Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020 County Fiscal Year Initially Proposed Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est Useful Life Assembly Districts Senate Districts Alameda 20/21 New Complete Streets Components Anita Avenue Sidewalk Construction Project This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design Anita Avenue from Castro Valley Boulevard to Somerset Avenue Pre-Construction 07/2019 09/2022 40-50 20 10 Alameda 20/21 New Road Maintenance & Rehabilitation Foothill Boulevard Pavement Rehabilitation Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) John Drive to 164th Avenue Construction 05/2021 10/2021 15-20 20 10 Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 East County Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Altamont Pass Road (I-580 to Landfill) Construction 05/2021 11/2021 15-20 16 7 Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pedestrian Ramp Project This project will include: Maintenance Program Plan Development | Locations to be determined Various Locations Pre-Construction 04/2020 09/2021 15-50 20 10 Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pavement Rehabilitation Program (Castro Valley Area) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Barrett Ct - Lake Chabot Rd To E To End; Chloe Ct - Jennifer Dr To N To End; Conrad Ct - Somerset Ave To S To End; Darlene Ct - Stanton Ave To Ne To End; Garrison Ave - Wilson Ave To S To End; Greenhills Ave - Simsbury Rd To Meadowood Rd; Jill Wy - Dominic Dr To N To End; La Costa Ave - Parsons Ave To Lakeridge Rd; Lakecrest Ct - Dominic Dr To S To End; Lakeridge Rd - Greenhills Ave To La Costa Ave; Link Ct - Parsons Ave To W To End; Lucern Ct - Barett Ct To N To End; Meadowood Rd - La Costa Construction 04/2021 10/2021 15-20 20 10 Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pavement Rehabilitation Program (Hayward San Leandro) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Arbor Ave - Lansing Wy N L West A St; Arbor Ct - Lansing Wy N To End; Corte Eulalia; Falgren Ave - Ricardo Ave Sw To End; Hood St; Lansing Wy - W L Hathaway Ave (Hcl) 122' Sw Arbor Ave; Medford Ct - Meekland Ave Sw & Se To End; Melrose Ave; Paseo Grande - Fwy 880 Overpass (Sw) Hesperian Bl; Rainier Ave - Se End Nw End; Ricardo Ave; Shasta St; Tallac Ct; Times Ave-Via Hermosa W Blossom Wy; Via Andeta; Via Arroyo-Via Mirlo Se & Nw-End; Via Bolsa; Via Primero; Via Rincon; Via San Marino; Via Segun Construction 04/2021 10/2021 15-20 20 10 Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pavement Rehabilitation Program (Micro Surfacing on Various Roadways) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Boxer Ct; Via Buena Vista - Via Chiquita To Via La Jolla; Via Chiquita - Via Buena Vista To Via Coralla; Via Chiquita - Bockman Rd To Via Coralla; Via Cielo; Via Coralla - Via Palma To Via Del Rey; Via Del Rey; Via Harriet; Via Karl; Via La Jolla - Via Helena To Via Sarita; Via La Jolla From Via Mesa To Via Helena; Via Margarita Ct - Via Margarita To To End; Via Melina - Bandoni Ave To Via Buena Vista; Via Milos; Via Natal; Via Owen; Via Sarita; Via Walter Construction 04/2021 10/2021 6-10 20 10 Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Slurry Seal on Various Roadways This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Bengal Ave From Hacienda Ave Perkins Rd; Ginger Ave From Robscott Ave Bengal Ave; Melrose Ave From Ginger Ave Perkins Rd; Oxford Ave From Bengal Ave Ricardo Ave; Perkins Ave From Robscott Ave Ricardo Ave; Robscott Ave From Hacienda Ave Perkins Rd; Via Del Rey From Via Manzanas Bockman Rd; Construction 04/2021 10/2021 4-6 20 10 Alameda 18/19 Carried Over Complete Streets Components Hesperian Boulevard Corridor Improvement Project This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construct complete street improvements along a major business corridor including sidewalks, class II bike lanes, street lighting, storm drains, traffic signals, crosswalks, pavement, landscaping and streetscaping Hesperian Boulevard from I-880 to A Street Construction 07/2020 11/2020 18-50 20 10 Alameda 19/20 In Progress Road Maintenance & Rehabilitation Somerset Ave Sidewalk Construction Project This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Feasibility Study, Preliminary Design Somerset Avenue from Redwood Road to Stanton Ave Pre-Construction 12/2019 06/2023 40-50 20 10 Alameda 19/20 In Progress Road Maintenance & Rehabilitation Crow Canyon Road Pavement Rehabilitation Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Line Construction 04/2020 03/2021 15-20 20 10 Alameda 19/20 In Progress Road Maintenance & Rehabilitation Foothill Road Storm Damage Repair Phase II This project will include: Pavement Rehab/Repair (Existing) | storm damage repair Foothill Road, MM 6.89 Construction 04/2020 03/2021 40-50 16 7 Alpine 20/21 New Road Maintenance & Rehabilitation Bear Valley Pavement Treatments Project This project will include: Cost Estimating, Project Scope Development Bear Valley, Alpine County CA Creekside Drive, Cub Lane, Flynn Road and John Ebbetts Road. Pre-Construction 07/2020 09/2020 7-10 5 1

Upload: others

Post on 22-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est Useful Life Assembly

Districts Senate

Districts

Alameda 20/21 New Complete Streets Components Anita Avenue Sidewalk Construction Project This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design Anita Avenue from Castro Valley Boulevard to Somerset Avenue Pre-Construction 07/2019 09/2022 40-50 20 10

Alameda 20/21 New Road Maintenance & Rehabilitation Foothill Boulevard Pavement Rehabilitation Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) John Drive to 164th Avenue Construction 05/2021 10/2021 15-20 20 10

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 East County Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Altamont Pass Road (I-580 to Landfill) Construction 05/2021 11/2021 15-20 16 7

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pedestrian Ramp Project This project will include: Maintenance Program Plan Development | Locations to be determined Various Locations Pre-Construction 04/2020 09/2021 15-50 20 10

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pavement Rehabilitation Program (Castro Valley Area) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Barrett Ct - Lake Chabot Rd To E To End; Chloe Ct - Jennifer Dr To N To End; Conrad Ct - Somerset Ave To S To End; Darlene Ct - Stanton Ave To Ne To End; Garrison Ave - Wilson Ave To S To End; Greenhills Ave - Simsbury Rd To Meadowood Rd; Jill Wy - Dominic Dr To N To End; La Costa Ave - Parsons Ave To Lakeridge Rd; Lakecrest Ct -Dominic Dr To S To End; Lakeridge Rd - Greenhills Ave To La Costa Ave; Link Ct - Parsons Ave To W To End; Lucern Ct - Barett Ct To N To End; Meadowood Rd - La Costa

Construction 04/2021 10/2021 15-20 20 10

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pavement Rehabilitation Program (Hayward San Leandro) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Arbor Ave - Lansing Wy N L West A St; Arbor Ct - Lansing Wy N To End; Corte Eulalia; Falgren Ave - Ricardo Ave Sw To End; Hood St; Lansing Wy - W L Hathaway Ave (Hcl) 122' Sw Arbor Ave; Medford Ct - Meekland Ave Sw & Se To End; Melrose Ave; Paseo Grande - Fwy 880 Overpass (Sw) Hesperian Bl; Rainier Ave - Se End Nw End; Ricardo Ave; Shasta St; Tallac Ct; Times Ave-Via Hermosa W Blossom Wy; Via Andeta; Via Arroyo-Via Mirlo Se & Nw-End; Via Bolsa; Via Primero; Via Rincon; Via San Marino; Via Segun

Construction 04/2021 10/2021 15-20 20 10

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pavement Rehabilitation Program (Micro Surfacing on Various Roadways) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Boxer Ct; Via Buena Vista - Via Chiquita To Via La Jolla; Via Chiquita -Via Buena Vista To Via Coralla; Via Chiquita - Bockman Rd To Via Coralla; Via Cielo; Via Coralla - Via Palma To Via Del Rey; Via Del Rey; Via Harriet; Via Karl; Via La Jolla - Via Helena To Via Sarita; Via La Jolla From Via Mesa To Via Helena; Via Margarita Ct - Via Margarita To To End; Via Melina - Bandoni Ave To Via Buena Vista; Via Milos; Via Natal; Via Owen; Via Sarita; Via Walter

Construction 04/2021 10/2021 6-10 20 10

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Slurry Seal on Various Roadways This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Bengal Ave From Hacienda Ave Perkins Rd; Ginger Ave From Robscott Ave Bengal Ave; Melrose Ave From Ginger Ave Perkins Rd; Oxford Ave From Bengal Ave Ricardo Ave; Perkins Ave From Robscott Ave Ricardo Ave; Robscott Ave From Hacienda Ave Perkins Rd; Via Del Rey From Via Manzanas Bockman Rd;

Construction 04/2021 10/2021 4-6 20 10

Alameda 18/19 Carried Over Complete Streets Components Hesperian Boulevard Corridor Improvement Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construct complete street improvements along a major business corridor including sidewalks, class II bike lanes, street lighting, storm drains, traffic signals, crosswalks, pavement, landscaping and streetscaping

Hesperian Boulevard from I-880 to A Street Construction 07/2020 11/2020 18-50 20 10

Alameda 19/20 In Progress Road Maintenance & Rehabilitation Somerset Ave Sidewalk Construction Project This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Feasibility Study, Preliminary Design Somerset Avenue from Redwood Road to Stanton Ave Pre-Construction 12/2019 06/2023 40-50 20 10

Alameda 19/20 In Progress Road Maintenance & Rehabilitation Crow Canyon Road Pavement Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Line Construction 04/2020 03/2021 15-20 20 10

Alameda 19/20 In Progress Road Maintenance & Rehabilitation Foothill Road Storm Damage Repair Phase II This project will include: Pavement Rehab/Repair (Existing) | storm damage repair Foothill Road, MM 6.89 Construction 04/2020 03/2021 40-50 16 7

Alpine 20/21 New Road Maintenance & Rehabilitation Bear Valley Pavement Treatments Project This project will include: Cost Estimating, Project Scope Development Bear Valley, Alpine County CA Creekside Drive, Cub Lane, Flynn Road and John Ebbetts Road. Pre-Construction 07/2020 09/2020 7-10 5 1

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Amador 20/21 New Road Maintenance & Rehabilitation Countywide Dig-out Repair Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Clinton Rd., Shenandoah Rd., Tyler Rd., Steiner Rd., Latrobe Rd., Shake Ridge Rd., Jackson Valley Rd., Dave Brubeck Rd., Main St. - Drytown, Buckhorn Ridge Rd.

Construction 08/2020 06/2021 10-15 5 8

Amador 20/21 New Traffic Control Devices Countywide Striping Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Forest Home Rd, Carbondale Rd, Shenandoah School Rd, Bell Rd, Ostrom Rd, Pine Gulch Rd, Old Hwy 49, Old Hwy 49, New Chicago Rd, Pioneer Creek Rd, Defender Grade, Joyce Rd, Pine Grove Volcano Rd, Pioneer Volcano Rd, Meadow Dr, Silver Dr, Sugar Pine Dr, McKenzie Dr, Barton Rd, Carson Dr, Mira Vista Ct, Alta Vista Ct, North Meadow, Creekside Dr, Ruggles Ct, Kings Ct, Forest Knoll Ct, Parkwood Dr East, Silver Point Dr, Fairway Dr, Parkwood Dr, along with 31 other streets within the County

Construction 08/2020 06/2021 5-7 5 8

Amador 20/21 New Road Maintenance & Rehabilitation Countywide Culvert Repair Project This project will include: Storm Drain/Culvert Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

Clinton Rd., Shenandoah Rd., Tyler Rd., Steiner Rd., Latrobe Rd., Shake Ridge Rd., Jackson Valley Rd., Dave Brubeck Rd. Construction 08/2020 06/2021 30-50 5 8

Amador 20/21 New Road Maintenance & Rehabilitation Countywide Roadway Maintenance Project This project will include: Minor Repairs/Materials (HMA Potholes, HMA Patching, Miscellaneous HMA, Rock, Minor Facilities)

Old Sacramento Rd., Sutter Creek Volcano Rd., Sutter Ione Rd., Carbondale Rd. , Pine Grove Volcano Rd., are location estimates. Locations within the County have not yet been finalized.

Construction 08/2020 06/2021 5-20 5 8

Amador 20/21 New Road Maintenance & Rehabilitation Countywide Crack Filling Project This project will include: Pavement Rehab/Repair (Existing) Locations within the County have not yet been finalized. Construction 08/2020 06/2021 3-7 5 8

Amador 20/21 New Road Maintenance & Rehabilitation Countywide Roadside Maintenance This project will include: Roadside maintenance for ditching, brushing, and cutting. Clinton Rd, Shenandoah Rd, Tyler Rd, Steiner Rd, Latrobe Rd, Shake Ridge Rd, Jackson Valley Rd, Dave Brubeck Rd, Buckhorn Rd. All locations are an estimate and have yet to be finalized.

Construction 08/2020 06/2021 3-5 5 8

Amador 20/21 New Road Maintenance & Rehabilitation Equipment and Tool Replacement This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment County Roads Procurement/Operational

Needs 08/2020 06/2021 10-15 5 8

Amador 20/21 New Road Maintenance & Rehabilitation Shenandoah Road Micro-surface Project This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New) Shenandoah Road Construction 08/2020 06/2021 7-10 5 8

Butte 18/19 In Progress Road Maintenance & Rehabilitation Hegan Lane

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Pre-pulverizing the full depth reclamation section, spreading 3.0% Type II Cement over the surface and processing to a depth of 16 inches, shaping and re-compacting the cement treated material to 98% relative density; paving an overlay with 4-inches of HMA, replacing thermoplastic traffic stripes and markings, and retro-reflective pavement markers, all in conformance with the Caltrans 2010 Standard Specifications, and these Special Provisions, unless specified herein. | The project is located southwest of the city of Chico, and begins at the intersection of Hegan Lane and Dayton Road running approximately 2.35 miles northeasterly along Hegan Lane to approximately 80’ east of the Union Pacific Rail Road Tracks. The work consists of, but is not limited to, pre-pulverizing the full depth reclamation section followed by spreading 3.0% Type II Cement over the surface and processing to a depth of 16 inches, shaping and re-compacting the cement treated material to 98%

From BSNF Railroad to Dayton Road. Located southwest of the city of Chico and begins at the intersection of Hegan Lane and Dayton Road running approximately 2.35 miles northeasterly along Hegan Lane to approximately 80’ east of the Union Pacific Rail Road Tracks.

Construction 03/2019 12/2020 25-30 3 4

Butte 18/19 In Progress Road Maintenance & Rehabilitation Foothill Blvd.

This project will include: Preliminary Design | Grind existing structural section, grade aggregate base back to finish grade. Overlay with 3" of asphalt concrete (AC). Place striping, pavement markers, pavement markings, and prepare finish grade for the traveling public. Grade roadside ditches to drain. | This project is in preliminary design and continuation is subject to future SB1 funding.

Oro Bangor Hwy. to Pinedale Ave. Pre-Construction 05/2020 12/2020 20-25 3 4

Butte 18/19 In Progress Road Maintenance & Rehabilitation Centerville Road Reconstruction (Lower) This project will include: Reconstruction Strom Damage Repairs 0.5 Miles North east of Honey Run Road Intersection Pre-Construction & Construction

05/2017 05/2020

04/2020 12/2020 30-30 3 4

Butte 18/19 In Progress Road Maintenance & Rehabilitation Oro-Quincy Highway Reconstruction This project will include: Reconstruction Strom Damage Repairs | Closeout reporting Site 1 in Mt. House and Site 2 is 0.75 miles North east of Site 1. Construction 06/2019 12/2020 30-30 3 4

Butte 18/19 In Progress Safety Skyway Median Guardrail This project will include: Safety Improvement Median Guardrail 5.5 Miles East of the Intersection of Skyway and Honey Run Road. Construction 02/2020 05/2020 30-30 3 4

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Butte 18/19 In Progress Road Maintenance & Rehabilitation Bidwell Avenue Strom Damage Repair This project will include: Storm Damage Repairs (Design and Permitting) Three Sites Between W. Sacramento St. on the West and Oak Lawn Ave. on the East. Pre-Construction 04/2020 12/2020 20-20 3 4

Butte 18/19 In Progress Road Maintenance & Rehabilitation Las Plumas Avenue Overlay This project will include: Structural Overlay From Las Plumas Way to Lower Wyandotte Rd. Pre-Construction & Construction

06/2017 06/2020

05/2020 12/2020 30-30 3 4

Butte 19/20 In Progress Road Maintenance & Rehabilitation Upper Centerville Road

This project will include: Environmental Study/Documents, Right of Way Acquisition, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Repair and Rehabilitation of existing roadway infrastructure lost during heavy rain event within the Camp Fire footprint.

Three (3) miles south of Nimshew Road. Pre-Construction & Construction

01/2019 01/2020

06/2019 12/2020 25-30 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Dark Canyon Road

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Repair and Rehabilitation of the existing roadway infrastructure lost during a heavy rain event with in the Camp Fire footprint.

2.5 Miles Southeast of Big Bend Road Pre-Construction & Construction

01/2019 01/2020

12/2019 12/2020 25-30 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Monte Vista/Lower Wyandotte This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Document Preparation Lincoln Blvd. to Lower Wyandotte Road. Pre-Construction 01/2020 07/2021 20-25 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Autrey Lane This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Document Preparation Las Plumas Ave. to Monte Vista Ave. Pre-Construction 01/2020 07/2021 20-25 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Monte Vista Avenue This project will include: Preliminary Design Autry Lane to Western Property line of Las Plumas High School. Pre-Construction 01/2020 07/2021 20-25 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation 2018 Butte County Slurry Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Project Scope Development, Preliminary Design | Slurry Seal Various Roads throughout the County

Roads to be Slurry Sealed Achilles Ct., Adrian Dr., Arthur Ct., Athens Ct., Auroa Ct., Babson Ct., Bremer Ct., Bronx Ct., Carver Ct., Cascade Dr., Chestnut Cir., Colby Ct., Compton Dr., Concord Ct., Coppel Ct., Curtis Ct., Dade Ct., David Ct., Delta Ct., Dimitri, Ct., Drexel Dr., Drury Dr., Ed Ct., Einstoss Ct., Eureka Dr., Ferguson Dr., Finch Ct., Fritz Ct., Glendale Dr., Heller Ct., Hobart Ct., Hood Ct., Iona Ct., Janine Ct., Jarvis Cir., Jennifer Ct., Kingsdale Ct., La Rosa Ct., Lander Ct., Layton Ct., Linda Lee Ct., Lucas Ct., Marsh Ct., Metzger Ct., Molinari Ct., Mooz Ct., Napa Ct., Oak Ridge Dr., Olivet Dr., Otis Ct., Pawn Ct., Penn Ct., Peterson Estates Dr., Pineland Cir., Potomac Dr., Providence Ct., Pueblo Dr., Rim Rock Dr., Rutgers Ct., Salk Ct., Sarah Ann Ct., Scripps Ct., Shaw Cir., Shoup Ct., Simonson Ct., Southwind Ct., Sunsup Ln., Tracy Ranch Rd., Tufts Ct., Tulsa Ct., Union Ct., Ventura Dr., Wake Ct., Wichita Dr., Woodbury Dr., Woodpecker Rd., Wyack Ct., Zuckerman Ct.

Pre-Construction & Construction

03/2019 05/2020

04/2020 12/2020 5-5 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Neal Road

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Right of Way Acquisition, Cost Estimating, Project Scope Development, Right of Way, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair of existing roadway due to excessive heavy truck traffic associated with the debris removal efforts of the Camp Fire recovery.

4.9 Miles Northeast of SR99 to Paradise Town Limit Pre-Construction & Construction

03/2019 01/2020

12/2019 12/2020 5-10 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Baldwin Ave (Palermo) This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Document Preparation

Lincoln Blvd. to Hewitt Ave. Pre-Construction & Construction

01/2020 01/2022

12/2020 12/2022 20-25 3 4

Butte 19/20 Carried Over Road Maintenance & Rehabilitation 2019 Butte County Chip Seal This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development

Cohasset Rd.; Rock Creek Rd.; Rock Creek Dr.; Sycamore Valley Rd.; Vilas Rd.; Harvey Rd.; Oro Quincy Hwy.; Lincoln Blvd

Pre-Construction & Construction

01/2019 05/2020

04/2020 10/2020 5-7 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Various Streets - Crack Sealing This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Crack Sealing Pavement Surface

Various Butte County Roads: Peterson Estates Drive to Greenview Circle. Please check Resolution for full locations.

Pre-Construction & Construction

01/2020 05/2020

04/2020 11/2020 10-10 3 4

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Butte 20/21 New Road Maintenance & Rehabilitation Cohassett Road This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Digouts/Patching/Chip Seal/Shoulder backing

Cohasset Road - Chico City limits to end of pavement Pre-Construction & Construction

01/2020 05/2020

04/2020 11/2020 10-10 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Ophir Road Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Full Depth Reclamation (FDR), Cement treated at 4%. New Pavement and shoulder backing.

Ophir Road Pre-Construction & Construction

01/2019 07/2019

06/2019 12/2019 20-30 3 4

Butte 20/21 New Safety Cohasset Road - Metal Beam Guard Rail Project

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Upgrading existing sub standard metal Beam guard rail (MBGR)

Cohasset Road Pre-Construction & Construction

01/2019 08/2020

07/2020 07/2021 20-30 3 4

Butte 20/21 New Match Funds County Wide Safe Routes to Schools Program This project will include: Public Works Staffing | Pedestrian, bicycle, and education program for low income communities County wide - Various schools Procurement/Operational

Needs 01/2019 07/2020 20-20 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Aguas Frias Road Rehabilitation

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Full Depth Reclamation (FDR), Cement treated 4%, pavement, shoulder backing, roadside ditch grading

Aguas Frias Road - Hwy 162 to 2 miles north of Hwy 162 Pre-Construction & Construction

07/2019 08/2020

07/2020 07/2021 20-25 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Lone Tree Road Rehabilitation Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation | Full Depth Reclamation (FDR), Cement treated 4%, pavement, shoulder backing, roadside ditch grading

Lone tree Road - 5.9mi to 7.8mi (Mile Markers) Pre-Construction & Construction

07/2019 08/2020

07/2020 07/2021 20-25 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Foothill Blvd. Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Full Depth Reclamation (FDR), Cement treated 4%, pavement, shoulder backing, roadside ditch grading

Foothill Blvd. - 0.0mi - 1.9mi (Mile Marker) Pre-Construction & Construction

07/2019 08/2020

07/2020 07/2021 20-25 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Miner's Ranch Road Rehabilitation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Full Depth Reclamation (FDR), Cement treated 4%, pavement, shoulder backing, roadside ditch grading

Miner's Ranch Road - 0.0mi to 2.7mi (Mile Marker) Pre-Construction & Construction

07/2019 08/2020

07/2020 07/2021 20-25 3 4

Butte 20/21 New Match Funds Lower Skyway - Fire Damaged MBGR Replacement

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation | Replacement of Camp Fire damaged Metal Beam Guard Rail (MBGR) | Matching funds for the ER funded MBGR Replacement Project

Lower Skyway - Chico City limits to Crossroads Pre-Construction & Construction

07/2019 07/2020

06/2020 09/2020 20-30 3 4

Butte 20/21 New Match Funds New Skyway - MBGR Replacement

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation | Replacement of Camp Fire damaged Metal Beam Guard Rail (MBGR) | Matching funds for the ER funded MBGR Replacement Project

New Skyway - Pentz Road to Coutolenc Pre-Construction & Construction

07/2019 07/2020

06/2020 10/2020 20-30 3 4

Butte 20/21 New Match Funds Upper Skyway MBGR Replacement

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Document Preparation | Replacement of Camp Fire damaged Metal Beam Guard Rail (MBGR) | Matching funds for the ER funded MBGR Replacement Project

Upper Skyway - Coutolenc to Lakeridge Circle Pre-Construction & Construction

07/2019 07/2020

06/2020 10/2020 20-30 3 4

Butte 20/21 New Match Funds Lower Skyway - Debris Damaged Road Repair

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Document Preparation | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project

Lower Skyway - Chico City limits to Crossroads Pre-Construction 10/2020 10/2021 20-30 3 4

Butte 20/21 New Match Funds Pentz Road Repair

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project

Pentz Road - Malibu Drive to State Hwy 70 Pre-Construction 10/2020 10/2021 20-30 3 4

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Butte 20/21 New Match Funds Skyway (New) Road Repair

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project

New Skyway - Paradise Town limit. Pentz Road to Coutolenc Pre-Construction 10/2020 10/2021 20-30 3 4

Butte 20/21 New Match Funds East Gridley Road Repair Project

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged roadway due to Oroville Spillway Incident and associated flooding. | Matching funds for the ER funded Roadway Repair Project.

East Gridley Road - Hutching's Drive to State Hwy 70. Pre-Construction & Construction

07/2019 02/2017

07/2020 12/2020 20-30 3 4

Butte 20/21 New Match Funds Glen Drive Repair Project

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

Glen Drive - Oro Quincy Hwy to Southview Drive Pre-Construction & Construction

12/2016 02/2017

01/2017 12/2020 20-30 3 4

Butte 20/21 New Match Funds Canyon Drive Repair Project

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

Canyon Drive - State Hwy 162 to Royal Oaks Drive Pre-Construction & Construction

12/2016 02/2017

01/2017 12/2020 20-30 3 4

Butte 20/21 New Match Funds Oro Bangor Hwy Repair

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

Oro Bangor Hwy - Miner's Ranch Road to La Porte Road Pre-Construction & Construction

12/2016 02/2017

01/2017 12/2020 20-30 3 4

Butte 20/21 New Match Funds Kelly Ridge Road Repair

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

Kelly Ride Road - State Hwy 162 to Royal Oaks Drive Pre-Construction & Construction

12/2016 02/2017

01/2017 12/2020 20-30 3 4

Butte 20/21 New Match Funds La Porte Road Repair

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

La Porte Road - Oro Bangor Hwy to Quarry Road Pre-Construction & Construction

12/2016 02/2017

01/2017 12/2020 20-30 3 4

Butte 20/21 New Match Funds Concow/Skyway/Various Metal Beam Guard Rail (MBGR) Replacement

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off-system MBGR due to the Camp Fire | Matching funds for the FEMA MBGR Replacement Project.

Concow/Skyway/Various County Roads (Off-System Roads) Pre-Construction & Construction

07/2019 08/2020

07/2020 12/2020 20-30 3 4

Butte 20/21 New Match Funds Pulga Metal Beam Guard Rail (MBGR) Replacement

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off-system MBGR on Pulga ROad due to the Camp Fire | Matching funds for the FEMA MBGR Replacement Project.

Pulga Road - State Hwy 70 to End of Pulga Road Pre-Construction & Construction

07/2019 08/2020

07/2020 12/2020 20-30 3 4

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Butte 20/21 New Road Maintenance & Rehabilitation Concow Road Repairs

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off-system Concow Road due to fire debris hauling associated with the Camp Fire

Concow Road - State Hwy 70 to end of pavement (7.1 Miles) Pre-Construction & Construction

07/2019 08/2020

07/2020 12/2020 10-10 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Honey Run Road Repair

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off-system Honey Run Road due to fire debris hauling associated with the Camp Fire

Honey Run Road Pre-Construction & Construction

07/2019 08/2020

07/2020 12/2020 10-10 3 4

Butte 20/21 New Road Maintenance & Rehabilitation Centerville Road Repair

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off-system Centerville Road due to fire debris hauling associated with the Camp Fire

Centerville Road - Honey Run Road to Nimshew Pre-Construction & Construction

07/2019 08/2020

07/2020 12/2020 10-10 3 4

Calaveras 20/21 New Road Maintenance & Rehabilitation Burson Road Phase I This project will include: Pavement Rehab/Repair (Existing) Burson Road from Hillvale Drive to Camanche Parkway South Construction 07/2020 09/2020 10-20 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Murphys Grade Road This project will include: Pavement Rehab/Repair (Existing) Various sections of Murphys Grade Road between Angels Camp and Murphys. Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Parrotts Ferry Road This project will include: Pavement Rehab/Repair (Existing) Main Street to Toulumne County Line Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Main Street (Vallecito) This project will include: Pavement Rehab/Repair (Existing) Highway 4 to Parrotts Ferry Road Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Angels road This project will include: Pavement Rehab/Repair (Existing) Highway 4 to Main Street (Vallecito) Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Copper Cove This project will include: Pavement Rehab/Repair (Existing) O'Byrnes Ferry Road to Little John Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation O'Byrnes Ferry Road This project will include: Pavement Rehab/Repair (Existing) Main Street (Copperopolis) to Toulumne County Line Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Little John This project will include: Pavement Rehab/Repair (Existing) Various sections from Main Street to Kiva Drive Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Main Street (Copperopolis) This project will include: Pavement Rehab/Repair (Existing) O'Byrnes Ferry Road to Highway 4 Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Copper Cove Subdivision This project will include: Pavement Rehab/Repair (Existing) Various streets within the Copper Cove Subdivision Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Hogan Dam Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Silver Rapids Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Vista Del Lago This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Hogam Dam Road Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Burson Road Phase II This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Hillvale Drive Construction 04/2021 10/2021 8-10 5 8

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Calaveras 20/21 New Road Maintenance & Rehabilitation Garner Place This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Baldwin Street This project will include: Pavement Rehab/Repair (Existing) Jenny Lind Road to Highway 26 Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Kirby Street This project will include: Pavement Rehab/Repair (Existing) Jenny Lind Road to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Silver Rapids Road This project will include: Pavement Rehab/Repair (Existing) Heney Lane to Hogan Dam Road Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Hartvickson Lane This project will include: Pavement Rehab/Repair (Existing) Vista Del Lago to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Jenny Lind Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Valley Springs This project will include: Pavement Rehab/Repair (Existing) Various County roads within the community of Valley Springs Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Contingency - Utility Coordination This project will include: Pavement Rehab/Repair (Existing) Paving projects listed here under fiscal year 20/21 Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Contingency - Utility Coordination This project will include: Pavement Rehab/Repair (Existing) Paving projects listed here under fiscal year 21/22 Construction 04/2021 10/2021 8-10 5 8

Colusa 18/19 Carried Over Road Maintenance & Rehabilitation Lone Star Road Resurfacing This project will include: Resurface Lone Star Road from HWY 20 to Able Road | Extensive subgrade geotechnical challenges have resulted in additional design requirements and delayed construction.

In the center area of the County, south of Highway 20, east of the City of Williams. From Hahn Road to Able Road Pre-Construction 07/2020 08/2020 20-25 3 4

Colusa 18/19 Carried Over Road Maintenance & Rehabilitation Lone Star Road Resurfacing This project will include: Resurface Lone Star Road from HWY 20 to Able Road | Extensive sub-grade geotechnical challenges have resulted in additional design requirements and delayed construction.

In the center area of the County, south of Highway 20, east of the City of Williams. From Hahn Road to Able Road Construction 08/2020 10/2020 20-25 3 4

Contra Costa 19/20 Forecasted Road Maintenance & Rehabilitation Traffic Safety Devices Maintenance

This project will include: Traffic Signing – This routine maintenance item is to perform sign repair, replacement, and installation along the unincorporated County roadways. (RMRA = $450k) Traffic Striping – This routine maintenance item is to perform new painting, routine painting and replacement of pavement striping along the unincorporated County roadways to enhance public safety. (RMRA = $500k)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Procurement/Operational Needs 07/2020 06/2021 2-10 11, 14, 15, 16 7, 9

Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation Road Drainage Maintenance

This project will include: All of the following are routine maintenance items: Ditch Cleaning – Perform drainage ditch cleaning to remove debris and vegetation which may obstruct the passage of stormwater and cause local flooding. (RMRA = $400k) | Clean Catch Basin – Perform cleaning of sediment and prevent obstructions of catch basins (drainage inlets) and related pipe systems. (RMRA $500k) Inspect Catch Basin – Perform inspections of catch basins and associated systems. This includes a visual inspection of the drainage inlet and any clean water inserts. Follow-up video inspections may be required for deeper inlets and/or suspected structural issue concerning the inlets. (RMRA = $300k)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Procurement/Operational Needs 07/2020 06/2021 15-40 11, 14, 15, 16 7, 9

Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation Pavement Repairs and Preparation

This project will include: • Pot Hole Patching – (RMRA = $500k) • Pavement Fabric Patching – (RMRA = $500k) • Pavement Failure Repair - Backhoe – (RMRA = $500k) • Pull Box Paving – (RMRA = $525k) • Hand Patching – (RMRA=$500k) • Crack Sealing – (RMRA = $600k) • Leveling – (RMRA = $475k) • Pavement Failure Repair – Grinder – (RMRA = $600k)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Procurement/Operational Needs 07/2020 06/2021 7-7 11, 14, 15, 16 7, 9

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation Surface Treatments - Double Chip Seal Project (2020)

This project will include: Work will also include surface preparation and pavement striping and markings. (RMRA funding = $2,200,000)

This project will apply a double chip seal to various roads as a pavement preservation project in the unincorporated Contra Costa County which include but are not limited to the following: Bear Creek Road, Chestnut Street, Sunset Road, Delta Road, Sellers Avenue, Eden Plains Road,, Byron Highway, Knightsen Avenue, Marsh Creek Road, Point of Timber Road, Bixler Road, Byron Highway and Camino Diablo.

Procurement/Operational Needs 07/2020 06/2021 7-7 11, 14, 15, 16 7, 9

Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation Surface Treatment - Asphalt Rubber Cape Seal Project (2020)

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Equipment | The project will apply an asphalt rubber chip seal covered with a type II slurry seal to the pavement surface. Work will also include surface preparation and pavement striping and markings. (RMRA funding = $4,750,000)

The project will apply a pavement surface treatment to various roadways in the Bay View (19 streets), Montalvin (18 streets), Unincorporated Lafayette and Martinez (67 streets) areas.

Procurement/Operational Needs 07/2020 06/2021 7-7 14 7

Contra Costa 19/20 In Progress Safety Kirker Pass Road Northbound Truck Lanes

This project will include: Storm Drain/Culvert Installation (New), Right of Way Acquisition, Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | The project consists of roadway widening for a truck lane and paved shoulder, construction of six retaining walls and two bioretention areas, drainage improvements, relocation of existing roadside features, signing and striping, and pavement rehabilitation on both the north and southbound lanes. Pavement rehabilitation will involve a 0.10’ grind and overlay of rubberized hot mix asphalt open grade on existing and new roadway pavement. (RMRA = $3,100,000)

Kirker Pass Road – from Clearbrook Drive to approximately 140 feet east of the driveway to 6141 Kirker Pass Road. Construction 05/2019 09/2020 7-50 14 7

Del Norte 20/21 New Road Maintenance & Rehabilitation 2021 Countywide Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Hunter Creek Road, Arlington Drive and Elk Valley Road from U.S. Highway 101 to Howland Hill Road. Construction 07/2020 06/2021 15-20 2 2

Del Norte 20/21 New Other Excavator Acquisition This project will include: Procurement of Public Works Equipment County wide Procurement/Operational Needs 07/2020 01/2021 25-25 2 2

Del Norte 20/21 New Other Facility Housing Equipment and Vehicles This project will include: Repair and Servicing of Public Works Equipment The Road Yard located at 500 E. Cooper Avenue, Crescent City. Procurement/Operational Needs 07/2020 06/2021 50-50 2 2

El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Roads of Placerville Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads.

Approximately 2.78 miles of roadway. Average PCI is 31.

Various county maintained roads throughout Placerville, CA.

Roads include but are not limited to: Mona Drive, Pierce Court, Prescott Avenue, Jacquier Road, No Name Road, Smith Flat Cemetery Road, Smith Flat Road and Smith Flat School Road.

Construction 12/2019 08/2020 10-15 5 1

El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Diamond Springs Business Park Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed throughout the business park. Approximately 1.85 miles of roadway. Average PCI is 35.

Diamond Springs Business Park is located in Diamond Springs, CA between Highway 49 and Highway 50.

Roads include but are not limited to: Bright Court, Capitol Avenue, Clear Court, Commerce Way, Enterprise Court, Enterprise Drive, Industrial Drive and Merchandise Way.

Construction 12/2019 08/2020 10-15 5 1

El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Cameron Park Subdivison Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed throughout the subdivision.

Approximately 7.01 miles of roadway. Average PCI is 34.

Cameron Park Subdivision is located in Cameron Park, CA and is north of Highway 50 and west of Cameron Park Drive consisting of approximately 21 roads.

Roads include but are not limited to: Braniff Court, Castlebrook Road, Cessna Drive, De Sabla Court, De Sabla Road, Eagle View Drive, El Dorado Royale Drive, El Encanto Road, Fairway Drive, Garden Circle, Linwood Lane, Los Santos Drive, Navion Court, No Name Court, Piper Court, Sage Drive, Sky Court, Sudbury Road, Toronto Road and Wood Lane.

Construction 12/2019 08/2020 10-15 5 1

El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Roads of Pollock Pines Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads.

Approximately 5.98 miles of roadway. Average PCI is 44.

Located in Pollock Pines, CA north of Highway 50 between Sly Park Road and Ridgeway Drive.

Roads include but are not limited to: Pony Express Trail, Willow Street, Fir Drive, Fairview Drive, North Street, Polaris Street, Laurel Drive, Balsam Drive, Maple Drive, Maple Avenue, Pine Street, Sanders Drive, Center View Court, and Center View Drive.

Construction 12/2019 08/2020 10-15 5 1

El Dorado 20/21 New Road Maintenance & Rehabilitation Forcefeed Loader This project will include: Procurement of Public Works Equipment Placerville, CA Procurement/Operational Needs 07/2020 01/2021 15-20 5 1

El Dorado 20/21 New Road Maintenance & Rehabilitation El Dorado Hills Subdivisions Prep Work and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The first phase will consist of roadside brushing of 3.86 miles of roadway within Franciscan Village and Marina Woods Unit 1 and 2. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Phase two (2) will consist of repairing damaged asphalt in the 3.86 miles within Franciscan Village and Marina Woods Unit 1 and 2, if needed. Phase Three (3) will consist of a surface treatment.

Franciscan Village is located in El Dorado Hills, CA between El Dorado Hills Boulevard, Francisco Drive, and Green Valley Road. Marina Woods Unit 1 and 2 is located in El Dorado Hills, CA between Francisco Drive and Folsom Lake.

Construction 10/2020 10/2021 13-17 5 1

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

El Dorado 20/21 New Road Maintenance & Rehabilitation Bar J Ranch Prep Work and Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The first phase will consist of roadside brushing of 5.90 miles of roadway within Bar J Ranch. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Phase two (2) will consist of repairing damaged asphalt in the 5.90 miles within Bar J Ranch, if needed. Phase Three (3) will consist of a surface treatment and all ADA upgrades that are required.

Bar J Ranch is located in Cameron Park, CA on both sides of Country Club Drive, north of Highway 50 and west of Cambridge Road. Construction 10/2020 10/2021 13-17 5 1

El Dorado 20/21 New Road Maintenance & Rehabilitation Carson Road Prep Work and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Carson Road Surface Treatment is a multi-year project. The first phases will concentrate on the preparation for the surface treatment. The first phase will consist of roadside brushing and ditching of 6. 77 miles of roadway along Carson Road. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting drainage issues and verifying all cross culverts are free of debris and are functioning to their fullest capacity | At that time, all culverts will be inspected for life expectancy and be replaced if needed. Phase two (2) will consist of repairing damaged asphalt in the 6. 77 miles of Carson Road, if needed. Phase Three (3) will consist of a surface treatment.

Carson Road starts in Placerville, CA and extends into Camino, CA and runs parallel north of Highway 50. Construction 10/2020 10/2021 13-17 5 1

El Dorado 20/21 New Road Maintenance & Rehabilitation Greenstone Road Area Prep Work and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The first phase will consist of roadside brushing and ditching of 4.31 miles of roadway along Greenstone Road area. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting drainage issues and making sure all cross culverts are free of debris and are functioning to their fullest capacity. At that time, all culverts will be inspected for life expectancy and be replaced if needed. | Phase two (2) will consist of repairing damaged asphalt in the 4.31 miles of Greenstone Road area, if needed. Phase Three (3) will consist of a surface treatment.

Greenstone Road Area is located in Placerville, CA and runs perpendicular to Highway 50. Construction 10/2020 10/2021 13-17 5 1

El Dorado 20/21 New Road Maintenance & Rehabilitation Sawmill Road Rehabilitation and Surface Treatment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The first phase will consist of roadside brushing and ditching of 1.83 miles of roadway along Sawmill Road. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting drainage issues and making sure all cross culverts are free of debris and are functioning to their fullest capacity. At that time, all culverts will be inspected for life expectancy and be replaced if needed. | Phase two (2) will consist of repairing damaged asphalt in the 1.83 miles of Sawmill Road. Phase Three (3) will consist of a surface treatment.

