gasguard . gasguard 2 & 3 - technicalqr.com.au · 6 l0200-0653fw(b)ks3* 65 21/2 300 400 15200...
TRANSCRIPT
GASGUARD .
www. systemcontrol.com.au
GASGUARD 2 & 3
Automatic gas safety system for all gas users Consisting of Gas safety shut off valve and Gas safety control panel
Ref: 33071-0110
• Automatic testing of the down-stream installationto check that all valves are closed and that pipeworkand fittings are gas tight before each system start-up.
• Protection from accidental or intentional misuse by students or users.
• Short testing time, with automatic start-up if no leakage was detected fromprevious operation.
• Easy installation and wiring due to combined gas valve block design and pre-wired system.
• Easy commissioning and trouble-shooting using logic diagram.
• Remote control by BMS, if required.
• Function according to AS5601 when Fire Suppressant System is installed.
GASGUARD 2&3 Installation And Commissioning Instruction
GASGUARD .
www. systemcontrol.com.au
Application For the commercial building management
GASGUARD 2&3 system can be used as the central gas safety system before building for hospital, factory, boiler room, and others gas users. Before every system start up, the GASGUARD automatically check the entire installation on gas pipe down stream of the safety shut off valve, for leaks, tight closing of valve and adequate supply pressure. The GASGUARD only supply gas once all tapping points are closed and the while system is ready for gas supply.
Commercial kitchen
Commercial boiler room
FQ
Central shut off system
Kitchen room
Boiler room
Work shopThe central GASGUARD 2 & 3 can be installed in the metering room, can be controlled remotely by BMS. Filter and gas pressure control system can be installed up stream of GASGUARD.
GASGUARD .
www. systemcontrol.com.au
Installation and accessories
GASGUARD 2& 3 can be connected to any safety interlock such as: emergency stop button, fire alarm system, fan pressure switch, gas leakage detector. GASGUARD 2 & 3 can be remotely controlled by BMS.
Filter Regu GASGUARD
L0200P
GLD
PS
BMS Building management systemESB Emergency stop buttonGLD Gas leakage detectorPS Pressure switch for fanFAS Fire alarm system
BMS
ESB FAS
Ball valve
OPSO Regulator Gas detector Emergency stop button pressure switch Stop button
Optional accessory
Order No. Name Description L0201** Emergency stop button Twist/Key reset J125S10 ( VGBF) OPSO regulator OPSO regulator from 20-100mm GFK *** Gas filter Optional diameter from 15-200mm. DG *** Pressure switch Optional pressure range up to 50kpa TCSE126KM(KG) Gas detector Wall fixed sensor and panel (KM for NG, KG for LPG) TCSE301A Alarm Siren and flashing lamp 230V AC (12V DC is optional)
Please contact SCE for more product information
GASGUARD .
www. systemcontrol.com.au
Technical data
Type of gas: Natural gas, LPG(gaseous), Biologically produced methane (Max. 0.1%-by-vol. H2S) or air; other gases on request. The gas must be dry in all temperature and must not contain condensate.. Inlet pressure Pe Max.: GASGUARD 2 50 kPa GASGUARD 3 100-800kPa Operating time: Opening time 5-24s
Closing time <1s
Storage temperature: 0-60℃ Working ambient temperature: -20- +60℃
No condensation permitted. Safety valve: A Class AG2726 Main voltage: 240V AC, +5/-15%, 50/60HZ; BMS interface: 24V DC. Cable gland: M20×1.5 Electrical connection: Terminal Max. 1.5mm² or plug Enclosure: IP 54 Valve housing: Aluminum, Valve seal: NBR Pipe connection: GASGUARD 2: DN65-DN200 GASGUARD 3: Rp40-DN150 Position indication contact rating: 240V AC, 3A Panel material: Plastic (special on request)
Wiring diagram
Easy installation thanks to pre-wired 2m cable with plug between control panel and gas valves by SCE. 24V DC interface for BMS, fire alarm system or any other remote control system Voltage free feedback to BMS Reserved terminals for safety interlock: emergency stop button, exhaust fan pressure switch, gas detector, etc.
