Page 1: FY 2017-2022 Proposed Highway Improvement Program

FY 2017-2022 Proposed Highway

Improvement Program

HIGHWAY REGION 5 DISTRICT 8 TABLE OF CONTENTS

Program Summary

State Roadway Project Descriptions

Local Roadway Project Descriptions

MAPS

District 8

Alton - East St. Louis and Vicinity

Page 2: FY 2017-2022 Proposed Highway Improvement Program

8-i

TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION

REGION 5, DISTRICT 8, COLLINSVILLE Overview Highway District 8 encompasses 11 counties in southwestern Illinois and includes the cities of Centralia, East St. Louis, Alton, Belleville, Edwardsville, Jerseyville, Highland, Greenville, Mascoutah and Chester, plus many smaller communities which serve as satellites for the larger employment centers. The state highway system in District 8 consists of 1,803 miles of highways and 1,001 bridges, supporting 15.9 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.862 billion annually for the FY 2017-2022 period. Approximately $597 million will be provided during FY 2017-2022 for improvements to state highways in District 8. The following table summarizes anticipated accomplishments on the state highway system in District 8 during this time frame.

FY 2017-2022 Accomplishments

System Maintenance Interstate (miles) 44 Non-Interstate (miles) 118 Safety Locations (number) 0 Bridge Maintenance Interstate (number) 21 Non-Interstate (number) 17 New Bridges (number) 0 Minor Structure Repair (number) 47 Congestion Mitigation Roads (miles) 1 Traffic Improvements (number) 3 System Expansion Roads (miles) 3 Locations (number) 0

Major Highway projects of interest that are tentatively scheduled during the FY 2017-2022 time frame include: • Interstate 55/Interstate 64 at Poplar Street Collector Distributor westbound and eastbound

0.1 mile east, 0.8 mile east and 0.9 mile east of Poplar Street Bridge in St. Clair County. Bridge deck overlay, bridge repair, engineering and pier repair are programmed during FY 2017-2022 at a cost of $64.2 million. Of this total, bridge repair on the westbound section 0.9 mile east of the Poplar Street Bridge is programmed in FY 2017 at a cost of $4 million. Provides for efficient movement.

• Interstate 55/Interstate 70/US 40 at B&0, Conrail and TRRA Railroad in East St. Louis. Bridge

repair, bridge approach roadway, bridge painting, engineering for contract plans and construction engineering are programmed in during FY 2018-2022 at a cost of $24 million.

• Interstate 57 from Jefferson County line to 0.5 mile north of Cross Road in Marion County.

Resurfacing on 9.5 miles, ramp repair at Illinois 161 interchange, bridge deck repair, bridge joint repair, bridge approach roadway, bridge deck sealing and rip rap are programmed during FY 2018-2022 at a cost of $22 million.

Page 3: FY 2017-2022 Proposed Highway Improvement Program

8-ii

• Interstate 70/US 40 from 0.1 mile west of Prairie Road to Bond County line in Madison and Bond Counties. Resurfacing on 6.4 miles, ramp repair, bridge painting, bridge joint repair, bridge deck sealing, rip rap, a bridge replacement, bridge deck overlay and bridge repair are programmed in FY 2017 at a cost of $20.1 million.

• Interstate 70 from Madison County line to Burlington Northern Railroad in Bond County.

Resurfacing on 15.9 miles, ramp repair, bridge repair, bridge painting, bridge joint repair, bridge new deck, bridge deck sealing, culvert repair, wing wall repair and rip rap are programmed during FY 2018-2022 at a cost of $76.1 million.

• Interstate 255/US 50 from 0.5 mile north of Illinois 157 to Collinsville Road in St. Clair County.

Resurfacing on 10.2 miles, patching, bridge repair, ramp repair, shoulder repair, bridge deck waterproofing, rip rap, bridge joint repair, bridge deck overlay and painting are programmed during FY 2018-2022 at a cost of $58.8 million.

• US 40 from 0.2 mile west of Formosa Road to 0.1 mile east of the Illinois 4 ramp. Resurfacing

on 6.3 miles and ADA improvements are programmed during FY 2018-2022 at a cost of $4 million.

• US 40 from 0.3 mile west of Illinois 127 to the Fayette County line in Bond County. Resurfacing on 8.1 miles and ADA improvements are programmed during FY 2018-2022 for $5 million.

• US 50 from 1 mile east of Crackerneck Road to 0.2 mile west of St. Rose Road in Clinton

County. Resurfacing on 4 miles is programmed during FY 2018-2022 for $6.5 million.

• US 67 at Delhi Bypass in Jersey County. New construction of 3.2 miles of a four-lane expressway for the bypass around Delhi including grading, paving, drainage, signing and lighting are programmed during FY 2018-2022 at a cost of $23 million.

• Illinois 4 from 0.3 mile south of Interstate 55 to 0.3 mile north of Illinois 143 in Madison County.

Resurfacing on 9.4 miles and new shoulders is programmed during FY 2018-2022 at a cost of $16 million.

• Illinois 13/Illinois 15 from Rodgers Drive in Freeburg to 0.1 mile south of Kaskaskia River in

St. Clair County and Illinois 13 over Illinois Central Gulf Railroad. Resurfacing on 8.9 miles, ADA improvements and bridge repair are programmed during FY 2018-2022 at a cost of $6.1 million.

• Illinois 96 from Hamburg Road to Illinois 100 in Calhoun County. Resurfacing on 7.4 miles and

ADA improvements are programmed in FY 2017 at a cost of $2.8 million. • Illinois 143 over Indian Creek 0.3 mile east of Wanda Road in Madison County. A bridge

replacement, land acquisition and utilities are programmed in FY 2017 at a cost of $7.4 million.

• Illinois 143 over Shoal Creek 0.9 mile east of Pierron. A bridge replacement is programmed in FY 2017 at a cost of $18.5 million. This project has been approved for Illinois Major Bridge Program funding.

• Illinois 161 over Crooked Creek 8.6 miles east of Illinois 127 and over a creek 1 mile west of

Centralia in Clinton County. A bridge replacement, land acquisition and utility adjustments at Crooked Creek and a culvert replacement at a creek 1 mile west of Centralia are programmed during FY 2018-2022 at a cost of $21 million. This project has been approved for Illinois Major Bridge Program funding.

• Illinois 267 from the Morgan County line to Short Road in Greene County. Resurfacing on

7.7 miles is programmed during FY 2018-2022 at a cost of $4.3 million.

Page 4: FY 2017-2022 Proposed Highway Improvement Program

8-iii

• Greenmount Road from Illinois 161 to Illinois 177 in St. Clair County. The construction of additional lanes and resurfacing on 1 mile, land acquisition and utility adjustments are programmed during FY 2018-2022 at a cost of $8.7 million.

• King Bridge Ramps over Interstate 55/64 westbound, Missouri Avenue, Relocated Illinois 3,

Terminal Railroad Association and Union Pacific Railroads in East St. Louis 0.7 mile east of the Mississippi River. A bridge replacement, land acquisition, utility adjustments and railroad flagger are programmed during FY 2017-2022 at a cost of $34.7 million. Of this total, the land acquisition and utility adjustments are programmed in FY 2017 at a cost of $2.5 million. These projects have been approved for Illinois Major Bridge Program funding.

Page 5: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$21,600,000POPLAR ST COLLECTOR- DISTRIBUTOR

(WB) 0.1 MI E OF POPLAR ST BRIDGE Bridge Maintenance

10BRIDGE DECK OVERLAYPIER REPAIR

ST. CLAIRSAFETYPRESERVE SYSTEM

I 55I 64I 64 WB CD

Structure Status AADT Truck Pct Str Number NHS3,000 0820141 YSTRUCTURAL BACKLOG 6

2018-2022$23,500,000POPLAR ST COLLECTOR- DISTRIBUTOR (EB) 0.2 MI E OF POPLAR ST BRIDGE Bridge Maintenance

4BRIDGE DECK OVERLAY ST. CLAIRSAFETYPRESERVE SYSTEM

I 55I 64

Structure Status AADT Truck Pct Str Number NHS26,700 0820144 YSTRUCTURAL BACKLOG 17

2018-2022$7,200,000POPLAR ST COLLECTOR- DISTRIBUTOR (EB) 0.7 MI E OF POPLAR ST BRIDGE Bridge Maintenance

4BRIDGE DECK OVERLAY ST. CLAIRSAFETYPRESERVE SYSTEM

I 55I 64

Structure Status AADT Truck Pct Str Number NHS18,600 0820256 YFUNCTIONAL BACKLOG 20

2018-2022$6,600,000POPLAR ST COLLECTOR- DISTRIBUTOR (WB) 0.8 MI E OF POPLAR ST BRIDGE Bridge Maintenance