Sawmill Road is located in South Lake Tahoe, CA between Lake Tahoe Boulevard and Highway 89. Construction 09/2020 10/2021 13-17 5 5

Fresno 18/19 Carried Over Traffic Control Devices Copper Avenue and Auberry Avenue Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Copper Avenue and Auberry Avenue Construction 07/2020 07/2021 20-20 23 8

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Jensen Avenue Reconstruction This project will include: Preliminary Design Jensen Avenue from Chateau Fresno to Cornelia Avenue Pre-Construction 07/2021 10/2021 20-20 31 14

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Travers Creek Bridge repalcement on Manning Avenue This project will include: Right of Way Travers Creek Bridge at Manning Avenue Pre-Construction 12/2021 12/2022 50-50 31 14

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation James Bypass Overflow on Manning - Replace 2 Bridges This project will include: Right of Way James Bypass Overflow at Manning Pre-Construction 07/2020 12/2020 50-50 31 12

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Delta Mendota Canal Bridge on Nees Avenue Bridge Replacement This project will include: Right of Way Delta Mendota Canal Bridge at Nees Avenue Pre-Construction 12/2021 12/2022 50-50 31 12

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Dry Creek on Burrough Valley Road Bridge Replacement This project will include: Environmental Study/Documents, Right of Way Dry Creek at Burrough Valley Road Bridge Pre-Construction 12/2022 12/2023 50-50 23 8

Fresno 19/20 Carried Over Other Golden State Boulevard over Fowler Switch Bridge Replacement This project will include: Environmental Study/Documents, Right of Way Golden State Boulevard at Fowler Switch Bridge Pre-Construction 01/2023 04/2024 50-50 31 14

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation North Fork Road over San Joaquin River Bridge Replacement This project will include: Environmental Study/Documents, Right of Way | Replace Bridge North Fork Road at San Joaquin River Bridge Pre-Construction 11/2025 11/2026 50-50 23 8

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation American Avenue Road Reconstruction This project will include: Right of Way American Avenue from State Route 99 to Temperance Avenue Pre-Construction 02/2021 12/2021 50-50 31 14

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Fresno 19/20 Carried Over Other Jensen Avenue Shoulder Improvements This project will include: Preliminary Design Jensen Avenue from State Route 145 to Dickenson Avenue Pre-Construction 05/2021 10/2021 20-20 31 12

Fresno 19/20 Carried Over Other American Avenue Shoulder Improvements This project will include: Preliminary Design American Avenue from State route 145 to Placer Avenue Pre-Construction 05/2021 10/2021 20-20 31 12

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Mt. Whitney Reconstruction and Pedestrian Improvements This project will include: Preliminary Design Mt. Whitney Avenue from Marks Avenue to Blythe Avenue Pre-Construction 04/2022 10/2022 20-20 31 12

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Cerini Avenue Reconstruction and Pedestrian Improvements This project will include: Preliminary Design Cerini Avenue from East Avenue to Cedar Avenue Pre-Construction 04/2022 10/2022 20-20 31 12

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Jensen Avenue Reconstruction This project will include: Preliminary Design Jensen Avenue from Chateau Fresno to Cornelia Avenue Pre-Construction 07/2021 10/2021 20-20 31 14

Fresno 18/19 In Progress Road Maintenance & Rehabilitation Lincoln Avenue Cold-in-place Recycling This project will include: Preliminary Design Lincoln Avenue between Grantland Alignment and SR 145 Pre-Construction 07/2021 10/2021 10-10 31 12

Fresno 20/21 New Safety Elkhorn over Liberty Millrace Canal This project will include: Environmental Study/Documents, Right of Way, Preliminary Design W. Elkhorn Avenue approximately 1 mile west of S. Cornelia Ave. and 6.4 miles west of SR 41. Pre-Construction 07/2021 12/2021 50-50 31 12

Fresno 20/21 New Safety Markwood Creek on Dinkey Creek Road This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design

Dinkey Creek Road over Markwood Creek, 4.87 miles east of Highway 168. Pre-Construction 07/2021 12/2021 50-50 23 8

Fresno 20/21 New Complete Streets Components Tranquility Road Improvements This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design

Community of Tranquility: Juanche Ave from Randolph Ave to Silvena Ave, and Daniels Ave from Randolph Ave to RR tracks. Pre-Construction 09/2021 12/2021 20-20 31 12

Fresno 20/21 New Complete Streets Components Jensen Avenue Reconstruction from Fig to Fruit

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design Jensen Ave from Fig Ave to Fruit Ave. Pre-Construction 05/2021 08/2021 20-20 31 14

Fresno 20/21 New Complete Streets Components Jensen Avenue Reconstruction from Fruit Ave to West Ave

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design Jensen Ave from Fruit Ave to West Ave. Pre-Construction 05/2023 10/2023 20-20 31 14

Fresno 20/21 New Safety Laton Sidewalk Project This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | In-road warning lights on Fowler Ave.

Community of Laton; Fowler Ave, Bliss Ave, Gonser Ave, Latonia Ave, and Murphy Ave. Construction 07/2020 12/2020 20-20 31 12

Fresno 20/21 New Road Maintenance & Rehabilitation American Avenue Shoulder Improvements -Clovis to temperance

This project will include: Environmental Study/Documents, Right of Way, Project Scope Development, Preliminary Design American Avenue from Clovis Ave to Temperance Ave. Pre-Construction 05/2023 09/2023 20-20 31 14

Fresno 20/21 New Road Maintenance & Rehabilitation Lincoln Ave Shoulder Improvements - SR 145 to Grantland Alignment

This project will include: Environmental Study/Documents, Right of Way, Project Scope Development, Preliminary Design Lincoln Ave from SR 145 to Grantland Alignment Pre-Construction 05/2021 09/2021 20-20 31 12

Fresno 20/21 New Road Maintenance & Rehabilitation County Overlays This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation

Fruit - San Jose to Palo Alto Barstow - Delmar to Thorne Sierra - Fresno CL to Fruit Central - Elm to Cornelia Annadale - Newmark to Reed Alta - Dinuba to Floral

Pre-Construction 07/2020 08/2020 10-10 23, 31 12, 14, 22

Fresno 20/21 New Road Maintenance & Rehabilitation 2020-21 Day Labor Overlays - Various Locations This project will include: Preliminary Design

Belmont-Newcomb:Jerrold, Kamm-SR145:Stinson, Placer- Lincoln:San Joaq, Canal, Belmont-Dickenson to SR 145, Cornelia - Shields to Dakota,Garfield - Bullard to Herndon, Herndon-Parkway Dr to Dickenson, Kearney-Chateau Frsno to Dickenson; Drummond-Maple:Sierra Vista; Sierra Vista - Jensen to Drummond; Gale - Avenal to .74 W/O Howard Alignment; Conejo-Peach to Bethel, Central-McCall to Bethel Pederson-Weldon:Princeton, Weldon-Piedra:MR, Princeton-Piedra:MR, Auberry-Powerhouse Rd: Jose Basin

Pre-Construction 07/2020 10/2020 10-10 23, 31 8, 12, 14

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Fresno 20/21 New Road Maintenance & Rehabilitation Adams Avenue Overlay - Cherry to Clovis This project will include: Preliminary Design Adams Ave from Cherry Ave to Clovis Ave. Pre-Construction 05/2022 10/2022 10-10 23 14

Fresno 20/21 New Road Maintenance & Rehabilitation Bituminous Seal Coats - Various Locations This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Barstow - Garfield to Biola; Nees - Oxford to I-5; Paul Negra - 1-5 to County Line (Merced); Del Rey - Dinuba to Floral; Newmark - SSR 168 to End Maintenance Road; Pepperweed Rd to Squaw Valley Road; Madsen -SR 168 to End Maintenance Road; Mendocino - SSR 168 to End Maintenance Road; Newmark - 05 N/O Adams to Parlier C.L.; Elwood Road - Lupine Dr to 3.67 NW/O Bonanza; Auberry Road - 2.5 SE/O to 5.3 SE/O Jose Basin Road

Construction 05/2020 06/2020 5-5 23, 31 8, 12, 14

Fresno 20/21 New Road Maintenance & Rehabilitation Slurry Seals-Sunnyside This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Sunnyside Area Construction 05/2020 06/2020 5-5 23 8

Fresno 20/21 New Road Maintenance & Rehabilitation Slurry Seals - Fig Garden This project will include: Preliminary Design

Van Ness - Ashlan to Holland Wilson - Saginaw to Pontiac Valentine - Alluvial to Dewey Wishon - Ramona to Ashlan

Pre-Construction 05/2021 06/2021 5-5 23 8

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Fresno County Overlays: Carry Over from FY 2016/17 SB 1 Funds - Various Locations

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and dig outs and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Church - Orange to Cedar Shaw - Fresno CL to Palm Shaw - Blackstone to Wishon Ct Palm - Dakota to Shaw Maple - Fresno CL to Cornell

Pre-Construction & Construction

02/2020 07/2020

07/2020 09/2020 10-10 23, 31 8, 12, 14

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Lincoln from SR 41 to Chateau Fresno Alignment

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Lincoln from SR 41 to Chateau Fresno Alignment Pre-Construction & Construction

07/2020 07/2021

06/2021 09/2021 10-10 31 12

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Chestnut from Herndon to Alluvial

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Chestnut from Herndon to Alluvial Pre-Construction & Construction

07/2020 07/2021

06/2021 09/2021 10-10 23 8

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Marks from Barstow to the RR Crossing S of Barstow

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Marks from Barstow to the RR Crossing S of Barstow Pre-Construction & Construction

07/2020 07/2021

06/2021 09/2021 10-10 23 8

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Barstow from Marks to Van Ness

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Barstow from Marks to Van Ness Pre-Construction & Construction

07/2020 07/2021

06/2021 09/2021 10-10 23 8

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay on Clovis Ave. from Jensen to SR-99

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Clovis Ave. from Jensen to SR-99 Pre-Construction & Construction

07/2020 07/2021

06/2021 09/2021 10-10 31 8, 14

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Fowler from Elkhorn to the Fresno/Kings County line

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Fowler from Elkhorn to the Fresno/Kings County line Pre-Construction & Construction

07/2020 07/2021

06/2021 09/2021 10-10 31 12, 14

Fresno 20/21 New Road Maintenance & Rehabilitation McCall Overlay from SR 180 to Shaw This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Document Preparation McCall Ave from SR 180 to Shaw Pre-Construction 08/2020 10/2020 10-10 23 14

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Glenn 20/21 New Road Maintenance & Rehabilitation Chip Seal Project - Various Sites- 45 Centerlane Miles

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Maintenance Program Plan Development

CR P, from SR 32 to CR 27; CR D, from CR 45 to CR 33; CR 9, from 4th Ave to CR 203; CR 9, from 99W to CR KK; CR S, from SR 32 to CR 21; CR S, from .5 mi s/o CR 25 to CR 33; CR 24, from CR S to SR 45; CR 48, from 99W to CR 47; CR 47, from CR 48 to CR MM; CR MM, from CR 45 to CR 47; CR 45, from CR MM to CR P; CR 203, from CR 9 to SR 32; CR M, from Orland City limit to CR 33; CR 27, from I-5 to CR M; and CR D, from CR 57 to CR 68.

Pre-Construction & Construction

07/2020 07/2020

08/2020 06/2021 7-10 3 4

Glenn 20/21 New Road Maintenance & Rehabilitation Fog and Rejuvinating Seal- Various Sites - 14 Miles This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) CR P, from CR 27 to CR 33; and CR V, from CR 29 to SR 162 Construction 08/2020 10/2020 3-5 3 4

Humboldt 20/21 New Other County-wide ADA Curb Ramp/Rehabilitation

This project will include: ADA Curb Ramp Installation (New), Right of Way, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This project covers the installation of accessible curb ramps in various locations throughout the county.

Signalized intersections on Central Avenue, Harrison and Myrtle, Harris and Walford, Harris and Harrison & various sites in the McKinleyville area.

Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 20-20 2 2

Humboldt 20/21 New Road Maintenance & Rehabilitation County-wide Roadway and Culvert Maintenance/Rehabilitation

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Cost Estimating, Project Scope Development, Storm Drain and/or Culvert Rehab/Repair (Existing) | This project covers labor, materials and equipment needed for road system maintenance repairs throughout the entirety of Humboldt County. These activities include, but are not limited to; crack filling and sealing, pothole patching, grading, grader patching, dig outs, slurry seal, chip seal, striping, painting, and brush cutting. | Additionally, materials required to complete these tasks, include, but are not limited to; hot and cold mix, tar, thermoplastic striping paints, culvert piping, and couplers, aggregate and any other materials used in the express intent of repairing a roadway or projects pertaining to safety. This includes both contracted and non-contracted work.

County-wide: Hoopa, McKinleyville, Eureka, Ferndale, Fortuna, Garberville Maintenance Areas

Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 20-20 2 2

Humboldt 20/21 New Safety Illegal Dumping and Encampment Reclamation Costs

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | This project covers the costs to clean up illegally dumped materials and restore sites where dumping has occurred and discourage future illegal dumping. Costs include labor, materials and equipment required to clean, repair and reclaim affected sites. It is anticipated that illegal dumping will continue to occur at sites until efforts to discourage illegal dumping take effect.

County-wide: Hoopa, Mckinleyville, Eureka, Ferndale, Fortuna, Garberville Maintenance Areas

Procurement/Operational Needs 07/2020 06/2021 1-5 2 2

Humboldt 20/21 New Safety Emergency Services

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment | This project encompasses all costs that pertain to emergency opening of roadways and the actions made to expedite repairs or provide service to disenfranchised citizens. This includes both contracted and non-contracted work. | These projects include, but are not limited to, culvert repair such as trenching, tunneling, compacting, armoring, as well as flagging, detouring, hauling, repairing, and providing essentials services such as transporting and accommodating citizens who have been deprived of the ability to utilize roadways due to unexpected road damages and closures.

County-wide: Hoopa, McKinleyville, Eureka, Ferndale, Fortuna, Garberville Maintenance Areas as needed related to emergency service response.

Procurement/Operational Needs 07/2020 06/2021 1-1 2 2

Humboldt 20/21 New Match Funds Roadside Brush Clearing for Traffic Safety and Fire Fuels Reduction

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | This project covers the added cost for labor materials and equipment required to perform brush clearing on county-maintained roads. This will also enhance the grant funding that the county has received for this type of work.

County-wide: Hoopa, McKinleyville, Eureka, Ferndale, Fortuna, Garberville Maintenance Areas

Procurement/Operational Needs 07/2020 06/2021 2-6 2 2

Imperial 19/20 In Progress Road Maintenance & Rehabilitation Road Improvements for Baughman Rd. from Forrester Rd. to Lack Rd. & Casey Rd. from

Griffin Rd. to Hwy. 78

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Right of Way, Preliminary Design, Document Preparation | Rehabilitate approximately 2.5 miles of road. The project will include the re-paving with Asphalt Concrete and the repair of failure areas of road markings. | Funds from FY 2020-21 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Baughman Road from Forrester Road to Lack Road; Casey Road from Griffin Road to State Route 78

Pre-Construction & Construction

12/2017 11/2020

10/2020 06/2021 6-10 56 40

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Imperial 19/20 In Progress Road Maintenance & Rehabilitation Schartz Road Project 1

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Rehabilitate approximately 1.5 miles of road. The project will include the re-paving with asphalt concrete and the repair of failure areas and road markings.

Schartz Road McConnell Road to Old Highway 111 Pre-Construction & Construction

10/2017 07/2021

06/2021 06/2022 4-5 56 40

Imperial 19/20 In Progress Road Maintenance & Rehabilitation Heber Avenue Project

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Rehabilitate approximately 0.5 miles of road. The project will include the re-paving with asphalt concrete or the resurfacing with slurry seal, construction of ADA ramps, associated drainage work and road markings. | This project is funded in part by Federal Funds.

Heber Ave. from Correll Road to State Route 86 Pre-Construction & Construction

07/2017 10/2020

09/2020 12/2020 8-10 56 40

Imperial 19/20 In Progress Safety Forrester Road Bridge Project

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Preparation | The project consists of the replacement of existing road bridge to retrofit seismically (Low Sufficiency rated). The project will be require a multiple years. | This project is funded in part by FHWA.

Forrester Road Bridge over Westside Main Canal, County Bridge No. 58C-0104

Pre-Construction & Construction

07/2017 05/2022

04/2022 12/2023 50-75 56 40

Imperial 19/20 In Progress Safety Winterhaven Drive Bridge Project This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Preparation | The project consists of seismic retrofitting existing road bridge due to the its current low sufficiency rating. | This project is funded in part by FHWA.

Winterhaven Drive Bridge over California Wasteway Channel, County Bridge No. 58C-0094

Pre-Construction & Construction

07/2017 11/2020

10/2020 11/2021 50-75 56 40

Imperial 19/20 In Progress Safety Keystone Road Intersection Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | Highway Intersection Safety improvement. The project will consist of adding lightning, paving, rumble strips, flashing beacons, and warning signs to the road intersection. | This project is funded in part by FHWA.

Keystone Road and Austin Road Intersection Pre-Construction & Construction

07/2017 12/2020

11/2020 12/2021 7-10 56 40

Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Forrester Road Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design, Document Preparation | 3-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Forrester Road: from Evan Hewes Highway to Interstate 8, from Evan Hewes Highway to Hackleman Road, from 0.80 Mi. N. of Worthington Road to Larsen Road, from 0.15 Mi. N. of Worthington Road to 0.20 Mi. S of Murphy Road, from Thompson Road to Keystone Road

Pre-Construction & Construction

07/2019 07/2021

06/2021 06/2022 7-10 56 40

Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Dogwood Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, Document Preparation | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Dogwood Road from Keystone Road to Harris Road Pre-Construction & Construction

07/2019 01/2022

12/2021 12/2022 7-10 56 40

Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Zenos Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design, Document Preparation | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Zenos Road from SR 115 to Melon Road Pre-Construction & Construction

07/2019 07/2021

06/2021 06/2022 7-10 56 40

Imperial 19/20 In Progress Road Maintenance & Rehabilitation Menvielle Road

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation | 3-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage. | Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Menvielle Road from SR 98 to SR 7 Pre-Construction & Construction

07/2017 07/2021

06/2021 12/2021 7-10 56 40

Imperial 19/20 Carried Over Safety Rural School Safety Improvements This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Preliminary Design, Document Preparation | Safety Improvements Signage/striping.

Magnolia Union Elementary at intersection of Casey Road and Silliman Road Pine Elementary at intersection of Holt Road and Townsend Road Meadows Union Elementary at Intersection of Bowker Road and Evan Hewes Highway

Pre-Construction & Construction

09/2019 07/2021

06/2021 12/2021 5-10 56 40

Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Picacho Road Bridge This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Preparation | The project will consist on the design and construction of the Bridge Rehabilitation for Picacho Road Bridge over Yuma Main.

Picacho Road Bridge over Yuma Main Pre-Construction & Construction

09/2019 07/2022

06/2022 12/2023 10-15 56 40

Imperial 19/20 In Progress Road Maintenance & Rehabilitation Gateway of the Americas Road System This project will include: Preliminary Design

Maggio Road from HWY 7 to Rood Road, Zinetta Road from Clara Nofal Road to Rood Road, Pan American Road from Nina Lee Road to Rood Road, Rood Road from Pan American Rood to Stergios Road, Menville Road from HWY 7 to Menvielle Court , Nina Lee Road from Carr Road to HWY 7, Los Alamos Road from Pan American Road to North End

Pre-Construction 05/2019 12/2020 7-10 56 40

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Imperial 19/20 In Progress Road Maintenance & Rehabilitation AC Skin Patching for Various County Roads This project will include: Pavement Rehab/Repair (Existing) | Maintenance work to be completed by County's forces.

Board Rd, Bowker Rd, Evan Hewes Highway, Holt Road, Hovley Road, Imperial Road, Kalin Road, McCabe Rd, Miller Rd, Ross Rd, Rutherford Rd, Underwood Rd, Wahl Road, Yuma Rd, Heber Road, and McCabe Road. Locations are estimates not yet final.

Construction 03/2020 12/2021 4-6 56 40

Imperial 19/20 In Progress Road Maintenance & Rehabilitation Pavement Overlay for Various County Roads This project will include: Preliminary Design

Clark Road from Wahl Road to .5 N. of HWY 98, Picacho Road from Quechan Road to Indian Rock Rd., Treadwell Road from HWY 86 to Camino Drive, Orchard Road from Bailey Road to .25 Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Pre-Construction 08/2019 12/2021 7-10 56 40

Imperial 19/20 Completed Road Maintenance & Rehabilitation Fog Seal and Pothole Repair for Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This project will just include Fog Seal and Pothole Repair.

Various County Roads including Seeley Townsite and Niland Townsite. Locations are estimates not yet final. Construction 02/2020 06/2020 2-3 56 40

Imperial 19/20 In Progress Safety Lack Road Bridge Project This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Preparation | The project consists of replacement of structurally compromised road bridge over the New River. The project is anticipated to require multiple years to be completed.

Lack Road Bridge over New River, County Brodge No. 58C-0101 Pre-Construction & Construction

12/2017 07/2021

06/2021 12/2022 50-75 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation AC Skin Patching for Various County Roads This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement makings and restriping. | Maintenance work to be completed by County's forces.

Beal Road, Bonesteele Road, Evan Hewes Highway, Imperial Road, Kalin Road, Kubler Road, Niles Ave, Bowker Road, Spa Road, Hot Mineral Spa Road, and Cocopah Road. Locations are estimates not yet final.

Construction 07/2020 06/2021 4-6 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation Bombay Beach Townsite This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

"Bombay Beach Townsite: Avenue A, Avenue B, Avenue C, Avenue D, Avenue E, Avenue F, Avenue G, Avenue H, Aisle for Palms, 1st Street, 2nd Street, 3rd Street, 4th Street, and 5th Street. "

Pre-Construction & Construction

09/2020 07/2021

06/2021 12/2021 7-10 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation Fog Seal and Pothole Repair for Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This project will just include Fog Seal and Pothole Repair. | Maintenance work to be completed by County's forces. Various County Roads. Locations are estimates not yet final. Construction 07/2020 06/2021 2-3 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation Pavement Overlay for Various County Roads This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Picacho Road from Quechan Road to Indian Rock Rd., Treadwell Road from HWY 86 to Camino Drive, Orchard Road from Bailey Road to .25 Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Construction 07/2020 06/2021 7-10 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation Storm Damaged for Various County Roads This project will include: Rain Damage Repair. Various County Roads. Locations are estimates not yet final. Construction 07/2020 06/2021 4-6 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation Storm Damaged for Various County Roads This project will include: Rain Damage Repair Various County Roads. Locations are estimates not yet final. Construction 07/2019 06/2020 4-6 56 40

Imperial 18/19 In Progress Road Maintenance & Rehabilitation Road Surface Repair Program in Imperial County

This project will include: Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping | Maintenance work to be completed by County's forces

Araz Road from Quick Road to Quick Road (2 Mi. W.); Brockman Road from McCabe Road to Lyons Road (.5 Mi. N.); Drew Road from Lyons Road (0.5 Mi. N.) to Diehl Road.; Austin Road from Harris Road to Larsen Road; Larsen Road from SR 86 to Clark Road; Ross Road from Forrester Road to Silsbee Road; Bowles Road from English Road to Lyerly Road; Carter Road from Loveland Road to Webster Road (0.7 Mi. S). Carter Road from Webster Road (0.7 Mi. S) to Webster Road; Gentry Road from Eddins Road to Vail Canal; Kalin Road from Carter Road to Cady Road; Rutherford Road from Kershaw Road to HWY 115 (1.75 Mi. E); Meloland Road from Evan Hewes Highway to Grumbles Road; Neighbors Road from County Line to Arizona State Line; Worthington Road from James Road to Alamo River

Construction 03/2019 06/2021 4-6 56 40

Inyo 18/19 Carried Over Road Maintenance & Rehabilitation Project# 5

This project will include: On South Lake Road, the project will pulverize and reclaim the existing pavement and portion of the existing subgrade for use as a new base course and overlay with a new asphalt concrete pavement section on 6.9 miles of South Lake Road, as well as minor widening along the first 2.1 miles.

South Lake Road (#2022) between US 168 and the South Lake trailhead parking area, approximately 12 miles Southwest of Bishop, California. Construction 05/2020 10/2020 15-20 26 8

Inyo 19/20 Carried Over Road Maintenance & Rehabilitation Project #7 First St. / West Jay Street improvement project

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This will be a County contribution using a percentage of RMRA funds for improvements that the City of Bishop will be performing to a County Road. While the City will be preforming a utility extension and upgrade for public safety.

Street First (West Jay Street) is located south of the City of Bishop, West of US395 (Main St.) and shares the City of Bishop/Inyo County Boundary. Construction 07/2019 10/2020 15-20 26 8

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Inyo 19/20 Carried Over Road Maintenance & Rehabilitation Project #9 Cactus Flat Road Repair This project will include: Pavement Rehab/Repair (Existing) Cactus Flat Road is located in Inyo County, just south of Olancha. The section that will be repaired is approximately 5 miles west of the intersection of Cactus Flat Road and US395, 5 miles south of Olancha.

Construction 07/2020 06/2021 15-20 26 8

Inyo 19/20 Carried Over Road Maintenance & Rehabilitation Project #10 North Round Valley Bridge

Replacement, Birchim Lane improvement; State matching funds requirement

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | The North Round Valley Bridge Replacement and Birchim Lane improvement project will address damages caused by a 2017 storm system that destroyed the bridge and access route for the 40 Acres Community. The County is using a percentage of its RMRA funds as a match for the State of California OES disaster funds being received for design and construction. | Total North Round Valley Bridge design and construction costs are estimated to be $3,400,000, of which the California OES will contribute 75% or $2,550,000. The remaining Inyo County match of 25% of project costs will be meet using RMRA funds

North Round Valley Road, with the damaged bridge, and Birchim Lane, that intersects North Round Valley Road, is located in Inyo County, 15 miles North West of Bishop.

Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 20-50 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #13 Crack Fill, Patching, Restriping, Overlay, Guardrails, and Culvert – As Required

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Application of rubberized crack fill and pot-hole patching to seal asphalt pavement to prevent water intrusion to the subgrade, protecting the subgrade from erosion and causing pavement failure. Overlay for some roads that are in an advanced state of deterioration, restriping, and guardrail and culvert repairs and/or replacement as necessary. | 2-5 years is the useful life of the crack fill and pot hole patching. 1-2 years is the useful life of the striping, 10 years is the useful life of the overlay, and 20+ years is the useful life of the guardrail and culvert repairs.

County-wide, the Inyo County Road Route system, where several roads are grouped in areas, or ‘zones’ will be used for identification of the residential streets, outlying roads, and individual roads. Bishop Area; Routes #1001 through #1006. Big Bine Area; Routes #2001, through #2004. Independence Area; Routes #3001 through #3005, and #3008. Lone Pine Area; Routes #4001 through #4008. Tecopa/Shoshone Area; Routes 5002 through #5006

Construction 07/2020 06/2021 1-20 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #14 Warm Springs Road – Grader Overlay

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Warm Springs Road Grader Overlay involves that application of includes the prepping, tack coating, and application of a 2” +/- layer of Cold Mix Asphalt (CMA) to 2.3 miles of existing roadway 24’ wide. Also included in this scope-of-work is any necessary shoulder backing and ditch clearing/shaping, as well as striping/asphalt markings.

The location is from US 395 to Eastside Construction 07/2020 06/2021 10-15 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #15 Death Valley Road – Chip Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Death Valley Road Chip Seal project includes the chip sealing to 4 miles of existing roadway 24’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas overlaid by the chip seal | The anticipated life of the chip seal is 5 years and the estimated life of the striping is 1-2 years.

The location is the road segment from 11.2 miles and 15.2 miles east of US 395 on Hwy 168 out of Big Pine. Construction 07/2020 06/2021 1-5 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #16 Trona Wildrose Road – Chip Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Trona Wildrose Road Chip Seal project includes the chip sealing of 2) 2 mile long segments of existing roadway 22’ wide. Also included in this scope-of-work are the striping/asphalt markings for areas overlaid by the chip seal. | The estimated useful life for the chip seal is 5 years and 1-2 years for the striping and pavement markings.

The location of the two road segments are north of the County Line on the South end Construction 07/2020 06/2021 1-5 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #17 Panamint Valley Road – Paver Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Panamint Valley Road project involves performing a paver overlay of intermittent segments of the 14 mile long section of existing roadway 22’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the chip seal is 5 -10 years and 1-2 years for the striping and pavement markings.

The location of the Panamint Valley Road is between Highway 190 and Trona Wildrose Road Construction 07/2020 06/2021 1-10 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #18 Old Spanish Trail Road – Grader Overlay

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Old Spanish Trail Road project involves performing a grader overlay of intermittent segments of the existing roadway 22’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the grader overlay is 10-15 years and 1-2 years for the striping and pavement markings.

The location of the Old Spanish Trail Road is between Highway 127 and the Nevada Border Construction 07/2020 06/2021 1-15 26 8

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Inyo 20/21 New Road Maintenance & Rehabilitation Project #19 Grandview, Mesquite, and Meadow Lane Fiber Seal Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Grandview, Mesquite, and Meadow Lane Project involves applying a fiber seal coat to approximately 1 mile of residential roadway 36’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the fiber seal coating is 3-5 years and 1-2 years for the striping and pavement markings.

The location of the Grandview, Mesquite, and Meadow Lane fiber seal coating project is in the residential area off West Line Street (CA 168 West) behind Manor Market.

Construction 07/2020 06/2021 1-5 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #20 Meadow Creek I/II & Lazy A Sidewalk Improvement Project

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Meadow Creek I/II & Lazy A Sidewalk Improvement Project involves the identification, removal, and replacement of damaged or displaced areas of concrete sidewalk as well as sections of curb & gutter. Tree removal, root pruning, installation of root barrier, and asphalt patching will also be required. | The estimated useful life for the sidewalk and curb & gutter replacement will be approximately 20+ years.

The location of the Grandview, Mesquite, and Meadow Lane fiber seal coating project is in the residential area off West Line Street (CA 168 West) behind Manor Market.

Construction 07/2020 06/2021 20-20 26 8

Inyo 20/21 New Road Maintenance & Rehabilitation Project #21 Lasky Lane Drainage Remediation Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The Lasky Lane Drainage Remediation Project involves the application of cold mix overlay to low areas of the existing Lasky Lane roadway to reconfigure drainage patterns to appropriate surface drainage transport mechanisms. | The estimated useful life for the Lasky Lane Drainage Remediation work will be approximately 30+ years.

The location of the Lasky Lane Drainage Remediation area is the section of Lasky Lane just north and west of Lone Pine. Construction 07/2020 06/2021 30-30 26 8

Kern 18/19 Carried Over Road Grade Separation Standard Street Alternate Access

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Right of Way, Document Preparation, ADA Curb Ramp Installation (New), Right of Way Acquisition, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | This safety, railroad grade separation, and complete street component project consists, in general, of constructing a grade separation, curb, gutter, sidewalk, drainage, and paved roadway on Atlas Court from Standard Street to Hageman Road. In the interest of public safety and aiding motor vehicle traffic, the new railroad crossing will serve as a second ingress/egress point to allow emergency responders, as well as the public, to freely enter and exit the area without disruption from rail traffic.

Atlas Court at the San Joaquin Valley Railroad and from Standard Street to Hageman Road

Pre-Construction & Construction

01/2014 07/2023

06/2023 06/2024 15-20 34 16

Kern 19/20 Carried Over Road Maintenance & Rehabilitation FY19-20 Chip Seals on Various Roads in Kern County

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Feasibility Study, Preliminary Design, Document Preparation | This road maintenance and rehabilitation project consists, in general, of placing a chip seal on approximately 44 miles of county roadways to preserve and protect the pavement.

FY19-20 Chip Seals located on various roads; Pond Rd from Garzoli Ave to Wildwood Rd, Palm Ave from Jackson Ave to Lerdo Hwy, Brown Rd from Hwy 395 to County Limit, Famoso Porterville Hwy from County Line Rd to Driver Rd, Famoso Rd from Hwy 65 to C St, Shafter Ave from Kimberlina Ave to Madre Ave, Mahan St from Springer Ave to China Lake Blvd, China Lake Blvd from Springer Ave to County Limit, Granite Rd from Hwy 155 to Woody Rd, and Shafter Ave from Riverside St to 7th Standard Rd

Pre-Construction & Construction

07/2019 07/2020

06/2020 09/2020 3-5 26, 34 16

Kern 19/20 Carried Over Road Maintenance & Rehabilitation Twenty Mule Team Road and Boron Road

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | This bike/pedestrian path project consists, in general, of construction of curbs, gutters, sidewalks and closing gaps in existing infrastructure such as curb ramps, high profile cross walks and sidewalk.

Located in Boron along the commercial frontage of Twenty Mule Team Road and Boron Road

Pre-Construction & Construction

08/2018 05/2020

04/2020 09/2020 15-20 36 16

Kern 19/20 Carried Over Complete Streets Components Various Streets within Rexland Acres

This project will include: Storm Drain/Culvert Installation (New), Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Right of Way, Document Preparation, ADA Curb Ramp Installation (New), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Preliminary Design, Bicycle Lane (New), Active Transportation Plan | This project consists, in general, of construction of storm drain lines, sidewalks, curb ramps, drive approaches, bike lanes, high visibility cross walks and solar powered street lights and safety signs.

Various streets within Rexland Acres located east on Union Avenue, west of Central Branch Kern Canal, north of Bakersfield city limit, south Pacheco Road

Pre-Construction & Construction

08/2018 05/2020

04/2020 08/2021 15-20 32 16

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Kern 19/20 Carried Over Road Maintenance & Rehabilitation Belle Terrace from Wible Road to City Limit

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | This road maintenance and rehabilitation project consists, in general, of digging out failed segments of roadway throughout approximately 1 mile and resurfacing the roadway with an asphalt overlay.

Belle Terrace from Wible Road to City Limit Pre-Construction & Construction

08/2018 09/2021

08/2021 06/2022 8-10 34 14

Kern 19/20 Carried Over Road Maintenance & Rehabilitation Rosamond Boulevard from Sierra Highway to Willow Springs Road

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | This road maintenance and rehabilitation project consists, in general, of overlaying approximately 1 mile of roadway with asphalt.

Rosamond Boulevard from Sierra Highway to Willow Springs Road Pre-Construction & Construction

08/2018 05/2021

04/2021 11/2021 8-10 36 16

Kern 19/20 Carried Over Road Maintenance & Rehabilitation Westwood Blvd from Woodford Tehachapi Road to Red Apple Avenue

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Document Preparation | This road maintenance and rehabilitation project consists in general, of reconstructing a 1.4 mile segment of roadway and resurfacing with an asphalt overlay.

Westwood Blvd from Woodford Tehachapi Road to Red Apple Avenue Pre-Construction & Construction

08/2018 05/2021

04/2021 11/2021 8-10 34 16

Kern 19/20 Carried Over Road Maintenance & Rehabilitation Renfro Road from Rosedale Highway/State Route 58 to Hageman Road

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Bicycle Lane (New), Document Preparation | This project consists, in general, of construction of 1.0 mile of asphalt concrete shoulders and class II bike lanes.

Renfro Road from Rosedale Highway/State Route 58 to Hageman Road Pre-Construction & Construction

07/2019 07/2020

06/2020 10/2020 15-20 34 16

Kern 20/21 New Road Maintenance & Rehabilitation Sierra Drive from Kernville Road to Buena Vista Drive

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This road maintenance, rehabilitation, and complete street component project consists, in general, of constructing drainage improvements including curb, gutter, and asphalt pavement.

Sierra Drive from Kernville Road to Buena Vista Drive Pre-Construction & Construction

02/2020 07/2020

07/2020 11/2020 15-20 26 16

Kern 20/21 New Complete Streets Components Airport Drive at Norris Road

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This safety and complete street component project consists, in general, of installing additional traffic signal heads.

Airport Drive at Norris Road Pre-Construction & Construction

07/2018 06/2019

05/2019 10/2021 15-20 34 16

Kern 20/21 New Road Maintenance & Rehabilitation FY2020-21 Spring Asphalt Concrete Stockpile throughout East Kern County

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This road maintenance project consists, in general, of purchasing approximately 25,000 tons of road maintenance asphalt material and self performing pothole patching and thin asphalt overlays on the road system throughout Kern County.

FY2020-21 Spring Asphalt Concrete Stockpile throughout East Kern County

Procurement/Operational Needs 07/2020 06/2021 1-2 26, 32, 34, 36 14, 16

Kern 20/21 New Road Maintenance & Rehabilitation FY2020-21 Spring Asphalt Concrete Stockpile throughout West Kern County

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This road maintenance project consists, in general, of purchasing approximately 50,000 tons of road maintenance asphalt material and self performing pothole patching and thin asphalt overlays on the road system throughout Kern County.

FY2020-21 Spring Asphalt Concrete Stockpile throughout West Kern County

Procurement/Operational Needs 07/2020 06/2021 1-2 26, 32, 34, 36 14, 16

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Kern 20/21 New Road Maintenance & Rehabilitation FY2020-21 Fall Asphalt Concrete Stockpile throughout West Kern County

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This road maintenance project consists, in general, of purchasing approximately 25,000 tons of road maintenance asphalt material and self performing pothole patching and thin asphalt overlays on the road system throughout Kern County.

FY2020-21 Fall Asphalt Concrete Stockpile throughout West Kern County Procurement/Operational Needs 07/2020 06/2021 1-2 26, 32, 34, 36 14, 16

Kern 20/21 New Road Maintenance & Rehabilitation FY2020-21 Chip Seal located on various roads in the County Maintained System

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation | This road maintenance and rehabilitation project consists, in general, of placing chip seal on county roadways to preserve and protect the pavement.

FY2020-21 Chip Seal located on various roads in the County Maintained System to be determined in the pre-construction phase.

Pre-Construction & Construction

07/2020 02/2021

01/2021 06/2021 3-5 26, 32, 34, 36 14, 16

Kern 20/21 New Complete Streets Components Boron Avenue from 20 Mule Team Road to

Cote Street and Cote Street from Boron Avenue to Roberts Avenue

This project will include: This active transportation and complete streets component project consists, in general, of constructing Class I bike paths, multi-use paths, sidewalks, curbs, gutters, curb ramps, drive approaches, and paving hot mix asphalt.

Boron Avenue from 20 Mule Team Road to Cote Street and Cote Street from Boron Avenue to Roberts Avenue Construction 04/2020 10/2020 15-20 36 16

Kern 20/21 New Complete Streets Components Meacham Road from Heath Road to 200 feet East of Jenkins Road

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | This safety and complete street component project consists, in general, of paving approximately 1.5 miles of roadway shoulders. This project will help alleviate the PM-10 problem in the area, create added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle, and provide an additional correction area for inattentive drivers thus reducing "run off the road" type of accidents.

Meacham Road from Heath Road to 200 feet East of Jenkins Road Pre-Construction & Construction

07/2019 07/2020

06/2020 11/2020 15-20 34 16

Kern 20/21 New Road Maintenance & Rehabilitation Brite Road from Buttonwillow Drive to Wasco Way, and Mirasol Avenue from Brite Road to

State Route 58

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This road maintenance, rehabilitation, safety, and complete streets component project consists, in general, of constructing 3.5 miles of roadway resurfacing and asphalt concrete shoulders. This project will help alleviate the PM-10 problem in the area, create added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle.

Brite Road from Buttonwillow Drive to Wasco Way, and Mirasol Avenue from Brite Road to State Route 58

Pre-Construction & Construction

07/2019 08/2020

07/2020 11/2020 15-20 32 14

Kern 20/21 New Complete Streets Components

Tatum Street from Hall Road to Hope Avenue, Wilson Lane from End to Hope Avenue, and Hope Avenue from Tatum Street to Habecker

Road

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design | This complete street component project consists, in general, of paving 1.0 mile of a dirt road and shoulders. Paving this dirt road and shoulders will help alleviate the PM-10 problem in the area, allow for safe pedestrian and bicycle travel between residential areas, commercial centers, and jobs, and improve access to public transportation systems, further enhancing mobility.

Tatum Street from Hall Road to Hope Avenue, Wilson Lane from End to Hope Avenue, and Hope Avenue from Tatum Street to Habecker Road

Pre-Construction & Construction

07/2019 09/2020

08/2020 12/2020 15-20 32 14

Kern 20/21 New Complete Streets Components

Rosamond Boulevard from 25th Street West to Stevenson Street, 30th Street West from

Rosamond Boulevard to Orange Street, and 25th Street West from Rosamond Boulevard to

Holiday Avenue

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | This safety and complete street component project consists, in general, of paving approximately 2.5 miles of roadway shoulders. This project will help alleviate the PM-10 problem in the area, create added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle, and provide an additional correction area for inattentive drivers thus reducing "run off the road" type of accidents.

Rosamond Boulevard from 25th Street West to Stevenson Street, 30th Street West from Rosamond Boulevard to Orange Street, and 25th Street West from Rosamond Boulevard to Holiday Avenue

Pre-Construction & Construction

08/2019 09/2020

08/2020 12/2020 15-20 36 16

Kern 20/21 New Traffic Control Devices Signal Interconnect on Merle Haggard Drive, Airport Drive, Norris Road and South Union

Avenue

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | This safety and traffic control devices project consists, in general, of constructing a wire connection between traffic signals for the purpose synchronizing the timing to increase efficiently, minimize delays, and improve traffic flow.

Signal Interconnect on Merle Haggard Drive, Airport Drive, Norris Road and South Union Avenue Construction 03/2020 12/2020 15-20 32, 34 14, 16

Kern 20/21 New Complete Streets Components Kern River Parkway Bike Trail - Enos Lane to Buena Vista Lake

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Bicycle Lane (New), Document Preparation | This active transportation and complete streets component project consists, in general, of constructing a Class I trail and multi-use path.

Kern River Parkway Bike Trail - Enos Lane to Buena Vista Lake Pre-Construction & Construction

07/2018 09/2020

08/2020 03/2021 15-20 32, 34 14, 16

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Kern 20/21 New Complete Streets Components Roberts Lane from Plymouth Avenue to Frontier Drive

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | This complete street component project consists, in general, of constructing pedestrian improvements of sidewalk, curb ramps, ADA accessibility, and drive approaches.

Roberts Lane from Plymouth Avenue to Frontier Drive Pre-Construction & Construction

02/2019 12/2020

11/2020 05/2021 15-20 34 16

Kern 20/21 New Complete Streets Components Holiday Avenue from 65th Street West to 60th Street West

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Pavement Improvement (New), Preliminary Design, Document Preparation | This complete street component project consists, in general, of paving 0.5 mile of a dirt road. Paving this dirt road will help alleviate the PM-10 problem in the area, allow for safe pedestrian and bicycle travel between residential areas, commercial centers, and jobs, and improve access to public transportation systems, further enhancing mobility.