GASGUARD .
www. systemcontrol.com.au
Control panel and main valve dimensions
Main valve dimensions
Item GASGUARD type Conection Dimendions (mm)
Weight(kg) mm inch L D2 d2 H1 H2 1 L0200-040**** 40 1-1/2 150 - - 345 100 10-112 L0200-050**** 50 2 180 - - 350 117 11-133 L0200-065**** 65 2-1/2 290 185 18 370 135 15-284 L0200-080**** 80 3 310 200 18 378 137 17-355 L0200-100**** 100 4 350 229 18 400 163 21-456 L0200-125**** 125 5 400 250 18 450 158 26-637 L0200-150**** 150 6 480 285 23 445 173 34-838 L0200-200**** 200 8 600 340 23 475 218 52-143
GASGUARD 2 & 3 gas flow rate and pressure drop
1, Natural gas sg=0.62 2, Town gas sg=0.45 3, LPG sg=1.65 4, Air sg=1.00
Max. ∆P≤0.25kpa of GASGUARD 2 & 3 is recommended. The pressure drop can’t be higher than 10% of inlet pressure. 1kpa=10mbar
GASGUARD .
www. systemcontrol.com.au
How to select a GASGUARD 2 & 3? 1, Information requirement: Please click below information to size a GASGUARD 2 & 3,
1, Application: Kitchen □ Boiler room □ Building management □ other ___________
2, Gas type: Nat gas □ LP gas □ other ____________
3, Gas pressure: 2.75kpa □ 7kpa □ 35kpa □ 100kpa □ other ________ kPa
4, Max. gas flow: __________MJ/h or ____________m3/h Gas flow direction ___________
5, Gas pipe diameter: 50mm □ 65mm □ 80mm □ 100mm □ 150mm □ other ________ mm
6, Power supply: 240V AC □ 24V DC □ Other__________________
7, BMS or fire alarm control signal: 240V AC □ 24VDC □
8, Voltage free valve position feedback signal to BMS: Yes □ No □
9, Optional or special requirement: _____________________________________________________ __________________________________________________________________________________
2, Standard models GASGUARD2:
Item Part No. Valve size Max. inlet
Max. gas [email protected] pressure drop Power
consumption W mm inch
pressure NG LPG kPa(1) m3/h MJ/h m3/h MJ/h
1 L0200-0652FW(B)KS* 65 21/2 50 125 4700 80 6400 1052 L0200-0802FW(B)KS* 80 3 50 160 6000 110 8800 1053 L0200-1002FW(B)KS* 100 4 50 250 9500 160 12800 1054 L0200-1252FW(B)KS* 125 5 50 350 13300 210 16800 1055 L0200-1502FW(B)KS* 150 6 40 550 20900 340 27200 1056 L0200-2002FW(B)KS* 200 8 20 900 34200 550 44000 105
3, Standard modes GASGUARD 3:
Item Part No. Valve size Max. inlet Max. gas flow@ 1kPa pressure drop Power
consumption W mm inch
pressure NG LPG kPa(1) m3/h MJ/h m3/h MJ/h
1 L0200-0403RW(B)KS1* 40 11/2 100 140 5300 90 7200 1052 L0200-0403RW(B)KS4* 40 11/2 400 140 5300 90 7200 1053 L0200-0503RW(B)KS1* 50 2 100 250 6000 160 12800 1054 L0200-0503RW(B)KS4* 50 2 400 250 6000 160 12800 1055 L0200-0653FW(B)KS1* 65 21/2 100 400 15200 240 19200 1056 L0200-0653FW(B)KS3* 65 21/2 300 400 15200 240 19200 1057 L0200-0803FW(B)KS1* 80 3 100 620 23500 320 25600 1058 L0200-0803FW(B)KS2* 80 3 200 620 23500 320 25600 1059 L0200-1003FW(B)KS1* 100 4 100 800 30400 480 38400 10510 L0200-1003FW(B)KS4* 100 4 400 800 30400 480 38400 10511 L0200-1253FW(B)KS1* 125 5 100 1100 41800 680 54400 10512 L0200-1503FW(B)KS1* 150 6 100 2000 76000 1100 88000 105
Remark: (1) All valves are BSP thread or DIN flange connection(2) Operation gas flow must be less than recommend Max. gas flow.(3) Power consumption at holding time when 240V AC power supplied.
GASGUARD .
www. systemcontrol.com.au
4, Order Example: L0200-0803FWKS1
* If “none”, this specification is omittedSpecial requirement for GASGUARD contact System Control Engineering for more information.