10BRIDGE DECK OVERLAY ST. CLAIRSAFETYPRESERVE SYSTEM

I 55I 64I 64 WB CD

Structure Status AADT Truck Pct Str Number NHS16,500 0820254 YADEQUATE 33

2017$4,000,000POPLAR ST COLLECTOR- DISTRIBUTOR (WB) 0.9 MI E OF POPLAR ST BRIDGE Bridge Maintenance

1BRIDGE REPAIR ST. CLAIRSAFETYPRESERVE SYSTEM

I 55I 64

2018-2022$1,250,000POPLAR ST BRIDGE COMPLEX & ASSOCIATED ROADWAYS Bridge Maintenance

2P.E. (PHASE I)P.E. (PHASE II)P.E. (CONSULTANT TSL)P.E. (CONSULTANT PLANS)P.E. (BRIDGE INSPECTION)

ST. CLAIRI 55I 64

8 - 1

Page 6: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$20,000,000B & O, CONRAIL & TRRA RR IN EAST ST

LOUIS System Maintenance

1BRIDGE REPAIRBRIDGE APPROACH ROADWAYBRIDGE PAINTING

ST. CLAIRSAFETYPRESERVE SYSTEM

I 55I 70US 40

2018-2022$2,500,000B & O, CONRAIL & TRRA RR IN EAST ST LOUIS System Maintenance

1P.E. (CONSULTANT TSL)P.E. (CONSULTANT PLANS)

ST. CLAIRI 55I 70US 40

2018-2022$1,500,000B & O, CONRAIL & TRRA RR IN EAST ST LOUIS System Maintenance

1CONSTRUCTION ENGINEERING ST. CLAIRI 55I 70US 40

2018-2022$5,000,000MADISON CO TRANSIT BIKE TRAIL (ABANDONED RR) 5 MI S OF ILL 140 Bridge Maintenance

1BRIDGE NEW DECK MADISONSAFETYPRESERVE SYSTEM

I 55

Structure Status AADT Truck Pct Str Number NHS15,750 0600002 YSTRUCTURAL ACCRUING 1915,750 0600003 YSTRUCTURAL ACCRUING 19

2018-2022$21,200,000JEFFERSON CO LINE TO 0.5 MI N OF CROSS RDMiles = 9.50 System Maintenance

5RESURFACINGBRIDGE DECK REPAIRSBRIDGE JOINT REPAIRBRIDGE APPROACH ROADWAYBRIDGE DECK SEALINGRIP RAP

MARIONSAFETYPRESERVE SYSTEM

I 57

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS20,364 39.4 Y0.099.50 GOODADEQUATE

2018-2022$800,000ILL 161 INTCHG System Maintenance

2RAMP REPAIR MARIONSAFETYPRESERVE SYSTEM

I 57

8 - 2

Page 7: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$50,000MISSISSIPPI RIVER

System Maintenance3BRIDGE DECK SEALING ST. CLAIRPRESERVE SYSTEMI 70

MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.

2018-2022$10,000,000I-55 TO 2.5 MI E OF I-55/70/270 INTCHGMiles = 2.56 System Maintenance

2RESURFACINGBRIDGE DECK REPAIRSBRIDGE REPAIRBRIDGE JOINT REPAIRBRIDGE DECK SEALINGRIP RAP

MADISONSAFETYPRESERVE SYSTEM

I 70

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS34,209 26.3 Y0.122.56 GOODACCRUING

2017$17,800,0000.1 MI W OF PRAIRIE RD TO BOND CO LINEMiles = 6.35 System Maintenance

5RESURFACINGBRIDGE PAINTINGBRIDGE REPAIRBRIDGE REPLACEMENTBRIDGE JOINT REPAIRBRIDGE DECK SEALINGRIP RAPBRIDGE DECK OVERLAY

MADISONBOND

SAFETYPRESERVE SYSTEM

I 70US 40

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS23,062 35.0 Y0.246.35 GOODBACKLOG

Structure Status AADT Truck Pct Str Number NHS175 0030042 NADEQUATE 14

2017$2,300,0000.1 MI W OF PRAIRIE RD TO BOND CO LINE System Maintenance

2RAMP REPAIR MADISONBOND

SAFETYPRESERVE SYSTEM

I 70

8 - 3

Page 8: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$45,000,000MADISON CO LINE TO 0.3 MI W OF

SUGAR LOAF RDMiles = 6.69 System Maintenance

1RESURFACINGBRIDGE NEW DECKBRIDGE REPAIRCULVERT REPAIRWING WALL REPAIRRIP RAPBRIDGE JOINT REPAIRBRIDGE DECK OVERLAYBRIDGE DECK SEALINGBRIDGE PAINTINGMISCELLANEOUS

BONDSAFETYPRESERVE SYSTEM

I 70US 40

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS23,426 35.4 Y0.186.69 GOODBACKLOG

Structure Status AADT Truck Pct Str Number NHS1,250 0030015 NSTRUCTURAL ACCRUING 811,500 0030001 YADEQUATE 3611,500 0030002 YADEQUATE 3611,500 0030003 YADEQUATE 3611,500 0030004 YADEQUATE 36

2018-2022$1,000,000MADISON CO LINE TO 0.3 MI W OF SUGAR LOAF RD System Maintenance

1RAMP REPAIR BONDSAFETYPRESERVE SYSTEM

I 70

2018-2022$28,300,0000.3 MI W OF SUGAR LOAF RD TO BN RRMiles = 9.17 System Maintenance

8RESURFACINGBRIDGE PAINTINGBRIDGE REPAIRBRIDGE JOINT REPAIRBRIDGE DECK SEALINGRIP RAPBRIDGE NEW DECK

BONDSAFETYPRESERVE SYSTEM

I 70

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS20,898 39.4 Y0.179.17 GOODBACKLOG

Structure Status AADT Truck Pct Str Number NHS10,050 0030007 YADEQUATE 4010,050 0030008 YSTRUCTURAL ACCRUING 4010,000 0030011 YSTRUCTURAL BACKLOG 4110,000 0030012 YADEQUATE 4110,000 0030013 YSTRUCTURAL BACKLOG 41

8 - 4

Page 9: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,800,0000.3 MI W OF SUGAR LOAF RD TO BN RR

System Maintenance2RAMP REPAIR BONDSAFETY

PRESERVE SYSTEMI 70

2018-2022$50,000JEFFERSON BARRACKS BRIDGE System Maintenance

1BRIDGE DECK SEALING MONROEPRESERVE SYSTEMI 255US 50

MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.

2017$500,000MISSISSIPPI RIVER TO S OF COLLINSVILLE RD System Maintenance

1PATCHING ST. CLAIRMONROE

SAFETYPRESERVE SYSTEM

I 255US 50ILL 3

2018-2022$20,000,0000.5 MI N OF ILL 157 TO 0.2 MI S OF LAKE BLVDMiles = 4.50 System Maintenance

1RESURFACINGBRIDGE REPAIR

ST. CLAIRSAFETYPRESERVE SYSTEM

I 255US 50

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS48,656 17.8 Y0.124.50 ACCEPTABLEADEQUATE

2018-2022$4,000,0000.5 MI N OF ILL 157 TO 0.2 MI S OF LAKE BLVD System Maintenance

1RAMP REPAIR ST. CLAIRSAFETYPRESERVE SYSTEM

I 255US 50

2018-2022$29,400,0000.2 MI S OF LAKE BLVD TO COLLINSVILLE RDMiles = 5.67 System Maintenance

5RESURFACINGPATCHINGBRIDGE REPAIRBRIDGE DECK WATERPROOFINGBRIDGE PAINTINGBRIDGE JOINT REPAIRSHOULDER REPAIRRIP RAP

ST. CLAIRSAFETYPRESERVE SYSTEM

I 255US 50

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS49,916 17.0 Y0.125.67 ACCEPTABLEADEQUATE

8 - 5

Page 10: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$5,400,0000.2 MI S OF LAKE BLVD TO COLLINSVILLE

RD System Maintenance

1RAMP REPAIR ST. CLAIRMADISON

SAFETYPRESERVE SYSTEM

I 255US 50

2017$2,000,000MISSISSIPPI RIVER Bridge Maintenance

3P.E. (PHASE I)P.E. (CONSULTANT TSL)P.E. SURVEYS (PHASE I)

MADISONI 270

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

2018-2022$5,000,000MISSISSIPPI RIVER

3P.E. (CONSULTANT TSL)P.E. (PHASE II)P.E. (CONSULTANT PLANS)P.E. SURVEYS (PHASE II)

MADISONI 270

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

2018-2022$3,000,000MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 Congestion Mitigation

2P.E. (PHASE I) MADISONI 270

2018-2022$2,000,000MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 Congestion Mitigation

1P.E. (PHASE II)P.E. (CONSULTANT PLANS)

MADISONI 270

2018-2022$2,000,000MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 Congestion Mitigation