Holiday Avenue from 65th Street West to 60th Street West Pre-Construction & Construction

03/2020 06/2021

05/2021 10/2021 15-20 36 16

Kern 20/21 New Complete Streets Components

Mathews Avenue from Mettler Avenue to Timmons Avenue, Christina Street from

Mathews Avenue to Cecil Avenue, and Brutton Street from Mathews Avenue to Cecil Avenue

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | This complete street component project consists, in general, of paving 1.8 miles of a dirt road. Paving this dirt road will help alleviate the PM-10 problem in the area, allow for safe pedestrian and bicycle travel between residential areas, commercial centers, and jobs, and improve access to public transportation systems, further enhancing mobility.

Mathews Avenue from Mettler Avenue to Timmons Avenue, Christina Street from Mathews Avenue to Cecil Avenue, and Brutton Street from Mathews Avenue to Cecil Avenue

Pre-Construction & Construction

03/2020 04/2021

03/2021 10/2021 15-20 32 14

Kern 20/21 New Road Maintenance & Rehabilitation County Maintained Road System - Road Maintenance Program

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | FY2020/21 Countywide Maintenance Program of road rights-of-way including, but not limited to, patching, crack filling, weed abatement, overlaying, sealing, snow removal, storm damage repair, ditch clearing, sump clearing, culvert repair, and shoulder backing.

Throughout the County Maintained Road System including, but not limited to, unincorporated areas of Arvin, Bakersfield, Boron, Buttonwillow, Delano, Frazier Park, Kernville, Lake Isabella, Lamont, Lebec, Lost Hills, McFarland, Mojave, Oildale, Ridgecrest, Rosamond, Shafter, Taft, Tehachapi, and Wasco.

Procurement/Operational Needs 07/2020 06/2021 1-5 26, 32, 34, 36 14, 16

Kern 20/21 New Road Maintenance & Rehabilitation County Maintained Road System - Traffic Maintenance Program

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | FY2020/21 Countywide Maintenance Program of traffic safety devices including, but not limited to, lights, signals, pavement markings, and signs.

Throughout the County Maintained Road System including, but not limited to, unincorporated areas of Arvin, Bakersfield, Boron, Buttonwillow, Delano, Frazier Park, Kernville, Lake Isabella, Lamont, Lebec, Lost Hills, McFarland, Mojave, Oildale, Ridgecrest, Rosamond, Shafter, Taft, Tehachapi, and Wasco.

Procurement/Operational Needs 07/2020 06/2021 2-5 26, 32, 34, 36 14, 16

Kern 20/21 New Complete Streets Components SR 184 from DiGiorgio Rd to Sunset Blvd

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New), Document Preparation | This active transportation and complete street component project consists, in general, of constructing pedestrian improvements of sidewalk, curb ramps, ADA accessibility, and drive approaches and a Class I bicycle path.

SR 184 from DiGiorgio Rd to Sunset Blvd Pre-Construction & Construction

07/2020 08/2021

07/2021 01/2022 15-20 32 14

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Kern 20/21 New Complete Streets Components Rosamond Boulevard from 20th Street to Elberta Street

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Document Preparation | This active transportation and complete street component project consists, in general, of constructing pedestrian improvements of sidewalk, curb ramps, ADA accessibility, and drive approaches.

Rosamond Boulevard from 20th Street to Elberta Street Pre-Construction & Construction

07/2020 09/2021

08/2021 01/2022 15-20 36 16

Kern 20/21 New Complete Streets Components Crosswalk Improvements in Oildale, East

Bakersfield, West Bakersfield, Lamont Buttonwillow, and Rosamond.

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | This safety and complete street component project consists, in general, of installing continental crosswalks, intersection warning signs, reflective signs, pedestrian crossing signs, curb ramps, curb, gutter, street lighting, cross drains, and asphalt tie-ins.

Crosswalk Improvements in Oildale, East Bakersfield, West Bakersfield, Lamont Buttonwillow, and Rosamond.

Pre-Construction & Construction

07/2020 11/2021

10/2021 03/2022 10-20 32, 34, 36 14, 16

Kern 20/21 New Complete Streets Components San Diego Street from Hall Road to Burgundy Avenue

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | This safety and complete street component project consists, in general, of installing continental crosswalks, intersection warning signs, reflective signs, pedestrian crossing signs, curb ramps, curb, gutter, street lighting, cross drains, and asphalt tie-ins.

San Diego Street from Hall Road to Burgundy Avenue Pre-Construction & Construction

07/2020 11/2021

10/2021 03/2022 15-20 32 14

Kern 20/21 New Traffic Control Devices Fairfax Road at Zephyr Lane

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation | This safety and traffic control devices project consists, in general, of constructing a traffic signal and ancillary facilities at the intersection to increase efficiently, minimize delays, improve traffic flow, and ADA accessibility.

Fairfax Road at Zephyr Lane Pre-Construction & Construction

02/2020 11/2020

10/2020 03/2021 15-20 32 14

Kern 20/21 New Complete Streets Components Virginia Street from Lake Street to Heritage Park

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New), Document Preparation | This active transportation and complete streets component project consists, in general, of constructing sidewalks, bike lanes, ADA infrastructure, and high visibility crosswalks.

Virginia Street from Lake Street to Heritage Park Pre-Construction & Construction

07/2020 01/2022

12/2021 05/2022 15-20 32 14

Kern 20/21 New Complete Streets Components Kern River Parkway Path extension near Lake Ming

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Bicycle Lane (New), Document Preparation | This active transportation and complete streets component project consists, in general, of constructing a Class I trail and multi-use path.

Kern River Parkway Path extension near Lake Ming Pre-Construction & Construction

07/2021 07/2022

06/2022 12/2022 15-20 34 16

Kern 20/21 New Complete Streets Components South Chester Avenue from Ming Avenue to Sandra Drive

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Document Preparation | This active transportation and complete streets component project consists, in general, of constructing sidewalks, ADA accessible ramps, rapid flashing beacons, signs, and lights.

South Chester Avenue from Ming Avenue to Sandra Drive Pre-Construction & Construction

07/2020 04/2024

03/2024 10/2024 15-20 32 14

Kern 20/21 New Complete Streets Components

Lake Isabella Boulevard from Tank Park to the Library and Erskine Creek Road from Lake

Isabella Boulevard to Elementary/Middle/High Schools

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New), Document Preparation | This active transportation and complete streets component project consists, in general, of constructing bicycle and pedestrian paths.

Lake Isabella Boulevard from Tank Park to the Library and Erskine Creek Road from Lake Isabella Boulevard to Elementary/Middle/High Schools

Pre-Construction & Construction

07/2020 04/2024

03/2024 11/2024 15-20 26 16

Kern 20/21 New Road Maintenance & Rehabilitation Fairfax Road from East Brundage Lane to Edison Highway

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This road maintenance and rehabilitation project consists, in general, of overlaying approximately 0.3 mile of roadway with asphalt.

Fairfax Road from East Brundage Lane to Edison Highway Pre-Construction & Construction

07/2020 03/2021

02/2021 06/2021 5-10 32 14

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Lake 18/19 Carried Over Road Maintenance & Rehabilitation Martin Street; Hartley Road This project will include: Martin Street - Resurface 1.4 miles of road. Hartley Road - Resurface 0.6 mile of road. Lakeport City Limit to Riggs Rd.; Lakeport City Limit to Crystal Lake Way Construction 07/2020 09/2021 10-20 4 2

Lake 20/21 New Road Maintenance & Rehabilitation Nice-Lucerne Cutoff

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | Resurface 1043 feet of road on Nice-Lucerne Cutoff to the intersections of Lakeshore Blvd and Westlake Rd. Current work includes project design and development of bid documents.

.2 miles from exit/entrance from south bound lane to Lakeshore Blvd to intersections of Lakeshore Blvd and Westlake Rd

Pre-Construction & Construction

07/2020 04/2021

03/2021 06/2021 10-20 4 2

Lake 19/20 Carried Over Road Maintenance & Rehabilitation Big Canyon Road This project will include: Big Canyon Road - Resurface .8 miles of road. Current work includes preliminary engineering and quantity development Wardlaw St. to Harbin Springs Rd. Pre-Construction 06/2019 06/2021 10-20 4 2

Lake 18/19 Forecasted Road Maintenance & Rehabilitation Rainbow Road;Lakeshore Blvd.

This project will include: Rainbow Road - Resurface 1 mile of road. Current work includes preliminary engineering and development of bid documents and construction: reconstruct and resurface Rainbow Road; Lakeshore Blvd - Resurface 1.2 miles of road. Current work includes preliminary engineering and development of bid documents. | Linked projects from FY 17/18 PE phase with FY 18/19 Con Phase for Rainbow Rd

Lakeshore Blvd. to Howard Ave.; Lakeport City Limit to Park Way Construction 09/2020 06/2021 10-20 4 2

Lassen 18/19 Carried Over Road Maintenance & Rehabilitation Center Road, County Road 215 Rehab. Project This project will include: Pavement Rehab/Repair (Existing) Center Road, County Road 215 (approximate 4 mile section - 0.904 miles east of Cramer Lane to 1.4 miles west of Juniper Ridge Road. Construction 05/2020 07/2020 10-15 1 1

Lassen 20/21 New Road Maintenance & Rehabilitation Herlong Access Road, County Road 359 Rehab.

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation Herlong Access Road - Pole Line Road to California Street Pre-Construction &

Construction 07/2021 08/2021

08/2021 10/2021 10-15 1 1

Lassen 20/21 New Road Maintenance & Rehabilitation FY 2020/21 Chip Seal Project This project will include: Pavement Rehab/Repair (Existing), Cost Estimating

Various County Roads including Richmond Road, Wingfield Road, Law Drive, Capezzoli Lane, Sage Valley Road, Sierra Vista Road, Hemphill Road, Blickenstaff Road, Diamond Way, Hayden Terrace, Emerson Drive, Florence Lane, Emerson Court, Circle Drive, Fairway Drive, Eagle Drive, Circle Court, San Francisco Street, Riverside Drive, Grove Street, Bonnie Way, Prattville Road, miller Road and South Street

Pre-Construction & Construction

09/2020 05/2021

11/2020 08/2021 5-10 1 1

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East Los Angeles - Whiteside St, et al. Phase I

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Reconstruct 2.3 miles of residential roads, parkway improvements, curb ramp upgrade. | The project cost includes design and construction. The project will be split into two phases for construction.

East Los Angeles community bounded by Interstate 10, City of Los Angeles, and Indiana Street, and Woods Avenue from State Route 60 and Pomona Boulevard

Pre-Construction & Construction

05/2017 08/2021

07/2021 06/2022 20-20 51 24

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation South San Jose Hills - La Seda, ET AL.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to preserve 5 miles of residential roads. The project will be constructed in two phases. Phase 1 will include pavement preparation and all concrete related works including installation of any missing sidewalks. Phase 2 will include the pavement preservation treatments. | Total project cost reflects design costs and concrete repair on roadways on streets within the limits of the project. Pavement portion is scheduled to begin June 2020.

South San Jose Hills community bounded by Giano Avenue, City of West Covina, La Seda Road, and Valley Boulevard

Pre-Construction & Construction

01/2019 07/2020

07/2020 07/2021 7-7 57 22

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Ladera Heights - Centinela Av, ET AL.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 1.2 miles of roadway, parkway improvements, curb ramp upgrade | Total project cost reflects design and construction.

Ladera Heights community - West Centinela Ave from Green Valley Cir to La Tijera Blvd. and South Centinela Ave from Jefferson Blvd to Compton Creek.

Pre-Construction & Construction

12/2017 08/2021

08/2021 12/2022 20-20 54 30

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Windsor Hills - 59th St, ET AL. -Reconstruction

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 2.2 miles of residential roads, parkway improvements, curb ramp upgrade | The project cost includes design and construction.

Windsor Hills community bounded by La Cienega Boulevard, Slauson Avenue, Fairfax Avenue, and City of Los Angeles

Pre-Construction & Construction

01/2013 09/2020

09/2020 09/2021 20-20 54 30

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Hacienda Heights - Garo St, ET AL.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 5.7 miles of residential roads, parkway improvements, curb ramps upgrade | The project cost includes design and construction.

Hacienda Heights bounded by State Route 60, Stimson Avenue, Halliburton Road, and Fieldgate Avenue

Pre-Construction & Construction

01/2013 08/2019

08/2019 04/2021 20-20 57 32

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Hacienda Heights - Leticia Dr, ET AL

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 7.2 miles of residential roads, parkway improvements, curb ramps upgrade | Currently in design. The project cost includes design and construction.

Hacienda Heights bounded by Los Altos Drive, Hacienda Boulevard, Colima Road, Camino Del Sur, and Vallecito Drive

Pre-Construction & Construction

03/2019 03/2022

03/2022 12/2022 20-20 57 32

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Whittier - Los Nietos/South Whittier -Sunshine Acres - Keith Dr, ET AL

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Landscape Safety Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 11.4 miles of residential roads, parkway improvements, curb ramps upgrade | The project cost includes design and construction.

West Whittier - Los Nietos/South Whittier communities bounded by Norwalk Boulevard, Mines Boulevard, Colima Road, and City of Whittier

Pre-Construction & Construction

10/2017 07/2019

07/2019 03/2022 20-20 57 32

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Chatsworth - Lake Manor Dr, ET AL.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Reconstruct 1.9 miles of residential roads, parkway improvements, curb ramps upgrade | Estimated advertise 12/2020

West Chatsworth unincorporated community Pre-Construction & Construction

01/2018 12/2020

12/2020 09/2021 20-20 45 27

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Santa Clarita Valley - Hasley Hills South

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 5.8 miles of residential roads, parkway improvements, curb ramps upgrade | Currently in design. The project cost includes design and construction.

Castaic community, Hasley Hills neighborhood Pre-Construction & Construction

10/2017 05/2021

05/2021 06/2022 20-20 38 21

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Santa Monica Mountains - Culvert Upgrades -Phase II

This project will include: Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Repair or replace existing corrugated metal pipe culverts which have documented deterioration or less than 24 inches in diameter | Currently in design. The project cost includes design and construction.

11 locations in unincorporated County area near Malibu, Agoura Hills, and Calabasas

Pre-Construction & Construction

07/2010 10/2020

10/2020 09/2021 50-50 50 27

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Santa Monica Mountains - Culvert Upgrades -Phase III

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Repair or replace existing corrugated metal pipe culverts which have documented deterioration or less than 24 inches in diameter | The project cost includes design and construction.

29 locations in unincorporated County area near Malibu, Agoura Hills, and Calabasas

Pre-Construction & Construction

07/2010 10/2020

10/2020 09/2021 50-50 50 27

Los Angeles 18/19 In Progress Traffic Control Devices South San Gabriel - Del Mar Av at Potrero Grande Dr

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Add protected left turn phasing to all approaches. | Project advertising date postponed

South San Gabriel - Del Mar Av at Potrero Grande Dr Construction 12/2020 07/2021 15-15 49 22

Los Angeles 18/19 In Progress Safety Walnut Park - Miscellaneous crossing improvements

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Feasibility Study, Preliminary Design, Active Transportation Plan, Document Preparation | Installation of limit lines, yield lines, continental crosswalk striping, ADA curb ramps, and curb extensions at intersections throughout Walnut Park | Project plans to be completed late 2020. Construction summer 2021.

Walnut Park Pre-Construction 04/2019 06/2021 20-20 59 33

Los Angeles 18/19 In Progress Traffic Control Devices Hacienda Heights - Halliburton Rd at Stimson Av

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Protected left-turn phasing for east and west approaches | Project construction expected August 2020

Hacienda Heights - Halliburton Rd at Stimson Av Pre-Construction & Construction

07/2018 08/2020

07/2020 01/2021 15-15 57 32

Los Angeles 18/19 In Progress Traffic Control Devices Rowland Heights - Pathfinder Rd at Blandford Dr

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Protected left-turn phasing for east and west approaches | Estimated start of construction February 2020

Rowland Heights - Pathfinder Rd at Blandford Dr Construction 02/2020 08/2020 15-15 55 29

Los Angeles 18/19 In Progress Safety Rowland Heights - Pathfinder Rd at Gallio Av This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New traffic signal | Currently under construction Rowland Heights - Pathfinder Rd at Gallio Av Construction 10/2019 07/2020 20-20 55 29

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Traffic Control Devices Altadena - Lake Av at Mendocino St This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Add split left turn phasing on Mendocino Street | Advertised May 12, 2020

Altadena - Lake Av at Mendocino St Construction 05/2020 02/2021 15-15 41 25

Los Angeles 18/19 In Progress Traffic Control Devices Altadena - Lincoln Av at Crosby St This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | New rapid rectangular flashing beacons | Construction began April 13, 2020

Altadena - Lincoln Av at Crosby St Construction 04/2020 07/2020 15-15 41 25

Los Angeles 18/19 In Progress Traffic Control Devices Altadena - Lincoln Av at Palm St This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | New rapid rectangular flashing beacons at existing marked crosswalk | The project began construction April 13, 2020.

Altadena - Lincoln Av at Palm St Construction 04/2020 07/2020 15-15 41 25

Los Angeles 18/19 In Progress Traffic Control Devices Littlerock - Palmdale Bl at 90th St East

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Protected left turn phasing | Design work has been completed and the project is being combined with another signal project for advertising.

Littlerock - Palmdale Bl at 90th St East Construction 06/2020 06/2021 15-15 36 21

Los Angeles 18/19 In Progress Traffic Control Devices Quartz Hill - Avenue L at 42nd St West This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | New traffic signal | Project has been designed. This will be added to a contract advertising multiple signals.

Quartz Hill - Avenue L at 42nd St West Construction 06/2020 06/2021 20-20 36 21

Los Angeles 18/19 In Progress Traffic Control Devices Olympic Boulevard at Garfield Avenue-upgrade traffic signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Upgrade standards, mastarms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Advertise August 2020

Unincorporated East Los Angeles - Olympic Bl at Garfield Av Pre-Construction & Construction

01/2017 08/2020

08/2020 09/2021 15-15 51 24

Los Angeles 18/19 In Progress Traffic Control Devices Whittier Boulevard at Eastern Avenue -upgrade traffic signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Advertising is scheduled August 2020

Unincorporated East Los Angeles - Whittier Boulevard at Eastern Avenue Pre-Construction & Construction

01/2017 08/2020

08/2020 09/2021 15-15 51 24

Los Angeles 18/19 In Progress Traffic Control Devices Badillo Avenue at Irwindale Avenue - upgrade traffic signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Advertise August 2020

Unincorporated Covina islands - Badillo Avenue at Irwindale Avenue Pre-Construction & Construction

01/2017 08/2020

08/2020 09/2021 15-15 48 22

Los Angeles 18/19 In Progress Traffic Control Devices Covina Boulevard at Hollenbeck Avenue -upgrade traffic signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Some work done by County force account labor. Advertising August 2020

Unincorporated Covina island - Covina Boulevard at Hollenbeck Avenue Pre-Construction & Construction

01/2017 08/2020

08/2020 06/2021 15-15 48 22

Los Angeles 18/19 In Progress Traffic Control Devices City of Palmdale/South Antelope Valley -Avenue P at 15th Street East plan review

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Inspection of completed traffic signal and County share. | Plan review and permitting costs (including inspection) only.

Unincorporated area adjacent to City of Palmdale - Avenue P at 15th Street East Construction 04/2020 07/2020 20-20 36 21

Los Angeles 18/19 In Progress Safety Glendora Mountain Road - Big Dalton Rd to East Fork Rd - Striping

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | Remove existing striping and install recessed thermoplastic striping and recessed pavement markers, install curve advisory signs | Length of the work is 14 miles. The project cost includes design and construction. Advertised April 14, 2020.

Glendora Mountain Road north of the City of Glendora to Glendora Ridge Road. Construction 04/2020 12/2020 10-10 41 25

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Traffic Control Devices Las Virgenes Road at Mulholland Highway and Piuma Road - Traffic Signals

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Upgrade vehicle heads, install video detection, battery back up, CCTV system and establish communications with LA County Traffic Management Center (TMC) | The project cost includes design and construction.

Unincorporated Santa Monica Mountains - Las Virgenes Road at Mulholland Highway and Piuma Road Construction 04/2020 12/2020 20-20 45 27

Los Angeles 18/19 In Progress Traffic Control Devices Cypress Street at Vincent Avenue - upgrade traffic signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation | Upgrade standards, mastarms, vehicle heads, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Project to be advertised August 2020.

Unincorporated Covina islands - Cypress Street at Vincent Avenue Pre-Construction & Construction

01/2019 08/2020

08/2020 06/2021 15-15 43 22

Los Angeles 18/19 In Progress Traffic Control Devices Workman Mill Road at Lomitas Avenue -upgrade traffic signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction.

Unincorporated North Whittier area - Workman Mill Road at Lomitas Avenue

Pre-Construction & Construction

01/2019 08/2020

07/2020 09/2021 15-15 57 22

Los Angeles 18/19 In Progress Traffic Control Devices Baldwin Park Boulevard at Amar Road -Upgrade Traffic Signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Advertising in August 2020.

Unincorporated Bassett area - Baldwin Park Boulevard at Amar Road Pre-Construction & Construction

01/2019 08/2020

08/2020 09/2021 15-15 57 22

Los Angeles 18/19 In Progress Traffic Control Devices Santa Anita Avenue at Freer Street - Upgrade Traffic Signal

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Advertise date is August 2020.

Unincorporated South Arcadia area - Santa Anita Avenue at Freer Street Pre-Construction & Construction

01/2019 08/2020

08/2020 09/2021 15-15 49 22

Los Angeles 18/19 In Progress Traffic Control Devices Azusa Avenue at Temple Avenue - upgrade traffic signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Advertise date is August 2020.

Unincorporated Valinda area - Azusa Avenue at Temple Avenue Pre-Construction & Construction

01/2019 08/2020

08/2020 09/2021 15-15 48, 57 22

Los Angeles 18/19 In Progress Traffic Control Devices As Needed Traffic Signal Construction FY 2018-19

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Procurement of Public Works Equipment | Installation and modification of traffic signals and street lights and the performance of other incidental and appurtenant work as-needed for one year. This project consists of advertising and award of the project, preparation of engineers' estimate and contract documents, and other non-project specific costs. | The project was advertised June 2018, began July 2019, and will end December 2020.

Installation and modification of traffic signals and street lights and the performance of other incidental and appurtenant work as-needed for one year. This project consists of advertising and award of the project, preparation of engineers' estimate and contract documents, and other non-project specific costs.

Procurement/Operational Needs 06/2018 12/2020 20-20

36, 38, 39, 41, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 57, 58, 59, 62, 63, 64, 66, 70

18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 32,

33, 34, 35

Los Angeles 18/19 In Progress Safety Traffic Safety Program - Program Management

This project will include: Public Works Staffing | Non-project specific expenditures related to the traffic safety program and implementation of Vision Zero, including supervision and management of line staff designing and managing projects with project IDs beginning in "TDS". | This is an ongoing program. Estimated expenditures are $150,000/year (fully loaded rate). Per CTC direction this project will be created annually and the cost and outputs reported at the end of each fiscal year.

Countywide program. Procurement/Operational Needs 01/2019 06/2023 20-20

36, 38, 39, 41, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 57, 58, 59, 62, 63, 64, 66, 70

18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 32,

33, 34, 35

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Safety 1st St at Mednik Ave et al

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install flashing beacons; Traffic signal upgrades; New pedestrian signal and crosswalk relocation; New traffic signal

Traffic signal upgrades; New pedestrian signal and crosswalk relocation; New traffic signal

(This RP includes the TDS0001512, TDS0001513, TDS0001532, TDS0001533 design work -consolidated into one construction contract) | Four signal projects have been consolidated. Project was awarded 9/10/2018, however due to delays the work did not begin until September 3, 2019. The construction expenses will be reported for FY 2019-20 onward. Construction will be completed early FY 2020-21.

East Los Angeles - 1st St at Herbert Av; East Los Angeles - 1st St at Mednik Av; Willowbrook - 120th St at Compton Creek/Parmalee Av; Arcadia - Temple City Bl at Naomi Av

Construction 09/2019 07/2020 15-15 49, 51, 64 22, 24, 35

Los Angeles 18/19 In Progress Traffic Control Devices Covina - Arrow Hwy at Enid Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Traffic signal upgrade - add protected/permissive left turn phasing for westbound traffic | The project cost includes design and construction. Project was advertised June 6, 2018

Arrow Highway at Enid Avenue, unincorporated Covina area Construction 06/2018 07/2020 15-15 48 22

Los Angeles 18/19 In Progress Traffic Control Devices West Valinda - Amar Rd at Vineland Av

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Upgrade the existing traffic signal on Amar Road at Vineland Avenue with protected left-turn phasing for eastbound and westbound traffic. | Award occurred March 2, 2020. The project cost includes design and construction.

Amar Road and Vineland Avenue in the unincorporated County community of West Valinda Construction 03/2020 12/2020 15-15 57 22

Los Angeles 18/19 In Progress Traffic Control Devices West Valinda - Vineland Av at Giordano St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install rectangular rapid flashing beacons on the north approach of Vineland Avenue and Giordano Street. | The project cost includes design and construction. Project began construction April 1, 2020.

Vineland Avenue at Giordano Street in the unincorporated County community of West Valinda. Construction 04/2020 09/2020 15-15 57 22

Los Angeles 18/19 In Progress Traffic Control Devices Rowland Heights - Pathfinder Road at Wellesley Dr

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade the existing traffic signal on Pathfinder Road at Wellesley Drive with protected left-turn phasing for westbound traffic. | The project cost includes design and construction. Project began construction November 28, 2019.

Pathfinder Road and Wellesley Drive in the unincorporated County community of Rowland Heights. Construction 11/2019 07/2020 15-15 55 29

Los Angeles 18/19 In Progress Traffic Control Devices West Whittier/Los Nietos - Norwalk Bl at Reichling Ln

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install additional traffic signal equipment and upgrade pedestrian equipment at the intersection of Norwalk Boulevard and Reichling Lane. | The project cost includes design and construction.

Intersection of Norwalk Boulevard and Reichling Lane in the unincorporated County community of West Whittier.

Pre-Construction & Construction

01/2020 01/2021

12/2020 06/2021 20-20 57 32

Los Angeles 18/19 In Progress Traffic Control Devices Agua Dulce/Leona Valley - Bouquet Cyn Rd -

Elizabeth Lake Rd to City of Santa Clarita Boundary Line

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road. | The project cost includes design and construction.

Bouquet Canyon Road beginning at Elizabeth Lake Road and ends at the Santa Clarita City Boundary.

Pre-Construction & Construction

01/2019 04/2021

03/2021 06/2021 10-10 36 21

Los Angeles 18/19 In Progress Traffic Control Devices Agua Dulce - Sierra Hwy at Vasquez Canyon Rd

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the existing traffic signal on Sierra Highway at Vasquez Canyon Road with protected left-turn phasing for nrthbound and outhbound traffic. | The project cost includes design and construction.

Sierra Highway at Vasquez Canyon Road in the uincorporated County community of Agua Dulce .

Pre-Construction & Construction

11/2019 11/2020

10/2020 06/2021 15-15 38 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 Carried Over Traffic Control Devices Charter Oak - Cienega Av at Sunflower Av

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | Upgrade pedestrian heads and curb ramps, install highway safety lighting, and remove striping within crosswalk at the intersection of Cienega Avenue and Sunflower Avenue. | The project cost includes design and construction.

The intersection of Cienega Avenue and Sunflower Avenue in the unincorporated County community of Covina. Pre-Construction 10/2020 03/2021 15-15 48 22

Los Angeles 18/19 In Progress Traffic Control Devices Covina - Arrow Hwy at Sunflower Av

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the existing traffic signal on Arrow Highway at Sunflower Avenue with protected left-turn phasing for eastbound and westbound traffic. | The project cost includes design and construction.

The intersection of Arrow Highway and Sunflower Avenue in the unincorporated County community of Covina. Pre-Construction 10/2020 03/2021 15-15 48 22

Los Angeles 18/19 In Progress Traffic Control Devices Stevenson Ranch - The Old Road at Pico Canyon Road

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Preliminary Design, Document Preparation | Upgrade the existing traffic signal on The Old Road at Pico Canyon Road. | The project cost includes design and construction.

The intersection of The Old Road and Pico Canyon Road in the unincorporated County community of Agua Dulce.

Pre-Construction & Construction

01/2020 07/2020

07/2020 06/2021 15-15 38 27

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Avocado Heights - Temple Av Et Al (Phase I)

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Resurface 3.9 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and pavement resurfacing. Uses recycled and in-place materials. | The project cost includes design and construction.

Various roadways within the Unincorporated Community of Avocado Heights.

Pre-Construction & Construction

07/2019 07/2021

07/2021 06/2022 10-10 48 22

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East Los Angeles Community – City Terrace Drive Et Al

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Rehabilitate 3.1 miles of major roads, including parkway improvements and curb ramps upgrade. | The project cost includes design and construction.

Various roadways within the Unincorporated Community of East Los Angeles

Pre-Construction & Construction

08/2019 09/2021

09/2021 06/2022 10-10 51 24

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Walnut Park – Walnut Street Et Al.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 7.1 miles of residential roads, including parkway improvements and curb ramps upgrade. | The project cost includes design and construction.

Unincorporated Walnut Park community bounded by City of Huntington Park, Seville Avenue, and City of South Gate

Pre-Construction & Construction

12/2018 08/2021

08/2021 06/2022 20-20 59 33

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Puente Valley – Fairgrove Avenue, et al.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Preserve 6.0 miles of residential roads, including pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction.

Unincorporated West Puente Valley community bounded by City of La Puente, Sunset Avenue, Fairgrove Avenue, and Willow Avenue

Pre-Construction & Construction

01/2019 09/2020

09/2020 07/2021 7-7 48 22

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Rosewood – Stanford Avenue, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Preserve 7.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, and curb ramps upgrades. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction. Expenditures include concrete prep work prior to beginning of project. Project ID RMD3222007: Stanford Avenue, et al -Rosewood Concrete Repair is combined into RDC0015698

Unincorporated Rosewood community bounded by City of Compton, Stanford Avenue, and Compton Boulevard.

Pre-Construction & Construction

01/2019 07/2020

07/2020 07/2021 7-7 64 35

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Carson – Milton Street, et al.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design | Reconstruct 2.4 miles of residential roads using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work . | The project cost includes design and construction. Advertising expected October 2020.

Unincorporated community of West Carson bounded by City of Los Angeles, Torrance Boulevard, and New Hampshire Avenue.

Pre-Construction & Construction

01/2019 10/2020

10/2020 07/2021 20-20 66 35

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Westmont – 99th Street, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Resurface 13 miles of residential roads. Cold mill AC to produce cold central plant recycled asphalt concrete pavement (CCPRACP), pulverize & stabilize remaining AC w/ underlying base material and/or soil to produce cement stabilized pulverized base (CSPB), then place layer of rubberized hot-mix asphalt over the CCPR on CSPB; reconstruct AC alleys with PCC; and parkway improvements. | The project cost includes design and construction. Advertising July 2020

Unincorporated community of Westmont bounded by City of Los Angeles and Century Boulevard

Pre-Construction & Construction

12/2018 07/2020

07/2020 12/2021 20-20 59, 62 30

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East La Mirada – Imperial Highway Et Al.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Reconstruct 2.7 miles of major roads. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. | The project cost includes design and construction.

Lambert Road, First Avenue, and Imperial Highway in the unincorporated community of East La Mirada

Pre-Construction & Construction

01/2019 08/2021

08/2021 12/2022 20-20 57 32

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Los Nietos Community – Pioneer Boulevard et al

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Resurface 1.6 miles of major roads. The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. | The project cost includes design and construction.

Pioneer Boulevard, Norwalk Boulevard, and Washington Boulevard in the unincorporated community of Los Nietos bounded by the Cities of Pico Rivera, Santa Fe Springs, and Whittier.

Pre-Construction & Construction

01/2019 07/2021

07/2021 06/2023 10-10 48, 57 32

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation North Whittier – Mission Mill Road, et al.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Preserve 6.7 miles of residential roads including pavement prep-work, parkway improvements, and curb ramps upgrades. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction. All concrete repair work were completed by RMD1424001.

Unincorporated community of North Whittier bounded by Cities of Industry, Pico Rivera, and Whittier.

Pre-Construction & Construction

01/2019 07/2020

07/2020 07/2021 7-7 57 32

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Rowland Heights – Saleroso Drive, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconstruct 3.0 miles of residential roads. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. | The project cost includes design and construction. Project advertised May 2020.

Calle Barcelona, Calle Madrid, Crosshaven Drive, Saleroso Drive, and Sunrise Drive bounded by Colima Road, Fullerton Road, the City of La Habra Heights, and Schabarum Regional Park.

Construction 05/2020 10/2021 20-20 55 29

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation South Whittier – Leland Avenue Et Al.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 6.0 miles of residential roads. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining pavement with underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB; curb ramps upgrade to comply with ADA and parkway improvement including new sidewalk along the southside of Utica St. | The project cost includes design and construction. Estimated advertise date March 2021.

Unincorporated community of South Whittier bounded by Carmenita Road, Meyer Road, Leffingwell Road, and Telegraph Road.

Pre-Construction & Construction

01/2019 03/2021

03/2021 06/2022 20-20 57 32

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Canyon Country – Sierra Highway- Sand Cyn Rd to City Boundary

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The primary objective of this project is to rehabilitate 1.3 miles of urban major road to repair the deteriorating pavement. The project includes the following proposed work:

- Parkway improvements - Construct PCC bus pad - Curb ramps upgrade - Roadway resurfacing | The project cost includes design and construction.

Unincorporated area of Canyon Country - City of Santa Clarita to Sand Canyon Road

Pre-Construction & Construction

01/2019 01/2021

01/2021 08/2021 20-20 36 21

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Castaic/Val Verde Communities – Hillcrest Parkway

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 8.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

Unincorporated Castaic and Val Verde communities - Hillcrest Parkway from The Old Road to 370' north of Terraza Court Construction 06/2020 07/2021 7-7 38 21

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Quartz Hill Community – Avenue L (Phase I)

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Resurface 0.3 mile of urban major road to repair the deteriorating pavement, including pavement dig-outs associated with severe pavement distresses. Minor closeout work in FY 2020-21. | The project cost includes design and construction.

Unincorporated Quartz Hill community - Avenue L - 52nd Street West to 55th Street West. Construction 07/2019 07/2020 10-10 36 21

Los Angeles 18/19 In Progress Safety San Francisquito Canyon Road and Lake Hughes Road Signage Project

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Install advance curve advisory signs and chevron signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along San Francisquito Canyon Road and Lake Hughes Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. | The project cost includes design and construction. Includes TDS0001586 and TDS0001585. Advertise date is March 2021.

For San Francisquito Canyon Road, it begins at Elizabeth Lake Road to the City of Santa Clarita Boundary Line. For Lake Hughes Road, it begins at Elizabeth Lake Road to Ridge Route Road. The length of the entire project is approximately 42 miles.

Pre-Construction & Construction

01/2019 03/2021

03/2021 12/2021 10-10 36, 38 21

Los Angeles 18/19 Completed Safety Traffic Safety Program HSIP Cycle 9 - Program Management

This project will include: Public Works Staffing | Non-project specific expenditures related to the traffic safety program and management of grants using the Highway Safety Improvement Program. This is an annual program, under HSIP Cycle 9 projects are closed out. | All projects in the Highway Safety Program are RMRA funded.

Countywide Procurement/Operational Needs 07/2020 06/2022 20-20

36, 38, 39, 41, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 57, 58, 59, 62, 63, 64, 66, 70

18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 32,

33, 34, 35

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Safety East Los Angeles - Atlantic Blvd and 6th St, et al. Accessible Pedestrian Signals

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project cost includes design and construction.

This project is at the intersections Atlantic Blvd at 6th St, Whittier Blvd at Goodrich Blvd, Sadler Ave at Beverly Blvd, and Whittier Blvd at Hoefner Ave in the unincorporated County of Los Angeles community of East Los Angeles and the City of Commerce.

Pre-Construction & Construction

05/2019 09/2020

09/2020 12/2020 15-15 51, 58 24, 32

Los Angeles 18/19 In Progress Safety Covina Islands- Arrow Hwy at Barranca Av and Arrow Hwy at Citrus Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Audible pedestrian system | Total project cost reflects design costs only.

Intersections of Arrow Highway at Barranca Ave, and Arrow Highway and Citrus Ave in the unincorporated community of Charter Oak Islands. Construction 01/2020 07/2020 20-20 48 22

Los Angeles 18/19 In Progress Safety Del Sur - Sierra Highway at W Avenue E

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | Shift striping 2.5' to the west along Sierra Highway at intersection. | The project cost includes design and construction.

Intersection of Sierra Highway and Avenue E, in the unincorporated County of Los Angeles community of Del Sur.

Pre-Construction & Construction

01/2019 08/2020

07/2020 10/2020 20-20 36 21

Los Angeles 18/19 In Progress Safety West Valinda- Amar Road at Willow Ave

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The objective of this project is to install protected and permissive left-turn phasing to an existing traffic signal at the intersection of Amar Road at Willow Avenue. | The project cost includes design and construction and total cost. County cost is $60,000. Project to be administered by City of La Puente.

Intersection of Amar Road and Willow Avenue, in the unincorporated County of Los Angeles community of West Valinda and the City of La Puente.

Construction 06/2020 10/2020 15-15 48, 57 22

Los Angeles 18/19 In Progress Safety Rowland Heights- Fullerton Road and Sunrise Drive

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The objective of this project is to install protected and permissive left-turn phasing to an existing traffic signal at the intersection of Fullerton Road and Sunrise Drive | The project cost includes design and construction. Project was advertised December 2019 and awarded March 2020.

Intersection of Fullerton Road at Sunrise Drive, in the unincorporated County of Los Angeles community of Rowland Heights Construction 12/2019 02/2021 20-20 55 29

Los Angeles 18/19 In Progress Safety Avocado Heights- Don Julian Road at 5th Avenue

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New traffic signal. | The project cost includes design and construction. Project was advertised December 2019 and awarded March 2020.

Intersection of Don Julian Rd and 5th Ave within the unincorporated County of Los Angeles community of Avocado Heights Construction 12/2019 09/2020 20-20 57 22

Los Angeles 18/19 In Progress Safety South Whittier-Leffingwell Road at Stamy Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | New traffic signal and appurtenant work. | The project cost includes design and construction. Advertising date is September 2020.

Intersections of Leffingwell Road/Stamy Road (East) and Leffingwell Road/Stamy Road (West), in the unincorporated County of Los Angeles community of South Whittier and East Whittier

Pre-Construction & Construction

12/2019 09/2020

09/2020 10/2021 20-20 57 32

Los Angeles 18/19 In Progress Safety Bouquet Canyon Rd at Vasquez Canyon Rd -Traffic Signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Install new traffic signal and do minor road widening. | The project cost includes design and construction.

Intersection of Bouquet Canyon Road and Vasquez Canyon Road in the unincorporated County of Los Angeles community of Agua Dulce.

Pre-Construction & Construction

11/2018 08/2020

08/2020 12/2020 20-20 36 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Traffic Control Devices As-Needed Traffic Signal Construction FY 2019-20

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Procurement of Public Works Equipment | Total project cost reflects project management costs and costs of the signals. Estimated award October 2019

Countywide Procurement/Operational Needs 12/2019 03/2021 20-20

36, 38, 39, 41, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 57, 58, 59, 62, 63, 64, 66, 70

18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 32,

33, 34, 35

Los Angeles 18/19 In Progress Safety Los Nietos, West Whittier- Mines Blvd at Glengarry Av

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a traffic signal with marked crosswalks at the intersection of Mines Blvd and Glengarry Av in the unincorporated Los Nietos/West Whittier. | The project cost includes design and construction.

Intersection of Mines Blvd and Glengarry Ave in the unincorporated County of Los Angeles community of Los Nietos / West Whittier Construction 12/2019 12/2020 20-20 57 32

Los Angeles 18/19 In Progress Safety East Los Angeles - Eastern Av at City Terrace Dr

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Design & construction of protective/permissive left turn phasing for SB & EB directions and for nearside vehicle heads for the EB & WB directions. | Total project cost reflects design costs only.

Intersection of Eastern Ave and City Terrace Drive in the unincorporated County of Los Angeles community of East Los Angeles.

Pre-Construction & Construction

01/2019 12/2020

12/2020 06/2021 15-15 51 24

Los Angeles 18/19 In Progress Safety Stevenson Ranch - Pico Cyn Rd at Stevenson Ranch Parkway

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install "NO RIGHT TURN ON RED" activated blank-out signs from Pico Canyon Rd to Stevenson Ranch Pkwy. The project will require removal of existing signs, installation of new signs, and preparation of updated traffic signal timing for the implementation of the new traffic signal operation. | The project cost includes design and construction.

Intersection of Pico Cyn Rd at Stevenson Ranch Parkway, in the unincorporated County of Los Angeles community of Stevenson Ranch. Construction 05/2020 07/2020 15-15 38 27

Los Angeles 18/19 In Progress Safety Rowland Heights - Fullerton Rd at Harbor Blvd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a new traffic signal at the intersection of Fullerton Rd at Harbor Blvd. | The project cost includes design and construction. Project was advertised December 2019 and awarded March 2020.

Intersection of Fullerton Rd at Harbor Blvd, in the unincorporated County of Los Angeles community of Rowland Heights. Construction 12/2019 03/2021 20-20 55 29

Los Angeles 18/19 In Progress Safety West Valinda/San Jose Hills - Gemini St at Azusa Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Installation (New Safety), Preliminary Design | The objective of this project is to install left-turn pocket, cut back loops, add vehicle head, update push button, and install bike detection to an existing traffic signal at the intersection of Azusa Avenue at Gemini Street. | The project cost includes design and construction.

Intersection of Azusa Avenue at Gemini Street, in the unincorporated County of Los Angeles community of East Valinda.

