156 Hawkins Lane
81 336
963
Horninglow Street
445 Horninglow Street
844
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
292 319 197
701
385
Horninglow Road Horninglow Street
77
726
153 552 234 221
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
245
297 104 236
191
135
Henhurst Hill Henhurst Hill
158
229
169 129 174
Postern Road 45
SATURN node 661
Hopley Road / Hanbury Road
59
7
52
82
3 126
Tutbury Road / Calais Road / Field Lane
387
254
Tutbury Road Horninglow Road
396
417 124
148
44 63 338
22
Field Lane
43 499
Calais Road
Beamhill, Burton
Select link analysis
Taken from the 2016 AM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
29 Tutbury Road
29 0 0
90
278278
Beamhill Road Harehedge Lane
0
42
111 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
4 Beacon Rd
2 0 0
80
0
Harehedge Lane Harehedge Lane
0
36
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
212 0
Rolleston Rd
0
00
55 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
49 Church Road
14 0 0
9
10
Bridge St Hillfield Lane
00
10
9 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
28 Hawkins Lane
9 0
89
Horninglow Street
0 Horninglow Street
38
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
118
49
Horninglow Road Horninglow Street
00
47
0 1 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
20
24 57 16
0
0
Henhurst Hill Henhurst Hill
2
0
0 19 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
97
41
Tutbury Road / Calais Road / Field Lane
212
Tutbury Road Horninglow Road
5555
Field Lane
Calais Road
Main Road, AnslowMain Road, Anslow
42
Main Rd
98SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 PM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
10 Tutbury Road
48 0 0
52
144144
Beamhill Road Harehedge Lane
0
65
218 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
1 Beacon Rd
1 0 0
43
0
Harehedge Lane Harehedge Lane
0
55
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
110 0
Rolleston Rd
0
00
153 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
34 Church Road
4 14 0 0
1
10
Bridge St Hillfield Lane
00
30
18 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
21 Hawkins Lane
27 0
55
Horninglow Street
0 Horninglow Street
77
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
1 Derby Road
1 0 0
76
23
Horninglow Road Horninglow Street
00
105
17 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
18
11 23 0
0
0
Henhurst Hill Henhurst Hill
12
0
0 56 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
34
86
Tutbury Road / Calais Road / Field Lane
110
Tutbury Road Horninglow Road
153153
Field Lane
Calais Road
Main Road, AnslowMain Road, Anslow
87
Main Rd
34SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 AM Beamhill Model Staffordshire County Council Trip Rates - 2016 divided by 8
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
4 Tutbury Road
4 0 0
11
3535
Beamhill Road Harehedge Lane
0
5
14 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
1 Beacon Rd
0 0 0
10
0
Harehedge Lane Harehedge Lane
0
5
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
27 0
Rolleston Rd
0
00
7 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
6 Church Road
2 0 0
1
1
Bridge St Hillfield Lane
00
1
1 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
4 Hawkins Lane
1 0
11
Horninglow Street
0 Horninglow Street
5
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
15
6
Horninglow Road Horninglow Street
00
6
0 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
3
3 7 2
0
0
Henhurst Hill Henhurst Hill
0
0
0 2 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
12
0 5
Tutbury Road / Calais Road / Field Lane
27
0
Tutbury Road Horninglow Road
77
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Main Road, AnslowMain Road, Anslow
5
Main Rd
12SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 PM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
1 Tutbury Road
6 0 0
7
1818
Beamhill Road Harehedge Lane
0
8
27 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
0 Beacon Rd
0 0 0
5
0
Harehedge Lane Harehedge Lane
0
7
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
14 0
Rolleston Rd
0
00
19 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
4 Church Road
4 2 0 0
0
1
Bridge St Hillfield Lane
00
4
2 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
3 Hawkins Lane
3 0
7
Horninglow Street
0 Horninglow Street
10
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
10
3
Horninglow Road Horninglow Street
00
13
2 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
2
1 3 0
0
0
Henhurst Hill Henhurst Hill
2
0
0 7 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
4
0 11
Tutbury Road / Calais Road / Field Lane
14
0
Tutbury Road Horninglow Road
1919
0
0 0 0
0
Field Lane
0 0
Calais Road
Main Road, AnslowMain Road, Anslow
11
Main Rd
4SATURN link 611 - 665
Beamhill, Burton
2014 AM Peak Hour - DM - ACTUAL FLOWS (PCUs) + Development Traffic
Actual Flows used; flows in PCUs. Growth Factor - 0.98
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
26 Tutbury Road
13 437 42
86
B
130
Beamhill Road C Harehedge Lane
D
5353
A
72
97 292 136
195
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
58 Beacon Rd58 Beacon Rd
23 183 33
125
18
Harehedge Lane Harehedge Lane
22
148
20 73 116
245245
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
667 101
Rolleston Rd
172
201
256 117
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
58 Church Road
193 541 31
90
125
Bridge St Hillfield Lane
5
47
176 109 116
7
Main StSATURN node 530
Horninglow Street / Hawkins Lane
161 Hawkins Lane
166 295166 295
638
Horninglow Street
391 Horninglow Street
500
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
177 Derby Road
321 513 0
639
218
Horninglow Road Horninglow Street
0
494
77 340 202 174
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
108
66 22 83
573
89
Henhurst Hill Henhurst Hill
34
251
53 11 11
Postern Road 59
SATURN node 661
Hopley Road / Hanbury Road
49
5
6363
139
1 102
Tutbury Road / Calais Road / Field Lane
453
422
Tutbury Road Horninglow Road
291
218 103
131
53 14 539
40
Field Lane
10 268
Calais Road
Beamhill Road/ Site entrances 0.98
589 589
5 0
Beamhill RoadBeamhill Road
344 344
0 23
12 0 0 50
SATURN nodes 1172 and 1173
Beamhill, Burton
2014 PM Peak Hour - DM - ACTUAL FLOWS (PCUs) + Development Traffic
Actual Flows used; flows in PCUs Growth Factor - 0.98Actual Flows used; flows in PCUs Growth Factor - 0.98
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
14 Tutbury Road
13 271 40
87
B
9191
Beamhill Road Harehedge Lane
C D
35
A
77
127 466 155
99
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 93 19
153
29
Harehedge Lane Harehedge Lane
35
224
11 174 248
82
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
332 226
Rolleston Rd
61
145145
559 294
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
262 Church Road
46 290 2
34
124
Bridge St Hillfield Lane
1515
190
105 414 142
0 49
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
100 Hawkins Lane
183 391
674
Horninglow Street
275 Horninglow Street
625
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
173 327 43
547
171
Horninglow Road Horninglow Street
00
677
0
57 499 191 164
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
47
104 9 118
310
61
Henhurst Hill Henhurst Hill
69
475
67 22 29
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
56
7
50
83
3 131
Tutbury Road / Calais Road / Field Lane
383
242
Tutbury Road Horninglow Road
397397
398 118
141
42 60 322
21
Field Lane
41 475
Calais Road
Beamhill Road/ Site entrances 0.98Beamhill Road/ Site entrances 0.98
293 293
11 0
Beamhill Road
500.8 500.8
0 41
4 0 0 264 0 0 26
SATURN nodes 1172 and 1173
Beamhill, Burton
2016 AM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
74 Tutbury Road
48 567 81
272
576576
Beamhill Road Harehedge Lane
71
183
284 296 51
32
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
145 Beacon Rd
37 172 4
284
35
Harehedge Lane Harehedge Lane
27
227
14 90 169
75
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
1033 184
Rolleston Rd
115
190190
329 111
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
231 Church Road
85 594 15
68
154
Bridge St Hillfield Lane
66
64
177 291 51
31
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
244 Hawkins Lane
323 364
710
Horninglow Street
457 Horninglow Street
558
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
114 Derby Road
559 378 5
757
340
Horninglow Road Horninglow Street
55
661
146 341 229 219
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
359
193 87 100
267
222
Henhurst Hill Henhurst Hill
96
132
67 85 41
Postern Road 112
SATURN node 661
Hopley Road / Hanbury Road
50
5
64
226
1 140
Tutbury Road / Calais Road / Field Lane
647
431
Tutbury Road Horninglow Road
345345
223 105
133
54 15 549
41
Field Lane
10 274
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
601 601
21 20
Beamhill Road
351 351
85 86
42 156 41 15642 156 41 156
SATURN nodes 1172 and 1173
Beamhill, Burton
2016 PM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
23 Tutbury Road
99 456 88
192
B
266266
Beamhill Road C Harehedge Lane
D
91
A 216
466 404 4
6
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
10 Beacon Rd
29 93 5
264
18
Harehedge Lane Harehedge Lane
35
315
26 157 194
66
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
533 229
Rolleston Rd
80
125125
666 179
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
314 Church Road
39 277 5
27
123
Bridge St Hillfield Lane
1818
164
210 464 154
168
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
255 Hawkins Lane
173 359
715
Horninglow Street
453 Horninglow Street
752
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
269 Derby Road
252 417 47
672
212
Horninglow Road Horninglow Street
11
696
149 532 260 269
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
151
266 43 96
244
84
Henhurst Hill Henhurst Hill
53
129
166 82 180
Postern Road 50
SATURN node 661
Hopley Road / Hanbury Road
57
7
51
114
3 209
Tutbury Road / Calais Road / Field Lane
486
246
Tutbury Road Horninglow Road
538538
406 121
144
43 61 329
22
Field Lane
42 485
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
299 299
34 33
Beamhill Road
511 511
122 123
17 82 16 8317 82 16 83
SATURN nodes 1172 and 1173
Beamhill, Burton
2026 AM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
133 Tutbury Road
105 620 81
398
B
621621
Beamhill Road C Harehedge Lane
D
106
A
180
307 320 14
24
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
59 Beacon Rd
37 140 1
369
192
Harehedge Lane Harehedge Lane
16
179
63 83 102
113
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
787 63
Rolleston Rd
95
325325
369 193
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
190 Church Road
85 632 64
70
182
Bridge St Hillfield Lane
44
53
168 226 62
28
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
145 Hawkins Lane
141 365
643
Horninglow Street
496 Horninglow Street
627
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
134 Derby Road
441 463 5
606
394
Horninglow Road Horninglow Street
2323
656
104 357 209 94
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
405
209 109 179
251
93
Henhurst Hill Henhurst Hill
259
221
106 148 47
Postern Road 87
SATURN node 661
Hopley Road / Hanbury Road
52
5
68
232
1 145
Tutbury Road / Calais Road / Field Lane
668
451
Tutbury Road Horninglow Road
359359
233 110
140
57 15 576
43
Field Lane
11 287
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
863 863
28 28
Beamhill Road
466 466
76 77
58 140 57 14158 140 57 141
SATURN nodes 1172 and 1173
Beamhill, Burton
2026 PM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
48 Tutbury Road
89 503 124
255
B
483483
Beamhill Road C Harehedge Lane
D
131
A
300
547 502 24
19
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
28 Beacon Rd
34 86 9
294
91
Harehedge Lane Harehedge Lane
36
434
100 134 189
72
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
746 236
Rolleston Rd
66
209209
593 291
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
332 Church Road
61 278 4
42
118
Bridge St Hillfield Lane
1515
167
312 404 139
117
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
164 Hawkins Lane
81 367
945
Horninglow Street
453 Horninglow Street
843
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
192 Derby Road
305 320 164
723
400
Horninglow Road Horninglow Street
77
740
177 528 233 208
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
259
297 129 246
191
136
Henhurst Hill Henhurst Hill
202
228
165 172 176
Postern Road 46
SATURN node 661
Hopley Road / Hanbury Road
59
7
52
116
3 212
Tutbury Road / Calais Road / Field Lane
497
254
Tutbury Road Horninglow Road
549549
417 124
148
44 63 338
22
Field Lane
43 499
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
621 621
50 50
Beamhill Road
702 702
104 105
22 77 22 7722 77 22 77
SATURN nodes 1172 and 1173
Beamhill, Burton
2007 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor -
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
17 Tutbury Road
6 395 23
115
56
Beamhill Road Harehedge Lane
5151
110
54 271 23
13
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
53 Beacon Rd53 Beacon Rd
21 170 31
107
17
Harehedge Lane Harehedge Lane
21
134
19 68 108
228228
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
595 94
Rolleston Rd
160
186
232 109
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
48 Church Road
178 503 29
82
115
Bridge St Hillfield Lane
5
42
162 101 107
7
Main StSATURN node 530
Horninglow Street / Hawkins Lane
146 Hawkins Lane
153 275153 275
583
Horninglow Street
364 Horninglow Street
460
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
165 Derby Road
298 476 0
580
197
Horninglow Road Horninglow Street
0
454
72 316 187 162
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
99
59 14 75
533
83
Henhurst Hill Henhurst Hill
31
234
49 8 10
Postern Road 55
SATURN node 661
Hopley Road / Hanbury Road
0
0
00
0
0 0
Tutbury Road / Calais Road / Field Lane
0
0
Tutbury Road Horninglow Road
0
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Beamhill, Burton
2007 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor -Actual Flows used; flows in PCUs Growth Factor -
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
8 Tutbury Road
30 351 66
103
2929
Beamhill Road Harehedge Lane
27
196
91 465 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
18 88 18
139
27
Harehedge Lane Harehedge Lane
33
205
11 164 234
77
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
300 213
Rolleston Rd
58
137137
509 277
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
243 Church Road
42 273 2
32
115
Bridge St Hillfield Lane
1414
176
97 390 134
46
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
92 Hawkins Lane
169 368
629
Horninglow Street
260 Horninglow Street
581
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
152 Derby Road
163 308 41
507
159
Horninglow Road Horninglow Street
00
626
52 471 180 155
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
43
97 6 111
293
58
Henhurst Hill Henhurst Hill
64
448
64 14 27
Postern Road 18
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
0
0 0
Tutbury Road / Calais Road / Field Lane
0
0
Tutbury Road Horninglow Road
00
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Beamhill, Burton
2012 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor - 1.052
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
22 B Tutbury Road
9 433 42
74
94
Beamhill Road D Harehedge Lane
C
5252
66
82 266 135
193
A
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
56 Beacon Rd56 Beacon Rd
22 179 32
112
18
Harehedge Lane Harehedge Lane
22
141
20 71 113
240240
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
626 99
Rolleston Rd
168
196
244 115
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
51 Church Road
187 529 30
87
121
Bridge St Hillfield Lane
5
44
171 107 113
7
Main StSATURN node 530
Horninglow Street / Hawkins LaneA
154 Hawkins Lane
161 289161 289
613
C Horninglow Street B
382 Horninglow Street
484
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
173 Derby Road
314 501 0
610
207
Horninglow Road 0 Horninglow Street
0
477
76 332 197 170
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
104
62 14 79
560
87
Henhurst Hill Henhurst Hill
33
246
52 8 11
Postern Road 58
SATURN node 661
Hopley Road / Hanbury Road
48
5
6262
124
1 95
Tutbury Road / Calais Road / Field Lane
418
414
Tutbury Road Horninglow Road
279
214 101
128
52 14 528
39
Field Lane
10 263
Calais Road
Beamhill, Burton
2012 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor - 1.041Actual Flows used; flows in PCUs Growth Factor - 1.041
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
13 Tutbury Road
B 7 268 40
80
7272
Beamhill Road C Harehedge Lane
D
35
68
99 461 153
98
A
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 91 18
145
28
Harehedge Lane Harehedge Lane
34
213
11 171 244
80
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
313 222
Rolleston Rd
60
143143
530 288
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
253 Church Road
44 284 2
33
120
Bridge St Hillfield Lane
1515
183
101 406 140
48
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins LaneA
95 Hawkins Lane
0 176 384
655
C Horninglow Street B
271 Horninglow Street
604
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
158 Derby Road
170 321 43
528
166
Horninglow Road Horninglow Street
00
652
0
54 490 188 161
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
44
100 6 116
304
60
Henhurst Hill Henhurst Hill
67
466
66 15 28
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
55
7
49
77
3 118
Tutbury Road / Calais Road / Field Lane
362
237
Tutbury Road Horninglow Road
370370
390 116
138
41 59 316
21
Field Lane
40 466
Calais Road
Beamhill, Burton
2014 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor - 1.076
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
22 Tutbury Road
9 437 42
75 B
95
Beamhill Road D Harehedge Lane
C
5353
A 67
83 269 136
195
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
57 Beacon Rd57 Beacon Rd
23 183 33
115
18
Harehedge Lane Harehedge Lane
22
144
20 73 116
245245
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
640 101
Rolleston Rd
172
201
249 117
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
52 Church Road
191 541 31
89
124
Bridge St Hillfield Lane
5
45
175 109 116
7
Main StSATURN node 530
Horninglow Street / Hawkins LaneA
157 Hawkins Lane
165 295165 295
627
C Horninglow Street B
391 Horninglow Street
495
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
177 Derby Road
321 513 0
624
212
Horninglow Road Horninglow Street
0
488
77 340 202 174
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road 59
106
63 15 81
573
89
Henhurst Hill Henhurst Hill
33
251
53 9 11
Postern Road 59
SATURN node 661
Hopley Road / Hanbury Road
49
5
6363
126
1 97
Tutbury Road / Calais Road / Field Lane
426
422
Tutbury Road Horninglow Road
285
218 103
131
53 14 539
40
Field Lane
10 268
Calais Road
Beamhill, Burton
2014 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor - 1.06Actual Flows used; flows in PCUs Growth Factor - 1.06
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
13 Tutbury Road
7 271 40
81
7373
Beamhill Road Harehedge Lane
35
69
100 466 155
99
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 93 19
147
29
Harehedge Lane Harehedge Lane
35
217
11 174 248
82
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
318 226
Rolleston Rd
61
145145
540 294
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
258 Church Road
44 290 2
34
122
Bridge St Hillfield Lane
1515
187
103 414 142
49
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
97 Hawkins Lane
179 391
667
Horninglow Street
275 Horninglow Street
615
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
173 327 43
537
0
169
Horninglow Road Horninglow Street
00
664
0
55 499 191 164
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
45
102 6 118
310
61
Henhurst Hill Henhurst Hill
68
475
67 15 29
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
56
7
50
79
3 120
Tutbury Road / Calais Road / Field Lane
369
242
Tutbury Road Horninglow Road
377377
398 118
141
42 60 322
21
Field Lane
41 475
Calais Road
Beamhill, Burton
2016 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs.