1P.E. (PHASE II)P.E. (CONSULTANT PLANS)

MADISONI 270

2018-2022$2,400,0000.2 MI W OF FORMOSA RD TO 0.2 MI E OF BETHANY LNMiles = 3.32 System Maintenance

2RESURFACINGADA IMPROVEMENTS

MADISONSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

US 40

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS10,794 10.1 Y0.233.32 ACCEPTABLEACCRUING

8 - 6

Page 11: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,600,0000.2 MI E OF BETHANY LN TO 0.1 MI E OF

ILL 4 RAMPMiles = 2.97 System Maintenance

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

US 40

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS9,434 12.2 N0.202.97 ACCEPTABLEBACKLOG

2018-2022$400,000E FORK SILVER CREEK 0.4 MI W OF ILL 4 Bridge Maintenance

1BRIDGE DECK WATERPROOFING MADISONPRESERVE SYSTEMUS 40

2018-2022$2,500,000US 40: POKEY RD TO OVERPASS RD; MILLERSBURG RD: US 40 TO S FR RD; N FR RD: US 40 TO 0.1 MI EMiles = 6.67 System Maintenance

2RESURFACING BONDSAFETYPRESERVE SYSTEM

US 40MILLERSBURG RDN FR RD

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS1,430 12.2 N0.146.31 ACCEPTABLEBACKLOG1,300 0.0 N0.150.25 ACCEPTABLEADEQUATE

25 0.0 N0.000.11 NOT ACCEPTABLEBACKLOG

2018-2022$5,000,0000.3 MI W OF ILL 127 TO FAYETTE CO LINEMiles = 8.13 System Maintenance

1RESURFACINGADA IMPROVEMENTS

BONDSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

US 40

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS2,923 14.3 N0.121.86 ACCEPTABLEACCRUING2,481 13.5 N0.136.27 ACCEPTABLEBACKLOG

2018-2022$400,000B&N RR AT SMITHBORO Bridge Maintenance

1BRIDGE DECK WATERPROOFING BONDPRESERVE SYSTEMUS 40

2018-2022$1,200,000ILL 4 N JCT IN LEBANON TO 0.3 MI W OF OLD US 50Miles = 2.17 System Maintenance

2RESURFACINGADA IMPROVEMENTS

ST. CLAIRSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

US 50

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS9,232 15.9 Y0.232.17 ACCEPTABLEBACKLOG

8 - 7

Page 12: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$6,500,0001 MI E OF CRACKERNECK RD TO 0.2 MI W

OF ST ROSE RDMiles = 3.98 System Maintenance

1RESURFACING CLINTONSAFETYPRESERVE SYSTEM

US 50

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS6,800 21.7 Y0.123.98 ACCEPTABLEBACKLOG

2017$500,000SUGAR CREEK TO SHOAL CREEK System Maintenance

1PATCHING CLINTONSAFETYPRESERVE SYSTEM

US 50

2018-2022$4,300,00011TH ST IN CARLYLE TO SHATTUC RDMiles = 9.47 System Maintenance

2RESURFACINGADA IMPROVEMENTS

CLINTONSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

US 50ILL 127

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS5,244 19.4 Y0.229.47 ACCEPTABLEACCRUING

2018-2022$225,00011TH ST IN CARLYLE TO SHATTUC RD System Maintenance

1LAND ACQUISITION CLINTONUS 50ILL 127

2018-2022$500,000DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance

2CULVERT REPLACEMENT CLINTONSAFETYPRESERVE SYSTEM

US 50

2018-2022$50,000DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance

2LAND ACQUISITION CLINTONUS 50

2018-2022$50,000DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance

2UTILITY ADJUSTMENT CLINTONUS 50

2017$3,800,0000.1 MI S OF BRITT RD TO 0.1 MI N OF US 50Miles = 8.00 System Maintenance

2RESURFACING MARIONSAFETYPRESERVE SYSTEM

US 51

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS3,549 16.6 Y0.208.00 ACCEPTABLEBACKLOG

8 - 8

Page 13: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$300,000MISSISSIPPI RIVER

Bridge Maintenance5BRIDGE DECK SEALING MADISONPRESERVE SYSTEMUS 67

CLARK BRIDGE

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

2018-2022$1,000,000MISSISSIPPI RIVER Bridge Maintenance

1BRIDGE JOINT REPAIR MADISONSAFETYPRESERVE SYSTEM

US 67CLARK BRIDGE

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

2018-2022$23,000,000DELHI BYPMiles = 3.15 System Expansion

6NEW CONSTRUCTIONGRADINGPAVINGDRAINAGESIGNING (NEW)LIGHTING

JERSEYTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENTPRESERVE SYSTEMSAFETY

US 67

2018-2022$900,000MADISON CO LINE TO JERSEYVILLE System Expansion

5UTILITY ADJUSTMENT JERSEYUS 67

2018-2022$500,000MADISON CO LINE TO JERSEYVILLE System Expansion

5LAND ACQUISITION JERSEYUS 67

2017$100,000AT BISSELL AVE & AT MARYVILLE AVE System Maintenance

1RR INTERCONNECT MADISONSAFETYMODAL CONNECTIVITY

ILL 3ILL 203

2018-2022$600,000AT OLD RED BUD RD Congestion Mitigation

1INTERSECTION RECONSTN MONROESAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT

ILL 3

8 - 9

Page 14: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$4,500,000MONROE CO LINE TO 0.2 MI S OF 1ST ST

IN RUMAMiles = 7.97 System Maintenance

2RESURFACINGADA IMPROVEMENTS

RANDOLPHSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

ILL 3

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS6,903 14.9 Y0.237.97 ACCEPTABLEBACKLOG

2017$500,000ILL 3: STATE ST TO S CROSBY ST; ILL 150: OPDYKE ST TO JUNG LN System Maintenance

4PATCHING RANDOLPHSAFETYPRESERVE SYSTEM

ILL 3ILL 150

2018-2022$2,500,000MACOUPIN CO LINE TO 0.3 MI S OF I-55Miles = 4.95 System Maintenance

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

ILL 4

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS4,076 6.0 N0.214.61 ACCEPTABLEBACKLOG2,800 14.5 Y0.280.34 NOT ACCEPTABLEBACKLOG

2018-2022$16,000,0000.3 MI S OF I-55 TO 0.3 MI N OF ILL 143Miles = 9.38 System Maintenance

1RESURFACINGNEW SHOULDERS

MADISONSAFETYPRESERVE SYSTEM

ILL 4

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS3,203 14.1 Y0.239.38 ACCEPTABLEBACKLOG

2018-2022$1,000,000CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance

2BRIDGE REPLACEMENT RANDOLPHSAFETYPRESERVE SYSTEM

ILL 4

2018-2022$50,000CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance

2LAND ACQUISITION RANDOLPHILL 4

2018-2022$50,000CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance

2UTILITY ADJUSTMENT RANDOLPHILL 4

8 - 10

Page 15: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$1,500,0000.2 MI E OF ILL 4 TO LOCUST ST IN

STEELEVILLEMiles = 2.51 System Maintenance

2RESURFACINGADA IMPROVEMENTS

RANDOLPHSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

ILL 4ILL 150

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS5,337 27.4 N0.462.51 ACCEPTABLEACCRUING

2017$150,000AT FREEBURG AVE Congestion Mitigation

2INTERSECTION RECONSTN ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT

ILL 13ILL 158

IDOT PARTICIPATION IN PROJECT.

2018-2022$5,600,000RODGERS DR IN FREEBURG TO 0.1 MI S OF KASKASKIA RIVERMiles = 8.91 System Maintenance

2RESURFACINGADA IMPROVEMENTS

ST. CLAIRSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

ILL 13ILL 15

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS7,835 10.2 N0.208.91 ACCEPTABLEBACKLOG

2018-2022$500,000ICG RR Bridge Maintenance

2BRIDGE REPAIR ST. CLAIRSAFETYPRESERVE SYSTEM

ILL 13

2018-2022$3,500,000RICHLAND CREEK 1 MI E OF JCT ILL 159 Bridge Maintenance

2BRIDGE NEW DECK ST. CLAIRSAFETYPRESERVE SYSTEM

ILL 15

Structure Status AADT Truck Pct Str Number NHS6,750 0820049 YADEQUATE 126,750 0820050 YADEQUATE 12

2018-2022$600,000LUNTE CREEK 3.6 MI W OF ILL 127 Bridge Maintenance

1BRIDGE REPLACEMENT WASHINGTONSAFETYPRESERVE SYSTEM

ILL 15

Structure Status AADT Truck Pct Str Number NHS2,550 0950008 NSTRUCTURAL BACKLOG 26

8 - 11

Page 16: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$50,000LUNTE CREEK 3.6 MI W OF ILL 127