Pre-Construction & Construction

01/2019 08/2020

08/2020 11/2020 15-15 57 22

Los Angeles 18/19 In Progress Safety Altadena - Windsor Av at Figueroa Dr

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install new traffic signal on Windsor Avenue at Figueroa Drive. Project advertised May 12, 2020. | The project cost includes design and construction.

Intersection of Windsor Avenue and Figueroa Drive in the unincorporated County community of Altadena in Supervisorial District No. 5 Construction 05/2020 12/2020 15-15 41 25

Los Angeles 18/19 In Progress Safety East Los Angeles - Cesar E Chavez Av at Alma Av

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install pedestrian safety improvements, including upgrading crosswalks, installing bulbouts, installing Rectangular Rapid-Flashing Beacons (RRFB's), ADA access ramps, communication, and other associated equipment at the intersections of East Cesar E. Chavez Avenue at Alma Avenue. | The project cost includes design and construction.

Intersection of East Cesar E. Chavez Ave at Alma Ave. in the unincorporated County community of East Los Angeles in Supervisorial District No. 1.

Pre-Construction & Construction

03/2019 07/2020

07/2020 12/2020 15-15 51 24

Los Angeles 18/19 In Progress Safety Florence/Firestone - Compton Av at Nadeau St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to install protected/permissive left-turn phasing. | The project cost includes design and construction.

Intersection of Compton Avenue and Nadeau Street in the unincorporated County community of Florence/Firestone.

Pre-Construction & Construction

03/2019 07/2020

07/2020 03/2021 15-15 59 32

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Safety South San Gabriel - Del Mar Av at Redding Av

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a new traffic signal and all associated equipment for the intersection of Del Mar Avenue and Redding Avenue. | The project cost includes design and construction.

Intersection of Del Mar Avenue and Redding Avenue, in the unincorporated County of Los Angeles community of South San Gabriel.

Pre-Construction & Construction

11/2019 11/2020

11/2020 08/2021 20-20 49 22

Los Angeles 18/19 In Progress Safety Hacienda Heights - Vallecito Dr at Las Lomitas Dr

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | Install a Left Turn pocket at the north approach; install a right edgeline on e/s of Vallecito Dr; install "KEEP CLEAR" markings. Project relisted to do cleanup work.

South Vallecito Drive, between Las Lomitas Drive and Manzanita Drive, is in the unincorporated community of Hacienda Heights in the Fourth Supervisorial District.

Construction 05/2019 07/2020 20-20 57 32

Los Angeles 18/19 In Progress Safety Mount Baldy Road

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to install approximately 380' feet of guardrail/concrete barrier, which will be replacing existing rock wall on the east side of Mt Baldy Road.

Mount Baldy Rd in unincorporated Claremont area Pre-Construction 01/2019 07/2022 30-30 41 25

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation La Puente/San Jose Hills - Valley Boulevard

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to reconstruct 2.7 miles of major roadways. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Roadway reconstruction | The project cost includes design and construction. Advertise date August 2021.

Various roadways within the Unincorporated Community of Avocado Heights/San Jose Hills.

Pre-Construction & Construction

10/2019 08/2021

08/2021 06/2023 20-20 57 22

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Altadena - Altadena Dr and Washington Blvd Roadway Improvement

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. | The project cost includes design and construction. Advertise date is June 2021.

Various roadways within the unincorporated County community of Altadena.

Pre-Construction & Construction

04/2019 06/2021

06/2021 12/2022 20-20 41 25

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East Rancho Dominguez - Compton Bl, et al.

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 2.1 miles of major roadways. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Pavement resurface | The project cost includes design and construction. Does not include stormwater components. Advertise date June 2021.

Various roadways within the Unincorporated Community of East Rancho Dominguez.

Pre-Construction & Construction

01/2020 06/2021

06/2021 08/2022 20-20 64 35

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Palmdale - Pearblossom Hwy - 45th St East to 53rd St East

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Total project cost reflects County share only. Administered by City of Palmdale.

Unincorporated Palmdale community - Pearblossom Hwy between 45th St E & 53rd St E

Construction 09/2019 12/2020 20-20 36 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Del Aire Community Road Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Reconstruct 1.2 miles of residential roads in the unincorporated community of Del Aire. Related concrete improvements include repair and reconstruction of sidewalks, curb ramps, and cross gutters. | The project cost includes design and construction. Concrete prep work being completed via RMDJOC6672-300.00.

Various roadways within the Unincorporated Community of Del Aire. Pre-Construction & Construction

08/2019 06/2020

06/2020 07/2021 20-20 62 35

Los Angeles 20/21 New Safety Bandini Islands - Bandini Bl at Downey Rd This project will include: Procurement of Road Maintenance and Rehab Materials | Prepare FRA grant application for the subject project RR signal improvement | This is cost of application only, total project cost TBD

Bandini Bl and Downey Rd in unincorporated Los Angeles County Procurement/Operational Needs 09/2019 06/2021 25-25 53 33

Los Angeles 20/21 New Traffic Control Devices East Los Angeles - 1st Street at Marianna Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | A constituent requested Public Works to install a Traffic Signal for the intersection of 1st Street and Marianna Avenue. Based on the results of the study Traffic Signal was recommended. | Project advertised May 2020.

Intersection of 1st Street and Marianna Avenue in East Los Angeles. Construction 05/2020 04/2021 20-20 51 24

Los Angeles 20/21 New Traffic Control Devices East Los Angeles - Cesar E Chavez Av at Eastern Av

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Install protected-permissive left-turn phasing for eastbound and westbound traffic at the intersection of Cesar E. Chavez Avenue at Eastern Avenue. | Project initiated per constituent's request.

East Los Angeles - Cesar E Chavez Av at Eastern Av Pre-Construction & Construction

02/2020 01/2021

01/2021 05/2021 15-15 51 24

Los Angeles 20/21 New Traffic Control Devices Walnut Park - Santa Fe Av - Sale Pl/South Gate City Boundary - Phase II

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install Rectangular Rapid Flashing Beacons, curb extension, and realign striping at intersections | Project was initiated per the Board's request.

Walnut Park community - Santa Fe Avenue, between Sale Place and the South Gate City Boundary.

Pre-Construction & Construction

08/2020 01/2021

12/2020 06/2021 15-15 59 33

Los Angeles 20/21 New Traffic Control Devices Whittier Narrows - Rosemead Bl at Gallatin Rd This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to upgrade the traffic signal at the intersection of Rosemead Boulevard at Gallatin Road.

Rosemead Boulevard at Gallatin Road, in the unincorporated County of Los Angeles community of Whittier Narrows and the City of Pico Rivera.

Pre-Construction & Construction

08/2019 12/2020

12/2020 06/2021 15-15 57 32

Los Angeles 20/21 New Traffic Control Devices Athens-Westmont - Normandie Av at 104th St

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the traffic signal at the intersection of Normandie Avenue at 104th Street, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

Athens-Westmont - Normandie Av at 104th St Pre-Construction 08/2020 10/2021 15-15 62 30

Los Angeles 20/21 New Traffic Control Devices Athens-Westmont - Vermont Av at 98th St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a new traffic signal at the intersection of Vermont Avenue at 98th Street.

This project is located at the intersection of Vermont Avenue at 98th Street, in the unincorporated County of Los Angeles community of Athens/Westmont and the City of Los Angeles.

Pre-Construction & Construction

09/2020 01/2022

12/2021 07/2022 20-20 62 30

Los Angeles 20/21 New Traffic Control Devices East Rancho Dominguez - Rosecrans Av at Atlantic Av

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Rosecrans Avenue at Atlantic Avenue, in the unincorporated County of Los Angeles community of East Rancho Dominguez and City of Compton.

Pre-Construction 08/2019 10/2021 15-15 64 35

Los Angeles 20/21 New Safety Florence-Firestone - Firestone Boulevard Vision Zero Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design | The objective of this project is to install the following traffic safety enhancements along Firestone Boulevard from Central Avenue to Alameda Street; High visibility crosswalks (22 crosswalks at 8 intersections); Leading Pedestrian Intervals (6 intersections); Curb extensions, paint and bollard (35 corners at 11 intersections; Upgrade 17 traffic signal vehicle heads from 8 inch to 12 inch; Install 1 Assessible Pedestrian Signal system; Upgrade 8 count-down pedestrian modules

Firestone Boulevard between Central Avenue and Alameda Street in the unincorporated County of Los Angeles community of Florence-Firestone.

Pre-Construction & Construction

03/2019 09/2020

09/2020 03/2021 15-15 59 33

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Traffic Control Devices Florence-Firestone - Gage Avenue at Hooper Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Document Preparation | Installation of protected/permissive left-turn phasing for all four approaches.

Gage Avenue and Hooper Avenue in the unincorporated community of Florence-Firestone in Supervisorial District 2.

Pre-Construction & Construction

11/2019 10/2020

10/2020 06/2021 15-15 59 33

Los Angeles 20/21 New Traffic Control Devices View Park/Windsor Hills - Overhill Drive at 58th Place/Orchid Drive

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to install a new traffic signal at the intersection of Overhill Drive at 58th Place/Orchid Drive

Overhill Dr at 58th Place, in the unincorporated County of Los Angeles community of View Park/Windsor Hills. Pre-Construction 12/2019 06/2021 20-20 54 30

Los Angeles 20/21 New Traffic Control Devices West Carson - Normandie Av at 228th St

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the traffic signal at the intersection of Normandie Avenue at 228th Street, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

Normandie Avenue at 228th Street, in the unincorporated County of Los Angeles community of West Carson. Pre-Construction 08/2019 10/2021 15-15 66 35

Los Angeles 20/21 New Traffic Control Devices Willowbrook - Broadway at El Segundo Bl

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to upgrade the traffic signal at the intersection of Broadway at El Segundo Boulevard, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

Broadway at El Segundo Boulevard, in the unincorporated County of Los Angeles community of Willowbrook. Pre-Construction 06/2020 10/2021 15-15 64 35

Los Angeles 20/21 New Safety Hacienda Heights-Garo St- Stimson Av/Fieldgate Av

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | The objective of this project is to install speed humps along Garo Street from Stimson Avenue to Fieldgate Avenue.

Garo Street from Stimson Avenue to Fieldgate Avenue, in the unincorporated County of Los Angeles community of Hacienda Heights. Construction 01/2021 02/2021 10-10 57 32

Los Angeles 20/21 New Traffic Control Devices Marina Del Rey - Admiralty Way at California Yacht Club Driveway

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a new traffic signal at the intersection of Admiralty Way at California Yacht Club Driveway. | The project cost includes design and construction.

Admiralty Way at California Yacht Club Driveway, in the unincorporated County of Los Angeles community of Marina Del Rey. Construction 12/2019 05/2021 20-20 62 26

Los Angeles 20/21 New Traffic Control Devices South Whittier - Calmada Av - Lanning Dr/Mulberry Dr

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | The objective of this project is to install edge striping and double yellow center line to improve safety on Calmada Avenue, between Lanning Drive and Mulberry Drive. | Work was primarily completed April 2020 but this is listed for completeness and for final closeout.

Calmada Avenue, between Lanning Drive and Mulberry Drive in the unincorporated County community of South Whittier Construction 02/2020 07/2020 10-10 57 32

Los Angeles 20/21 New Safety Agua Dulce - Bouquet Canyon Rd - Santa

Clarita BL to 640' n/o MM 16.43 & 1145' n/o MM 3.52 to 950' n/o MM 0.18

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | nstall curve advisory signs and chevron signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road. The project will update existing signing along the road including the installation of advance curve advisory signs and arrows for horizontal curves where applicable.

Bouquet Canyon Road located near the County of Los Angeles unincorporated communities of Leona Valley and Bouquet Canyon.

Pre-Construction & Construction

06/2019 07/2020

07/2020 09/2020 10-10 36 21

Los Angeles 20/21 New Traffic Control Devices Castaic Road at Ridge Route Road and The Old Road at Parker Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design | The objective of this project is to install new traffic signals at two intersections. | Combined TDS0001697 & TDS001698

Castaic Road at Ridge Route Road and The Old Road at Parker Road in the unincorporated County of Los Angeles community of Castaic.

Pre-Construction & Construction

12/2019 09/2020

08/2020 03/2022 20-20 38 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Traffic Control Devices La Crescenta - Foothill Blvd at Cloud Av

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install new traffic signal on Foothill Boulevard at Cloud Avenue.

Foothill Boulevard and Cloud Avenue in the unincorporated County community of La Crescenta-Montrose i

Pre-Construction & Construction

10/2019 09/2020

09/2020 06/2021 20-20 43 25

Los Angeles 20/21 New Traffic Control Devices La Crescenta-Montrose - Ocean View Blvd at Montrose Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Install protected permissive left-turn phasing for north and south bound traffic. | This project will decrease the number of delay cycles.

Ocean View Boulevard and Montrose Avenue is located in the unincorporated County community of La Crescenta

Pre-Construction & Construction

11/2019 02/2021

02/2021 05/2021 15-15 43 25

Los Angeles 20/21 New Traffic Control Devices Angeles Forest - Mt Baldy Rd - Mills Av to County Boundary

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs and centerline rumble strips in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Mount Baldy Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

County of Los Angeles unincorporated communities of Claremont and Angeles National Forest, and the City of Claremont. It begins at Mills Avenue and ends at the County boundary. The length of the project is approximately 8.0 miles.

Pre-Construction & Construction

07/2020 01/2022

12/2021 07/2022 10-10 41 25

Los Angeles 20/21 New Traffic Control Devices Azusa - Barranca Av at Baseline Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to upgrade the existing traffic signal on Barranca Avenue at Baseline Road.

Barranca Avenue and Baseline Road in the unincorporated County community of Azusa

Pre-Construction & Construction

10/2019 08/2020

08/2020 03/2021 15-15 48 22, 25

Los Angeles 20/21 New Traffic Control Devices Mega Consultant Projects FY 2018-19 Group I This project will include: Preparing scope of work, preliminary utility notice, field, reviewing consultants' proposals. | East San Gabriel Valley. The project work is listed under their respective projects.

Irwindale Av at Cypress St, Don Julian Rd at 5th Av, Vineland Av at Giordano St, Pathfinder Rd at Wellesley Dr, Fullerton Rd at Sunrise Dr

Procurement/Operational Needs 05/2019 12/2020 15-15 48, 55, 57 22, 29

Los Angeles 20/21 New Road Maintenance & Rehabilitation East Los Angeles - 1st Street

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 1.8 miles of major roads.

1st Street from Indiana St to Rowan Av and from Herbert Av to 140 feet west of Vancouver Av.

Pre-Construction & Construction

01/2021 11/2021

11/2021 06/2022 7-7 51 24

Los Angeles 20/21 New Road Maintenance & Rehabilitation East Los Angeles - Floral Drive

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to resurface 0.5 mile of major roads. The project includes parkway improvements and curb ramp upgrade. | The project cost includes design and construction.

Unincorporated County Community of East Los Angeles and the City of Monterey Park

Pre-Construction & Construction

10/2019 12/2021

12/2021 12/2022 10-10 51 24

Los Angeles 20/21 New Road Maintenance & Rehabilitation Walnut Park - Pacific Boulevard, et al.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to resurface 2.6 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

Various roadways within the Unincorporated Community of Walnut Park. Pre-Construction 07/2020 06/2021 10-10 59 33

Los Angeles 20/21 New Road Maintenance & Rehabilitation West Puente Valley - Duff Ave et al.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 13.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of West Puente Valley.

Pre-Construction & Construction

06/2021 07/2022

06/2022 06/2023 7-7 48 22

Los Angeles 20/21 New Road Maintenance & Rehabilitation Florence-Firestone - 58th Place, et al.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 7.0 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

Various roadways within the Unincorporated Community of Florence-Firestone.

Pre-Construction & Construction

10/2020 12/2021

12/2021 06/2022 7-7 59 33

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Road Maintenance & Rehabilitation Rosewood - San Pedro Street, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 3.5 miles of major roadways. The project includes parkway improvements, curb ramps upgrade, and pavement resurface.

Various roadways within the Unincorporated Community of Rosewood. Pre-Construction & Construction

06/2021 07/2023

06/2023 06/2024 10-10 64 35

Los Angeles 20/21 New Road Maintenance & Rehabilitation Windsor Hills - Southridge Avenue, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 6.3 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

Various roadways within the Unincorporated Community of Windsor Hills. Pre-Construction & Construction

06/2021 06/2023

06/2023 06/2024 10-10 54 30

Los Angeles 20/21 New Road Maintenance & Rehabilitation Malibu - Entrada Road, et al. This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to preserve 7.6 miles of residential roads. The project includes pavement prep-work and pavement preservation.

Various roadways within the Unincorporated Community of Malibu. Pre-Construction 01/2021 07/2021 7-7 50 27

Los Angeles 20/21 New Road Maintenance & Rehabilitation Malibu - Saddle Peak Road, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 3.6 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

Various roadways within the Unincorporated Community of Malibu. Pre-Construction & Construction

01/2021 07/2022

07/2022 07/2023 10-10 50 27

Los Angeles 20/21 New Road Maintenance & Rehabilitation Hacienda Heights - Hacienda Boulevard

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 3.1 miles of roadways. The project includes parkway improvements, curb ramps upgrade, and pavement resurfacing.

County Unincorporated Community of Hacienda Heights. Pre-Construction & Construction

02/2020 08/2021

08/2021 06/2022 10-10 57 32

Los Angeles 20/21 New Road Maintenance & Rehabilitation Rowland Heights - Nearbank Street, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 8.7 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

Various roadways within the Unincorporated Community of Rowland Heights.

Pre-Construction & Construction

06/2021 06/2022

06/2022 12/2023 10-10 55, 57 29, 32

Los Angeles 20/21 New Road Maintenance & Rehabilitation South Whittier - Lakeland Rd Pavement Improvements (ABO)(SFS)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This is a County contribution to the city of Santa Fe Springs for a resurfacing of 0.2 miles of residential roads.

Lakeland Road adjacent to the City of Santa Fe Springs. Pre-Construction & Construction

05/2021 12/2021

12/2021 06/2022 10-10 51 24

Los Angeles 20/21 New Road Maintenance & Rehabilitation South Whittier - Lemon Dr et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 5.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurface.

Various roadways within the Unincorporated Community of South Whittier.

Pre-Construction & Construction

06/2021 12/2022

12/2022 12/2023 10-10 51 24

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Road Maintenance & Rehabilitation West Whittier Los Nietos - Aeolian Street, et al.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 5.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of West Whittier Los Nietos.

Pre-Construction & Construction

06/2020 06/2021

06/2021 06/2022 7-7 57 32

Los Angeles 20/21 New Road Maintenance & Rehabilitation Agua Dulce - 101st Street East - Avenue S to Avenue T

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to preserve 1.0 miles of Division Street. The project includes pavement prep-work and pavement preservation.

Unincorporated Community of Agua Dulce. Pre-Construction & Construction

09/2020 06/2021

06/2021 07/2022 7-7 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Agua Dulce - San Francisquito Canyon Road -Elizabeth Lake Road to MM 4.6

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to rehabilitate 4.6 miles of rural major roads. The project includes pavement prep work and pavement rehabilitation.

Unincorporated County Community of Agua Dulce. Pre-Construction & Construction

06/2021 06/2022

06/2022 07/2023 20-20 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Agua Dulce - Sierra Highway (Phase 2) -Vasquez Canyon Road to Davenport Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 2.7 miles of a rural major road to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurface.

Unincorporated community of Agua Dulce Pre-Construction & Construction

01/2021 12/2021

12/2021 12/2022 10-10 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Altadena - Marengo Avenue, et al.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of Altadena. Pre-Construction & Construction

01/2021 07/2021

07/2021 12/2022 7-7 41 25

Los Angeles 20/21 New Road Maintenance & Rehabilitation Angeles National Forest - Mount Wilson Road, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 5.6 miles of rural local roads. The project includes pavement prep-work and pavement resurfacing.

Various roadways within the Angeles National Forest. Pre-Construction & Construction

01/2021 06/2022

06/2022 12/2023 10-10 41 25

Los Angeles 20/21 New Road Maintenance & Rehabilitation Castaic/Val Verde - Commerce Center Drive, et al.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to resurface 1.8 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

Unincorporated Community of Castaic and Val Verde Construction 05/2020 07/2021 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Bouquet Canyon - Bouquet Canyon Road - MM 8.74 to Elizabeth Lake Road

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to rehabilitate 7.4 miles of major/local roads. The project includes pavement prep work and pavement rehabilitation.

Unincorporated Community of Bouquet Canyon Pre-Construction & Construction

01/2020 12/2020

09/2020 07/2022 20-20 36 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Road Maintenance & Rehabilitation Desert View Highlands - Mesquite Road, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 7.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

Within the Unincorporated Community of Desert View Highlands Pre-Construction & Construction

01/2021 12/2022

12/2022 12/2023 20-20 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation East La Verne - Webb Canyon Rd, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 5.9 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

Various roadways within the Unincorporated Community of East La Verne.

Pre-Construction & Construction

01/2020 12/2022

12/2022 12/2023 10-10 41 25

Los Angeles 20/21 New Road Maintenance & Rehabilitation East San Gabriel - Acacia Street, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to preserve 9.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of East San Gabriel.

Pre-Construction & Construction

12/2020 12/2021

12/2021 12/2022 7-7 49 22

Los Angeles 20/21 New Road Maintenance & Rehabilitation Littlerock - 102nd Street, et al.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to preserve 15.9 miles of rural local roads. The project includes pavement prep-work and pavement preservation.

Within the Unincorporated Community of Littlerock. Pre-Construction & Construction

01/2021 12/2021

12/2021 06/2022 7-7 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Roosevelt - Avenue E - 130th Street East to 140th Street East

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to reconstruct from 130th St East to 140th St East (1.0 mi) of rural major roads. The project includes pavement prep work, pavement reconstruction, culvert replacement, and guardrail installation. | JOC construction started June 2020.

Unincorporated County Community of Roosevelt. Construction 06/2020 07/2021 20-20 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Roosevelt/North Lancaster - 120th Street East -Avenue D to Avenue I

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to preserve 5.0 miles of Division Street. The project includes pavement prep-work and pavement preservation

Unincorporated Community of Roosevelt and North Lancaster. Pre-Construction & Construction

07/2020 06/2021

06/2021 12/2022 7-7 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation South Antelope Valley - Pearblossom Highway -Sierra Highway to City of Palmdale Boundary

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 1.1 miles of major roads.

Unincorporated Community of South Antelope Valley Pre-Construction & Construction

06/2021 06/2022

06/2022 12/2023 10-10 36 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Road Maintenance & Rehabilitation Stevenson Ranch - Stevenson Ranch Tract (Phase II)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to preserve 4.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of Stevenson Ranch.

Pre-Construction & Construction

12/2020 07/2021

07/2021 12/2022 7-7 38 27

Los Angeles 20/21 New Road Maintenance & Rehabilitation Sun Village - 95th Street East - Avenue R to Palmdale Boulevard

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 0.6 miles of rural local road to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

Unincorporated community of Littlerock Pre-Construction & Construction

12/2020 06/2021

06/2021 12/2021 10-10 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Sun Village/Lake Los Angeles - Palmdale Boulevard (Phase III) - 90th Street East to

140th Street East

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to rehabilitate 5.0 miles of a major highway.

Various roadways within the Unincorporated Communities of Sun Village and Lake Los Angeles.

Pre-Construction & Construction

12/2020 02/2022

02/2022 12/2023 20-20 36 21

Los Angeles 20/21 New Road Maintenance & Rehabilitation Ingleside Way @ MM 0.11 to 0.18

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Preliminary Design, Document Preparation | The primary objective of this project is to provide slope and road repair in the unincorporated Malibu area. The proposed work includes constructing a new wall to replace the existing deteriorating wall. The wall will stabilize the slope, protect the roadway, and secure access for residents.

Unincorporated Malibu area. Pre-Construction & Construction

01/2020 07/2020

07/2020 07/2021 20-20 50 27

Los Angeles 20/21 New Road Maintenance & Rehabilitation 6704 Provence Road Catch Basin Lateral Repair Project

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair and upgrade existing catch basin and outlets to current standard. Unincorporated San Gabriel area. Construction 08/2020 09/2020 20-20 49 22

Los Angeles 19/20 In Progress Traffic Control Devices Covina Island - Cypress St at Irwindale Ave

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install protected/permissive left-turn phasing. Although this is at the same location as TDS0001526 (FY 18-19 expenditure report RP229), that was for prep work for coordination for this project. Project advertised May 12, 2020.

The intersection of Cypress St and Irwindale Ave within shared jurisdiction between the City of Irwindale and the County of Los Angeles. Construction 05/2020 05/2021 15-15 48 22

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 19/20 In Progress Traffic Control Devices Covina Islands - Enid Avenue at Newburgh Street

This project will include: ADA Curb Ramp Installation (New), Cost Estimating, Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | Install curb ramp and striping for crosswalk. | The work consists of upgrading signing including the installation of the necessary pavement markings for the uncontrolled school crossing along Enid Avenue south of Newburgh Street. It will also include the upgrading of School zoning signage along Enid Avenue. Work to be performed by County force account labor. Project not yet constructed.

Unincorporated Covina island - Enid Avenue at Newburgh Street Pre-Construction & Construction

01/2019 07/2020

07/2020 12/2020 10-10 48 22

Los Angeles 19/20 In Progress Traffic Control Devices East Los Angeles - 1st Street at Herbert Ave (17/18 Carryover)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install flashing beacons at crosswalk on west approach. Project was awarded in 2018 and completed in 2020, this is for remaining charges.

East Los Angeles - 1st Street at Herbert Avenue Construction 08/2018 07/2020 20-20 51 24

Los Angeles 19/20 In Progress Traffic Control Devices East Los Angeles - Eastern Avenue at Ramona Boulevard

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to install left-turn phasing to an existing traffic signal at the intersection of Eastern Avenue at Ramona Boulevard.

Eastern Avenue and Ramona Boulevard, in the unincorporated County of Los Angeles community of East Los Angeles.

Pre-Construction & Construction

11/2019 01/2021

01/2021 08/2021 15-15 51 24

Los Angeles 19/20 In Progress Traffic Control Devices East Los Angeles - Whittier Blvd at Atlantic Blvd

This project will include: Cost Estimating, Preliminary Design, Document Preparation | The objective of this project is to install additional traffic signal equipment and upgrade pedestrian equipment at the intersection of Whittier Blvd at Atlantic Blvd. (This work will be merged into the East LA Community Roadway Improvement Project, RDC0016147, which will be Federally funded and not through RMRA; scheduled to advertise June 2021)

Whittier Blvd at Atlantic Blvd in the unincorporated community of East Los Angeles. Pre-Construction 07/2020 06/2021 15-15 51 24

Los Angeles 19/20 In Progress Traffic Control Devices Walnut Park – Pacific Boulevard at Broadway

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install protected left-turn phasing to the north, south and east approaches to an existing traffic signal at the intersection of Pacific Boulevard at Broadway. (Construction in FY 2020-21)

Pacific Boulevard at Broadway, in the unincorporated County of Los Angeles community of Walnut Park.

Pre-Construction & Construction

01/2020 03/2021

03/2021 06/2021 15-15 59 33

Los Angeles 19/20 In Progress Traffic Control Devices Calabasas - Kanan Rd from Mulholland Hwy to 3096ft N/O Silver Creek Rd

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Kanan Rd from Mulholland Hwy to 3096ft N/O Silver Creek Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2021-22)

County of Los Angeles unincorporated community of Calabasas Pre-Construction & Construction

05/2020 05/2021

04/2021 12/2021 10-10 50 27

Los Angeles 19/20 Carried Over Traffic Control Devices Malibu Lake - Kanan Dume Rd from 2560ft N/O Cavalleri Rd to Mulholland Hwy

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Kanan Dume Rd from 2560ft N/O Cavalleri Rd to Mulholland Hwy. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2021-22)

County of Los Angeles unincorporated community of Malibu Lake. Pre-Construction & Construction

09/2020 05/2021

04/2021 12/2021 10-10 50 27

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 19/20 Carried Over Traffic Control Devices Monte Nido - Malibu Canyon Rd from 1050ft N/O Malibu Crest Dr to Piuma Rd

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Malibu Canyon Rd from 1050ft N/O Malibu Crest Dr to Piuma Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

County of Los Angeles unincorporated community of Monte Nido. Pre-Construction 01/2021 07/2021 10-10 50 27

Los Angeles 19/20 In Progress Traffic Control Devices La Rambla - 7th Street at Patton Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install rectangular rapid flashing beacons and required striping at the existing marked pedestrian crossing on 7th Street and Patton Avenue. Project award April 2020.

7th Street and Patton Avenue, in the unincorporated County of Los Angeles community of La Rambla. Construction 04/2020 07/2020 15-15 70 35

Los Angeles 19/20 Carried Over Traffic Control Devices Marina Del Rey - Fiji Way at Lincoln Bl

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to install split phasing for the East and West approaches of the signalized intersection at Fiji Way and Lincoln Bl. Project carried over to FY 2020-21 with no expenses in FY 2019-20.

Fiji Way and Lincoln Bl, in the unincorporated County of Los Angeles community of Marina Del Rey.

Pre-Construction & Construction

09/2020 06/2021

06/2021 12/2021 15-15 62 26

Los Angeles 19/20 Carried Over Traffic Control Devices Marina Del Rey - Via Marina at Channel Walk This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to install a new traffic signal at the intersection of Via Marina at Channel Walk. No work done in FY 2019-20.

Via Marina at Channel Walk, in the unincorporated County of Los Angeles community of Marina Del Rey. Pre-Construction 09/2020 06/2021 20-20 62 26

Los Angeles 19/20 In Progress Traffic Control Devices South Whittier - Mulberry Drive at Calmada Avenue

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Document Preparation | The objective of this project is to upgrade the traffic signal at the intersection of Mulberry Drive at Calmada Avenue to include left-turn phasing.

Mulberry Drive at Calmada Avenue, in the unincorporated County of Los Angeles community of South Whittier.

Pre-Construction & Construction

11/2019 02/2021

02/2021 12/2021 15-15 57 32

Los Angeles 19/20 Carried Over Traffic Control Devices Agua Dulce - Sierra Hwy from 2100ft S/O Quinn Dr to Avenue S

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from 2100ft S/O Quinn Dr to Avenue S. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. No work in FY 2019-20.

County of Los Angeles unincorporated community of Agua Dulce/Acton. The length of the entire project is approximately 27 miles.

Pre-Construction & Construction

08/2020 07/2021

07/2021 06/2022 10-10 38 21

Los Angeles 19/20 In Progress Traffic Control Devices Arcadia - Temple City Bl at Naomi Av (17/18 Carryover)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | New traffic signal at Temple City Boulevard and Naomi Avenue. | The project was combined into the 1st/Herbert et al project (TDS0001562) for construction. This reflects remaining work in FY 2020-21.

Temple City Boulevard and Naomi Avenue is in the unincorporated community of Arcadia. Construction 08/2018 07/2020 20-20 49 22

Los Angeles 19/20 Carried Over Traffic Control Devices Castaic - Copper Hill Dr at Avenida Rancho Tesoro

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to upgrade the traffic signal at the intersection of Copper Hill Dr at Avenida Rancho Tesoro by installing additional vehicle heads, countdown pedestrian heads, and bicycle detection. (No work completed in FY 2019-20) (Construction in FY 2020-21)

Copper Hill Dr at Avenida Rancho Tesoro, in the unincorporated County of Los Angeles community of Castaic and the City of Santa Clarita.

Pre-Construction & Construction

08/2020 11/2020

11/2020 01/2021 15-15 38 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 19/20 In Progress Traffic Control Devices Castaic -Hillcrest Pkwy at Beryl Place

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install flashing beacons and required striping at the existing marked school crossing on Hillcrest Pkwy at Beryl Place. Project advertised May 12, 2020.

Hillcrest Pkwy at Beryl Place, in the unincorporated County of Los Angeles community of Castaic/Val Verde. Construction 05/2020 12/2020 15-15 38 21

Los Angeles 19/20 In Progress Traffic Control Devices Charter Oak - Sunflower Ave at Cypress Street

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to install a new traffic signal. (Construction in FY 2020-21)

Sunflower Ave and Cypress Street In the unincorporated community of Charter Oak.

Pre-Construction & Construction

04/2020 07/2020

07/2020 11/2020 20-20 48 22

Los Angeles 19/20 Carried Over Traffic Control Devices Del Sur - Sierra Hwy - Avenue G to Avenue A

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from Avenue G to Avenue A. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. No work done in FY 2019-20. Estimated advertise date April 2021.

County of Los Angeles unincorporated community of Del Sur. Pre-Construction & Construction

08/2020 04/2021

04/2021 05/2022 10-10 36 21

Los Angeles 19/20 Carried Over Traffic Control Devices Desert View Highlands - Elizabeth Lake Rd at Mesquite Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to upgrade the traffic signal at the intersection of Elizabeth Lake Rd at Mesquite Rd by installing vehicle heads, bicycle detection, and detectable warning surface. No expenses in FY 2019-20.

Elizabeth Lake Rd at Mesquite Rd, in the unincorporated County of Los Angeles community of Desert View Highlands.

Pre-Construction & Construction

07/2020 08/2020

08/2020 01/2021 15-15 36 21

Los Angeles 19/20 Carried Over Traffic Control Devices Leona Valley/Lake Hughes - Elizabeth Lake Rd from Lake Hughes Rd to 2095ft E/O Bouquet

Cyn Rd

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Elizabeth Lake Rd from Lake Hughes Rd to 2095ft E/O Bouquet Cyn Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. No expenses in FY 2019-20.

County of Los Angeles unincorporated community of Leona Valley/Lake Hughes.

Pre-Construction & Construction

07/2020 07/2021

07/2021 06/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices Covina Islands - Arrow Highway at Lark Ellen Avenue

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to install left-turn phasing to an existing traffic signal at the intersection of Arrow Highway and Lark Ellen Avenue. (Construction in FY 2020-21)

Arrow Highway and Lark Ellen Avenue, in the unincorporated County of Los Angeles community of Covina Islands.

Pre-Construction & Construction

03/2020 12/2020

12/2020 06/2021 15-15 48 22

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Avocado Heights – 6th – Valley Bl and Lomitas Ave (City/County Coop)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Improvement (New) | The primary objective of this project is to rehabilitate 0.8 miles of local roads. The project includes roadway reconstruction. Cost is only County share.

Unincorporated County community of Avocado Heights and City of Industry Construction 06/2021 12/2021 20-20 57 22

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Avocado Heights - Pellisier Village

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Pavement Improvement (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The primary objective of this project is to preserve 1.4 miles of residential roads.

Various roadways within the Unincorporated Community of Avocado Heights.

Pre-Construction & Construction

08/2019 07/2020

07/2020 10/2020 7-7 57 22, 32

Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Claremont/Pomona – Towne Avenue Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Total project cost includes design and construction. This is the County contribution to the project cost.

Unincorporated County Community adjacent to Claremont and Pomona, Towne Ave from Foothill Blvd to Bonita Ave

Construction 10/2019 07/2020 20-20 52 20

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation East Los Angeles - Cesar E Chavez Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 1.9 miles of major roads, including parkway improvements, curb ramps upgrade, and pavement resurface. (Construction in FY 2022-23)

Various roadways within the Unincorporated Community of East Los Angeles.

Pre-Construction & Construction

09/2019 01/2022

01/2022 12/2022 10-10 51 24

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation East Los Angeles - Michigan Avenue, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to preserve 8.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

Various roadways within the Unincorporated Community of East Los Angeles

Pre-Construction & Construction

01/2020 09/2020

09/2020 07/2021 7-7 51 24

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation West Rancho Dominguez - 139th Street, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to reconstruct 4.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway reconstruction.

Various roadways within the Unincorporated Community of West Rancho Dominguez.

Pre-Construction & Construction

01/2020 12/2021

12/2021 12/2022 20-20 64 35

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Westchester - Sophomore Drive, et al.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 1.9 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of Westchester Pre-Construction & Construction

07/2019 08/2020

08/2020 07/2021 7-7 54, 62 26, 30

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Rolling Hills - Crenshaw Blvd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 0.6 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing.

Various roadways within the Unincorporated Community of Rolling Hills Pre-Construction & Construction

02/2020 06/2021

06/2021 11/2022 10-10 66 26

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Rowland Heights - Otterbein Avenue, et al.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 5.9 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Rowland Heights.

Pre-Construction & Construction

01/2020 09/2020

08/2020 07/2021 7-7 55 29

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation West Whittier/Los Nietos - Mines Boulevard, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to rehabilitate 3.0 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction.

Various roadways within the Unincorporated Community of West Whittier Los Nietos.

Pre-Construction & Construction

05/2020 03/2023

03/2023 12/2023 10-10 57 32

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation West Whittier Los Nietos - Rivera Road, et al.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 4.0 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. Project began construction May 2020.

Various roadways within the Unincorporated Community of West Whittier Los Nietos. Construction 05/2020 07/2021 7-7 57 32

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Altadena - Glenrose Avenue, et al.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The primary objective of this project is to preserve 9.5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. Project ID recoded. Concrete work begins June 2020 and ends August 2020. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Altadena. Pre-Construction & Construction

06/2019 06/2020

06/2020 06/2022 7-7 41 25

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Angeles National Forest - Big Tujunga Canyon Road (Ph I)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to rehabilitate 10.1 miles of major roads. The project includes pavement prep work and pavement rehabilitation.

Various roadways within the Angeles National Forest. Pre-Construction & Construction

01/2020 06/2021

06/2021 12/2022 20-20 39, 43 25

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Del Sur - Avenue G - 20,040' W/O 90th Street West to 70th Street West

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 3.4 mile of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

Unincorporated community of Del Sur Pre-Construction & Construction

05/2020 06/2021

06/2021 12/2022 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Kagel/Lopez Canyons - Kagel Canyon Road, et al.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to resurface 8.6 miles of major urban roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing.

Various roadways within the Unincorporated Community of Kagel/Lopez Canyons Construction 05/2020 07/2021 10-10 39 25

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation La Crescenta-Montrose – La Crescenta Avenue, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Rehabilitate 5.2 miles of major roads, including parkway improvements and curb ramps upgrade. Formerly known as La Crescenta-Montrose – Pennsylvania Avenue, et al.

Unincorporated La Crescenta-Montrose area surrounded by the Cities of Glendale and La Canada Flintridge.

Pre-Construction & Construction

06/2019 01/2022

01/2022 06/2022 20-20 43 25

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Lake Los Angeles - 240th Street East, et al.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to resurface 9.5 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing.

Various roadways within the Unincorporated Community of Lake Los Angeles.

Pre-Construction & Construction

05/2020 06/2022

06/2022 12/2022 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Lake Los Angeles - Palmdale Boulevard (Phase II) - 170th St East to 215th St East

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to resurface 4.5 miles of major rural roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2022-23)

Various roadways within the Unincorporated Community of Palmdale Pre-Construction & Construction

05/2020 06/2022

06/2022 12/2022 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Leona Valley - Godde Hill Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to rehabilitate 2.4 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction.

Various roadways within the Unincorporated Community of Leona Valley Pre-Construction & Construction

05/2020 06/2022

06/2022 06/2023 20-20 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Quartz Hill - 20th St West - Avenue O-12 to Avenue M

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 2.8 miles of local roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2022-23)

Unincorporated area of Quartz Hill. Pre-Construction & Construction

05/2020 06/2022

06/2022 12/2022 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Quartz Hill - 55th Street West - Avenue M to Avenue M-8

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 0.75 mile of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

Unincorporated community of Quartz Hill Pre-Construction & Construction

04/2020 06/2022

06/2022 06/2023 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Quartz Hill - Avenue L (Phase 2) - 52nd Street West to 40th Street West

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 1.2 mile of urban major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing. (Construction in FY 2022-23)

Unincorporated community of Quartz Hill Pre-Construction & Construction

05/2020 06/2022

06/2022 12/2022 10-10 36 21

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Roosevelt - Avenue J - 150th Street East to 240th Street East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 9 miles of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

Unincorporated community of Roosevelt Pre-Construction & Construction

04/2020 09/2020

09/2020 08/2021 10-10 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation South Antelope Valley - Avenue N - 50th St East to 90th St East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to rehabilitate 4 miles of local roads. The project includes parkway improvements curb ramp upgrades, and roadway reconstruction. (Construction in FY 2022-23)

Unincorporated Community of Palmdale. Pre-Construction & Construction

05/2020 06/2022

06/2022 06/2023 20-20 36 21

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation South Monrovia Islands - Walnut Grove Avenue, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to reconstruct 3.8 miles of major roadways. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2023-24)

Various roadways within the Unincorporated Communities of Mayflower Village and East San Gabriel.

Pre-Construction & Construction

05/2020 03/2023

03/2023 12/2023 20-20 48, 49 22

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation White Fence Farm - 30th Street West - Avenue N-8 to Avenue O-12

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Pavement Improvement (New), Preliminary Design, Document Preparation | The primary objective of this project is to resurface 1.2 miles of major highway.

Previously known as White Fence Farm - 30th Street West - Avenue N-8 to Avenue O-12

Unincorporated Community of Quartz Hill Pre-Construction & Construction

04/2020 07/2020

07/2020 07/2021 20-20 36 21

Los Angeles 20/21 New Safety Santa Monica Mountains - Malibu Canyon Road at MM 2.32

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install approximately 695 feet of guard rail on Malibu Canyon Road approximately one mile north of Francisco Ranch Road.

Malibu Canyon Road approximately one mile north of Francisco Ranch Road in the Santa Monica Mountains.

Pre-Construction & Construction

05/2020 06/2022

06/2022 12/2022 30-30 50 27

Los Angeles 20/21 New Safety Lancaster - Sierra Highway at Avenue E

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Improve truck turning radius at Avenue E and Sierra Highway, by widening Sierra Highway to shift left turn pockets, extend reinforced box culvert and relocate the 36 inch drain pipe, reconfigure the guardrail and restripe the roadway.