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
49 Tutbury Road
27 625 66
199
432
Beamhill Road Harehedge Lane
7171
138
173 298 53
50
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
124 Beacon Rd124 Beacon Rd
46 182 22
229
19
Harehedge Lane Harehedge Lane
26
197
13 101 197
8585
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
1003 216
Rolleston Rd
124
187
278 120
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
219 Church Road
71 577 5
74
152
Bridge St Hillfield Lane
6
65
170 291 51
31
Main StSATURN node 530
Horninglow Street / Hawkins Lane
247 Hawkins Lane
303 362303 362
737
Horninglow Street
453 Horninglow Street
548
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
118 Derby Road
538 408 4
779
293
Horninglow Road Horninglow Street
5
608
138 342 239 242
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
375
175 33 76
52
216
Henhurst Hill Henhurst Hill
125
136
64 65 36
Postern Road 81
SATURN node 661
Hopley Road / Hanbury Road
50
5
6464
129
1 99
Tutbury Road / Calais Road / Field Lane
435
431
Tutbury Road Horninglow Road
290
223 105
133
54 15 549
41
Field Lane
10 274
Calais Road
Beamhill, Burton
2016 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
15 Tutbury Road
57 468 87
146
136136
Beamhill Road Harehedge Lane
55
162
295 448 4
6
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
9 Beacon Rd
28 93 10
227
16
Harehedge Lane Harehedge Lane
35
219
25 162 218
66
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
447 253
Rolleston Rd
80
124124
631 185
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
304 Church Road
38 270 5
29
121
Bridge St Hillfield Lane
1919
138
141 482 154
168
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
253 Hawkins Lane
191 360
695
Horninglow Street
470 Horninglow Street
724
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
266 Derby Road
247 427 68
640
192
Horninglow Road Horninglow Street
11
676
143 535 247 278
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
144
261 21 97
239
83
Henhurst Hill Henhurst Hill
44
140
157 42 177
Postern Road 47
SATURN node 661
Hopley Road / Hanbury Road
57
7
51
80
3 123
Tutbury Road / Calais Road / Field Lane
376
246
Tutbury Road Horninglow Road
385385
406 121
144
43 61 329
22
Field Lane
42 485
Calais Road
Beamhill, Burton
2026 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
94 Tutbury Road
68 669 133
299
513513
Beamhill Road Harehedge Lane
105
157
223 327 21
22
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
67 Beacon Rd
35 150 3
356
183
Harehedge Lane Harehedge Lane
16
160
64 85 92
107
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
808 56
Rolleston Rd
93
323323
332 195
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
164 Church Road
75 622 27
68
199
Bridge St Hillfield Lane
55
47
159 229 63
25
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
125 Hawkins Lane
142 370
653
Horninglow Street
512 Horninglow Street
608
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
147 Derby Road
441 432 5
603
416
Horninglow Road Horninglow Street
2323
650
121 360 202 82
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
404
191 67 129
261
79
Henhurst Hill Henhurst Hill
265
228
104 131 48
Postern Road 81
SATURN node 661
Hopley Road / Hanbury Road
52
5
68
135
1 104
Tutbury Road / Calais Road / Field Lane
456
451
Tutbury Road Horninglow Road
304
233 110
140
57 15 576
43
Field Lane
11 287
Calais Road
Beamhill, Burton
2026 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
40 Tutbury Road
65 513 119
217
358358
Beamhill Road Harehedge Lane
132
237
411 535 27
19
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
28 Beacon Rd
33 86 11
259
87
Harehedge Lane Harehedge Lane
40
385
91 141 213
75
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
687 235
Rolleston Rd
67
207207
553 315
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
315 Church Road
57 275 4
47
121
Bridge St Hillfield Lane
1414
143
297 398 139
117
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
156 Hawkins Lane
81 336
963
Horninglow Street
445 Horninglow Street
844
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
292 319 197
701
385
Horninglow Road Horninglow Street
77
726
153 552 234 221
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
245
297 104 236
191
135
Henhurst Hill Henhurst Hill
158
229
169 129 174
Postern Road 45
SATURN node 661
Hopley Road / Hanbury Road
59
7
52
82
3 126
Tutbury Road / Calais Road / Field Lane
387
254
Tutbury Road Horninglow Road
396
417 124
148
44 63 338
22
Field Lane
43 499
Calais Road
Beamhill, Burton
Select link analysis
Taken from the 2016 AM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
29 Tutbury Road
29 0 0
90
278278
Beamhill Road Harehedge Lane
0
42
111 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
4 Beacon Rd
2 0 0
80
0
Harehedge Lane Harehedge Lane
0
36
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
212 0
Rolleston Rd
0
00
55 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
49 Church Road
14 0 0
9
10
Bridge St Hillfield Lane
00
10
9 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
28 Hawkins Lane
9 0
89
Horninglow Street
0 Horninglow Street
38
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
118
49
Horninglow Road Horninglow Street
00
47
0 1 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
20
24 57 16
0
0
Henhurst Hill Henhurst Hill
2
0
0 19 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
97
41
Tutbury Road / Calais Road / Field Lane
212
Tutbury Road Horninglow Road
5555
Field Lane
Calais Road
Main Road, AnslowMain Road, Anslow
42
Main Rd
98SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 PM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
10 Tutbury Road
48 0 0
52
144144
Beamhill Road Harehedge Lane
0
65
218 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
1 Beacon Rd
1 0 0
43
0
Harehedge Lane Harehedge Lane
0
55
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
110 0
Rolleston Rd
0
00
153 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
34 Church Road
4 14 0 0
1
10
Bridge St Hillfield Lane
00
30
18 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
21 Hawkins Lane
27 0
55
Horninglow Street
0 Horninglow Street
77
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
1 Derby Road
1 0 0
76
23
Horninglow Road Horninglow Street
00
105
17 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
18
11 23 0
0
0
Henhurst Hill Henhurst Hill
12
0
0 56 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
34
86
Tutbury Road / Calais Road / Field Lane
110
Tutbury Road Horninglow Road
153153
Field Lane
Calais Road
Main Road, AnslowMain Road, Anslow
87
Main Rd
34SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 AM Beamhill Model Staffordshire County Council Trip Rates - 2016 divided by 8
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
4 Tutbury Road
4 0 0
11
3535
Beamhill Road Harehedge Lane
0
5
14 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
1 Beacon Rd
0 0 0
10
0
Harehedge Lane Harehedge Lane
0
5
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
27 0
Rolleston Rd
0
00
7 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
6 Church Road
2 0 0
1
1
Bridge St Hillfield Lane
00
1
1 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
4 Hawkins Lane
1 0
11
Horninglow Street
0 Horninglow Street
5
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
15
6
Horninglow Road Horninglow Street
00
6
0 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
3
3 7 2
0
0
Henhurst Hill Henhurst Hill
0
0
0 2 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
12
0 5
Tutbury Road / Calais Road / Field Lane
27
0
Tutbury Road Horninglow Road
77
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Main Road, AnslowMain Road, Anslow
5
Main Rd
12SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 PM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
1 Tutbury Road
6 0 0
7
1818
Beamhill Road Harehedge Lane
0
8
27 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
0 Beacon Rd
0 0 0
5
0
Harehedge Lane Harehedge Lane
0
7
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
14 0
Rolleston Rd
0
00
19 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
4 Church Road
4 2 0 0
0
1
Bridge St Hillfield Lane
00
4
2 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
3 Hawkins Lane
3 0
7
Horninglow Street
0 Horninglow Street
10
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
10
3
Horninglow Road Horninglow Street
00
13
2 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
2
1 3 0
0
0
Henhurst Hill Henhurst Hill
2
0
0 7 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
4
0 11
Tutbury Road / Calais Road / Field Lane
14
0
Tutbury Road Horninglow Road
1919
0
0 0 0
0
Field Lane
0 0
Calais Road
Main Road, AnslowMain Road, Anslow
11
Main Rd
4SATURN link 611 - 665
Beamhill, Burton
2014 AM Peak Hour - DM - ACTUAL FLOWS (PCUs) + Development Traffic
Actual Flows used; flows in PCUs. Growth Factor - 0.98
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
26 Tutbury Road
13 437 42
86
B
130
Beamhill Road C Harehedge Lane
D
5353
A
72
97 292 136
195
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
58 Beacon Rd58 Beacon Rd
23 183 33
125
18
Harehedge Lane Harehedge Lane
22
148
20 73 116
245245
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
667 101
Rolleston Rd
172
201
256 117
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
58 Church Road
193 541 31
90
125
Bridge St Hillfield Lane
5
47
176 109 116
7
Main StSATURN node 530
Horninglow Street / Hawkins Lane
161 Hawkins Lane
166 295166 295
638
Horninglow Street
391 Horninglow Street
500
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
177 Derby Road
321 513 0
639
218
Horninglow Road Horninglow Street
0
494
77 340 202 174
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
108
66 22 83
573
89
Henhurst Hill Henhurst Hill
34
251
53 11 11
Postern Road 59
SATURN node 661
Hopley Road / Hanbury Road
49
5
6363
139
1 102
Tutbury Road / Calais Road / Field Lane
453
422
Tutbury Road Horninglow Road
291
218 103
131
53 14 539
40
Field Lane
10 268
Calais Road
Beamhill Road/ Site entrances 0.98
589 589
5 0
Beamhill RoadBeamhill Road
344 344
0 23
12 0 0 50
SATURN nodes 1172 and 1173
Beamhill, Burton
2014 PM Peak Hour - DM - ACTUAL FLOWS (PCUs) + Development Traffic
Actual Flows used; flows in PCUs Growth Factor - 0.98Actual Flows used; flows in PCUs Growth Factor - 0.98
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
14 Tutbury Road
13 271 40
87
B
9191
Beamhill Road Harehedge Lane
C D
35
A
77
127 466 155
99
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 93 19
153
29
Harehedge Lane Harehedge Lane
35
224
11 174 248
82
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
332 226
Rolleston Rd
61
145145
559 294
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
262 Church Road
46 290 2
34
124
Bridge St Hillfield Lane
1515
190
105 414 142
0 49
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
100 Hawkins Lane
183 391
674
Horninglow Street
275 Horninglow Street
625
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
173 327 43
547
171
Horninglow Road Horninglow Street
00
677
0
57 499 191 164
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
47
104 9 118
310
61
Henhurst Hill Henhurst Hill
69
475
67 22 29
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
56
7
50
83
3 131
Tutbury Road / Calais Road / Field Lane
383
242
Tutbury Road Horninglow Road
397397
398 118
141
42 60 322
21
Field Lane
41 475
Calais Road
Beamhill Road/ Site entrances 0.98Beamhill Road/ Site entrances 0.98
293 293
11 0
Beamhill Road
500.8 500.8
0 41
4 0 0 264 0 0 26
SATURN nodes 1172 and 1173
Beamhill, Burton
2016 AM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
74 Tutbury Road
48 567 81
272
576576
Beamhill Road Harehedge Lane
71
183
284 296 51
32
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
145 Beacon Rd
37 172 4
284
35
Harehedge Lane Harehedge Lane
27
227
14 90 169
75
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
1033 184
Rolleston Rd
115
190190
329 111
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
231 Church Road
85 594 15
