Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?

Upload: chin

Post on 06-Feb-2016

31 views

Category:

Documents


1 download

DESCRIPTION

LID Requirements in Mecklenburg County. Where Is It Required?. Why Is It Necessary?. What Is The Goal?. How Does It Work?. Gar Creek in Huntersville. Huntersville Jurisdiction. Effective February 2003. Stream Miles = 40 Impaired Stream Miles = 25 @ 63%. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Gar Creek in Huntersville

Gar Creek in Huntersville

LID Requirements in Mecklenburg County

What Is The Goal?

Why Is It Necessary?

Where Is It Required?

How Does It Work?

Page 2: Gar Creek in Huntersville

Town Limits = 38.9 square miles ETJ = 22 square miles Total Area = 60.9 sqaure miles

Huntersville JurisdictionEffective February 2003

Stream Miles = 40

Impaired Stream Miles = 25 @ 63%

Page 3: Gar Creek in Huntersville

Increased Development Results in Declining Water Increased Development Results in Declining Water Quality ConditionsQuality Conditions

Page 4: Gar Creek in Huntersville

Storm Water Runoff Pollutants

Bacteria

Sediment

Heavy Metals

Pesticides

Fertilizers

Petroleum Products

Page 5: Gar Creek in Huntersville

Channel erosion due to storm water runoff volumes and rates.

Page 6: Gar Creek in Huntersville

McDowell Creek, Huntersville

Mountain Island Lake

Page 7: Gar Creek in Huntersville

McDowell Creek Water Quality Model

Developed by Tetra Tech, Inc. – Private consulting firm

Objectives of the Modeling Effort:

Quantify the negative impacts

Identify causes

Predict future impacts

Develop solutions

Page 8: Gar Creek in Huntersville

116.9

205.4

0

50

100

150

200

250

ton

s/ye

ar

Existing FutureTN

75.7 % Increase

Total Nitrogen

Existing Future

10.17

18.93

0

2

4

6

8

10

12

14

16

18

20

ton

s/ye

ar

Existing FutureTP

86.1 % Increase

Total Phosphorus

Existing Future

1.8

13.5

0

2

4

6

8

10

12

14

Tim

es/

yea

r

Existing FutureBankfull Return Interval

650 % Increase

Bank Full Conditions

Existing Future

Modeling Results

Page 9: Gar Creek in Huntersville

The conventional methods alone do not work effectively.

Page 10: Gar Creek in Huntersville

To establish storm water management requirements and controls to prevent surface water degradation by controlling discharges of pollutants

as well as runoff volumes and rates.

Goal Established by Elected Officials

Page 11: Gar Creek in Huntersville

Performance Criteria:

6 Basic Elements Need to be addressed:1. 85% TSS removal.2. Using LID treat the runoff from the first 1 inch of

rainfall.3. Use LID in combination with conventional practices

to treat the difference in runoff from pre versus post conditions for the 2 year 24 hour storm.

4. Any temporary water quality storage pools must drawdown in 48 to 120 hours.

5. Peak storm water runoff rates shall be controlled for development above 12% impervious

6. No one BMP shall receive runoff from an area greater than 5 acres.

Page 12: Gar Creek in Huntersville

Rain Gardens

Dry Ponds

Wet Ponds

Grassed Swales

LID Conventional

Use a combination of conventional and Low Impact Development (LID) techniques to mimic, to the extent practicable, the natural hydrology of a site by:

• infiltrating,

• storing,

• retaining, and

• detaining

storm water.

Page 13: Gar Creek in Huntersville

BMPs for Use in Huntersville (Tables 6.1 and 6.2, Pages 48 and 49)

BMP Applicable Zoning Districts(1)

Applicable Performance Criteria

(2)

Design Function(3)

Function(4)(WQ, VC, PC)

