fy 2017-2022 proposed highway improvement program
TRANSCRIPT
FY 2017-2022 Proposed Highway
Improvement Program
HIGHWAY REGION 5 DISTRICT 8 TABLE OF CONTENTS
Program Summary
State Roadway Project Descriptions
Local Roadway Project Descriptions
MAPS
District 8
Alton - East St. Louis and Vicinity
8-i
TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION
REGION 5, DISTRICT 8, COLLINSVILLE Overview Highway District 8 encompasses 11 counties in southwestern Illinois and includes the cities of Centralia, East St. Louis, Alton, Belleville, Edwardsville, Jerseyville, Highland, Greenville, Mascoutah and Chester, plus many smaller communities which serve as satellites for the larger employment centers. The state highway system in District 8 consists of 1,803 miles of highways and 1,001 bridges, supporting 15.9 million vehicle miles of travel daily. State Program The program for state and local highways will average $1.862 billion annually for the FY 2017-2022 period. Approximately $597 million will be provided during FY 2017-2022 for improvements to state highways in District 8. The following table summarizes anticipated accomplishments on the state highway system in District 8 during this time frame.
FY 2017-2022 Accomplishments
System Maintenance Interstate (miles) 44 Non-Interstate (miles) 118 Safety Locations (number) 0 Bridge Maintenance Interstate (number) 21 Non-Interstate (number) 17 New Bridges (number) 0 Minor Structure Repair (number) 47 Congestion Mitigation Roads (miles) 1 Traffic Improvements (number) 3 System Expansion Roads (miles) 3 Locations (number) 0
Major Highway projects of interest that are tentatively scheduled during the FY 2017-2022 time frame include: • Interstate 55/Interstate 64 at Poplar Street Collector Distributor westbound and eastbound
0.1 mile east, 0.8 mile east and 0.9 mile east of Poplar Street Bridge in St. Clair County. Bridge deck overlay, bridge repair, engineering and pier repair are programmed during FY 2017-2022 at a cost of $64.2 million. Of this total, bridge repair on the westbound section 0.9 mile east of the Poplar Street Bridge is programmed in FY 2017 at a cost of $4 million. Provides for efficient movement.
• Interstate 55/Interstate 70/US 40 at B&0, Conrail and TRRA Railroad in East St. Louis. Bridge
repair, bridge approach roadway, bridge painting, engineering for contract plans and construction engineering are programmed in during FY 2018-2022 at a cost of $24 million.
• Interstate 57 from Jefferson County line to 0.5 mile north of Cross Road in Marion County.
Resurfacing on 9.5 miles, ramp repair at Illinois 161 interchange, bridge deck repair, bridge joint repair, bridge approach roadway, bridge deck sealing and rip rap are programmed during FY 2018-2022 at a cost of $22 million.
8-ii
• Interstate 70/US 40 from 0.1 mile west of Prairie Road to Bond County line in Madison and Bond Counties. Resurfacing on 6.4 miles, ramp repair, bridge painting, bridge joint repair, bridge deck sealing, rip rap, a bridge replacement, bridge deck overlay and bridge repair are programmed in FY 2017 at a cost of $20.1 million.
• Interstate 70 from Madison County line to Burlington Northern Railroad in Bond County.
Resurfacing on 15.9 miles, ramp repair, bridge repair, bridge painting, bridge joint repair, bridge new deck, bridge deck sealing, culvert repair, wing wall repair and rip rap are programmed during FY 2018-2022 at a cost of $76.1 million.
• Interstate 255/US 50 from 0.5 mile north of Illinois 157 to Collinsville Road in St. Clair County.
Resurfacing on 10.2 miles, patching, bridge repair, ramp repair, shoulder repair, bridge deck waterproofing, rip rap, bridge joint repair, bridge deck overlay and painting are programmed during FY 2018-2022 at a cost of $58.8 million.
• US 40 from 0.2 mile west of Formosa Road to 0.1 mile east of the Illinois 4 ramp. Resurfacing
on 6.3 miles and ADA improvements are programmed during FY 2018-2022 at a cost of $4 million.
• US 40 from 0.3 mile west of Illinois 127 to the Fayette County line in Bond County. Resurfacing on 8.1 miles and ADA improvements are programmed during FY 2018-2022 for $5 million.
• US 50 from 1 mile east of Crackerneck Road to 0.2 mile west of St. Rose Road in Clinton
County. Resurfacing on 4 miles is programmed during FY 2018-2022 for $6.5 million.
• US 67 at Delhi Bypass in Jersey County. New construction of 3.2 miles of a four-lane expressway for the bypass around Delhi including grading, paving, drainage, signing and lighting are programmed during FY 2018-2022 at a cost of $23 million.
• Illinois 4 from 0.3 mile south of Interstate 55 to 0.3 mile north of Illinois 143 in Madison County.
Resurfacing on 9.4 miles and new shoulders is programmed during FY 2018-2022 at a cost of $16 million.
• Illinois 13/Illinois 15 from Rodgers Drive in Freeburg to 0.1 mile south of Kaskaskia River in
St. Clair County and Illinois 13 over Illinois Central Gulf Railroad. Resurfacing on 8.9 miles, ADA improvements and bridge repair are programmed during FY 2018-2022 at a cost of $6.1 million.
• Illinois 96 from Hamburg Road to Illinois 100 in Calhoun County. Resurfacing on 7.4 miles and
ADA improvements are programmed in FY 2017 at a cost of $2.8 million. • Illinois 143 over Indian Creek 0.3 mile east of Wanda Road in Madison County. A bridge
replacement, land acquisition and utilities are programmed in FY 2017 at a cost of $7.4 million.
• Illinois 143 over Shoal Creek 0.9 mile east of Pierron. A bridge replacement is programmed in FY 2017 at a cost of $18.5 million. This project has been approved for Illinois Major Bridge Program funding.
• Illinois 161 over Crooked Creek 8.6 miles east of Illinois 127 and over a creek 1 mile west of
Centralia in Clinton County. A bridge replacement, land acquisition and utility adjustments at Crooked Creek and a culvert replacement at a creek 1 mile west of Centralia are programmed during FY 2018-2022 at a cost of $21 million. This project has been approved for Illinois Major Bridge Program funding.
• Illinois 267 from the Morgan County line to Short Road in Greene County. Resurfacing on
7.7 miles is programmed during FY 2018-2022 at a cost of $4.3 million.
8-iii
• Greenmount Road from Illinois 161 to Illinois 177 in St. Clair County. The construction of additional lanes and resurfacing on 1 mile, land acquisition and utility adjustments are programmed during FY 2018-2022 at a cost of $8.7 million.
• King Bridge Ramps over Interstate 55/64 westbound, Missouri Avenue, Relocated Illinois 3,
Terminal Railroad Association and Union Pacific Railroads in East St. Louis 0.7 mile east of the Mississippi River. A bridge replacement, land acquisition, utility adjustments and railroad flagger are programmed during FY 2017-2022 at a cost of $34.7 million. Of this total, the land acquisition and utility adjustments are programmed in FY 2017 at a cost of $2.5 million. These projects have been approved for Illinois Major Bridge Program funding.