Avenue E and Sierra Highway in unincorporated Antelope Valley. Pre-Construction & Construction

05/2020 06/2022

06/2022 06/2023 30-30 41 25

Los Angeles 18/19 In Progress Traffic Control Devices East Los Angeles - Olympic Bl at Saybrook Av This project will include: Upgrade the existing vehicle heads, pedestrian heads and pedestrian pushbuttons at the intersection of Olympic Boulevard and Saybrook Avenue. | Total project cost reflects design costs only.

Olympic Boulevard and Saybrook Avenue - East Los Angeles Construction 06/2020 07/2020 15-15 51 24

Los Angeles 19/20 In Progress Safety East Los Angeles and Saybrook Communities Traffic Safety Improvements

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Roundabout Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this project is to install traffic circle/islands for traffic calming purposes at the intersections of Northside Drive at Montebello Parkway, and Southside Drive at Coolidge Way.

The intersections of Northside Drive at Montebello Parkway, and Southside Drive at Coolidge Way, in the unincorporated County of Los Angeles communities of East Los Angeles and Saybrook.

Pre-Construction & Construction

07/2019 03/2021

02/2021 06/2021 10-10 51 24

Los Angeles 19/20 In Progress Traffic Control Devices Fairgrove Ave at Sandia Ave et al

(Gale/Falstone, Hacienda/Shadybend, Telegraph/Victoria)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install flashing beacon and restripe crosswalk; New traffic signal; New traffic signal with left turn phasing; Protected left-turn phasing for west approach. Includes TDS0001514, TDS0001516, TDS0001517, TDS0001545. | Advertised May 12, 2020.

West Valinda - Fairgrove Av at Sandia Av; Hacienda Heights - Gale Av at Falstone Av; Hacienda Heights - Hacienda Bl at Shadybend Dr ; South Whittier - Telegraph Rd at Victoria Av

Construction 05/2020 12/2020 15-20 48, 57 22, 32

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Los Angeles 20/21 New Road Maintenance & Rehabilitation East Los Angeles - Whiteside Street, et al. (Phase II)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Feasibility Study, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Resurface 2.1 miles of residential roads, parkway improvements, curb ramp upgrade. | The project cost includes design and construction. The project will be split into two phases for construction. The primary objective of this project is to resurface 2.1 miles of residential roads. The project includes parkway improvements, curb ramp upgrades, new sidewalks (as appropriate), and roadway resurfacing.

Various roadways within the Unincorporated Community of East Los Angeles.

Pre-Construction & Construction

05/2017 07/2021

07/2021 07/2022 20-20 51 24

Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Stevenson Ranch - Stevenson Ranch Tract (Phase I)

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 4.0 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, pavement prep-work, and pavement preservation.

Various roadways within the Unincorporated Community of Stevenson Ranch. Construction 08/2020 08/2021 7-7 38 21

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 12 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 30 and end at Road 30 1/2 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 14 2"Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 23 and end at Road 23 1/2 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 17 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at city limit and end 684 feet West Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 18 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 15 and end at Road 16 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 200 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Mountain View Peak Road and end at Road 8082 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 222 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Power House Road and end at Tunoi Pl Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 225 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Rainbow Drive and end at Whiskey Pines Drive Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 23 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 7 1/2 and end at Avenue 8 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 23 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 9 1/2 and end at Avenue 10 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 26 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 21 and end at Avenue 23 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 28 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Ellis Street and end at Harper Blvd. Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 7 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 8 1/2 and end at Road 9 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 7 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Chowchilla Canal Road and end 4,770 ft. east of Chowchilla Canal Construction 10/2020 06/2021 15-25 5 12

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 7 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 20 and end at Road 21 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Self-Loading Patch Trucks This project will include: Procurement of Public Works Equipment Countywide Procurement/Operational Needs 10/2020 06/2021 15-25 5 12

Marin 20/21 New Road Maintenance & Rehabilitation Northern Region Road Resurfacing 2020-2021 This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Rehabilitate roads in the Loma Verde neighborhood: Calle Empinado, Corte Escuela, Corte Norte, Corte Colina, Calle Arboleda, Via Herbosa

Pre-Construction & Construction

07/2020 07/2021

06/2021 11/2021 15-30 2 2

Marin 20/21 New Road Maintenance & Rehabilitation Central Region Road Resurfacing 2020-2021 This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Rehabilitate roads in Central Region: Auburn St, Woodland Ave, Baytree Rd, Circle Rd, Indian Rd, Knoll Way, Oak View Dr, Ranch Road, Red Rock Way

Pre-Construction & Construction

07/2020 06/2021

06/2021 11/2021 15-30 2 2

Marin 20/21 New Road Maintenance & Rehabilitation Sir Francis Drake - Point Reyes Seashore This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing)

Sir Francis Drake Blvd In Point Reyes Seashore Construction 04/2021 12/2021 15-30 2 2

Mariposa 20/21 New Match Funds Replace Darrah Road Bridge This project will include: Bridge Structure Rehab/Repair (Existing) | Roadway Bridge Approaches and Safety Improvements Darrah Road one half mile from the intersection of Darrah and HWY 49 Construction 03/2021 05/2022 20-40 5 8

Mariposa 20/21 New Other Road Equipment Purchase This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment Equipment Use Countywide Procurement/Operational

Needs 11/2020 05/2021 15-20 5 8

Mariposa 20/21 New Safety Roadway Striping Countywide This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Countywide Heavy ADT Roadways Construction 03/2021 07/2021 4-7 5 8

Mariposa 20/21 New Road Maintenance & Rehabilitation Gravel Roadway Maintenance Easterm Region of the County This project will include: Pavement Rehab/Repair (Existing) | Gravel Roadway Grading Eastern Section of County Construction 07/2020 06/2021 4-6 5 8

Mariposa 20/21 New Other Gravel Roadway Maintenance Northern Region of the County This project will include: Pavement Rehab/Repair (Existing) | Gravel Roadway Grading Northern Sector of the County Construction 07/2020 06/2021 4-7 5 8

Mariposa 20/21 New Road Maintenance & Rehabilitation Gravel Roadway Maintenance West Region of the County This project will include: Pavement Rehab/Repair (Existing) | Gravel Roadway Maintenance Western Region of the County Construction 07/2020 06/2021 4-7 5 8

Mariposa 20/21 New Road Maintenance & Rehabilitation Road Shoulder Drainage and Weed Abatement This project will include: Procurement of Public Works Equipment | Roadway Drainade Maintenance and Weed Abatement on County Roads Countywide Procurement/Operational

Needs 07/2020 04/2021 3-5 5 8

Mariposa 20/21 New Safety ROW Tree Hazard Removal This project will include: Procurement of Public Works Equipment | Remove roadside trees that are a safety concern Countywide Procurement/Operational

Needs 07/2020 06/2021 15-20 5 8

Mariposa 20/21 New Road Maintenance & Rehabilitation Upgrade Pavement within the Central Business District 3rs St. to 12th St. This project will include: Pavement Improvement (New) 3rd Street to 12th Street Construction 03/2021 06/2021 15-20 5 8

Mariposa 20/21 New Traffic Control Devices Upgrade Traffic Signage This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Countywide Construction 07/2020 06/2021 8-12 5 8

Mariposa 20/21 New Other Conduct Traffic Studies This project will include: Feasibility Study Countywide Pre-Construction 07/2020 06/2021 4-7 5 8

Mariposa 20/21 New Road Maintenance & Rehabilitation Pavement Maintenance North Sector of the County This project will include: Pavement Rehab/Repair (Existing) Northern Sector of the County Construction 07/2020 06/2021 5-5 5 8

Mariposa 20/21 New Road Maintenance & Rehabilitation Pavement Repair and Maintenance Eastern Region This project will include: Pavement Rehab/Repair (Existing) Eastern region of the County Construction 07/2020 06/2021 5-5 5 8

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Mariposa 20/21 New Road Maintenance & Rehabilitation Pavement Repair and Maintenance West Region This project will include: Pavement Rehab/Repair (Existing) West Region of the County Construction 07/2020 06/2021 5-5 5 8

Mariposa 20/21 New Match Funds Indian Gulch Bridge This project will include: Bicycle Lane (New) Indian Gulch Road at Creek Construction 07/2020 07/2021 20-35 5 8

Mariposa 20/21 New Match Funds Ben Hur Road Rehab This project will include: Pavement Improvement (New) Ben Hur Rd. Post Mile 15.00 - 18.50 Construction 03/2021 06/2021 15-20 5 8

Mendocino 20/21 New Road Maintenance & Rehabilitation 2020 Corrective/Preventative Maintenance Projects This project will include: Pavement Rehab/Repair (Existing)

Flynn Creek Road, CR 135, MP 0.00-8.97; Albion Little River Road, CR 403, MP 0.00-3.19; Comptche Ukiah Road, CR 223, MP 0.00-10.00

Construction 08/2020 09/2020 15-21 2 2

Merced 19/20 Carried Over Road Maintenance & Rehabilitation Rahilly Road Overlay Project, from SR59 to End (FY 19/20 CARRYOVER)

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

On Rahilly Road from SR59 to 3.0 miles west of SR59. Construction 07/2020 06/2021 10-15 21 12

Merced 19/20 Carried Over Match Funds La Grange Road Over Dry Creek Bridge

Replacement Project - Local Match (FY 19/20 CARRYOVER)

This project will include: Bridge Structure Rehab/Repair (Existing) | Local match requirement for FHWA funding. This project involves the replacement of the existing 2-lane bridge on La Grange Road at Dry Creek. The new bridge will provide adequate and safe vehicle access by realigning the north and south approaches and increasing the sight distance. Therefore, meeting current safety design standards and enhancing public safety. This project is 88.53% federally funded with an 11.47% local match requirement.

On La Grange Road approximately 4.0 miles north of the community of Snelling. Construction 07/2020 06/2021 25-50 21 12

Merced 19/20 Carried Over Road Maintenance & Rehabilitation Gurr Road at SR 140 Intersection

Improvements and Overlay (FY 19/20 CARRYOVER)

This project will include: Pavement Rehab/Repair (Existing) | The project consists of widening the turning radius of the southern shoulder of State Route 140 and Gurr Road and resurfacing 0.62 miles of Gurr Road.

Gurr Road from SR 140 to Wardrobe Road. Construction 10/2020 04/2021 10-15 21 12

Merced 19/20 Carried Over Road Maintenance & Rehabilitation Childs Avenue Rehabilitation Project (FY 19/20 CARRYOVER)

This project will include: Pavement Rehab/Repair (Existing) | Full Depth Reclamation (FDR) and Overlay or 4.5-miles of road. Childs Avenue between Tower Road and Plainsburg Road Construction 06/2020 01/2021 15-20 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Misc Roadway Repairs/Overlay Preparation

Work within Unincorporated Areas of the County

This project will include: Project Scope Development, Active Transportation Plan | This project consists of routine pot-hole repairs and thin asphalt overlays within unincorporated areas of Merced County. This project also includes roadway surface and shoulder preparation work for upcoming overlays on various roads.

Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2020 06/2021 1-10 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Roadway Surface Treatments within Unincorporated Areas of the County

This project will include: Project Scope Development, Active Transportation Plan | This project consists of applying pavement preservation asphalt surface treatments to existing roadways. This preventative maintenance project will increase pavement life and improve safety for all traveling motorists.

Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2020 06/2021 1-5 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Install Shoulder Backing within Unincorporated Areas of the County

This project will include: Project Scope Development, Active Transportation Plan | This project consists of maintaining existing road shoulders by replenishing the shoulder material. Therefore, extending the pavement life and improve safety for all traveling motorists.

Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2020 06/2021 1-5 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Bridge Maintenance & Repairs within Unincorporated Areas of the County

This project will include: Project Scope Development, Active Transportation Plan | This project consists of routine maintenance and constructing needed repairs to existing bridges. Therefore, maintaining the safety and integrity of the County’s existing bridge structures and improving safety for all traveling motorists.

Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2020 06/2021 5-10 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Central Avenue Overlay Project This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

Central Avenue from Turner Avenue to County Line. Construction 07/2020 06/2021 10-15 21 12

Merced 20/21 New Road Maintenance & Rehabilitation River Road Overlay Project This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

River Road from Keaton Road to SR165. Construction 07/2020 06/2021 10-15 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Dan Ward Road Overlay Project This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

Dan Ward Road from Franklin Road to Beachwood Drive Construction 07/2020 06/2021 10-15 21 12

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Merced 20/21 New Road Maintenance & Rehabilitation August Avenue Overlay Project This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

August Avenue from Griffith Avenue to Shanks Road Construction 07/2020 06/2021 10-15 21 12

Merced 20/21 New Road Maintenance & Rehabilitation Hinton Avenue Overlay Project This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

Hinton Avenue from August Avenue to Schendel Avenue Construction 07/2020 06/2021 10-15 21 12

Modoc 20/21 New Road Maintenance & Rehabilitation Chip Seal Modoc County Roads 20/21 This project will include: Maintenance Program Plan Development County Roads 99, 102, 108, 120, 122, 135, 154, 176, 176A, 260, 261, 262, 115, 57, 59, 59A, 59B, 56, & 65 Pre-Construction 07/2020 08/2020 7-9 1 1

Mono 19/20 In Progress Road Maintenance & Rehabilitation Long Valley Streets Rehabilitation PS&E and Construction Contingencies

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Long Valley - Including Crowley Lake, Sunny Slopes, and a portion of Swall Meadows

Pre-Construction & Construction

01/2020 05/2021

04/2021 12/2021 10-25 5 8

Mono 19/20 In Progress Road Maintenance & Rehabilitation Twin Lakes Road Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Bridgeport Valley Construction 03/2020 12/2020 5-5 5 8

Mono 19/20 Carried Over Road Maintenance & Rehabilitation Bridge Maintenance Program This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Document Preparation Antelope Valley, Bridgeport, Long Valley, etc. Pre-Construction 07/2020 12/2020 10-10 5 8

Mono 20/21 New Road Maintenance & Rehabilitation Airport Road Rehabilitation PS&E and Construction Contingencies

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation

Airport Road and a portion of Hot Creek Hatchery Road Pre-Construction & Construction

01/2020 05/2021

04/2021 12/2021 25-25 5 8

Mono 20/21 New Road Maintenance & Rehabilitation Rock Creek Road Drainage Repairs This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) Rock Creek Road near the Mono-Inyo County Line Construction 09/2020 11/2020 25-35 5 8

Mono 20/21 New Road Maintenance & Rehabilitation Road Division Crack Sealing and Striping This project will include: Project Scope Development, Preliminary Design, Maintenance Program Plan Development County-wide Pre-Construction 07/2020 06/2021 5-5 5 8

Mono 20/21 New Road Maintenance & Rehabilitation Virginia Lakes Road Maintenance This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation Virginia Lakes Road Pre-Construction 01/2021 06/2021 5-5 5 8

Mono 20/21 New Road Maintenance & Rehabilitation 2021 Pavement Preservation This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation

Rock Creek Rd, Mt Morrison Rd, Convict Lake Rd, Aspen Springs Ranch Rd, Gregory Lane, Larkspur Ln, Shanna Cr, Camp Antelope Rd, Patricia Ln

Pre-Construction 01/2021 06/2021 5-5 5 8

Monterey 18/19 Carried Over Road Maintenance & Rehabilitation Iverson Road, Gloria Road, Johnson Canyon Road

This project will include: Pavement Rehab/Repair (Existing) | Reconstruct/rehabilitate 5 miles of road (Iverson Rd-2.2 mi, Gloria Rd-1.9 mi, Johnson Cyn Rd-0.9 mi).

On Iverson Road, from Gloria Road to Johnson Canyon Road; on Gloria Road, from Tavernettie Road to Iverson Road; & on Johnson Canyon Road, from Iverson Road to SVSWA entrance; near the City of Gonzales.

Construction 07/2020 06/2021 10-20 30 12

Monterey 18/19 Carried Over Road Maintenance & Rehabilitation River Road Route 68 This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate River Road from State Route 68 to Las Palmas Parkway, 2.6 miles of road.

On River Road, From State Route 68 to Las Palmas Parkway, near the City of Salinas. Construction 07/2020 06/2021 10-20 29, 30 12, 17

Monterey 20/21 New Road Maintenance & Rehabilitation River Road Limekiln Rd This project will include: Pavement Rehab/Repair (Existing) | Reconstruct/rehabilitate River Road from Limekiln Road to Gonzales River Road Bridge, 4.6 miles of road.

On River Road, from Limekiln Road to Gonzales River Road Bridge, near the City of Gonzales. Construction 07/2020 06/2021 10-20 30 12, 17

Monterey 18/19 Carried Over Road Maintenance & Rehabilitation Alisal Road This project will include: Pavement Rehab/Repair (Existing) | Project is to rehabilitate Alisal Road near Salinas On Alisal Road, near Salina Appx 700 feet of road Construction 07/2021 06/2022 10-20 30 12

Monterey 20/21 New Road Maintenance & Rehabilitation Street Sweeping

This project will include: Procurement of Road Maintenance and Rehab Materials | Perform street sweeping on County roads at various urbanized locations, totaling approximately 300 miles of sweeping. Sweeping is performed at least twice per year for each location, typically in September and April. (NPDES)

Carmel Communities – Scenic Point, Mission Fields, Mid Valley, Brookdale Carmel Valley Communities – Carmel Village, Carmel Woods, High Meadows, Jacks Peak Highway 68 Communities – Toro Park & Serra Village, Las Palmas, San Benancio, Corral de Tierra, Spreckles Northern County Communities – Castroville, Pajaro, Las Lomas, Prunedale, Bolsa Knolls, Boronda, Moss Landing, Oak Hills, Aromas, Davis Rd & Blanco Rd

Procurement/Operational Needs 09/2020 04/2021 1-1 29, 30 12, 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Monterey 20/21 New Road Maintenance & Rehabilitation Drainage Clearing This project will include: Public Works Staffing | Perform drainage clearing on County roads at various locations to prevent localized flooding during rain/storm events, which could lead to road pavement failure.

County wide at various locations. A partial list of roads is as follows: Carpenteria Rd, Dunbarton Rd, Hall Rd, Las Lomas Dr, Oak Vale Rd, Rodgers Rd, Hartnell Rd, Old Stage Rd, Potter Rd, Potter Rd, Rosehart Way, Rosehart Way, Arroyo Seco Rd, Camphora - Gloria Rd, Camphora Rd, Central Ave South, Chualar Rd, Clark Rd, Colony Rd, Fairview Rd, Foothill Rd, Fort Romie Rd, Gloria Rd, Hobson Ave, Jolon Rd, Lagomarsino Ave, Lewis Creek Rd, Lonoak Rd, Los Coches Rd

Procurement/Operational Needs 07/2020 06/2021 1-1 29, 30 12, 17

Monterey 20/21 New Road Maintenance & Rehabilitation Vegetation Clearing/Removal This project will include: Public Works Staffing | Perform vegetation clearing/removal along County roads at various locations. Vegetation often encroaches onto road right-of-way blocking and hindering motorists' sight distance. This would ensure to keep sight distance clear.

County wide at various locations. A partial list of roads is as follows: Allison Rd, Amaral Rd, Archer Rd, Aromas Rd, Avila Rd, Baumann Rd, Bay Farms Rd, Bay View Rd, Bayhill Rd, Berry Rd, Berta Canyon Rd, Bishop St, Blackie Rd, Blohm Ave, Bluff Rd, Boronda Rd, Brentwood Ct, Calle Del Adobe, Carneros Ct, Carneros Rd, Carpenteria Rd, Castroville Blvd, Chester Dr, Clausen Rd, Coker Rd, Collins Rd, Corey Rd

Procurement/Operational Needs 07/2020 06/2021 1-1 29, 30 12, 17

Monterey 20/21 New Road Maintenance & Rehabilitation Las Lomas Drive This project will include: Storm Drain/Culvert Installation (New) On Las Lomas Drive, from Hall Road to Thomas Road, the community of Las Lomas. Construction 07/2020 06/2021 20-30 29 17

Monterey 20/21 New Road Maintenance & Rehabilitation Countywide Road Striping This project will include: Procurement of Road Maintenance and Rehab Materials

County wide at various locations. A partial list of roads is as follows: 15th Street, 17th Street, Abbott Street, Alvarado Road, Artichoke Road, Associated Lane, Avila Road, Berta Canyon Road, Bradley Road, Bunte Road, Burns Road, Cachuaga Road, Camphora Gloria Road, Canada Drive, Carmel Knolls Drive, Carmel Valley Road, Central Avenue, Cholame Road, Colony Road, Corda Road, Country Club Drive, Cypress Avenue, Del Monte Farms Road, Doud Road, Dunbarton Road, Elkhorn Road, Elm Avenue

Procurement/Operational Needs 03/2021 06/2021 2-5 29, 30 12, 17

Napa 20/21 New Road Maintenance & Rehabilitation Olive Hill Lane Paving This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Olive Hill Lane - Hagen Road to Hagen Road Construction 07/2020 12/2020 20-20 4 3

Napa 20/21 New Road Maintenance & Rehabilitation Mount George Road Paving This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) Mount George Road - Olive Hill Lane to end. Construction 07/2020 12/2020 10-20 4 3

Napa 20/21 New Other Brookside Drive Storm Repair This project will include: Pavement Rehab/Repair (Existing) | Storm damage road repair Brookside Drive at Conn Creek Construction 07/2020 12/2020 10-20 4 3

Napa 20/21 New Road Maintenance & Rehabilitation Countywide striping This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Striping of various county roads

All county roads. The following link reflects project locations in which work will be performed and will be updated by the County as work takes place. https://napacounty.maps.arcgis.com/apps/webappviewer/index.html?id=7 5012d06d08342159b9e9094f1b275a6/

Pre-Construction & Construction

07/2019 07/2020

06/2020 12/2023 10-20 4 3

Napa 18/19 In Progress Road Maintenance & Rehabilitation Traffic Signal and Street Light Installation and Rehabilitation

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade for existing traffic signals and install and repair approximately 10 street lights.

Traffic Signals-Airport Road, Atlas Peak Road, Trancas St. at Silverado Trail. New street lights-Old Sonoma Road/Congress Valley Road

Pre-Construction & Construction

07/2019 07/2020

06/2020 12/2020 15-20 4 3

Napa 18/19 Carried Over Road Maintenance & Rehabilitation Mount Veeder Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Sub grade stabilization and overlays Mount Veeder Road Construction 07/2020 12/2020 20-50 4 3

Napa 18/19 Carried Over Road Maintenance & Rehabilitation Soda Canyon Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Sub grade stabilization and overlays From Loma Vista continuing east 1 mile Construction 07/2020 12/2020 20-50 4 3

Napa 18/19 Carried Over Road Maintenance & Rehabilitation Partrick Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Sub grade stabilization and overlays End of County road continuing East for 1 mile Construction 07/2020 12/2020 20-50 4 3

Napa 18/19 Forecasted Road Maintenance & Rehabilitation Soda Canyon Road Paving This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Pavement overlay Silverado Trail to Loma Vista Construction 07/2021 12/2022 20-20 4 3

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Napa 18/19 Forecasted Road Maintenance & Rehabilitation Berryessa Highlands This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Rebuild, Overlay, seal, as required

Arroyo Grande Drive, Arroyo Lindo Court, Bahia Vista Court, Black Oak Lane, Blue Cove Drive, Cape Cod Court, Carlson Way, Clearwater Court, Eastridge Drive, Headlands Drive, Jasmine Court, Kona Court, Manzanita Lane, Neptune Court, Nile Court, Noah Court, Overland Drive,Parkview Lane, Poppy Lane,Redrock Drive, Rimrock Drive, Steele Canyon Road, WestridgeDrive, Woodhaven Court

Construction 07/2023 12/2023 20-20 4 3

Napa 18/19 Forecasted Road Maintenance & Rehabilitation Berryessa Estates This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Seals

Bridle Street, Colt Court, DeputyDrive, Harness Drive, Lariat Street, Mustang Court, Pony Court, Sage Court, Spur Court, Spur Street, Stagecoach Canyon Road, Stallion Court, Wagon Wheel Drive, Wagon Wheel Court

Construction 07/2023 12/2023 10-10 4 3

Napa 18/19 Forecasted Road Maintenance & Rehabilitation Silverado Trail Phase K This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Prep work for Pavement Overlay Oak Knoll Avenue to Yountville Crossroad Construction 07/2021 12/2021 20-20 4 3

Napa 18/19 In Progress Road Maintenance & Rehabilitation Zinfandel Lane Overlays

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Document Preparation, Active Transportation Plan | Pavement Overlay

Zinfandel Lane-State Highway 29 to Silverado Trail Pre-Construction & Construction

07/2019 07/2020

06/2020 12/2020 20-25 4 3

Napa 18/19 Forecasted Road Maintenance & Rehabilitation Buhman Road Bridge This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Bicycle Lane (New) | Bridge Replacement

Buhman Avenue at Congress Valley Road Pre-Construction & Construction

07/2020 07/2021

06/2021 12/2021 40-40 4 3

Napa 18/19 Forecasted Other Mt. Veeder Road Bridge

This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Bicycle Lane (New) | Bridge Repair

Mt. Veeder Road, Mile Post Marker 2.13 Pre-Construction & Construction

06/2020 09/2020

09/2020 12/2020 40-75 4 3

Nevada 20/21 New Road Maintenance & Rehabilitation 2020 Microsurface and Pavement Rehabilitation Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Project Scope Development, Preliminary Design, Document Preparation

lower Colfax rd, willow Valley Rd, Quaker Hill rd, Tammy Way, Alexandra Way, Alta Sierra Way, Karen Dr, Barde Ct, Curtis Ct, ernest Ct, Jon Eric ct, Michael Way, Sean Way, Tony Ct,

Pre-Construction & Construction

05/2020 05/2020

10/2020 10/2020 3-15 1 1

Nevada 20/21 New Road Maintenance & Rehabilitation 2020 Brushing, Shoulder General Maintenace Project

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Improvement (New)

various locations, not limited to lower Colfax Way, willow Valley Rd, Quaker Hill Rd, Tammy way, Alexandra Way, Alta Sierra Dr, Karen Dr, Barde Ct, Curtis Ct, Ernst Ct, Jon Eric Ct, Michael Way, Sean Way, Tony Ct.

Pre-Construction & Construction

05/2020 07/2020

11/2020 12/2020 3-15 1 1

Orange 19/20 In Progress Road Maintenance & Rehabilitation Annual Road Maintenance - Rossmoor

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, Microsurfacing, traffic striping, pavement marking and related minor construction

Various streets within Rossmoor South of Katella Avenue, East of 605 Freeway, North of 405 Freeway and West of Los Alamitos Blvd

Pre-Construction & Construction

04/2020 07/2020

05/2020 12/2021 7-10 72 34

Orange 19/20 In Progress Road Maintenance & Rehabilitation Annual Road Maintenance Anaheim Island This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

Various Streets North of Ball Road, East of Gilbert Street, South of Broadway and West of Brookhurst Street

Pre-Construction & Construction

04/2020 08/2020

05/2020 12/2021 7-10 65 29

Orange 19/20 In Progress Road Maintenance & Rehabilitation Annual Road Maintenance Northwest Tustin This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

Hewes Avenue from 17th Street to Foothill Blvd, Dodge Avenue from Hewes Avenue to Newport Avenue and various Streets South of Dodge Avenue

Pre-Construction & Construction

06/2020 09/2020

07/2020 12/2021 7-10 68 37

Orange 20/21 New Road Maintenance & Rehabilitation Annual Road Maintenance East Tustin This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The project consists of performing remedial repairs of AC & PCC, grind and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

Various streets within East Tustin; East of Newport Avenue, South of Skyline Drive, North of Bryan Avenue and West of Tustin Ranch Road

Pre-Construction & Construction

07/2020 10/2020

08/2020 12/2021 7-10 68 37

Orange 20/21 New Road Maintenance & Rehabilitation Annual Road Maintenance Ladera Ranch This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The project consists of remedial repairs of AC & PCC, grind and overlay, traffic striping, pavement marking and related minor construction.

Along Sienna Parkway and O'Neill Drive in Ladera Ranch Pre-Construction & Construction

02/2020 06/2020

04/2020 12/2021 7-10 73 36

Orange 20/21 New Road Maintenance & Rehabilitation Bridge Maintenance–Arroyo Trabuco Creek ( 55C0606 & 55C0637)

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of performing remedial repairs to utility opening in soffit, corrosion repair in girders, plug utility drainage leak, and related minor construction

Oso Parkway Bridge (# 55C0606); Crown Valley Bridge (# 55C0637)

Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 10-15 73 36

Orange 20/21 New Road Maintenance & Rehabilitation Bridge Maintenance– Santiago Canyon Road (55C0049)

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of performing bridge deck treatment and related minor construction. Santiago Canyon Road Bridge over Santiago Creek Pre-Construction &

Construction 07/2020 01/2021

12/2020 06/2021 7-10 68, 73 36, 37

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Orange 20/21 New Road Maintenance & Rehabilitation Bridge Maintenance- Island Way (55C0561) This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of performing remedial repairs of slope pavement under abutment, railings, and related minor construction.

Island Way Bridge over Dana Point Harbor Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 7-10 73 36

Orange 20/21 New Road Maintenance & Rehabilitation Bridge Maintenance- Hamilton-Victoria (55C0103)

This project will include: Bridge Structure Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of performing remedial repairs of sidewalk at bridge approach, and related minor construction.

Hamilton-Victoria Bridge over Santa Ana River Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 7-10 74 37

Orange 18/19 In Progress Road Maintenance & Rehabilitation Trabuco Creek Road Stabilization (Design Phase)

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design, Document Preparation | The project will reconstruct approximately 2.8 miles of existing dirt road with environmentally friendly geofabric material, previous base material, and construct roadway drainage to facilitate emergency vehicle access.

Along Trabuco Creek Road at Trabuco Canyon Road to Cleveland National Forest Pre-Construction 07/2019 12/2022 5-10 73 36

Orange 20/21 New Safety Modjeska Grade Road, Road and Drainage Improvements (Design Phase)

This project will include: Preliminary Design | The project will provide a proper drainage system, a structurally sound pavement and stabilized slope.

From Santiago Canyon Road and Modjeska Grade Road intersection to 100 feet south of Markuson Road and Modjeska Canyon Road intersection.

Pre-Construction 01/2020 06/2025 25-25 73 36

Orange 18/19 In Progress Safety Gilbert Street Improvements - Phase II

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design, Document Preparation | The project consists of installing traffic signal equipment, upgrading railroad appurtenances, and constructing ADA accessible curb ramps and refuge area.

Along Gilbert Street at Pacific Place Union Pacific Railroad (UPRR) Crossing in the Cities of Anaheim and Stanton Pre-Construction 01/2018 06/2023 20-20 65 29

Orange 19/20 In Progress Safety ADA (Americans with Disabilities Act) Upgrades (Annual)-Anaheim Island

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of curb ramp, sidewalk, driveway upgrades and improvements to satisfy current ADA standards and requirements.

Various streets within the unincorporated Anaheim island Construction 08/2019 06/2021 25-25 65 29

Orange 20/21 New Safety ADA (Americans with Disabilities Act) Upgrade (Annual)-Midway City

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of curb ramp, sidewalk, and driveway upgrades and improvements to satisfy current ADA standards and requirements.

Various streets within unincorporated portions of Midway City Pre-Construction & Construction

02/2020 12/2020

10/2020 06/2021 20-20 72 34

Orange 20/21 New Safety Sidewalk Gap Closure - Kellogg Drive (Design & Construction Phases)

This project will include: Project Scope Development, Right of Way, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | provides accessibility for all people while satisfying current ADA standards and requirements

Kellogg Drive between McCarthy Lane and Old Ranch Road Pre-Construction & Construction

02/2020 12/2020

10/2020 06/2021 25-25 55 29

Orange 19/20 In Progress Safety Crawford Canyon Road Sidewalk Extension (Design Phase)

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design, Document Preparation | The project consists of extending sidewalk along Crawford Canyon Road to enhance pedestrian safety and access by addressing the gap in connectivity. The project also includes upgrades to the existing traffic signal system at the Newport Avenue intersection.

Along Crawford Canyon Road from Willis Lane to Newport Avenue; Newport Avenue from Hyde Park to 750 feet east of Crawford Canyon Road

Pre-Construction 07/2019 12/2023 25-25 68 37

Orange 18/19 In Progress Safety Olive Heights Sidewalk Gap Closure (Design and Construction Phase)

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project work consists of removing and reconstructing pavement within the roadway, construct 4 feet ADA sidewalk, driveways, and curb ramps, upgrade signs, and small retaining walls, along 3000 feet of roads.

Various streets with the Olive Heights area in City of Anaheim (Orange Olive Road, Buena Vista St, Olive Avenue, Palm Ave, Orange Ave, View Ave)

Pre-Construction & Construction

07/2019 10/2020

10/2020 06/2021 10-10 68 37

Orange 20/21 New Traffic Control Devices Traffic Management Center Fiber Optic Expansion (2020-2021)

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | The project consists of expanding the fiber optics network components to provide real- time data in order to improve transportation safety and mobility.

Various street segments along Oso Parkway and Los Patrones Parkway Pre-Construction 02/2020 06/2020 20-20 73 36

Orange 20/21 New Traffic Control Devices Traffic Signal Upgrades (Annual) – 17th St at Esplanade Ave.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project consists of upgrading the existing traffic signal system by replacing aged, damaged, and/or obsolete equipment with new equipment.

Intersection of 17th Street and Esplanade Avenue. Construction 02/2020 06/2020 20-20 68 37

Orange 19/20 In Progress Traffic Control Devices Traffic Signal Upgrades (Annual) – Newport Avenue at La Loma Drive

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project consists of upgrading the existing traffic signal system to current state standards by replacing aged, damaged, and/or obsolete equipment with new equipment.

Intersection of Newport Avenue at La Loma Drive in the county unincorporated area of North Tustin Construction 02/2020 06/2020 20-20 68 37

Orange 19/20 In Progress Traffic Control Devices Traffic Signal Upgrades (Annual) – Newport Avenue at La Colina Drive

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project consists of upgrading the existing traffic signal system to current state standards by replacing aged, damaged, and/or obsolete equipment with new equipment.

Intersection of Newport Avenue at La Colina Drive in the county unincorporated area of North Tustin Construction 02/2020 06/2020 20-20 68 37

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Orange 19/20 In Progress Traffic Control Devices Traffic Signal Upgrades (Annual) – Newport Avenue at Cowan Heights Drive/Rockhurst

Avenue

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project consists of upgrading the existing traffic signal system to current state standards by replacing aged, damaged, and/or obsolete equipment with new equipment.

Intersection of Newport Avenue at Cowan Heights Drive/Rockhurst Avenue in unincorporated North Tustin Construction 02/2020 06/2020 20-20 68 37

Orange 20/21 New Traffic Control Devices Traffic Signal Upgrade- Newland St at Hazard Ave (Design & Construction)

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The project consists of upgrading the existing traffic signal system by replacing aged, damaged, or obsolete equipment with new equipment, and modifying the signal phasing.

Intersection of Newland Street and Hazard Avenue Pre-Construction & Construction

02/2020 12/2020

12/2020 06/2021 20-20 72 34

Orange 18/19 In Progress Complete Streets Components Laguna Canyon Road - Segment 4, Phases II to IV

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Project Scope Development, Right of Way, Feasibility Study, Pavement Improvement (New), Preliminary Design, Bicycle Lane (New), Document Preparation | The project will widen shoulders to facilitate a 3500 feet Class II bike lane and undergrounding Southern California Edison power poles. Combined project with Caltrans includes construction of drainage culvert, roadway widening, and restriping and mitigation.

El Toro Road to SR-73 Pre-Construction & Construction

07/2019 12/2020

11/2020 06/2023 25-25 74 37

Orange 18/19 In Progress Complete Streets Components Collins Avenue and Eckhoff Street Cul-De-Sac Improvements

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of building out the cul- de-sacs along approximately 650 LF of streets following a cell tower relocation. Work consists of removal and replace asphalt concrete, replace fencing and gate, curb and gutter, ADA improvements, and replacement of driveways.

Collins Avenue cul-de-sac to the intersection at Eckhoff Street, and Eckhoff Street cul-de-sac to the intersection of Collins Avenue, within the City of Orange

Construction 12/2019 12/2021 15-15 68 37

Orange 18/19 In Progress Complete Streets Components Santa Ana Avenue and University Drive Drainage & Pavement Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Project name changed from Santa Ana Avenue Storm Drain Improvements and Pocket Park | The project consists of reconstructing storm drain catch basin to accommodate ADA access ramps, reconstructing pavement and constructing a neighborhood park facility to treat roadway runoff.

Southeast corner of Santa Ana Avenue and University Drive; and University Drive from Santa Ana Avenue to Willo Lane, within the City of Costa Mesa and unincorporated County

Construction 10/2019 12/2021 50-50 74 37

Orange 19/20 In Progress Complete Streets Components City of Anaheim - Brookhurst Street Road and Sidewalk Improvements

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Bicycle Lane (New) | The project consists of constructing an additional southbound lane to improve traffic flow, as well as construction of a bike lane and sidewalk improvements

Brookhurst Street from Cerritos Avenue to Ball Road Construction 07/2020 06/2021 25-25 65 29

Orange 20/21 New Safety Barrett Lane Drainage Improvements (Pre-Design)

This project will include: Preliminary Design | The project consists of installing a storm drain system and constructing sidewalk improvements. Along Circula Panorama, Fairhaven Extension and Barrett Lane Pre-Construction 02/2020 06/2023 25-25 68 37

Orange 20/21 New Safety Trabuco Canyon Bridge (55C0008) Replacement (Design Phase)

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | The project consists of replacing the existing bridge with a new bridge of adequate lane width which will also address overtopping during storm events

On Trabuco Canyon Road over Trabuco Creek Channel (L02) Pre-Construction 07/2020 06/2024 50-75 73 36

Orange 20/21 New Safety Guardrail Project This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The project consists of upgrading damaged, substandard, and missing guardrails along various streets

Along various streets within North Tustin area of unincorporated Orange County Pre-Construction 07/2020 06/2021 10-20 68 37

Orange 20/21 New Safety Antonio Parkway Gateway Improvements This project will include: Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The project consists of constructing a raised median to enhance traffic safety along the corridor.

1,500 feet along Antonio Parkway from the end of City of Rancho Santa Margarita boundary

Pre-Construction & Construction

07/2020 02/2021

01/2021 06/2023 20-20 73 36

Orange 18/19 In Progress Other Brea Blvd, Bridge Replacement and Corridor Enhancement Project

This project will include: Storm Drain/Culvert Installation (New), Environmental Study/Documents, Right of Way Acquisition, Project Scope Development, Right of Way, Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | Project Name changed from Brea Blvd/Brea Canyon Road Widening Project - Phase 1 | The project consists of removal and reconstruction of 3 new bridges, construction of retaining walls, roadway and intersection grading, and utility relocations.

Canyondale Drive to Orange County / Los Angeles County Boundary Limit

Pre-Construction & Construction

08/2017 01/2021

01/2021 06/2024 20-25 55 29

Orange 19/20 In Progress Other Peters Canyon Bikeway Extension (Design Phase)

This project will include: Environmental Study/Documents, Right of Way, Project Scope Development, Preliminary Design, Document Preparation | The project consists of 3.1 miles of class I and class II bikeways

Along Jamboree Road from Canyon View Avenue to Pioneer Road; and along Pioneer Road from Jamboree Road to Pioneer Way

Pre-Construction 07/2019 06/2024 25-25 68 37

Orange 19/20 In Progress Other OC Loop Segment D Carbon Canyon Creek Bikeway (Design Phase)

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Feasibility Study, Preliminary Design, Document Preparation | The project consists of .67 miles long class I (off-road) bikeway.

Bastanchury Road to Imperial Avenue Pre-Construction 07/2019 06/2024 25-25 55 29

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Orange 19/20 In Progress Other OC Loop Segment O Coyote Creek Bikeway (Design Phase)

This project will include: Environmental Study/Documents, Right of Way, Project Scope Development, Feasibility Study, Preliminary Design, Document Preparation | The project consists of 1.1 miles long class I (off-road) paved bikeway.

North Fork Trail to Artesia Boulevard Pre-Construction 07/2019 06/2025 25-25 58, 65 32

Orange 19/20 In Progress Other OC Loop Segment P Coyote Creek Bikeway (Design Phase)

This project will include: Environmental Study/Documents, Project Scope Development, Feasibility Study, Preliminary Design, Document Preparation | The project consists of .6 miles long class I (off-road) paved bikeway

Artesia Boulevard to Knott Avenue Pre-Construction 07/2019 06/2026 25-25 57, 65 32

Orange 19/20 In Progress Other OC Loop Segment Q Coyote Creek Bikeway (Design Phase)

This project will include: Environmental Study/Documents, Right of Way, Project Scope Development, Feasibility Study, Preliminary Design, Document Preparation | The project consists of 1 miles long class I (off-road) paved bikeway

Knott Avenue to La Mirada Boulevard Pre-Construction 07/2019 06/2027 25-25 57, 65 32

Orange 18/19 In Progress Complete Streets Components Coast Highway Bikeway and Pedestrian Bridge at Capistrano Beach

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | Project name changed from Surfside Inn Pedestrian Overcrossing Phase II, Over Metrolink Railroad Tracks (Design Phase) | The project consists of retrofitting the bridge per Caltrans seismic standards

Over Metrolink railroad tracks Pre-Construction 01/2019 06/2022 50-75 73 36

Placer 20/21 New Road Maintenance & Rehabilitation HMA Overlay/Slurry Seal 2020 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Totaling in approximately 75 miles of various County roads within the following areas: Tahoe West Shore, Meadow Vista, Colfax, Penryn, Foresthill, Auburn, Granite Bay, Newcastle.