68
154
Bridge St Hillfield Lane
66
64
177 291 51
31
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
244 Hawkins Lane
323 364
710
Horninglow Street
457 Horninglow Street
558
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
114 Derby Road
559 378 5
757
340
Horninglow Road Horninglow Street
55
661
146 341 229 219
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
359
193 87 100
267
222
Henhurst Hill Henhurst Hill
96
132
67 85 41
Postern Road 112
SATURN node 661
Hopley Road / Hanbury Road
50
5
64
226
1 140
Tutbury Road / Calais Road / Field Lane
647
431
Tutbury Road Horninglow Road
345345
223 105
133
54 15 549
41
Field Lane
10 274
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
601 601
21 20
Beamhill Road
351 351
85 86
42 156 41 15642 156 41 156
SATURN nodes 1172 and 1173
Beamhill, Burton
2016 PM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
23 Tutbury Road
99 456 88
192
B
266266
Beamhill Road C Harehedge Lane
D
91
A 216
466 404 4
6
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
10 Beacon Rd
29 93 5
264
18
Harehedge Lane Harehedge Lane
35
315
26 157 194
66
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
533 229
Rolleston Rd
80
125125
666 179
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
314 Church Road
39 277 5
27
123
Bridge St Hillfield Lane
1818
164
210 464 154
168
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
255 Hawkins Lane
173 359
715
Horninglow Street
453 Horninglow Street
752
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
269 Derby Road
252 417 47
672
212
Horninglow Road Horninglow Street
11
696
149 532 260 269
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
151
266 43 96
244
84
Henhurst Hill Henhurst Hill
53
129
166 82 180
Postern Road 50
SATURN node 661
Hopley Road / Hanbury Road
57
7
51
114
3 209
Tutbury Road / Calais Road / Field Lane
486
246
Tutbury Road Horninglow Road
538538
406 121
144
43 61 329
22
Field Lane
42 485
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
299 299
34 33
Beamhill Road
511 511
122 123
17 82 16 8317 82 16 83
SATURN nodes 1172 and 1173
Beamhill, Burton
2026 AM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
133 Tutbury Road
105 620 81
398
B
621621
Beamhill Road C Harehedge Lane
D
106
A
180
307 320 14
24
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
59 Beacon Rd
37 140 1
369
192
Harehedge Lane Harehedge Lane
16
179
63 83 102
113
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
787 63
Rolleston Rd
95
325325
369 193
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
190 Church Road
85 632 64
70
182
Bridge St Hillfield Lane
44
53
168 226 62
28
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
145 Hawkins Lane
141 365
643
Horninglow Street
496 Horninglow Street
627
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
134 Derby Road
441 463 5
606
394
Horninglow Road Horninglow Street
2323
656
104 357 209 94
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
405
209 109 179
251
93
Henhurst Hill Henhurst Hill
259
221
106 148 47
Postern Road 87
SATURN node 661
Hopley Road / Hanbury Road
52
5
68
232
1 145
Tutbury Road / Calais Road / Field Lane
668
451
Tutbury Road Horninglow Road
359359
233 110
140
57 15 576
43
Field Lane
11 287
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
863 863
28 28
Beamhill Road
466 466
76 77
58 140 57 14158 140 57 141
SATURN nodes 1172 and 1173
Beamhill, Burton
2026 PM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
48 Tutbury Road
89 503 124
255
B
483483
Beamhill Road C Harehedge Lane
D
131
A
300
547 502 24
19
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
28 Beacon Rd
34 86 9
294
91
Harehedge Lane Harehedge Lane
36
434
100 134 189
72
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
746 236
Rolleston Rd
66
209209
593 291
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
332 Church Road
61 278 4
42
118
Bridge St Hillfield Lane
1515
167
312 404 139
117
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
164 Hawkins Lane
81 367
945
Horninglow Street
453 Horninglow Street
843
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
192 Derby Road
305 320 164
723
400
Horninglow Road Horninglow Street
77
740
177 528 233 208
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
259
297 129 246
191
136
Henhurst Hill Henhurst Hill
202
228
165 172 176
Postern Road 46
SATURN node 661
Hopley Road / Hanbury Road
59
7
52
116
3 212
Tutbury Road / Calais Road / Field Lane
497
254
Tutbury Road Horninglow Road
549549
417 124
148
44 63 338
22
Field Lane
43 499
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
621 621
50 50
Beamhill Road
702 702
104 105
22 77 22 7722 77 22 77
SATURN nodes 1172 and 1173
Beamhill, Burton
2007 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor -
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
17 Tutbury Road
6 395 23
115
56
Beamhill Road Harehedge Lane
5151
110
54 271 23
13
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
53 Beacon Rd53 Beacon Rd
21 170 31
107
17
Harehedge Lane Harehedge Lane
21
134
19 68 108
228228
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
595 94
Rolleston Rd
160
186
232 109
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
48 Church Road
178 503 29
82
115
Bridge St Hillfield Lane
5
42
162 101 107
7
Main StSATURN node 530
Horninglow Street / Hawkins Lane
146 Hawkins Lane
153 275153 275
583
Horninglow Street
364 Horninglow Street
460
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
165 Derby Road
298 476 0
580
197
Horninglow Road Horninglow Street
0
454
72 316 187 162
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
99
59 14 75
533
83
Henhurst Hill Henhurst Hill
31
234
49 8 10
Postern Road 55
SATURN node 661
Hopley Road / Hanbury Road
0
0
00
0
0 0
Tutbury Road / Calais Road / Field Lane
0
0
Tutbury Road Horninglow Road
0
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Beamhill, Burton
2007 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor -Actual Flows used; flows in PCUs Growth Factor -
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
8 Tutbury Road
30 351 66
103
2929
Beamhill Road Harehedge Lane
27
196
91 465 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
18 88 18
139
27
Harehedge Lane Harehedge Lane
33
205
11 164 234
77
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
300 213
Rolleston Rd
58
137137
509 277
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
243 Church Road
42 273 2
32
115
Bridge St Hillfield Lane
1414
176
97 390 134
46
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
92 Hawkins Lane
169 368
629
Horninglow Street
260 Horninglow Street
581
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
152 Derby Road
163 308 41
507
159
Horninglow Road Horninglow Street
00
626
52 471 180 155
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
43
97 6 111
293
58
Henhurst Hill Henhurst Hill
64
448
64 14 27
Postern Road 18
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
0
0 0
Tutbury Road / Calais Road / Field Lane
0
0
Tutbury Road Horninglow Road
00
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Beamhill, Burton
2012 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor - 1.052
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
22 B Tutbury Road
9 433 42
74
94
Beamhill Road D Harehedge Lane
C
5252
66
82 266 135
193
A
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
56 Beacon Rd56 Beacon Rd
22 179 32
112
18
Harehedge Lane Harehedge Lane
22
141
20 71 113
240240
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
626 99
Rolleston Rd
168
196
244 115
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
51 Church Road
187 529 30
87
121
Bridge St Hillfield Lane
5
44
171 107 113
7
Main StSATURN node 530
Horninglow Street / Hawkins LaneA
154 Hawkins Lane
161 289161 289
613
C Horninglow Street B
382 Horninglow Street
484
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
173 Derby Road
314 501 0
610
207
Horninglow Road 0 Horninglow Street
0
477
76 332 197 170
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
104
62 14 79
560
87
Henhurst Hill Henhurst Hill
33
246
52 8 11
Postern Road 58
SATURN node 661
Hopley Road / Hanbury Road
48
5
6262
124
1 95
Tutbury Road / Calais Road / Field Lane
418
414
Tutbury Road Horninglow Road
279
214 101
128
52 14 528
39
Field Lane
10 263
Calais Road
Beamhill, Burton
2012 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor - 1.041Actual Flows used; flows in PCUs Growth Factor - 1.041
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
13 Tutbury Road
B 7 268 40
80
7272
Beamhill Road C Harehedge Lane
D
35
68
99 461 153
98
A
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 91 18
145
28
Harehedge Lane Harehedge Lane
34
213
11 171 244
80
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
313 222
Rolleston Rd
60
143143
530 288
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
253 Church Road
44 284 2
33
120
Bridge St Hillfield Lane
1515
183
101 406 140
48
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins LaneA
95 Hawkins Lane
0 176 384
655
C Horninglow Street B
271 Horninglow Street
604
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
158 Derby Road
170 321 43
528
166
Horninglow Road Horninglow Street
00
652
0
54 490 188 161
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
44
100 6 116
304
60
Henhurst Hill Henhurst Hill
67
466
66 15 28
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
55
7
49
77
3 118
Tutbury Road / Calais Road / Field Lane
362
237
Tutbury Road Horninglow Road
370370
390 116
138
41 59 316
21
Field Lane
40 466
Calais Road
Beamhill, Burton
2014 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs. Growth Factor - 1.076
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
22 Tutbury Road
9 437 42
75 B
95
Beamhill Road D Harehedge Lane
C
5353
A 67
83 269 136
195
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
57 Beacon Rd57 Beacon Rd
23 183 33
115
18
Harehedge Lane Harehedge Lane
22
144
20 73 116
245245
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
640 101
Rolleston Rd
172
201
249 117
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
52 Church Road
191 541 31
89
124
Bridge St Hillfield Lane
5
45
175 109 116
7
Main StSATURN node 530
Horninglow Street / Hawkins LaneA
157 Hawkins Lane
165 295165 295
627
C Horninglow Street B
391 Horninglow Street
495
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
177 Derby Road
321 513 0
624
212
Horninglow Road Horninglow Street
0
488
77 340 202 174
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road 59
106
63 15 81
573
89
Henhurst Hill Henhurst Hill
33
251
53 9 11
Postern Road 59
SATURN node 661
Hopley Road / Hanbury Road
49
5
6363
126
1 97
Tutbury Road / Calais Road / Field Lane
426
422
Tutbury Road Horninglow Road
285
218 103
131
53 14 539
40
Field Lane
10 268
Calais Road
Beamhill, Burton
2014 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs Growth Factor - 1.06Actual Flows used; flows in PCUs Growth Factor - 1.06
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
13 Tutbury Road
7 271 40
81
7373
Beamhill Road Harehedge Lane
35
69
100 466 155
99
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 93 19
147
29
Harehedge Lane Harehedge Lane
35
217
11 174 248
82
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
318 226
Rolleston Rd
61
145145
540 294
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
258 Church Road
44 290 2
34
122
Bridge St Hillfield Lane
1515
187
103 414 142
49
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
97 Hawkins Lane
179 391
667
Horninglow Street
275 Horninglow Street
615
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
173 327 43
537
0
169
Horninglow Road Horninglow Street
00
664
0
55 499 191 164
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
45
102 6 118
310
61
Henhurst Hill Henhurst Hill
68
475
67 15 29
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
56
7
50
79
3 120
Tutbury Road / Calais Road / Field Lane
369
242
Tutbury Road Horninglow Road
377377
398 118
141
42 60 322
21
Field Lane
41 475
Calais Road
Beamhill, Burton
2016 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUs.