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$21,600,000POPLAR ST COLLECTOR- DISTRIBUTOR
(WB) 0.1 MI E OF POPLAR ST BRIDGE Bridge Maintenance
10BRIDGE DECK OVERLAYPIER REPAIR
ST. CLAIRSAFETYPRESERVE SYSTEM
I 55I 64I 64 WB CD
Structure Status AADT Truck Pct Str Number NHS3,000 0820141 YSTRUCTURAL BACKLOG 6
2018-2022$23,500,000POPLAR ST COLLECTOR- DISTRIBUTOR (EB) 0.2 MI E OF POPLAR ST BRIDGE Bridge Maintenance
4BRIDGE DECK OVERLAY ST. CLAIRSAFETYPRESERVE SYSTEM
I 55I 64
Structure Status AADT Truck Pct Str Number NHS26,700 0820144 YSTRUCTURAL BACKLOG 17
2018-2022$7,200,000POPLAR ST COLLECTOR- DISTRIBUTOR (EB) 0.7 MI E OF POPLAR ST BRIDGE Bridge Maintenance
4BRIDGE DECK OVERLAY ST. CLAIRSAFETYPRESERVE SYSTEM
I 55I 64
Structure Status AADT Truck Pct Str Number NHS18,600 0820256 YFUNCTIONAL BACKLOG 20
2018-2022$6,600,000POPLAR ST COLLECTOR- DISTRIBUTOR (WB) 0.8 MI E OF POPLAR ST BRIDGE Bridge Maintenance
10BRIDGE DECK OVERLAY ST. CLAIRSAFETYPRESERVE SYSTEM
I 55I 64I 64 WB CD
Structure Status AADT Truck Pct Str Number NHS16,500 0820254 YADEQUATE 33
2017$4,000,000POPLAR ST COLLECTOR- DISTRIBUTOR (WB) 0.9 MI E OF POPLAR ST BRIDGE Bridge Maintenance
1BRIDGE REPAIR ST. CLAIRSAFETYPRESERVE SYSTEM
I 55I 64
2018-2022$1,250,000POPLAR ST BRIDGE COMPLEX & ASSOCIATED ROADWAYS Bridge Maintenance
2P.E. (PHASE I)P.E. (PHASE II)P.E. (CONSULTANT TSL)P.E. (CONSULTANT PLANS)P.E. (BRIDGE INSPECTION)
ST. CLAIRI 55I 64
8 - 1
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$20,000,000B & O, CONRAIL & TRRA RR IN EAST ST
LOUIS System Maintenance
1BRIDGE REPAIRBRIDGE APPROACH ROADWAYBRIDGE PAINTING
ST. CLAIRSAFETYPRESERVE SYSTEM
I 55I 70US 40
2018-2022$2,500,000B & O, CONRAIL & TRRA RR IN EAST ST LOUIS System Maintenance
1P.E. (CONSULTANT TSL)P.E. (CONSULTANT PLANS)
ST. CLAIRI 55I 70US 40
2018-2022$1,500,000B & O, CONRAIL & TRRA RR IN EAST ST LOUIS System Maintenance
1CONSTRUCTION ENGINEERING ST. CLAIRI 55I 70US 40
2018-2022$5,000,000MADISON CO TRANSIT BIKE TRAIL (ABANDONED RR) 5 MI S OF ILL 140 Bridge Maintenance
1BRIDGE NEW DECK MADISONSAFETYPRESERVE SYSTEM
I 55
Structure Status AADT Truck Pct Str Number NHS15,750 0600002 YSTRUCTURAL ACCRUING 1915,750 0600003 YSTRUCTURAL ACCRUING 19
2018-2022$21,200,000JEFFERSON CO LINE TO 0.5 MI N OF CROSS RDMiles = 9.50 System Maintenance
5RESURFACINGBRIDGE DECK REPAIRSBRIDGE JOINT REPAIRBRIDGE APPROACH ROADWAYBRIDGE DECK SEALINGRIP RAP
MARIONSAFETYPRESERVE SYSTEM
I 57
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS20,364 39.4 Y0.099.50 GOODADEQUATE
2018-2022$800,000ILL 161 INTCHG System Maintenance
2RAMP REPAIR MARIONSAFETYPRESERVE SYSTEM
I 57
8 - 2
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$50,000MISSISSIPPI RIVER
System Maintenance3BRIDGE DECK SEALING ST. CLAIRPRESERVE SYSTEMI 70
MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.
2018-2022$10,000,000I-55 TO 2.5 MI E OF I-55/70/270 INTCHGMiles = 2.56 System Maintenance
2RESURFACINGBRIDGE DECK REPAIRSBRIDGE REPAIRBRIDGE JOINT REPAIRBRIDGE DECK SEALINGRIP RAP
MADISONSAFETYPRESERVE SYSTEM
I 70
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS34,209 26.3 Y0.122.56 GOODACCRUING
2017$17,800,0000.1 MI W OF PRAIRIE RD TO BOND CO LINEMiles = 6.35 System Maintenance
5RESURFACINGBRIDGE PAINTINGBRIDGE REPAIRBRIDGE REPLACEMENTBRIDGE JOINT REPAIRBRIDGE DECK SEALINGRIP RAPBRIDGE DECK OVERLAY
MADISONBOND
SAFETYPRESERVE SYSTEM
I 70US 40
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS23,062 35.0 Y0.246.35 GOODBACKLOG
Structure Status AADT Truck Pct Str Number NHS175 0030042 NADEQUATE 14
2017$2,300,0000.1 MI W OF PRAIRIE RD TO BOND CO LINE System Maintenance
2RAMP REPAIR MADISONBOND
SAFETYPRESERVE SYSTEM
I 70
8 - 3
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$45,000,000MADISON CO LINE TO 0.3 MI W OF
SUGAR LOAF RDMiles = 6.69 System Maintenance
1RESURFACINGBRIDGE NEW DECKBRIDGE REPAIRCULVERT REPAIRWING WALL REPAIRRIP RAPBRIDGE JOINT REPAIRBRIDGE DECK OVERLAYBRIDGE DECK SEALINGBRIDGE PAINTINGMISCELLANEOUS
BONDSAFETYPRESERVE SYSTEM
I 70US 40
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS23,426 35.4 Y0.186.69 GOODBACKLOG
Structure Status AADT Truck Pct Str Number NHS1,250 0030015 NSTRUCTURAL ACCRUING 811,500 0030001 YADEQUATE 3611,500 0030002 YADEQUATE 3611,500 0030003 YADEQUATE 3611,500 0030004 YADEQUATE 36
2018-2022$1,000,000MADISON CO LINE TO 0.3 MI W OF SUGAR LOAF RD System Maintenance
1RAMP REPAIR BONDSAFETYPRESERVE SYSTEM
I 70
2018-2022$28,300,0000.3 MI W OF SUGAR LOAF RD TO BN RRMiles = 9.17 System Maintenance
8RESURFACINGBRIDGE PAINTINGBRIDGE REPAIRBRIDGE JOINT REPAIRBRIDGE DECK SEALINGRIP RAPBRIDGE NEW DECK
BONDSAFETYPRESERVE SYSTEM
I 70
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS20,898 39.4 Y0.179.17 GOODBACKLOG
Structure Status AADT Truck Pct Str Number NHS10,050 0030007 YADEQUATE 4010,050 0030008 YSTRUCTURAL ACCRUING 4010,000 0030011 YSTRUCTURAL BACKLOG 4110,000 0030012 YADEQUATE 4110,000 0030013 YSTRUCTURAL BACKLOG 41
8 - 4
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,800,0000.3 MI W OF SUGAR LOAF RD TO BN RR
System Maintenance2RAMP REPAIR BONDSAFETY
PRESERVE SYSTEMI 70
2018-2022$50,000JEFFERSON BARRACKS BRIDGE System Maintenance
1BRIDGE DECK SEALING MONROEPRESERVE SYSTEMI 255US 50
MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.
2017$500,000MISSISSIPPI RIVER TO S OF COLLINSVILLE RD System Maintenance
1PATCHING ST. CLAIRMONROE
SAFETYPRESERVE SYSTEM
I 255US 50ILL 3
2018-2022$20,000,0000.5 MI N OF ILL 157 TO 0.2 MI S OF LAKE BLVDMiles = 4.50 System Maintenance
1RESURFACINGBRIDGE REPAIR
ST. CLAIRSAFETYPRESERVE SYSTEM
I 255US 50
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS48,656 17.8 Y0.124.50 ACCEPTABLEADEQUATE
2018-2022$4,000,0000.5 MI N OF ILL 157 TO 0.2 MI S OF LAKE BLVD System Maintenance
1RAMP REPAIR ST. CLAIRSAFETYPRESERVE SYSTEM
I 255US 50
2018-2022$29,400,0000.2 MI S OF LAKE BLVD TO COLLINSVILLE RDMiles = 5.67 System Maintenance
5RESURFACINGPATCHINGBRIDGE REPAIRBRIDGE DECK WATERPROOFINGBRIDGE PAINTINGBRIDGE JOINT REPAIRSHOULDER REPAIRRIP RAP
ST. CLAIRSAFETYPRESERVE SYSTEM
I 255US 50
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS49,916 17.0 Y0.125.67 ACCEPTABLEADEQUATE
8 - 5
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$5,400,0000.2 MI S OF LAKE BLVD TO COLLINSVILLE
RD System Maintenance
1RAMP REPAIR ST. CLAIRMADISON
SAFETYPRESERVE SYSTEM
I 255US 50
2017$2,000,000MISSISSIPPI RIVER Bridge Maintenance
3P.E. (PHASE I)P.E. (CONSULTANT TSL)P.E. SURVEYS (PHASE I)
MADISONI 270
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
2018-2022$5,000,000MISSISSIPPI RIVER
3P.E. (CONSULTANT TSL)P.E. (PHASE II)P.E. (CONSULTANT PLANS)P.E. SURVEYS (PHASE II)
MADISONI 270
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
2018-2022$3,000,000MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 Congestion Mitigation
2P.E. (PHASE I) MADISONI 270
2018-2022$2,000,000MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 Congestion Mitigation
1P.E. (PHASE II)P.E. (CONSULTANT PLANS)
MADISONI 270
2018-2022$2,000,000MISSISSIPPI RIVER BRIDGE TO E OF ILL 111 Congestion Mitigation
1P.E. (PHASE II)P.E. (CONSULTANT PLANS)
MADISONI 270
2018-2022$2,400,0000.2 MI W OF FORMOSA RD TO 0.2 MI E OF BETHANY LNMiles = 3.32 System Maintenance
2RESURFACINGADA IMPROVEMENTS
MADISONSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
US 40
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS10,794 10.1 Y0.233.32 ACCEPTABLEACCRUING
8 - 6
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,600,0000.2 MI E OF BETHANY LN TO 0.1 MI E OF
ILL 4 RAMPMiles = 2.97 System Maintenance
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
US 40
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS9,434 12.2 N0.202.97 ACCEPTABLEBACKLOG
