Funding Mechanism Consultation
and Proposed new Treatment
Plant
Franz Josef Wastewater – Information Session
![Page 2: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/2.jpg)
Information Session
SCOPE
Introduction and Opening - Mayor Mike Havill
• Part A - Franz Wastewater backgroundVivek Goel – G.M. – District Assets
• Part B - The Funding Mechanism – Current consultationGary Borg – G.M. – Corporate Services
Tanya Winter – Chief Executive
• Part C - Proposed Treatment Solution – SupplementaryInformation
Vivek Goel – G.M. – District Assets
Gary Borg – G.M. – Corporate ServicesJim Ebenhoh – G.M. – Planning, Community and Environment
![Page 3: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/3.jpg)
Introductions and Opening Message
MAYOR MIKE
HAVILL
![Page 4: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/4.jpg)
Part A – Background
The Franz Josef Wastewater Treatment Plant (existing plant) consistsof two oxidation ponds that are intended to discharge treatedeffluent into the Waiho River. The existing plant is owned andoperated by Westland District Council (WDC).
The system was built in 1970’s with the very first discharge consentgranted on 14 November 1977 for a period of 20 years. Consentswere granted under Water and Soil Conservation Act 1967 at thattime.
The consents were then renewed and granted by WCRC inSeptember 2001 for period of 35 years, i.e. a final expiry in 2036.
Another variation to the discharge limits was approved in July 2015to help with the compliance matters.
![Page 5: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/5.jpg)
Franz Josef Wastewater
![Page 6: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/6.jpg)
Franz Josef Wastewater
Some facts Pond 1 (Primary Pond) = area 0.6ha = 6000m2
Pond 2 (Secondary Pond) = area 0.3ha = 3000m2
Base population (for current system) = 600 people
![Page 7: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/7.jpg)
What is required to make the current system work?
An example of a possible layout forthe oxidation ponds.
A Hybrid System with assisteddisinfection including fixed mediaand a covered cell.
Area required: Approx. 4 times +Buffer Zones
Source: SKM report 2009 – Franz Josef performancereview and Upgrade Assessment
The options with oxidation ponds will be further discussed in Part C of this session
![Page 8: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/8.jpg)
2016 Flooding in Franz Josef
![Page 9: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/9.jpg)
![Page 10: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/10.jpg)
![Page 11: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/11.jpg)
![Page 12: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/12.jpg)
![Page 13: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/13.jpg)
![Page 14: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/14.jpg)
Part B – Funding Mechanism
Background and Overview of the proposal
1. Current Ten Year Plan – Project consulted andapproved
2. 2016/17 Annual Plan Process – Project fundingconsulted
3. Current consultation – Funding optionsa) The submissions close on 8 September 2016b) Hearing will be on 14 September 2016
![Page 15: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/15.jpg)
The Project – Long Term Plan
The project is included in the current Long Term Plan(2015-2025).
The cost spread in the LTP is:Financial Year ending Budgets Funding30 June 2017 $2,562,500 Loan: $1.5M
Subsidy/Grant: $1.0M
30 June 2018 $2,562,500 Loan: $1.5M
Subsidy/Grant:$1.0M
30 June 2019 $2,330,600 Loan: $1.0M
Subsidy:$1.3M
30 June 2020 $1,116,000 Loan: $1.1M
30 June 2021 $1,152,000 Loan: $1.1M
![Page 16: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/16.jpg)
The Proposal
Current Consultation
We need to establish whether we have the right method in place to pay for
the new facility.
The options are:OPTION 1: STATUS QUO i.e. Current targeted and harmonised rating system across theDistrict.OPTION 2: 50-50 – i.e. 50% paid by Franz Community and 50% harmonised across theremainder of connections in the districtOPTION 3: 100% paid by Franz Community (This was the previous consulted option inAnnual Plan 2016/17)
Important Note: Council will continue to seek external funding from various sources. Anygrants/contributions received will be incorporated into the above options, which will lessen the netcapital funding requirement from ratepayers.
![Page 17: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/17.jpg)
Funding Options
OPTION 1: STATUS QUO i.e. Current targeted and harmonised rating system across the District.