Construction 10/2020 08/2021 7-25 1, 5, 6 1, 4

Placer 20/21 New Road Maintenance & Rehabilitation Chip Seal - Western Placer County This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Penryn, Newcastle, Auburn, Foresthill, Meadow Vista, Colfax, Alta/Dutch Flat Construction 07/2020 08/2021 7-10 1, 5, 6 1, 4

Placer 20/21 New Road Maintenance & Rehabilitation Purchase of Aggregate/Asphalt Material for miscellaneous repairs This project will include: Procurement of Road Maintenance and Rehab Materials

Various locations throughout the County pending road review. Materials will be used for pothole patching and repair of surface pavement rideability.

Procurement/Operational Needs 07/2020 06/2021 2-7 1, 5, 6 1, 4

Placer 20/21 New Road Maintenance & Rehabilitation Alta Forestry Road Slide Repair This project will include: Cut Slope Rehab/Repair to protect roadway (Existing). Alta Forestry Road, Alta Construction 07/2020 11/2020 20-50 1 1

Placer 20/21 New Road Maintenance & Rehabilitation Rollins Lake Road Slide Repair This project will include: Cut Slope Rehab/Repair to protect roadway (Existing). Rollins Lake Road, Colfax Construction 07/2020 11/2020 20-50 1 1

Placer 20/21 New Road Maintenance & Rehabilitation Miscellaneous Concrete/ADA Curb Repair Purchase Order This project will include: Project Scope Development Various locations - Auburn area subdivisions, Granite Bay subdivisions,

and West Roseville area subdivisions if needed Pre-Construction 07/2020 05/2021 30-50 1, 5, 6 1, 4

Placer 20/21 New Road Maintenance & Rehabilitation Tree Trimming/Vegetation Management Purchase Order This project will include: Project Scope Development

Various locations - Foresthill Road corridor to Robinson Flat, roads adjacent to the I-80 corridor from Meadow Vista to Donner Lake, English Colony Road

Pre-Construction 07/2020 05/2021 5-7 1, 6 1, 4

Placer 19/20 In Progress Road Maintenance & Rehabilitation HMA Overlay / Slurry Seal 2019 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

Locations:Tahoe West Shore, Meadow Vista, Colfax, Penryn, Foresthill, Auburn, Granite Bay, Lincoln, Sheridan. HMA Overlay-Tahoe West Shore and Kings Beach, Todd Valley/Foresthill, Meadow Vista, Lincoln, Sheridan Slurry Seal - Granite Bay subdivisions: Treelakes, Greyhawk, Douglas Ranch, Grosvenor Downs, Hidden Lakes, Lakeland, Wood Bridge Ranch; Subdivision roads in Auburn, Penryn and Foresthill: Lomida, The Vineyard, New Airport Rd, Trailhead, Blackhawk, Monte Verde, Walter's Way.

Construction 04/2020 08/2020 7-25 1, 6 1, 4

Placer 19/20 Carried Over Road Maintenance & Rehabilitation Auburn Ravine/Foresthill Road Overpass Surface Repairs and Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Auburn Ravine/Foresthill Road overpass Construction 06/2020 10/2020 25-50 1 1

Placer 19/20 Carried Over Road Maintenance & Rehabilitation 36" Culvert Lining This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Greenstone Ct, Auburn, CA Construction 06/2020 08/2020 30-35 1 1

Plumas 18/19 In Progress Complete Streets Components Greenville Streets Pavement Rehabilitation This project will include: Curb, Gutter & Sidewalk Repairs - in conjunction with a pavement repair project. Grand Street, Jessie Street, Bush Street Construction 07/2020 06/2021 15-25 1 1

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Plumas 20/21 New Road Maintenance & Rehabilitation RMRA FY20-21 Pavement Treatments This project will include: Pavement Rehab/Repair (Existing)

Lake Davis Road, 6.5 miles, Grizzly Road, 1.3 Miles, Bush Street in Greenville, All Hamilton Branch Subdivision Streets, 3.2 miles, Lake Almanor Dr., 0.7 miles, Peninsula Dr., 0.25 miles, all Valley Ranch Subdivision Sts., 2.7 miles, County Route A15, 1.2 miles.

Pre-Construction & Construction

05/2020 07/2020

06/2020 09/2021 7-15 1 1

Plumas 20/21 New Road Maintenance & Rehabilitation RMRA FY20-21 Maintenance and Operations This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing Countywide Procurement/Operational

Needs 07/2020 09/2021 1-5 1 1

Plumas 20/21 New Other RMRA FY20-21 Equipment Acquisition for CARB Compliance This project will include: Procurement of Public Works Equipment Countywide Procurement/Operational

Needs 07/2020 09/2021 25-25 1 1

Plumas 18/19 In Progress Road Maintenance & Rehabilitation Blairsden-Graeagle Road Bridge Replacement -Final Design Phase

This project will include: Bridge Replacement over the Middle Fork of the Feather River - Final Design Phase | The consultant team has been selected and the contract for the final design phase is scheduled to go to the Board of Supervisors for approval in Late October or early November 2018.

Blairsden-Graeagle Road Bridge, Br. No. 9C-0134, over the MFFR near Blairsden Pre-Construction 07/2020 12/2020 50-50 1 1

Riverside 20/21 New Road Maintenance & Rehabilitation Akley St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Gillette St to Deeble Entrance Pre-Construction & Construction

05/2020 06/2020

06/2020 07/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Anthony Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Adelfa St to Landerville Blvd Pre-Construction & Construction

05/2020 07/2020

06/2020 08/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Bodkin Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Brand St to Landerville Blvd Pre-Construction & Construction

05/2020 07/2020

06/2020 08/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Brand St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Landerville Blvd to Anthony Ave Pre-Construction & Construction

06/2020 08/2020

07/2020 09/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Buena Vista St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Grand Ave to S'ly .15mi Pre-Construction & Construction

06/2020 08/2020

07/2020 09/2020 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Coleman Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Gilette St to Adelfa St Pre-Construction & Construction

07/2020 09/2020

08/2020 10/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Cottrell Blvd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Adelfa St to Blackwell Blvd Pre-Construction & Construction

07/2020 09/2020

08/2020 10/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Deprad St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Marshall St to Cowie St Pre-Construction & Construction

07/2020 09/2020

08/2020 10/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Deprad St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Cowie St to Cox St Pre-Construction & Construction

08/2020 10/2020

09/2020 11/2020 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Deprad St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Cox St to E'ly .13mi Pre-Construction & Construction

09/2020 11/2020

10/2020 12/2020 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Encina Dr This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Naranjo St to Short St Pre-Construction & Construction

09/2020 11/2020

10/2020 12/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Gilette St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Coleman Ave to Akley St Pre-Construction & Construction

10/2020 12/2020

11/2020 01/2021 12-15 60 31

Riverside 20/21 New Road Maintenance & Rehabilitation Haynes Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Brand St to Landerville Blvd Pre-Construction & Construction

10/2020 12/2020

11/2020 01/2021 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Landerville Blvd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Brand St to Cotterell Blvd Pre-Construction & Construction

11/2020 01/2021

12/2020 02/2021 12-15 67 28

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Riverside 20/21 New Road Maintenance & Rehabilitation Grand Ave This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Plumas St to Patrick Ct Pre-Construction & Construction

07/2020 03/2021

09/2020 07/2021 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Mockingbird Cyn Rd This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Resurface Road

Markham St to Van Buren Blvd Pre-Construction & Construction

11/2020 09/2021

03/2021 12/2021 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Peeler Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Adelfa St to Landerville Blvd Pre-Construction & Construction

11/2020 01/2021

12/2020 02/2021 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Ranspot Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Landerville Blvd to Adelfa St Pre-Construction & Construction

12/2020 02/2021

01/2021 03/2021 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Short St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Encina Dr to Brand St Pre-Construction & Construction

12/2020 02/2021

01/2021 03/2021 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Van Buren Blvd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Repair Settlement RR Bridge near I-215 Pre-Construction &

Construction 08/2019 12/2020

05/2020 03/2021 7-10 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Van Buren Blvd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

.10 mi NW Pine Ct to Capella St Pre-Construction & Construction

11/2020 09/2021

03/2021 12/2021 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Zellar St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Akley St to S'ly .30 mi Pre-Construction & Construction

01/2021 03/2021

02/2021 04/2021 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation Center St/ Stephens Ave

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New) | Resurface Road

I-215 to W'ly Versailles Pl Pre-Construction & Construction

04/2020 09/2020

12/2020 03/2021 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Evelyn St This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Katy Way to .05 mi S'ly El Cerrito Rd Pre-Construction & Construction

04/2020 08/2020

05/2020 11/2020 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Frances St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road Katy Way to El Cerrito Rd Pre-Construction &

Construction 02/2020 08/2020

05/2020 11/2020 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Grand View Dr This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Resurface Road Katy Way to Marilyn Dr Pre-Construction &

Construction 02/2020 08/2020

05/2020 11/2020 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Grant St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Resurface Road Temescal Cyn Rd to SW'ly .30 mi Pre-Construction &

Construction 02/2020 08/2020

05/2020 11/2020 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Katy Way This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road El Cerrito Rd to S'ly Frances St .08 mi Pre-Construction &

Construction 02/2020 08/2020

05/2020 11/2020 15-20 60 31

Riverside 20/21 New Road Maintenance & Rehabilitation Marilyn Dr This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road El Cerrito Rd to Grant St Pre-Construction &

Construction 02/2020 08/2020

05/2020 11/2020 15-20 60 31

Riverside 20/21 New Road Maintenance & Rehabilitation Rainbow Cyn Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconstruct Road Frontage Rd to N'ly .98 mi Pre-Construction &

Construction 08/2019 01/2021

06/2020 09/2021 12-15 75 28

Riverside 20/21 New Road Maintenance & Rehabilitation Chicago Ave This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Palm Ave to Cedar Ave Pre-Construction & Construction

08/2019 08/2020

05/2020 11/2020 15-20 61 31

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Johnston Ave

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

San Jacinto St. to E'ly Stanford .12 mi Pre-Construction & Construction

05/2019 11/2020

02/2020 08/2021 15-20 67 23

Riverside 20/21 New Road Maintenance & Rehabilitation Allen Ave This project will include: Resurface Road Olson Ave to White Ave Pre-Construction & Construction

01/2021 03/2021

02/2021 04/2021 12-15 67 23

Riverside 20/21 New Road Maintenance & Rehabilitation Bohlen Rd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Mitchell Rd to N'ly .16 mi Pre-Construction & Construction

02/2020 04/2020

03/2020 07/2020 12-15 71 28

Riverside 20/21 New Road Maintenance & Rehabilitation Lloyd St This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Fairview Ave to E'ly .10 mi Pre-Construction &

Construction 01/2019 08/2020

05/2020 11/2020 15-20 71 23

Riverside 20/21 New Road Maintenance & Rehabilitation Pala Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Resurface Road S'ly Pechanga Rd .07 mi to SD Co. Line Pre-Construction &

Construction 05/2020 01/2021

06/2020 03/2021 15-20 75 28

Riverside 20/21 New Road Maintenance & Rehabilitation Ramona Expy

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface road

W'ly Warren Rd .55 mi to E'ly .65 mi Pre-Construction & Construction

01/2020 11/2020

05/2020 02/2021 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation Rancho California Rd This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Roundabout Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconstruct Roundabout

Anza Rd Pre-Construction & Construction

01/2020 01/2021

05/2020 09/2021 15-20 75 28

Riverside 20/21 New Road Maintenance & Rehabilitation Soboba St This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Stetson Ave to SR 74 Pre-Construction & Construction

08/2019 05/2021

05/2020 08/2021 12-15 71 28

Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Stetson Ave

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Santa Fe St to Hemet St Pre-Construction & Construction

06/2019 11/2020

01/2020 08/2021 15-20 67 23

Riverside 20/21 New Road Maintenance & Rehabilitation Thomas St This project will include: Resurface Road Fairview Ave to E'ly .10 mi Pre-Construction & Construction

01/2019 08/2020

05/2020 03/2021 15-20 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation 52nd Ave This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Jackson St to Van Buren St Pre-Construction & Construction

09/2019 03/2021

05/2020 10/2021 15-20 60 31

Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Bubbling Wells Rd

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Dillion to Camino Campanero Pre-Construction & Construction

07/2014 03/2021

05/2020 07/2021 15-20 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation Camino Aventura This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Resurface Road

Bubbling Wells to E'ly .25 mi Pre-Construction & Construction

06/2020 03/2021

07/2020 07/2021 15-20 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation 11th Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Neighbours Blvd to Arrowhead Blvd Pre-Construction & Construction

05/2020 07/2020

06/2020 05/2021 10-10 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation 14th Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Stephenson Blvd to SH 78 Pre-Construction & Construction

03/2021 05/2021

04/2021 06/2021 10-12 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation 59th Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct Road Polk St to Fillmore St Pre-Construction &

Construction 04/2020 06/2020

05/2020 03/2021 12-15 56 28

Riverside 20/21 New Road Maintenance & Rehabilitation Calhoun St This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct Road 54th Ave to 52nd Ave Pre-Construction &

Construction 11/2018 03/2021

05/2020 10/2021 15-20 42 28

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Riverside 20/21 New Road Maintenance & Rehabilitation Keim Blvd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road 20th Ave to 18th Ave Pre-Construction & Construction

01/2021 03/2021

02/2021 04/2021 10-12 56 28

Riverside 20/21 New Road Maintenance & Rehabilitation Lemon Blossom Ln This project will include: Pavement Rehab/Repair (Existing) | Resurface Road 66th Ave to 68th Ave Pre-Construction & Construction

02/2020 04/2020

03/2020 02/2021 10-12 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation Hobson Way This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

.24 mi W'ly De Frain Blvd to E'ly .50 mi Pre-Construction & Construction

08/2019 08/2020

05/2020 11/2020 12-15 56 28

Riverside 20/21 New Road Maintenance & Rehabilitation North Shore Area Resurfacing Group This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road

Various roads in Riverside county 4th District Map:https://rctlma.org/Portals/0/districts/content/documents/district4_Jun e2017.pdf

Pre-Construction & Construction

08/2019 03/2021

05/2020 10/2021 12-15 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation Ramon Rd This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Varner Rd to Monterey Ave Pre-Construction & Construction

01/2020 05/2021

05/2020 07/2021 12-15 42 28

Riverside 18/19 Carried Over Road Maintenance & Rehabilitation Thousand Palms Cyn Rd This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Ramon Rd to Dillion Rd Pre-Construction &

Construction 07/2020 02/2021

10/2020 07/2021 12-15 56 28

Riverside 20/21 New Road Maintenance & Rehabilitation Varner Rd

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

38th Ave to Berkey Dr Pre-Construction & Construction

01/2020 03/2021

05/2020 10/2021 12-15 42 28

Riverside 20/21 New Road Maintenance & Rehabilitation Varner Rd

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

Monterey Ave to .13 mi SE'ly Boca Chica Trl Pre-Construction & Construction

09/2019 03/2021

05/2020 09/2021 12-15 42 28

Riverside 18/19 Carried Over Road Maintenance & Rehabilitation Ramona Expy

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface road

Rider St to E'ly 5th St .10 mi Pre-Construction & Construction

03/2020 11/2020

07/2020 02/2021 15-20 42, 61, 67 23, 31

Riverside 20/21 New Road Maintenance & Rehabilitation Jonathan Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface road | Pavement Rehab/Repair (Existing) Brookside Ave to N'ly 1.12 mi Pre-Construction &

Construction 12/2019 02/2020

01/2020 05/2021 12-15 42 23

Riverside 20/21 New Road Maintenance & Rehabilitation San Timoteo Cyn Rd

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Install Traffic Signal

Live Oak Cyn Rd Pre-Construction & Construction

08/2008 01/2021

05/2020 06/2023 12-15 61 31

Riverside 20/21 New Road Maintenance & Rehabilitation 1st District Slurry Seal This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Slurry Seal, Paving and/or Striping Rehab/Repair (Existing Safety)

Various Roads in 1st District Map: https://rctlma.org/Portals

Pre-Construction & Construction

12/2019 12/2020

05/2020 07/2021 5-7 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation 1st District Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal Various Roads in 1st District Map: https://rctlma.org/Portals

Pre-Construction & Construction

06/2020 08/2020

07/2020 09/2020 12-15 67 28

Riverside 20/21 New Road Maintenance & Rehabilitation 3rd District Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal Various Roads in 3rd District Map: https://www.rctlma.org

Pre-Construction & Construction

05/2020 07/2020

06/2020 08/2020 5-7 42, 67, 75 23, 28

Riverside 20/21 New Road Maintenance & Rehabilitation 4th District Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal Various Roads in 4th District Map:https://rctlma.org/Portals/0/districts/content/documents/district4_Jun e2017.pdf

Pre-Construction & Construction

07/2020 09/2020

08/2020 04/2021 5-7 42, 56 28

Riverside 20/21 New Road Maintenance & Rehabilitation Culvert Rehab I This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Reconstruct Culverts

Various Roads in 1st District Map: https://rctlma.org/Portals

Pre-Construction & Construction

09/2019 07/2020

02/2020 06/2021 15-20 67 28

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Sacramento 18/19 In Progress Road Maintenance & Rehabilitation Pavement Maintenance and Rehabilitation Force Account 2019

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating | Pavement Maintenance and Rehabilitation Repair and rehabilitate failed areas of pavement on arterial, residential and rural roadways, including: removal and replacement of failed pavement and base material, pothole repair, patching, crack sealing, pavement balancing, slurry and chip sealing, and pavement overlay. RMRA funding for FY 2020-21 will be used for construction only.

• W. Elverta Rd from Powerline Rd to Pritchard Ave (Moved to 2020) • Powerline Rd from Elverta Rd to W. Elkhorn Blvd

• San Juan Rd from Garden Hwy to City Limits • Bar Du Lane, from Rogers Rd. to 4,000 ft. South • Reese Rd from Gerber Rd. to 3,000 ft. North • Rogers Rd from Bradshaw Rd to East End • Campoy St from Minnesota Ave to Fair Oaks Blvd • Vincent Ave from Hazel Ave to East End • 18th St from Elkhorn Bl. to Q St. See additional locations on FY20/21 submittal

Pre-Construction & Construction

05/2019 06/2019

06/2019 06/2020 20-25 6, 7, 8, 9 1, 4, 6, 8

Sacramento 20/21 New Safety 47th Avenue Pedestrian and Bicycle Improvements Project

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Feasibility Study, Preliminary Design, Bicycle Lane (New), Document Preparation | Construct a continuous 2-mile Class II bicycle and pedestrian facility and will connect to the existing bicycle lane network.

47th Ave, between the City of Sacramento/Sacramento County border and light rail tracks (western limit) to Stockton Blvd (eastern limit).

Pre-Construction & Construction

07/2017 07/2020

02/2020 10/2020 40-50 7, 9 6

Sacramento 20/21 New Safety Accessible Curb Ramp Improvements - 2020 This project will include: ADA Curb Ramp Installation (New), Cost Estimating, Feasibility Study, Preliminary Design | Install and upgrade curb ramps to current ADA standards at non-signalized intersections throughout the unincorporated areas of Sacramento County.

Approximately 95 curb ramp locations are from the constituent special request list, and are yet to be finalized for the unincorporated area in the County of Sacramento. Please see the link https://sacdot.saccounty.net/Documents/Projects/ADA/Updated%20ADA %20Curb%20Ramp%20List%20for%202020%20CDBG%20%20FY20-21%20Projects%20Ver%204-20-20%20%28003%29.pdf for the complete list of curb ramp locations from the constituent special request list.

Pre-Construction & Construction

07/2019 07/2020

02/2020 12/2020 50-60 6, 7, 8, 9 4, 6

Sacramento 18/19 In Progress Complete Streets Components Pavement Rehabilitation and Overlay Project (SB1 Phase 3)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. RMRA funding for FY 2020-21 will be used for construction only.

*El Camino Ave - Mission Ave - Garfield Ave (Moved from RF0D90) *Hazel Ave - Pershing Ave - Greenback Ln *Kingsford Ave - American River Dr - Arden Way *Marconi Ave - Eastern Ave - Walnut Ave *Rio Linda Blvd - Elverta Rd - Placer County Line

Pre-Construction & Construction

06/2019 03/2020

02/2020 11/2020 20-25 6, 7, 8 1, 4, 6

Sacramento 19/20 In Progress Complete Streets Components Pavement Rehabilitation and Overlay Project (SB1 Phase 4)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. RMRA funding for FY 2020-21 will be used for construction only.

*Ashton Dre - Saverien Dr - Wixford Way *Barberry Lane - Morse Ave - Watt Ave *California Ave - Oak Ave - Palm Ave *Charleston Dr - Rustic Road - Winding Way *Holly Dr - Crocker Rd - Larch Lane *Robertson Ave - Walnut Ave - Fair Oaks Blvd *Saverien Dr American River Dr Fair Oaks Blvd *Watt Ave - Cottage Way - El Camino Ave *Wixford Way - American River - Drive End *W Elkhorn Blvd - West 2nd St -2nd St See Project List for additional 20 locations.

Pre-Construction & Construction

06/2019 07/2020

07/2020 11/2020 20-25 6, 7, 8, 9, 11 1, 3, 4, 6, 8

Sacramento 19/20 In Progress Complete Streets Components Pavement Rehabilitation and Overlay Project (SB1 Phase 5)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. RMRA funding for FY 2020-21 will be used for construction only.

* Kenneth Ave - Central Ave - Oak Ave * Madison Ave - Dewey Dr - San Juan Ave

Pre-Construction & Construction

06/2019 06/2020

05/2020 11/2020 20-25 6, 8 1, 4

Sacramento 20/21 New Road Maintenance & Rehabilitation Pavement Maintenance and Rehabilitation Force Account 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating | Repair and rehabilitate failed areas of pavement on arterial, residential and rural roadways, including: removal and replacement of failed pavement and base material, pothole repair, patching, crack sealing, pavement balancing, slurry and chip sealing, and pavement overlay. This project is continuous throughout the fiscal year and involves pavement maintenance on roadways in all communities of unincorporated Sacramento County. RMRA funding for FY 2020-21 will be used for construction only.

* W. Elverta Rd from Powerline Rd to Pritchard Ave (from 2019) * Terminous Rd - Oxbo Dr - Hwy 12 * Jackson Slough Rd - Terminous Rd - Hwy 12 * Doneva Ave - Minnesota Ave - East End * Arnold Way - Mather Subdivision - Mather Boulevard * Colony Rd - Valensin Rd - Woods Rd * Main St - Locke Rd - Levee Rd * Sherman Island Rd - Hwy 160 - Levee * Terminous Rd - Jackson Slough Rd - Oxbo Dr * Sargent Ave - New Hope Rd - Kost Rd

Pre-Construction & Construction

06/2019 07/2019

07/2019 09/2020 20-25 6, 7, 8, 9, 11 1, 3, 5, 6, 8

Sacramento 20/21 New Complete Streets Components Pavement Rehabilitation and Overlay Project (SB1 2021)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. RMRA funding for FY 2020-21 will be used for construction only.

Multiple locations with the list starting at Mendocino Blvd, Fruitridge to 22nd Ave and ending at Sloughhouse Rd, Grant Line Rd to Cresthill Dr. Please see the the locations listed under Project Location for the project Pavement Rehabilitation and Overlay Project (SB1 2021) on the Project List (part of the attached file "Executed by the Board-Reso & Project List.pdf").

Pre-Construction & Construction

06/2020 07/2020

07/2020 09/2021 20-25 6, 7, 8, 9, 11 3, 6, 7, 9

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Sacramento 18/19 In Progress Road Maintenance & Rehabilitation Twin Cities Road Bridge Replacement at Snodgrass Slough

This project will include: Environmental Study/Documents, Right of Way Acquisition, Bridge Structure Rehab/Repair (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient movable swing, steel bridge with a new concrete structure and roadway approaches.

Twin Cities Road at Snodgrass Slough, located 2.0 miles east of River Road

Pre-Construction & Construction

04/2017 04/2022

12/2020 11/2023 75-90 9 3

Sacramento 18/19 In Progress Road Maintenance & Rehabilitation Franklin Blvd Bridge Replacement at Lost Slough

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient two-lane timber trestle bridge with a new two-lane steel reinforced concrete bridge.

Franklin Boulevard at Lost Slough waterway, located south of Twin Cities Road and east of Interstate 5

Pre-Construction & Construction

05/2010 07/2020

11/2019 10/2020 75-90 9 3

Sacramento 18/19 In Progress Road Maintenance & Rehabilitation Michigan Bar Road Bridge Replacement at Cosumnes River

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient modular concrete panel deck on modular steel box deck trusses and steel girders bridge with a new one-lane concrete slab bridge.

Michigan Bar Road at the Cosumnes River, located approximately one mile north of State Route 16

Pre-Construction & Construction

07/2011 05/2021

10/2020 11/2021 75-90 8 8

Sacramento 18/19 In Progress Road Maintenance & Rehabilitation Alta Mesa Rd Bridge Replacement at Laguna Creek

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair (Existing), Right of Way, Preliminary Design | Replace the existing structurally-deficient two-lane concrete deck on timber stringers bridge with a new two-lane concrete slab bridge.

Alta Mesa Road at Laguna Creek, located north of State Route 104 Pre-Construction & Construction

05/2012 04/2021

10/2020 09/2022 75-90 8 8

Sacramento 18/19 In Progress Complete Streets Components Power Inn Rd Improvements Project

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Pavement Rehab/Repair (Existing), Right of Way Acquisition, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Right of Way, Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Preliminary Design, Bicycle Lane (New) | Construct complete street improvements including new sidewalks, curb and gutter, ADA-compliant curb ramps, bike lanes, street lighting, and center medians. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay.

Power Inn Road, from 450 feet south of Loucreta Drive to 52nd Avenue Pre-Construction & Construction

08/2016 05/2021

12/2020 12/2021 50-60 9 6

Sacramento 18/19 In Progress Road Maintenance & Rehabilitation New Hope Road Bridge Replacement at Grizzly Slough

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient two-lane concrete bridge with a new two-lane pre-tension multiple-girder bridge.

New Hope Road at Grizzly Slough waterway, located approximately one half-mile north of the San Joaquin County line

Pre-Construction & Construction

05/2012 05/2021

12/2020 11/2021 75-90 9 5

Sacramento 18/19 In Progress Complete Streets Components Old Florin Town Improvements Phase 2

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Right of Way Acquisition, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Right of Way, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Landscape Safety Installation (New), Bicycle Lane (New) | Construct complete street improvements including new sidewalks, curb and gutter, ADA-compliant curb ramps, bike lanes, street lighting, center medians, and traffic signal upgrades including ADA-compliant pedestrian signals. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay. RMRA funding for FY 2020-21 will be used for construction only.

Florin Road, from Power Inn Road to French Road/Florin Perkins Road Pre-Construction & Construction

07/2014 07/2019

11/2018 09/2020 50-60 9 6

Sacramento 20/21 New Safety HSIP Street Light Installation This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Right of Way, Preliminary Design, Document Preparation | Install new LED street lighting and other safety improvements on unincorporated area streets for pedestrian and traffic safety.

•Coyle Ave from Woodleigh Dr to Dewey Dr •Hillsdale Blvd from Frizell Ave. to McCloud Dr •Watt Ave from Elkhorn Blvd to 700’ north of Elkhorn Blvd.

Pre-Construction & Construction

07/2019 07/2022

11/2021 10/2022 20-30 6, 7, 8 4

San Benito 20/21 New Road Maintenance & Rehabilitation Cienega Rd Entension Medium Maintenance, CAPE Seal (Chip Seal w/ Slurry Seal)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation

From 0.4 Mi S/Union Road to Hospital Road Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 5-10 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Cienega Rd Extension Medium Maintenance, CAPE Seal (Chip Seal with Slurry Seal)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation

From Union Road to COP 1475' S/O Union Rd Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 5-10 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Cienega Road Medium Rehab, Cold-in-Place Recycling with HMA Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development

From Ashford Circle to Mudstone Ranch Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Fairview Rd Medium Rehab, Cold-in-Place Recycling with HMA Overlay

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design

From Los Viboras to Acquistapace Rd Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Benito 20/21 New Road Maintenance & Rehabilitation Cole Road Heavy Maintenance, CAPE - Double Chip Seal w/ Slurry Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

From 104' N Ricardo Dr to 2100' N Ricardo Dr Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Cole Road Medium Maintenance, CAPE Seal (Chip Seal w/ Slurry Seal)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation

From 2100' N Ricardo Drive to Anzar Road Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 5-10 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Anzar Road Heavy Maintenance, CAPE -Double Chip Seal with Slurry Seal

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

From Cole Road to School Road Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Anzar Road Medium Maintenance, CAPE Seal (Chip Seal w/ Slurry Seal)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation

From School Road to Searle Rd Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 5-10 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Anzar Road Heavy Maintenance, CAPE -Double Chip Seal with Slurry Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

From Searle Road to San Juan Highway Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Carr Avenue Medium Rehab, Cold-in-Place Recycling with HMA Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

From Anzar Rd to Carpenteria Rd Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Salinas Road Medium Rehab, Cold-in-place Recycling with HMA Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

From Cl @ San Juan Hollister Rd to Mission Vineyard Rd Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Fairview Rd Medium Rehab, Cold-in-place Recycling with HMA Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Preparation

From San Felipe Rd to Ludis Lane Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Benito 20/21 New Road Maintenance & Rehabilitation Cienega Rd Heavy Maintenance, Full Depth Reclamation with HMA Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Preparation

From Mudstone Ranch to HHSRP Pre-Construction & Construction

08/2020 04/2021

02/2021 06/2021 10-15 30 12

San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Mountain Avenue and other roads (Previously San Antonio Heights Chip Seal)

This project will include: Preliminary Design | Mill and overlay as well as ADA curb ramp update on 20.56 miles in the San Antonio Heights area. Various roads in the San Antonio Heights area Pre-Construction 07/2019 06/2021 12-15 40, 41 23, 25

San Bernardino 18/19 In Progress Road Maintenance & Rehabilitation Garnet Street and Other Roads This project will include: Preliminary Design | Overlay of 1.39 miles in the Redlands area. Garnet Street (0.29 Miles South of Newport Ave North to Florida St), Florida St (Greenspot Rd East to Garnet St), Greenspot Rd (0.19 Miles North of Florida St South to Florida Street)

Pre-Construction 08/2019 10/2020 10-12 40 23

San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Merrill Avenue and other roads This project will include: Preliminary Design | Reconstruction of 1.79 miles on Merrill Avenue. Reconstruction of 1.51 miles on Randall Avenue. Overlay of 0.25 miles on Sequoia Avenue.

Merrill Avenue from Cherry Avenue east to Catawba Avenue; Randall Avenue (Cherry Avenue east to Poplar Avenue); Sequoia Avenue (Hemlock Avenue east to Beech Avenue);

Pre-Construction 07/2019 06/2021 12-20 52 20

San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Sheep Creek Drive and other roads (Previously Wrightwood area Chip Seal) This project will include: Overlay on 27.83 miles in the Wrightwood area. Various roads in the Wrightwood area. Pre-Construction 07/2020 08/2020 7-10 36 23

San Bernardino 20/21 New Complete Streets Components South Fontana Area ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in Fontana Area Pre-Construction 07/2019 06/2021 15-20 52 20

San Bernardino 20/21 New Complete Streets Components North San Bernardino ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

San Bernardino 20/21 New Complete Streets Components South San Bernardino ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Bernardino 20/21 New Complete Streets Components Southeast Del Rosa ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

San Bernardino 20/21 New Complete Streets Components Southwest Del Rosa ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

San Bernardino 20/21 New Complete Streets Components South Mentone ADA Project This project will include: Preliminary Design Various Roads in Mentone Area Pre-Construction 06/2020 09/2023 15-20 42 23

San Bernardino 20/21 New Complete Streets Components Chino/Montclair ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in Chino and Montclair Area

Pre-Construction 06/2020 09/2023 15-20 52 20

San Bernardino 20/21 New Road Maintenance & Rehabilitation Amboy Road And Pole Line Road This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development

Amboy Road: Bullion Mountain Road east to 0.12 miles west of Ironage Road; Pole Line Road: Lear Ave east to Morongo Road

Pre-Construction & Construction

05/2020 07/2020

07/2020 07/2021 10-12 42 16

San Bernardino 20/21 New Road Maintenance & Rehabilitation Brentwood Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Lake Arrowhead area Construction 07/2020 09/2020 10-12 33 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Arrowbear Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Arrowbear area Construction 06/2020 07/2020 10-12 33 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Mount Baldy Road and Ice House Canyon Road This project will include: Pavement Rehab/Repair (Existing) Mount Baldy Road: Los Angeles County line north 4.87 miles; Ice House

Canyon Road: Mount Baldy Road east 0.16 miles Construction 07/2020 08/2020 7-10 40 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Bernard Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Crestline area Construction 07/2020 08/2020 10-12 33 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Trona Road This project will include: Pavement Rehab/Repair (Existing) SH 395 North to Searless Station Cutoff Rd; Trona area Construction 10/2021 11/2021 10-12 33 16

San Bernardino 20/21 New Road Maintenance & Rehabilitation Kingston Road This project will include: Pavement Rehab/Repair (Existing) .56 miles north of I-15 SB off ramp north to Excelsior Mine Road; 11.11 miles northerly of Excelsior Mine northerly to Nevada State Line Construction 04/2020 06/2020 10-12 33 16

San Bernardino 20/21 New Road Maintenance & Rehabilitation North Shore Lane and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Big Bear area Construction 06/2020 07/2020 10-12 33 16, 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Nipton Road and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Nipton area Construction 05/2020 07/2020 10-12 33 16

San Bernardino 20/21 New Road Maintenance & Rehabilitation Lynwood Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Locations in the San Bernardino area Construction 09/2021 11/2021 7-12 40 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Date Street and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Highland and San Bernardino area Construction 09/2021 11/2021 10-12 40 23

San Bernardino 20/21 New Road Maintenance & Rehabilitation Roswell Avenue and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Chino and Montclair area Construction 09/2020 11/2021 10-12 52 20

San Bernardino 20/21 New Road Maintenance & Rehabilitation Fifth Avenue and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Mentone area Construction 06/2021 09/2021 10-12 40, 42 23

San Bernardino 20/21 New Complete Streets Components Crestline ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in Crestline Area Pre-Construction 09/2020 06/2024 15-20 33 23

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Diego 20/21 New Road Maintenance & Rehabilitation 20/21 Pavement Seal, ADA Ramps and Culverts

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Document Preparation

District 5: Palm Canyon Dr., Wranglers Dr., Wheel Hub Pl., Pointing Rock dr., For a complete listing of the roads proposed as part of this project please visit the following website which includes both a list and an interactive map identifying the location and name of roads in this project (Fiscal Year 20/21):https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacin g_Program.html

Pre-Construction & Construction

07/2020 07/2021

03/2021 12/2021 7-10 71, 75, 77, 79,

80 36, 38, 40

San Diego 20/21 New Road Maintenance & Rehabilitation FY 2020-21 AC Overlay

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Maintenance Program Plan Development, Bicycle Lane (New), Document Preparation

Enrico Fermi, Airway Drive, Robinwood Dr., Colling Rd., Winnetka Dr., Pluto Ct. For a complete listing of the roads proposed as part of this project please visit the following website which includes both a list and an interactive map identifying the location and name of roads in this project (Fiscal Year 20/21):https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacin g_Program.html

Pre-Construction & Construction

07/2020 07/2021

03/2021 12/2021 10-15 71, 75, 77, 79,

80 36, 38, 40

San Francisco 20/21 New Road Maintenance & Rehabilitation PW Various Locations Pavement Renovation No 51

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), -Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - Construction of 20 ADA compliant curb ramps -

Grind and pave 24 Blocks Grind and pave 8 Intersections

Pavement Renovation on; Anson Pl : End to Powell St Himmelmann Pl : Broadway to Pacific Ave Jackson St : Drumm St to Columbus Ave Joice St : End to Clay St Leroy Pl : End to Sacramento St Mason St : Bush St to California St Parkhurst Aly : Clay St to End Sabin Pl : California St to End Security Pacific Pl : Ofarrell St to End Trader Vic Aly : Post St to Cosmo Pl Walter U Lum Pl : Clay St to Washington St

Construction 03/2021 01/2022 14-21 17 11

San Francisco 20/21 New Road Maintenance & Rehabilitation Fulton St and Grove St Pavement Renovation

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair -(Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - Construction of 35 ADA compliant curb ramps -

Grind and pave 26 Blocks Grind and pave 19 Intersections

Fulton St : Franklin St to Arguello Blvd Grove St : Lyon St to Central Ave Construction 05/2021 05/2022 14-21 17, 19 11

San Francisco 20/21 New Road Maintenance & Rehabilitation PW Various Locations Pavement Renovation No 52

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), -Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - Construction of 60 ADA compliant curb ramps -

Grind and pave 33 Blocks Grind and pave 12 Intersections

Several blocks on: 30th St Andover St Aztec St Bessie St Coso Ave Ellsworth St Eugenia Ave Heyman Ave Lundys Ln Manchester St Mirabel Ave Montezuma St Mullen Ave Peralta Ave Precita Ave Prospect Ave Stoneman St Treat Ave

Construction 10/2021 07/2022 14-21 17 11

San Francisco 20/21 New Road Maintenance & Rehabilitation PW Various Locations Pavement Renovation No 53

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), -Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - # of curb ramps TBD -

Grind and pave 45 Blocks Grind and pave 20 Intersections

Several blocks on: 15th St ; 18th St ; 19th St ; 23rd St ; 26th St ; Alabama St ; Buena Vista Ave East ; Buena Vista Ave West ; De Haro St ; Harrison St ; Indiana St ; Jamestown Ave ; Mariposa St ; Minnesota St ;Missouri St ; Tennessee St ; Upper Ter ; Wisconsin St ; Woodward St

Construction 09/2021 09/2022 14-21 17 11

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Francisco 20/21 New Road Maintenance & Rehabilitation PW Various Locations Pavement Renovation No 54

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), -Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - # of curb ramps TBD -

Grind and pave 47 Blocks Grind and pave 35 Intersections

10th St : Fell St \ Market St \ Polk St to Brannan St \ Division St \ Potrero Ave; 12th St : Howard St to Harrison St; Brussels St : Wilde Ave to Campbell Ave; Bryant St : The Embarcadero to Beale St; Campbell Ave : Brussels St to Goettingen St; Leland Ave : Cora St to End; Rutland St : Arleta Ave to Visitacion Ave; South Van Ness Ave : 12th St to 17th St Velasco Ave : Schwerin St to Calgary St \ Sawyer St Visitacion Ave : Loehr St to Hahn St Wilde Ave :Brussels St to Alpha St \ Goettingen St

Construction 10/2021 10/2022 14-21 17 11

San Francisco 20/21 New Road Maintenance & Rehabilitation PW Various Locations Pavement Renovation No 55

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair -(Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - # of curb ramps TBD -

Grind and pave 51 Blocks Grind and pave 28 Intersections

18th St : Treat Ave to Dolores St 21st St : Florida St to Treat Ave 22nd St : Shotwell St to Church St 23rd St : Ames St to Chattanooga St 25th St : York St to Mission St Bryant St : 21st St to Cesar Chavez St Cesar Chavez St : Guerrero St to Noe St Harrison St : 23rd St to 25th St Linda St : 19th St to End Noe St : 23rd St to Elizabeth St Still St : Rousseau St to Lyell St

Construction 12/2021 11/2022 14-21 17 11

San Francisco 20/21 New Road Maintenance & Rehabilitation PW Various Locations Pavement Renovation No 56

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), -Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | - # of curb ramps TBD -

Grind and pave 43 Blocks Grind and pave 26 Intersections

15th St :08th St\Carolinat to Vermont; 19th St :Connecticut to Carolina 26th St :Wisconsin to Rhode Island; Mariposa St :Texas to Rhode Island; Mckinnon Ave :End to Lane; Mendell St :Williams Ave to Yosemite Ave; Oakdale Ave :End to Keith; Palou Ave :End to Griffith; Pennsylvania Ave :20th St to Cesar Chavez St\I-280NOff Ramp; Revere Ave :Keith to 03rd St\Bay View; Shafter Ave :Hawes to 03rd St; Thomas Ave :Griffith to Lane; Utah St :23rd St to 24th St; Yosemite Ave :Hawes to 03rd St

Construction 12/2021 12/2022 14-21 17 11

San Joaquin 20/21 New Road Maintenance & Rehabilitation Lammers Road Resurfacing (West Side Only) This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.7 mile of existing roadway with asphalt concrete.

Tracy City Limits to Middle Road Pre-Construction & Construction

04/2020 04/2021

04/2021 05/2021 10-15 13 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Lillian Avenue and Stokes Avenue Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.6 mile of existing roadway with asphalt concrete.

Miner Avenue to State Route 26; State Route 26 to North End Pre-Construction & Construction

04/2020 04/2021

04/2021 05/2021 10-15 13 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Wilcox Road Resurfacing

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Design and construction to repair and resurface approximately 0.4 mile of existing roadway with asphalt concrete, and repair curb, gutter, and sidewalk where needed.

Cherokee Road to North End Pre-Construction & Construction

04/2020 05/2021

05/2021 06/2021 10-15 13 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Alhambra Avenue Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.6 mile of existing roadway with asphalt concrete.

Shippee Lane to Morada Lane Pre-Construction & Construction

04/2020 04/2021

04/2021 05/2021 10-15 13 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Brady Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1 mile of existing roadway with asphalt concrete.

Manteca Road to East End Pre-Construction & Construction

04/2020 05/2021

05/2021 06/2021 10-15 12 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Briggs Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.1 miles of existing roadway with asphalt concrete.

West End to Manthey Road Pre-Construction & Construction

04/2020 05/2021

05/2021 06/2021 10-15 12 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Campbell Avenue Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.2 miles of existing roadway with asphalt concrete.

Escalon City Limits to Magnolia Avenue Pre-Construction & Construction

04/2020 05/2021

05/2021 06/2021 10-15 12 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Seidner Avenue Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurfacing approximately 1.3 miles of existing roadway with asphalt concrete.