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
49 Tutbury Road
27 625 66
199
432
Beamhill Road Harehedge Lane
7171
138
173 298 53
50
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
124 Beacon Rd124 Beacon Rd
46 182 22
229
19
Harehedge Lane Harehedge Lane
26
197
13 101 197
8585
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
1003 216
Rolleston Rd
124
187
278 120
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
219 Church Road
71 577 5
74
152
Bridge St Hillfield Lane
6
65
170 291 51
31
Main StSATURN node 530
Horninglow Street / Hawkins Lane
247 Hawkins Lane
303 362303 362
737
Horninglow Street
453 Horninglow Street
548
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
118 Derby Road
538 408 4
779
293
Horninglow Road Horninglow Street
5
608
138 342 239 242
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
375
175 33 76
52
216
Henhurst Hill Henhurst Hill
125
136
64 65 36
Postern Road 81
SATURN node 661
Hopley Road / Hanbury Road
50
5
6464
129
1 99
Tutbury Road / Calais Road / Field Lane
435
431
Tutbury Road Horninglow Road
290
223 105
133
54 15 549
41
Field Lane
10 274
Calais Road
Beamhill, Burton
2016 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
15 Tutbury Road
57 468 87
146
136136
Beamhill Road Harehedge Lane
55
162
295 448 4
6
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
9 Beacon Rd
28 93 10
227
16
Harehedge Lane Harehedge Lane
35
219
25 162 218
66
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
447 253
Rolleston Rd
80
124124
631 185
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
304 Church Road
38 270 5
29
121
Bridge St Hillfield Lane
1919
138
141 482 154
168
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
253 Hawkins Lane
191 360
695
Horninglow Street
470 Horninglow Street
724
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
266 Derby Road
247 427 68
640
192
Horninglow Road Horninglow Street
11
676
143 535 247 278
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
144
261 21 97
239
83
Henhurst Hill Henhurst Hill
44
140
157 42 177
Postern Road 47
SATURN node 661
Hopley Road / Hanbury Road
57
7
51
80
3 123
Tutbury Road / Calais Road / Field Lane
376
246
Tutbury Road Horninglow Road
385385
406 121
144
43 61 329
22
Field Lane
42 485
Calais Road
Beamhill, Burton
2026 AM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
94 Tutbury Road
68 669 133
299
513513
Beamhill Road Harehedge Lane
105
157
223 327 21
22
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
67 Beacon Rd
35 150 3
356
183
Harehedge Lane Harehedge Lane
16
160
64 85 92
107
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
808 56
Rolleston Rd
93
323323
332 195
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
164 Church Road
75 622 27
68
199
Bridge St Hillfield Lane
55
47
159 229 63
25
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
125 Hawkins Lane
142 370
653
Horninglow Street
512 Horninglow Street
608
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
147 Derby Road
441 432 5
603
416
Horninglow Road Horninglow Street
2323
650
121 360 202 82
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
404
191 67 129
261
79
Henhurst Hill Henhurst Hill
265
228
104 131 48
Postern Road 81
SATURN node 661
Hopley Road / Hanbury Road
52
5
68
135
1 104
Tutbury Road / Calais Road / Field Lane
456
451
Tutbury Road Horninglow Road
304
233 110
140
57 15 576
43
Field Lane
11 287
Calais Road
Beamhill, Burton
2026 PM Peak Hour - DM - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
40 Tutbury Road
65 513 119
217
358358
Beamhill Road Harehedge Lane
132
237
411 535 27
19
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
28 Beacon Rd
33 86 11
259
87
Harehedge Lane Harehedge Lane
40
385
91 141 213
75
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
687 235
Rolleston Rd
67
207207
553 315
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
315 Church Road
57 275 4
47
121
Bridge St Hillfield Lane
1414
143
297 398 139
117
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
156 Hawkins Lane
81 336
963
Horninglow Street
445 Horninglow Street
844
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
292 319 197
701
385
Horninglow Road Horninglow Street
77
726
153 552 234 221
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
245
297 104 236
191
135
Henhurst Hill Henhurst Hill
158
229
169 129 174
Postern Road 45
SATURN node 661
Hopley Road / Hanbury Road
59
7
52
82
3 126
Tutbury Road / Calais Road / Field Lane
387
254
Tutbury Road Horninglow Road
396
417 124
148
44 63 338
22
Field Lane
43 499
Calais Road
Beamhill, Burton
Select link analysis
Taken from the 2016 AM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
29 Tutbury Road
29 0 0
90
278278
Beamhill Road Harehedge Lane
0
42
111 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
4 Beacon Rd
2 0 0
80
0
Harehedge Lane Harehedge Lane
0
36
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
212 0
Rolleston Rd
0
00
55 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
49 Church Road
14 0 0
9
10
Bridge St Hillfield Lane
00
10
9 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
28 Hawkins Lane
9 0
89
Horninglow Street
0 Horninglow Street
38
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
118
49
Horninglow Road Horninglow Street
00
47
0 1 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
20
24 57 16
0
0
Henhurst Hill Henhurst Hill
2
0
0 19 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
97
41
Tutbury Road / Calais Road / Field Lane
212
Tutbury Road Horninglow Road
5555
Field Lane
Calais Road
Main Road, AnslowMain Road, Anslow
42
Main Rd
98SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 PM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
10 Tutbury Road
48 0 0
52
144144
Beamhill Road Harehedge Lane
0
65
218 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
1 Beacon Rd
1 0 0
43
0
Harehedge Lane Harehedge Lane
0
55
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
110 0
Rolleston Rd
0
00
153 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
34 Church Road
4 14 0 0
1
10
Bridge St Hillfield Lane
00
30
18 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
21 Hawkins Lane
27 0
55
Horninglow Street
0 Horninglow Street
77
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
1 Derby Road
1 0 0
76
23
Horninglow Road Horninglow Street
00
105
17 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
18
11 23 0
0
0
Henhurst Hill Henhurst Hill
12
0
0 56 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
34
86
Tutbury Road / Calais Road / Field Lane
110
Tutbury Road Horninglow Road
153153
Field Lane
Calais Road
Main Road, AnslowMain Road, Anslow
87
Main Rd
34SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 AM Beamhill Model Staffordshire County Council Trip Rates - 2016 divided by 8
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
4 Tutbury Road
4 0 0
11
3535
Beamhill Road Harehedge Lane
0
5
14 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
1 Beacon Rd
0 0 0
10
0
Harehedge Lane Harehedge Lane
0
5
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
27 0
Rolleston Rd
0
00
7 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
6 Church Road
2 0 0
1
1
Bridge St Hillfield Lane
00
1
1 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
4 Hawkins Lane
1 0
11
Horninglow Street
0 Horninglow Street
5
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
15
6
Horninglow Road Horninglow Street
00
6
0 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
3
3 7 2
0
0
Henhurst Hill Henhurst Hill
0
0
0 2 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
12
0 5
Tutbury Road / Calais Road / Field Lane
27
0
Tutbury Road Horninglow Road
77
0 0
0
0 0 0
0
Field Lane
0 0
Calais Road
Main Road, AnslowMain Road, Anslow
5
Main Rd
12SATURN link 611 - 665
Beamhill, Burton
Select link analysis
Taken from the 2016 PM Beamhill Model Staffordshire County Council Trip Rates
(including Drakelow and proposed LDF sites)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road
1 Tutbury Road
6 0 0
7
1818
Beamhill Road Harehedge Lane
0
8
27 0 0
0
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
0 Beacon Rd
0 0 0
5
0
Harehedge Lane Harehedge Lane
0
7
0 0 0
0
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
14 0
Rolleston Rd
0
00
19 0
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
4 Church Road
4 2 0 0
0
1
Bridge St Hillfield Lane
00
4
2 0 0
0
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
3 Hawkins Lane
3 0
7
Horninglow Street
0 Horninglow Street
10
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
0 Derby Road
0 0 0
10
3
Horninglow Road Horninglow Street
00
13
2 0 0 0
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
2
1 3 0
0
0
Henhurst Hill Henhurst Hill
2
0
0 7 0
Postern Road 0
SATURN node 661
Hopley Road / Hanbury Road
0
0
0
4
0 11
Tutbury Road / Calais Road / Field Lane
14
0
Tutbury Road Horninglow Road
1919
0
0 0 0
0
Field Lane
0 0
Calais Road
Main Road, AnslowMain Road, Anslow
11
Main Rd
4SATURN link 611 - 665
Beamhill, Burton
2014 AM Peak Hour - DM - ACTUAL FLOWS (PCUs) + Development Traffic
Actual Flows used; flows in PCUs. Growth Factor - 0.98
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
26 Tutbury Road
13 437 42
86
B
130
Beamhill Road C Harehedge Lane
D
5353
A
72
97 292 136
195
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
58 Beacon Rd58 Beacon Rd
23 183 33
125
18
Harehedge Lane Harehedge Lane
22
148
20 73 116
245245
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston Rd
Horninglow Rd North
667 101
Rolleston Rd
172
201
256 117
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
58 Church Road
193 541 31
90
125
Bridge St Hillfield Lane
5
47
176 109 116
7
Main StSATURN node 530
Horninglow Street / Hawkins Lane
161 Hawkins Lane
166 295166 295
638
Horninglow Street
391 Horninglow Street
500
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
177 Derby Road
321 513 0
639
218
Horninglow Road Horninglow Street
0
494
77 340 202 174
Derby StreetDerby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst Hill
Hopley Road
108
66 22 83
573
89
Henhurst Hill Henhurst Hill
34
251
53 11 11
Postern Road 59
SATURN node 661
Hopley Road / Hanbury Road
49
5
6363
139
1 102
Tutbury Road / Calais Road / Field Lane
453
422
Tutbury Road Horninglow Road
291
218 103
131
53 14 539
40
Field Lane
10 268
Calais Road
Beamhill Road/ Site entrances 0.98
589 589
5 0
Beamhill RoadBeamhill Road
344 344
0 23
12 0 0 50
SATURN nodes 1172 and 1173
Beamhill, Burton
2014 PM Peak Hour - DM - ACTUAL FLOWS (PCUs) + Development Traffic
Actual Flows used; flows in PCUs Growth Factor - 0.98Actual Flows used; flows in PCUs Growth Factor - 0.98
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North arm to account for flow discrepancy)
14 Tutbury Road
13 271 40
87
B
9191
Beamhill Road Harehedge Lane
C D
35
A
77
127 466 155
99
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
3 Beacon Rd
19 93 19
153
29
Harehedge Lane Harehedge Lane
35
224
11 174 248
82
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
332 226
Rolleston Rd
61
145145
559 294
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
262 Church Road
46 290 2
34
124
Bridge St Hillfield Lane
1515
190
105 414 142
0 49
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
100 Hawkins Lane
183 391
674
Horninglow Street
275 Horninglow Street
625
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
161 Derby Road
173 327 43
547
171
Horninglow Road Horninglow Street
00
677
0
57 499 191 164
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
47
104 9 118
310
61
Henhurst Hill Henhurst Hill
69
475
67 22 29
Postern Road 19
SATURN node 661
Hopley Road / Hanbury Road
56
7
50
83
3 131
Tutbury Road / Calais Road / Field Lane
383
242
Tutbury Road Horninglow Road
397397
398 118
141
42 60 322
21
Field Lane
41 475
Calais Road
Beamhill Road/ Site entrances 0.98Beamhill Road/ Site entrances 0.98
293 293
11 0
Beamhill Road
500.8 500.8
0 41
4 0 0 264 0 0 26
SATURN nodes 1172 and 1173
Beamhill, Burton
2016 AM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
74 Tutbury Road
48 567 81
272
576576
Beamhill Road Harehedge Lane
71
183
284 296 51
32
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
145 Beacon Rd
37 172 4
284
35
Harehedge Lane Harehedge Lane
27
227
14 90 169
75
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
1033 184
Rolleston Rd
115
190190
329 111
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
231 Church Road
85 594 15
68
154
Bridge St Hillfield Lane
66
64
177 291 51
31
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
244 Hawkins Lane
323 364
710
Horninglow Street
457 Horninglow Street
558
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
114 Derby Road
559 378 5
757
340
Horninglow Road Horninglow Street
55
661
146 341 229 219
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
359
193 87 100
267
222
Henhurst Hill Henhurst Hill
96
132
67 85 41
Postern Road 112
SATURN node 661
Hopley Road / Hanbury Road
50
5
64
226
1 140
Tutbury Road / Calais Road / Field Lane
647
431
Tutbury Road Horninglow Road
345345
223 105
133
54 15 549
41
Field Lane
10 274
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
601 601
21 20
Beamhill Road
351 351
85 86
42 156 41 15642 156 41 156
SATURN nodes 1172 and 1173
Beamhill, Burton
2016 PM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
23 Tutbury Road
99 456 88
192
B
266266
Beamhill Road C Harehedge Lane
D
91
A 216
466 404 4
6
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
10 Beacon Rd
29 93 5
264
18
Harehedge Lane Harehedge Lane
35
315
26 157 194
66
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
533 229
Rolleston Rd
80
125125
666 179
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
314 Church Road
39 277 5
27
123
Bridge St Hillfield Lane
1818
164
210 464 154
168
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
255 Hawkins Lane
173 359
715
Horninglow Street
453 Horninglow Street
752
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
269 Derby Road
252 417 47
672
212
Horninglow Road Horninglow Street
11
696
149 532 260 269
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
151
266 43 96
244
84
Henhurst Hill Henhurst Hill
53
129
166 82 180
Postern Road 50
SATURN node 661
Hopley Road / Hanbury Road
57
7
51
114
3 209
Tutbury Road / Calais Road / Field Lane
486
246
Tutbury Road Horninglow Road
538538
406 121
144
43 61 329
22
Field Lane
42 485
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
299 299
34 33
Beamhill Road
511 511
122 123
17 82 16 8317 82 16 83
SATURN nodes 1172 and 1173
Beamhill, Burton
2026 AM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
AM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
133 Tutbury Road
105 620 81
398
B
621621
Beamhill Road C Harehedge Lane
D
106
A
180
307 320 14
24
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
59 Beacon Rd
37 140 1
369
192
Harehedge Lane Harehedge Lane
16
179
63 83 102
113
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
787 63
Rolleston Rd
95
325325
369 193
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
190 Church Road
85 632 64
70
182
Bridge St Hillfield Lane
44
53
168 226 62
28
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
145 Hawkins Lane
141 365
643
Horninglow Street
496 Horninglow Street
627
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
134 Derby Road
441 463 5
606
394
Horninglow Road Horninglow Street
2323
656
104 357 209 94
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
405
209 109 179
251
93
Henhurst Hill Henhurst Hill
259
221
106 148 47
Postern Road 87
SATURN node 661
Hopley Road / Hanbury Road
52
5
68
232
1 145
Tutbury Road / Calais Road / Field Lane
668
451
Tutbury Road Horninglow Road
359359
233 110
140
57 15 576
43
Field Lane
11 287
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
863 863
28 28
Beamhill Road
466 466
76 77
58 140 57 14158 140 57 141
SATURN nodes 1172 and 1173
Beamhill, Burton
2026 PM Peak Hour - Waterman Boreham Rates - ACTUAL FLOWS (PCUs)
Actual Flows used; flows in PCUsActual Flows used; flows in PCUs
PM Peak Hour
A511 Tutbury Rd/ Harehedge Ln/ Beamhill Road(Adjusted on Tutbury Road North approach to account for flow discrepancy)
48 Tutbury Road
89 503 124
255
B
483483
Beamhill Road C Harehedge Lane
D
131
A
300
547 502 24
19
Tutbury RoadSATURN node 533
Harehedge Ln/ Beacon Rd/ Rolleston Rd
28 Beacon Rd
34 86 9
294
91
Harehedge Lane Harehedge Lane
36
434
100 134 189
72
Rolleston RdSATURN node 532
Horninglow Road North/ Rolleston RdHorninglow Road North/ Rolleston Rd
Horninglow Rd North
746 236
Rolleston Rd
66
209209
593 291
Horninglow Rd NorthSATURN node 534
Hillfield Ln/ Main St/ Bridge St/ Church Rd
332 Church Road
61 278 4
42
118
Bridge St Hillfield Lane
1515
167
312 404 139
117
Main StSATURN node 530
Horninglow Street / Hawkins LaneHorninglow Street / Hawkins Lane
164 Hawkins Lane
81 367
945
Horninglow Street
453 Horninglow Street
843
SATURN node 521
Derby Road / Horninglow Road / Horninglow Street
192 Derby Road
305 320 164
723
400
Horninglow Road Horninglow Street
77
740
177 528 233 208
Derby Street
SATURN node 514
Hopley Road / Postern Road / Henhurst HillHopley Road / Postern Road / Henhurst Hill
Hopley Road
259
297 129 246
191
136
Henhurst Hill Henhurst Hill
202
228
165 172 176
Postern Road 46
SATURN node 661
Hopley Road / Hanbury Road
59
7
52
116
3 212
Tutbury Road / Calais Road / Field Lane
497
254
Tutbury Road Horninglow Road
549549
417 124
148
44 63 338
22
Field Lane
43 499
Calais Road
Beamhill Road/ Site entrancesBeamhill Road/ Site entrances
621 621
50 50
Beamhill Road
702 702
104 105
22 77 22 7722 77 22 77
SATURN nodes 1172 and 1173
1 of 62
TRAFFIC GROWTH
1. SCC has confirmed that the assessment years for the proposed development should be 2016 and 2026.
Assessments have also been undertaken for 2012 and 2014 as a sensitivity test.
2. The assessments are to be carried out based on National Roads Trafffic Forecast (NRTF) low growth rates for the local network and and will be for
the years stated above.