100% Funded by Westland – No externalContribution
Financial Yearending
LTP Ratesprojection
Revised Ratesprojections
30 June 2018 303 412
30 June 2019 340 409
30 June 2020 364 406
30 June 2021 389 402
30 June 2022 414 399
30 June 2023 410 396
30 June 2024 407 393
30 June 2025 403 390
![Page 18: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/18.jpg)
Funding Options
OPTION 2: 50-50 – i.e. 50% paid by Franz Community and 50% harmonised across the remainder of connections in the district
50% Funded by Westland – 50% Franz CommunityFinancial Year ending LTP Rates projection Revised Rates projections
Rest of Westland
Franz Rates
30 June 2018 303 358 590
30 June 2019 340 356 583
30 June 2020 364 354 576
30 June 2021 389 352 569
30 June 2022 414 350 562
30 June 2023 410 347 554
30 June 2024 407 345 547
30 June 2025 403 343 540
![Page 19: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/19.jpg)
Funding Options
OPTION 3: 100% paid by Franz Community (This was the previous consulted option in
Annual Plan 2016/17)
In this option rest of Westland rates are not affected by the project. The Franz rates are shown below.
100% Funded by Franz Community
Financial Year ending LTP Rates projection Revised Rates projections(Change from LTP)
30 June 2018 303 919
30 June 2019 340 904
30 June 2020 364 890
30 June 2021 389 876
30 June 2022 414 861
30 June 2023 410 847
30 June 2024 407 832
30 June 2025 403 818
![Page 20: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/20.jpg)
Comparison of Option 1,2,3 and LTP
50% Franz-50% Rest
![Page 21: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/21.jpg)
External Funding
• Business Case to Central Government
• The business case has been reviewed and commentedon by LGNZ
• Council’s early discussions indicate the likelihood ofan independent application being accepted is low
• The National Tourism Infrastructure Fund has beencreated and Council has been directed to this fund
• Region wide affordability and comparatives will beconsidered by government.
![Page 22: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/22.jpg)
Comparison with neighbours
District Average rate per property
(2016/17 Annual Plan)
Buller District
(Westport – Residential with 1-2connections)
$820.00
Greymouth District (Greymouth Town) $639.60Southland District
(Harmonised)
$364.97
Westland District
(Harmonised throughout)
$261.70
![Page 23: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/23.jpg)
External Funding
• National Tourism Infrastructure Fund
• The government has released the criteria for this fund. Westland will submit and make applications to this fund.
• This work is now in progress.
• Discussions with stakeholders
• Initial discussions have commenced with stakeholders.• Proposals are commercially sensitive.• Any contribution will reduce the capital requirement on the
project
![Page 24: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/24.jpg)
Part C - Proposed Solution – Supplementary Information
SCOPE
1. Continue on background from Part A
2. Timeline to date include non-compliance history
3. The solutions considered – including estimates
4. The proposed location
5. Environmental Effects and mitigation
![Page 25: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/25.jpg)
Timeline – Franz WWTP
![Page 26: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/26.jpg)
Treatment Options available
In Theory – 3 Forms of treatment can be applied depending on the desired outcomes.
1. Primary Treatment 2. Secondary Treatment 3. Tertiary or advanced Treatment
As identified on the timeline – WDC Staff has applied and tested possible economical solutions.
These include a range of options including assessments on introduction of mechanical aeration, floating media treatments, expansion at the current site and also possible engineered stop banks to lower the risks associated with Waiho River.
![Page 27: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/27.jpg)
Expansion of current WWTP site
In 2009 – WDC commissioned investigations to assess the current WWTP site.
At that time the projections related to Franz Josef were estimated as:
The above estimates assumed to be around 2031 are well passed in the year 2012.