State Route 120 to Kelly Road Pre-Construction & Construction

04/2020 05/2021

05/2021 06/2021 10-15 12 5

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Joaquin 20/21 New Road Maintenance & Rehabilitation Brennan Avenue Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 3 miles of existing roadway with asphalt concrete.

Escalon City Limits to Mariposa Road Pre-Construction & Construction

04/2020 06/2021

06/2021 07/2021 10-15 12 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Turner Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.5 miles of existing roadway with asphalt concrete.

Davis Road to Lodi City Limits Pre-Construction & Construction

04/2020 06/2021

06/2021 07/2021 10-15 9 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Van Allen Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 2 miles of existing roadway with asphalt concrete.

State Route 120 to Lone Tree Road Pre-Construction & Construction

04/2020 06/2021

06/2021 07/2021 10-15 12 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation East Country Club Reconstruction, Phase 4

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Design and construction to reconstruct approximately 0.4 mile of existing roadway with asphalt concrete, and repair curb, gutter, and sidewalk where needed.

Lake Drive: South End to North End; Middlefield Avenue: Carlton Avenue to Lake Drive

Pre-Construction & Construction

04/2020 07/2021

07/2021 09/2021 15-20 13 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation S. 99 Frontage Road (E) Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.3 miles of existing roadway with asphalt concrete.

Stockton City Limits to Munford Avenue Pre-Construction & Construction

04/2020 07/2021

07/2021 09/2021 10-15 13 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Castle Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.5 miles of existing roadway with asphalt concrete.

Northland Road to French Camp Road Pre-Construction & Construction

04/2020 07/2021

07/2021 08/2021 10-15 12 5

San Joaquin 20/21 New Road Maintenance & Rehabilitation Melton Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 2 miles of existing roadway with asphalt concrete.

Manteca Road to Austin Road Pre-Construction & Construction

04/2020 08/2021

08/2021 09/2021 10-15 12 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Ellen Street and Shaw Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.9 mile of existing roadway with asphalt concrete.

SR 26 to North End Pre-Construction & Construction

04/2019 07/2020

07/2020 08/2020 10-15 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Horner Avenue Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.9 mile of existing roadway with asphalt concrete.

Drake Avenue to Walker Lane Pre-Construction & Construction

04/2019 08/2020

08/2020 09/2020 10-15 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Paloma Avenue and Portola Avenue Resurfacing

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.5 mile of existing roadway with asphalt concrete.

Paloma Avenue: Thornton Road to Lower Sacramento Road Portola Avenue: Balboa Avenue to Cortez Avenue

Pre-Construction & Construction

04/2019 08/2020

08/2020 09/2020 10-15 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Magnolia Avenue and Mahon Avenue Resurfacing

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 2.0 miles of existing roadway with asphalt concrete.

Escalon-Bellota Road to Campbell Road (both roads) Pre-Construction & Construction

04/2019 07/2020

07/2020 08/2020 10-15 12 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Shippee Lane Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 0.9 mile of existing roadway with asphalt concrete.

N 99 Frontage Road E to Alhambra Avenue Pre-Construction & Construction

04/2019 07/2020

07/2020 08/2020 10-15 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Chip Seal 2019-2020 This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to resurface and rehabilitate approximately 63 miles of existing roadways with chip seal.

SD1:Access St; Austin Rd; Mathews Rd; Newcastle Rd; JackTone Rd W/S. SD2:N 99 Frontage Rd E; McAllen Rd; Newton Rd SD3: Austin Rd; Howard Rd; Lathrop Rd; Roberts Rd; Thornton Rd W/S. SD4:Cometa Rd; Comstock Rd; Davis Rd; Dodds Rd; French Camp Rd; Harney Ln; JackTone Rd; JackTone Rd E/S; Lone Tree Rd; Lower Sacramento Rd; N 99 Frontage Rd E; N 99 Frontage Rd W; New Hope Rd; River Rd; Thornton Rd; Turner Rd; West Ripon Rd S/S. SD5:Corral Hollow Rd; 11th St; Grant Line Rd; Linne Rd; West Ripon Rd

Pre-Construction & Construction

04/2019 06/2020

06/2020 08/2020 5-7 9, 12, 13 5

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Slurry Seal Arterial and Collector Roads 2019-2020

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and Construction to repair and apply slurry seal to approximately 14.9 miles of existing arterial and collector roadways.

SD1: Boggs Tract; Burkett Gardens/Orchard Homesites; French Camp; Mosswood/Taft Park. SD2: Alpine Heights; Lincoln Village Central; Lincoln Village East; Lincoln Village West; Lower Sacramento Rd; Oakridge. SD3: Elkhorn Golf Course Estates; Lathrop Rd; Lower Sacramento Rd; Wagner Heights. SD4: Morada North; Morada South; Morada Central. SD5: Larch Rd; Woodward Ave.

Pre-Construction & Construction

04/2019 06/2020

06/2020 07/2020 5-7 9, 12, 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation West Country Club Reconstruction, Phase 9

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Design and construction to reconstruct approximately 0.3 mile of existing roadway with asphalt concrete, and repair curb, gutter, and sidewalk where needed.

De Ovan Avenue: Kirk Avenue to Ryde Avenue Pre-Construction & Construction

04/2019 09/2020

09/2020 11/2020 15-20 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation East Country Club Reconstruction, Phase 3

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Design and construction to reconstruct approximately 0.4 mile of existing roadway with asphalt concrete, and repair curb, gutter and sidewalk where needed.

Monterey Avenue: Franklin Avenue to Marine Avenue. Sonoma Avenue: Plymouth Avenue to Delaware Avenue.

Pre-Construction & Construction

04/2019 08/2020

08/2020 09/2020 15-20 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Durham Ferry Road Resurfacing This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.6 miles of existing roadway with asphalt concrete.

SR 33 to 1.5 miles West of Kasson Road Pre-Construction & Construction

04/2019 09/2020

09/2020 10/2020 10-15 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation New Hope Road, Nowell Road and Thornton Road Resurfacing

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and resurface approximately 1.2 miles of existing roadway with asphalt concrete.

Thornton Road to Nowell Road; South End to New Hope Road; Walnut Grove Road to New Hope Road

Pre-Construction & Construction

04/2019 08/2020

08/2020 09/2020 10-15 13 5

San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Peltier Road Resurfacing/Widening This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair, resurface and widen approximately 1.7 miles of existing roadway with asphalt concrete.

Thornton Road to Ray Road Pre-Construction & Construction

04/2019 10/2020

10/2020 11/2020 10-15 13 5

San Luis Obispo 20/21 New Road Maintenance & Rehabilitation 2020-21 Surface Treatment Various County Roads This project will include: Pavement Rehab/Repair (Existing)

The scope of the work includes surface treating approximately 59.4 miles of various County Roads including: •8.4 miles in rural west Paso Robles area •16.0 miles in rural east Templeton area •21.7 miles in rural east Cayucos and Morro Bay areas •13.3 miles in Cayucos area

Pre-Construction & Construction

06/2020 01/2021

08/2020 06/2021 5-15 35 17

San Luis Obispo 20/21 New Road Maintenance & Rehabilitation 2020-21 HMA Overlay Various South County Roads Nipomo

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

The scope of the work includes resurfacing approximately 12.6 miles of various South County Roads including: •12.6 miles in Nipomo area

Pre-Construction & Construction

08/2020 06/2021

02/2021 12/2021 20-25 35 17

San Luis Obispo 20/21 New Road Maintenance & Rehabilitation 2020-21 HMA Overlay Various North County Roads (10th/Chimney Rock)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

The scope of the work includes resurfacing approximately 6.9 miles of various North County Roads including: •1.2 miles in west San Miguel area •5.7 miles in rural west Paso Robles area

Pre-Construction & Construction

05/2020 01/2021

12/2020 06/2021 20-25 35 17

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Mirada Road Bridge and Bank Stabilization Project

This project will include: Preliminary Design | This Project consists of replacing the existing bridge with a prefabricated aluminum bridge and stabilizing the banks adjacent to the bridge with bank protection (soil nail walls and rock slope protection).

Miramar Beach, Half Moon Bay Pre-Construction 07/2018 12/2021 50-75 13 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation

Cape Seal Project in the Broadmoor Village, Burlingame Hills, Harbor/Industrial, Menlo

Oaks, North Fair Oaks, San Mateo Highlands, and West Menlo Park Areas (2021 OBAG

Cape Seal)

This project will include: Preliminary Design, Document Preparation | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Unincorporated San Mateo County. Broadmoor Village, Burlingame Hills, Harbor/Industrial, Menlo Oaks, North Fair Oaks, San Mateo Highlands, and West Menlo Park Areas.

Pre-Construction 07/2018 12/2021 5-10 11, 13 19, 22, 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Scenic Drive Repair This project will include: Preliminary Design | This Project consists of installing a concrete pile wall with a subsurface soil drainage system and reconstructing the damaged road portion of Scenic Drive.

Scenic Drive, La Honda Pre-Construction 07/2018 12/2020 20-25 13 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Madera Bridge Rehabilitation Project (Bridge Preventative Maintenance Program)

This project will include: Preliminary Design, Document Preparation | This project consists of bridge rehabilitation work on Madera Lane Bridge over El Corte de Madera Creek.

Madera Lane Bridge over El Corte de Madera Creek, San Gregorio, Ca. Pre-Construction 07/2018 12/2020 20-30 13 24

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Bridge Preventative Maintenance Project (BPMP Phase 2)

This project will include: Cost Estimating, Preliminary Design, Document Preparation | This Project consists of performing bridge preventative maintenance rehabilitation work on nine existing bridges within the County of San Mateo, such as treating bridge decks with methacrylate, repairing concrete spalling, and repairing scour protection at existing slope protection.

9 bridges located in the unincorporated areas of San Mateo County.; Pescadero Creek Road Bridge at Cloverdale Road; Pescadero Road [Anderson Bridge]; Pescadero Road Bridge at Alpine Creek; Sand Hill Road Bridge; Lobitos Creek Road; Butano Cut-Off Bridge ; Wurr Road Bridge ; Entrada Way Bridge; Gazos Creek Road Bridge;

Pre-Construction 07/2018 12/2021 20-30 13 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Old La Honda Slipout Permanent Repairs This project will include: Preliminary Design, Document Preparation | This project consists of conducting a feasibility analysis and constructing improvements to rebuild the road and stabilize the road embankment

Old La Honda Rd. Unincorporated San Mateo County. Pre-Construction 07/2018 12/2020 30-50 13 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Higgins Canyon Road Slipout This project will include: Preliminary Design, Document Preparation | This project consists of conducting a feasibility analysis and constructing improvements to rebuild the road and stabilize the road embankment

Higgins Canyon Road Unincorporated San Mateo County Pre-Construction 07/2018 12/2020 30-50 13 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Concrete Repairs (North Fairs Oaks Area) This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | This Project consists of repairing and installing concrete infrastructure such as sidewalk, curbs and gutters, valley gutters and access ramps.

North Fair Oaks Area Construction 07/2018 12/2020 20-25 13 24

San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Cloverdale Bridge Scour Counter Measures

This project will include: Preliminary Design, Document Preparation | This project consists of removing failed concrete slope protection and coarse woody debris adjacent to the bents of the bridge and constructing permanent scour countermeasures to stabilize the bents from further scour due to creek bed degradation. Some emergency debris removal occurred in Winter 2018.

Cloverdale Road Bridge is located approximately 3 miles south of the intersection of Pescadero Creek Road and Cloverdale Road, just south of Eden West Road.

Pre-Construction 01/2019 12/2020 50-75 13 24

San Mateo 19/20 Carried Over Complete Streets Components Pedestrian Improvements on El Camino Real/Mission Road

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) | This Project is a joint project with City of Daly City to install concrete sidewalks and access ramps along a portion of El Camino Real/Mission Road.

Daly City along a portion of El Camino Real and Mission Rd. Construction 07/2019 12/2020 20-25 19 11

San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Reconstruction of Roads in the West Menlo Area (Vine Street)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into the existing structural section to a depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

Roads in the West Menlo Park Area Pre-Construction & Construction

07/2019 12/2020

12/2020 12/2021 20-25 24 13

San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Reconstruction of Roads in the North Fair Oaks Area (Loyola Avenue)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into the existing structural section to a depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

Roads in the North Fair Oaks Area Pre-Construction & Construction

07/2019 07/2020

07/2020 12/2020 20-25 24 13

San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Overlay Project in Road Maintenance Districts 3, El Granada, Emerald Lake Hills, Moss

Beach, Palomar Park, Princeton By The Sea, San Mateo Highlands, and West Menlo Park

Areas (2020 Resurfacing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | An overlay or resurfacing project involves the application of approximately 2 inches of asphalt concrete to the existing surface or pavement of the road to help prolong the life of the road. Overlaid or resurfaced roads may include repairs to fix cracks and/or potholes in advance of the surface treatment. These repairs won’t be visible after the final road treatment.

El Granada, Emerald Lake Hills, Moss Beach, Palomar Park, Princeton By The Sea, San Mateo Highlands, and West Menlo Park Areas

Pre-Construction & Construction

07/2019 07/2020

07/2020 12/2020 10-15 22, 24 13

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation

Cape and Slurry Seal Project in the El Granada, Ladera, Los Trancos Woods,

Montara, Moss Beach, and Skylonda Areas (2020 Cape)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

El Granada, Ladera, Los Trancos Woods, Montara, Moss Beach, and Skylonda Areas

Pre-Construction & Construction

07/2019 07/2020

07/2020 12/2020 5-10 24 13

San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Chip Seal Project in the Road Maintenance Districts 8, 9, and Skylonda Areas (2020 Chip)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Road Maintenance Districts 8, 9, and Skylonda Areas Pre-Construction & Construction

07/2019 07/2020

07/2020 12/2020 5-10 24 13

San Mateo 19/20 Carried Over Other Storm Damage Improvement Project in La Honda, Road Maintenance Districts 8 and 9

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and constructing improvements to rebuild the damaged roads caused by storm water erosion.

La Honda, Road Maintenance Districts 8 and 9. Pre-Construction & Construction

07/2019 07/2020

07/2020 12/2020 20-25 24 13

San Mateo 19/20 Carried Over Other Lerida Court and Garbada Way Retaining Wall Project

This project will include: Cost Estimating, Project Scope Development, Landscape Safety Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Document Preparation | This project consists of conducting a feasibility analysis and constructing improvements, including retaining walls to stabilize hillside slopes along Lerida Court and Garbada Way in the Ladera Area.

Ladera/Portola Valley Pre-Construction & Construction

07/2019 12/2020

12/2020 12/2021 50-75 24 13

San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Bridge Maintenance Project

This project will include: Procurement of Public Works Equipment | This project consists of performing bridge maintenance such as deck treatments for short span bridges throughout the San Mateo County. The deck treatment shall consist of a methacrylate or concrete polyester overlay.

San Mateo County wide Procurement/Operational Needs 07/2019 12/2021 20-30 19, 22, 24 11, 13

San Mateo 20/21 New Other Annual Coastside Vegetation This project will include: Procurement of Public Works Equipment | This Project consists of maintenance of vegetation along roadway and within County maintained areas Various streets in County of San Mateo Procurement/Operational

Needs 07/2020 12/2021 1-5 22, 24 13

San Mateo 20/21 New Other Concrete repairs (Countywide) This project will include: Procurement of Road Maintenance and Rehab Materials | This Project consists of repairing and installing concrete infrastructure such as sidewalk, curbs and gutters, valley gutters and access ramps.

Various streets in County of San Mateo Procurement/Operational Needs 07/2020 06/2021 20-25 22, 24 13

San Mateo 20/21 New Other Street and Regulatory Sign Replacement

(Country Club, Burlingame Hills and San Mateo Highlands)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | This Project consists of replacing existing street and regulatory signs to meet reflectivity and sizing requirements.

Country Club, Burlingame Hills and San Mateo Highlands Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 20-25 22, 24 13

San Mateo 20/21 New Other 2020 Coastside Culvert Repairs This project will include: Procurement of Public Works Equipment | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and minimize damage to the road system.

Various county own parts of San Mateo County Procurement/Operational Needs 07/2020 06/2021 20-25 22, 24 13

San Mateo 20/21 New Other 2020 Slipout Repairs This project will include: Repair and Servicing of Public Works Equipment | This project consists of constructing improvements to rebuild the road and stabilize the road embankment. Various county own streets in County of San Mateo Procurement/Operational

Needs 07/2020 06/2021 30-50 22, 24 13

San Mateo 20/21 New Other Lower Bear Gulch 60 in. Culvert Repair

This project will include: Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | This project consists of removing and replacing a 60 inch eroded culvert with a new section to provide a continuous network of storm drainage system and minimize damage to the road system.

Lower Bear Gulch Road in La Honda Area Pre-Construction & Construction

07/2020 01/2021

12/2020 06/2021 20-25 22, 24 13

San Mateo 20/21 New Other Chip Seal Project in the Road Maintenance Districts 8 and 9 (2021 Chip)

This project will include: Procurement of Public Works Safety Materials and Gear | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

Various county owned streets in County of San Mateo Procurement/Operational Needs 07/2020 12/2021 5-10 22, 24 13

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

San Mateo 20/21 New Other Overlay Project in Emerald Lake Hills, Palomar Park, San Mateo Highlands, and West Menlo

Park Areas (2021 Resurfacing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating | An overlay or resurfacing project involves the application of approximately 2 inches of asphalt concrete to the existing surface or pavement of the road to help prolong the life of the road. Overlaid or resurfaced roads may include repairs to fix cracks and/or potholes in advance of the surface treatment. These repairs won’t be visible after the final road treatment.

Emerald Lake Hills, Palomar Park, San Mateo Highlands, and West Menlo Park

Pre-Construction & Construction

07/2020 01/2021

12/2020 12/2021 10-15 22, 24 13

San Mateo 20/21 New Other 2021 Countywide Culvert Repairs This project will include: Procurement of Public Works Safety Materials and Gear | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and minimize damage to the road system.

County of San Mateo Procurement/Operational Needs 07/2020 12/2021 20-25 22, 24 13

San Mateo 20/21 New Other 2021 Countywide Striping Project This project will include: Procurement of Road Maintenance and Rehab Materials | This project consists of replacing and installing striping for the road and bicycle facilities Various county owned streets in County of San Mateo. Procurement/Operational

Needs 07/2020 12/2021 5-10 22, 24 13

Santa Barbara 20/21 New Road Maintenance & Rehabilitation Countywide Paving This project will include: Pavement Rehab/Repair (Existing)

Aliso Canyon Rd,Betteravia Rd Black Rd to Sinton Rd,Black Rd; Orcutt Rd Telephone Rd; Santa Maria Mesa Rd; Bonita School Rd; Roblar Ave; Ballard ; Canyon Rd; Figueroa Mountain Rd; Santa Rosa Rd; Jalama Rd; Foxen Canyon Rd; Happy Canyon Rd; Zaca Station Rd; Bell St; HWY 135; 1660' E HWY 135; Hapgood Rd; HWY 246 E End; HWY 246 W End; Sweeney Rd; Roble Dr; Las Olas Dr;Marina Dr; Mayrum St; Anita Ln; Rhoads Ave; Burtis St; San Marcos Rd; Anita Ln; Via Miguel S End ; Anita Ln; Glenn Annie Rd; Refugio Rd

Construction 07/2020 06/2021 10-15 35, 37 19

Santa Barbara 20/21 New Road Maintenance & Rehabilitation Countywide Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development

Summit Rd (Middle Rd Hot Springs Rd); La Mirada Dr (Hwy 192 ) Paquita Dr La Mirada DrPaquita DrE End Paquita Dr; La Mirada Dr to E End; Walnut Park Dr; Ribera Dr to S End Walnut Park Ln; Walnut Park Dr to S End Calle Barquero; University Dr to Santa Rosalia; Tiburon Pl; Calle Barquero to W End; Brown Rd; 2 MI E HWY 1 to 2.45 MI E HWY 1 Mission Gate Rd Purisima Rd to HWY 246 Cherry Ave Clark Ave to Patterson Ave Foxen Canyon Rd MP 23.00 to MP 24.00

Pre-Construction & Construction

07/2020 05/2021

04/2021 07/2021 10-20 35, 37 19

Santa Barbara 20/21 New Safety School Zone Striping This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

School zones around the following schools: Cuyama Christian Academy, El Camino School, Hollister School, Mountain View School, Winfred Wollam School, Santa Ynez School, Olga Reed School, Los Berros School, Buena Vista School, Cabrillo High School, Arellanes School, and Patterson School.

Construction 07/2020 04/2021 3-5 35, 37 19

Santa Barbara 20/21 New Safety Countywide Striping and Pavement Marking This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

San Ysidro Rd, N & S Jameson Ln, Padaro Ln, Calle Real, Lillie Ave, Santa Claus Ln, Sheffield Dr, Ortega Hill Rd, Santa Monica Rd, Cravens Ln, Mission Canyon Rd,Tunnel Rd,Gobernador Canyon Rd,Rincon Hill Rd, Shepard Mesa Rd, Lambert Rd, Toro Canyon Rd,Via Real,La Cumbre Rd,Park Ln,Romero Canyon Road,San Leandro Ln,Santa Rosa Ln,E Mountain Dr,Hollister Ave,Turnpike Rd,Calle Real,Cathedral Oaks Rd,San Marcos Rd,Patterson Ave,Palmer Rd,Jalama Rd, and 30 other locations throughout the County

Construction 07/2020 04/2021 3-5 35, 37 19

Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Uvas Creek Bridge @ Uvas Rd This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement and realign roadway. Uvas Rd Construction 12/2020 10/2022 30-50 29 17

Santa Clara 19/20 Forecasted Road Maintenance & Rehabilitation Replacement of Hooker Creek Bridge @ Aldercroft Heights Road (37C0506) This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 09/2022 10/2024 30-50 28 15

Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Mitigation and Monitoring of Isabel Creek

Bridge (37C0089) at San Antonio Valley Road (10Yr)

This project will include: Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New) | Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

San Antonio Valley Road Construction 09/2019 08/2029 30-50 25, 30 15

Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Environmental Mitigation, Monitoring & Reporting-Scour G I - 37C0103 (ON SYSTEM)

This project will include: Landscape Safety Rehab/Repair (Existing) | Once bridge is constructed, plantings have to be done as mitigation. 10-yr monitor and reporting to regulatory agencies are conditions of permits.

Carnadero Creek Bridge at Bloomfield Avenue Construction 07/2018 06/2028 30-50 30 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Clara 20/21 New Road Maintenance & Rehabilitation Pavement and Other General Road Maintenance

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | Annual Maintenance activities such as patching, chip seal, crack seal, overlay, striping and other general road and roadside maintenance as needed throughout the county.

County Wide all locations are yet to be finalized and are determined based on priority need, resources, and funding throughout the year.

Procurement/Operational Needs 07/2020 06/2021 7-10 24, 25, 27, 28,

29, 30 10, 13, 15, 17

Santa Clara 20/21 New Road Maintenance & Rehabilitation Metal Beam Guard Rail Improvements - Phase 2

This project will include: Preliminary Design | Repair existing damaged guard rails and new installation which includes terminal systems.

Hicks Road, Alum Rock Avenue, Leavesley Road, Page Mill Road, Moody Road, Canon Vista, Almaden Expressway, Henwood Road

Pre-Construction & Construction

07/2020 04/2021

03/2021 06/2021 25-50 25, 27, 28, 29,

30 13, 15, 17

Santa Clara 20/21 New Traffic Control Devices Signal Mast Arms at Foothill

Expressway/Arboretum and San Tomas Expressway/Forbes

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design

Arboretum Avenue at Foothill Expressway, Forbes Avenue at San Tomas Expressway

Pre-Construction & Construction

07/2019 01/2020

12/2019 02/2020 30-50 24, 25 10, 13

Santa Clara 20/21 New Traffic Control Devices Traffic Signal at Watsonville Road and Uvas Road

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design Watsonville Road at Uvas Road Pre-Construction &

Construction 07/2021 12/2021

11/2021 06/2022 10-10 17 30

Santa Clara 20/21 New Safety Pedestrian Striping and Sign Enhancements on County Expressways

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Paving and/or Striping Installation (New Safety), Preliminary Design

Almaden Expressway, Capitol Expressway, San Tomas Expressway, Foothill Expressway, Montague Expressway, San Tomas Expressway, Page Mill Expressway

Pre-Construction & Construction

06/2020 08/2020

07/2020 06/2021 30-50 24, 25 15, 17

Santa Clara 19/20 Carried Over Traffic Control Devices Front Loops Replacement at Various Locations

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Replace front vehicle detector loops at signalized intersections to promote efficiency of signals. Works in conjunctions with the County's Intelligent Transportation System network.

County Expressways Central, Lawrence, Foothill, Page Mill-Oregon, San Tomas, Montague, Almaden, and Capitol (all locations are yet to be finalized and are determined based on priority need, resources, and funding throughout the year)

Pre-Construction & Construction

08/2020 12/2020

11/2020 06/2021 10-15 24, 25, 27, 28,

30 13, 15, 17

Santa Clara 19/20 In Progress Safety Pedestrian Sensor Installation and Mast Arm on Foothill Expressway

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Improve pedestrian safety Foothill Expressway Construction 08/2018 09/2020 30-50 27, 28 15

Santa Clara 19/20 Carried Over Traffic Control Devices Leavesley Road at New Avenue - New Traffic Signal Installation This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Leavesley Road at New Avenue Construction 09/2020 08/2021 10-10 30 17

Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Soundwall Replacement Project This project will include: Landscape Safety Rehab/Repair (Existing) | The project will repair or replace existing damaged sound walls along the County Expressway system.

County Expressways; Central, Lawrence, Foothill, Page Mill-Oregon, San Tomas, Montague, Almaden, and Capitol. All locations are yet to be finalized and are determined based on priority need, resources, and funding throughout the year.

Construction 06/2019 06/2021 50-50 24, 25, 27, 28, 29 10, 13, 15, 17

Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Trash Capture Systems This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project enables the County to meet on-going trash reduction mandates by retrofitting existing storm drain inlets with trash capturing screens.

County Expressways Construction 06/2019 06/2021 20-20 24, 25, 27, 28, 29 10, 13, 15, 17

Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Metal Beam Guard Rail Improvements - Phase 1

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | The project will repair or replace existing damaged Guard Rails along the County roads and add additional Guard Rails where warranted for safety.

Hicks Road, Alum Rock Avenue, Leavesley Road, Page Mill Road, Moody Road, Canon Vista, Almaden Expressway, Henwood Road Construction 07/2020 10/2020 25-50 24, 25, 27, 28,

29, 30 10, 13, 15, 17

Santa Clara 19/20 Carried Over Complete Streets Components ADA Pedestrian Ramps This project will include: ADA Curb Ramp Installation (New)

Tallent Avenue, Freeman Avenue, Ridgetop Drive, McKee Road, Fairway Drive, Alum Rock Avenue, Gion Avenue, Ridgeview Avenue, Piazza Way, Porter Lane, McVay Avenue, Woodhaven Drive, Tunis Avenue, San Martin Avenue, Lawrence Expressway

Construction 05/2020 06/2021 25-50 27, 30 15, 17

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Uvas Road Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation and provide better access for bicyclists Uvas Road Construction 06/2020 10/2020 15-20 25 17

Santa Clara 19/20 Forecasted Complete Streets Components Intersection Improvements Stevens Creek @ San Tomas

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Project will provide 2nd left turn lane at intersection of Stevens Creek and San Tomas Expressway. Stevens Creek Blvd at San Tomas Expressway Construction 06/2023 10/2024 30-40 28 17

Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Almaden Expressway Pavement Rehabilitaiton This project will include: Pavement Rehab/Repair (Existing) Almaden Expressway Construction 07/2020 12/2020 15-25 25 15

Santa Clara 19/20 Carried Over Complete Streets Components Capitol Expressway Sidewalk and Soundwall Improvements

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Preliminary Design | Project will provide new sidewalks and replace damaged soundwalls along certain sections of Capitol Expressway. Phase I & II completed. Phase III on hold due to LRT extension project and Expressway Program Widening. May incorporate Phase III Soundwall Project into Expressway Widening Project once LRT project is completed.

Capitol Expressway Pre-Construction & Construction

04/2012 04/2024

03/2024 03/2025 30-50 27, 28 15

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Soda Springs Road Soil Stabilization This project will include: Environmental Study/Documents, Landscape Safety Installation (New) | Due to soil instability roads are too narrow for safety. Soil stabilization will allow the road to be widened to allow for safe passage and for the use of first responders in emergency situations.

Soda Springs Road Pre-Construction & Construction

07/2019 09/2019

08/2019 10/2020 10-10 28 15

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road (37C0508) This project will include: Bridge replacement. Aldercroft Heights Road Pre-Construction &

Construction 03/2016 09/2022

08/2022 10/2024 30-50 28 15

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road (37C0507) This project will include: Bridge replacement. Aldercroft Heights Road Pre-Construction &

Construction 03/2016 09/2022

08/2022 10/2024 30-50 28 15

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Mitigation & Monitoring of Stevens Canyon Bridges 37C0604 & 605 (Old 37C0574 & 575)

This project will include: Bridge Structure Rehab/Repair (Existing) | Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

Stevens Canyon Construction 06/2016 05/2028 30-50 28 13

Santa Clara 18/19 In Progress Safety Red Fox Creek Bridge @ New Ave. 37C-172 This project will include: Bridge replacement. New Ave. Pre-Construction & Construction

06/2003 12/2020

11/2020 10/2022 30-50 30 17

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Cochrane Bridge Monitoring Program 37C-166 This project will include: Bridge Structure Rehab/Repair (Existing), Feasibility Study, Preliminary Design | Continuous seismic monitoring of bridge over Anderson Lake. Cochrane bridge at Anderson Lake Pre-Construction &

Construction 09/2003 11/2020

06/2018 06/2028 30-50 25 17

Santa Clara 18/19 In Progress Safety Alma Pump Station Upgrades This project will include: Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Safety and electrical improvements at Alma Street and Oregon Expressway Pre-Construction &

Construction 07/2013 09/2018

08/2018 10/2020 30-50 24 13

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation McKean Road Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Preliminary Design | Pavement rehabilitation and provide better access for bicyclists McKean Road Pre-Construction &

Construction 06/2018 07/2020

06/2020 10/2020 15-20 25 17

Santa Clara 18/19 In Progress Complete Streets Components Alum Rock Ave Multimodal Trail

This project will include: Preliminary Design | Construct new bike/ped trail to connect City of San Jose's, Caltrans', and County's ROW along Alum Rock Rd from White Rd to Alum Rock City Park. SB1 funds to be used for staff cost to initiate project and for contract administration. Construction, Construction Engineering, and inspection costs to come from Measure B.

Alum Rock Ave Pre-Construction 08/2019 05/2025 20-30 25 15

Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Capitol Expressway Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design | Pavement rehabilitation of Capitol Expressway. Will evaluate CIR and HMA to promote longevity and cost effectiveness over mill/fill process.

Capitol Expressway Pre-Construction & Construction

06/2018 07/2020

06/2020 11/2020 15-25 24 15

Santa Cruz 20/21 New Traffic Control Devices Holohan Road and College Road at Hwy 152 This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety) Hwy 152 Construction 05/2022 12/2022 50-75 30 17

Santa Cruz 20/21 New Other Jamison Creek Road PM 1.61 This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Slipout - 25'L x 10'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall PM 1.61 Construction 05/2022 12/2022 50-75 29 17

Santa Cruz 20/21 New Safety Pinehurst Dr at Greenbrier Dr This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New) Greenbrier Dr Construction 05/2021 12/2021 50-75 29 17

Santa Cruz 20/21 New Other Soquel San Jose Rd PM 1.25 This project will include: Slipouts - 60' long. Recommend soil nail reatining wall PM 1.25 Construction 05/2023 12/2023 50-75 29 17

Santa Cruz 20/21 New Safety State Park Dr at Santa Cruz Av, Broadway, & Center Ave

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New) Santa Cruz Av, Broadway, Center Ave Construction 05/2022 12/2022 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 20/21 New Road Maintenance & Rehabilitation 2020 RSTP/STIP Resurfacing Project This project will include: Pavement Rehab/Repair (Existing)

Glen Arbor Rd; Hihn Rd; East Zayante Rd; Upper Zayante Rd; West Vine Hill Rd; Vine Hill Rd; Mountain View Rd; North Rodeo Gulch Rd; Laurel Glen Rd; Mount Hermon Rd; Lockwood Ln; Graham Hill Rd; Pioneer Rd; Varni Rd; Empire Grade

Construction 05/2020 12/2020 10-10 29 17

Santa Cruz 20/21 New Other Countywide Roadway Culvert Survey This project will include: Maintenance Program Plan Development All Roads Pre-Construction 05/2020 12/2022 50-50 29 17

Santa Cruz 20/21 New Road Maintenance & Rehabilitation Countywide Roadside Vegetation Maintenance Project This project will include: Landscape Safety Rehab/Repair (Existing) | Vegetation Maintenance

Graham Hill Rd ; Bonny Doon Rd; Bear Creek Rd ;East Zayante Rd;Empire Grade Rd;Eureka Canyon Rd; Highland Way; Summit Rd; N Rodeo Gulch Rd; Larkin Valley Rd; Soquel San Jose Rd

Construction 05/2020 07/2021 5-5 29 17

Santa Cruz 20/21 New Road Maintenance & Rehabilitation Countywide Roadside Drainage Maintenance Project This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing)

Graham Hill Rd; Felton Empire Rd; Bear Creek Rd; East Zayante Rd; Glen Arbor Rd; El Rancho Dr; Swanton Rd; Browns Valley Rd; Hazel Dell Rd; Larkin Valley Rd; N Rodeo Gulch Rd; Laurel Glen Rd; Mountain View Rd

Construction 05/2020 07/2021 5-5 29 17

Santa Cruz 20/21 New Road Maintenance & Rehabilitation Countywide Culvert Maintenance Project This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Orchard Dr; Mill St; Double Bogey Dr; Boulder St; El Rancho Dr; Prescott Rd; Soquel San Jose Rd; Bowen Ave; Valencia Rd; Fletcher Ct; Old Chittenden Rd; Buena Vista Dr

Construction 05/2020 07/2021 50-75 29 17

Santa Cruz 20/21 New Road Maintenance & Rehabilitation Countywide Roadbed Maintenance Project This project will include: Pavement Rehab/Repair (Existing) Empire Grade Rd; Eureka Canyon Rd; Highland Way; Swanton Rd ; N Rodeo Gulch Rd; Browns Valley Rd; Hazel Dell Rd Construction 05/2020 07/2021 10-20 29 17

Santa Cruz 20/21 New Safety Countywide Striping Maintenance Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Striping Maintenance

Two Bar Rd; Newell Creek Rd; Glen Arbor Rd; Rio Del Mar Blvd; Bonita Dr; Soquel Dr; 17th Ave; Green Valley Rd; Casserly Rd; Corralitos Rd Construction 05/2020 07/2021 5-5 29 17

Santa Cruz 20/21 New Safety Countywide Signage Maintenance Project This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Empire Grade Rd; Glenwood Dr; Bear Creek Rd; Felton Empire Rd; Ice Cream Grade Rd; Bonny Doon Rd; Soquel Dr; East Cliff Dr; Portola Dr; 17th Ave; Soquel/San Jose Rd; Buena Vista Dr; Freedom Blvd; Corralitos Rd; Eureka Canyon Rd; Carlton Rd ; Casserly Rd

Construction 05/2020 07/2021 10-20 29 17

Santa Cruz 20/21 New Safety Countywide Guardrail Maintenance Project This project will include: Guardrail Maintenance EL RANCHO DR; LA MADRONA DR; BEAR CREEK RD; SOQUEL/SAN JOSE RD; GLENWOOD DR Construction 05/2020 07/2021 50-75 29 17

Santa Cruz 20/21 New Other Road Drainage Master Plan Study - Zone 5 roads

This project will include: Feasibility Study, Preliminary Design | Road Drainage Master Plan Study - Zone 5 roads All Roads Pre-Construction 05/2020 06/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Alba Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Retaining Wall PM 0.73 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Bear Creek Rd PM 4.99

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (70' L) -Recommend WB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 4.99 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Bear Creek Rd PM 7.0 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (25' L) - Recommend EB Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 7.0 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Branciforte Dr PM 2.22 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 75' L) - Recommend SB Shoulder Reconstruction, Creek Bank Armoring and Retaining Wall (Soldier Pile) Installation

PM 2.22 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Lompico Road PM 0.22 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' W x 100' L) - Recommend SB Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 0.22 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Lompico Road PM 2.38 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10' W x 25' L) - Recommend NB Travelled Way and Shoulder Reconstruction and Installation of Retaining Wall (Crib)

PM 2.38 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Redwood Lodge Road PM 2.02 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Large Slipout (30' W x 120' L) and Landslide -Recommend Roadway Reconstruction and Retaining Wall (Stitch Pile) Installation

PM 2.02 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Soquel San Jose Road PM 5.91 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Large Slipout (24' W x 115' L) - Recommend Roadway Reconstruction and Retaining Wall (TBD) Installation

PM 5.91 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Stetson Road PM 1.20 This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (60' L x 15' D) - Recommend EB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 1.20 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Swanton Road PM 0.72

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 8' Concrete Arch Culvert Failure and Slipout (54' L) -Recommend Temporary Creek Diversion System, SB Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 0.72 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Alba Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (75' L) - Recommend Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 1.58 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Branciforte Drive This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 75' L) - Recommend SB Shoulder Reconstruction, Retaining Wall (Soldier Pile) Installation

PM 1.77 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hazel Dell Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Large Slipout/ landslide 85' long x 10' deep, slip potential - Retaining Wall Installation

PM 2.00 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hazel Dell Road This project will include: Large Slipout, Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (TBD) Installation PM 2.08 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hazel Dell Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout - 30' wide by 10' deep, Recommend Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 2.13 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hazel Dell Road

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Settling Roadway 85' long, possible cross culvert damage, Recommend Culvert Replacement, Roadway and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 2.16 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hazel Dell Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Failing Crib Wall - 50' long x 12' tall, Recommend Shoulder Reconstruction and Retaining Wall Structure

PM 2.21 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Hazel Dell Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout with Embankment Settlement, Recommend Shoulder Reconstruction and Retaining Wall

PM 2.37 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hazel Dell Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Failed Crib Wall, Reconstruct Damaged Shoulder and Roadway, Retaining Wall (Soldier Pile) Installation

PM 2.58 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jamison Creek Road This project will include: Slipout - 55'L x 15'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall PM 0.70 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jamison Creek Road This project will include: Slipout - 80'L x 8'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall PM 0.80 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jamison Creek Road This project will include: Slipout - 30'L x 10'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall PM 1.44 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mt. Charlie Road This project will include: 85' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction PM 0.26 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mt. Charlie Road This project will include: 50' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction PM 2.47 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Rider Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 35' L slipout, Recommend Installing Retaining Wall (TBD), Pavement and Shoulder Reconstruction

PM 0.07 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Rider Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 80' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction

PM 0.80 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Schulties Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Large Slipout and roadway failure - Recommend Roadway and Shoulder Reconstruction and Retaining Wall Installation

PM 2.05 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Stetson Road This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design | Slipout (55' L x 18' D) - Recommend EB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 1.08 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Swanton Road This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 60' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction

PM 3.00 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Alta Via Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway Failure (12' W x 50' L)- Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.42 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Bean Creek Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (25+/-' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 2.10 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Bear Creek Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' W x 20+/-' L) - Recommend NB/EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 2.12 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Bear Creek Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' L) - Recommend SB/WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 7.26 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Browns Valley Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Existing Retaining Wall Damaged - Recommend WB/SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and 18" Culvert and Repair of Existing Retaining Wall (Crib)

PM 2.14 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Browns Valley Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10' L) - Recommend NB Shoulder Reconstruction, RSP and Drainage Improvements

PM 2.93 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Casserly Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 80' L) - Recommend EB/SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 2.93 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 30 17

Santa Cruz 19/20 Carried Over Other Casserly Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 20' L) - Recommend EB/SB Shoulder Reconstruction and Drainage Improvements

PM 3.39 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 30 17

Santa Cruz 19/20 Carried Over Other Cathedral Dr

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10+/-' W x 60' L) and Roadway/Embankment Settling (60' L) - Recommend SB Traveled Way and Shoulder Reconstruction, , Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.21 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Cox Rd This project will include: Slipout (40' L) - Recommend WB Shoulder Reconstruction, Drainage Improvements (New Storm Drain Through Wall) and Retaining Wall (Soldier Pile) Installation PM 1.93 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Cox Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (60'W x 100' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile)

PM 2.03 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other East Cliff Dr This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Damage to Roadway Caused By Wave Runup -Recommend NB and SB Shoulder Reconstruction, Clearing and Grubbing, and Placement of RSP

@Corcoran Lagoon Pre-Construction & Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other East Zayante Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 0.59 Pre-Construction &

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure and Slipout (12' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements including 36" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

PM 3.16 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Document Preparation | Major Slipout (20+/-' W x 70' L) with Potential Deep Seated Landslide -Recommend NB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 3.36 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (20' L) Caused by Fallen Trees and Near Existing Retaining Wall (Crib) - Recommend NB and SB Traveled Way and Shoulder Reconstruction, Drainage Improvements including RSP and Retaining Wall (Soldier Pile) Installation

PM 4.67 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (25' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation

PM 5.05 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (25' L) - Recommend NB Shoulder Reconstruction, RSP and Retaining Wall (Soldier Pile) Installation

PM 5.31 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation

PM 8.39 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Felton Empire Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (60' L) -Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.40 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Felton Empire Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (36' L) Near Existing Crib Wall - Recommend WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 1.62 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Felton Empire Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (70' L) Near Existing Retaining Wall (Crib) -Recommend WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 2.62 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Gaffey Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' L) - Recommend EB (Outboard) Embankment Reconstruction, RSP and Drainage Improvements

PM 0.03, 0.04, 0.08 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 30 17

Santa Cruz 19/20 Carried Over Other Glenwood Cutoff

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (4' W x 35' L) - Recommend WB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 0.02 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Dr This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Erosion Under Existing Retaining Wall (Soldier Pile) -Recommend Backfill of Eroded Slope, Drainage Improvements and Erosion Control

PM 2.02 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Dr

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Retaining Wall Failure Caused by Erosion Under Footing, Adjacent to Existing Retaining Walls (Crib) - Recommend Backfill Eroded Footing, Install Drainage Improvements and Retaining Wall (Crib)

PM 2.60 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Dr This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 4.27 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Granite Creek Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' L) - Recommend NB Shoulder Reconstruction, RSP and Overside Drain Replacement

PM 0.47 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Granite Creek Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (3'+/- W x 10' L) - Recommend SB Traveled Way and Shoulder Reconstruction and Placement of RSP

PM 2.10 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Green Valley Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 1.85 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure/Slipout (15' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements including 36" Culvert, and Retaining Wall (Soldier Pile) Installation

@ Spanish Ranch Rd Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Large Slipout (200' L) - Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation PM 3.19 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Landslide Caused Damage to Existing Downdrain and Retaining Wall -Recommend Removal of Debris, Installation of Inlet Debris Protection Wall and New Overside Drain

PM 3.24 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Slipout (8' W x 36' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation PM 3.74 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Slipout (10+/-' W x 25' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 3.91 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Slipout (70' L) - Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert and Retaining Wall (Soldier Pile) Installation PM 5.45 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hubbard Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' W x 40' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.80 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Road/Embankment Settling (65' L) - Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.36 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (37' L) Due to Downed Tree - Recommend WB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Geogrid Reinforced MSE) Installation

PM 1.55 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Road/Embankment Settling (12' W x 100' L) -Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.60 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (6' W x 20+/-') - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Earth backfill and Downdrain

PM 0.64 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure & Roadway/Embankment Settling -Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Headwalls Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation,

PM 0.68 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | PM 1.02 - Slipout (20+/-' W x 60' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation, PM 1.04 - Slipout (6' W x 40' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 1.02, 1.04, 1.07 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure & Roadway/Embankment Settling -Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Headwalls

PM 1.66 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Kings Creek Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout and Damaged Downdrain - Recommend Installation of Gabion Baskets or RSP, Backfill and Reinstall Culvert

PM 1.65 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Kings Creek Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' L) and Landslide - Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 3.03 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Kings Creek Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout and Roadway/Embankment Settling -Recommend Roadway Reconstruction, Drainage Improvements, and Retaining Wall (Stitch Pile) Installation

PM 3.16 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Laurel Glen Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (25' L) - Recommend NB/WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile)

PM 1.97 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Little Basin Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (35' L) - Recommend EB (Outboard) Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.64 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Little Basin Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (80' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.85 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lockhart Gulch Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (55'L) - Recommend NB Shoulder Reconstruction, Drainage Improvements, and Retaining Wall (Crib) Installation

PM 0.24 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Loma Prieta Av This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20'L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, and Retaining Wall (Soldier Pile) Installation

PM 2.82 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Loma Prieta Way This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (60' L) - Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 3.33 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lompico Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (45' L) - Recommend NB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Crib) Installation

PM 1.22 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lorenzo Av This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Address 12415 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lower Highland Way This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (18' W x 65'L) - Recommend Traveled Way and Shoulder Reconstruction, RSP, and Retaining Wall (Soldier Pile) Installation

PM 0.34 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other McGregor Dr This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' L) - Recommend SB Shoulder Reconstruction and Drainage Improvements

PM 1.35 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Merk Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 25' L) - Recommend NB (Outboard) Shoulder Reconstruction, RSP and Drainage Improvements

PM 1.10 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Morrell Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout and Culvert Failure- Recommend Roadway Reconstruction, 18" and 24" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

PM 0.15 Pre-Construction & Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Miller Cutoff Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 85'L) Adjacent to Existing Crib Wall (Installed 2016) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.49 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Morrell Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 25' L) - Recommend Roadway Reconstruction, Drainage Improvements and Installation of Geogrid Reinforced Earth Retaining Structure

PM 0.50 Pre-Construction & Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mt. Bache Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (13' W x 40' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.14 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.54 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Roadway Settling (10' W x 45'L) - Recommend New Roadway Structural Section and Drainage Improvements PM 1.35 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Roadway Settling (10' W x 40'L) - Recommend New Roadway Structural Section and Drainage Improvements PM 1.89 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Mt. Madonna Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 0.96 Pre-Construction &

Construction 05/2020 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Nelson Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 3 Slipouts (Varying 30 to 50' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.43 Pre-Construction & Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Nelson Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 0.44 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd This project will include: Slipout (50'+/- W x 66' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

PM 0.92 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (6' W x 50' L) - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 3.82 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (30'+/- W x 40' L) -Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 4.31 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (48' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 4.94 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Bear Creek Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 36' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.01 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50'L) - Recommend NB/EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.01 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout - Recommend NB/EB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 1.06 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10' W x 50' L) - Recommend NB/EB Traveled Way, Drainage Improvements and Shoulder Reconstruction and Retaining Wall (Crib) Installation

PM 1.20 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (12' W x 90' L) - Recommend NB/EB (Outboard) Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

PM 1.36 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Paper Mill Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 30' L) - Recommend NB Shoulder Reconstruction and Retaining Wall (Soldier Pile)

Address 3559 Pre-Construction & Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Paulsen Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 0.43 Pre-Construction &

Construction 05/2020 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Porter Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (8' W x 35' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.33 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Prescott Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout - Recommend NB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 0.52 Pre-Construction & Construction

05/2020 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.50 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout Along Existing Stitch Pile Wall (65' L) -Recommend Replace Damaged Guardrail and Backfill Eroded Slope

PM 1.65 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.15 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure - Recommend embankment reconstruction, excavation and backfill, concrete headwall, 120'' culvert, erosion control and revegetation.