3. Relevant NRTF low growth indices from a 1996 base year are as follows:-
Year Indices
2007 111.37
2012 118.37
2014 121.15
2016 124.00
2026 132.00
4. The NRTF growth factors for the local highway network are therefore as follows:-
From To Indices
2007 2012 1.063
2007 2014 1.088
2012 2016 1.048
2012 2026 1.115
5. The TEMPRO 6.1 growth factor for the AM and PM peak periods for the assessment years are as follows:-
Burton upon Trent
AM Peak PM Peak
From To Production Attraction Average Production Attraction Average
2007 2012 1.069 1.036 1.052 1.055 1.026 1.040
2007 2014 1.092 1.048 1.070 1.073 1.035 1.054
2012 2016 1.044 1.025 1.034 1.035 1.017 1.026
2012 2026 1.126 1.067 1.096 1.102 1.047 1.075
GB Average
AM Peak PM Peak
From To Production Attraction Average Production Attraction Average
2007 2012 1.063 1.063 1.063 1.062 1.062 1.062
2007 2014 1.083 1.083 1.083 1.082 1.082 1.082
2012 2016 1.037 1.037 1.037 1.037 1.037 1.037
2012 2026 1.118 1.118 1.118 1.120 1.120 1.120
6. The factor to apply to the NRTF growth factor to obtain the TEMPRO adjusted low growth factor is the ratio of the Burton TEMPRO growth factor
to the GB growth factor are as follows:-
From To AM Peak PM Peak
2007 2012 0.990 0.980
2007 2014 0.989 0.974
2012 2016 0.997 0.989
2012 2026 0.981 0.959
7. The TEMPRO adjusted NRTF low growth factors for the surrounding local network for the base year (????) and future assessment year (????) are
as follows:-
From To AM Peak PM Peak
2007 2012 1.05 1.04
2007 2014 1.08 1.06
2012 2014 0.02 0.02
2012 2016 1.04 1.04
2012 2026 1.09 1.07
Final TA Traffic Flows
Growth Factors Waterman Boreham Ltd
2 of 62
Final TA Traffic Flows
Growth Factors Waterman Boreham Ltd
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 1
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use : 04 - EDUCATION
Category : A - PRIMARY
VEHICLES
Selected regions and areas:
02 SOUTH EAST
HC HAMPSHIRE 1 days
03 SOUTH WEST
DV DEVON 1 days
04 EAST ANGLIA
CA CAMBRIDGESHIRE 1 days
SF SUFFOLK 2 days
05 EAST MIDLANDS
NR NORTHAMPTONSHIRE 2 days
06 WEST MIDLANDS
WO WORCESTERSHIRE 1 days
11 SCOTLAND
FA FALKIRK 1 days
Filtering Stage 2 selection:
Parameter: Number of pupils
Range: 230 to 657 (units: )
Public Transport Provision:
Selection by: Include all surveys
Date Range: 01/01/03 to 26/11/08
Selected survey days:
Monday 1 days
Tuesday 1 days
Wednesday 4 days
Thursday 1 days
Friday 2 days
Selected survey types:
Manual count 9 days
Directional ATC Count 0 days
Selected Locations:
Suburban Area (PPS6 Out of Centre) 5
Edge of Town 3
Neighbourhood Centre (PPS6 Local Centre) 1
Selected Location Sub Categories:
Residential Zone 6
Village 1
No Sub Category 2
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 2
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
LIST OF SITES relevant to selection parameters
1 CA-04-A-01 PRIMARY SCHOOL, ST NEOTS CAMBRIDGESHIRE
LONGSANDS ROAD
ST NEOTS
Edge of Town
No Sub Category
Total Number of pupils: 3 2 5
Survey date: THURSDAY 06/03/03 Survey Type: MANUAL
2 DV-04-A-03 PRIMARY SCHOOL, PLYMOUTH DEVON
ARDEN GROVE
PENNYCROSS
PLYMOUTH
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of pupils: 2 3 0
Survey date: FRIDAY 08/07/05 Survey Type: MANUAL
3 FA-04-A-02 PRIMARY SCHOOL, NEAR FALKIRK FALKIRK
NEW HALLGLEN ROAD
HALLGLEN
NEAR FALKIRK
Neighbourhood Centre (PPS6 Local Centre)
Village
Total Number of pupils: 3 0 4
Survey date: WEDNESDAY 25/04/07 Survey Type: MANUAL
4 HC-04-A-04 PRIMARY SCHOOL, WINCHESTER HAMPSHIRE
AUSTEN AVENUE
WINCHESTER
Edge of Town
Residential Zone
Total Number of pupils: 2 3 1
Survey date: TUESDAY 20/11/07 Survey Type: MANUAL
5 NR-04-A-01 PRIMARY SCH., NORTHAMPTON NORTHAMPTONSHIRE
GRANGE ROAD
EASTFIELD PARK
NORTHAMPTON
Suburban Area (PPS6 Out of Centre)
No Sub Category
Total Number of pupils: 3 7 6
Survey date: WEDNESDAY 23/05/07 Survey Type: MANUAL
6 NR-04-A-02 PRIMARY SCHOOL, N'HAMTON NORTHAMPTONSHIRE
DAYRELL ROAD
NORTHAMPTON
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of pupils: 4 0 0
Survey date: WEDNESDAY 26/11/08 Survey Type: MANUAL
7 SF-04-A-01 PRIMARY SCHOOL, IPSWICH SUFFOLK
BELL LANE
KESGRAVE
IPSWICH
Edge of Town
Residential Zone
Total Number of pupils: 5 3 1
Survey date: FRIDAY 10/10/03 Survey Type: MANUAL
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 3
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
LIST OF SITES relevant to selection parameters (Cont.)
8 SF-04-A-02 PRIMARY SCHOOL, IPSWICH SUFFOLK
SIDEGATE LANE
IPSWICH
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of pupils: 6 5 7
Survey date: WEDNESDAY 21/05/08 Survey Type: MANUAL
9 WO-04-A-01 PRIMARY SCHOOL, DROITWICH WORCESTERSHIRE
ST PETERS CHURCH LANE
DROITWICH SPA
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of pupils: 4 4 7
Survey date: MONDAY 13/06/05 Survey Type: MANUAL
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 4
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY
VEHICLES
Calculation factor: 1 PUPILS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days PUPILS Rate Days PUPILS Rate Days PUPILS Rate
0 0 0.000 0 0 0.000 0 0 0.00000:00 - 01:00
0 0 0.000 0 0 0.000 0 0 0.00001:00 - 02:00
0 0 0.000 0 0 0.000 0 0 0.00002:00 - 03:00
0 0 0.000 0 0 0.000 0 0 0.00003:00 - 04:00
0 0 0.000 0 0 0.000 0 0 0.00004:00 - 05:00
0 0 0.000 0 0 0.000 0 0 0.00005:00 - 06:00
0 0 0.000 0 0 0.000 0 0 0.00006:00 - 07:00
9 389 0.025 9 389 0.008 9 389 0.03307:00 - 08:00
9 389 0.278 9 389 0.197 9 389 0.47508:00 - 09:00
9 389 0.018 9 389 0.036 9 389 0.05409:00 - 10:00
9 389 0.011 9 389 0.011 9 389 0.02210:00 - 11:00
9 389 0.025 9 389 0.021 9 389 0.04611:00 - 12:00
9 389 0.027 9 389 0.037 9 389 0.06412:00 - 13:00
9 389 0.017 9 389 0.020 9 389 0.03713:00 - 14:00
9 389 0.039 9 389 0.011 9 389 0.05014:00 - 15:00
9 389 0.162 9 389 0.211 9 389 0.37315:00 - 16:00
9 389 0.026 9 389 0.057 9 389 0.08316:00 - 17:00
9 389 0.017 9 389 0.028 9 389 0.04517:00 - 18:00
4 428 0.023 4 428 0.018 4 428 0.04118:00 - 19:00
0 0 0.000 0 0 0.000 0 0 0.00019:00 - 20:00
0 0 0.000 0 0 0.000 0 0 0.00020:00 - 21:00
0 0 0.000 0 0 0.000 0 0 0.00021:00 - 22:00
0 0 0.000 0 0 0.000 0 0 0.00022:00 - 23:00
0 0 0.000 0 0 0.000 0 0 0.00023:00 - 24:00
Total Rates: 0.668 0.655 1.323
Parameter summary
Trip rate parameter range selected: 230 - 657 (units: )
Survey date date range: 01/01/03 - 26/11/08
Number of weekdays (Monday-Friday): 9
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 0
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 5
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY
OGVS
Calculation factor: 1 PUPILS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days PUPILS Rate Days PUPILS Rate Days PUPILS Rate
0 0 0.000 0 0 0.000 0 0 0.00000:00 - 01:00
0 0 0.000 0 0 0.000 0 0 0.00001:00 - 02:00
0 0 0.000 0 0 0.000 0 0 0.00002:00 - 03:00
0 0 0.000 0 0 0.000 0 0 0.00003:00 - 04:00
0 0 0.000 0 0 0.000 0 0 0.00004:00 - 05:00
0 0 0.000 0 0 0.000 0 0 0.00005:00 - 06:00
0 0 0.000 0 0 0.000 0 0 0.00006:00 - 07:00
9 389 0.000 9 389 0.000 9 389 0.00007:00 - 08:00
9 389 0.000 9 389 0.000 9 389 0.00008:00 - 09:00
9 389 0.000 9 389 0.000 9 389 0.00009:00 - 10:00
9 389 0.000 9 389 0.000 9 389 0.00010:00 - 11:00
9 389 0.001 9 389 0.001 9 389 0.00211:00 - 12:00
9 389 0.001 9 389 0.000 9 389 0.00112:00 - 13:00
9 389 0.000 9 389 0.000 9 389 0.00013:00 - 14:00
9 389 0.000 9 389 0.000 9 389 0.00014:00 - 15:00
9 389 0.000 9 389 0.000 9 389 0.00015:00 - 16:00
9 389 0.000 9 389 0.000 9 389 0.00016:00 - 17:00
9 389 0.000 9 389 0.000 9 389 0.00017:00 - 18:00
4 428 0.000 4 428 0.000 4 428 0.00018:00 - 19:00
0 0 0.000 0 0 0.000 0 0 0.00019:00 - 20:00
0 0 0.000 0 0 0.000 0 0 0.00020:00 - 21:00
0 0 0.000 0 0 0.000 0 0 0.00021:00 - 22:00
0 0 0.000 0 0 0.000 0 0 0.00022:00 - 23:00
0 0 0.000 0 0 0.000 0 0 0.00023:00 - 24:00
Total Rates: 0.002 0.001 0.003
Parameter summary
Trip rate parameter range selected: 230 - 657 (units: )
Survey date date range: 01/01/03 - 26/11/08
Number of weekdays (Monday-Friday): 9
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 0
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 6
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY
PSVS
Calculation factor: 1 PUPILS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days PUPILS Rate Days PUPILS Rate Days PUPILS Rate
0 0 0.000 0 0 0.000 0 0 0.00000:00 - 01:00
0 0 0.000 0 0 0.000 0 0 0.00001:00 - 02:00
0 0 0.000 0 0 0.000 0 0 0.00002:00 - 03:00
0 0 0.000 0 0 0.000 0 0 0.00003:00 - 04:00
0 0 0.000 0 0 0.000 0 0 0.00004:00 - 05:00
0 0 0.000 0 0 0.000 0 0 0.00005:00 - 06:00
0 0 0.000 0 0 0.000 0 0 0.00006:00 - 07:00
9 389 0.000 9 389 0.000 9 389 0.00007:00 - 08:00
9 389 0.001 9 389 0.001 9 389 0.00208:00 - 09:00
9 389 0.001 9 389 0.000 9 389 0.00109:00 - 10:00
9 389 0.001 9 389 0.002 9 389 0.00310:00 - 11:00
9 389 0.001 9 389 0.001 9 389 0.00211:00 - 12:00
9 389 0.001 9 389 0.001 9 389 0.00212:00 - 13:00
9 389 0.000 9 389 0.000 9 389 0.00013:00 - 14:00
9 389 0.000 9 389 0.000 9 389 0.00014:00 - 15:00
9 389 0.001 9 389 0.001 9 389 0.00215:00 - 16:00
9 389 0.000 9 389 0.000 9 389 0.00016:00 - 17:00
9 389 0.000 9 389 0.000 9 389 0.00017:00 - 18:00
4 428 0.000 4 428 0.000 4 428 0.00018:00 - 19:00
0 0 0.000 0 0 0.000 0 0 0.00019:00 - 20:00
0 0 0.000 0 0 0.000 0 0 0.00020:00 - 21:00
0 0 0.000 0 0 0.000 0 0 0.00021:00 - 22:00
0 0 0.000 0 0 0.000 0 0 0.00022:00 - 23:00
0 0 0.000 0 0 0.000 0 0 0.00023:00 - 24:00
Total Rates: 0.006 0.006 0.012
Parameter summary
Trip rate parameter range selected: 230 - 657 (units: )
Survey date date range: 01/01/03 - 26/11/08
Number of weekdays (Monday-Friday): 9
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 0
TRICS 2011(b)v6.8.1 130711 B14.57 (C) 2011 JMP Consultants Ltd on behalf of the TRICS Consortium Friday 05/08/11
Page 7
Waterman Boreham Ltd Halifax Place Nottingham Licence No: 701710
TRIP RATE for Land Use 04 - EDUCATION/A - PRIMARY
CYCLISTS
Calculation factor: 1 PUPILS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days PUPILS Rate Days PUPILS Rate Days PUPILS Rate
0 0 0.000 0 0 0.000 0 0 0.00000:00 - 01:00
0 0 0.000 0 0 0.000 0 0 0.00001:00 - 02:00
0 0 0.000 0 0 0.000 0 0 0.00002:00 - 03:00
0 0 0.000 0 0 0.000 0 0 0.00003:00 - 04:00
0 0 0.000 0 0 0.000 0 0 0.00004:00 - 05:00
0 0 0.000 0 0 0.000 0 0 0.00005:00 - 06:00
0 0 0.000 0 0 0.000 0 0 0.00006:00 - 07:00
9 389 0.001 9 389 0.000 9 389 0.00107:00 - 08:00
9 389 0.032 9 389 0.003 9 389 0.03508:00 - 09:00
9 389 0.002 9 389 0.001 9 389 0.00309:00 - 10:00
9 389 0.000 9 389 0.000 9 389 0.00010:00 - 11:00
9 389 0.001 9 389 0.000 9 389 0.00111:00 - 12:00
9 389 0.001 9 389 0.001 9 389 0.00212:00 - 13:00
9 389 0.001 9 389 0.002 9 389 0.00313:00 - 14:00
9 389 0.000 9 389 0.001 9 389 0.00114:00 - 15:00
9 389 0.005 9 389 0.028 9 389 0.03315:00 - 16:00
9 389 0.000 9 389 0.005 9 389 0.00516:00 - 17:00
9 389 0.000 9 389 0.002 9 389 0.00217:00 - 18:00
4 428 0.000 4 428 0.000 4 428 0.00018:00 - 19:00
0 0 0.000 0 0 0.000 0 0 0.00019:00 - 20:00
0 0 0.000 0 0 0.000 0 0 0.00020:00 - 21:00
0 0 0.000 0 0 0.000 0 0 0.00021:00 - 22:00
0 0 0.000 0 0 0.000 0 0 0.00022:00 - 23:00
0 0 0.000 0 0 0.000 0 0 0.00023:00 - 24:00
Total Rates: 0.043 0.043 0.086
Parameter summary
Trip rate parameter range selected: 230 - 657 (units: )
Survey date date range: 01/01/03 - 26/11/08
Number of weekdays (Monday-Friday): 9
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 0
A511 Tutbury Road / Harehedge Lane / Beamhill Road
Scenario
PRC Max Q PRC Max Q
2012 Base - Existing Junction -5.1% 18 14.3% 10
2014 Base - Existing Junction -10.4% 22 13.3% 10
