funding availability & safety programs

32
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/201 3

Upload: hyacinth-hoffman

Post on 03-Jan-2016

31 views

Category:

Documents


1 download

DESCRIPTION

FUNDING AVAILABILITY & SAFETY PROGRAMS. 3//21/2013. Laurie Schultz, PE Administration Program Manager [email protected] 773-8149 Nicole Frankl Safety Engineer, Project Development [email protected] 773-4421. Agenda. MAP-21 FUNDING CATEGORIES FEDERAL STATE - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FUNDING AVAILABILITY & SAFETY PROGRAMS

FUNDING AVAILABILITY & SAFETY PROGRAMS

3//21/2013

Page 2: FUNDING AVAILABILITY & SAFETY PROGRAMS

Laurie Schultz, PELaurie Schultz, PEAdministration Program ManagerAdministration Program Manager

[email protected]@state.sd.us773-8149773-8149

Nicole FranklNicole FranklSafety Engineer, Project DevelopmentSafety Engineer, Project Development

[email protected]@state.sd.us773-4421773-4421

Page 3: FUNDING AVAILABILITY & SAFETY PROGRAMS

Agenda

MAP-21FUNDING CATEGORIES

FEDERAL STATE

SAFETY FUNDINGSTRATEGIC HIGHWAY SAFETY

PLAN

Page 4: FUNDING AVAILABILITY & SAFETY PROGRAMS

MAP-21

Page 5: FUNDING AVAILABILITY & SAFETY PROGRAMS

MAP-21Moving Ahead for Progress in the 21st

Century ActPassed on July 6, 2012Condensed 29 funding categories into 6Eliminated dedicated bridge funding2 year bill

Page 6: FUNDING AVAILABILITY & SAFETY PROGRAMS

MAP-21 FUNDINGMAP-21 SAFETEA-LU

Page 7: FUNDING AVAILABILITY & SAFETY PROGRAMS

FUNDING CATETORIES

FEDERAL

Page 8: FUNDING AVAILABILITY & SAFETY PROGRAMS

FEDERAL FUNDING CATEGORIES

Surface Transportation Program (STP) Funds

Bridge Replacement (STP)Safety FundsTransportation AlternativesState Infrastructure Bank (SIB) LoansState Planning & Research (SPR) Funds

Page 9: FUNDING AVAILABILITY & SAFETY PROGRAMS

FEDERAL FUNDING CATEGORIES

Surface Transportation Program (STP)

Page 10: FUNDING AVAILABILITY & SAFETY PROGRAMS

FEDERAL FUNDSCOUNTY SURFACE TRANSPORTATION

PROGRAM (STP) FUNDS

$12.3 Million Fed, State pays 18.05% match for a total of $15.0

Distributed based on a formula: 1/3 road miles 1/3 rural population and 1/3 based on land area

If State gets more money, counties and cities get more money.

County fund balance on SDDOT/LGA website Roads OR Bridges

Page 11: FUNDING AVAILABILITY & SAFETY PROGRAMS

COUNTY SURFACE TRANSPORTATION PROGRAM (STP) FUNDS

Projects done only on an eligible route http://www.sddot.com/transportation/highways/classification/Default.aspx

Major Collector on Rural System Collector on Urban System

Types of Projects Structures Grading Surfacing (new pavement, overlays, and gravel) Blotter Surfaces Chip Seals Crack Sealing (Preventive Only)

Page 12: FUNDING AVAILABILITY & SAFETY PROGRAMS

FEDERAL FUNDS COUNTY STP

YEAR ALLOCATION

◦FY98 $6,906,000

◦FY99 $8,246,000

◦FY00 $8,774,000

◦FY01 $9,085,000

◦FY02 $9,477,000

◦FY03 $8,185,000

◦FY04 $8,690,000

◦FY05 $9,401,000

◦FY06 $9,467,000

◦FY07 $10,220,000

◦FY08 $10,684,000

◦FY09 $10,518,000

◦FY10 $10,518,000

◦FY11 $12,833,257

◦FY12 $12,833,257

Page 13: FUNDING AVAILABILITY & SAFETY PROGRAMS

COUNTY SURFACE TRANSPORTATION PROGRAM (STP) FUNDS

Counties add their STP projects to SDDOT Statewide Transportation Improvement Plan (STIP)

Counties submit resolutions with program changes to LGA Office

DOT hires consulting engineers; county selects consultant

DOT lets projects to bids and manages construction engineering.

Page 14: FUNDING AVAILABILITY & SAFETY PROGRAMS

COUNTY SURFACE TRANSPORTATION PROGRAM (STP) FUNDS

FLEXIBLE FINANCING:

Let funding build in account until you can afford what you want to do.

Exchange one year’s allocation for state funds

Page 15: FUNDING AVAILABILITY & SAFETY PROGRAMS

COUNTY SURFACE TRANSPORTATION PROGRAM (STP) FUNDS

State Infrastructure Bank Loan (SIB Loan)Ability to borrow money against future STP funds to construct now instead of laterCan only be applied to Federal Aid SystemInterest free loanProjects let to bids by SDDOT

Page 16: FUNDING AVAILABILITY & SAFETY PROGRAMS

FEDERAL BRIDGE FUNDS

Page 17: FUNDING AVAILABILITY & SAFETY PROGRAMS

FEDERAL BRIDGE FUNDS $7.4 Million set aside from STP funds Requires 20% Local Match Counties add their STP projects to SDDOT

Statewide Transportation Improvement Plan (STIP) Counties submit resolutions with program changes

to LGA Office DOT hires consulting engineers with county

concurrence DOT lets projects to bids and manages

construction engineering.