PM 1.80 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (18' W x 35' L) - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 0.23 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | PM 0.29 Roadway/Embankment Settling (120' L) Near Existing Retaining Wall - Recommend NB (Outboard) Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation, PM 0.31 Slipout (40' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP and Retaining Wall (Soldier Pile) Installation, PM 0.33 Culvert Failure & Slipout (30' L) - NB (Outboard) Shoulder Reconstruction, Drainage Improvements including 18" Culvert

PM 0.29, 0.31, 0.33 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | PM 0.38 Slipout (50' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation, PM 0.40 ULTRABLOCK Retaining Wall Failure - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile)

PM 0.38, 0.40 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other San Andreas Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 40' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.24 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other San Andreas Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 1.30 Pre-Construction &

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Schulties Rd This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing) | Large Slipout (17' W x 100' L) - Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.51 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Seacliff Dr This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 0.56 Pre-Construction &

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Siesta Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' L) - Recommend EB Embankment Reconstruction and Erosion Control

PM 0.04 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | slipout/settlement pavement separation PM 0.43 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Road slump. Slurry and earth backfill repair PM 1.38 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 3' diameter sinkhole PM 1.90 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation PM 2.83 Pre-Construction &

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (25' W x 12' L) - Recommend EB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 4.06 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel Dr This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) @ Aptos Creek Rd. Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel Dr This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Right of Way, Preliminary Design, Document Preparation

@ Robertson St. Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel San Jose Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 2 slipouts, 20x50x10 & 50x150x10 PM 3.97 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel San Jose Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (39' L) - Recommend Roadway Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation

PM 5.67 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Spanish Ranch Rd

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Slipout (30' L) Located Adjacent to Existing Crib wall Installed 2002 - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.20 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Spanish Ranch Rd This project will include: Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Slipout (70' L) - Recommend Roadway Reconstruction, 18" Culvert and Retaining Wall (Soldier Pile) Installation

PM 0.37 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 40' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.16 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure and Slipout (18' W x 25' L) -Recommend NB Traveled Way and Shoulder Reconstruction and 18" Culvert and Retaining Wall (Soldier Pile) Installation

PM 1.18 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20+/-' W x 50' L) - Recommend SB Traveled Way and Shoulder Reconstruction, RSP. and Retaining Wall (Soldier Pile) Installation

PM 1.85 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Large Slipout (40+/-' L) Near Existing Cross Culvert -Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP, and Retaining Wall (Soldier Pile) Installation

PM 1.90 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 20' L) Due to Fallen Tree -Recommend SB Traveled Way and Shoulder Reconstruction and Drainage Improvements

PM 2.36 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15+/-' W x 20' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

PM 3.05 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Two Bar Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' W x 65' L) - Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.13 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Upper East Zayante Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (45' L) Near Existing Retaining Wall (Crib) and Landslide - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.68 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Valencia Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Slipout (12' W x 60' L) -Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.34 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Valencia Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (90' L) - Recommend Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 2.43 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Valencia School Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10+/-' W x 60' L) - Recommend WB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.35 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Vine Hill Rd This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout 30' L) - Recommend Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.18 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other Vine Hill Rd

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 50' L) - Recommend NB Shoulder Reconstruction, Drainage Improvements including 24" Culvert and Retaining Wall (Soldier Pile) Installation

PM 1.27 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 19/20 Carried Over Other West Park Av This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' L) - Recommend SB Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 0.80 Pre-Construction & Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jamison Creek Rd This project will include: Slipout - 49'L x 8'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall PM 1.09 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 18/19 In Progress Road Maintenance & Rehabilitation Glen Haven Road PM 0.81 This project will include: Slipout (40' W x 35' L) - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation PM 0.81 Pre-Construction &

Construction 02/2017 05/2020

05/2020 12/2020 50-75 29 17

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Santa Cruz 18/19 In Progress Road Maintenance & Rehabilitation Glen Haven Road PM 2.27 This project will include: Preparation of design and environmental documents for slipout (19' W x 100' L) - Recommend NB Traveled Way and Shoulder Reconstruction, New Culvert and Retaining Wall (Soldier Pile) Installation

PM 2.27 Pre-Construction & Construction

02/2017 05/2020

05/2020 12/2020 50-75 29 17

Santa Cruz 20/21 New Other Laurel Rd PM 1.97

This project will include: Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Slipout (15'+/- W x 50' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

PM 1.97 Pre-Construction & Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Shasta 18/19 Forecasted Road Maintenance & Rehabilitation 2021 SB-1 PAVEMENT REHABILITATION This project will include: New asphalt concrete overlay of roadway, restripe, and replace pavement markers.

CHINA GULCH DR from Oak St to Canyond Rd; GAS POINT RD from W Anderson Dr to SH005; MEADOW VIEW DR from Churn Creek Rd to Rdg C/L; OAK RUN RD from Old 44 Dr to Terri Rand Ln; OLD OREGON TRL from SH005 (E. side of overpass) to Rdg C/L (S/O Miller Butte Rd); PLACER RD from Rdg C/L (@ Thompson Ln) to Muletown Rd; DEE KNOCH RD from Jim Day Rd to Pittville Rd; PALM AVE from Oak St to Happy Valley Rd; OASIS RD from Rdg C/L to Rdg C/L; SWEDE CREEK RD from Old 44 Dr to Buckboard Trl

Pre-Construction & Construction

01/2021 06/2021

04/2021 10/2021 8-12 1 1

Shasta 18/19 In Progress Safety RIVERLAND DRIVE WIDENING PROJECT HSIPL-5906(128)

This project will include: Highway Safety Improvement Project (HSIP) to widen roadway shoulders. Widen Shoulders to improve safety for motorized and non-motorized users. RIVERLAND DRIVE from Knighton Rd to 2 miles south of Knighton Rd Pre-Construction &

Construction 06/2020 06/2021

12/2020 10/2021 8-12 1 1

Shasta 19/20 Forecasted Road Maintenance & Rehabilitation GAS POINT ROAD AT NO NAME DITCH BOX CULVERT REPLACEMENT BRLS-5906(119) This project will include: Pavement Rehab/Repair (Existing) | Replace box culvert and widen road. GAS POINT ROAD between Anthony St and Charles St Construction 07/2021 10/2021 50-50 1 1

Shasta 19/20 Forecasted Traffic Control Devices DESCHUTES ROAD AT CEDRO LANE This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) DESCHUTES ROAD at CEDRO LANE Construction 07/2022 10/2022 50-50 1 1

Shasta 20/21 New Road Maintenance & Rehabilitation 2020 SB-1 PAVEMENT REHABILITATION This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Chip seal surface treatments, restriping, and replacing pavement markers.

QUARTZ HILL RD from Redding City Limit to Keswick Dam Rd; RAINBOW LAKE RD from Baker Ridge Rd to End of Paving; OAK RUN RD from Lookout Mountain Rd to Buzzard Roost Rd; OLD ALTURAS RD from Abernathy Ln to Arapaho Dr

Pre-Construction & Construction

04/2020 08/2020

05/2020 10/2020 5-9 1 1

Shasta 20/21 New Road Maintenance & Rehabilitation GAS POINT ROAD PAVEMENT REHABILITATION

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | New asphalt concrete overlay of the roadway, restriping, and replacing pavement markers.

GAS POINT RD from Interstate 5 to West Anderson Dr Pre-Construction & Construction

03/2020 07/2020

05/2020 10/2020 8-12 1 1

Sierra 20/21 New Road Maintenance & Rehabilitation Countywide Road Maintenance Program

This project will include: Procurement of Road Maintenance and Rehab Materials | Purchase of materials and equipment for maintaining county roadways regarding roadway surface, reforming drainage to protect the road and storm runoff removing vegetation to improve visual clearances and guardrail.

Countywide Procurement/Operational Needs 07/2020 06/2021 2-5 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Roadway Striping and Pavement Markings This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) All paved Siskiyou County Roads that currently have pavement striping, stenciling or thermoplastic delineation. Construction 07/2020 06/2021 1-2 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Road Sign Upgrade and Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Location will be determined by priority based on routine Retro-reflectivity study. Location subject to change based upon need and available resources.

Construction 07/2020 06/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Vegetation Management - Including tree trimming, mowing, and noxious weed control.

This project will include: This project consists of hazardous tree removal, tree trimming, mowing, roadside brush and grass removal/control combined with noxious weed control. Various areas throughout Siskiyou County. Construction 07/2020 06/2021 1-2 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Gravel Road Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This routine maintenance item includes grading and re-contouring of gravel roads. This process will include application of crushed aggregate where required.

Various locations throughout Siskiyou County's unpaved road system. Locations include but not limited to: Louie Road, Old State Highway, Sheepy Creek, Willow Creek Road.

Construction 07/2020 06/2021 1-5 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Aggregate Production This project will include: Procurement of Road Maintenance and Rehab Materials | This project will consist of production of aggregate materials at the County's Yellow Butte and Little Lynne mine sites.

Yellow Butte and Little Lynne Mine Sites Procurement/Operational Needs 07/2020 06/2021 1-3 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Roadside Shoulder Maintenance This project will include: Pavement Rehab/Repair (Existing) Countywide project. Shoulder improvement location will be dictated by current condition and need. Construction 07/2020 06/2021 1-3 1 1

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Siskiyou 20/21 New Road Maintenance & Rehabilitation Pavement Patching and Repair This project will include: Pavement Rehab/Repair (Existing) This is a Countywide project. Location will be dictated by need and roadway safety. Construction 07/2020 06/2021 1-5 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation Maintenance of Public Works Equipment This project will include: Repair and Servicing of Public Works Equipment Located at all facilities Countywide. Procurement/Operational Needs 06/2020 07/2021 1-5 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 1 - Ager Beswick Road - Asphalt Repair This project will include: Pavement Rehab/Repair (Existing) Ager Beswick Road From Mile Post 0 - Mile Post 3.81 Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 2, Mt. Shasta Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Holiday Lane, Holiday Court, Lake Court, Michelle Drive. Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 2, McCloud Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Quincy Ave. and California Ave. Construction 05/2021 09/2022 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 3 Gazelle Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Desoza Lane, White Rock Road, Scarface Road, Timmons Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 4 - Fort Jones Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Patterson Creek Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 5 Etna Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Gazelle Callahan Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 6 Macdoel Area - Asphalt Repair This project will include: Pavement Rehab/Repair (Existing) Shady Dell Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 19/20 Carried Over Road Maintenance & Rehabilitation Ditch and Culvet Maintenance

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project will consist of debris removal from flow lines, drainage ditches and culverts, reestablishing ditch lines in an effort to maintain flow lines and reduce the potential for flooding and sediment disbursement into waterways.

Various locations though out the Siskiyou County road system. Construction 12/2020 06/2021 1-3 1 1

Solano 20/21 New Road Maintenance & Rehabilitation Liberty Island Road This project will include: Pavement Rehab/Repair (Existing), Preliminary Design Liberty Island Road from 1.53 miles north of the Shag Slough Bridge to Swan Road.

Pre-Construction & Construction

07/2020 12/2020

12/2020 06/2021 10-20 4 3

Solano 20/21 New Road Maintenance & Rehabilitation Chip Seals 20-21 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Location details at: https://www.solanocounty.com/depts/rm/public_works/default.asp Captial Improvement Plan. Baker Bartlett Binghamton Bulkley King Midway Campbell Canal Ln Cantelow Casey Chadbourne Circle C Currey Currie Denverton Doyle Gentile Griffin Hackman Mills Noble Nunes O'Day Schroeder Serenity Serpa Shelton Steiger Hill Stevenson Bridge Rd Sweeney Thomasson Tremont Rd old Vaughn Dixon Rds (Pedrick S of I-80 – Vaughn), Fairfield Rds, Benicia Rds-Lake Herman)Reservoir to I-680).

Construction 07/2020 06/2021 10-10 4, 11 3

Solano 20/21 New Road Maintenance & Rehabilitation Overlays 20-21 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design

Durbin Lane (Green Valley Road -End) Fox Road (Hawkins Road-Weber Road) Green Valley Road (Rockville Road-211' N/Rockville Road) Green Valley Road (211' N/Rockville Road-.765 mi N/@ Valley End Lane) Green Valley Road (.765 mi N/@ Valley End Lane-End) Sievers Road (Currey Road-Pedrick Road) Weber Road (Lewis Road-Fox Road) West Cordelia Road (End-Fairfield C/L)

Pre-Construction & Construction

06/2020 07/2020

07/2020 06/2021 20-30 4, 11 3

Solano 20/21 New Safety Peabody Road This project will include: Right of Way Peabody Road from Fairfield City limit to Vacaville City limit. Pre-Construction 07/2020 06/2021 50-99 11 3

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Solano 20/21 New Safety Sidewalk Improvement Project 2020 This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Valley Gutter Replacement

Sidewalk Improvements: Beach St (170’ w of Cypress Ave - Central Ave), Glen Cove Rd (Robles wy - Bush Ave), Idora Ave (Benicia Rd to Pine Ave), aPine Ave and 160 feet of Woodrow w of Pine Ave, Lewis Ave (120 feet w of Glen Cove Rd to Glen Cove Rd), Lincoln Ave East (210 feet w of Laurel St - 80 feet w of Laurel St), Magazine St (Vallejo City Limit to Aspen Ct). Valley Gutter Improvements: Via Palo Linda at the intersection with Walnut Dr and Via Palo Linda at the intersection of Peach Ct.

Construction 07/2020 06/2021 50-80 4, 14 3

Solano 20/21 New Other Microsurfacing/Slurry Seal 20-21 This project will include: Preliminary Design | Rehabilitate two asphalt pedestrian paths and Suisun Valley Court.

Green Valley Road Pedestrian Path-(Fairfield City limit to Rockville Road), Suisun Parkway Pedestrian Path-(Fairfield City limit near I-80 to Fairfield City limit near Suisun Creek) and Suisun Valley Court-(Suisun Valley Road to End).

Pre-Construction & Construction

07/2020 12/2020

12/2020 06/2021 6-8 4, 11 3

Solano 20/21 New Safety RTIF Safety Improvement Project 2020 This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety) Rockville Road and Midway Road Pre-Construction &

Construction 07/2020 12/2020

12/2020 06/2021 10-15 4, 11 3

Solano 20/21 New Road Maintenance & Rehabilitation Rubberized Chip Seal with Microsurfacing 20-21 This project will include: Pavement Rehab/Repair (Existing), Preliminary Design

Locations at: https://www.solanocounty.com/depts/rm/public_works/default.asp Captial Improvement Plan. Beach Benicia Carlson Carquinez St Clayton Cordelia Creed Cypress Evans Flannery Fry Gilcrest Ave (ALL), Goose Haven Hargus Idora Kildeer Lambie Leisure Town Lemon Lopes Orchard Peabody Pennsylvania Phillip Reis Ridge Ritchie Scally Sperry Starr Thomas Walters Rd (Frontage) West Cordelia Woodrow Ave City of Vallejo Roads (S. Regatta, Admiral Calahan and Benicia Rd).

Pre-Construction & Construction

07/2020 12/2020

12/2020 06/2021 10-15 4, 11, 14 3

Solano 20/21 New Road Maintenance & Rehabilitation Lake Herman Road This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Lake Herman Road - Reservoir Road to 2.6 miles east of the City of Vallejo limits. Construction 07/2020 06/2021 10-20 14 3

Sonoma 18/19 Carried Over Road Maintenance & Rehabilitation Grind & Patch Pave This project will include: Pavement Rehab/Repair (Existing) River Road Construction 07/2020 06/2021 5-10 2, 10 2, 3

Sonoma 19/20 Carried Over Road Maintenance & Rehabilitation Culvert and Viaduct Replacement Projects

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Includes repair of damage culverts and viaducts, cleaning and repair of road signs, removal of roadside vegetation, and repair of slip outs and landslides.

Lawndale Road, Liberty Road Construction 07/2020 06/2021 20-20 2, 4, 10 2, 3

Sonoma 18/19 Carried Over Road Maintenance & Rehabilitation Viaduct Replacement This project will include: Bridge Structure Rehab/Repair (Existing) | Viaduct Replacement Summerhome Park Road Construction 07/2020 06/2021 30-30 2 2

Sonoma 20/21 New Safety Sing Reflectivity Upgrade This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Guerneville Area in West Sonoma County Construction 07/2020 06/2021 5-5 2, 10 2, 3

Sonoma 20/21 New Road Maintenance & Rehabilitation Grind/Pave and Grader Patch Pave This project will include: Pavement Rehab/Repair (Existing) Old Redwood Highway and Wagnon Drive Construction 07/2020 06/2021 5-10 2, 10 2, 3

Sonoma 20/21 New Road Maintenance & Rehabilitation Culvert Repair and Replacement This project will include: Storm Drain/Culvert Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing)

Canyon Road, Sperring Road, Trinity Road, Lakeville Road, Mark West Springs, River Road, Dry Creek Road, Hidden Valley Road, Donald Street Construction 07/2020 06/2021 15-20 2, 10 2, 3

Sonoma 20/21 New Road Maintenance & Rehabilitation 20/21 Pavement Preservation Program This project will include: Pavement Rehab/Repair (Existing) | Full Depth Reclamation and Overlays

Grove Street, Linden Street, Solano Avenue, Barnett Valley Road, Grange Road, Tomales Road, East Cotati Avenue, and Lake Center Drive Lark Center D

Construction 07/2020 06/2021 10-20 2, 10 2, 3

Sonoma 20/21 New Safety Striping and Stenciling This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Approximately 156 miles of Striping and Stenciling of an estimated 252 intersections.

Various Roads in unincorporated Sonoma County in the general proximity to the following cities: Annapolis, Cotati, Guerneville, Healdsburg, and Sonoma

Construction 07/2020 06/2021 5-5 2, 10 2, 3

Sonoma 20/21 New Other Procurement of Public Works Equipment This project will include: Procurement of Public Works Equipment Annapolis, Cotati, Guerneville, Healdsburg, Santa Rosa, and Sonoma yards.

Procurement/Operational Needs 07/2020 06/2021 15-20 2, 10 2, 3

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Stanislaus 20/21 New Match Funds Hickman Road Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing) | Hickman Bridge was inspected by Caltrans in 2017 and has a sufficincy rating of 64.7 and is classified as structurally deficient it also has been deemed scour deficient. The County is using SB1 to as match funding to HBP and LSSRP - State 1B for replacement of the bridge

HIckman Road over the Tuolumne River Construction 07/2020 06/2022 75-100 21 8

Stanislaus 20/21 New Match Funds Crows Landing Road Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing) | The Crows Landing Road Bridge Replacement, will be a 3-lane bridge replacement. The bridge was determined to be scour critical and functionally obsolete. SB1 will be used as a match to HBP and LSSRP State bond funding

Crows Landing Road over San Joaquin River Construction 07/2020 06/2023 75-100 21 12

Stanislaus 20/21 New Road Maintenance & Rehabilitation Gates Road/Dakota Ave/Diablo Grande Blvd This project will include: Pavement Rehab/Repair (Existing) Gates Road, Dakota Ave and Diablo Grande Blvd Construction 07/2020 06/2021 7-10 21 12

Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020 Annual Chip This project will include: Pavement Rehab/Repair (Existing)

Supervisor District 1 - East Oakdale / Knights Ferry area - multiple roads. Roads have been identified and listed in the PDF uploaded as Project -2020 Annual Chip - Locations. The Supervisor District 1 can be identified in the attached PDF labled Stanislaus County Supervisor District Locations

Construction 05/2020 06/2021 5-7 12 8

Stanislaus 20/21 New Road Maintenance & Rehabilitation 2021 Chip Seal This project will include: Project Scope Development

Supervisor District 2 - Turlock and 3 - Salida numerous roads. While the Supervisor Dristricts have been identified, specific roads have not been determined and are still being evaluated by staff. The Supvisor District map has been uploaded as a PDF labled Stanislaus County Supervisor District Locations

Pre-Construction 07/2020 06/2021 5-7 5, 8 12

Stanislaus 20/21 New Safety 2020 Countywide Center and Edge-line Striping This project will include: Maintenance Program Plan Development Countywide in all Supervisor Districts as reported or identified through out the year. Supervisor Districts are shown in PDF labled Stanislaus County Supervisor District Locations

Pre-Construction 07/2020 06/2021 2-2 12, 21 5, 8, 12

Stanislaus 20/21 New Safety 2020 Countywide Shoulder Improvemnets This project will include: Maintenance Program Plan Development

Countywide location to include all Supervisor Districts 1-5. Work will be done as shoulders are identified as needing improvements. Supvisor Districts are shown in PDF labled Stanislaus County Supervisor District Locations

Pre-Construction 07/2020 06/2021 5-10 12, 21 5, 8, 12

Stanislaus 18/19 In Progress Other Keyes Road Bridge over TID Canal This project will include: Bridge Structure Rehab/Repair (Existing) | Replace Keyes Rd Bridge over TID canal Keyes Rd between Moffett and Esmar Road Construction 07/2020 06/2021 75-100 21 12

Stanislaus 19/20 Carried Over Other Schell Road Bridge over SSJIID Canal This project will include: Bridge Structure Rehab/Repair (Existing) Schell Road off Sonora Road North of Knights Ferry Construction 07/2020 06/2021 50-100 12 12

Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Crows Landing Road Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Crows Landing Road Pavement Rehabilitation from Hatch Road to Whitmore Avenue Crows Landing Road from Hatch Road to Whitmore Avenue Construction 07/2020 06/2021 20-20 21 12

Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Albers Road Repavement This project will include: Pavement Rehab/Repair (Existing) | Albers Road Pavement Rehabilitation Albers Road from Claribel Rd to the City of Oakdale Construction 07/2020 06/2021 15-15 12 8

Stanislaus 18/19 Forecasted Road Maintenance & Rehabilitation Garner Road Repavement This project will include: Pavement Rehab/Repair (Existing) | Garner Road Pavement Rehabilitation Garner Road at Yosemite Blvd (SR132) to Leckron Pre-Construction &

Construction 07/2020 01/2021

12/2020 12/2021 15-15 21 8

Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Sisk Road Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Sisk Road Pavement Rehabilitation from Green Leaf Court to Kiernan Avenue Sisk Road from Green Leaf Court to Kiernan Avenue Pre-Construction &

Construction 07/2020 01/2021

12/2020 12/2021 15-15 12 5

Stanislaus 20/21 New Other 2020-2021 Countywide Bridge Maintenace This project will include: Maintenance Program Plan Development | The County has over 200 bridges that it is responsible for maintaining. Included would be spaul repair, deck sealing and vegatation removal.

Countywide in all Supervisor Districts 1-5 as reported or identified by staff. Supervisor areas our shown in PDF labled Stanislaus County Supervisor District Locations

Pre-Construction 07/2020 06/2021 10-10 12, 21 5, 8, 12

Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020-2021 Countywide Patch Trucks This project will include: Maintenance Program Plan Development Countywide in all Supervisor Districts 1-5 as are reported or identified by crews. Supervisor Districts are shown in PDF labled Stanislaus County Supervisor District Locations

Pre-Construction 07/2020 06/2021 5-7 12, 21 5, 8, 12

Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020-2021 Countywide Crack Seal This project will include: Maintenance Program Plan Development Countywide in all Supervisor Districts 1-5 as identified by staff. Supervisor Districts are shown in PDF labled Stanislaus Supervisor District Locations Pre-Construction 07/2020 06/2021 5-5 12, 21 5, 8, 12

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Stanislaus 20/21 New Safety 2020 Countywide Pavement Markings and Signs This project will include: Maintenance Program Plan Development

Countywide in all Supervisor Districts 1-5 as reported or identified by crews. Supervisor Districts are shown in PDF labled Stanislaus County Supervisor District Locations

Pre-Construction 07/2020 06/2021 5-10 12, 21 5, 8, 12

Stanislaus 18/19 In Progress Other Quincy Road Bridge This project will include: Bridge Structure Rehab/Repair (Existing), Project Scope Development | Replace Bridge over TID Lateral No. 3 Quincy Road @ E Taylor Road Pre-Construction &

Construction 07/2019 01/2021

12/2020 12/2021 75-75 12 8

Stanislaus 18/19 In Progress Road Maintenance & Rehabilitation 9th Street Repavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | 9th Street Pavement Rehabilitation 9th Street from Pecos Avenue to Tuolumne River Bridge Construction 01/2021 12/2021 20-20 21 12

Sutter 19/20 Carried Over Road Maintenance & Rehabilitation Truck Route Intersection Improvements

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | The project will widen three intersections with the addition of asphalt and base rock to allow for large trucks to make the turns without conflict with other motorists. In addition new striping will be provided to make the intersection movements clear to all drivers. (This project is only partly funded by SB1)

The Project will take place at the following intersections:; Intersection of Reed Road and Muir Road; Intersection of Muir Road and Barry Road; Intersection of Railroad Avenue and Barry Road

Construction 02/2021 07/2021 10-20 3 4

Sutter 20/21 New Road Maintenance & Rehabilitation FY2020-21 Road Overlay Project This project will include: Pavement Rehab/Repair (Existing) Sinard Road from Paseo Avenue to Pennington Road; Sheldon Road from Paseo Avenue to Pennington Road; Farmlan Road from SR99 to Decker Road

Construction 02/2021 06/2021 10-20 3 4

Sutter 20/21 New Road Maintenance & Rehabilitation FY2020-21 Road Seals Project This project will include: Pavement Rehab/Repair (Existing)

Franklin Road from Township Road to Acacia Avenue; Elmer Avenue from CYC Limit to Eckhart Road; Eckhart Road from Elmer Avenue to Tierra Buena Road; East Onstott Frontage Road from CYC Limit to Eager Road; Villa Avenue from Butte House Road to North End; Romero Street from Butte House Road to North End; Long Street from Romero Street to East End; Valencia Street from Romero Street to East End; Capistrano Street from Romero Street to West End; Laredo Street from Romero Street to West End; Peralta

Construction 02/2021 06/2021 7-15 3 4

Tehama 20/21 New Road Maintenance & Rehabilitation District A - Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Dist A- no carryover roads from prior years. New roads include: Rawson, Paskenta, Benson, Bowman, Evergreen, Dusty. Construction 07/2020 06/2021 7-10 3 4

Tehama 20/21 New Road Maintenance & Rehabilitation District B - Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

District B roads that were not rolled forward from prior FY. Shasta Blvd, Manton Rd., South Ave., Forward Rd., Wildcat Rd. Construction 07/2020 06/2021 7-10 3 4

Tehama 20/21 New Road Maintenance & Rehabilitation District C - Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety)

District C roads that were not rolled over from prior FY. Black Butte, Boggs Champlin, Capay, Corning, Glenn, Hall, Kirkwood, Long Hollow, Lowery, Paskenta, Round Valley, South, Toomes Camp

Construction 07/2020 06/2021 7-10 3 4

Tehama 20/21 New Road Maintenance & Rehabilitation Shop Equipment This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | Equipment Purchase: Culvert Cleaning Jet trailer, Snow Blower, Grader, Skip Loader, Patch Truck, Pressure Washer, 3/4 Ton 2-Whl Drv Ext. Cab Truck

Shasta Blvd, Manton Rd., South Ave., Forward Rd., Wildcat Rd., Procurement/Operational Needs 07/2020 06/2021 15-20 3 4

Tehama 20/21 New Road Maintenance & Rehabilitation Engineering Department - Bridge Repair This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Feasibility Study, Preliminary Design, Document Preparation Woodson Bridge, South Avenue @Sacramento River Pre-Construction &

Construction 07/2019 07/2020

06/2020 06/2021 30-30 3 4

Trinity 20/21 New Road Maintenance & Rehabilitation North County Chip Seal Project (Weaverville) This project will include: Pavement Rehab/Repair (Existing) Trinity Dam, China Gulch, DC School, E. Weaver Creek, Roundy, Steelbridge, Steiner Flat, China, Coon Creek, Flame Tree, and Hennessey Road

Construction 06/2021 10/2021 15-15 2 2

Trinity 20/21 New Road Maintenance & Rehabilitation Pavement Preparation Project (Hayfork) This project will include: Pavement Rehab/Repair (Existing) Amort, Corral Bottom, Hyampom, and Lower South Fork Roads Construction 06/2021 10/2021 10-10 2 2

Trinity 20/21 New Road Maintenance & Rehabilitation Mid County Chip Seal project (Hayfork) This project will include: Pavement Rehab/Repair (Existing) Carter Gulch, Demos, East, Hardy, Mill, Nelson, Summit Creek, and Garrett Roads Construction 06/2021 10/2021 15-15 2 2

Trinity 20/21 New Road Maintenance & Rehabilitation South County Chip Seal Project (Ruth) This project will include: Pavement Rehab/Repair (Existing) Ruth Zenia, and Van Duzen Roads Construction 06/2021 10/2021 15-15 2 2

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Trinity 20/21 New Road Maintenance & Rehabilitation County Wide Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing) Slurry seal approximately 11 short road sections consisting of approximately 2.1 miles. Actual road sections to be reported at conclusion of project

Construction 08/2020 10/2020 7-7 2 2

Trinity 20/21 New Safety Advance Bridge Study This project will include: Environmental Study/Documents, Feasibility Study | Evaluate Select County Bridges to determine if the bridge needs to be replaced or can be rehabilitated and/or Scour Analysis.

E. Fork Stuarts Fork-Guy Covington Road, Price Creek – Price Creek Road, Salt Creek – Long Ridge Road, Kerlin Creek – Lower South Fork Road, Long Canyon Creek – Power House Road.

Pre-Construction 12/2020 06/2023 1-5 2 2

Tulare 20/21 New Road Maintenance & Rehabilitation 2021 RRAA Project 1 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design | Road rehabilitation through asphalt concrete overlay or asphalt pulverization and overlay.

The proposed project locations are: Ave 272 between Rd 128 and Rd 140; Rd 168 between A296 (Mineral King) and Ave 315; Ave 256 between Rd 140 and Rd 152; Ave 416 between Rd 144 and Rd 152; and Rd 168 between Ave 315 and State Route 216.

Pre-Construction & Construction

05/2020 01/2020

12/2020 10/2021 10-15 26 14, 16

Tulare 20/21 New Road Maintenance & Rehabilitation 2021 RRAA Project 2 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design | Road rehabilitation through asphalt concrete overlay or asphalt pulverization and overlay.

The proposed project locations are: Ave 184 between Rd 28 and Rd 80; D112A (I St.) between Ave 200 and Ave 211; Rd 208 between State Route 190 and Ave 152; Rd 236 between Ave 100 and Ave 104; and D238 between Ave 104 and Ave 112.

Pre-Construction & Construction

05/2020 01/2020

12/2020 10/2021 10-15 26 14, 16

Tulare 20/21 New Road Maintenance & Rehabilitation 2021 RRAA Project 3 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design | Road rehabilitation through asphalt concrete overlay or asphalt pulverization and overlay.

The proposed project locations are: Rd 228 between Ave 228 (Honolulu) and Ave 232 (Tulare); Avenue 228 (Honolulu) between Rd 228 (Strathmore) and D236 (Round Valley); Ave 216 (Paige) between Rd 68 and Rd 84 (Enterprise); Ave 320 between Rd 92 (Shirk) and Rd 108; Ave 160 between Rd 192 and Rd 200; and M137 (Reservation Rd) between MP 7.0 to MP 8.18.

Pre-Construction & Construction

05/2020 01/2020

12/2020 10/2021 10-15 26 14, 16

Tuolumne 18/19 In Progress Road Maintenance & Rehabilitation Tuolumne Road North Surface Treatment

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Preliminary Engineering should be complete by 6/2020. Construction costs are higher then revenues anticipated for 20/21 so County will allocate a portion of 20/21 revenues to go to construction in 2022. | This is for the testing and preparation of plans for the project. Construction will occur using 20/21 funds.

Located on Tuolumne Road North from Ponderosa Way to SR108 Pre-Construction & Construction

04/2019 07/2020

06/2020 06/2022 7-20 5 8

Tuolumne 18/19 In Progress Road Maintenance & Rehabilitation Kewin Mill Road Reconstruction This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design Located on Kewin Mill Road Pre-Construction &

Construction 04/2019 07/2020

06/2020 06/2022 20-20 5 8

Tuolumne 19/20 In Progress Road Maintenance & Rehabilitation Capital-Tuolumne Road Surface Treatment Project

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design | Preliminary Engineering performed in 19/20 and looking at 20/21 for construction.

Tuolumne Road from Mono Way to Tuolumne Road North Pre-Construction & Construction

07/2019 07/2020

06/2020 06/2023 5-8 5 8

Tuolumne 19/20 In Progress Road Maintenance & Rehabilitation Capital-Standard Road Rehabilitation Project

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New) | Preliminary Engineering performed in 19/20 and looking at 20/21 for construction.

Standard Road from Mono Way to Camage Ave. Pre-Construction & Construction

07/2019 07/2020

06/2020 06/2023 7-20 5 8

Tuolumne 20/21 New Other Special Departmental Expense This project will include: Procurement of Public Works Systems/Databases All of Tuolumne county Procurement/Operational Needs 07/2020 06/2021 1-1 5 8

Tuolumne 20/21 New Road Maintenance & Rehabilitation Spray Program This project will include: Procurement of Road Maintenance and Rehab Materials Various Roads through the county. Roads are selected within the County maintained system.

Procurement/Operational Needs 07/2020 06/2021 1-1 5 8

Tuolumne 20/21 New Traffic Control Devices Traffic and Signal Maintenance This project will include: Repair and Servicing of Public Works Equipment | Annual routine maintenance and emergency work of all county traffic signals. 13 various signal locations throughout the County. Procurement/Operational

Needs 07/2020 06/2021 1-1 5 8

Tuolumne 20/21 New Road Maintenance & Rehabilitation Crack Fill Program This project will include: Procurement of Road Maintenance and Rehab Materials Contract work on LaGrange and Mono Way. Force Account work on various roads through out County.

Procurement/Operational Needs 08/2020 06/2021 1-2 5 8

Ventura 20/21 New Road Maintenance & Rehabilitation Pavement Resurfacing - Lockwood Valley Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation

Western half of Lockwood Valley Road From SR 33 to Mutau Road (16.40 centerline miles)

Pre-Construction & Construction

07/2020 08/2022

05/2022 10/2022 15-20 37 19

Ventura 20/21 New Road Maintenance & Rehabilitation Pavement Resurfacing - Sulphur Mountain Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation

Sulphur Mountain Road from End of road to SR 150 (4.64 centerline miles)

Pre-Construction & Construction

07/2020 08/2022

05/2022 10/2022 15-20 37 19

Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 21, 2020

Ventura 20/21 New Road Maintenance & Rehabilitation Road Maintenance Activities Countywide

This project will include: Bridge Structure Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Shoulder maintenance, striping, sign replacement, ditch cleaning, culvert cleaning and other routine maintenance operations.

West County areas including: Ojai, Ventura, Oxnard, Limoneira, and Yerba Buena. East County areas including: Moorpark, Somis, Piru, Camarillo, and Simi.

Construction 07/2020 06/2021 1-2 37, 38, 44, 45 19, 27

Yolo 19/20 In Progress Road Maintenance & Rehabilitation South River Road Reconstruction This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | Full Reconstruction, shoulder backing, restriping, and pavement marking of 5.2 miles of road.

South River Road from the City of West Sacramento to the Freeport Bridge

Pre-Construction & Construction

09/2019 06/2022

05/2022 12/2022 15-20 4 3

Yuba 20/21 New Road Maintenance & Rehabilitation 2020 Overlay Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development

Various roads, including Alberta Ave, Albrecht Ave, Ames Rd, Ash Way, Baywood Way, Birch Ct, Boyer Rd, Chandler Rd, Country Club Ct, Deborah Rd, Doc Adams Rd, Ella Rd, Elmwood Ct, Fern Ct, Fernwood Dr., Gold St, Grove Ave, Jewett Ave, Kenwood Way, Laurellen Rd, Magnolia, Maywood Ct, Maywood Dr., Moon, Moonshine, N. Roberta, S. Roberta, Noble Rd, Oakwood Dr., Park Circle, Park Ct, Pinewood Way, Redwood Ct, Second Ave, Star, Sun, Vine Ct., Volk St, Wiget, Wildwood Dr., Woodland Circle, Woodland Dr

Pre-Construction & Construction

03/2020 07/2020

05/2020 12/2020 10-20 3 4