2018-2022$400,000E FORK SILVER CREEK 0.4 MI W OF ILL 4 Bridge Maintenance
1BRIDGE DECK WATERPROOFING MADISONPRESERVE SYSTEMUS 40
2018-2022$2,500,000US 40: POKEY RD TO OVERPASS RD; MILLERSBURG RD: US 40 TO S FR RD; N FR RD: US 40 TO 0.1 MI EMiles = 6.67 System Maintenance
2RESURFACING BONDSAFETYPRESERVE SYSTEM
US 40MILLERSBURG RDN FR RD
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS1,430 12.2 N0.146.31 ACCEPTABLEBACKLOG1,300 0.0 N0.150.25 ACCEPTABLEADEQUATE
25 0.0 N0.000.11 NOT ACCEPTABLEBACKLOG
2018-2022$5,000,0000.3 MI W OF ILL 127 TO FAYETTE CO LINEMiles = 8.13 System Maintenance
1RESURFACINGADA IMPROVEMENTS
BONDSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
US 40
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS2,923 14.3 N0.121.86 ACCEPTABLEACCRUING2,481 13.5 N0.136.27 ACCEPTABLEBACKLOG
2018-2022$400,000B&N RR AT SMITHBORO Bridge Maintenance
1BRIDGE DECK WATERPROOFING BONDPRESERVE SYSTEMUS 40
2018-2022$1,200,000ILL 4 N JCT IN LEBANON TO 0.3 MI W OF OLD US 50Miles = 2.17 System Maintenance
2RESURFACINGADA IMPROVEMENTS
ST. CLAIRSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
US 50
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS9,232 15.9 Y0.232.17 ACCEPTABLEBACKLOG
8 - 7
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$6,500,0001 MI E OF CRACKERNECK RD TO 0.2 MI W
OF ST ROSE RDMiles = 3.98 System Maintenance
1RESURFACING CLINTONSAFETYPRESERVE SYSTEM
US 50
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS6,800 21.7 Y0.123.98 ACCEPTABLEBACKLOG
2017$500,000SUGAR CREEK TO SHOAL CREEK System Maintenance
1PATCHING CLINTONSAFETYPRESERVE SYSTEM
US 50
2018-2022$4,300,00011TH ST IN CARLYLE TO SHATTUC RDMiles = 9.47 System Maintenance
2RESURFACINGADA IMPROVEMENTS
CLINTONSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
US 50ILL 127
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS5,244 19.4 Y0.229.47 ACCEPTABLEACCRUING
2018-2022$225,00011TH ST IN CARLYLE TO SHATTUC RD System Maintenance
1LAND ACQUISITION CLINTONUS 50ILL 127
2018-2022$500,000DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance
2CULVERT REPLACEMENT CLINTONSAFETYPRESERVE SYSTEM
US 50
2018-2022$50,000DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance
2LAND ACQUISITION CLINTONUS 50
2018-2022$50,000DRAINAGE DITCH 0.5 MI E OF HUEY RD Bridge Maintenance
2UTILITY ADJUSTMENT CLINTONUS 50
2017$3,800,0000.1 MI S OF BRITT RD TO 0.1 MI N OF US 50Miles = 8.00 System Maintenance
2RESURFACING MARIONSAFETYPRESERVE SYSTEM
US 51
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS3,549 16.6 Y0.208.00 ACCEPTABLEBACKLOG
8 - 8
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$300,000MISSISSIPPI RIVER
Bridge Maintenance5BRIDGE DECK SEALING MADISONPRESERVE SYSTEMUS 67
CLARK BRIDGE
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
2018-2022$1,000,000MISSISSIPPI RIVER Bridge Maintenance
1BRIDGE JOINT REPAIR MADISONSAFETYPRESERVE SYSTEM
US 67CLARK BRIDGE
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
2018-2022$23,000,000DELHI BYPMiles = 3.15 System Expansion
6NEW CONSTRUCTIONGRADINGPAVINGDRAINAGESIGNING (NEW)LIGHTING
JERSEYTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENTPRESERVE SYSTEMSAFETY
US 67
2018-2022$900,000MADISON CO LINE TO JERSEYVILLE System Expansion
5UTILITY ADJUSTMENT JERSEYUS 67
2018-2022$500,000MADISON CO LINE TO JERSEYVILLE System Expansion
5LAND ACQUISITION JERSEYUS 67
2017$100,000AT BISSELL AVE & AT MARYVILLE AVE System Maintenance
1RR INTERCONNECT MADISONSAFETYMODAL CONNECTIVITY
ILL 3ILL 203
2018-2022$600,000AT OLD RED BUD RD Congestion Mitigation
1INTERSECTION RECONSTN MONROESAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT
ILL 3
8 - 9
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$4,500,000MONROE CO LINE TO 0.2 MI S OF 1ST ST
IN RUMAMiles = 7.97 System Maintenance
2RESURFACINGADA IMPROVEMENTS
RANDOLPHSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
ILL 3
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS6,903 14.9 Y0.237.97 ACCEPTABLEBACKLOG
2017$500,000ILL 3: STATE ST TO S CROSBY ST; ILL 150: OPDYKE ST TO JUNG LN System Maintenance
4PATCHING RANDOLPHSAFETYPRESERVE SYSTEM
ILL 3ILL 150
2018-2022$2,500,000MACOUPIN CO LINE TO 0.3 MI S OF I-55Miles = 4.95 System Maintenance
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
ILL 4
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS4,076 6.0 N0.214.61 ACCEPTABLEBACKLOG2,800 14.5 Y0.280.34 NOT ACCEPTABLEBACKLOG
2018-2022$16,000,0000.3 MI S OF I-55 TO 0.3 MI N OF ILL 143Miles = 9.38 System Maintenance
1RESURFACINGNEW SHOULDERS
MADISONSAFETYPRESERVE SYSTEM
ILL 4
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS3,203 14.1 Y0.239.38 ACCEPTABLEBACKLOG
2018-2022$1,000,000CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance
2BRIDGE REPLACEMENT RANDOLPHSAFETYPRESERVE SYSTEM
ILL 4
2018-2022$50,000CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance
2LAND ACQUISITION RANDOLPHILL 4
2018-2022$50,000CREEK 2.5 MI & 3 MI S OF ILL 13 INT Bridge Maintenance
2UTILITY ADJUSTMENT RANDOLPHILL 4
8 - 10
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$1,500,0000.2 MI E OF ILL 4 TO LOCUST ST IN
STEELEVILLEMiles = 2.51 System Maintenance
2RESURFACINGADA IMPROVEMENTS
RANDOLPHSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
ILL 4ILL 150
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS5,337 27.4 N0.462.51 ACCEPTABLEACCRUING
2017$150,000AT FREEBURG AVE Congestion Mitigation
2INTERSECTION RECONSTN ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT
ILL 13ILL 158
IDOT PARTICIPATION IN PROJECT.
2018-2022$5,600,000RODGERS DR IN FREEBURG TO 0.1 MI S OF KASKASKIA RIVERMiles = 8.91 System Maintenance
2RESURFACINGADA IMPROVEMENTS
ST. CLAIRSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
ILL 13ILL 15
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS7,835 10.2 N0.208.91 ACCEPTABLEBACKLOG
2018-2022$500,000ICG RR Bridge Maintenance
2BRIDGE REPAIR ST. CLAIRSAFETYPRESERVE SYSTEM
ILL 13
2018-2022$3,500,000RICHLAND CREEK 1 MI E OF JCT ILL 159 Bridge Maintenance
2BRIDGE NEW DECK ST. CLAIRSAFETYPRESERVE SYSTEM
ILL 15
Structure Status AADT Truck Pct Str Number NHS6,750 0820049 YADEQUATE 126,750 0820050 YADEQUATE 12
2018-2022$600,000LUNTE CREEK 3.6 MI W OF ILL 127 Bridge Maintenance
1BRIDGE REPLACEMENT WASHINGTONSAFETYPRESERVE SYSTEM
ILL 15
Structure Status AADT Truck Pct Str Number NHS2,550 0950008 NSTRUCTURAL BACKLOG 26
8 - 11
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$50,000LUNTE CREEK 3.6 MI W OF ILL 127
Bridge Maintenance1LAND ACQUISITION WASHINGTONILL 15
2018-2022$50,000LUNTE CREEK 3.6 MI W OF ILL 127 Bridge Maintenance
1UTILITY ADJUSTMENT WASHINGTONILL 15
2018-2022$800,000NASHVILLE CREEK 0.2 MI W OF NASHVILLE Bridge Maintenance
1BRIDGE REPLACEMENT WASHINGTONSAFETYPRESERVE SYSTEM
ILL 15
Structure Status AADT Truck Pct Str Number NHS3,550 0950009 NSTRUCTURAL ACCRUING 12
2018-2022$50,000NASHVILLE CREEK 0.2 MI W OF NASHVILLE Bridge Maintenance
1LAND ACQUISITION WASHINGTONILL 15
2018-2022$50,000NASHVILLE CREEK 0.2 MI W OF NASHVILLE Bridge Maintenance
1UTILITY ADJUSTMENT WASHINGTONILL 15
2017$2,800,000HAMBURG RD TO ILL 100Miles = 7.35 System Maintenance
2RESURFACINGADA IMPROVEMENTS
CALHOUNSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
ILL 96
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS608 17.6 Y0.157.35 GOODBACKLOG
2018-2022$400,000CREEK IN KAMPSVILLE Bridge Maintenance
2BRIDGE NEW DECK CALHOUNSAFETYPRESERVE SYSTEM
ILL 96
Structure Status AADT Truck Pct Str Number NHS950 0070014 YSTRUCTURAL ACCRUING 7
8 - 12
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$110,000AT W COUNTY RD
Congestion Mitigation2LEFT TURN LANES
TRAF SIGNAL INSTALLATIONJERSEYSAFETY
MODAL CONNECTIVITYTRANSPORTATION OPS
ILL 109
IDOT PARTICIPATION IN PROJECT.