2016 Base - Existing Junction -274.4% 278 -319.2% 259
2026 Base - Existing Junction -372.4% 401 -868.1% 355
2014 Base + Dev - Existing Junction -11.3% 24 2.2% 11
2016 Base + Dev - Existing Junction -526.6% 438 -793.1% 324
2026 Base + Dev - Existing Junction -522.2% 546 -894.4% 369
2014 Base + Dev - Improved Junction 97.5% 10 102.6% 10
2016 Base + Dev - Improved Junction -61.5% 178 -23.5% 44
2026 Base + Dev - Improved Junction -85.1% 263 -172.6% 271
Horninglow Street / Hawkins Lane
`
PRC Max Q PRC Max Q
2012 Base - Existing Junction 25.2% 16 23.4% 17
2014 Base - Existing Junction 22.1% 16 18.8% 17
2016 Base - Existing Junction -1.7% 24 0.8% 23
2026 Base - Existing Junction -1.4% 21 -16.7% 61
2014 Base + Dev - Existing Junction 20.4% 17 19.7% 18
2016 Base + Dev - Existing Junction -0.6% 22 1.0% 23
2026 Base + Dev - Existing Junction 2.0% 20 -19.3% 60
AM Peak PM Peak
AM Peak PM Peak
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.112 0 0.11 0.008 0 0.13 0.114 0 0.12 0.008 0 0.16 0.119 0 0.12 0.008 0 0.13 0.367 1 0.19 0.029 0 0.15 0.872 4 0.52 0.046 0 0.19 1.063 20 1.29 0.952 2 1.23 1.093 24 1.57 0.963 4 3.78
0.327 1 0.18 0.442 1 0.21 0.336 1 0.18 0.452 1 0.31 0.362 1 0.19 0.468 1 0.22 0.689 2 0.33 0.625 2 0.28 0.922 7 0.63 0.747 3 0.36 1.047 15 1.40 0.989 12 0.86 1.076 17 1.67 1.130 28 2.12
0.244 0 0.14 0.544 1 0.2 0.251 0 0.14 0.555 2 0.20 0.253 0 0.14 0.557 2 0.20 0.457 1 0.18 0.503 1 0.19 0.401 1 0.18 0.455 1 0.18 0.216 0 0.15 0.539 2 0.21 0.238 0 0.15 0.495 1 0.20
0.549 1 0.21 0.297 0 0.2 0.569 1 0.21 0.329 1 0.25 0.578 1 0.22 0.361 1 0.23 0.276 0 0.18 0.258 0 0.19 0.311 0 0.21 0.936 5 1.54 0.274 0 0.16 1.306 14 7.34 0.315 0 0.17 1.441 18 10.26
0.473 1 0.24 0.754 3 0.4 0.490 1 0.24 0.778 3 0.49 0.503 1 0.25 0.802 4 0.46 0.689 2 0.35 0.757 3 0.40 0.767 3 0.41 1.031 17 1.13 0.538 1 0.27 1.372 76 6.37 0.605 2 0.30 1.504 115 9.34
0.049 0 0.12 0.044 0 0.14 0.051 0 0.12 0.044 0 0.14 0.051 0 0.12 0.044 0 0.14 0.107 0 0.14 0.064 0 0.14 0.085 0 0.14 0.071 0 0.14 0.078 0 0.14 0.093 0 0.16 0.082 0 0.13 0.103 0 0.17
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.169 0 0.16 0.69 2 0.28 0.186 0 0.17 0.728 3 0.31 0.213 0 0.18 0.754 3 0.33 0.986 10 0.84 0.948 8 0.57 1.021 12 0.99 0.997 12 0.75 1.006 9 1.00 1.034 15 0.95 1.029 11 1.10 1.068 19 1.17
0.693 2 0.38 0.601 1 0.34 0.721 2 0.40 0.640 2 0.36 0.734 3 0.42 0.668 2 0.38 0.989 10 0.97 0.938 6 0.71 1.022 12 1.16 0.972 7 0.94 1.008 12 1.01 1.003 9 1.15 1.033 13 1.18 1.032 10 1.44
0.365 1 0.2 0.45 2 0.2 0.381 1 0.21 0.466 2 0.20 0.382 1 0.21 0.467 2 0.20 0.198 1 0.20 0.552 2 0.22 0.202 1 0.21 0.588 3 0.23 0.248 1 0.22 0.548 3 0.22 0.252 1 0.22 0.559 3 0.23
0.218 0 0.22 0.832 4 0.52 0.228 0 0.23 0.862 5 0.57 0.237 0 0.23 0.877 5 0.60 0.398 1 0.26 0.954 9 0.71 0.406 1 0.27 1.096 24 1.52 0.324 1 0.25 0.893 6 0.58 0.361 1 0.27 1.011 13 0.96
0.579 2 0.21 0.132 0 0.18 0.600 3 0.22 0.134 0 0.18 0.607 3 0.22 0.140 0 0.18 0.245 1 0.18 0.118 0 0.18 0.305 1 0.18 0.129 0 0.19 0.266 1 0.17 0.186 0 0.19 0.317 1 0.18 0.206 1 0.19
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
1.004 14 0.93 0.512 1 0.22 1.041 19 1.16 0.534 1 0.23 1.062 22 1.31 0.545 1 0.23 1.155 29 2.13 0.591 1 0.27 1.147 28 2.03 0.634 2 0.30 1.181 42 2.57 1.022 11 0.82 1.189 44 2.69 1.078 15 1.04
0.275 0 0.18 0.628 3 0.38 0.333 1 0.18 0.974 21 0.72 0.340 1 0.18 0.990 25 0.82 0.467 1 0.26 0.721 5 0.30 0.448 1 0.25 0.747 6 0.33 0.634 3 0.28 1.177 84 2.95 0.641 3 0.28 1.165 82 2.74
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.932 10 0.3 0.929 9 0.4 0.967 14 0.37 0.958 11 0.46 0.978 16 0.41 0.969 12 0.49 1.218 103 3.60 1.327 133 6.64 1.210 99 3.54 1.305 122 6.32 1.072 43 1.13 1.591 289 15.64 1.121 61 1.69 1.549 264 14.36
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0.944 10 0.37 0.922 9 0.29 0.982 15 0.47 0.945 11 0.34 0.993 16 0.50 0.961 13 0.37 1.265 120 4.98 1.091 57 1.47 1.358 170 7.17 1.114 66 1.84 1.314 117 4.89 1.083 53 1.39 1.321 125 5.45 1.101 60 1.68
0.49 1 0.07 0.699 2 0.12 0.504 1 0.07 0.716 3 0.12 0.505 1 0.07 0.723 3 0.13 0.632 2 0.10 0.877 6 0.22 0.640 2 0.11 0.899 8 0.24 0.599 2 0.10 0.921 9 0.27 0.583 2 0.09 0.930 10 0.29
0.937 11 0.29 0.915 9 0.28 0.967 16 0.36 0.938 11 0.32 0.987 20 0.42 0.951 13 0.34 1.165 102 2.18 1.265 136 3.73 1.177 110 2.41 1.337 174 5.11 1.138 87 1.77 1.443 260 7.51 1.109 71 1.38 1.495 311 8.87
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.129 0 0.13 0.203 0 0.15 0.134 0 0.13 0.207 0 0.16 0.138 0 0.13 0.225 0 0.16 0.284 0 0.15 0.555 1 0.24 0.340 1 0.16 0.834 4 0.39 4.866 108 16.37 1.719 88 11.16 4.430 123 18.81 2.687 189 31.90
0.046 0 0.21 0.124 0 0.23 0.047 0 0.21 0.130 0 0.24 0.048 0 0.22 0.131 0 0.24 0.139 0 0.21 0.653 2 0.36 0.213 0 0.28 0.858 4 0.60 4.823 22 16.77 1.703 52 11.31 4.216 24 20.28 2.657 99 32.25
0.133 0 0.19 0.269 1 0.17 0.139 0 0.19 0.276 1 0.17 0.149 0 0.19 0.303 1 0.18 0.536 2 0.23 0.235 1 0.16 0.583 2 0.27 0.368 1 0.18 0.914 12 1.04 0.698 4 0.33 0.915 12 1.01 0.780 6 0.46
0.525 1 0.29 0.681 2 0.35 0.547 1 0.30 0.701 2 0.37 0.586 1 0.32 0.722 2 0.38 0.959 9 0.84 1.214 44 3.59 1.688 86 8.12 1.351 69 6.09 2.605 194 23.60 2.628 407 38.00 3.383 328 40.19 3.744 538 68.45
0.36 1 0.18 0.212 1 0.18 0.378 1 0.18 0.218 1 0.18 0.404 1 0.18 0.228 1 0.18 0.560 1 0.21 0.247 1 0.15 0.722 4 0.31 0.287 1 0.15 0.311 1 0.18 0.466 1 0.20 0.368 1 0.20 0.457 1 0.20
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.002 0 0.10 0.005 0 0.10 0.002 0 0.10 0.005 0 0.10 0.002 0 0.10 0.005 0 0.10 0.002 0 0.10 0.005 0 0.10 0.002 0 0.10 0.006 0 0.11 0.002 0 0.10 0.005 0 0.10 0.002 0 0.10 0.006 0 0.11
0.197 0 0.14 0.247 0 0.14 0.204 0 0.14 0.256 0 0.14 0.215 0 0.14 0.277 0 0.15 0.211 0 0.14 0.258 0 0.14 0.304 0 0.16 0.442 1 0.18 0.222 0 0.14 0.265 0 0.14 0.316 1 0.16 0.449 1 0.18
0.010 0 0.11 0.014 0 0.11 0.010 0 0.11 0.014 0 0.11 0.010 0 0.11 0.014 0 0.11 0.010 0 0.11 0.014 0 0.11 0.011 0 0.11 0.014 0 0.11 0.010 0 0.11 0.014 0 0.11 0.011 0 0.11 0.014 0 0.11
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.101 0 0.11 0.088 0 0.12 0.106 0 0.11 0.091 0 0.12 0.106 0 0.11 0.091 0 0.12 0.106 0 0.11 0.093 0 0.12 0.106 0 0.11 0.093 0 0.12 0.113 0 0.11 0.096 0 0.12 0.113 0 0.11 0.096 0 0.12
0.123 0 0.18 0.074 0 0.19 0.128 0 0.18 0.079 0 0.19 0.128 0 0.18 0.079 0 0.19 0.132 0 0.18 0.080 0 0.19 0.132 0 0.18 0.080 0 0.19 0.142 0 0.19 0.082 0 0.19 0.142 0 0.19 0.082 0 0.19
0.028 0 0.11 0.131 0 0.14 0.030 0 0.11 0.137 0 0.14 0.030 0 0.11 0.137 0 0.14 0.030 0 0.11 0.137 0 0.14 0.030 0 0.11 0.137 0 0.14 0.030 0 0.11 0.143 0 0.14 0.030 0 0.11 0.143 0 0.14
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
0.468 1 0.17 0.923 8 0.49 0.467 1 0.18 0.987 12 0.67 0.498 1 0.18 1.011 15 0.77 0.480 1 0.18 1.010 15 0.76 0.680 2 0.24 1.173 36 2.31 0.569 1 0.20 1.057 21 1.03 1.080 11 0.58 1.235 46 2.84
0.425 1 0.28 0.846 4 0.6 0.505 1 0.31 0.948 6 0.93 0.524 1 0.32 0.950 7 1.10 0.526 1 0.32 0.950 7 1.09 0.772 3 0.58 1.118 12 2.65 0.648 2 0.42 0.996 8 1.37 1.022 6 1.03 1.187 15 3.19
0.887 11 0.81 0.535 2 0.29 0.920 15 0.96 0.555 2 0.30 0.923 16 1.01 0.560 2 0.31 0.933 17 1.04 0.561 2 0.31 0.959 25 1.46 0.608 3 0.42 0.987 27 1.43 0.584 2 0.33 1.014 41 2.08 0.633 3 0.49
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
- - - - - - - - - - - - 0.160 0 0.18 0.082 0 0.17 *** - - - - - 0.609 2 0.31 0.316 1 0.21 - - - - - - 0.747 3 0.45 0.452 1 0.32
- - - - - - - - - - - - 0.000 0 0.00 0.000 0 0.00 - - - - - - 0.043 0 0.12 0.079 0 0.14 - - - - - - 0.126 0 0.12 0.213 1 0.20
RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay RFC Q Delay
- - - - - - - - - - - - 0.023 0 0.10 0.008 0 0.11 - - - - - - 0.611 2 0.31 0.315 1 0.21 - - - - - - 0.744 3 0.45 0.451 1 0.32
- - - - - - - - - - - - 0.010 0 0.11 0.025 0 0.12 - - - - - - 0.045 0 0.12 0.082 0 0.14 - - - - - - 0.064 0 0.14 0.133 0 0.17
PM AM PM AM PMAM PM AM PM AM PM AM PM AM
PM AM PM AM PM
2012 2014 2014 + Dev 2016 2016 + Dev 2026 2026 + Dev
AM PM AM PM AM PM AM PM AM
PM AM PM AM PM
2012 2014 2014 + Dev 2016 2016 + Dev 2026 2026 + Dev
AM PM AM PM AM PM AM PM AM
PM AM PM AM PM
2012 2014 2014 + Dev 2016 2016 + Dev 2026 2026 + Dev
AM PM AM PM AM PM AM PM AM
AM PMAM PM AM PM AM PM
2012 2014 2014 + Dev 2016 2016 + Dev 2026 2026 + Dev
2014 2014 + Dev 2016 2016 + Dev 2026 2026 + Dev
AM PM AM
AM PM AM PM AM PM
AM PM AM
2016 2016 + Dev 2026
PM
2026 + Dev
AM PM AM PM AM PM
AM PM
2014 + Dev 2016 2016 + Dev 2026 2026 + Dev
AM PM AM PM AM PM
AM PM
2016 2016 + Dev 2026 2026 + Dev
2016 2016 + Dev 2026 2026 + Dev
Harehedge Lane / Rolleston Road / Bitham Lane Junction
Movement
2014 2014 + Dev
Movement
2014 2014 + Dev
Approach
Beamhill Road (West) to Western Site Access / Beamhill Road (East)
Western Site Access / Beamhill Road Junction
AM PM AM PM
2014 2014 + Dev
2014
Western Site Access to Beamhill Road (East) / Beamhill Road (West)
Eastern Site Access to Beamhill Road (East) / Beamhill Road (West)
Beamhill Road (West) to Eastern Site Access / Beamhill Road (East)
Movement
Movement
Calais Road to Horninglow Road
Tutbury Road to Calais Road / Horninglow Road
Eastern Site Access / Beamhill Road Junction
Harehedge Lane to Bitham Lane / Rolleston Road (South)
Rolleston Road (South) to Harehedge Lane / Bitham Lane / Rolleston Road (North)
Bitham Lane to Rolleston Road (South)
Bitham Lane to Harehedge Lane / Rolleston Road (North)
Rolleston Road (North) to Harehedge Lane / Bitham Lane / Rolleston road (South)
Tutbury Road / Calais Road Junction
Calais Road to Tutbury Road
Movement
Field Lane to Calais Road (North)
Field Lane to Calais Road (South)
Calais Road (North) to Field Lane / Calais Road (South)
Hopley Road to Hanbury Road (West)
Hanbury Road (West) to Hopley Road / Hanbury Road (East)
Calais Road / Field Lane Junction
Hopley Road to Hanbury Road (East)
Movement
Movement
Postern Road to Henhurst Hill (West) / Hopley Road
Postern Road to Henhurst Hill (East)
A511 Horninglow Road North / Rolleston Road Junction
Rolleston Road to A511 (North) / A511 (South)
Arm C - A511 (South)
Arm D - Derby Road (West)
A511 (South) to A511 (North) / Rolleston Road
Hanbury Road / Hopley Road Junction
Hopley Road to Henhurst Hill (East) / Postern Road / Henhurst Hill (West)
Henhurst Hill (West) / Hopley Road to Henhurst Hill (East) / Postern Road
Arm E - A511 (North)
Hopley Road / Henhurst Hill / Postern Road Junction
Henhurst Hill (East) / Postern Road to Henhurst Hill (West) / Hopley Road
Approach
Derby Turn Roundabout
Arm A - Derby Road (North)
Arm B - Little Burton East
Hillfield Lane to Main Street / Bridge Street / Church Road
Church Road to Main Street / Bridge Street / Hillfield Lane
Bridge Street / Church Road / Hillfield Lane / Main Street Junction
AM PM
AM PM AM PM AM PM AM PM AM PM
Bridge Street to Church Road
Bridge Street to Main Street / Hillfield Lane
Main Street to Bridge Street / Church Road / Main Street
Movement
Harehedge Lane to Rolleston Road (North)
AM PM
2026 2026 + Dev
AM PM AM PM AM PM AM PM
2014 2014 + Dev 2016 2016 + Dev
PM AM PM AM PM AM PM AM PM
2012
AM PM
AM PM
PMAM
AM PM
PMAM
AM PM
2012
2012
2012
2012
2012
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpi"(drive-on-the-left) at 14:14:14 on Monday, 21 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 Beamhill Road / Western Site Access Base 2016 + Full Dev LOCATION : DATE : 21/11/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Beamhill Road (East) ARM B IS Western Site Access ARM C IS Beamhill Road (West)