![Page 28: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/28.jpg)
Expansion of current WWTP site
Based on then data – SKM suggested a staged upgrade to the existing oxidations ponds
![Page 29: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/29.jpg)
Expansion of current WWTP site
![Page 30: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/30.jpg)
Expansion of current WWTP site
![Page 31: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/31.jpg)
Expansion of current WWTP site
![Page 32: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/32.jpg)
Expansion of current WWTP site
![Page 33: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/33.jpg)
Expansion of current WWTP site
The Expected Effluent Quality is based on then 2031 demand projections
![Page 34: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/34.jpg)
Cost estimates – Option 3 - 2009
![Page 35: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/35.jpg)
Current Costs in 2016/17
OPUS consultants have reviewed the reports and estimate the comparisons as below
![Page 36: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/36.jpg)
Alternatives considered – 2012/13
With the same challenge as on date – take the cheapest option available, Council staff investigated further options available.
It was suggested that a secondary treatment introduction will be cheap and affordable and can possibly produce results as desired.
Floating media treatments were proposed and implemented . The solution failed. Costs – approximately $250k.
The solution was estimated close to $350k, however stage 2 was not completed as the technology did not produce the desired outcome.
![Page 37: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/37.jpg)
Floating Media Treatments
![Page 38: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/38.jpg)
![Page 39: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/39.jpg)
![Page 40: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/40.jpg)
![Page 41: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/41.jpg)
![Page 42: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/42.jpg)
![Page 43: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/43.jpg)
![Page 44: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/44.jpg)
![Page 45: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/45.jpg)
![Page 46: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/46.jpg)
![Page 47: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/47.jpg)
![Page 48: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/48.jpg)
Infiltration Gallery Issues
![Page 49: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/49.jpg)
![Page 50: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/50.jpg)
![Page 51: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/51.jpg)
![Page 52: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/52.jpg)
![Page 53: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/53.jpg)
![Page 54: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/54.jpg)
![Page 55: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/55.jpg)
![Page 56: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/56.jpg)
![Page 57: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/57.jpg)
![Page 58: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/58.jpg)
Solution : A Tertiary Treatment Plant
Based on the research and costings undertaken to date:• A High Rate Wastewater Treatment Process Plant
Following to be considered in the design:• Visual buffering• Noise• Odour• Ability of plant to handle future growth and• Ability to handle variable flows
Please refer Appendix 1 A of the proposal.
![Page 59: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/59.jpg)
![Page 60: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/60.jpg)
OPUS – Site Assessments
![Page 61: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/61.jpg)
Waiho River future
![Page 62: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/62.jpg)
![Page 63: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/63.jpg)
The Proposed Site
![Page 64: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/64.jpg)
The Proposed Site
![Page 65: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/65.jpg)
The Proposed Site
![Page 66: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/66.jpg)
Other Planning Matters
Like any Wastewater Treatment process, the plants will have to be designed carefully to address the following concerns: • Noise • Odour/Smell• Visual effects
All above factors have been taken into consideration while providing the scope of the plant to the proposers. These have been addressed in Appendix 1B of the proposal.
Consenting Process
• Land Use consent from WDC• Current discharge consents review and possible variations for
discharge point
![Page 67: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/67.jpg)
The process to date
• Nov/Dec 2015 – Design Investigations commenced –Budget $150k.
• Best Value for money – Design and Build Option• 5 experienced companies selected for providing the
solution. – OPUS and WDC• Probity Auditor appointed• Procurement guidelines in accordance with MBIE and
SOLGM good practice.
• Refer to Appendix 1D of the proposal.
![Page 68: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/68.jpg)
Environment Court Proceedings
• On 6 August 2015, WCRC made an application for Enforcement Orderpursuant to Section 316 of the Resource Management Act 1991.
• Council has since been in discussions and in mediation with WCRC. Theproceedings have been on hold since based on assurances from WDC.
• As per the last report submitted on 30 June 2016, Environment courts haveindicated, no further extension will be granted beyond 7 October 2016.
• As per our legal advise this is a serious situation and a decision is required byCouncil in this matter. A copy of the legal advice is now available on Councilwebsite as supplementary information to the consultation Proposal.
![Page 69: Funding Mechanism Consultation and Proposed new Treatment ... · Part B –Funding Mechanism Background and Overview of the proposal 1. Current Ten Year Plan –Project consulted](https://reader034.vdocuments.net/reader034/viewer/2022042807/5f79a12c2a9f35208833b5b3/html5/thumbnails/69.jpg)
Franz Josef Wastewater
QUESTIONS ?