Session G3: Friday, 2:15-3:30 p.m. Corridor Re-Mix: Connecting the Nodes in Marstons Mills, MA Jo Anne Miller Buntich, Town of Barnstable Elizabeth S. Jenkins, AICP, Town of Barnstable Maureen Chlebek, P.E., PTOE, McMahon Associates Christi Apicella, AICP, McMahon Associates Brian Kuchar, RLA, P.E., Horsley Witten Group

Upload: planning1

Post on 06-Aug-2015

43 views

Category:

Presentations & Public Speaking


0 download

TRANSCRIPT

Page 1: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Session G3: Friday, 2:15-3:30 p.m.

Corridor Re-Mix: Connecting the

Nodes in Marstons Mills, MA

Jo Anne Miller Buntich, Town of Barnstable

Elizabeth S. Jenkins, AICP, Town of Barnstable

Maureen Chlebek, P.E., PTOE, McMahon Associates

Christi Apicella, AICP, McMahon Associates

Brian Kuchar, RLA, P.E., Horsley Witten Group

Page 2: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Session G3: Friday, 2:15-3:30 p.m.

October 24, 2014

Page 3: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Jo Anne Miller Buntich, Director

Growth Management Department

Elizabeth S. Jenkins, AICP, Principal Planner

Growth Management Department

Maureen Chlebek, P.E., PTOE

Senior Project Manager

General Manager – Taunton and Providence

Christi Apicella, AICP

Project Manager

Brian Kuchar, RLA, P.E.

Senior Landscape Architect

Page 4: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

[subtitle or location]

Cash Market

Intersection

Focus Areas

Mill Pond The Village Core

Main

Street

Legend

Page 5: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Community Based

Context Sensitive

Design

Page 6: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Traffic Calming

Pedestrian Connectivity

Place making

Safety

Improve Water Quality

Shared Parking

Cash Market Intersection

Community Concerns

Page 7: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Layout Limits

Settled/developed area

Topography

Permitting

Parking

Reduce Vehicle Dominance

Create Village Atmosphere

Change Behavior

Challenges

Page 8: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22
Page 9: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Cash Market

Intersection

Focus Areas

Mill Pond The Village Core

Main

Street

Legend

Page 10: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Cash Market Intersection

[insert photo (s)]

Photo credit: Google Maps

Page 11: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Cash Market Intersection

Page 12: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Cash Market Intersection

Photo credit: Google Maps

Page 13: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Village Photos

Photo credit: Google Maps

Page 14: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Village Photos

Photo credit: Google Maps

Photo credit: Google Maps

Page 15: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Village Photos

Page 16: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

•Traffic Calming

•Complete Streets

•Geometric

Improvements

•Signage and Striping

•Lighting and

Streetscape Elements

•Green Streets and Low

Impact Development

Toolbox

Page 17: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Develop preferred concept (25 minutes)

▪ Facilitators

▪ Roll plan

▪ Cross-sections

▪ Game pieces

Report back

Community concept

Break out groups

Page 18: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Cash Market - Existing conditions

Page 19: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Sample Cross Sections

Page 20: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Proposed Recommendations – October 2013

Page 21: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Preferred Option: Road Realignment

Page 22: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Preferred Option: Cross Section

Existing

Page 23: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Preferred Option: Four-Legged intersection Design

Advantages:

Provides conventional design

Maintains parking at Cash Market

Provides Traffic calming by platform

intersection

Page 24: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Considered

Raised Crosswalks

Curved Roadway

4-Way Stops

Midblock

crosswalks

Bumpouts

Bollards

Pedestrian Warning signs

On-street parking

Page 25: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Recommended

Mid-Block Crosswalks with Bumpouts (Curb Extensions)

Bollards

Pedestrian Warning Signs

Platform Intersection

On-street Parking

Page 26: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Continued civic engagement with stakeholders through

Village Association

25% design workshop at November Village Association

meeting

Concerns and suggestions incorporated

Final design presented to Village before bid documents

released.

Design Process

[[

Page 27: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Civic Engagement

Project success grew from gaining and maintaining stakeholders’ trust.

Long term civic engagement process began in early 2009.

Media presence was important – project webpage; e-mail notices

Personal interactions critical to success.

Partnership with Village Association. Village Association personal contacts extended those personal interactions to bring about trust and consensus.

Page 28: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Funding

Unique funding source: the Cape Cod Commission’s ability to assess mitigation for regional impacts allowed design concepts and construction documents without “penny pinching”

Town capital funds set aside for FY 2017 construction

Construction will begin once bid process is complete

Page 29: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Feedback

Questions

Comments

Page 30: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Jo Anne Miller Buntich

p 508 862 4735 | e-mail [email protected]

Elizabeth S. Jenkins, AICP

p 508 862 4736 | e-mail [email protected]

Maureen Chlebek, P.E., PTOE

p 401 648 7200 | e-mail [email protected]

Brian Kuchar, RLA, P.E.

p 508 833 6600 | e-mail [email protected]

Christi Apicella, AICP

p 508 823 2245 | e-mail [email protected]

Page 31: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

END PPT – PLACEHOLDERS to follow to

discuss other options, only if time allows

Page 32: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 1 – Streetscape

Page 33: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 1 – Cross Section

Existing

Page 34: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 1 – Precedents

Page 35: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Options 2 – Cross Section

Existing

Page 36: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 3 – Streetscape

Page 37: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 3 – Cross Section

Existing

Page 38: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 3 – Precedents

Page 39: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 4 – Cross Section

Existing

Page 40: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Concept 1 – Four-legged Intersection Design

Page 41: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 2 – Streetscape

Advantages: [give reasons selected over other options]

Page 42: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Option 2 – Precedents

Page 43: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Concept 3 – Roundabout Design

Page 44: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Concept 4 – One-Way Design

Page 45: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Pedestrian Circulation

Page 46: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Cross-Sections Graphic

Existing

Proposed Main Street Options

Page 47: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Pedestrian Connection – Woodland Walkway

Page 48: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Pedestrian Connection - Switchback Ramp

NOTE: Switchback ramp would be an elevated structure (i.e. on piers or utilizing retaining walls).

Page 49: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Pedestrian Circulation

Page 50: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Boardwalk Sidewalks

Page 51: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Curb Extensions

Page 52: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Gateway Nodes

Page 53: G3 sneapa2014 marstons mills_final_with notes-backup_ 2014-10-22

Creating a Sense of Place