Bridge Maintenance1LAND ACQUISITION WASHINGTONILL 15

2018-2022$50,000LUNTE CREEK 3.6 MI W OF ILL 127 Bridge Maintenance

1UTILITY ADJUSTMENT WASHINGTONILL 15

2018-2022$800,000NASHVILLE CREEK 0.2 MI W OF NASHVILLE Bridge Maintenance

1BRIDGE REPLACEMENT WASHINGTONSAFETYPRESERVE SYSTEM

ILL 15

Structure Status AADT Truck Pct Str Number NHS3,550 0950009 NSTRUCTURAL ACCRUING 12

2018-2022$50,000NASHVILLE CREEK 0.2 MI W OF NASHVILLE Bridge Maintenance

1LAND ACQUISITION WASHINGTONILL 15

2018-2022$50,000NASHVILLE CREEK 0.2 MI W OF NASHVILLE Bridge Maintenance

1UTILITY ADJUSTMENT WASHINGTONILL 15

2017$2,800,000HAMBURG RD TO ILL 100Miles = 7.35 System Maintenance

2RESURFACINGADA IMPROVEMENTS

CALHOUNSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

ILL 96

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS608 17.6 Y0.157.35 GOODBACKLOG

2018-2022$400,000CREEK IN KAMPSVILLE Bridge Maintenance

2BRIDGE NEW DECK CALHOUNSAFETYPRESERVE SYSTEM

ILL 96

Structure Status AADT Truck Pct Str Number NHS950 0070014 YSTRUCTURAL ACCRUING 7

8 - 12

Page 17: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$110,000AT W COUNTY RD

Congestion Mitigation2LEFT TURN LANES

TRAF SIGNAL INSTALLATIONJERSEYSAFETY

MODAL CONNECTIVITYTRANSPORTATION OPS

ILL 109

IDOT PARTICIPATION IN PROJECT.

2017$250,000ILL 111/267 AT DAVID LN; ILL 255 N OF ILL 140 TO S OF CULP LN; ILL 255 N OF SEMINARY RD System Maintenance

1MISCELLANEOUS JERSEYMADISON

ILL 111ILL 255ILL 267

2018-2022$5,000,000CONRAIL & B&O RR Bridge Maintenance

1BRIDGE DECK WATERPROOFINGBRIDGE JOINT REPAIR

ST. CLAIRPRESERVE SYSTEMSAFETY

ILL 111

2017$2,200,000ILL 177 TO 0.4 MI N OF MOCKINGBIRD RD IN NASHVILLEMiles = 4.11 System Maintenance

2RESURFACING WASHINGTONSAFETYPRESERVE SYSTEM

ILL 127

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS4,751 16.2 N0.224.11 ACCEPTABLEBACKLOG

2017$6,600,000INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance

4BRIDGE REPLACEMENT MADISONSAFETYPRESERVE SYSTEM

ILL 143

Structure Status AADT Truck Pct Str Number NHS10,000 0600082 YSTRUCTURAL BACKLOG 10

2017$250,000INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance

2LAND ACQUISITION MADISONILL 143

2017$500,000INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance

2UTILITY ADJUSTMENT MADISONILL 143

8 - 13

Page 18: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$18,500,000SHOAL CREEK 0.9 MI E OF PIERRON

Bridge Maintenance5BRIDGE REPLACEMENT BONDSAFETY

PRESERVE SYSTEMILL 143

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

Structure Status AADT Truck Pct Str Number NHS2,000 0030034 NSTRUCTURAL BACKLOG 16

2018-2022$810,000MISSISSIPPI RIVER AT CHESTER Bridge Maintenance

1BRIDGE REPAIR RANDOLPHSAFETYPRESERVE SYSTEM

ILL 150

MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.

2018-2022$2,500,000ILL 13 IN COULTERVILLE TO ILL 154Miles = 6.02 System Maintenance

2RESURFACINGADA IMPROVEMENTS

RANDOLPHSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

ILL 153

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS1,993 16.6 N0.315.81 ACCEPTABLEBACKLOG

2018-2022$1,100,000SILVER CREEK TRIB S OF HAMEL SCL Bridge Maintenance

2BRIDGE REPLACEMENT MADISONSAFETYPRESERVE SYSTEM

ILL 157

Structure Status AADT Truck Pct Str Number NHS2,500 0602454 NSTRUCTURAL BACKLOG 6

2018-2022$50,000SILVER CREEK TRIB S OF HAMEL SCL Bridge Maintenance

2LAND ACQUISITION MADISONILL 157

2018-2022$50,000SILVER CREEK TRIB S OF HAMEL SCL Bridge Maintenance

2UTILITY ADJUSTMENT MADISONILL 157

8 - 14

Page 19: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$2,100,000DOUGLAS CREEK 0.8 MI N OF SMITHTON

Bridge Maintenance7BRIDGE REPLACEMENT ST. CLAIRSAFETY

PRESERVE SYSTEMILL 159

Structure Status AADT Truck Pct Str Number NHS9,100 0820071 NFUNCTIONAL BACKLOG 10

2018-2022$100,000DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance

7LAND ACQUISITION ST. CLAIRILL 159

2018-2022$100,000DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance

7UTILITY ADJUSTMENT ST. CLAIRILL 159

2018-2022$2,100,000FOURTH ST IN TRENTON TO ILL 161Miles = 5.09 System Maintenance

2RESURFACINGADA IMPROVEMENTS

CLINTONSAFETYPRESERVE SYSTEMTRANSPORTATION OPS

ILL 160

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS3,965 12.4 N0.155.09 GOODBACKLOG

2018-2022$1,400,000ILL 161 TO ILL 177Miles = 3.78 System Maintenance

2RESURFACING CLINTONSAFETYPRESERVE SYSTEM

ILL 160

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS2,001 12.9 N0.143.78 GOODBACKLOG

2018-2022$2,800,000ILL 158 E JCT TO 0.2 MI E OF ILL 4Miles = 4.61 System Maintenance

1RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

ILL 161

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS7,524 8.8 Y0.224.61 ACCEPTABLEBACKLOG

8 - 15

Page 20: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$20,000,000CROOKED CREEK 8.6 MI E OF ILL 127 &

CREEK 1 MI W OF CENTRALIA Bridge Maintenance

12BRIDGE REPLACEMENTCULVERT REPLACEMENT

CLINTONSAFETYPRESERVE SYSTEM

ILL 161

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

Structure Status AADT Truck Pct Str Number NHS6,900 0140025 NSTRUCTURAL BACKLOG 156,900 0142001 NSTRUCTURAL BACKLOG 15

2018-2022$500,000CROOKED CREEK 8.6 MI E OF ILL 127 Bridge Maintenance

3LAND ACQUISITION CLINTONILL 161

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

2018-2022$500,000CROOKED CREEK 8.6 MI E OF ILL 127 Bridge Maintenance

3UTILITY ADJUSTMENT CLINTONILL 161

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

2018-2022$4,300,000MORGAN CO LINE TO SHORT RDMiles = 7.65 System Maintenance

1RESURFACING GREENESAFETYPRESERVE SYSTEM

ILL 267

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS2,111 20.6 N0.267.65 ACCEPTABLEBACKLOG

2018-2022$2,500,000APPLE CREEK 8.6 MI N OF GREENFIELD Bridge Maintenance

1BRIDGE NEW DECK GREENESAFETYPRESERVE SYSTEM

ILL 267

Structure Status AADT Truck Pct Str Number NHS2,150 0310015 NSTRUCTURAL BACKLOG 19

2018-2022$1,100,000AT LICK CREEK S OF CH 9 Bridge Maintenance

1BRIDGE NEW DECK GREENESAFETYPRESERVE SYSTEM

ILL 267

Structure Status AADT Truck Pct Str Number NHS2,150 0310016 NSTRUCTURAL BACKLOG 19

8 - 16

Page 21: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$10,000I-55/70 TO I-255

System Expansion5LAND ACQUISITION MADISON

ST. CLAIRMONROE

GATEWAYCONNECTOR

2018-2022$10,000I-55/70 TO I-255 System Expansion

5LAND ACQUISITION MADISONST. CLAIRMONROE

GATEWAYCONNECTOR

2018-2022$10,000I-55/70 TO I-255 System Expansion

1LAND ACQUISITION MADISONST. CLAIRMONROE

GATEWAYCONNECTOR

2018-2022$8,000,000ILL 161 TO ILL 177Miles = 1.00 Congestion Mitigation

4ADDITIONAL LANESRESURFACING

ST. CLAIRSAFETYTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENTPRESERVE SYSTEM

GREENMOUNT RD

CONTINGENT UPON A JURISDICTIONAL TRANSFER.