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- -------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I -------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.20 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I I - VISIBILITY I (VC-B) 90.00 M. I I - BLOCKS TRAFFIC I YES I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 59.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 59.0 M. I I - LANE 1 WIDTH I (WB-C) 3.25 M. I I - LANE 2 WIDTH I (WB-A) 0.00 M. I -------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2014 + Dev 120 Units AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 4.30 I 6.45 I 4.30 I I ARM B I 15.00 I 45.00 I 75.00 I 0.15 I 0.23 I 0.15 I I ARM C I 15.00 I 45.00 I 75.00 I 7.43 I 11.14 I 7.43 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 3 -------------------------------------------------------------------------------- Demand set: 218029 Beamhill Road / Western Site Access Base 2014 + Dev 120 Units AM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 07.45 - 08.00 I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I I I I 0.0 I 0.0 I 344.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I I I I 0.0 I 0.0 I 12.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.992 I 0.008 I 0.000 I I I I 589.0 I 5.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-AC 0.15 10.17 0.015 0.00 0.01 0.2 0.10 I I C-AB 0.06 9.40 0.007 0.00 0.01 0.1 0.11 I I A-B 0.00 I I A-C 4.32 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-AC 0.18 9.95 0.018 0.01 0.02 0.3 0.10 I I C-AB 0.07 9.20 0.008 0.01 0.01 0.1 0.11 I I A-B 0.00 I I A-C 5.15 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-AC 0.22 9.65 0.023 0.02 0.02 0.3 0.11 I I C-AB 0.09 8.92 0.010 0.01 0.01 0.2 0.11 I I A-B 0.00 I I A-C 6.31 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-AC 0.22 9.65 0.023 0.02 0.02 0.3 0.11 I I C-AB 0.09 8.92 0.010 0.01 0.01 0.2 0.11 I I A-B 0.00 I I A-C 6.31 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-AC 0.18 9.95 0.018 0.02 0.02 0.3 0.10 I I C-AB 0.07 9.20 0.008 0.01 0.01 0.1 0.11 I I A-B 0.00 I I A-C 5.15 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-AC 0.15 10.17 0.015 0.02 0.02 0.2 0.10 I I C-AB 0.06 9.40 0.007 0.01 0.01 0.1 0.11 I I A-B 0.00 I I A-C 4.32 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.0 08.30 0.0 08.45 0.0 09.00 0.0 09.15 0.0
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.0 08.30 0.0 08.45 0.0 09.00 0.0 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 6 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 16.5 I 11.0 I 1.7 I 0.10 I 1.7 I 0.10 I I C-AB I 6.9 I 4.6 I 0.8 I 0.11 I 0.8 I 0.11 I I A-B I 0.0 I 0.0 I I I I I I A-C I 473.5 I 315.7 I I I I I --------------------------------------------------------------------------- I ALL I 1307.6 I 871.7 I 2.5 I 0.00 I 2.5 I 0.00 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2014 + Dev 120 Units PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 7 -------------------------------------------------------------------------------- DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 6.26 I 9.39 I 6.26 I I ARM B I 15.00 I 45.00 I 75.00 I 0.05 I 0.08 I 0.05 I I ARM C I 15.00 I 45.00 I 75.00 I 3.80 I 5.70 I 3.80 I ------------------------------------------------------------------------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2014 + Dev 120 Units PM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 16.45 - 17.00 I I I I I I I ARM A I 0.000 I 0.000 I 1.000 I I I I 0.0 I 0.0 I 501.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.000 I 0.000 I 1.000 I I I I 0.0 I 0.0 I 4.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.964 I 0.036 I 0.000 I I I I 293.0 I 11.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-AC 0.05 9.66 0.005 0.00 0.01 0.1 0.10 I I C-AB 0.14 8.92 0.015 0.00 0.02 0.2 0.11 I I A-B 0.00 I I A-C 6.29 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-AC 0.06 9.34 0.006 0.01 0.01 0.1 0.11 I I C-AB 0.16 8.63 0.019 0.02 0.02 0.3 0.12 I I A-B 0.00 I I A-C 7.51 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-AC 0.07 8.90 0.008 0.01 0.01 0.1 0.11 I I C-AB 0.20 8.22 0.025 0.02 0.03 0.4 0.12 I I A-B 0.00 I I A-C 9.19 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 9 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-AC 0.07 8.90 0.008 0.01 0.01 0.1 0.11 I I C-AB 0.20 8.22 0.025 0.03 0.03 0.4 0.12 I I A-B 0.00 I I A-C 9.19 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-AC 0.06 9.34 0.006 0.01 0.01 0.1 0.11 I I C-AB 0.16 8.63 0.019 0.03 0.02 0.3 0.12 I I A-B 0.00 I I A-C 7.51 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-AC 0.05 9.66 0.005 0.01 0.01 0.1 0.10 I I C-AB 0.14 8.92 0.015 0.02 0.02 0.2 0.11 I I A-B 0.00 I I A-C 6.29 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.0 17.15 0.0 17.30 0.0 17.45 0.0 18.00 0.0 18.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2014 + Dev 120 Units.vpo - Page 10 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 5.5 I 3.7 I 0.6 I 0.11 I 0.6 I 0.11 I I C-AB I 15.1 I 10.1 I 1.8 I 0.12 I 1.8 I 0.12 I I A-B I 0.0 I 0.0 I I I I I I A-C I 689.6 I 459.7 I I I I I --------------------------------------------------------------------------- I ALL I 1113.5 I 742.4 I 2.4 I 0.00 I 2.4 I 0.00 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:50:19 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpi"(drive-on-the-left) at 14:16:11 on Monday, 21 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 Beamhill Road / Western Site Access Base 2016 + Full Dev LOCATION : DATE : 21/11/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Beamhill Road (East) ARM B IS Western Site Access ARM C IS Beamhill Road (West)
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- -------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I -------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.20 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I I - VISIBILITY I (VC-B) 90.00 M. I I - BLOCKS TRAFFIC I YES I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 59.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 59.0 M. I I - LANE 1 WIDTH I (WB-C) 3.25 M. I I - LANE 2 WIDTH I (WB-A) 0.00 M. I -------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2016 + Full Dev AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 5.45 I 8.17 I 5.45 I I ARM B I 15.00 I 45.00 I 75.00 I 2.47 I 3.71 I 2.47 I I ARM C I 15.00 I 45.00 I 75.00 I 7.78 I 11.66 I 7.78 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 3 -------------------------------------------------------------------------------- Demand set: 218029 Beamhill Road / Western Site Access Base 2016 + Full Dev AM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 07.45 - 08.00 I I I I I I I ARM A I 0.000 I 0.195 I 0.805 I I I I 0.0 I 85.0 I 351.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.788 I 0.000 I 0.212 I I I I 156.0 I 0.0 I 42.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.966 I 0.034 I 0.000 I I I I 601.0 I 21.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-AC 2.48 7.06 0.352 0.00 0.53 7.5 0.22 I I C-AB 0.26 9.12 0.029 0.00 0.03 0.4 0.11 I I A-B 1.07 I I A-C 4.40 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-AC 2.97 6.60 0.450 0.53 0.79 11.3 0.27 I I C-AB 0.31 8.86 0.035 0.03 0.04 0.6 0.12 I I A-B 1.27 I I A-C 5.26 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-AC 3.63 5.95 0.611 0.79 1.47 20.1 0.42 I I C-AB 0.39 8.51 0.045 0.04 0.05 0.7 0.12 I I A-B 1.56 I I A-C 6.44 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-AC 3.63 5.95 0.611 1.47 1.52 22.5 0.43 I I C-AB 0.39 8.51 0.045 0.05 0.05 0.8 0.12 I I A-B 1.56 I I A-C 6.44 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-AC 2.97 6.60 0.450 1.52 0.84 13.5 0.28 I I C-AB 0.31 8.86 0.035 0.05 0.04 0.6 0.12 I I A-B 1.27 I I A-C 5.26 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-AC 2.48 7.06 0.352 0.84 0.55 8.7 0.22 I I C-AB 0.26 9.12 0.029 0.04 0.03 0.5 0.11 I I A-B 1.07 I I A-C 4.40 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.5 * 08.15 0.8 * 08.30 1.5 * 08.45 1.5 ** 09.00 0.8 * 09.15 0.6 *
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.0 08.30 0.0 08.45 0.1 09.00 0.0 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 6 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 272.5 I 181.7 I 83.6 I 0.31 I 83.6 I 0.31 I I C-AB I 28.9 I 19.3 I 3.6 I 0.12 I 3.6 I 0.12 I I A-B I 117.0 I 78.0 I I I I I I A-C I 483.1 I 322.1 I I I I I --------------------------------------------------------------------------- I ALL I 1728.8 I 1152.5 I 87.2 I 0.05 I 87.2 I 0.05 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2016 + Full Dev PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 7 -------------------------------------------------------------------------------- DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 7.91 I 11.87 I 7.91 I I ARM B I 15.00 I 45.00 I 75.00 I 1.24 I 1.86 I 1.24 I I ARM C I 15.00 I 45.00 I 75.00 I 4.16 I 6.24 I 4.16 I ------------------------------------------------------------------------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2016 + Full Dev PM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 16.45 - 17.00 I I I I I I I ARM A I 0.000 I 0.193 I 0.807 I I I I 0.0 I 122.0 I 511.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.828 I 0.000 I 0.172 I I I I 82.0 I 0.0 I 17.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.898 I 0.102 I 0.000 I I I I 299.0 I 34.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-AC 1.24 6.90 0.180 0.00 0.22 3.1 0.18 I I C-AB 0.43 8.52 0.050 0.00 0.05 0.8 0.12 I I A-B 1.53 I I A-C 6.41 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-AC 1.48 6.42 0.231 0.22 0.30 4.3 0.20 I I C-AB 0.51 8.15 0.062 0.05 0.07 1.0 0.13 I I A-B 1.83 I I A-C 7.66 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-AC 1.82 5.76 0.315 0.30 0.45 6.4 0.25 I I C-AB 0.62 7.64 0.082 0.07 0.09 1.4 0.14 I I A-B 2.24 I I A-C 9.38 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 9 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-AC 1.82 5.76 0.315 0.45 0.46 6.8 0.25 I I C-AB 0.62 7.64 0.082 0.09 0.09 1.4 0.14 I I A-B 2.24 I I A-C 9.38 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-AC 1.48 6.42 0.231 0.46 0.31 4.8 0.20 I I C-AB 0.51 8.15 0.062 0.09 0.07 1.0 0.13 I I A-B 1.83 I I A-C 7.66 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-AC 1.24 6.89 0.180 0.31 0.22 3.5 0.18 I I C-AB 0.43 8.52 0.050 0.07 0.05 0.8 0.12 I I A-B 1.53 I I A-C 6.41 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.2 17.15 0.3 17.30 0.4 17.45 0.5 18.00 0.3 18.15 0.2
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.1 17.45 0.1 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2016 + Full Dev.vpo - Page 10 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 136.3 I 90.8 I 28.8 I 0.21 I 28.9 I 0.21 I I C-AB I 46.8 I 31.2 I 6.5 I 0.14 I 6.5 I 0.14 I I A-B I 167.9 I 111.9 I I I I I I A-C I 703.4 I 468.9 I I I I I --------------------------------------------------------------------------- I ALL I 1465.9 I 977.3 I 35.3 I 0.02 I 35.3 I 0.02 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:50:43 on 21/12/2011]
