future cluster

19
Future Cluster Andrew Krioukov Prashanth Mohan

Upload: kiele

Post on 15-Feb-2016

22 views

Category:

Documents


0 download

DESCRIPTION

Future Cluster. Andrew Krioukov Prashanth Mohan. Sun Box. Solar Panels. Peak Sun Hours (PSH) 315 W / m 2 at peak ( SunPower E19) Daily: 1.26 kWh / m 2 = 4.536 MJ / m 2. Assume 4 PSH. Day. Design and Analysis of Micro-Solar Power Systems for Wireless Sensor Networks - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Future Cluster

Future Cluster

Andrew KrioukovPrashanth Mohan

Page 2: Future Cluster

Sun Box

Page 3: Future Cluster

Solar Panels• Peak Sun Hours (PSH) • 315 W / m2 at peak (SunPower E19)• Daily: 1.26 kWh / m2 = 4.536 MJ / m2

Assume 4 PSH

Page 4: Future Cluster

Day

Design and Analysis of Micro-Solar Power Systems for Wireless Sensor NetworksJaein Jeong, Xiaofan Jiang, David Culler

Page 5: Future Cluster

Week

Page 6: Future Cluster

Provision to Peak

Page 7: Future Cluster

513 – Not Enough SunInsufficient energy to service your request. Please try again later.

Page 8: Future Cluster

Deficit

Page 9: Future Cluster

Provision 100x

Page 10: Future Cluster

Surplus

Page 11: Future Cluster

Trade-offs

Page 12: Future Cluster

Sun Box

• 8’ x 8’ x 20’• ~15 m2 per face

Page 13: Future Cluster
Page 14: Future Cluster

Embedded Servers?

• 600 MHz ARM• 256 MB RAM• 3” x 3” x 0.5”• Runs Linux,

Apache, PHP, MySQL, etc.

Page 15: Future Cluster

Rack

• 2U = 3.5” x 19” x 28”• 6 wide x 28 deep

= 168 Beagles

• ~32GB RAM• ~100GHz• < $25k

• 4 cores x 8 CPU x 2Ghz = 64 GHz

• ~16GB RAM• $10k

vs

Page 16: Future Cluster
Page 17: Future Cluster
Page 18: Future Cluster
Page 19: Future Cluster