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS19,276 0.2 N0.151.00 ACCEPTABLEADEQUATE

2018-2022$400,000ILL 161 TO ILL 177 Congestion Mitigation

1LAND ACQUISITION ST. CLAIRGREENMOUNT RD

2018-2022$300,000ILL 161 TO ILL 177 Congestion Mitigation

1UTILITY ADJUSTMENT ST. CLAIRGREENMOUNT RD

2018-2022$1,000,000COLLINSVILLE RD TO ILL 3 / N 1ST ST System Expansion

1LAND ACQUISITION ST. CLAIRILL 3 / N 1ST STCONNECTOR(PROPOSED)

2018-2022$170,000MLK BRIDGE IN EAST ST. LOUIS Bridge Maintenance

5BRIDGE DECK SEALING ST. CLAIRPRESERVE SYSTEMILLINOIS AVE

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

8 - 17

Page 22: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$32,000,000I-55/64 (WB), MISSOURI AVE, RELOCATED

ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance

4BRIDGE REPLACEMENT ST. CLAIRSAFETYPRESERVE SYSTEM

KING BRIDGE RAMPS

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

Structure Status AADT Truck Pct Str Number NHS13,300 0826003 YFUNCTIONAL BACKLOG 12

2017$500,000I-55/64 (WB), MISSOURI AVE, RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance

4LAND ACQUISITION ST. CLAIRKING BRIDGE RAMPS

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

2017$2,000,000I-55/64 (WB), MISSOURI AVE, RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance

4UTILITY ADJUSTMENT ST. CLAIRKING BRIDGE RAMPS

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

2018-2022$200,000I-55/64 (WB), MISSOURI AVE, RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance

1RR FLAGGER ST. CLAIRSAFETYKING BRIDGE RAMPS

ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.

2018-2022$1,100,000ILL 4 TO US 50 E OF LEBANON System Expansion

3P.E. (PHASE II)P.E. (CONSULTANT PLANS)

ST. CLAIRLEBANON BYP

2017$175,000MISSISSIPPI RIVER Bridge Maintenance

4BRIDGE DECK SEALING MADISONPRESERVE SYSTEMMCKINLEY BRIDGESALISBURY ST

8 - 18

Page 23: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$4,800,000CAHOKIA CREEK 0.5 MI S OF ILL 143

Bridge Maintenance2BRIDGE NEW DECK

BRIDGE SUPERSTRUCTUREMADISONSAFETY

PRESERVE SYSTEMTRANSPORTATION OPS

N SIU ENT RDNB & SB

Structure Status AADT Truck Pct Str Number NHS2,900 0600140 NSTRUCTURAL BACKLOG 22,900 0600141 NSTRUCTURAL BACKLOG 2

2018-2022$600,0000.3 MI E OF WANDA RD TO CAHOKIA CREEK RDMiles = 1.21 System Maintenance

2RESURFACINGDRAINAGE

MADISONSAFETYPRESERVE SYSTEM

OLD ALTON /EDWARDSVILLE RD

Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS1,595 0.0 N0.271.21 NOT ACCEPTABLEBACKLOG

2018-2022$1,200,000TRIB TO INDIAN CREEK 1 MI E OF I-255 Bridge Maintenance

1CULVERT REPLACEMENT MADISONSAFETYPRESERVE SYSTEM

OLD ALTON /EDWARDSVILLE RD

2018-2022$50,000TRIB TO INDIAN CREEK 1 MI E OF I-255 Bridge Maintenance

1LAND ACQUISITION MADISONOLD ALTON /EDWARDSVILLE RD

2018-2022$50,000TRIB TO INDIAN CREEK 1 MI E OF I-255 Bridge Maintenance

1UTILITY ADJUSTMENT MADISONOLD ALTON /EDWARDSVILLE RD

2017$750,000VARIOUS ADA RAMPS System Maintenance

1ADA IMPROVEMENTS DISTRICT-WIDESAFETYTRANSPORTATION OPS

VARIOUS

2018-2022$3,750,000VARIOUS ADA RAMPS

2ADA IMPROVEMENTS DISTRICT-WIDESAFETYTRANSPORTATION OPS

VARIOUS

2017$2,630,000CHANGE ORDER RESERVE System Maintenance

1CHANGE ORDERS DISTRICT-WIDEVARIOUS

8 - 19

Page 24: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$6,502,000HIGHWAY SAFETY IMPROVEMENT

PROGRAM PROJECTS System Maintenance

6SAFETY IMPROVEMENTS DISTRICT-WIDESAFETYVARIOUS

2018-2022$34,525,000HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS

5SAFETY IMPROVEMENTS DISTRICT-WIDESAFETYVARIOUS

2017$500,000ON-CALL ENGINEERING System Maintenance

1PRELIMINARY ENGINEERING DISTRICT-WIDEVARIOUS

2018-2022$300,000ON-CALL ENGINEERING System Maintenance

1P.E. SOILS (PHASE I)P.E. SOILS (PHASE II)

DISTRICT-WIDEVARIOUS

2017$250,000ON-CALL ENGINEERING System Maintenance

2P.E. SURVEYS (ROW) DISTRICT-WIDEVARIOUS

2018-2022$650,000ON-CALL ENGINEERING

1P.E. SURVEYS (ROW) DISTRICT-WIDEVARIOUS

2017$2,850,000ON-CALL ENGINEERING

1PRELIMINARY ENGINEERING DISTRICT-WIDEVARIOUS

2018-2022$3,750,000ON-CALL ENGINEERING

1PRELIMINARY ENGINEERING DISTRICT-WIDEVARIOUS

2018-2022$100,000ON-CALL ENGINEERING - MATERIALS INSPECTION System Maintenance

1CONSTRUCTION ENGINEERING DISTRICT-WIDEVARIOUS

2017$50,000RR FLAGGER AGREEMENT System Maintenance

1RR FLAGGER DISTRICT-WIDESAFETYVARIOUS

8 - 20

Page 25: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$250,000SUBSURFACE UTILITY ENGINEERING

COORDINATION - PTB 171 System Maintenance

3P.E. SUBSURFACE UTILITIES DISTRICT-WIDEVARIOUS

2017$200,000LOCAL ROADS CONSULTANT System Maintenance

3P.E. PROJECT MANAGERS DISTRICT-WIDEVARIOUS

2018-2022$1,050,000LOCAL ROADS CONSULTANT

3P.E. PROJECT MANAGERS DISTRICT-WIDEVARIOUS

2017$100,000DEEP WELL & PUMP REPAIRS System Maintenance

4MISCELLANEOUS MADISONST. CLAIR

VARIOUS

2018-2022$200,000DEEP WELL & PUMP REPAIRS

1MISCELLANEOUS MADISONST. CLAIR

VARIOUS

2017$50,000ENVIRONMENTAL MAINTENANCE & TREE MITIGATION System Maintenance

4MISCELLANEOUS DISTRICT-WIDEVARIOUS

2018-2022$100,000ENVIRONMENTAL MAINTENANCE & TREE MITIGATION

1MISCELLANEOUS DISTRICT-WIDEVARIOUS

2017$50,000MISCELLANEOUS LAND ACQUISITION System Maintenance

4LAND ACQUISITION DISTRICT-WIDEVARIOUS

2018-2022$1,450,000MISCELLANEOUS LAND ACQUISITION

1LAND ACQUISITION DISTRICT-WIDEVARIOUS

2017$250,000PRE-LAND ACQUISITION ACTIVITY System Maintenance

4PRE-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS

8 - 21

Page 26: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$500,000PRE-LAND ACQUISITION ACTIVITY

1PRE-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS

2017$1,000,000POST-LAND ACQUISITION ACTIVITY System Maintenance

4POST-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS

2018-2022$1,900,000POST-LAND ACQUISITION ACTIVITY

1POST-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS

2017$150,000MISCELLANEOUS UTILITIES System Maintenance

1UTILITY ADJUSTMENT DISTRICT-WIDEVARIOUS

2017$1,000,000VARIOUS LOCATIONS (ISAS) System Maintenance

2ARCHAEOLOGICAL SURVEY DISTRICT-WIDEVARIOUS

2018-2022$1,350,000VARIOUS LOCATIONS (ISAS)

1ARCHAEOLOGICAL SURVEY DISTRICT-WIDEVARIOUS

2017$500,000DISTRICT MISCELLANEOUS System Maintenance

4MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

2018-2022$1,000,000DISTRICT MISCELLANEOUS

1MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

2018-2022$3,000,000PAVEMENT PATCHING

1PATCHING DISTRICT-WIDESAFETYPRESERVE SYSTEM

VARIOUS

2017$500,000CONSTRUCTION ENGINEERING System Maintenance

1CONSTRUCTION ENGINEERING DISTRICT-WIDEVARIOUS

8 - 22

Page 27: FY 2017-2022 Proposed Highway Improvement Program

District 8State Highways

FY 2017-2022 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,000,000CONSTRUCTION ENGINEERING

