full-scale ground-based inerting ___________________________________ aar-422 fire safety r&d...
TRANSCRIPT
![Page 1: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/1.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
July 17-18, 2001International Aircraft Systems Fire
Protection Working GroupWilson, NC
Full Scale GBI Testingwith B747 SP
![Page 2: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/2.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
Background• Focus of the Testing is to Better Quantify the
Parameters that Effect the Benefit of GBI – Wind and Weather
– Equipment Usage
– Cross Venting
• Study Manifold Design
• Study the Cost and Benefit of Potential OBIGG Systems.
• Platform to Examine Cross Flow Reduction Methods
![Page 3: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/3.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________Boeing 747 SP
![Page 4: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/4.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
Work Completed• Wrote Research Plan and Testing Safety Plan
• Have a Preliminary Schedule– Start Testing 8-6-01
– Test for 12 Weeks
• Obtained Aircraft– Located Preliminary Parking Spot
– Have Most Support Equipment Required
• Began Installing Testing Control Center and Instrumentation.
• CWT has Been Opened and Cleaned and is Ready to be Modified
![Page 5: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/5.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
Instrumentation Planned• Gas Sample Tubing
– Sample Oxygen at Eight Locations in the CWT
– Sample THC at Any Two of Those Locations
– Sample Oxygen in Surge Tanks, Dry Bay
• Thermocouples– 8 in Fuel
– 8 in Ullage
– 16 Mounted on Interior Wall Surfaces
• Plan to Measure Pressure in Tank Bays
• Record NEA Volume Flow and Oxygen Concentration
![Page 6: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/6.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
747 SP Gas Sample Locations
Dry Bay
1
3
5 6
2
4
7 8
![Page 7: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/7.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
Potential Instrumentation Improvements• Measure NEA Flow and Purity Directly
• THC Measurements at Surge Tank
• Wind Speed and Direction
• ?
![Page 8: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/8.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
Pending Work• Modify CWT
– NEA Delivery System
– Thermocouples
– Sample Tubing
• Complete Installation of DAS and Control Room
• Get NEA Source on Site
• Do End-to-End Signal Check
![Page 9: Full-Scale Ground-Based Inerting ___________________________________ AAR-422 Fire Safety R&D July 17-18, 2001 International Aircraft Systems Fire Protection](https://reader036.vdocuments.net/reader036/viewer/2022082418/5697c00b1a28abf838cc8384/html5/thumbnails/9.jpg)
AAR-422 Fire Safety R&D
Full-Scale Ground-Based Inerting___________________________________
Full Scale GBI System Diagram
GroundHeat/HVAC
GroundPower
Movable Stairway
Ground Based NEA
Supply
NEA Hose Reel
Tug
Tow Bar