Specification for GASGUARD 3: L0200-0803FWKS1, GASGUARD 3, 80mm diameter, 3" flanged connection, Max. inlet gas pressure 100kPa. NG@20000MJ/h. 24V interface for BMS or fire section. Voltage free valve position feed back to BMS. 2m pre-wired cable from panel to valves.
GASGUARD 2&3 Installation And Commissioning Instruction
GASGUARD 2&3 Installation And Commissioning
Instruction
System Control Engineering Pty Ltd
Ref: 34130
GASGUARD 2&3 Installation And Commissioning Instruction
GASGUARD 2&3
-Gas Safety Shut Off System
Installation and Commissioning
Instructions
Please read this introduction and the
valve manual before any operation and
keep in a safe place.
Warning:
All the work set out in these operating
instructions must be completed by authorized
trained personnel! Incorrect installation, adjustment,
modification, operation or maintenance may cause
injury or material damage.
Check delivery
Check the quantity of products are match
your order. No visible damage to goods
Check before installation
Main power voltage, electric power
consumption, ambient temperature, enclosure, inlet
gas pressure and installation position-see label on
the valve and control panel.
Valve installation position
Valve can be installed in vertical position and
horizontal position. but not upside down.
The valve must at a min. distance of 20mm from any
material whatsoevers.
Check the gas flow direction before fasting to pipe
Tightness test on the up and down stream pipe, shut
off all gas appliances before starting the GASGUARD
GASGUARD 2 Pe max:
50kpa
GASGUARD 3 Pe max:
Check the label on VK
Caution! Do not clamp the unit in a
vice. This could cause external
leakage. Only secure the pipe by
holding the octagon with a suitable
spanner.
Caution! When the valve be installed in
vertical pipe, the wire connection box
must be pointing upwards. Otherwise
the actuator will be damaged.
GASGUARD 2&3 Installation And Commissioning Instruction
www.systemcontrol.com.au
System Adjustment
The bypass valve and Pressure switch are pre-set by
manufacture.
Commissioning and Troubleshooting
Please see the file of GASGUARD Commissioning
and Troubleshooting.
Important! Before commissioning, the down stream
pipe pressure must be released and all pipes must be
leak-proof.
Maintenance of System
Test For Internal and External leakage
Check for any external leaking in the pipe and valve
connections and the valve body. Check for any
internal leaking of the valve, if so, change to a new
valve.
Function Check
Follow the instruction of Commissioning and
Trouble- shooting to do the function check.
Control Panel Installation
Wall mounting panel dimension and screw size see
below.
Key Switch
Stop button
Power On Press & Hold for start
Ready to Test
Gas On when Lit
SCE GASGUARD
200mm
120
mm
Gas Off when LitOff On
Optional
75mm
125mm
89m
m
188mm
4×4mm holes for screw the lower part of panel on the wall. Ø 3.5×25mm screw are recommended
4 of screw to open the panel
Wiring
GASGUARD prewired with 2m lead with 3pin plug for
power supply. If no power point is available change
to hard wire.
2m prewired cable with quick connection plug from
the valves to panel, 2m extension cable is optional
(L0200-PC03).
Wire Selection
Wire size is Max. 1.5mm2
Flexible wire is recommended.
This unit MUST be protected from water and
U.V.
For more details of valves and control panel,
see the Kromschroeder product instructions
and SCE wiring drawing.
Caution! In order to ensure smooth and
safe operation: check the inlet and outlet
tightness and function of the GASGUARD
every year.
Caution! GASGUARD 2 PeMax. is 50kpa,
operating PeMax. is 35kPa.Any over
pressure operation will cause
unrepairable damage to the valves.
Caution! Commission may only be carried
out by an authorised fitter or authorised
person. The unit may only be released for
unsupervised operation once
commissioning has been completed
correctly.
No
No
No
No No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Check valve is installed with correct voltage coil and gas flow direction.
No Yes
Is leakage test OK for all of the down- stream gas pipework?
Install the valve properly by following the instructions
Test & fix any leakage point on the pipe.
Is GASGUARD wired correctly? Rewire following the wiring diagram
Relieve down stream pipe pressure and shut off all gas appliances
Reset all safety interlocks: fire alarm system, Emergency stop button, BMS, etc.