Page 18: FUNDING AVAILABILITY & SAFETY PROGRAMS

Local Gov't Federal Bridge Funds (Federal Portion Only; NO Match)

Fiscal Year Allocation Inspection CostsActual Amount For Rehab and/or

Replacement

1993 $4,981,000.00 $167,913.93 $4,813,086.07

1994 $4,488,000.00 $541,525.60 $3,946,474.40

1995 $4,661,000.00 $172,689.70 $4,488,310.30

1996 $3,835,000.00 $540,000.00 $3,295,000.00

1997 $4,268,000.00 $171,126.00 $4,096,874.00

1998 $5,512,000.00 $541,843.00 $4,970,157.00

1999 $6,064,000.00 $204,620.15 $5,859,379.85

2000 $7,319,000.00 $504,187.22 $6,814,812.78

2001 $8,813,000.00 $194,720.95 $8,618,279.05

2002 $8,272,000.00 $569,167.46 $7,702,832.54

2003 $6,870,000.00 $260,099.51 $6,609,900.49

2004 $7,900,000.00 $637,514.49 $7,262,485.51

2005 $6,842,000.00 $277,494.30 $6,564,505.70

2006 $7,650,000.00 $699,460.23 $6,950,539.77

2007 $7,913,000.00 $301,469.94 $7,611,530.06

2008 $7,280,000.00 $823,782.21 $6,456,217.79

2009 $6,532,000.00 $432,230.66 $6,099,769.34

2010 $7,581,000.00 $1,154,661.37 $6,426,338.63

2011 $7,978,000.00 $462,635.64 $7,515,364.36

2012 $7,470,635.00 $1,131,853.63 $6,338,781.37

Page 19: FUNDING AVAILABILITY & SAFETY PROGRAMS
Page 20: FUNDING AVAILABILITY & SAFETY PROGRAMS

LOCALLY OWNED BRIDGES:

3948 Local and 1799 State = 5747 TOTAL

2100 Local over 50 years old (53%)

1009 over 75 years old (25%)

Bridges are designed for a 50 year life

Page 21: FUNDING AVAILABILITY & SAFETY PROGRAMS

LOCALLY OWNED BRIDGES:

Average bridge replacement cost on local system: $161,000Cost to replace 2100 bridges:

$499 MillionFederal Bridge Funds Available:

$7.4 M/Yr.Currently programmed to FY 202325 bridges per year with federal funds

Page 22: FUNDING AVAILABILITY & SAFETY PROGRAMS

LACK OF MAINTENTANCE

Page 23: FUNDING AVAILABILITY & SAFETY PROGRAMS

HEAVIER FARM EQUIPMENT

Page 24: FUNDING AVAILABILITY & SAFETY PROGRAMS

OLD AND WEAK BRIDGES

Page 25: FUNDING AVAILABILITY & SAFETY PROGRAMS

Increase in the license plate fees expected to generate $31 million per year.

Not to be used to replace general funds in highway budgets.

Page 26: FUNDING AVAILABILITY & SAFETY PROGRAMS

TRANSPORTATION ALTERNATIVES PROGRAM

REPLACES THE FOLLOWING PROGRAMS:

•Transportation Enhancement Program •Safe Routes To Schools Program•Recreational Trails Program•Scenic Byways Program

Page 27: FUNDING AVAILABILITY & SAFETY PROGRAMS

TRANSPORTATION ALTERNATIVES PROGRAM

$ 5.3 million/yr. to SDDOT$ 2 million/yr. in grantsLetter of Intent due May 1

http://sddot.com/services/transalt/default.aspx

Site visit requiredApplications due June 15Consultants designDOT constructs18.05% match required$400,000 max grant amount

Page 28: FUNDING AVAILABILITY & SAFETY PROGRAMS

TRANSPORTATION ALTERNATIVES PROGRAM

1. Pedestrian and bicycle facilities

2. Rails to trails

3. Turnouts, overlooks, and viewing areas

4. Remove outdoor advertising; historic preservation and rehab of historic transportation facilities; vegetation management in rights-of-way;

5. Environmental mitigation activity to address storm water; or wildlife access management

6. Recreational Trails Program (GF&P)

7. Safe Routes to Schools Program

Page 29: FUNDING AVAILABILITY & SAFETY PROGRAMS

FUNDING CATEGORIES

STATE

Page 30: FUNDING AVAILABILITY & SAFETY PROGRAMS

STATE FUNDINGAgribusiness Grants

Applications due April 15, July 15, or October 15.

Industrial Park Grants Applications due April 15, July 15, or October 15.

Community Access Grants Applications due July 15

$200,000

60/40 cost share

Page 31: FUNDING AVAILABILITY & SAFETY PROGRAMS

STATE FUNDING Agri-Business Grant

<1 mile long projects Available to city, town, township, county, tribe

Industrial Park Road Grant Investment minimum of 5X the state participation costs Total employment of 50 people in park Minimum of 5 new jobs created Able to start construction within 6 months of approval of

funds Community Access

Class 2 or Class 3 cities <1 mile in length

Page 32: FUNDING AVAILABILITY & SAFETY PROGRAMS

STATE FUNDING

COUNTY WIDE STRIPING PROGRAM:

$0.5 MILLION PER YEARCOUNTY SELECTS ROUTESDOT LETS TO BIDS AND CONSTRUCTS