2017$250,000ILL 111/267 AT DAVID LN; ILL 255 N OF ILL 140 TO S OF CULP LN; ILL 255 N OF SEMINARY RD System Maintenance
1MISCELLANEOUS JERSEYMADISON
ILL 111ILL 255ILL 267
2018-2022$5,000,000CONRAIL & B&O RR Bridge Maintenance
1BRIDGE DECK WATERPROOFINGBRIDGE JOINT REPAIR
ST. CLAIRPRESERVE SYSTEMSAFETY
ILL 111
2017$2,200,000ILL 177 TO 0.4 MI N OF MOCKINGBIRD RD IN NASHVILLEMiles = 4.11 System Maintenance
2RESURFACING WASHINGTONSAFETYPRESERVE SYSTEM
ILL 127
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS4,751 16.2 N0.224.11 ACCEPTABLEBACKLOG
2017$6,600,000INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance
4BRIDGE REPLACEMENT MADISONSAFETYPRESERVE SYSTEM
ILL 143
Structure Status AADT Truck Pct Str Number NHS10,000 0600082 YSTRUCTURAL BACKLOG 10
2017$250,000INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance
2LAND ACQUISITION MADISONILL 143
2017$500,000INDIAN CREEK 0.3 MI E OF WANDA RD Bridge Maintenance
2UTILITY ADJUSTMENT MADISONILL 143
8 - 13
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$18,500,000SHOAL CREEK 0.9 MI E OF PIERRON
Bridge Maintenance5BRIDGE REPLACEMENT BONDSAFETY
PRESERVE SYSTEMILL 143
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
Structure Status AADT Truck Pct Str Number NHS2,000 0030034 NSTRUCTURAL BACKLOG 16
2018-2022$810,000MISSISSIPPI RIVER AT CHESTER Bridge Maintenance
1BRIDGE REPAIR RANDOLPHSAFETYPRESERVE SYSTEM
ILL 150
MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.
2018-2022$2,500,000ILL 13 IN COULTERVILLE TO ILL 154Miles = 6.02 System Maintenance
2RESURFACINGADA IMPROVEMENTS
RANDOLPHSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
ILL 153
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS1,993 16.6 N0.315.81 ACCEPTABLEBACKLOG
2018-2022$1,100,000SILVER CREEK TRIB S OF HAMEL SCL Bridge Maintenance
2BRIDGE REPLACEMENT MADISONSAFETYPRESERVE SYSTEM
ILL 157
Structure Status AADT Truck Pct Str Number NHS2,500 0602454 NSTRUCTURAL BACKLOG 6
2018-2022$50,000SILVER CREEK TRIB S OF HAMEL SCL Bridge Maintenance
2LAND ACQUISITION MADISONILL 157
2018-2022$50,000SILVER CREEK TRIB S OF HAMEL SCL Bridge Maintenance
2UTILITY ADJUSTMENT MADISONILL 157
8 - 14
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$2,100,000DOUGLAS CREEK 0.8 MI N OF SMITHTON
Bridge Maintenance7BRIDGE REPLACEMENT ST. CLAIRSAFETY
PRESERVE SYSTEMILL 159
Structure Status AADT Truck Pct Str Number NHS9,100 0820071 NFUNCTIONAL BACKLOG 10
2018-2022$100,000DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance
7LAND ACQUISITION ST. CLAIRILL 159
2018-2022$100,000DOUGLAS CREEK 0.8 MI N OF SMITHTON Bridge Maintenance
7UTILITY ADJUSTMENT ST. CLAIRILL 159
2018-2022$2,100,000FOURTH ST IN TRENTON TO ILL 161Miles = 5.09 System Maintenance
2RESURFACINGADA IMPROVEMENTS
CLINTONSAFETYPRESERVE SYSTEMTRANSPORTATION OPS
ILL 160
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS3,965 12.4 N0.155.09 GOODBACKLOG
2018-2022$1,400,000ILL 161 TO ILL 177Miles = 3.78 System Maintenance
2RESURFACING CLINTONSAFETYPRESERVE SYSTEM
ILL 160
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS2,001 12.9 N0.143.78 GOODBACKLOG
2018-2022$2,800,000ILL 158 E JCT TO 0.2 MI E OF ILL 4Miles = 4.61 System Maintenance
1RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
ILL 161
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS7,524 8.8 Y0.224.61 ACCEPTABLEBACKLOG
8 - 15
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$20,000,000CROOKED CREEK 8.6 MI E OF ILL 127 &
CREEK 1 MI W OF CENTRALIA Bridge Maintenance
12BRIDGE REPLACEMENTCULVERT REPLACEMENT
CLINTONSAFETYPRESERVE SYSTEM
ILL 161
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
Structure Status AADT Truck Pct Str Number NHS6,900 0140025 NSTRUCTURAL BACKLOG 156,900 0142001 NSTRUCTURAL BACKLOG 15
2018-2022$500,000CROOKED CREEK 8.6 MI E OF ILL 127 Bridge Maintenance
3LAND ACQUISITION CLINTONILL 161
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
2018-2022$500,000CROOKED CREEK 8.6 MI E OF ILL 127 Bridge Maintenance
3UTILITY ADJUSTMENT CLINTONILL 161
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
2018-2022$4,300,000MORGAN CO LINE TO SHORT RDMiles = 7.65 System Maintenance
1RESURFACING GREENESAFETYPRESERVE SYSTEM
ILL 267
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS2,111 20.6 N0.267.65 ACCEPTABLEBACKLOG
2018-2022$2,500,000APPLE CREEK 8.6 MI N OF GREENFIELD Bridge Maintenance
1BRIDGE NEW DECK GREENESAFETYPRESERVE SYSTEM
ILL 267
Structure Status AADT Truck Pct Str Number NHS2,150 0310015 NSTRUCTURAL BACKLOG 19
2018-2022$1,100,000AT LICK CREEK S OF CH 9 Bridge Maintenance
1BRIDGE NEW DECK GREENESAFETYPRESERVE SYSTEM
ILL 267
Structure Status AADT Truck Pct Str Number NHS2,150 0310016 NSTRUCTURAL BACKLOG 19
8 - 16
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$10,000I-55/70 TO I-255
System Expansion5LAND ACQUISITION MADISON
ST. CLAIRMONROE
GATEWAYCONNECTOR
2018-2022$10,000I-55/70 TO I-255 System Expansion
5LAND ACQUISITION MADISONST. CLAIRMONROE
GATEWAYCONNECTOR
2018-2022$10,000I-55/70 TO I-255 System Expansion
1LAND ACQUISITION MADISONST. CLAIRMONROE
GATEWAYCONNECTOR
2018-2022$8,000,000ILL 161 TO ILL 177Miles = 1.00 Congestion Mitigation
4ADDITIONAL LANESRESURFACING
ST. CLAIRSAFETYTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENTPRESERVE SYSTEM
GREENMOUNT RD
CONTINGENT UPON A JURISDICTIONAL TRANSFER.