Turn on the GASGUARD by key switch
Is the “Power ON” and the “Gas OFF”
lamp on?
If only “Gas OFF” is lit, check the “Power ON” globe
“Power ON” and “Gas ON” light immediately. Check the valve for any internal leakage
If only “Power ON” is lit, reset the stop button on panel or check “Gas OFF” lamp
Are you ready?
No light on? Check the power supply, interlock or fuse
GASGUARD Commissioning and Troubleshooting Follow the procedure below to commission your GASGUARD correctly …… and safely.
• All installation and wiring must be carried out by a licensed plumber and electrician! • All the work described in these instructions may only be completed by authorized, trained personnel! • Warning! Incorrect installation, adjustment, modification, operation or maintenance may cause injury or material damage
No
Yes Yes
Yes Yes
Yes
Yes
Yes
Turn on the gas appliances to check system is functioning correctly
If fitted, turn off and reset system using “Stop button” to check
If fitted, turn off and reset system using interlocks or BMS.
Shut off system and relieve down steam gas pressure, restart system, double check the testing time.
Check for any down stream leakage (pipe fittings, appliance turned on etc.) or bypass valve not functioning.
You have set up the GASGUARD properly
No No Press and hold “Start” button.
“Gas ON” is Lit .
Yes
No
Check function of main gas valve
Name _______________________ Signature_____________________ Date: ___/___/_______ Service Phone: ________________ Company :_____________________ ______________________________
Write down the testing time on the side label
“Gas ON” is not lit after pressing the “Start” button for long period
“Gas OFF” lamp off, but “Gas ON” not lit. Check the “Gas ON” globe
Check the gas supply pressure
www.systemcontrol.com.au Ref: 30441 - 0809
9 P
IN p
lug
SY
ST
EM
C
ON
TR
OL
E
NG
INE
ER
ING
AC
N 0
06
491
88
1
PT
Y L
TD
AB
N 6
1 8
15
305
49
6
ME
LB
OU
RN
E
S
YD
NE
Y
BR
ISB
AN
E
A
DE
LA
IDE
AU
CK
LA
ND
ww
w.s
yste
mcon
tro
l.com
.au
DA
TE
:1
9-0
3-2
01
1
DR
AW
N:
SC
E
RE
VIS
ION
PA
GE
:1
NE
XT
DW
G N
o.
39648
DA
TE
OF
:1
EN
12
34
5N
67
811
12
13
910
14
15
16
E
B2
CN
CN
O
EB
Sta
nd
ard
24
V D
C c
on
tro
l sig
na
l fr
om
BM
S
or
fire
ala
rm s
yste
m,
Mo
ve
po
we
r su
pp
ly fro
m te
rmin
al 2
to
term
ina
l 1
EB
E
me
rgency S
top B
utton
VB
B
ypass G
as V
alv
e
VM
Main
Gas V
alv
e
PS
P
ressure
Sw
itch
CP
I C
lose P
ositio
n Indic
ation
Sw
itch
B1 B
ridge
B2 B
ridge
Op
tio
nal
Vo
ltag
e
fre
e v
alv
e p
ositio
n
fee
db
ack f
or
bu
ildin
g
ma
na
ge
me
nt
syste
m
GA
SG
UA
RD
Co
ntr
ol
Pan
el &
Eq
uip
me
nt
Wir
ing
L0
20
0-P
VM
CP
IP
S
CN
C
NO
NC
NO
C
Ne
w T
erm
ina
l #
Wir
e s
ize
to t
he
pa
ne
l: f
lexib
le w
ire
1-1
.5m
m2
NL
24
0V
AC
2m
pre
wir
ed c
ab
le f
rom
co
ntr
ol p
an
elto
valv
es,
1m
fo
r L
ab v
ers
ion
1,
Mo
ve
po
wer
su
pply
fro
m t
erm
ina
l 2
to t
erm
ina
l 1
wh
en
24
V D
C c
on
ne
cte
d t
o t
erm
inal1
5 &
16
fro
m
fire
serv
ice
s p
an
el.
2,R
em
ove
lin
kB
2 W
he
n c
on
ne
cting
an
y
rem
ote
sa
fety
in
terl
ock s
uch
as e
me
rgen
cy
sto
p b
utt
on
s,
fan
sw
itche
s,
flo
w s
witch
es,
gas d
ete
cto
rse
tc.
