fullbright campus design
DESCRIPTION
Students were responsible for provisioning the site to optimize the energy-water-food nexus; and for site planning and design from concept to construction documentation, including building siting. Focus was placed on creating a site that is ecologically balanced along with thoughtful design of specific site infrastructure including, but not limited to, vehicular and pedestrian circulation, parking, grading, drainage and storm water management. The overarching goal of the project was to develop the site in such way that all systems (water, food, energy and ecological) are balanced, and that human and natural systems are integrated. The building must achieve LEED certification and the landscape must meet the requirements to gain Sustainable Site Initiative (SITES) recognition.TRANSCRIPT
Fullbright Campus
Design
Class:
Instructors:
LA 413
Calkins
Motloch
Zhang
Drawn By:
Andrea
Kuruda
Rebecca
McKevitz
Date:
Document Title:
12-10-14
Kuruda_Mckevitz_
Comprensive Project
State Road 135 and Sunshine
Ridge Road
Brown County, Indiana
Sheet # 1-Existing Conditions
Sheet # 2-Integrated Systems Plan
Sheet # 3-Erosion and Sediment Control Plan
Sheet # 4-Layout Plan
Sheet # 5-Road Alignment A
Sheet # 6-Road Alignment B
Sheet # 7-Grading Plan
Sheet # 8-Details
Sheet # 9-Drainage Plan
Sheet # 10-Site Sections
Sheet # 11-Planting Plan
Sheet # 12-Site Plan
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Existin
g
Co
nd
itio
ns
Pro
je
ct T
itle
:
Sh
ee
t T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Sh
ee
t #
:
1 o
f 1
2
Sca
le
:
1"=
3
0'-0
"
Scale: 1"= 30' N
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
In
te
gra
te
d
Syste
ms
Sh
ee
t T
itle
:S
he
et #
:
2 o
f 1
2
Sca
le
:
Biomass
Food Systems
Energy Systems
Water Systems
Systems Diagram
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Ero
sio
n &
Se
dim
en
t
Sh
ee
t T
itle
:S
he
et #:
3 o
f 1
2
Sca
le
:
1"=
5
0'-0
"
Stabalized Construction Entry
Scale: 1"= 2'
Vegitation Protection Fence Elevation
Scale: 1"= 2'
Vegitation Protection Fence Section
Scale: 1"= 2'
Legend
Scale: 1"= 50' N
2
31
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
La
yo
ut
Pla
n
Sh
ee
t T
itle
:S
he
et #
:
4 o
f 1
2
Sca
le
:
1"=
3
0'-0
"
Scale: 1"= 30' N
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Ro
ad
Alig
nm
en
t: A
Sh
ee
t T
itle
:S
he
et #:
5 o
f 1
2
Sca
le
:
1"=
2
0'-0
"
Scale: 1"= 20' N
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Ro
ad
Alig
nm
en
t: B
Sh
ee
t T
itle
:S
he
et #:
6 o
f 1
2
Sca
le
:
1"=
2
0'-0
"
Scale: 1"= 20' N
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Existin
g
Co
nd
itio
ns
Sh
ee
t T
itle
:S
he
et #
:
7 o
f 1
2
Sca
le
:
1"=
3
0'-0
"
Scale: 1"= 30' N
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
De
ta
ils
Sh
ee
t T
itle
:S
he
et #
:
8 o
f 1
2
Sca
le
:
1"=
2
'-0
"
Concrete and Limestone Pavement
Scale: 1"= 2'
Limestone Pavement Plan
Scale: 1"= 2'
Concrete Curb and Limestone
Pavement
Scale: 1"= 2'
Concrete Retaining Wall
Scale: 1"= 2'
Brick Veneer Wall
Scale: 1"= 2'
Rain Garden
Scale: 1"= 2'
Above Ground Cistern
Scale: 1"= 2'
1
2
3
4 5
6
7
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Dra
in
ag
e
Pla
n
Sh
ee
t T
itle
:S
he
et #:
9 o
f 1
2
Sca
le
:
1"=
5
0'-0
"
Scale: 1"= 50' N
Catch Basin #2
Scale: 1"= 20'
Catch Basin #1
Scale: 1"= 20'
1
2
Drawn By:
Date:
Document Title:
Fullbright C
am
pus D
esign
Pro
je
ct T
itle
:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Site
Se
ctio
ns
Sh
ee
t T
itle
:S
he
et #
:
11
o
f 1
2
Scale:
1"=
1
0'-0
"
Drawn By:
Date:
Document Title:
Fu
llb
rig
ht C
am
pu
s D
esig
n
Project T
itle:
Class:
Instructors:
11-1-14
Kuruda_Mckevitz_
Comprensive Project
LA 413
Calkins
Motloch
Zhang
Andrea
Kuruda
Rebecca
McKevitz
Pla
ntin
g
Pla
n
Sheet T
itle:
Sheet #:
11
o
f 1
2
Scale:
1"=
5
0'-0
"
Scale: 1"= 50' N
Vegetable Garden
Apple Orchard
Green House
(Living
Machine)
Fullbright Building
Parking Lot
Prairie
Entry Plaza
Wetlands