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 1 -------------------------------------------------------------------------------- TRL LIMITED (C) COPYRIGHT 2006 CAPACITIES, QUEUES, AND DELAYS AT 3 OR 4-ARM MAJOR/MINOR PRIORITY JUNCTIONS PICADY 5.1 ANALYSIS PROGRAM RELEASE 4.0 (SEPT 2008) ADAPTED FROM PICADY/3 WHICH IS CROWN COPYRIGHT BY PERMISSION OF THE CONTROLLER OF HMSO -------------------------------------------------------- FOR SALES AND DISTRIBUTION INFORMATION, PROGRAM ADVICE AND MAINTENANCE CONTACT: TRL SOFTWARE BUREAU TEL: CROWTHORNE (01344) 770758, FAX: 770356 EMAIL: [email protected] -------------------------------------------------------- THE USER OF THIS COMPUTER PROGRAM FOR THE SOLUTION OF AN ENGINEERING PROBLEM IS IN NO WAY RELIEVED OF HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF THE SOLUTION Run with file:- "Q:\Projects\Projects 218000-218087\218029 - Beamhill Road Burton\Calcs\PICADY\ Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpi"(drive-on-the-left) at 14:03:43 on Monday, 21 November 2011
RUN INFORMATION *************** RUN TITLE : 218029 Beamhill Road / Western Site Access LOCATION : DATE : 21/11/11 CLIENT : ENUMERATOR : carlh [NOTT-3C404F8E] JOB NUMBER : STATUS : DESCRIPTION :
MAJOR/MINOR JUNCTION CAPACITY AND DELAY *************************************** INPUT DATA ---------- MAJOR ROAD (ARM C) --------------------- MAJOR ROAD (ARM A) I I I I I I MINOR ROAD (ARM B) ARM A IS Beamhill Road (East) ARM B IS Western Site Access ARM C IS Beamhill Road (West)
STREAM LABELLING CONVENTION --------------------------- STREAM A-B CONTAINS TRAFFIC GOING FROM ARM A TO ARM B STREAM B-AC CONTAINS TRAFFIC GOING FROM ARM B TO ARM A AND TO ARM C ETC.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 2 -------------------------------------------------------------------------------- GEOMETRIC DATA -------------- -------------------------------------------------------------------------------------- I DATA ITEM I MINOR ROAD B I -------------------------------------------------------------------------------------- I TOTAL MAJOR ROAD CARRIAGEWAY WIDTH I ( W ) 6.20 M. I I CENTRAL RESERVE WIDTH I (WCR ) 0.00 M. I I I I I MAJOR ROAD RIGHT TURN - WIDTH I (WC-B) 2.20 M. I I - VISIBILITY I (VC-B) 90.00 M. I I - BLOCKS TRAFFIC I YES I I I I I MINOR ROAD - VISIBILITY TO LEFT I (VB-C) 59.0 M. I I - VISIBILITY TO RIGHT I (VB-A) 59.0 M. I I - LANE 1 WIDTH I (WB-C) 3.25 M. I I - LANE 2 WIDTH I (WB-A) 0.00 M. I -------------------------------------------------------------------------------------- .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2026 + Full Dev AM TIME PERIOD BEGINS 07.45 AND ENDS 09.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 6.78 I 10.16 I 6.78 I I ARM B I 15.00 I 45.00 I 75.00 I 2.47 I 3.71 I 2.47 I I ARM C I 15.00 I 45.00 I 75.00 I 11.14 I 16.71 I 11.14 I ------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 3 -------------------------------------------------------------------------------- Demand set: 218029 Beamhill Road / Western Site Access Base 2026 + Full Dev AM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 07.45 - 08.00 I I I I I I I ARM A I 0.000 I 0.140 I 0.860 I I I I 0.0 I 76.0 I 466.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.707 I 0.000 I 0.293 I I I I 140.0 I 0.0 I 58.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.969 I 0.031 I 0.000 I I I I 863.0 I 28.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 1
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 07.45-08.00 I I B-AC 2.48 6.44 0.386 0.00 0.61 8.5 0.25 I I C-AB 0.35 8.80 0.040 0.00 0.04 0.6 0.12 I I A-B 0.95 I I A-C 5.85 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.00-08.15 I I B-AC 2.97 5.80 0.512 0.61 1.00 14.0 0.35 I I C-AB 0.42 8.48 0.049 0.04 0.06 0.8 0.12 I I A-B 1.14 I I A-C 6.98 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.15-08.30 I I B-AC 3.63 4.88 0.744 1.00 2.47 31.5 0.70 I I C-AB 0.51 8.04 0.064 0.06 0.08 1.1 0.13 I I A-B 1.39 I I A-C 8.55 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.30-08.45 I I B-AC 3.63 4.88 0.744 2.47 2.65 38.7 0.77 I I C-AB 0.51 8.04 0.064 0.08 0.08 1.2 0.13 I I A-B 1.39 I I A-C 8.55 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 5 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 08.45-09.00 I I B-AC 2.97 5.80 0.512 2.65 1.10 18.5 0.38 I I C-AB 0.42 8.48 0.049 0.08 0.06 0.8 0.12 I I A-B 1.14 I I A-C 6.98 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 09.00-09.15 I I B-AC 2.48 6.44 0.386 1.10 0.65 10.3 0.26 I I C-AB 0.35 8.80 0.040 0.06 0.04 0.7 0.12 I I A-B 0.95 I I A-C 5.85 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.6 * 08.15 1.0 * 08.30 2.5 ** 08.45 2.7 *** 09.00 1.1 * 09.15 0.6 *
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 08.00 0.0 08.15 0.1 08.30 0.1 08.45 0.1 09.00 0.1 09.15 0.0
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 6 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 272.5 I 181.7 I 121.5 I 0.45 I 121.5 I 0.45 I I C-AB I 38.5 I 25.7 I 5.3 I 0.14 I 5.3 I 0.14 I I A-B I 104.6 I 69.7 I I I I I I A-C I 641.4 I 427.6 I I I I I --------------------------------------------------------------------------- I ALL I 2245.0 I 1496.6 I 126.8 I 0.06 I 126.8 I 0.06 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* .SLOPES AND INTERCEPT -------------------- (NB:Streams may be combined, in which case capacity will be adjusted) --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM B-C STREAM A-C STREAM A-B I --------------------------------------------------------- I 677.63 0.26 0.10 I --------------------------------------------------------- -------------------------------------------------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing Slope For Opposing Slope For OpposingI I STREAM B-A STREAM A-C STREAM A-B STREAM C-A STREAM C-B I -------------------------------------------------------------------------------------------------- I 539.16 0.25 0.10 0.15 0.35 I -------------------------------------------------------------------------------------------------- --------------------------------------------------------- I Intercept For Slope For Opposing Slope For Opposing I I STREAM C-B STREAM A-C STREAM A-B I --------------------------------------------------------- I 626.08 0.24 0.24 I --------------------------------------------------------- (NB These values do not allow for any site specific corrections)
TRAFFIC DEMAND DATA ------------------- ----------------------- I ARM I FLOW SCALE(%) I ----------------------- I A I 100 I I B I 100 I I C I 100 I -----------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2026 + Full Dev PM TIME PERIOD BEGINS 16.45 AND ENDS 18.15 LENGTH OF TIME PERIOD - 90 MIN. LENGTH OF TIME SEGMENT - 15 MIN.
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 7 -------------------------------------------------------------------------------- DEMAND FLOW PROFILES ARE SYNTHESISED FROM TURNING COUNT DATA ------------------------------------------------------------------------------------ I I NUMBER OF MINUTES FROM START WHEN I RATE OF FLOW (VEH/MIN) I I ARM I FLOW STARTS I TOP OF PEAK I FLOW STOPS I BEFORE I AT TOP I AFTER I I I TO RISE I IS REACHED I FALLING I PEAK I OF PEAK I PEAK I I I I I I I I I ------------------------------------------------------------------------------------ I ARM A I 15.00 I 45.00 I 75.00 I 10.07 I 15.11 I 10.07 I I ARM B I 15.00 I 45.00 I 75.00 I 1.24 I 1.86 I 1.24 I I ARM C I 15.00 I 45.00 I 75.00 I 8.39 I 12.58 I 8.39 I ------------------------------------------------------------------------------------
Demand set: 218029 Beamhill Road / Western Site Access Base 2026 + Full Dev PM ----------------------------------------------------------- I I TURNING PROPORTIONS I I I TURNING COUNTS I I I (PERCENTAGE OF H.V.S) I I -------------------------------------- I TIME I FROM/TO I ARM A I ARM B I ARM C I ----------------------------------------------------------- I 16.45 - 17.00 I I I I I I I ARM A I 0.000 I 0.129 I 0.871 I I I I 0.0 I 104.0 I 702.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM B I 0.778 I 0.000 I 0.222 I I I I 77.0 I 0.0 I 22.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I I I ARM C I 0.925 I 0.075 I 0.000 I I I I 621.0 I 50.0 I 0.0 I I I I ( 0.0)I ( 0.0)I ( 0.0)I I I I I I I ----------------------------------------------------------- TURNING PROPORTIONS ARE CALCULATED FROM TURNING COUNT DATA
QUEUE AND DELAY INFORMATION FOR EACH 15 MIN TIME SEGMENT -------------------------------------------------------- FOR COMBINED DEMAND SETS AND FOR TIME PERIOD 2
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 16.45-17.00 I I B-AC 1.24 5.79 0.215 0.00 0.27 3.8 0.22 I I C-AB 0.63 8.00 0.078 0.00 0.09 1.3 0.14 I I A-B 1.30 I I A-C 8.81 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.00-17.15 I I B-AC 1.48 5.06 0.293 0.27 0.40 5.8 0.28 I I C-AB 0.75 7.53 0.099 0.09 0.12 1.8 0.15 I I A-B 1.56 I I A-C 10.52 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.15-17.30 I I B-AC 1.82 4.03 0.451 0.40 0.78 10.8 0.44 I I C-AB 0.92 6.88 0.133 0.12 0.18 2.8 0.17 I I A-B 1.91 I I A-C 12.88 I I I
------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 9 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.30-17.45 I I B-AC 1.82 4.03 0.451 0.78 0.80 11.9 0.45 I I C-AB 0.92 6.88 0.133 0.18 0.19 2.8 0.17 I I A-B 1.91 I I A-C 12.88 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 17.45-18.00 I I B-AC 1.48 5.05 0.293 0.80 0.43 6.8 0.28 I I C-AB 0.75 7.53 0.099 0.19 0.13 1.9 0.15 I I A-B 1.56 I I A-C 10.52 I I I
------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------ I TIME DEMAND CAPACITY DEMAND/ PEDESTRIAN START END DELAY GEOMETRIC DELAY AVERAGE DELAY I I (VEH/MIN) (VEH/MIN) CAPACITY FLOW QUEUE QUEUE (VEH.MIN/ (VEH.MIN/ PER ARRIVING I I (RFC) (PEDS/MIN) (VEHS) (VEHS) TIME SEGMENT) TIME SEGMENT) VEHICLE (MIN) I I 18.00-18.15 I I B-AC 1.24 5.78 0.215 0.43 0.28 4.4 0.22 I I C-AB 0.63 8.00 0.078 0.13 0.09 1.4 0.14 I I A-B 1.30 I I A-C 8.81 I I I
------------------------------------------------------------------------------------------------------------------*WARNING* NO MARGINAL ANALYSIS OF CAPACITIES AS MAJOR ROAD BLOCKING MAY OCCUR
QUEUE FOR STREAM B-AC ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.3 17.15 0.4 17.30 0.8 * 17.45 0.8 * 18.00 0.4 18.15 0.3
QUEUE FOR STREAM C-AB ------------------------- TIME NO. OF SEGMENT VEHICLES ENDING IN QUEUE 17.00 0.1 17.15 0.1 17.30 0.2 17.45 0.2 18.00 0.1 18.15 0.1
-------------------------------------------------------------------------------- TRL TRL Viewer 3.2 AG Q:\.. \Beamhill Road - Western Site Access\Base 2026 + Full Dev.vpo - Page 10 -------------------------------------------------------------------------------- QUEUEING DELAY INFORMATION OVER WHOLE PERIOD -------------------------------------------- --------------------------------------------------------------------------- I STREAM I TOTAL DEMAND I * QUEUEING * I * INCLUSIVE QUEUEING * I I I I * DELAY * I * DELAY * I I I----------------------------------------------------------------I I I (VEH) (VEH/H) I (MIN) (MIN/VEH) I (MIN) (MIN/VEH) I --------------------------------------------------------------------------- I B-AC I 136.3 I 90.8 I 43.4 I 0.32 I 43.4 I 0.32 I I C-AB I 68.8 I 45.9 I 12.0 I 0.17 I 12.0 I 0.17 I I A-B I 143.1 I 95.4 I I I I I I A-C I 966.3 I 644.2 I I I I I --------------------------------------------------------------------------- I ALL I 2169.2 I 1446.2 I 55.5 I 0.03 I 55.5 I 0.03 I --------------------------------------------------------------------------- * DELAY IS THAT OCCURRING ONLY WITHIN THE TIME PERIOD * INCLUSIVE DELAY INCLUDES DELAY SUFFERED BY VEHICLES WHICH ARE STILL QUEUEING AFTER THE END OF THE TIME PERIOD * THESE WILL ONLY BE SIGNIFICANTLY DIFFERENT IF THERE IS A LARGE QUEUE REMAINING AT THE END OF THE TIME PERIOD. *******END OF RUN******* ============================================= end of file ===============================================
Printed at 09:51:08 on 21/12/2011]