3.2
m le
ad
With
3 p
in p
lug f
or
po
we
r sup
ply
.
Gas in
let
CO
NT
RO
L P
AN
EL
SYST
EM C
ON
TRO
L E
NG
INEE
RIN
GAC
N 0
06 4
91 8
81
PTY
LTD
ABN
61
815
305
496
MEL
BO
UR
NE
SYD
NEY
BR
ISB
AN
E
A
DEL
AID
E
A
UC
KLA
ND
ww
w.s
yste
mco
ntro
l.com
.au
DAT
E:03
08
2009
DR
AWN
: SC
E
REV
ISIO
NPA
GE:
1
NEX
T
DW
G N
o. 3
4127
DAT
E
OF:
1D
imen
sion
sfo
r GA
SGU
AR
Dco
ntro
l pan
el
L020
0-P
Key
Sw
itch
Stop
but
ton
Pow
er O
nPr
ess
& H
old
for
star
tR
eady
to T
est
Gas
On
whe
n Li
t
SCE
GA
SGU
AR
D
200m
m
120mmG
as O
ff w
hen
Lit
Off
O
n
Opt
iona
l
75m
m125m
m4
of s
crew
to
open
the
pane
l
105m
m
Hei
ght w
ithou
t sto
p bu
tton
SCE
GA
SGU
AR
DC
ontr
ol p
anel
212m
m
108mm
5mm
Dia
met
er
Dim
ensi
ons
for m
ount
ing
SY
ST
EM
CO
NT
RO
LE
NG
INE
ER
ING
AC
N00
64
91
88
1P
TY
LT
DA
BN
61
81
53
05
49
6
ME
LB
OU
RN
ES
YD
NE
YB
RIS
BA
NE
AD
EL
AID
EA
UC
KL
AN
Dw
ww
.sys
tem
con
tro
l.com
.au
DA
TE
:0
30
82
00
9
DR
AW
N:
SC
E
RE
VIS
ION
PA
GE
:1
NE
XT
DW
GN
o.346
98
DA
TE
OF
:1M
ou
nti
ng
Tem
pla
tefo
rG
AS
GU
AR
DC
on
tro
lP
an
el
L0
20
0-P
1:1
SC
EG
AS
GU
AR
D
Co
ntr
olp
an
el
5m
mD
ia
212m
m
108mm
Scale
:fu
llsiz
e
GASGUARD .
www. systemcontrol.com.au
Detail information on this system or other products, please contact System Control Engineering pty. Ltd local office or visit www.systemcontrol.com.au
We reserve the right to make technical modification in the interests progress
Victoria New South Wales Queensland South Australia New Zealand Tel: (03) 9845 0000 Tel: (02) 9838 9966 Tel: (07) 3801 4223 Tel: (08) 8401 9870 Tel:(09) 9636 1401 Fax: (03) 9878 5337 Fax: (02) 9838 8788 Fax: (07) 3801 4229 Fax: (08) 8312 4963 Fax:(09)9636 1525
Distributed by:
GASGUARDOPERATING INSTRUCTIONS
- To be installed adjacent to the control panel -
1. Turn OFF all gas appliances and outlets which are served by this
GASGUARD
2. Check that the Inlet gas supply is turned ON
3. Turn the Key Switch ON. The WHITE Power On lamp will come on.
If the WHITE lamp does not come on, check any applicable circuit
breakers or contact your electrician.
4. Now, either the YELLOW or GREEN lamps should be lit.
If neither lamp is lit, reset any Emergency Stop switches or other
devices that are interlocked with the control panel. There may be one
on the top right of the panel and/or in locations remote from the panel.
5. If the GREEN, Gas On lamp is lit, the gas supply has automatically detected
that the system is good and you can use your gas appliances, as required.
6. If the YELLOW Ready to Test light is illuminated, press and hold the GREEN
button until this GREEN Gas On button is lit.
See below for the approximate time you must hold this button to
pressure test your system.
7. If the GREEN Gas On lamp does not come on, go to Step 1 and again check
that ALL gas appliances and valves are turned off.
8. If the above operations do not restore your gas supply, you may have a gas
leakage that must be checked by a qualified person.
Your Service Contact …………………………………………………………
Approximate Hold Time (Item 6) for this system …….. seconds / minutes
www.systemcontrol.com.au
34128-310310