4CONSTRUCTION ENGINEERING DISTRICT-WIDEVARIOUS

2017$900,000GUARDRAIL & MEDIAN CABLE INSTALLATION System Maintenance

4GUARDRAILMEDIAN CABLE

DISTRICT-WIDESAFETYVARIOUS

2018-2022$1,800,000GUARDRAIL & MEDIAN CABLE INSTALLATION

1GUARDRAILMEDIAN CABLE

DISTRICT-WIDESAFETYVARIOUS

2017$562,000CONGESTION MITIGATION AIR QUALITY System Maintenance

6MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

2018-2022$2,810,000CONGESTION MITIGATION AIR QUALITY

5MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

8 - 23

Page 28: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,250,000ILL 3: 0.1 MI N OF KASKASKIA RD TO 0.1

MI S OF OLD RED BUD RD; OLD RED BUD RD: ILL 3 TO 0.6 MI E; KASKASKIA RD: ILL 3 TO 0.1 MI WMiles = 0.95

2RECONSTRUCTION MONROESAFETYPRESERVE SYSTEM

ILL 3CH 1OLD RED BUD RDKASKASKIA RD

2017$1,061,000AT FREEBURG AVE IN BELLEVILLE

1INTERSECTION RECONSTN ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT

ILL 13ILL 158SOUTH BELT EAST

2018-2022$922,000E EDWARDSVILLE RD TO WOODLAND AVE IN WOOD RIVERMiles = 0.65

2RESURFACING MADISONSAFETYPRESERVE SYSTEM

6TH ST

2018-2022$1,613,000HARTMAN LN TO CENTRAL PARK DR IN O'FALLONMiles = 0.30

2NEW CONSTRUCTION ST. CLAIRTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENT

ASHLAND AVE EXT

2018-2022$561,0000.1 MI W OF WOOD RIVER AVE TO 0.3 MI E IN EAST ALTONMiles = 0.29

2RESURFACING MADISONSAFETYPRESERVE SYSTEM

BERKSHIRE BLVD

2017$1,500,000MODOC FERRY RD TO ROOTS RDMiles = 4.07

4RESURFACING RANDOLPHSAFETYPRESERVE SYSTEM

BLUFF RD

2018-2022$400,000GIBBS CREEK

1BRIDGE REHABILITATION CLINTONSAFETYPRESERVE SYSTEM

BOULDER RD

2018-2022$513,000PULLEN BLVD TO LINCOLN BLVD IN CENTRALIAMiles = 0.98

1RESURFACING MARIONSAFETYPRESERVE SYSTEM

BROADWAY

8 - 24

Page 29: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$851,000BROADWAY ST: 0.1 MI E OF BELCHIK

MEM PKWY TO ALLEN ST & W OF HENRY ST TO MONUMENT AVE; HENRY ST: S OF BROADWAY ST; RIDGE ST: S OF BROADWAY STMiles = 0.76

2RESURFACING MADISONSAFETYPRESERVE SYSTEM

BROADWAY STHENRY STRIDGE ST

2017$1,200,000STATE ST TO HANCOCK ST IN CHESTERMiles = 0.31

3RECONSTRUCTION RANDOLPHSAFETYPRESERVE SYSTEM

BUENA VISTA STTAYLOR STBISSELL ST

2017$1,700,000MISSISSIPPI RIVER BARGE DOCK (FOX TERMINAL) TO ILL 3 IN CAHOKIAMiles = 1.08

7RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM

CARGILL ELEVATORRD

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.

2017$720,000STATE ST TO WASHINGTON ST IN BELLEVILLEMiles = 0.51

3RESURFACINGBIKEWAY

ST. CLAIRSAFETYPRESERVE SYSTEMTRANSPORTATION OPSMODAL CONNECTIVITY

CENTREVILLE AVE

2017$360,000ILL 106 TO ILL 67Miles = 2.26

1RESURFACING GREENESAFETYPRESERVE SYSTEM

CH 2

2018-2022$800,000AT US 50

2INTERSECTION IMPROVEMENT CLINTONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

CH 3BOULDER RD

2018-2022$125,000NSRR TO GALLATIN ST IN WALNUT HILLMiles = 0.08

2RESURFACING MARIONSAFETYPRESERVE SYSTEM

CH 3WALNUT HILL RD

2018-2022$1,500,000JIM'S CREEK 4 MI SE OF PATOKA

3BRIDGE REPLACEMENT MARIONSAFETYPRESERVE SYSTEM

CH 5MARSHALL CREEK RD

8 - 25

Page 30: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$600,000MISSISSIPPI RIVER RD TO CH 1

Miles = 3.20 1RESURFACING CALHOUNSAFETY

PRESERVE SYSTEMCH 6BATCHTOWN RD

2018-2022$554,000I-57 RAMP (SB) TO GARRET RDMiles = 3.55

1RESURFACING MARIONSAFETYPRESERVE SYSTEM

CH 8KINOKA RD

2018-2022$420,000CH 15 TO TR 64 / N 650E RDMiles = 2.54

2RESURFACING GREENESAFETYPRESERVE SYSTEM

CH 13WALKERVILLE RD

2018-2022$875,000RADOM ECL TO US 51Miles = 1.53

2RESURFACING WASHINGTONSAFETYPRESERVE SYSTEM

CH 23

2017$473,000COMBS ST TO N MORRISON AVE IN COLLINSVILLEMiles = 0.54

4RESURFACING MADISONSAFETYPRESERVE SYSTEM

CLAY ST

2018-2022$421,000S OF ILL 3 TO N OF MCADAMS PKWY IN GODFREYMiles = 0.74

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

CLIFTON TERRACERD

2017$138,000OWL CREEK AT N EDGE OF MULBERRY GROVE

2BRIDGE REPLACEMENT BONDSAFETYPRESERVE SYSTEM

COUNTY LINE RD

2018-2022$400,000AT I-255 IN DUPO

11UTILITY ADJUSTMENT ST. CLAIRDAVIS ST FERRY RD

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.

2018-2022$19,075,000AT I-255 IN DUPO

10BRIDGE (NEW) ST. CLAIRTRANSPORTATION OPSFREIGHT MOVEMENT

DAVIS ST FERRY RD

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.

8 - 26

Page 31: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$500,000BEAVER CREEK

1BRIDGE REPLACEMENT BONDSAFETY

PRESERVE SYSTEMDUDLEYVILLE RD

2018-2022$1,413,000AT UNNAMED CREEK

1BRIDGE REPLACEMENT ST. CLAIRSAFETYPRESERVE SYSTEM

DUTCH HOLLOW RD

ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

2018-2022$475,000SCHOENBERGER CREEK

1BRIDGE REHABILITATION ST. CLAIRSAFETYPRESERVE SYSTEM

DUTCH HOLLOW RD

2018-2022$1,399,000LAKEVIEW ACRES RD TO 0.3 MI W IN MARYVILLEMiles = 0.26

2RECONSTRUCTION MADISONSAFETYPRESERVE SYSTEM

E MAIN ST

2017$451,000S OF ST. LOUIS AVE TO PICKER AVE IN EAST ALTONMiles = 0.30

3RESURFACINGCURB AND GUTTERSIDEWALKS

MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

EAST ALTON AVE

2018-2022$650,000LONGFELLOW ST TO MORELAND RD IN BETHALTOMiles = 0.33

2RESURFACING MADISONSAFETYPRESERVE SYSTEM

EAST CENTRAL ST

2017$287,000MONSANTO AVE TO QUEENY AVE IN SAUGETMiles = 0.80

3RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

FALLING SPRINGSRD

2018-2022$727,0000.2 MI W OF ILL 203 TO ILL 203 IN GRANITE CITYMiles = 0.17

1RECONSTRUCTION MADISONSAFETYPRESERVE SYSTEM

FEHLING RD

2017$6,400,000CROSS ST IN SHILOH TO ILL 158Miles = 1.60

8NEW CONSTRUCTION ST. CLAIRTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENT

FRANK SCOTT PKWY

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.THIS EARMARK WILL BE FUNDED SEPARATELY.

