function 4 review training all craft conference william burrus, president
TRANSCRIPT
FUNCTION 4
REVIEW TRAININGAll Craft Conference
William Burrus, President
FUNCTION 0 - Operations SupportFUNCTION 1- Mail ProcessingFUNCTION 2- Delivery ServicesFUNCTION 3- Maintenance
FUNCTION 4 - Customer ServicesFUNCTION 5- FinanceFUNCTION 6- Human ResourcesFUNCTION 7- Customer Services SupportFUNCTION 8- AdministrationFUNCTION 9- Training
**Additional Information See:Role of Steward in the Information Age Training Booklet
DEFINITION
“a systematic approach to determining a reasonable,
achievable work hour budget, based on historical
data andon-site observation by knowledgeable team
members.” Definition cont’d.
“the majority of the reviews will produce efficiencies
in methods improvements and work hour savings,
some reviews will result in additional work hours being
recommended to current budgets.”
STAFFING PROGRAMS
AWPS(Automated Workforce Projection System)
Replaces:
CSEP
C-SAM
OVERVIEW
Postmaster’s Fact Sheet***Either the fact sheet or ROVER (Remote Office Verification
Electronic Retrieval)
8-Week Analysis
On-Sight Review Overview cont’d.
EIGHT WEEK ANALYSISEIGHT WEEK ANALYSIS
This is an analysis of the ACTUAL WORK This is an analysis of the ACTUAL WORK performed in the respective Labor performed in the respective Labor Distribution Codes (LDCs) within that office Distribution Codes (LDCs) within that office for an 8 week periodfor an 8 week period
This process has evolved over the years.This process has evolved over the years. Presently they will “look” at four weeks in Presently they will “look” at four weeks in
March and 4 weeks in October.March and 4 weeks in October. They will look at yearly averages that They will look at yearly averages that
could be adjusted by the on site review could be adjusted by the on site review team.team.
On-Site ReviewOn-Site ReviewThis portion of the review is most recognizable to This portion of the review is most recognizable to employees. It is performed by visiting supervisory employees. It is performed by visiting supervisory personnel from a different office, the Review Team.personnel from a different office, the Review Team.
They are responsible for observing the operations of the They are responsible for observing the operations of the office, and are instructed not to change any operation or office, and are instructed not to change any operation or practice, but they will make recommendations to the practice, but they will make recommendations to the Postmaster during the review, and make recommendations Postmaster during the review, and make recommendations at the exit meeting.at the exit meeting.
The amount of time a Review Team is in a The amount of time a Review Team is in a particular office will vary, depending upon the particular office will vary, depending upon the size of the office, the hours of operation and size of the office, the hours of operation and other factors. (Some Function Fours consist of only a data other factors. (Some Function Fours consist of only a data
review)review)
Exit Meeting
Following the observation period, the Review Team will have an exit meeting with the
Postmaster. There is no prohibition from the Union
attending the meeting and a request should be made in writing to attend the exit
meeting. You should request a copy of any documentation
provided.
Postmaster/Station Manager
Supervisors
MVS/HCR Drivers
Employees
Review Team
ROLES
ACTION PLAN
“The Employer shall have the exclusive right,
subject to the provisions of this Agreement and
consistent with applicable laws and
regulations:Action Plan cont’d.
To direct employees of the Employer in the performance of
official duties;
To hire, promote, transfer, assign, and retain employees in
positions within the Postal Service and to suspend,
demote, discharge, or take other disciplinary action against
such employee; Action Plan cont’d.
To maintain the efficiency of the operations entrusted to it;
To determine the methods, means and personnel by which such operations are to be conducted; . . . .”
DOCUMENT VIOLATIONS
ARTICLE 1.6
ARTICLE 7.2
ARTICLE 12
ARTICLE 8.2.C
ARTICLE 7.3.B
The first thing you should do is request to be notified
of the Function 4 Review, when it is scheduled, etc,and also request to attend all meetings related to it,
including the exit interview.
Request Info. cont’d.
REQUEST INFORMATION
Request for Information cont.
The Postmaster’s Fact Sheet or ROVER
The working forms and notes of the Review Team. This should include the Form 3930 Operations Analysis
Form, 8-Week Analysis, Allied Labor Schedule, etc.
Copy of the Function 4 findings.
Sample Request for Information
Determination and documentation of any Letter or Rural Carriers performing work during the Function 4 Review.
Documentation on any changes in automated equipment.
Analyze Info. cont’d.
ANALYZE INFORMATION
Determine if there are any withheld or reverted duty assignments in your office.
Establish the complement of your office by craft and
identify any loaned employees.
Determine if any work was shifted to management, other
crafts, or casuals.
NLRB
“Management may not refuse to provide
information, or delay providing
information, including notes of Function
4 Team Members.”Gadsden, AL August 2003
LABOR DISTRIBUTION CODES
LDC 41 - Automation Operations
LDC 43 - Distribution Operations
LDC 44 - Box Operations
LDC 45 - Window Operations
LDC 46 - Vending Equipment
LDC 48 - Administrative
SAMPLE STATEMENT FROM THE UNION
FUNCTION 4 IN-DEPTH STUDIES
BYRDSTOWN, TN
CARTHAGE, TN
CROSSVILLE, AL
GRAND MARAIS, MN
MILWAUKEE, WI
POYNETTE, WI
In-dept Studies cont’d.
STEP 4
Q90C-4Q-C 94011535:
“No bargaining unit work will be shifted from craft
employees to postmasters/supervisors
solely as a result of a review using the Workload/Workhour Budget Equalization Guideline
process.”
BILL HENDERSON QUOTE 9/21/94
SMALL OFFICE VARIANCE PLAN
“SOV should not be used to determine either
staffing orbudget in post offices.”
ARBITRATION CASES INVOLVING
REVERSIONS/ABOLISHMENTS BASED ON FUNCTION 4
OR OTHER SURVEYS
Arb. cases cont’d.
NORTHFIELD, MA
CARBONDALE, IL
PLAQUEMINE, LA
PHOENIXVILLE, PA
TULIA, TX
END OF CLASS