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS19,276 0.2 N0.151.00 ACCEPTABLEADEQUATE
2018-2022$400,000ILL 161 TO ILL 177 Congestion Mitigation
1LAND ACQUISITION ST. CLAIRGREENMOUNT RD
2018-2022$300,000ILL 161 TO ILL 177 Congestion Mitigation
1UTILITY ADJUSTMENT ST. CLAIRGREENMOUNT RD
2018-2022$1,000,000COLLINSVILLE RD TO ILL 3 / N 1ST ST System Expansion
1LAND ACQUISITION ST. CLAIRILL 3 / N 1ST STCONNECTOR(PROPOSED)
2018-2022$170,000MLK BRIDGE IN EAST ST. LOUIS Bridge Maintenance
5BRIDGE DECK SEALING ST. CLAIRPRESERVE SYSTEMILLINOIS AVE
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
8 - 17
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$32,000,000I-55/64 (WB), MISSOURI AVE, RELOCATED
ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance
4BRIDGE REPLACEMENT ST. CLAIRSAFETYPRESERVE SYSTEM
KING BRIDGE RAMPS
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
Structure Status AADT Truck Pct Str Number NHS13,300 0826003 YFUNCTIONAL BACKLOG 12
2017$500,000I-55/64 (WB), MISSOURI AVE, RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance
4LAND ACQUISITION ST. CLAIRKING BRIDGE RAMPS
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
2017$2,000,000I-55/64 (WB), MISSOURI AVE, RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance
4UTILITY ADJUSTMENT ST. CLAIRKING BRIDGE RAMPS
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
2018-2022$200,000I-55/64 (WB), MISSOURI AVE, RELOCATED ILL 3, TRRA & UP RR IN E ST. LOUIS 0.7 MI E OF MISSISSIPPI RIVER Bridge Maintenance
1RR FLAGGER ST. CLAIRSAFETYKING BRIDGE RAMPS
ILLINOIS MAJOR BRIDGE PROGRAM PROJECT.
2018-2022$1,100,000ILL 4 TO US 50 E OF LEBANON System Expansion
3P.E. (PHASE II)P.E. (CONSULTANT PLANS)
ST. CLAIRLEBANON BYP
2017$175,000MISSISSIPPI RIVER Bridge Maintenance
4BRIDGE DECK SEALING MADISONPRESERVE SYSTEMMCKINLEY BRIDGESALISBURY ST
8 - 18
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$4,800,000CAHOKIA CREEK 0.5 MI S OF ILL 143
Bridge Maintenance2BRIDGE NEW DECK
BRIDGE SUPERSTRUCTUREMADISONSAFETY
PRESERVE SYSTEMTRANSPORTATION OPS
N SIU ENT RDNB & SB
Structure Status AADT Truck Pct Str Number NHS2,900 0600140 NSTRUCTURAL BACKLOG 22,900 0600141 NSTRUCTURAL BACKLOG 2
2018-2022$600,0000.3 MI E OF WANDA RD TO CAHOKIA CREEK RDMiles = 1.21 System Maintenance
2RESURFACINGDRAINAGE
MADISONSAFETYPRESERVE SYSTEM
OLD ALTON /EDWARDSVILLE RD
Needs Category Miles Roughness(IRI) Rutting AADT Truck Pct NHS1,595 0.0 N0.271.21 NOT ACCEPTABLEBACKLOG
2018-2022$1,200,000TRIB TO INDIAN CREEK 1 MI E OF I-255 Bridge Maintenance
1CULVERT REPLACEMENT MADISONSAFETYPRESERVE SYSTEM
OLD ALTON /EDWARDSVILLE RD
2018-2022$50,000TRIB TO INDIAN CREEK 1 MI E OF I-255 Bridge Maintenance
1LAND ACQUISITION MADISONOLD ALTON /EDWARDSVILLE RD
2018-2022$50,000TRIB TO INDIAN CREEK 1 MI E OF I-255 Bridge Maintenance
1UTILITY ADJUSTMENT MADISONOLD ALTON /EDWARDSVILLE RD
2017$750,000VARIOUS ADA RAMPS System Maintenance
1ADA IMPROVEMENTS DISTRICT-WIDESAFETYTRANSPORTATION OPS
VARIOUS
2018-2022$3,750,000VARIOUS ADA RAMPS
2ADA IMPROVEMENTS DISTRICT-WIDESAFETYTRANSPORTATION OPS
VARIOUS
2017$2,630,000CHANGE ORDER RESERVE System Maintenance
1CHANGE ORDERS DISTRICT-WIDEVARIOUS
8 - 19
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$6,502,000HIGHWAY SAFETY IMPROVEMENT
PROGRAM PROJECTS System Maintenance
6SAFETY IMPROVEMENTS DISTRICT-WIDESAFETYVARIOUS
2018-2022$34,525,000HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS
5SAFETY IMPROVEMENTS DISTRICT-WIDESAFETYVARIOUS
2017$500,000ON-CALL ENGINEERING System Maintenance
1PRELIMINARY ENGINEERING DISTRICT-WIDEVARIOUS
2018-2022$300,000ON-CALL ENGINEERING System Maintenance
1P.E. SOILS (PHASE I)P.E. SOILS (PHASE II)
DISTRICT-WIDEVARIOUS
2017$250,000ON-CALL ENGINEERING System Maintenance
2P.E. SURVEYS (ROW) DISTRICT-WIDEVARIOUS
2018-2022$650,000ON-CALL ENGINEERING
1P.E. SURVEYS (ROW) DISTRICT-WIDEVARIOUS
2017$2,850,000ON-CALL ENGINEERING
1PRELIMINARY ENGINEERING DISTRICT-WIDEVARIOUS
2018-2022$3,750,000ON-CALL ENGINEERING
1PRELIMINARY ENGINEERING DISTRICT-WIDEVARIOUS
2018-2022$100,000ON-CALL ENGINEERING - MATERIALS INSPECTION System Maintenance
1CONSTRUCTION ENGINEERING DISTRICT-WIDEVARIOUS
2017$50,000RR FLAGGER AGREEMENT System Maintenance
1RR FLAGGER DISTRICT-WIDESAFETYVARIOUS
8 - 20
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$250,000SUBSURFACE UTILITY ENGINEERING
COORDINATION - PTB 171 System Maintenance
3P.E. SUBSURFACE UTILITIES DISTRICT-WIDEVARIOUS
2017$200,000LOCAL ROADS CONSULTANT System Maintenance
3P.E. PROJECT MANAGERS DISTRICT-WIDEVARIOUS
2018-2022$1,050,000LOCAL ROADS CONSULTANT
3P.E. PROJECT MANAGERS DISTRICT-WIDEVARIOUS
2017$100,000DEEP WELL & PUMP REPAIRS System Maintenance
4MISCELLANEOUS MADISONST. CLAIR
VARIOUS
2018-2022$200,000DEEP WELL & PUMP REPAIRS
1MISCELLANEOUS MADISONST. CLAIR
VARIOUS
2017$50,000ENVIRONMENTAL MAINTENANCE & TREE MITIGATION System Maintenance
4MISCELLANEOUS DISTRICT-WIDEVARIOUS
2018-2022$100,000ENVIRONMENTAL MAINTENANCE & TREE MITIGATION
1MISCELLANEOUS DISTRICT-WIDEVARIOUS
2017$50,000MISCELLANEOUS LAND ACQUISITION System Maintenance
4LAND ACQUISITION DISTRICT-WIDEVARIOUS
2018-2022$1,450,000MISCELLANEOUS LAND ACQUISITION
1LAND ACQUISITION DISTRICT-WIDEVARIOUS
2017$250,000PRE-LAND ACQUISITION ACTIVITY System Maintenance
4PRE-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS
8 - 21
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$500,000PRE-LAND ACQUISITION ACTIVITY
1PRE-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS
2017$1,000,000POST-LAND ACQUISITION ACTIVITY System Maintenance
4POST-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS
2018-2022$1,900,000POST-LAND ACQUISITION ACTIVITY
1POST-ACQUISITION ACTIVITY DISTRICT-WIDEVARIOUS
2017$150,000MISCELLANEOUS UTILITIES System Maintenance
1UTILITY ADJUSTMENT DISTRICT-WIDEVARIOUS
2017$1,000,000VARIOUS LOCATIONS (ISAS) System Maintenance
2ARCHAEOLOGICAL SURVEY DISTRICT-WIDEVARIOUS
2018-2022$1,350,000VARIOUS LOCATIONS (ISAS)
1ARCHAEOLOGICAL SURVEY DISTRICT-WIDEVARIOUS
2017$500,000DISTRICT MISCELLANEOUS System Maintenance
4MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
2018-2022$1,000,000DISTRICT MISCELLANEOUS
1MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
2018-2022$3,000,000PAVEMENT PATCHING
1PATCHING DISTRICT-WIDESAFETYPRESERVE SYSTEM
VARIOUS
2017$500,000CONSTRUCTION ENGINEERING System Maintenance
1CONSTRUCTION ENGINEERING DISTRICT-WIDEVARIOUS
8 - 22
District 8State Highways
FY 2017-2022 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,000,000CONSTRUCTION ENGINEERING
4CONSTRUCTION ENGINEERING DISTRICT-WIDEVARIOUS
2017$900,000GUARDRAIL & MEDIAN CABLE INSTALLATION System Maintenance
4GUARDRAILMEDIAN CABLE
DISTRICT-WIDESAFETYVARIOUS
2018-2022$1,800,000GUARDRAIL & MEDIAN CABLE INSTALLATION
1GUARDRAILMEDIAN CABLE
DISTRICT-WIDESAFETYVARIOUS
2017$562,000CONGESTION MITIGATION AIR QUALITY System Maintenance
6MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
2018-2022$2,810,000CONGESTION MITIGATION AIR QUALITY
5MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
8 - 23
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$1,250,000ILL 3: 0.1 MI N OF KASKASKIA RD TO 0.1
MI S OF OLD RED BUD RD; OLD RED BUD RD: ILL 3 TO 0.6 MI E; KASKASKIA RD: ILL 3 TO 0.1 MI WMiles = 0.95
2RECONSTRUCTION MONROESAFETYPRESERVE SYSTEM
ILL 3CH 1OLD RED BUD RDKASKASKIA RD
2017$1,061,000AT FREEBURG AVE IN BELLEVILLE
1INTERSECTION RECONSTN ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT
ILL 13ILL 158SOUTH BELT EAST
2018-2022$922,000E EDWARDSVILLE RD TO WOODLAND AVE IN WOOD RIVERMiles = 0.65
2RESURFACING MADISONSAFETYPRESERVE SYSTEM
6TH ST
2018-2022$1,613,000HARTMAN LN TO CENTRAL PARK DR IN O'FALLONMiles = 0.30
2NEW CONSTRUCTION ST. CLAIRTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENT
ASHLAND AVE EXT
2018-2022$561,0000.1 MI W OF WOOD RIVER AVE TO 0.3 MI E IN EAST ALTONMiles = 0.29
2RESURFACING MADISONSAFETYPRESERVE SYSTEM
BERKSHIRE BLVD
2017$1,500,000MODOC FERRY RD TO ROOTS RDMiles = 4.07
4RESURFACING RANDOLPHSAFETYPRESERVE SYSTEM
BLUFF RD
2018-2022$400,000GIBBS CREEK
1BRIDGE REHABILITATION CLINTONSAFETYPRESERVE SYSTEM
BOULDER RD
2018-2022$513,000PULLEN BLVD TO LINCOLN BLVD IN CENTRALIAMiles = 0.98
1RESURFACING MARIONSAFETYPRESERVE SYSTEM
BROADWAY
8 - 24
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$851,000BROADWAY ST: 0.1 MI E OF BELCHIK
MEM PKWY TO ALLEN ST & W OF HENRY ST TO MONUMENT AVE; HENRY ST: S OF BROADWAY ST; RIDGE ST: S OF BROADWAY STMiles = 0.76
2RESURFACING MADISONSAFETYPRESERVE SYSTEM
BROADWAY STHENRY STRIDGE ST
2017$1,200,000STATE ST TO HANCOCK ST IN CHESTERMiles = 0.31
3RECONSTRUCTION RANDOLPHSAFETYPRESERVE SYSTEM
BUENA VISTA STTAYLOR STBISSELL ST
2017$1,700,000MISSISSIPPI RIVER BARGE DOCK (FOX TERMINAL) TO ILL 3 IN CAHOKIAMiles = 1.08
7RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM
CARGILL ELEVATORRD
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.
2017$720,000STATE ST TO WASHINGTON ST IN BELLEVILLEMiles = 0.51
3RESURFACINGBIKEWAY
ST. CLAIRSAFETYPRESERVE SYSTEMTRANSPORTATION OPSMODAL CONNECTIVITY
CENTREVILLE AVE
2017$360,000ILL 106 TO ILL 67Miles = 2.26
1RESURFACING GREENESAFETYPRESERVE SYSTEM
CH 2
2018-2022$800,000AT US 50
2INTERSECTION IMPROVEMENT CLINTONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
CH 3BOULDER RD
2018-2022$125,000NSRR TO GALLATIN ST IN WALNUT HILLMiles = 0.08
2RESURFACING MARIONSAFETYPRESERVE SYSTEM
CH 3WALNUT HILL RD
2018-2022$1,500,000JIM'S CREEK 4 MI SE OF PATOKA
3BRIDGE REPLACEMENT MARIONSAFETYPRESERVE SYSTEM
CH 5MARSHALL CREEK RD
8 - 25
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$600,000MISSISSIPPI RIVER RD TO CH 1
Miles = 3.20 1RESURFACING CALHOUNSAFETY
PRESERVE SYSTEMCH 6BATCHTOWN RD
2018-2022$554,000I-57 RAMP (SB) TO GARRET RDMiles = 3.55
1RESURFACING MARIONSAFETYPRESERVE SYSTEM
CH 8KINOKA RD
2018-2022$420,000CH 15 TO TR 64 / N 650E RDMiles = 2.54
2RESURFACING GREENESAFETYPRESERVE SYSTEM
CH 13WALKERVILLE RD
2018-2022$875,000RADOM ECL TO US 51Miles = 1.53
2RESURFACING WASHINGTONSAFETYPRESERVE SYSTEM
CH 23
2017$473,000COMBS ST TO N MORRISON AVE IN COLLINSVILLEMiles = 0.54
4RESURFACING MADISONSAFETYPRESERVE SYSTEM
CLAY ST
2018-2022$421,000S OF ILL 3 TO N OF MCADAMS PKWY IN GODFREYMiles = 0.74
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
CLIFTON TERRACERD
2017$138,000OWL CREEK AT N EDGE OF MULBERRY GROVE
2BRIDGE REPLACEMENT BONDSAFETYPRESERVE SYSTEM
COUNTY LINE RD
2018-2022$400,000AT I-255 IN DUPO
11UTILITY ADJUSTMENT ST. CLAIRDAVIS ST FERRY RD
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.
2018-2022$19,075,000AT I-255 IN DUPO
10BRIDGE (NEW) ST. CLAIRTRANSPORTATION OPSFREIGHT MOVEMENT
DAVIS ST FERRY RD
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.
8 - 26
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$500,000BEAVER CREEK
1BRIDGE REPLACEMENT BONDSAFETY
PRESERVE SYSTEMDUDLEYVILLE RD
2018-2022$1,413,000AT UNNAMED CREEK
1BRIDGE REPLACEMENT ST. CLAIRSAFETYPRESERVE SYSTEM
DUTCH HOLLOW RD
ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
2018-2022$475,000SCHOENBERGER CREEK
1BRIDGE REHABILITATION ST. CLAIRSAFETYPRESERVE SYSTEM
DUTCH HOLLOW RD
2018-2022$1,399,000LAKEVIEW ACRES RD TO 0.3 MI W IN MARYVILLEMiles = 0.26
2RECONSTRUCTION MADISONSAFETYPRESERVE SYSTEM
E MAIN ST
2017$451,000S OF ST. LOUIS AVE TO PICKER AVE IN EAST ALTONMiles = 0.30
3RESURFACINGCURB AND GUTTERSIDEWALKS
MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
EAST ALTON AVE
2018-2022$650,000LONGFELLOW ST TO MORELAND RD IN BETHALTOMiles = 0.33
2RESURFACING MADISONSAFETYPRESERVE SYSTEM
EAST CENTRAL ST
2017$287,000MONSANTO AVE TO QUEENY AVE IN SAUGETMiles = 0.80
3RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
FALLING SPRINGSRD
2018-2022$727,0000.2 MI W OF ILL 203 TO ILL 203 IN GRANITE CITYMiles = 0.17
1RECONSTRUCTION MADISONSAFETYPRESERVE SYSTEM
FEHLING RD
2017$6,400,000CROSS ST IN SHILOH TO ILL 158Miles = 1.60
8NEW CONSTRUCTION ST. CLAIRTRANSPORTATION OPSMODAL CONNECTIVITYFREIGHT MOVEMENT
FRANK SCOTT PKWY
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.THIS EARMARK WILL BE FUNDED SEPARATELY.
