fuse block & switch panel kit

1
Installation Instructions (P/N 101994601) Fuse Block & Switch Panel Kit Step 1 – Mounting Bolt the mounting bracket to the first two bolts on the left that mount the roof to the windshield panel. Attach the switch panel to the mount bracket using the supplied ¼”-20 bolts and washers. Step 2 – Electrical Connection Standard connections to the back of the switch panel should be made using split spade terminals. Any existing wire terminals should be changed to these. Connections should be made in the following manner from left to right. Position #1 – Hot Wire to Fuses (painted red) Position #2 – Back Lighting Position #3 – SW. #1 Worklights Position #4 – SW. #2 Wiper Position #5 – SW. #3 Strobe Light Position #6 – SW. #4 Fan Position #7 – SW. #5 Dome Light Position #8 – SW. #6 (Top Function) Position #9 – SW. #6 (Bottom Function) Position #10 – Ground (painted black) PARTS LIST Item # Description Qty/Unit 1SF11 Switch Fuse Unit w/ Fuses 1 1SF12 Mounting Bracket 1 1SF13 ¼-20 x 5/8 Bolts 2 1SF14 ¼ Flat Steel Washers 2 1SF15 Split Spade Terminal 12-10 4 1SF16 Split Spade Terminal 16-14 8 11107 Red 10 Ga. Wire for power lead 8ft. * 11107 Black 10 Ga. Wire for ground 8ft. * * universal kit not required for all installations.

Upload: alftoy

Post on 21-Oct-2015

19 views

Category:

Documents


4 download

DESCRIPTION

Fuse block switch panel

TRANSCRIPT

Page 1: Fuse Block & Switch Panel Kit

Installation Instructions (P/N 101994601)

Fuse Block & Switch Panel Kit

Step 1 – Mounting Bolt the mounting bracket to the first two bolts on the left that mount the roof to the windshield panel. Attach the switch panel to the mount bracket using the supplied ¼”-20 bolts and washers. Step 2 – Electrical Connection Standard connections to the back of the switch panel should be made using split spade terminals. Any existing wire terminals should be changed to these. Connections should be made in the following manner from left to right. Position #1 – Hot Wire to Fuses (painted red) Position #2 – Back Lighting Position #3 – SW. #1 Worklights Position #4 – SW. #2 Wiper Position #5 – SW. #3 Strobe Light Position #6 – SW. #4 Fan Position #7 – SW. #5 Dome Light Position #8 – SW. #6 (Top Function) Position #9 – SW. #6 (Bottom Function) Position #10 – Ground (painted black)

PARTS LIST Item # Description Qty/Unit 1SF11 Switch Fuse Unit w/ Fuses 1 1SF12 Mounting Bracket 1 1SF13 ¼-20 x 5/8 Bolts 2 1SF14 ¼ Flat Steel Washers 2 1SF15 Split Spade Terminal 12-10 4 1SF16 Split Spade Terminal 16-14 8 11107 Red 10 Ga. Wire for power lead 8ft. * 11107 Black 10 Ga. Wire for ground 8ft. * * universal kit not required for all installations.