8 - 27

Page 32: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$400,000CROSS ST IN SHILOH TO ILL 158

Miles = 0.01 9NEW CONSTRUCTION ST. CLAIRTRANSPORTATION OPS

MODAL CONNECTIVITYFREIGHT MOVEMENT

FRANK SCOTT PKWY

2017$2,000,000E OF ILL 159 TO W OF OLD COLLINSVILLE RD IN SWANSEAMiles = 0.77

3RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

FRANK SCOTT PKWY

2018-2022$400,000ILL 111/140 TO CALIFORNIA AVE IN EAST ALTONMiles = 1.04

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

FRANKLIN AVE

2017$630,000HAMACHER ST: RODGERS ST TO OSTERHAGE DR; OSTERHAGE DR: HAMACHER ST TO BRIARCLIFF DR; BRADFORD LN: MARKET ST (OLD ILL 3) TO RODGERS ST IN WATERLOOMiles = 1.12

3RESURFACING MONROESAFETYPRESERVE SYSTEM

HAMACHER STOSTERHAGE DRBRADFORD LN

2018-2022$400,000SAMUEL W ANDREWS DR TO ILL 127 IN GREENVILLEMiles = 0.11

3WIDENING & RESURFACING BONDSAFETYPRESERVE SYSTEM

IDLER LN

2018-2022$200,000N OF MAIN ST TO BOONE ST IN SALEM

3SIDEWALKS MARIONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

ILLINOIS ST

2017$1,250,000AT HOLY CROSS RD IN BREESE

4INTERSECTION RECONSTN CLINTONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT

JAMESTOWN RD

2018-2022$750,000ILL 158 IN MILLSTADT TO DOUGLAS RDMiles = 2.27

2RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

JEFFERSON STFLORAVILLE RD

8 - 28

Page 33: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$360,000UNNAMED STREAM 1.2 MI SW OF

HILLCREST RD

1BRIDGE REPLACEMENT CALHOUNSAFETYPRESERVE SYSTEM

JOHNSON HOLLOW RD

2018-2022$125,000W MCCORD ST TO E 3RD ST IN CENTRALIAMiles = 0.36

1RESURFACING MARIONSAFETYPRESERVE SYSTEM

LOCUST ST

2018-2022$854,000ILL 162 TO TERMINAL AVE IN GRANITE CITYMiles = 0.85

2RESURFACING MADISONSAFETYPRESERVE SYSTEM

MARYVILLE RD

2018-2022$475,000ILL 4 TO HERMAN ST IN LEBANONMiles = 0.15

1RECONSTRUCTIONSIDEWALKS

ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

MCALLISTER ST

2017$971,000OLD COLLINSVILLE RD TO MERRIAM PKWY IN O'FALLONMiles = 1.15

5RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM

MILBURN SCHOOL RD

2017$160,000MADISON CREEK

4BRIDGE REPLACEMENT CALHOUNSAFETYPRESERVE SYSTEM

MISSISSIPPI RIVERRD

2017$476,000TERMINAL RR TO ILL 162 IN PONTOON BEACHMiles = 0.27

3RECONSTRUCTIONCURB AND GUTTERSIDEWALKS

MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

MOCKINGBIRD LN

2018-2022$999,0000.1 MI N OF COLUMBIA AVE TO S OF COLUMBIA AVE IN WATERLOOMiles = 0.10

1RECONSTRUCTION MONROESAFETYPRESERVE SYSTEM

MOORE ST

2018-2022$1,325,000MAIN ST IN BETHALTO TO ILL 159Miles = 2.76

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

MORO RD

8 - 29

Page 34: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$700,000US 40 TO 0.5 MI S

Miles = 8.53 1RESURFACING BONDSAFETY

PRESERVE SYSTEMMULBERRY GROVE RD

2018-2022$73,000N 10TH ST TO N COUNTY RD IN MASCOUTAH

1BIKEWAY ST. CLAIRTRANSPORTATION OPSMODAL CONNECTIVITY

MULTI-USE PATH

2018-2022$2,428,000DRY FORK CREEK 1.5 MI SW OF SORENTO

5BRIDGE REPLACEMENT BONDSAFETYPRESERVE SYSTEM

NEW DOUGLAS AVE

ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

2018-2022$343,000DRY FORK CREEK 1.5 MI SW OF SORENTO

5CONSTRUCTION ENGINEERING BONDNEW DOUGLAS AVE

ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

2018-2022$500,000SORENTO RD TO 0.5 MI SMiles = 0.50

1RESURFACING BONDSAFETYPRESERVE SYSTEM

NEW DOUGLAS AVE

2018-2022$1,000,000NW RR E OF OLD POAG RD

1BRIDGE REHABILITATION MADISONSAFETYPRESERVE SYSTEM

NEW POAG RD

2018-2022$901,000OAK ST: A ST TO E MAIN ST; A ST: ILL 159 TO N OAK ST IN BELLEVILLEMiles = 0.48

2RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

OAK STA ST

2017$1,430,000SHOAL CREEK NW OF BREESE

5BRIDGE REPLACEMENT CLINTONSAFETYPRESERVE SYSTEM

OLD STATE RD

ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

2017$441,000SIMMONS RD TO OBERNUEFEMANN RD IN O'FALLONMiles = 0.38

3RECONSTRUCTIONCURB AND GUTTER

ST. CLAIRSAFETYPRESERVE SYSTEM

PORTER RD

8 - 30

Page 35: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2017$600,000ELM POINT BRANCH 2 MI S OF PANAMA

2BRIDGE REPLACEMENT BONDSAFETY

PRESERVE SYSTEMRENO RDTR 82

2018-2022$610,000CHERRY ST TO ILL 3 IN COLUMBIAMiles = 0.64

2RESURFACING MONROESAFETYPRESERVE SYSTEM

S MAIN ST

2018-2022$1,852,000MADISON CO LINE TO US 50Miles = 5.12

1RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

SCOTT-TROY RD

2018-2022$500,0000.2 MI N OF JOHNSON RD TO 0.1 MI N OF JOHNSON RD IN SHILOHMiles = 0.16

1RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM

SHILOH STATION RD

2018-2022$599,000LAKEVIEW LN TO MILBURN SCHOOL RD / FAIRWOOD HILLS RD IN O'FALLONMiles = 0.35

1RECONSTRUCTIONSIDEWALKS

ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

SIMMONS RD

2017$829,0000.1 MI N OF AUSTIN DR TO 0.1 MI S OF CHARLESTON DR IN TROYMiles = 0.25

5RECONSTRUCTIONSIDEWALKS

MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

SPRING VALLEY RD

2018-2022$700,000ELM ST TO ILL 157 IN EDWARDSVILLEMiles = 0.28

2RESURFACING MADISONSAFETYPRESERVE SYSTEM

ST LOUIS ST

2017$900,000KING ARTHUR LN TO W OF ILL 111 / US 67 IN GODFREYMiles = 0.46

3RESURFACING MADISONSAFETYPRESERVE SYSTEM

STAMPER LN

8 - 31

Page 36: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$395,000ILL 157 TO 0.2 MI E IN COLLINSVILLE

2INTERSECTION RECONSTN MADISONSAFETY

PRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT

SUGAR LOAF RD

2018-2022$436,0000.2 MI E OF ILL 157 TO 0.3 MI E OF ILL 157 IN COLLINSVILLEMiles = 0.11

1RECONSTRUCTION MADISONSAFETYPRESERVE SYSTEM

SUGARLOAF RD

2017$413,000ALTON ST TO MONROE ST IN LEBANONMiles = 0.19

7RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM

SUMMERFIELD ST

2017$577,000MISSOURI AVE TO SUMMIT AVE IN EAST ST LOUISMiles = 0.54

4RESURFACINGSIDEWALKS

ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

TENTH ST

2017$5,205,000DISTRICTWIDE CMAQ PROJECTS

4MISCELLANEOUS DISTRICT-WIDEVARIOUS

2018-2022$6,269,000DISTRICTWIDE CMAQ PROJECTS

3MISCELLANEOUS DISTRICT-WIDEVARIOUS

2018-2022$6,265,000DISTRICTWIDE CMAQ PROJECTS

1MISCELLANEOUS DISTRICT-WIDEVARIOUS

2018-2022$6,069,000DISTRICTWIDE CMAQ PROJECTS

1MISCELLANEOUS DISTRICT-WIDEVARIOUS

8 - 32

Page 37: FY 2017-2022 Proposed Highway Improvement Program

District 8Local Highways

FY 2017-2020 Highway Improvement Program

Route/Street

MYP Years

CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$379,000ILL 162 TO N MAIN ST IN TROY

Miles = 0.23 1RECONSTRUCTION

SIDEWALKSBIKEWAY

MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

W CLAY ST

2018-2022$614,000ST LOUIS RD TO LEBANON RD IN COLLINSVILLEMiles = 0.99

3RESURFACINGSIDEWALKS

MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

W MAIN ST

2018-2022$831,00028TH ST TO 17TH ST IN BELLEVILLEMiles = 0.79

1RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM

W MAIN ST

2017$551,000ILL 157 TO S BUCHANAN ST IN EDWARDSVILLEMiles = 0.65

3RESURFACINGCURB AND GUTTERSIDEWALKS

MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS

W SCHWARZ ST

2018-2022$1,380,000ILL 143 IN ROXANA TO NEW POAG RDMiles = 2.96

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

WANDA RD

2018-2022$451,000N OF SALU ST TO COLLEGE AVE IN ALTONMiles = 0.55

1RESURFACING MADISONSAFETYPRESERVE SYSTEM

WASHINGTON AVE

2017$1,216,000TRIB E FORK OF WOOD RIVER CREEK

4BRIDGE REPLACEMENT MADISONSAFETYPRESERVE SYSTEM

WOODBURN RD

2018-2022$400,000CH 19 TO TR 130Miles = 3.41

1RESURFACING GREENESAFETYPRESERVE SYSTEM

WOODY RD

8 - 33

Page 38: FY 2017-2022 Proposed Highway Improvement Program

!