8 - 27
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$400,000CROSS ST IN SHILOH TO ILL 158
Miles = 0.01 9NEW CONSTRUCTION ST. CLAIRTRANSPORTATION OPS
MODAL CONNECTIVITYFREIGHT MOVEMENT
FRANK SCOTT PKWY
2017$2,000,000E OF ILL 159 TO W OF OLD COLLINSVILLE RD IN SWANSEAMiles = 0.77
3RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
FRANK SCOTT PKWY
2018-2022$400,000ILL 111/140 TO CALIFORNIA AVE IN EAST ALTONMiles = 1.04
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
FRANKLIN AVE
2017$630,000HAMACHER ST: RODGERS ST TO OSTERHAGE DR; OSTERHAGE DR: HAMACHER ST TO BRIARCLIFF DR; BRADFORD LN: MARKET ST (OLD ILL 3) TO RODGERS ST IN WATERLOOMiles = 1.12
3RESURFACING MONROESAFETYPRESERVE SYSTEM
HAMACHER STOSTERHAGE DRBRADFORD LN
2018-2022$400,000SAMUEL W ANDREWS DR TO ILL 127 IN GREENVILLEMiles = 0.11
3WIDENING & RESURFACING BONDSAFETYPRESERVE SYSTEM
IDLER LN
2018-2022$200,000N OF MAIN ST TO BOONE ST IN SALEM
3SIDEWALKS MARIONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
ILLINOIS ST
2017$1,250,000AT HOLY CROSS RD IN BREESE
4INTERSECTION RECONSTN CLINTONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT
JAMESTOWN RD
2018-2022$750,000ILL 158 IN MILLSTADT TO DOUGLAS RDMiles = 2.27
2RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
JEFFERSON STFLORAVILLE RD
8 - 28
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$360,000UNNAMED STREAM 1.2 MI SW OF
HILLCREST RD
1BRIDGE REPLACEMENT CALHOUNSAFETYPRESERVE SYSTEM
JOHNSON HOLLOW RD
2018-2022$125,000W MCCORD ST TO E 3RD ST IN CENTRALIAMiles = 0.36
1RESURFACING MARIONSAFETYPRESERVE SYSTEM
LOCUST ST
2018-2022$854,000ILL 162 TO TERMINAL AVE IN GRANITE CITYMiles = 0.85
2RESURFACING MADISONSAFETYPRESERVE SYSTEM
MARYVILLE RD
2018-2022$475,000ILL 4 TO HERMAN ST IN LEBANONMiles = 0.15
1RECONSTRUCTIONSIDEWALKS
ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
MCALLISTER ST
2017$971,000OLD COLLINSVILLE RD TO MERRIAM PKWY IN O'FALLONMiles = 1.15
5RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM
MILBURN SCHOOL RD
2017$160,000MADISON CREEK
4BRIDGE REPLACEMENT CALHOUNSAFETYPRESERVE SYSTEM
MISSISSIPPI RIVERRD
2017$476,000TERMINAL RR TO ILL 162 IN PONTOON BEACHMiles = 0.27
3RECONSTRUCTIONCURB AND GUTTERSIDEWALKS
MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
MOCKINGBIRD LN
2018-2022$999,0000.1 MI N OF COLUMBIA AVE TO S OF COLUMBIA AVE IN WATERLOOMiles = 0.10
1RECONSTRUCTION MONROESAFETYPRESERVE SYSTEM
MOORE ST
2018-2022$1,325,000MAIN ST IN BETHALTO TO ILL 159Miles = 2.76
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
MORO RD
8 - 29
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$700,000US 40 TO 0.5 MI S
Miles = 8.53 1RESURFACING BONDSAFETY
PRESERVE SYSTEMMULBERRY GROVE RD
2018-2022$73,000N 10TH ST TO N COUNTY RD IN MASCOUTAH
1BIKEWAY ST. CLAIRTRANSPORTATION OPSMODAL CONNECTIVITY
MULTI-USE PATH
2018-2022$2,428,000DRY FORK CREEK 1.5 MI SW OF SORENTO
5BRIDGE REPLACEMENT BONDSAFETYPRESERVE SYSTEM
NEW DOUGLAS AVE
ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
2018-2022$343,000DRY FORK CREEK 1.5 MI SW OF SORENTO
5CONSTRUCTION ENGINEERING BONDNEW DOUGLAS AVE
ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
2018-2022$500,000SORENTO RD TO 0.5 MI SMiles = 0.50
1RESURFACING BONDSAFETYPRESERVE SYSTEM
NEW DOUGLAS AVE
2018-2022$1,000,000NW RR E OF OLD POAG RD
1BRIDGE REHABILITATION MADISONSAFETYPRESERVE SYSTEM
NEW POAG RD
2018-2022$901,000OAK ST: A ST TO E MAIN ST; A ST: ILL 159 TO N OAK ST IN BELLEVILLEMiles = 0.48
2RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
OAK STA ST
2017$1,430,000SHOAL CREEK NW OF BREESE
5BRIDGE REPLACEMENT CLINTONSAFETYPRESERVE SYSTEM
OLD STATE RD
ILLINOIS MAJOR BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
2017$441,000SIMMONS RD TO OBERNUEFEMANN RD IN O'FALLONMiles = 0.38
3RECONSTRUCTIONCURB AND GUTTER
ST. CLAIRSAFETYPRESERVE SYSTEM
PORTER RD
8 - 30
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2017$600,000ELM POINT BRANCH 2 MI S OF PANAMA
2BRIDGE REPLACEMENT BONDSAFETY
PRESERVE SYSTEMRENO RDTR 82
2018-2022$610,000CHERRY ST TO ILL 3 IN COLUMBIAMiles = 0.64
2RESURFACING MONROESAFETYPRESERVE SYSTEM
S MAIN ST
2018-2022$1,852,000MADISON CO LINE TO US 50Miles = 5.12
1RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
SCOTT-TROY RD
2018-2022$500,0000.2 MI N OF JOHNSON RD TO 0.1 MI N OF JOHNSON RD IN SHILOHMiles = 0.16
1RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM
SHILOH STATION RD
2018-2022$599,000LAKEVIEW LN TO MILBURN SCHOOL RD / FAIRWOOD HILLS RD IN O'FALLONMiles = 0.35
1RECONSTRUCTIONSIDEWALKS
ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
SIMMONS RD
2017$829,0000.1 MI N OF AUSTIN DR TO 0.1 MI S OF CHARLESTON DR IN TROYMiles = 0.25
5RECONSTRUCTIONSIDEWALKS
MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
SPRING VALLEY RD
2018-2022$700,000ELM ST TO ILL 157 IN EDWARDSVILLEMiles = 0.28
2RESURFACING MADISONSAFETYPRESERVE SYSTEM
ST LOUIS ST
2017$900,000KING ARTHUR LN TO W OF ILL 111 / US 67 IN GODFREYMiles = 0.46
3RESURFACING MADISONSAFETYPRESERVE SYSTEM
STAMPER LN
8 - 31
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$395,000ILL 157 TO 0.2 MI E IN COLLINSVILLE
2INTERSECTION RECONSTN MADISONSAFETY
PRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPSFREIGHT MOVEMENT
SUGAR LOAF RD
2018-2022$436,0000.2 MI E OF ILL 157 TO 0.3 MI E OF ILL 157 IN COLLINSVILLEMiles = 0.11
1RECONSTRUCTION MADISONSAFETYPRESERVE SYSTEM
SUGARLOAF RD
2017$413,000ALTON ST TO MONROE ST IN LEBANONMiles = 0.19
7RECONSTRUCTION ST. CLAIRSAFETYPRESERVE SYSTEM
SUMMERFIELD ST
2017$577,000MISSOURI AVE TO SUMMIT AVE IN EAST ST LOUISMiles = 0.54
4RESURFACINGSIDEWALKS
ST. CLAIRSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
TENTH ST
2017$5,205,000DISTRICTWIDE CMAQ PROJECTS
4MISCELLANEOUS DISTRICT-WIDEVARIOUS
2018-2022$6,269,000DISTRICTWIDE CMAQ PROJECTS
3MISCELLANEOUS DISTRICT-WIDEVARIOUS
2018-2022$6,265,000DISTRICTWIDE CMAQ PROJECTS
1MISCELLANEOUS DISTRICT-WIDEVARIOUS
2018-2022$6,069,000DISTRICTWIDE CMAQ PROJECTS
1MISCELLANEOUS DISTRICT-WIDEVARIOUS
8 - 32
District 8Local Highways
FY 2017-2020 Highway Improvement Program
Route/Street
MYP Years
CurrentPastCountyEst. Cost Objectives Improvements Location2018-2022$379,000ILL 162 TO N MAIN ST IN TROY
Miles = 0.23 1RECONSTRUCTION
SIDEWALKSBIKEWAY
MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
W CLAY ST
2018-2022$614,000ST LOUIS RD TO LEBANON RD IN COLLINSVILLEMiles = 0.99
3RESURFACINGSIDEWALKS
MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
W MAIN ST
2018-2022$831,00028TH ST TO 17TH ST IN BELLEVILLEMiles = 0.79
1RESURFACING ST. CLAIRSAFETYPRESERVE SYSTEM
W MAIN ST
2017$551,000ILL 157 TO S BUCHANAN ST IN EDWARDSVILLEMiles = 0.65
3RESURFACINGCURB AND GUTTERSIDEWALKS
MADISONSAFETYPRESERVE SYSTEMMODAL CONNECTIVITYTRANSPORTATION OPS
W SCHWARZ ST
2018-2022$1,380,000ILL 143 IN ROXANA TO NEW POAG RDMiles = 2.96
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
WANDA RD
2018-2022$451,000N OF SALU ST TO COLLEGE AVE IN ALTONMiles = 0.55
1RESURFACING MADISONSAFETYPRESERVE SYSTEM
WASHINGTON AVE
2017$1,216,000TRIB E FORK OF WOOD RIVER CREEK
4BRIDGE REPLACEMENT MADISONSAFETYPRESERVE SYSTEM
WOODBURN RD
2018-2022$400,000CH 19 TO TR 130Miles = 3.41
1RESURFACING GREENESAFETYPRESERVE SYSTEM
WOODY RD
8 - 33
!