Strategic Clearing & Grading U, T, R 3(a)   WQ, VC, PC

Reduce Impervious Surfaces U, T, R 3(a)   WQ, VC, PC

Bioretention (Rain Garden) U, T, R 3(a), 3(b) Section 4.0 WQ, VC, PC

Infiltration Trench U, T, R 3(a), 3(b) Section 8.0 WQ, VC, PC

Infiltration Swale U, T, R 3(a), 3(b) Section 8.0 WQ, VC, PC

Swales U, T, R 3(a) Section 5.0 WQ, VC

Swales with Outlet Control T, R 3(a), 3(a) Section 5.0 WQ, VC, PC

Vegetative Filter Strips & Buffers U, T, R 3(a) Section 7.0 WQ, PC

Dry Well, Cistern & Rainbarrel U, T, R 3(b)   WQ, VC, PC

Porous Paving U, T, R 3(b)   WQ, VC

Curb & Gutter Elimination R 3(b)   WQ, PC

Rooftop Storage U, T, R 3(b)   VC, PC

Wet Pond U, T, R 3(b), 3(d) Section 1.0 WQ, VC, PC

Extended Dry Pond T, R 3(b), 3(d) Section 6.0 VC, PC

Storm Water Wetlands T, R 3(b) Section 2.0 WQ, VC, PC

Sand Filter T, R 3(a) Section 3.0 WQ, VC, PC

(1)     Applicable Zoning Districts: These are the Zoning Districts where the BMP can be used including U = Urban; T = Transitional; R = Rural.(2)     Applicable Performance Criteria: These are the Performance Criteria Section numbers (see Section 3) that the BMP can be used to satisfy.(3)     Design Function: All BMP designs are contained in the N.C. Department of Environment & Natural Resources, Storm Water Best Management Pratices, April 1999(4)     Functions: These are the dominate functions that the BMPs perform including WQ = Water Quality; VC = Volume Control, PC = Peak Control.

Page 14: Gar Creek in Huntersville

Site Data SheetArea (ft2) % of Site Area (ft2) % of Site

Pervious AreasRow Crops

PastureForest

WetlandMeadow

LawnImpervious Areas

Residential & Light IndustrialRooftops

Driveways & Parking LotsOther Impervious Area

RoadSidewalk

Commercial & Heavy IndustrialRooftops

Parking LotOther Impervious Area

RoadSidewalk

Storm Water Management FacilitiesPond/Wetland Surface AreaSwales/Channels/Infiltration

Site Totals: 0 0.0% 0 0.0%

Total Site Impervious Cover1

Impervious Cover within Developed Area2

Existing Land Use Proposed Land UseLand Use/Cover Data

N/AN/A

Page 15: Gar Creek in Huntersville

BMPsProject Unassigned Drainage Areas (DA) associated with BMP sets.

Areas (ft2) Area (ft2) DA1 DA2 DA3Pervious Areas

Row Crops 0 0Pasture 0 0Forest 0 0

Wetland 0 0Meadow 0 0

Lawn 0 0Impervious Areas

Residential & Light IndustrialRooftops 0 0

Driveways & Parking Lots 0 0Other Impervious Area 0 0

Road 0 0Sidewalk 0 0

Commercial & Heavy IndustrialRooftops 0 0

Parking Lot 0 0Other Impervious Area 0 0

Road 0 0Sidewalk 0 0

Storm Water Management FacilitiesPond/Wetland Surface Area 0 0Swales/Channels/Infiltration 0 0

Total Area 0 0

Proposed Land Use/ Cover Data by DA

Page 16: Gar Creek in Huntersville

BMPsBMPs Applied to DA DA1 DA2 DA3Wet PondDry PondWetlandSurface Sand FilterBioretentionWater Quality Dry SwaleGrass ChannelsInfiltrationUser-defined BMP (Sequential with other assigned BMPs)

Stream BufferEnter Buffer Width for each DA with Stream Buffer (feet): 50Percent of DA within treatment zone (150' + buffer width) 56.0%

Storage volume for 2 yr, 24 hr storm (acre-ft) 1.376

Net Reductions DA1 DA2 DA3Flow converted to infiltration by BMPs 35.0% 0.0% 5.6%Total Nitrogen 67.8% 25.0% 17.3%Total Phosphorus 80.6% 19.0% 21.5%TSS 93.1% 47.0% 34.6%Fecal Coliform 97.8% 78.0% 2.8%

Page 17: Gar Creek in Huntersville

Model Output – Pollutant Loading

Page 18: Gar Creek in Huntersville

Davidson

Goose, Duck & Stevens Creek Watersheds in

Mint Hill

Other Areas of Mecklenburg County where LID is being Considered

Page 19: Gar Creek in Huntersville

?