!

!

l

l

l

l

ll

l

l

l

l

ll

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

:9161

:93

2164

0/67

:9159

:9140

:9100

:937

:9127

2157

:915

:94

:9108

:9154

0/50

:9267

:916

0/50

:9111

:9177

:93:9127

2155

:9160

0/40

:913

:93

2170

:9156

:9100

:996

:9143

2170

:94

21270

:915

:91570/51

:9143

0/50

2170

:94

0/40

:9159

:9153

:9143

:9161

0/50 2164

:9158

:9155

:9150

0/51

:93

:9177

:9160

:9140

0/50

21255

:9127

:9203

:9162

:9177:9160

0/51

:94

0/51

:9109

:9157

:913

:9163

:915 :9160

:9255

:9159

:915

:9150

:9177

:93

:9100:916

:9153

0/40

2170

:9106

:9111

:9157

0/67

:9156

:915

:9140

0/50

:9111

:9158

0/50

:913

2164

:9143

:9111

:915

Centralia

Cahokia

Belleville

Fairview HtsE St Louis

Granite City

Collinsville

Glen Carbon

EdwardsvilleWood River

Alton

Godfrey

Rockwood

KaskaskiaChester

SteelevilleEllis Grove Percy

Prairie Du Rocher Evansville

Ruma

FultsBaldwin

Sparta

Coulterville

TildenRedBud

Maeystown DuboisMarissa

Oakdale RadomLenzburg

Hecker

ValmeyerNew Athens

AshleySt Libory

Waterloo

Fayetteville

Nashville

RichviewAddievilleVenedy

SmithtonNew Minden

OkawvilleIrvington

HoyletonFreeburg

FreeburgMillstadt

Walnut HillColumbia

KellWamacDamiansville

BartelsoNew BadenDupo

HoffmanAlbersE Carondelet

Mascoutah

Central CityGermantownShiloh

SummerfieldAlortonSauget

Centreville

HueyBeckemeyerTrentonLebanon

SandovalO'fallon

OdinAviston

BreeseIukaWashington Park CarlyleCaseyville

FairmontBrooklyn Salem

Fairmont

Pontoon BeachVenice

St JacobAlmaMadison Maryville Troy

Keyesport PatokaPierron Kinmundy

MarineVernon

Highland

Pocahontas FarinaSouth Roxana

GrantforkHartford Roxana

Alhambra Old RipleyHamel Smithboro

East AltonGreenville

Bethalto Mulberry GroveWordenBrussels Elsah

LivingstonNew Douglas

GraftonSorento

PanamaBatchtown BrightonOtterville

FieldonJerseyville

FidelityHardin

Kane

Hamburg

RockbridgeEldredKampsville Carrollton

Greenfield

White HallHillview

Wilmington Roodhouse

RANDOLPH

MONROEWASHINGTON

ST. CLAIR

CLINTON MARION

MADISONBOND

JERSEY

CALHOUN

GREENE

JunctionCity

SeeInsetMap

!

!

!

l

l

l

l

ll

l

l

l

l

ll

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

:9161

:93

2164

0/67

:9159

:9140

:9100

:937

:9127

2157

:915

:94

:9108

:9154

0/50

:9267

:916

0/50

:9111

:9177

:93:9127

2155

:9160

0/40

:913

:93

2170

:9156

:9100

:996

:9143

2170

:94

21270

:915

:91570/51

:9143

0/50

2170

:94

0/40

:9159

:9153

:9143

:9161

0/50 2164

:9158

:9155

:9150

0/51

:93

:9177

:9160

:9140

0/50

21255

:9127

:9203

:9162

:9177:9160

0/51

:94

0/51

:9109

:9157

:913

:9163

:915 :9160

:9255

:9159

:915

:9150

:9177

:93

:9100:916

:9153

0/40

2170

:9106

:9111

:9157

0/67

:9156

:915

:9140

0/50

:9111

:9158

0/50

:913

2164

:9143

:9111

:915

Centralia

Cahokia

Belleville

Fairview HtsE St Louis

Granite City

Collinsville

Glen Carbon

EdwardsvilleWood River

Alton

Godfrey

Rockwood

KaskaskiaChester

SteelevilleEllis Grove Percy

Prairie Du Rocher Evansville

Ruma

FultsBaldwin

Sparta

Coulterville

TildenRedBud

Maeystown DuboisMarissa

Oakdale RadomLenzburg

Hecker

ValmeyerNew Athens

AshleySt Libory

Waterloo

Fayetteville

Nashville

RichviewAddievilleVenedy

SmithtonNew Minden

OkawvilleIrvington

HoyletonFreeburg

FreeburgMillstadt

Walnut HillColumbia

KellWamacDamiansville

BartelsoNew BadenDupo

HoffmanAlbersE Carondelet

Mascoutah

Central CityGermantownShiloh

SummerfieldAlortonSauget

Centreville

HueyBeckemeyerTrentonLebanon

SandovalO'fallon

OdinAviston

BreeseIukaWashington Park CarlyleCaseyville

FairmontBrooklyn Salem

Fairmont

Pontoon BeachVenice

St JacobAlmaMadison Maryville Troy

Keyesport PatokaPierron Kinmundy

MarineVernon

Highland

Pocahontas FarinaSouth Roxana

GrantforkHartford Roxana

Alhambra Old RipleyHamel Smithboro

East AltonGreenville

Bethalto Mulberry GroveWordenBrussels Elsah

LivingstonNew Douglas

GraftonSorento

PanamaBatchtown BrightonOtterville

FieldonJerseyville

FidelityHardin

Kane

Hamburg

RockbridgeEldredKampsville Carrollton

Greenfield

White HallHillview

Wilmington Roodhouse

RANDOLPH

MONROEWASHINGTON

ST. CLAIR

CLINTON MARION

MADISONBOND

JERSEY

CALHOUN

GREENE

JunctionCity

SeeInsetMap

DISTRICT 8REGION 5

PROPOSED FY 2017-2022HIGHWAY PROGRAM#

1

#

1

FY 2017 FY 2018-2022 HIGHWAYSPOT

ROADWAYBRIDGE

Page 39: FY 2017-2022 Proposed Highway Improvement Program

! l

lll

l

l

l

l

l

l

:9159

:9100

:9111

:932155

:9143

217021270

:915

:9157

2170

0/402155

0/40

:9159

:9143

:9161

0/50

2164

:9158

21255

0/5021255

:9203

:9162

:9157

:913

:9163 :915

:9255

:9157

:9177 :9158

:93

:9111

:9157

0/67 :9140:9111

0/50:93

:93

:9158

:9140

2164

:9111

Swansea

Cahokia

Belleville

FairviewHeights

East St Louis

Collinsville

Glen Carbon

Granite City

Edwardsville

Wood River

Alton

Godfrey

EastAlton

EastCarondelet

21255

:93

:9140

:91110/67

0/67 :9111

:9159

21270

0/50

Columbia

Dupo

ShilohAlorton

Sauget

Centreville

LebanonO'fallon

Washington ParkFairmont

Caseyville

MadisonBrooklynVenice

Maryville

Madison

TroyPontoon Beach

South RoxanaHartford Roxana

Bethalto

MADISON

ST. CLAIR! l

lll

l

l

l

l

l

l

:9159

:9100

:9111

:932155

:9143

217021270

:915

:9157

2170

0/402155

0/40

:9159

:9143

:9161

0/50

2164

:9158

21255

0/5021255

:9203

:9162

:9157

:913

:9163 :915

:9255

:9157

:9177 :9158

:93

:9111

:9157

0/67 :9140:9111

0/50:93

:93

:9158

:9140

2164

:9111

Swansea

Cahokia

Belleville

FairviewHeights

East St Louis

Collinsville

Glen Carbon

Granite City

Edwardsville

Wood River

Alton

Godfrey

EastAlton

EastCarondelet

21255

:93

:9140

:91110/67

0/67 :9111

:9159

21270

0/50

Columbia

Dupo

ShilohAlorton

Sauget

Centreville

LebanonO'fallon

Washington ParkFairmont

Caseyville

MadisonBrooklynVenice

Maryville

Madison

TroyPontoon Beach

South RoxanaHartford Roxana

Bethalto

MADISON

ST. CLAIR

ALTON - EAST ST LOUISAND VICINITY

DISTRICT 8REGION 5

PROPOSED FY 2017-2022HIGHWAY PROGRAM#

1

#

1

FY 2017 FY 2018-2022 HIGHWAYSPOT

ROADWAYBRIDGE