gaza strip: water and habitat department- january-december … · 2016-03-21 · due to gaza 2014...

1
Wadi Gaza Environmental Improvement Lot 1 – Intermediate WWTP (treatment capacity of 16'000m3/d ) Lot 2 – 4km of pressure line three sewage pumps Lot 3 – Rehabilitation of Al-Nusirate sewage pumping station (240,000 Beneficiaries) Emergency Repairing Wastewater Pumping Stations (42,000 Beneficiaries) Electromechanical Refurbishment Water Booster Station (75,000 Beneficiaries) Rehabilitation of Beit Lahia WWTP (330,000 Beneficiaries) Rehabilitation of Pump Stations 5A&7B (140,000 Beneficiaries) Rehabilitation of Abu Naser Well (15,000 Beneficiaries) Rehabilitation of Water and Sanitation Infrastructures in Gaza Strip Bani Suhaila Support to the Power Sector Gaza Strip: Water and Habitat Department- January-December 2015 Deficit 50% Current Project Planning Emergency Preparedness (1,723 beneficiaries) - Application of 3M protective film Hospitals Rehabilitaion (321 beneficiaries) - Repair damage from 2014 conflict Securing Reliable Power Supply (2,257 beneficiaries) - Generator maintenance and repair - Supply of oil and consumables - Operations capacity development Power Supply Water Facilities Health Facilities 120 MW from Israel 27 MW from Egypt 60 MW from Gaza Power Plant (GPP) Power Distribution to Gaza Strip Projects that Covers all Gaza Strip - Mechanical and Electrical Refurbishment Water and Wastewater Facilities (800,000 Beneficiaries) - Emergency Rehabilitation and Refurbishment Wells ,Pumping Stations (800,000 Beneficiaries) - Emergency Intervention for Winterization and Cleaning Requirements (190,000 Beneficiaries) - Nahal Oz – Mekorot Connection Water Supply (400,000 Beneficiaries) MoH Hospitals VS No. of Beds 1 0 8 6 6 7 4 4 2 0 0 1 0 0 4 0 3 8 1 6 6 3 3 3 Gaza North Gaza Rafah Khan Yunis Middle Area Covering all Gaza Strip - Restock GEDCo warehouse Providing electrical material - Support the rehabilitation of Gaza power distribution network - Rehabilitate the electrical grid and restore the connection to WASH and Health facilities Support to the Health Sector 48 Shifa Nasser EGH Nasr Ped. Al Aqsa Kamal Edwan Al Dora Beit Hanun Tal Sultan Psychiatric Ophthalmic Najjar Wadi Gaza Nahal Oz Electromechanical Upgrade Rehab of Wells and PS’s Beit Lahia WWTP Winterization and Cleaning Rehab. Ps 5A and 7B Abasan Kabira BS Rehab. of Nasr Well Water and Wastewater Projects VS Beneficiaries Rehab of Beit Hanun PS Data Source: ICRC/ WatHab Quarterly Report/Jan-Dec 2015 Prepared By: Nibal Assaly/ICRC/WatHab Jer Date: 20 Jan. 2016 The WatHab activities are reported along the following categories: Water and Wastewater: covers activities WatHab implements in the water and power sectors in partnership with or to build the capacity of the Palestinian Water Authority (PWA), the Coastal Municipalities Water Utility (CMWU), and the Gaza Electrical Distribution Company (GEDCo) in Gaza. Emergency Preparedness: for the last 15 months, the ICRC closely works with PWA, CMWU, PENRA GEDCo and Ministry of Local Government (MoLG) to support the elaboration of Gaza water and power service providers' contingency planning, and implement the most needed emergency preparednes measures. Health : covers activities and projects supporting infrastructure, and non-medical equipment in Gaza hospitals in partnership with the Ministry of Health (MoH). Detention: covers support activities WatHab implements in permanent and temporary places of detention in Gaza in partnership under the respective management of the Ministry of Interior (MoI)’ General Administration of Rehabilitation and Reform Centers (GARRC) and Palestinian Police (PP). Power : covers support to GEDCo to restore Gaza power distribution system capacity and rehabilitate the electrical grid in order to restore the connection of essential public infrastructures 1 Million By End of 2015 15 Thousand 25 Thousand 42 Thousand 140 Thousand 190 Thousand 330 Thousand 240 Thousand 400 Thousand 800 Thousand 800 Thousand ! Ready? ! Ready? N

Upload: others

Post on 05-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gaza Strip: Water and Habitat Department- January-December … · 2016-03-21 · Due to Gaza 2014 war, essential water and sewage infrastructures damaged . WatHab objective to rehabilitate

Due to Gaza 2014 war, essential water and sewage infrastructures damaged . WatHab objective to rehabilitate these facilities so that by end of 2015, 500’000 people in Gaza will regain access to functional water and sanitation facilities

Wadi Gaza Environmental Improvement Lot 1 – Intermediate WWTP

(treatment capacity of 16'000m3/d ) Lot 2 – 4km of pressure line

three sewage pumps Lot 3 – Rehabilitation of Al-Nusirate

sewage pumping station(240,000 Bene�ciaries)

Emergency Repairing Wastewater Pumping Stations (42,000 Bene�ciaries)

Electromechanical Refurbishment Water Booster Station (75,000 Bene�ciaries)

Rehabilitation of Beit Lahia WWTP (330,000 Bene�ciaries)

Rehabilitation ofPump Stations 5A&7B(140,000 Bene�ciaries)

Rehabilitation of Abu Naser Well(15,000 Bene�ciaries)

Rehabilitation of Water and Sanitation Infrastructures in Gaza Strip

sewage pumping station sewage pumping station

Rehabilitation ofPump Stations 5A&7B(140,000 Bene�ciaries)