!
!
l
l
l
l
ll
l
l
l
l
ll
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
:9161
:93
2164
0/67
:9159
:9140
:9100
:937
:9127
2157
:915
:94
:9108
:9154
0/50
:9267
:916
0/50
:9111
:9177
:93:9127
2155
:9160
0/40
:913
:93
2170
:9156
:9100
:996
:9143
2170
:94
21270
:915
:91570/51
:9143
0/50
2170
:94
0/40
:9159
:9153
:9143
:9161
0/50 2164
:9158
:9155
:9150
0/51
:93
:9177
:9160
:9140
0/50
21255
:9127
:9203
:9162
:9177:9160
0/51
:94
0/51
:9109
:9157
:913
:9163
:915 :9160
:9255
:9159
:915
:9150
:9177
:93
:9100:916
:9153
0/40
2170
:9106
:9111
:9157
0/67
:9156
:915
:9140
0/50
:9111
:9158
0/50
:913
2164
:9143
:9111
:915
Centralia
Cahokia
Belleville
Fairview HtsE St Louis
Granite City
Collinsville
Glen Carbon
EdwardsvilleWood River
Alton
Godfrey
Rockwood
KaskaskiaChester
SteelevilleEllis Grove Percy
Prairie Du Rocher Evansville
Ruma
FultsBaldwin
Sparta
Coulterville
TildenRedBud
Maeystown DuboisMarissa
Oakdale RadomLenzburg
Hecker
ValmeyerNew Athens
AshleySt Libory
Waterloo
Fayetteville
Nashville
RichviewAddievilleVenedy
SmithtonNew Minden
OkawvilleIrvington
HoyletonFreeburg
FreeburgMillstadt
Walnut HillColumbia
KellWamacDamiansville
BartelsoNew BadenDupo
HoffmanAlbersE Carondelet
Mascoutah
Central CityGermantownShiloh
SummerfieldAlortonSauget
Centreville
HueyBeckemeyerTrentonLebanon
SandovalO'fallon
OdinAviston
BreeseIukaWashington Park CarlyleCaseyville
FairmontBrooklyn Salem
Fairmont
Pontoon BeachVenice
St JacobAlmaMadison Maryville Troy
Keyesport PatokaPierron Kinmundy
MarineVernon
Highland
Pocahontas FarinaSouth Roxana
GrantforkHartford Roxana
Alhambra Old RipleyHamel Smithboro
East AltonGreenville
Bethalto Mulberry GroveWordenBrussels Elsah
LivingstonNew Douglas
GraftonSorento
PanamaBatchtown BrightonOtterville
FieldonJerseyville
FidelityHardin
Kane
Hamburg
RockbridgeEldredKampsville Carrollton
Greenfield
White HallHillview
Wilmington Roodhouse
RANDOLPH
MONROEWASHINGTON
ST. CLAIR
CLINTON MARION
MADISONBOND
JERSEY
CALHOUN
GREENE
JunctionCity
SeeInsetMap
!
!
!
l
l
l
l
ll
l
l
l
l
ll
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
:9161
:93
2164
0/67
:9159
:9140
:9100
:937
:9127
2157
:915
:94
:9108
:9154
0/50
:9267
:916
0/50
:9111
:9177
:93:9127
2155
:9160
0/40
:913
:93
2170
:9156
:9100
:996
:9143
2170
:94
21270
:915
:91570/51
:9143
0/50
2170
:94
0/40
:9159
:9153
:9143
:9161
0/50 2164
:9158
:9155
:9150
0/51
:93
:9177
:9160
:9140
0/50
21255
:9127
:9203
:9162
:9177:9160
0/51
:94
0/51
:9109
:9157
:913
:9163
:915 :9160
:9255
:9159
:915
:9150
:9177
:93
:9100:916
:9153
0/40
2170
:9106
:9111
:9157
0/67
:9156
:915
:9140
0/50
:9111
:9158
0/50
:913
2164
:9143
:9111
:915
Centralia
Cahokia
Belleville
Fairview HtsE St Louis
Granite City
Collinsville
Glen Carbon
EdwardsvilleWood River
Alton
Godfrey
Rockwood
KaskaskiaChester
SteelevilleEllis Grove Percy
Prairie Du Rocher Evansville
Ruma
FultsBaldwin
Sparta
Coulterville
TildenRedBud
Maeystown DuboisMarissa
Oakdale RadomLenzburg
Hecker
ValmeyerNew Athens
AshleySt Libory
Waterloo
Fayetteville
Nashville
RichviewAddievilleVenedy
SmithtonNew Minden
OkawvilleIrvington
HoyletonFreeburg
FreeburgMillstadt
Walnut HillColumbia
KellWamacDamiansville
BartelsoNew BadenDupo
HoffmanAlbersE Carondelet
Mascoutah
Central CityGermantownShiloh
SummerfieldAlortonSauget
Centreville
HueyBeckemeyerTrentonLebanon
SandovalO'fallon
OdinAviston
BreeseIukaWashington Park CarlyleCaseyville
FairmontBrooklyn Salem
Fairmont
Pontoon BeachVenice
St JacobAlmaMadison Maryville Troy
Keyesport PatokaPierron Kinmundy
MarineVernon
Highland
Pocahontas FarinaSouth Roxana
GrantforkHartford Roxana
Alhambra Old RipleyHamel Smithboro
East AltonGreenville
Bethalto Mulberry GroveWordenBrussels Elsah
LivingstonNew Douglas
GraftonSorento
PanamaBatchtown BrightonOtterville
FieldonJerseyville
FidelityHardin
Kane
Hamburg
RockbridgeEldredKampsville Carrollton
Greenfield
White HallHillview
Wilmington Roodhouse
RANDOLPH
MONROEWASHINGTON
ST. CLAIR
CLINTON MARION
MADISONBOND
JERSEY
CALHOUN
GREENE
JunctionCity
SeeInsetMap
DISTRICT 8REGION 5
PROPOSED FY 2017-2022HIGHWAY PROGRAM#
1
#
1
FY 2017 FY 2018-2022 HIGHWAYSPOT
ROADWAYBRIDGE
! l
lll
l
l
l
l
l
l
:9159
:9100
:9111
:932155
:9143
217021270
:915
:9157
2170
0/402155
0/40
:9159
:9143
:9161
0/50
2164
:9158
21255
0/5021255
:9203
:9162
:9157
:913
:9163 :915
:9255
:9157
:9177 :9158
:93
:9111
:9157
0/67 :9140:9111
0/50:93
:93
:9158
:9140
2164
:9111
Swansea
Cahokia
Belleville
FairviewHeights
East St Louis
Collinsville
Glen Carbon
Granite City
Edwardsville
Wood River
Alton
Godfrey
EastAlton
EastCarondelet
21255
:93
:9140
:91110/67
0/67 :9111
:9159
21270
0/50
Columbia
Dupo
ShilohAlorton
Sauget
Centreville
LebanonO'fallon
Washington ParkFairmont
Caseyville
MadisonBrooklynVenice
Maryville
Madison
TroyPontoon Beach
South RoxanaHartford Roxana
Bethalto
MADISON
ST. CLAIR! l
lll
l
l
l
l
l
l
:9159
:9100
:9111
:932155
:9143
217021270
:915
:9157
2170
0/402155
0/40
:9159
:9143
:9161
0/50
2164
:9158
21255
0/5021255
:9203
:9162
:9157
:913
:9163 :915
:9255
:9157
:9177 :9158
:93
:9111
:9157
0/67 :9140:9111
0/50:93
:93
:9158
:9140
2164
:9111
Swansea
Cahokia
Belleville
FairviewHeights
East St Louis
Collinsville
Glen Carbon
Granite City
Edwardsville
Wood River
Alton
Godfrey
EastAlton
EastCarondelet
21255
:93
:9140
:91110/67
0/67 :9111
:9159
21270
0/50
Columbia
Dupo
ShilohAlorton
Sauget
Centreville
LebanonO'fallon
Washington ParkFairmont
Caseyville
MadisonBrooklynVenice
Maryville
Madison
TroyPontoon Beach
South RoxanaHartford Roxana
Bethalto
MADISON
ST. CLAIR
ALTON - EAST ST LOUISAND VICINITY
DISTRICT 8REGION 5
PROPOSED FY 2017-2022HIGHWAY PROGRAM#
1
#
1
FY 2017 FY 2018-2022 HIGHWAYSPOT
ROADWAYBRIDGE