Wadi Gaza Environmental Improvement Lot 1 – Intermediate WWTP (treatment capacity of 16'000m3/d Lot 2 – 4km of pressure line

sewage pumping station sewage pumping station sewage pumping station

KHAN YUNIS

RAFAH

GAZANORTH

BeitLahiaLahiaLahia

Bani Suhaila

WadiWadiWadiGazaGazaGazaGazaGazaGaza

Support to the Power Sector

Gaza Strip: Water and Habitat Department- January-December 2015

Deficit50%

Deficit50%

Current Project Planning

Emergency Preparedness (1,723 bene�ciaries) - Application of 3M protective �lm

Hospitals Rehabilitaion (321 bene�ciaries)- Repair damage from 2014 con�ict

Securing Reliable Power Supply (2,257 bene�ciaries)- Generator maintenance and repair- Supply of oil and consumables- Operations capacity development

Power

Supply

Water

Facilities

Health

Facilities

120 MWfrom Israel

27 MWfrom Egypt

60 MWfrom Gaza Power

Plant (GPP) Power Distributionto Gaza Strip

Emergency Repairing Wastewater Pumping Stations (42,000

Emergency Repairing Wastewater Pumping Stations Emergency Repairing Wastewater Pumping Stations Emergency Repairing Wastewater Pumping Stations (

Emergency Repairing Wastewater Pumping Stations (

Emergency Repairing Wastewater Pumping Stations (

GAZA

Gaza

Lot 2 – 4km of pressure line three sewage pumps Lot 3 – Rehabilitation of Al-Nusirate sewage pumping station Lot 3 – Rehabilitation of Al-Nusirate sewage pumping station

three sewage pumps Lot 3 – Rehabilitation of Al-Nusirate sewage pumping station

(treatment capacity of 16'000m3/d Lot 2 – 4km of pressure line Lot 2 – 4km of pressure line three sewage pumps Lot 2 – 4km of pressure line three sewage pumps Lot 3 – Rehabilitation of Al-Nusirate sewage pumping station

Lot 2 – 4km of pressure line three sewage pumps Lot 3 – Rehabilitation of Al-Nusirate

Lot 2 – 4km of pressure line Lot 2 – 4km of pressure line KHAN YUNIS

Bani SuhailaBani SuhailaBani SuhailaBani Suhaila

Projects that Covers all Gaza Strip

- Mechanical and Electrical Refurbishment Water and Wastewater Facilities (800,000 Bene�ciaries)

- Emergency Rehabilitation and Refurbishment Wells ,Pumping Stations (800,000 Bene�ciaries)

- Emergency Intervention for Winterization and Cleaning Requirements (190,000 Bene�ciaries)

- Nahal Oz – Mekorot Connection Water Supply (400,000 Bene�ciaries)

Wadi Gaza Environmental Improvement Wadi Gaza Environmental Improvement Wadi Gaza Environmental Improvement

MDDLEAREA

Deir Al BalahAl Balah

Deir Al BalahAl Balah

NORTHBeit

LahiaBeit

HanunBeit

HanunHanunGazaGazaGazaGazaGaza

MoH Hospitals VS No. of Beds

108 66

744

2001004038

166

333 Gaza

North GazaRafah

Khan

Yunis

Middle

Area

Covering all Gaza Strip

- Restock GEDCo warehouse Providing electrical material

- Support the rehabilitation of Gaza power distribution network

- Rehabilitate the electrical grid and restore the connection to WASH and Health facilities

Support to the Health Sector

48Shifa

Nasser

EGH

Nasr Ped.

Al Aqsa

Kamal Edwan

Al Dora

Beit Hanun

Tal Sultan

Psychiatric

Ophthalmic

Najjar

Wadi Gaza

Nahal Oz

Electromechanical Upgrade

Rehab of Wells and PS’s

Beit Lahia WWTP

Winterization and Cleaning

Rehab. Ps 5A and 7B

Abasan Kabira BS

Rehab. of Nasr Well

Water and Wastewater Projects VS Beneficiaries

Rehab of Beit Hanun PS

Data Source: ICRC/ WatHab Quarterly Report/Jan-Dec 2015 Prepared By: Nibal Assaly/ICRC/WatHab Jer Date: 20 Jan. 2016

The WatHab activities are reported along the following categories:

Water and Wastewater: covers activities WatHab implements in the water and power sectors in partnership with or to build the capacity of the Palestinian Water Authority (PWA), the Coastal Municipalities Water Utility (CMWU), and the Gaza Electrical Distribution Company (GEDCo) in Gaza.

Emergency Preparedness: for the last 15 months, the ICRC closely works with PWA, CMWU, PENRA GEDCo and Ministry of Local Government (MoLG) to support the elaboration of Gaza water and power service providers' contingency planning, and implement the most needed emergency preparednes measures.

Health : covers activities and projects supporting infrastructure, and non-medical equipment in Gaza hospitals in partnership with the Ministry of Health (MoH).

Detention: covers support activities WatHab implements in permanent and temporary places of detention in Gaza in partnership under the respective management of the Ministry of Interior(MoI)’ General Administration of Rehabilitation and Reform Centers (GARRC) and Palestinian Police (PP).

Power : covers support to GEDCo to restore Gaza power distribution system capacity and rehabilitate the electrical grid in order to restore the connection of essential public infrastructures

1 Million

By End of 2015

15 Thousand

25 Thousand

42 Thousand

140 Thousand

190 Thousand

330 Thousand

240 Thousand

400 Thousand

800 Thousand

800 Thousand

!Ready?

!Ready?

N